Page 1: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

November 14, 2016 Shady Hill School

Mount Auburn Street Corridor Study

Page 2: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Commonwealth of Massachusetts

Governor Charles D. Baker

Lieutenant Governor

Karyn E. Polito

Energy and Environmental Secretary Matthew A. Beaton

Department of Conservation and Recreation Commissioner

Leo P. Roy

Page 3: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

DCR Mission Statement

To protect, promote and enhance our common wealth of natural, cultural

and recreational resources for the well-being of all.

Page 4: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Agenda

• Welcome

• History – Shared Goals

• Short-term Concept

• Long-term Concepts

Page 5: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Project Area

Page 6: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Schedule

Page 7: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Project Overview

Page 8: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Spring 2016: Gathering Public Input and Setting Goals

• April – Site Walk • 5/5 Stakeholder meeting • 6/1 Public Meeting • Wikimap: May to June • Targeted briefings

Shared Goals Adopted: June 23, 2016

Page 9: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Shared Goals

1. Calm traffic, provide clarity, reduce crashes and severity of crashes

2. Improve connectivity, air quality and expand mobility choices by: a. Measuring people, not cars b. Reducing transit delays c. Improving safety, access, parking and comfort for bicycles. d. Maintaining mobility for motor vehicles e. Improving safety, attractiveness, noise, and comfort for pedestrians

and residents

3. Address cut-through traffic in the Larchwood, Huron Village, and Coolidge Hill Neighborhoods

4. Offer short-term and long-term solutions

5. Acknowledge enforcement and special uses by BB&N, Mt. Auburn Cemetery, Mt. Auburn, Shady Hill, and Tufts Health Plan

Page 10: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Summer 2016: Developing Concepts

• July 21 – Major intersections – Mt. Auburn at Fresh Pond – Mt. Auburn at Brattle

• August 18 – Major intersections – Gerry’s Landing Interchanges – Fresh Pond at Huron and Brattle – Explored Alternative Approaches

• Fresh Pond at Mt. Auburn Underpass, Roundabout, or Rotary

Page 11: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Summer 2016: Developing Concepts

2 1 8

0 0 9

Page 12: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Fall 2016: Refining and Advancing Concepts

• September 15 – Introduction to transit priority – Mt. Auburn at Belmont – Refinements to:

• Gerry’s Landing 2-T • Fresh Pond at Huron and Brattle

– Plaza Charrette – Short-term Improvements

• November 11 – Parkway Road Diet Feasibility – Transit Priority in Depth – Landscape Improvements – Project-wide Design Concepts:

• Option A and Option B – VISSIM Proof of Concepts – Road Safety Audit (RSA) Results

Page 13: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

RSA Results Supportive of Concepts

Some Overall Recommendations: – Reduce Pavement Area Where Excessive – Clarify Signage, Signals, and

Pavement Markings – Tighten Turns to Reduce Speed and

Pedestrian/Vehicle Conflicts – Improve Pedestrian and Bicycle Conditions

Page 14: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

PLEASE NOTE: The following concepts are drafts;

works in progress shown only for the purpose of collecting public feedback for their improvement

Page 15: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Short-term Concept

Page 16: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Mt. Auburn Street at Fresh Pond Parkway

Additional Short-term Improvements: • Signal Improvements • Dedicated Bus Lane

Page 17: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Long-term Concept

Page 18: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

North of Mount Auburn Street

Page 19: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Fresh Pond Parkway: North of Mount Auburn Street

Page 20: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Tactics Used to Reach Shared Goals

• Narrow Lanes • Enhance

Neighborhood Feel

Page 21: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Relevant Plans

Highway Safety Imp. Program Crash Clusters (2011-13)

Lowell Park Cultural Landscape Report (2014)

Huron Ave Reconstruction (2013-16)

Page 22: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Road Diet for Traffic Calming

Page 23: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Tree Replacements for Traffic Calming

FIRST PLANTINGS LIKELY SPRING 2018

Page 24: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Gateway Treatment Opportunity?

Page 25: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Raised Intersection, Stamped Asphalt, or Both?

