Learning for Life
Duxbury Co-Located Middle & High School
Town of Duxbury
SHEPHERD
ENGINEERING
3Si
THE TEAM
UEC
OPM
Souza True &Partners
Frank Locker
� 50 Years of Service
� Professional and Technical Staff including:
� Registered Architects
� Recognized Educational Facilities Planners
� Interior Designers
� Licensed Construction Supervisors
� LEED Professional / Green Team
� In-House Specifications Writer
� 130 School Building Projects in Massachusetts
� $2.6 Billion ( today's $ ) in Construction
� No Legal Judgments
Mount Vernon Group Architects
Architecture Awards and Publications
� Responsive, Contextual, Functional Designs
� Flexible, Economical, Sustainable (Green)
� Maximum High Performance and High
Technology Features
� Fulfill Community Needs and Expectations
� Enhance Educational Attainment
The Mount Vernon GroupDesign Philosophy
Design Philosophy
GREEN Initiatives
Green Initiatives
Teaching Tool :
• Computer based monitoring system
• Monitor in public space displays power generation by
Renewable Energy :
• Photovoltaic
• Geothermal
Photovoltaic system and building energy usage.
GREEN/ Sustainable Design Goals
• Improves the learning environment
• Costs less to operate and maintain
• Protects the environment
Green Initiatives
The Incremental Costs & Benefits of Green Schools in Massachusetts(Including renewable energy costs, incentives and benefits)
Table 1: Total Project Statistics
Cost Benefits of Green Schools
Chicopee High School
Chicopee High School
Chicopee High School
Roosevelt Middle School
Normandin Middle School
Amesbury High School
Ashland High School
Ashland High School
Ashland High School
Ashland High School
Ashland High School
Ashland High School
Academic
Core / Community
Core / Community
Administration /
Support / Media
Sp
ine
Ashland Model High School Organization
Minnechaug Regional High School, Wilbraham, MA
General Bid Results
General Contractor Contract Price
Bidder $45,504,000
• 60 kw photo voltaic
• IT infrastructure
• Security system (camera's insideand outside school )
• Consumer lab 4 stations and teaching stations
• Full theatrical Auditorium ( 750 )
Cost per Square Foot
$198.00
• Science casework, fume hoods, washing machines, refrigerators, cabinets
• Kitchen equipment
• Driveways, Parking, Ball Fields & Utilities
• Fixed Gymnasium Equipment
Minnechaug RHS -General Bid Results
Model High School – Study Elevation
Model High School – Study Elevation
Minnechaug Regional High School
Manchester Essex Middle High School
Manchester Essex Middle High School
Manchester-Essex High School Manchester, Massachusetts
Manchester Essex Middle High School
Existing Conditions
Existing Traffic
Existing Traffic
Option 1 TrafficOption 1
Option 2 TrafficOption 2
Option 2
Option 1 - Construction – Phase 1 (Construct Middle School)Option 1
Option 1 - Construction – Phase 2 (Demolish Old Middle School, Construct High School)
Option 1
Option 1 - Old High School Site DevelopmentOption 1
Option 1 First Floor PlanOption 1
PAC
Vision Diagram
Option 1 Second Floor PlanOption 1
PAC
Vision Diagram
Option 1 Third Floor PlanOption 1
PAC
Vision Diagram
Existing Conditions
Option 2 - Construction – Phase 1Option 2
Option 2 - Completed ProjectOption 2
Option 2 Conceptual Site Plan
Organizational Diagram
Organizational Diagram
Organizational Diagram
Organizational Diagram
Organizational Diagram
Organizational Diagram
1st Floor Plan (with Auditorium)Option 2a
Vision Diagram
H.S. Entry
M.S. Entry
Community Entry
2nd Floor Plan (with Auditorium)Option 2a
Vision Diagram
3rd Floor Plan (Auditorium Scheme)Option 2a
Vision Diagram
Conceptual Site Plan
Elevation Study
Elevation Study
Elevation Study
Elevation Study
Elevation Study
Thank You