moshtak cv 2016 pic

6
Moshtak Jassim Mob: IRQ: +964 7736785857 or TRK: +90 553 017 2011 [email protected] & [email protected] 1 Name Moshtak Naji Jasim Profession Civil Engineer Date of Birth 5/3/1963 Nationality: Iraqi Years of Experience 30 Years Marital status: Married, two children. E-MAIL: [email protected] , [email protected] Tel. TRK: +90 553 017 2011 , IRQ: +964 7736785857 Residency: Iraq- Baghdad and Turkey - Istanbul Objective A career with an international company with a global focus requiring a professional skilled in civil engineering with proven ability as a manager, project engineer, expert communicator, creative problem solver, critical thinker and team builder and leader. A position that will allow me to grow and develop while working alongside of local and foreign workers. Qualifications: An expert experienced Civil Engineer worked as project manager, construction manager, project engineer and consultant for many construction projects, e.g. Oil and gas, infrastructure projects- water treatment plant, sewage treatment plant, water supply, sewage system – Airstrips, agricultural land reclamation, irrigation canals, drainage, multi-story buildings, highways, bridges. Speak English fluently Member of the Iraqi Engineers Union -1985. Education: - B.Sc. Engineering- Engineering collage- Baghdad University 1985. Other Training: - GIS (geographic information system) distance course, ITC- Netherlands, 2007. - Auto CAD, Land Devolvement training Cores - Arc Map training Cores Computer Skills: Microsoft office. AutoCAD Civil 3D Autodesk Land Development. Languages: Arabic – Mother language English – Fluent, ILETS Certificate.

Upload: moshtak-jelawi

Post on 17-Jan-2017

23 views

Category:

Documents


0 download

TRANSCRIPT

Moshtak Jassim Mob: IRQ: +964 7736785857 or TRK: +90 553 017 2011

[email protected] & [email protected]

1

Name Moshtak Naji Jasim

Profession Civil Engineer

Date of Birth 5/3/1963

Nationality: Iraqi

Years of Experience 30 Years

Marital status: Married, two children.

E-MAIL: [email protected] , [email protected]

Tel. TRK: +90 553 017 2011 , IRQ: +964 7736785857

Residency: Iraq- Baghdad and Turkey - Istanbul

Objective

A career with an international company with a global focus requiring a professional skilled in civil engineering with proven ability as a manager, project engineer, expert communicator, creative problem solver, critical thinker and team builder and leader. A position that will allow me to grow and develop while working alongside of local and foreign workers.

Qualifications:

An expert experienced Civil Engineer worked as project manager, construction manager, project engineer and consultant for many construction projects, e.g. Oil and gas, infrastructure projects- water treatment plant, sewage treatment plant, water supply, sewage system – Airstrips, agricultural land reclamation, irrigation canals, drainage, multi-story buildings, highways, bridges. Speak English fluently Member of the Iraqi Engineers Union -1985.

Education:

- B.Sc. Engineering- Engineering collage- Baghdad University 1985.

Other Training:

- GIS (geographic information system) distance course, ITC- Netherlands, 2007.

- Auto CAD, Land Devolvement training Cores

- Arc Map training Cores

Computer Skills:

Microsoft office.

AutoCAD Civil 3D

Autodesk Land Development.

Languages:

Arabic – Mother language

English – Fluent, ILETS Certificate.

Moshtak Jassim Mob: IRQ: +964 7736785857 or TRK: +90 553 017 2011

[email protected] & [email protected]

2

Employment Record:

6/2010 – 18/03/2015

Employer: OMV

(Yemen Block S2) Exploration GmbH

Faj Attan, Beirut St., Hadda Zone P.O. Box: 15361 Sana'a, Republic of Yemen

Position: Project Engineer

Projects : 1. Central Processing Facility - capacity 30 000 barrel per day

2. Export Pipeline, 16 inch, 123 km, from Block S2 to Safir Central Processing Unit. Capacity 80 000 barrel per day.

3. Two Early Production Facilities project, capacity 10 000 barrel per day for each.

4. Field Gathering System. 70 km 6 inch and 4 inch pipelines.

5. Diesel Storage Facility- capacity 4000 barrel

6. Sewage Treatment Plant

7. Infrastructure projects:

Airstrip

Services Camps and Warehouses

Military Camp and Main Gate

Duties: The role is to provide technical guidance, leadership and direction in a project engineering role.

