mortezagholi osanloo - amirkabir university of technology

17
Amirkabir University of Technology (Tehran Polytechnic) MortezaGholi Osanloo Professor Department of Mining Engineering (Emeritus) Email: osanloo aut.ac.ir Phone: h-index (Scopus): 24 Citations (Scopus): 1662 Supervised PhD Theses # Thesis title By Date 1 Open pit iron mines reclamation cost estimation with regard to post mining land uses Mir Sina Amirshenava & Mortezagholi Osanloo December 2021 2 Determination of optimum transition depth from open pit to underground mining under geological and economic uncertainty Ali Soltani Khaboushan & Mortezagholi Osanloo July 2020 3 Optimization of in- pit crushing and conveying system plan in deep open pit mines Morteza Paricheh & Mortezagholi Osanloo February 2020 4 [Long - Term Open pit Optimum Production Planning with the Objective of Minimizing the Risk of Grade Variance] Javad Gholam Nejad & Mortezagholi Osanloo March 2007 Supervised MSc Theses # Thesis title By Date 1 Small Scale Mining and Sustainable Development Indexes Nima Samadinia & Mortezagholi Osanloo February 2022 2 Selection of the most suitable open pit mined land useas considering the effects of climate condition and type of mineral Seyed Ali Mirbagheri & Mortezagholi Osanloo October 2021 3 using Semi- quantitative Methods to evaluate the Positive and Negative effects of Different Mining Stages on Sustainable Development Indexes Mahdi Hosseinpour & Mortezagholi Osanloo March 2021

Upload: others

Post on 22-Apr-2022

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MortezaGholi Osanloo - Amirkabir University of Technology

Amirkabir University of Technology(Tehran Polytechnic)

MortezaGholi OsanlooProfessor Department of Mining Engineering (Emeritus)

Email:osanloo aut.ac.ir

Phone:

h-index (Scopus):24Citations (Scopus):1662

Supervised PhD Theses

# Thesis title By Date

1 Open pit iron mines reclamation cost estimation with regard to post miningland uses

Mir Sina Amirshenava &Mortezagholi Osanloo

December2021

2 Determination of optimum transition depth from open pit to undergroundmining under geological and economic uncertainty

Ali Soltani Khaboushan &Mortezagholi Osanloo

July 2020

3 Optimization of in- pit crushing and conveying system plan in deep open pitmines

Morteza Paricheh &Mortezagholi Osanloo

February2020

4 [Long - Term Open pit Optimum Production Planning with the Objective ofMinimizing the Risk of Grade Variance]

Javad Gholam Nejad &Mortezagholi Osanloo

March2007

Supervised MSc Theses

# Thesis title By Date

1 Small Scale Mining and Sustainable Development Indexes Nima Samadinia &Mortezagholi Osanloo

February2022

2 Selection of the most suitable open pit mined land useas considering theeffects of climate condition and type of mineral

Seyed Ali Mirbagheri &Mortezagholi Osanloo

October2021

3 using Semi- quantitative Methods to evaluate the Positive and Negativeeffects of Different Mining Stages on Sustainable Development Indexes

Mahdi Hosseinpour &Mortezagholi Osanloo

March2021

Page 2: MortezaGholi Osanloo - Amirkabir University of Technology

4 Determination of reliable ultimate pil limits in open-pit Iron ore mine withthe objective of maximizing the accuracy of mines life cycle

Mohammadmahdi Akbari& Mortezagholi Osanloo

January2020

5 Pre-mature closure prediction model in open-pit iron mines and its effecton sustainability index

Mahdi Pouresmaieli &Mortezagholi Osanloo

September2019

6 Mine Cutoff grade Modeling in Iron Ore Open Pit Mining Considering multiand different destinations

Mohammad Barbari &Mortezagholi Osanloo

February2019

7 prediction of reliable stable slope in iron open pit mines consideringprobability of different failure modes

Behnam Mazhari Kadijani& Mortezagholi Osanloo

February2019

8 Determination of Ultimate Pit Limit in Open-pit Mine Considering Royalty Hamid Mergani &Mortezagholi Osanloo

April 2018

9 Block stone productivity valuation of quarry mines using geomechanicalproperties of rock mass

Arman Hazrathosseini &Mortezagholi Osanloo

October2017

10 optimization of open pit mine push backs under geomechanical parametersuncertainty

Alireza Kamrani &Mortezagholi Osanloo

February2017

11 Modeling the reliability of production rate in open pit mines Eftekhar Eskandari &Mortezagholi Osanloo

December2016

12 Minimizing the waiting time of hetrogeneous loading and haulage systemsin an open pit mine

Mohsen Rahmani Boldaji &Mortezagholi Osanloo

October2016

13 Optimization of fuel consumption of dump truck in open-pit mines Casestudy: sirjan, golgohar number3

Mehrshad MirzaeianKhamseh & MortezagholiOsanloo

October2015

14 Investigation of Sustainable Developments Indexes and Its Role on OpenPit Mines Design

Golnaz Moradi &Mortezagholi Osanloo

January2015

15 The Possibility of Selecting Conveyor-In Pit Crusher System In Open PitMining Under Production Uncertainty

Morteza Paricheh &Mortezagholi Osanloo

October2014

16 evaluation of sarcheshmeh taransportation system productivity bystatistical

Amir Amarloo &Mortezagholi Osanloo

October2014

17 Multi-facility location selection in base metal open pit mines Mehrdad Fazeli Salmani &Mortezagholi Osanloo

March2014

18 Prediction of open pit mining machines performance (Drilling, loading,hauling system) using maintainability and reliability analysis

