mount auburn street corridor study - mass.gov€¦ · • community feedback design changes •...

69
November 1, 2016 Russell Youth Community Center Mount Auburn Street Corridor Study

Upload: others

Post on 14-Jun-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

November 1, 2016 Russell Youth

Community Center

Mount Auburn Street Corridor Study

Page 2: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Commonwealth of Massachusetts

Governor Charles D. Baker

Lieutenant Governor

Karyn E. Polito

Energy and Environmental Secretary Matthew A. Beaton

Department of Conservation and Recreation Commissioner

Leo P. Roy

Page 3: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

DCR Mission Statement

To protect, promote and enhance our common wealth of natural, cultural

and recreational resources for the well-being of all.

Page 4: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Project Area

Page 5: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Schedule

Page 6: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Agenda

• Welcome

• Road Safety Audit Results

• Road Diet Analysis

• VISSIM Analysis – Early Results

• VISSIM Takeaways & Design Changes

• Community Feedback Design Changes

• Landscaping Ideas

Page 7: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Road Safety Audit Results

Page 8: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Crash Rate Comparison: 2011-2015 (5 years)

Page 9: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Crash Type Comparison

Page 10: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Crash Severity Comparison

Page 11: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Fresh Pond Parkway at Huron Avenue

• No overhead traffic signal indications – Poor visibility for existing signals

approaching from Fresh Pond Parkway

– Rear-end crashes on Fresh Pond Parkway NB and SB

– Red light running

• Left turns restricted, but only during peak hours – No “protected” (green arrow)

phasing; vehicles must turn left against oncoming traffic

– Crashes involving SB left-turning vehicles and NB through vehicles

Page 12: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Takeaways – Fresh Pond Parkway at Huron Avenue

• Install Overhead Signals

• Check yellow and “all red” signal phases

• Consider Restricting Fresh Pond Parkway Left Turns 24/7

Page 13: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Fresh Pond Parkway at Mount Auburn Street

• Large pavement area – Unclear vehicle paths – High-speed turns due to

large corner radii • Turns restricted due to geometry or

signal phasing – Motorists may make illegal turn rather

than attempt to find legal route – e.g. Fresh Pond Parkway southbound

vehicles looking for Mt. Auburn Hospital • Unclear lane use (Fresh Pond Parkway

southbound) – Wide enough for 3-4 lanes,

marked for 2 lanes

Page 14: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Fresh Pond Parkway at Mount Auburn Street (cont’d)

• Poor signal visibility – No overhead indications

at most approaches – Large intersection area

• Pedestrians must cross

Gerrys Landing Road in three stages – Two pedestrian crashes – Pedestrians more likely

to disobey signals with longer delay

Page 15: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Takeaways – Fresh Pond Parkway at Mount Auburn Street

• Reduce Pavement & Improve Markings

• Install Overhead Signals

• Remove 3rd Southbound Lane

• Reduce Pedestrian Delay

• Improve Pedestrian Crossings

Page 16: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Mount Auburn Street at Brattle Street/Aberdeen Avenue

• Brattle St. slip lane – Intersects Mt. Auburn St. just 100’

east of Aberdeen Avenue stop line • Rear-end crashes • Merge with traffic occurs within

queue for intersection – Stop line set back from

Aberdeen Avenue by 100’ • Signal Indications

– No overhead signals – poor visibility – Westbound left-turn lag phase –

left-turn and rear-end crashes – Aberdeen southbound left-turns get

little green time

Page 17: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Takeaways – Mount Auburn Street at Brattle Street/Aberdeen Avenue

• Install Overhead Signals

• Adjust signals at Aberdeen

• Remove Brattle/ Mt. Auburn Merge

• T-Up Intersection at Brattle

• Install New Signal at Brattle

• Create Signal-Protected Bike Crossing

Page 18: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Road Diet Analysis

Page 19: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Fresh Pond Parkway 4:3 Road Diet – AM Peak Queues