As a Project Engineer I am responsible for preparing of tender documents of the projects and, on site, ensuring the projects are executed in adherence to all applicable codes and standards. I assist in the scoping, regulatory and approval activities of projects, and monitor the engineering consulting firm’s progress in budgeting, planning, scheduling, coordination and execution of work related to projects. I also provide project support in planning of future infrastructure projects.

Key Responsibilities:

Preparing engineering tendering documents; ITT, Project Statement of Requirements, SOW, Basis of Design, Specifications...etc.

Work with the Project Manager and as part of a corporate multi-department team to scope, plan, develop and execute a variety of projects for OMV oil facilities. I am responsible for multiple projects.

Work closely OMV engineering department, construction management team, and asset development team to plan, schedule, implement and ensure the proper execution of various infrastructure projects.

Proactively monitor cost and schedule against deliverables for the various infrastructure projects, and work to resolve any delays or scheduling issues.

Moshtak Jassim Mob: IRQ: +964 7736785857 or TRK: +90 553 017 2011

[email protected] & [email protected]

3

Participate in design reviews and projects meetings. Ensure all activities comply with regulatory, safety, and environmental

policies, procedures and approvals. Coordinate project development on these activities with the appropriate consultant authorities.

Assist in project managing and planning and making key decisions. Troubleshoot and resolve a variety of technical issues. Manage interface between engineering and construction and provide support

where necessary. Initiate service requisitions and service orders.

1/2009 – 2/2010

Employer: Consulting Engineering Center, International – CECI (Sajdi And Partners)

Project : Al Kowlah Jabal Rass Rural Road Project – Al Hudaidah Governorate –Yemen

Ministry of Public Work and Highways – Rural Access Project (RAP)

Position: Resident Engineer

Description:

10.5 km Asphaltic Road in mountain area 4.7 km road of Cyclopean Pavement 33 Culverts. 6.5 km of Retaining Walls. Two 50m Irish Crossings

2/2005 – 12/2008

Employer: Harza Engineering Company International

In Associated With Montgomery Watson Arabtech Jardeneh

Project : Urban Water Supply And Sanitation Project Sana'a Water Distribution Systems Improvements.

Construction Consultant

Description: 60 km Ductile Iron Pipes (800, 600, 500, 400, 300, 200 and 150mm Diameter).

450 km High Density Pole Ethylene HPDE (125, 63, 32 and 25mm diameter).

13000 house connections. The valves and accessories (Isolation Vales, Air valves, Washouts,

Water meters, saddles, ferrules ….etc).

240 chambers for isolation valves, air valves, washouts and fire hydrates.

105 000 Sqm asphalt works. Water treatment plant.

Position: Site Consultant Engineer

Duties: Site Engineer, Quantity Surveyor, Topographic Surveying Engineer, Mapping, And Drafting. Site supervising Quantity Surveying.

Moshtak Jassim Mob: IRQ: +964 7736785857 or TRK: +90 553 017 2011

[email protected] & [email protected]

4

Supervise the pre-construction and post-construction topography mapping.

Supervise plotting as-built records to Sana’a base map. 4/2007 – 10/2007

Employer: AL-EIN Est

Project : Al Ahli and Al Shaab Stadiums Field Turf Synthetic Grass Soccer.

Position: Construction Manager. Part time.

12/2003 – 2/2005

Employer: H.T.C (Al Hashedi For Trading And Contracting) Yemen International - (Canadian Nexen).

Project : Main Oil Line Re-Route Pipeline 24”

24 inches Imbedded protected steel pipeline 22.5 km lengths and parallel Service Road.