Zeynab Allah Karami &Mortezagholi Osanloo

October2013

19 modeling the reliable break even cut-off grade in open pit copper mines Mansoor BabazadeMasjedy & MortezagholiOsanloo

October2013

20 Optimum deep of open-pit mines with regard to reclamation cost Hossein Sheikhi &Mortezagholi Osanloo

October2013

21 New Approach to Overall Stripping Ratio with Numeration of Dilution Factor Mohammad Shahaby Pooi& Mortezagholi Osanloo

February2013

22 short term production scheduling in Jajarm Bauxite mine (Tagoie) usinglinear

Hamid Dehghani &Mortezagholi Osanloo

February2013

23 Open-pit mines design under pit slope uncertainty Ali Moradi Afrapoli &Mortezagholi Osanloo

February2013

24 Determinatiion of Mine Phases Under Commodity Price Uncertainty Sara Feyzi Behnagh &Mortezagholi Osanloo

January2013

Page 3: MortezaGholi Osanloo - Amirkabir University of Technology

25 Optimum Selective Mining Unit (SMU) and its impact on estimation of orereserve and open-pit mine design: case study copper mines

Rasul Ebrahimi Saatlou &Mortezagholi Osanloo

February2012

26 Developing A Model for Predication of Optimum Drilling Speed byMonitoring The Data While Drilling Blasthole: Case study Iron Mine of Iran

Kazem Brosmand &Mortezagholi Osanloo

February2012

27 Prediction of minable copper reserve - case study: sngun copper mine Fazlollah Ghasemi &Mortezagholi Osanloo

February2012

28 Determinatiuon of optimum cut off grade in iron ore mines with regard toreducing the most important undesirable environmental effects

Somayye Narrei &Mortezagholi Osanloo

January2012

29 modeling of Milad Barzegar Toochahi& Mortezagholi Osanloo

February2011

30 Optimum Hossein Abbaspour &Mortezagholi Osanloo

January2011

31 influence of Mohsen Ghanbari &Mortezagholi Osanloo

October2010

32 Dimension stones deposit block modeling with the objective of optimizingof mine production planning

Ali Aghadadehzadeh &Mortezagholi Osanloo

August2010

33 Determination of ultimate pit limits of large deposits using network flowalgorithm case study iron ore mines

Mehdi Rahmanpour &Mortezagholi Osanloo

January2010

34 SELECTION OF THE SUITABLE MINING METHOD FOR NO.4 OF GOL-GOHARIRON ORE MINE OF IRANBASED ON UBC AND MODIFIED NICH OLASMETHODS

Mahyar Ramezani &Mortezagholi Osanloo

February2009

35 OPTIMUM DESIGN OF HAULAGE FLEET OF GOLE-E-GOHAR IRON ORE MINEUSING COMPUTER SIMULATION LANGUAGE - GPSS/H

Saeid Reza Dindarloo &Mortezagholi Osanloo

February2009

36 SHORT RANG PRODUCTION PLANNING OF GOLE GOHAR IRON MINE OFIRAN (NO . 3) USING THE NEW FUNDAMENTAL TREE THEORY

Navid Farzam Tabar &Mortezagholi Osanloo

January2009

37 INTERMEDIATE PRODUCTION PLANNING OF SUNGUN COPPER MINE OFIRAN BASED ON COPPER PRICE PREDICTED BY CHAOS TEORY

Ali Soltani Khobooshan &Mortezagholi Osanloo

November2008

38 DEVELOPING THE SOFTWARE PROGRAMME TO EVALUATE THEPOTENTIALITY OF OPEN PIT MINING METHOD OF ORE DEPOSITE DURINGEXPLORAT

Ali Abbasi & MortezagholiOsanloo

June 2008

39 JAJARM UNDERGROUND MINE CONCEPTUAL AND BASICE WITHCREATIVE WITH CREATIVE PROBLEM SOLVING ALGORITM

Ali Akbar Asghari Rad &Mortezagholi Osanloo

March2008

40 DETERMINATION OF SUITABLE AFTER-USE OPTIONS FOR MINED LANDSBY DVELOPMENT A MINED LAND SUBITABILITY CLASSIFICATION (MLS

Hossein SoltanMohammadi &Mortezagholi Osanloo

February2008

41 PREDICTION OF COPPER PRICE VARIATION IN NEXT 10 YEARS ANDINVESTIGAT OF ITS EFFECT ON SARCHESHME ULTIMATE PIT LIMITS BY