Page 20: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Fresh Pond Parkway 4:3 Road Diet – PM Peak Queues

Page 21: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Fresh Pond Parkway 4:3 Road Diet – Cut Through Streets

Page 22: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Review of Shared Goals

1. Calm traffic, provide clarity, reduce crashes and severity of crashes2. Improve connectivity, air quality and expand mobility choices by:

a. Measuring people, not carsb. Reducing transit delaysc. Improving safety, access, parking and comfort for bicycles.d. Maintaining mobility for motor vehiclese. Improving safety, attractiveness, noise, and comfort for pedestrians

and residents3. Address cut-through traffic in the Larchwood, Huron Village, and

Coolidge Hill Neighborhoods4. Offer short-term and long-term solutions5. Acknowledge enforcement and special uses by BB&N, Mt. Auburn

Cemetery, Mt. Auburn Hospital, Shady Hill, and Tufts Health Plan

Page 23: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Review of Shared Goals

1. Calm traffic, provide clarity, reduce crashes and severity of crashes 2. Improve connectivity, air quality and expand mobility choices by:

a. Measuring people, not cars b. Reducing transit delays c. Improving safety, access, parking and comfort for bicycles d. Maintaining mobility for motor vehicles e. Improving safety, attractiveness, noise, and comfort for

pedestrians and residents 3. Address cut-through traffic in the Larchwood, Huron Village, and

Coolidge Hill Neighborhoods 4. Offer short-term and long-term solutions 5. Acknowledge enforcement and special uses by BB&N, Mt. Auburn

Cemetery, Mt. Auburn, Shady Hill, and Tufts Health Plan

Page 24: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

VISSIM Traffic Analysis – Early Results

Page 25: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Person Throughput Analysis (AM Peak)

Percent Bus Vehicles = 2% Percent Bus Person Throughput = 43% Bus Throughput = 925 persons/hour Vehicle Throughput = 1,200 persons/hour

Percent Bus Vehicles = 3% Percent Bus Person Throughput = 56% Bus Throughput = 985 persons/hour Vehicle Throughput = 765 persons/hour

Page 26: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Bus Travel Time Option B*

Existing With Partial Bus Lanes and

Queue Jump

* With two-stage crossing

• About 2 minutes bus travel time savings with bus lanes

• About 3.5 minutes

reduction in 90th percentile travel time

Page 27: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Auto Travel Time Option B*

• Vehicle operations improve on Mt Auburn due to signal timing changes at Fresh Pond Parkway

Existing With Partial Bus Lanes and

Queue Jump

* With two-stage crossing

Page 28: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Bus Travel Time Option A*

Existing With partial bus lane and

queue jump Additional bus lane

between Homer and Aberdeen

* With two-stage crossing

• Additional bus lane provides over 2.5 minutes travel time savings

Page 29: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Auto Travel Time and Pedestrian Delay

Existing With single-stage crossing

at FP Two-stage crossing at FP

Page 30: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

VISSIM Traffic Analysis – Takeaways & Design Changes

Page 31: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

PLEASE NOTE: The following concepts are drafts; works in progress

shown only for the purpose of collecting public feedback for

their improvement.

Page 32: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

One-Stage Crossing becomes Two-Stage Crossing

DRAFT CONCEPT

Page 33: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Change to Aberdeen to Homer Lane Directions

DRAFT CONCEPT

Page 34: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Aberdeen to Brattle – Transit Lane Very Challenging

DRAFT CONCEPT

Page 35: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Community-Feedback-Driven Design Alternatives

Page 36: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Option A – Increase Safety / Eliminate Merging Movement

DRAFT CONCEPT

Page 37: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Option B – Maintain Merge Lane

DRAFT CONCEPT

Page 38: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Mount Auburn at Belmont Proposed Design

DRAFT CONCEPT

Page 39: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Mount Auburn at Belmont: Existing Volumes (AM Peak)