Page 26: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Huron Avenue at Fresh Pond Parkway

Page 27: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Calming Neighborhood Cut-throughs in Larchwood

• Speed Tables

• Raised Crossings

• Speed Humps

Page 28: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Option A: Maintain Existing Geometry

DRAFT

DRAFT CONCEPT

Page 29: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Other Things We Tried: Circulation Change, Mid-Block Crossing

• Concerns About: – Circulation – Sight lines – RRFB Visibility

and Recognition – Speeds – Noise – Lack of Desire Line

DRAFT

Page 30: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Brattle Street at Fresh Pond Parkway

Page 31: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Other Things We Tried: 4:3 Road Diet

A.M. QUEUES

Page 32: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Other Things We Tried: 4:3 Road Diet

P.M. QUEUES

Page 33: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Other Things We Tried: 4:3 Road Diet – Impacts

Page 34: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

South of Mount Auburn Street

Page 35: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Gerry’s Landing: Option A

Page 36: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Gerry’s Landing: Option B

Page 37: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Gerry’s Landing: Tactics Used

• Increase Parkland

• Road Diet

• Lane Narrowing

• Protected Bike Lane

• Shorten Pedestrian Crossings

• T-up Intersections

• Organize School and Boathouse Curb Use

Page 38: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Gerry’s Landing: Relevant Plans

Cambridge Riverfront Plan (2011)

Charles River Connectivity Study (2014)

Greenough Boulevard Road Diet

Page 39: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Gerry’s Landing: Main Flow of Traffic

Blue Arrows Show High Volume Movement

Page 40: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Road Diet and Lane Narrowing

Page 41: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Pedestrian Crossings Improved

One-Stage Crossings

Page 42: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Organize Curb Use: Option A

Page 43: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Organize Curb Use: Option B

Page 44: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Additional Benefit: 4+ Acres of New Accessible Open Space

Page 45: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Greenough Side: New Parkland

Page 46: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Park Programming Exercise

1.6 ACRES OF 3.5 TOTAL

Page 47: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

What Can This Look Like?

THE LAWN ON D

Page 48: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

What Can This Look Like?

HARVARD UNDERPASS PARK

Page 49: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

How Would You Like to Use This Space?

Page 50: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Eliot Bridge Intersection

Page 51: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Other Things We Tried

• Double Roundabout • Crossover Diamond

Page 52: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Mount Auburn Street

Page 53: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Mount Auburn Street: Option A Mount Auburn Street: Option A

Page 54: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Mount Auburn Street: Option B

Page 55: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Tactics Used

• Road Diet

• Bus-only Lanes

• Bus Signal Queue Jump

• Eliminate Merge

• T-up Intersection

• Protected Two-stage Turn Queue

• Bicycle-only Slip Lanes

Page 56: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Relevant Plans Highway Safety Imp. Program

Crash Clusters (2011-13) Watertown Comprehensive Plan (2013)

Cambridge Bicycle Plan (2015)

MBTA Key Bus Route Improvement Program (2013)

Cambridge Transit Strategic Plan (2014)

Watertown Bicycle Transportation Plan (2003)

Strawberry Hill Neighborhood Plan (2003)

Page 57: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Belmont Street at Mount Auburn Street: Option A

Page 58: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Cambridge - Watertown Greenway Connection: Option A

Page 59: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Bicycle Slip Lane

Page 60: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Star Market Driveway

Page 61: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Eliminate Lefts into Star Market Driveway: Option A

Page 62: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Eliminate Lefts into Star Market Driveway: Option B

Page 63: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Homer Street Entrance into Star Market

Page 64: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Star Market Plaza Concepts – Please Leave Your Comments

Page 65: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Star Market Plaza Concepts – Please Leave Your Comments

Page 66: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

At Brattle Street

MOUNT AUBURN

Page 67: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

At Brattle Street: Option A

Page 68: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

At Brattle Street: Option B

Page 69: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

At Brattle Street: RSA Recommends T-up of Intersection

Page 70: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

At Brattle Street: T-up Intersection (Option A)

Page 71: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Signal Warranted

• Peak-hour, Four-hour Volumes Warrant a Traffic Signal, Estimates for Eight-hour Volumes also Warrant a Signal (MUTCD 2009)

Page 72: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

At Brattle Street: Bike Desire Line Study

Page 73: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Bicycle-only Slip Lane

Page 74: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Landscaping Opportunity – Please Leave Your Comments

Page 75: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Landscaping Opportunity – Please Leave Your Comments

Page 76: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Other Things We Tried: Fifth Lane

Page 77: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Other Things We Tried: Fifth Lane (at Aberdeen)

Page 78: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Other Things We Tried: Fifth Lane (at Brattle)

Page 79: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Other Things We Tried: Westbound Bike Lane

AM PEAK

Page 80: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Other Things We Tried: Westbound Bike Lane

PM PEAK

Page 81: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Other Things We Tried: Maintain Merge (Option B)