22.5 km route vertical and horizontal geometric design. Supervise the civil work including 22.5 Km Gatch road, protections,

gabions works and three valve stations. Supervise of 500,000 cum rock removal by blasting. Quantity Surveyor. Preparing topographic maps using GPS and Total Stations, and

transferring the data to AutoCAD files.

Bending Engineering

As built record and drawings in digital format.

Position: Civil Engineer

Duties: Civil Engineering, Surveying Engineering And Quantity Survey

2/2002 – 12/2003

Employer: Al Negashi Contracting Bureau

Project : Ain Ali - Al Dafeer Bridge - Hajja

One Span Concrete Bridge With Pre-Cast Concrete Girders

Position: Construction Manager. 1/2001 – 3/2002

Employer: Internasionale De Development Et De Construcsion – I D C (Lebanon)

Project : Sana’a Hotel- Movenpik

Construction of The Largest Hotel Building In Yemen

Position: Chief Surveying Engineer And Quantity Surveyor.

Duties: Civil engineering surveying works for the Project including drafting and plotting survey data to Auto CAD files.

11/1999 –12/2000

Moshtak Jassim Mob: IRQ: +964 7736785857 or TRK: +90 553 017 2011

[email protected] & [email protected]

5

Employer: Hawk International Co.( ISO 9002)

Project : East Shabwa Project

Supervise the civil work including 17.5 Km road.

Central Processing Unit (CPU) second phase construction.

17 km 16 inch pipelines.

Masela Site (Canadian Nexen)

65km -16 inch Oil pipeline and parallel Service Road.

Hodeida – Al Katheeb Saleef Road Project.

48km asphaltic road

Position: Civil, Surveying Engineer And Quantity Surveyor, Mapping And Drafting.

9/1998 – 11/1999

Employer: Al Towity National Contracting And Engineering Corporation

Projects : 1. Wadi Hammam Irish Crossing Project and Azzan Bridge.

2. Construction of 4km road -1km concrete pavement and 3km asphaltic road- with masonry side protections work.

3. Construction of (311m) bridge crossing Wadi Azzan with 11 spans..

Position: Civil, Surveying Engineer And Quantity Surveyor.

Responsibilities: Horizontal and vertical geometric re-design.

Construction engineer.

Quantity surveyor.

All the surveying works

Prepare the as-built drawings in digital format. 2/1994- 9/1998

Employer: Al Furat Center For Studies and Designs for Irrigation And Reclamation Projects

Ministry Of Irrigation.

Position: Chief of Surveying Department

Duties: Consulting Engineering

Project : 1. Design and supervise 243 km roads.

2. Five Small Dams Project in the western desert of Iraq- survey and study.

3. 200km drains in Karkok Project north of Iraq- topographic survey and quantities survey.

4. 550km Main Drain in south of Iraq- survey and executions supervision.

5. 285km main canal in south of Iraq- survey and executions

Moshtak Jassim Mob: IRQ: +964 7736785857 or TRK: +90 553 017 2011

[email protected] & [email protected]

6

supervision.

6. 48km main drain in the south east of Iraq- survey and executions supervision.

6/1991- 2/1994

Employer: State Establishment for Heavy Engineering Equipment.

Position: Civil And Surveying Engineer.

Project : 1. Design and supervise 18km road branched from amrea-mosaib road to petrochemical complex project

2. Communication tower in Baghdad (1992) of 204m heights in which 80m concrete constructed by slip molded system and 124m steel structure.

3. Dora power station chimney in Baghdad 100m height slip mold concrete structure.

1989-1991

Employer : Petrochemical Project (PC2) –

Ministry of Industry.

Project : Petrochemical Complex Number Two in IRAQ (PC2)

Duties: Resident Engineer.

Description:

25 km roads, 4 large industry units, 2 multistory buildings, 4 large steel structure warehouses and 10 000 employee housing village.

1985-1989

Employer : Directorate Of Military Engineering And Directorate Of Military Surveying

Ministry Of Defiance

Projects: Design and supervise the execution for 155 km of roads and several housing and facility buildings.