Page 40: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Mount Auburn at Belmont: Existing Volumes (PM Peak)

Page 41: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Mount Auburn at Belmont Proposed Design – No Change

DRAFT CONCEPT

Page 42: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Boat House Circulation – Option B

DRAFT CONCEPT

Page 43: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

BB&N and Boat House Circulation – Option A

DRAFT CONCEPT

Page 44: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Fresh Pond Parkway Midblock Crossing

• Concerns about: – Sight lines – RRFB visibility and

recognition – Speeds – Noise – Lack of desire line

DRAFT

Page 45: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Larch St. Left Restriction

• Concerns about: – Circulation

DRAFT

Page 46: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

New Option A – Maintain Existing Geometry

DRAFT

DRAFT CONCEPT

Page 47: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Raised Intersection, Stamped Asphalt or Both?

DRAFT CONCEPT

Page 48: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Raised Intersection, Stamped Asphalt or Both?

DRAFT CONCEPT

Page 49: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Raised Intersection, Speed Table, Stamped Asphalt or? Speed Table Feasibility Research: • Many different studies have shown that

speeds can be reduced anywhere from 1% to 21%, but they have rarely been used on high volume or high volume streets in the US.

• Typically they are used in a dense urban context or a side street residential context.

• Although speed tables are generally applied on low-speed facilities in the United States, they may have applications on approaches to high-speed intersections where low speeds are desired. (NCHRP 613)

Status: Continue to Study

Page 50: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Speed Activated Speed Limit Reminder Signs

FHWA cites 1 to 14% speed reductions

Page 51: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Gateway Treatments

Page 52: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Speed Limit Enforcement Cameras

Page 53: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Speed Limit Enforcement Cameras – Legislation

Page 54: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Star Market Driveway

Page 55: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Star Market Driveway – Option A

DRAFT CONCEPT

Page 56: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Star Market Driveway – Option B

DRAFT CONCEPT

Page 57: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Landscaping Ideas

Page 58: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Fresh Pond Parkway Street Trees

FIRST PLANTINGS LIKELY SPRING 2018

Page 59: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Star Market Plaza Scheme 1

DRAFT CONCEPT

Page 60: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Star Market Plaza Scheme 2

DRAFT CONCEPT

Page 61: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Brattle Plaza Scheme 1

DRAFT CONCEPT

Page 62: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Brattle Plaza Scheme 2

DRAFT CONCEPT

Page 63: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Preferred Entrance into Star Market

Page 64: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Short Term Option

Page 65: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Mt. Auburn Street at Fresh Pond Parkway — Short-Term

DRAFT CONCEPT

Page 66: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Mt. Auburn Street at Fresh Pond Parkway — Short-Term

DRAFT CONCEPT

Page 67: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

We Want Your Feedback

• Please leave your comments on the roll plans around the room

Page 68: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

Next Steps

• Second Public Meeting: November 14 – Long and short-term options, their benefits and traffic analysis – Please bring your friends and neighbors!

• Final Stakeholder Group Meeting and Public Meeting: January

Page 69: Mount Auburn Street Corridor Study - Mass.Gov€¦ · • Community Feedback Design Changes • Landscaping Ideas . Mount Auburn Street Corridor Study Road Safety Audit Results

Mount Auburn Street Corridor Study

For More Information:

• Project Website: www.mass.gov/dcr/mt-auburn-corridor-study • If you have comments or suggestions on this project:

– Submit online at: http://www.mass.gov/eea/agencies/dcr/public-outreach/submit-public-comments/

– Write: Department of Conservation and Recreation, Office of Public Outreach, 251 Causeway Street, Suite 600, Boston, MA 02114

– Deadline (pertaining to this meeting): Thursday, 10/15/16 • Note: Public comments submitted to DCR may be posted on the DCR

website in their entirety. • If you have questions, please email:

[email protected]