Page 82: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Fresh Pond Parkway at Mount Auburn

Page 83: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Fresh Pond Parkway and Mt Auburn Street: Tactics Used

• Road Diet

• Reduce Pavement

• Raised Pedestrian Crossing

• Reduce Pedestrian Crossing Time

• Bicycle Crossing

• Two-way Protected Bike Lane

Page 84: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Fresh Pond Parkway at Mount Auburn Street

Page 85: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Reduce Pavement

363 feet

376 feet

Page 86: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Reduce Pavement

212 feet

295 feet

Page 87: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Single to Two-stage Crossing

Page 88: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

New Bike Crossing

Page 89: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Pedestrian Crossing Operations

72 feet

22 feet

18 feet 34 feet

35 feet

Page 90: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Road Safety Audit Finding: Reduce Left-turn Violations

Page 91: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Other Things We Tried: Roundabout

Page 92: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Roundabout Feasibility: Residential Impacts

.22 acres and two homes

Page 93: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Roundabout Feasibility: Avoiding Residential Impacts

Page 94: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Roundabout Feasibility: Parkland Impacts

.48 acres

Page 95: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Roundabout Feasibility: La Rotonda Size Comparison

Page 96: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Other Things We Tried: Underpass

Page 97: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Other Things We Tried: Two Different Double T’s

Page 98: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Introduction to Transit Priority

Page 99: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Bus-only Lane and Transit Signal Priority

Page 100: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

VISSIM Traffic Analysis

Page 101: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

VISSIM Animations

• Existing Conditions • Long Term Option A

Page 102: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Person Throughput Analysis (AM Peak)

Percent Bus Vehicles = 2% Percent Bus Person Throughput = 43% Bus Throughput = 925 persons/hour Vehicle Throughput = 1,200 persons/hour

Percent Bus Vehicles = 3% Percent Bus Person Throughput = 56% Bus Throughput = 985 persons/hour Vehicle Throughput = 765 persons/hour

Page 103: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Bus Travel Time Option B (AM Peak)

Existing With Partial Bus Lanes and

Queue Jump

• About 2 minutes bus travel time savings with bus lanes

• About 3.5 minutes

reduction in 90th percentile travel time

Page 104: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Auto Travel Time Option B (AM Peak)

• Vehicle operations improve on Mt Auburn due to signal timing changes at Fresh Pond Parkway

Existing With Partial Bus Lanes and

Queue Jump

Page 105: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Bus Travel Time Option A (AM Peak)

Existing With partial bus lane and

queue jump Additional bus lane

between Homer and Aberdeen

• Additional bus lane provides over 2.5 minutes travel time savings

Page 106: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Auto Travel Time and Pedestrian Delay Option A (AM Peak)

Existing With single-stage

crossing at FP Two-stage crossing at FP

Page 107: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Bus Travel Time Option A (PM Peak)

Existing With Two-Stage Crossing and 4-Lane Section

• About 1 minutes bus travel time savings with bus lanes in the eastbound direction

• Westbound bus travel

time increases slightly (less than 0.5 minutes) as a result of lane repurposing

Page 108: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Auto Travel Time Option A (PM Peak)

Existing With Two-Stage Crossing and

4-Lane Section

Page 109: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Operations at Elliot Bridge and Memorial Drive (PM Peak)

Elliot Bridge Approach Delay and Queue (PM Peak)

Page 110: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

We Want Your Feedback

Please leave your comments on the roll plans around the room, and leave your park exercise on the sign in table when you leave.

Page 111: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

Next Steps

• Final Stakeholder Group Meeting and Public Meeting: January 2017

Page 112: Mount Auburn Street Corridor Study - Mass.Gov · 2017-08-27 · • Fresh Pond at Huron and Brattle – Plaza Charrette – Short-term Improvements • November 11 – Parkway Road

Mount Auburn Street Corridor Study

For More Information:

• Project Website: www.mass.gov/dcr/mt-auburn-corridor-study

• If You Have Comments or Suggestions on This Project: – Submit online at: http://www.mass.gov/eea/agencies/dcr/public-

outreach/submit-public-comments/ – Write: Department of Conservation and Recreation, Office of Public

Outreach, 251 Causeway Street, Suite 600, Boston, MA 02114 – Comment Period (pertaining to this meeting):

Monday, November 14 – December 28, 2016

• Note: Public comments submitted to DCR may be posted on the DCR website in their entirety.

• If You Have Questions, Please E-mail: [email protected]