Hassan Pejman Fard &Mortezagholi Osanloo

February2007

42 LONG-TERM PRODUCTION PLANNING IN ANOMALY N.3 OF GOL-E-GOHARWITH REGARD TO IN-PIT CRUSHER

Pejman Seyed Sadri &Mortezagholi Osanloo

February2007

43 LONG TERM OPEN - PIT PRODUCTION PLANNING BY ARTIFICALINTELLIGENT ALGORITHM

Vahid Rafiee &Mortezagholi Osanloo

February2007

44 LINER PROGRAMMING, MEDIUM - RANG PRODUCTION PLANNING,OPTIMIZATION

Mahmoud Labbaf &Mortezagholi Osanloo

October2006

Books

Page 4: MortezaGholi Osanloo - Amirkabir University of Technology

# Title Author(s) Publisher country publicationdate

version

Portal Records

1 Coal Engineering and Technology MortezagholiOsanloo

Iran (IslamicRepublic of)

September2020

1

2 surface mining methods MortezagholiOsanloo

Iran (IslamicRepublic of)

September2019

5

3 Surface mining methods MortezagholiOsanloo

Iran (IslamicRepublic of)

June 2014 4

4 Surface mining methods MortezagholiOsanloo

Iran (IslamicRepublic of)

June 2014 4

5 Surface mining methods, 3rd edition MortezagholiOsanloo

Iran (IslamicRepublic of)

July 2010 3

6 Mine Wastes Characterization, Treatment andEnvironmental Impacts

MortezagholiOsanloo

Iran (IslamicRepublic of)

January2015

1

7 ``` MortezagholiOsanloo

Iran (IslamicRepublic of)

December2005

1

Journal Papers

Portal Records

1 Mir Sina Amirshenava, Mortezagholi Osanloo, "Strategic planning of post-mining land uses: A semi-quantitativeapproach based on the SWOT analysis and IE matrix", RESOURCES POLICY, March 2022 Vol. 76, Num. 10258, Page0-0, March 2022,

2 Mir Sina Amirshenava, Mortezagholi Osanloo, Akbar Esfahanipour, "Development of open-pit mine reclamation costestimation models: A regression-based approach", International Journal of Engineering, October 2021 Vol. 34,Num. 11, Page 0-0, October 2021,

3 Mir Sina Amirshenava, Mortezagholi Osanloo, "Mined land suitability assessment: a semi-quantitative approachbased on a new classification of post-mining land uses", International Journal of Mining ,Reclamation andEnvironment, August 2021 Vol. 0, Num. 0, Page 0-0, August 2021,

4 Ali Soltani Khaboushan, Mortezagholi Osanloo, "Determination of an optimum interface between open pit andunderground mining activities in Mazinu coal mine of Tabas power plant", Journal of Mining and Environment,August 2020 Vol. 0, Num. 0, Page 0-0, August 2020,

5 Ahmad Hajarian, Mortezagholi Osanloo, "A new developed model to determine waste dump site selection in openpit mines: An approach to minimize haul road construction cost", International Journal of Engineering, July 2020Vol. 33, Num. 7, Page 0-0, July 2020,

6 Ali Soltani Khaboushan, Mortezagholi Osanloo, Akbar Esfahanipour, "Optimization of open pit to undergroundtransition depth: An idea for reducing waste rock contamination while maximizing economic benefits", JOURNALOF CLEANER PRODUCTION, July 2020 Vol. 0, Num. 0, Page 0-0, July 2020,

7 Ali Soltani Khaboushan, Mortezagholi Osanloo, "Semi-symmetrical production scheduling of an orebody foroptimizing the depth of transitioning from open pit to block caving", RESOURCES POLICY, April 2020 Vol. 68, Num.0, Page 0-0, April 2020,

8 Morteza Paricheh, Mortezagholi Osanloo, "Concurrent open-pit mine production and in-pit crushing-conveyingsystem planning", ENGINEERING OPTIMIZATION, October 2019 Vol. 0, Num. 0, Page 0-0, October 2019,

Page 5: MortezaGholi Osanloo - Amirkabir University of Technology

9 Ali Soltani Khaboushan, Mortezagholi Osanloo, "A Set of Classified Integer Programming (IP) Models for OptimumTransition from Open Pit to Underground Mining Methods", Natural Resources Research, August 2019 Vol. 0, Num.0, Page 1-17, August 2019,

10 Ali Soltani Khaboushan, Mortezagholi Osanloo, "An Uncertainty-based Transition from Open Pit to UndergroundMining", International Journal of Engineering, August 2019 Vol. 32, Num. 8, Page 1218-1224, August 2019,

11 Yousef Azimi, S.Hasan Khoshrou, Mortezagholi Osanloo, "prediction of blast induced ground vibration (BIGV) ofquarry mining using hybrid genetic algorithm optimized artificial neural network", MEASUREMENT, July 2019 Vol.147, Num. 0, Page 0-0, July 2019,

12 Mir Sina Amirshenava, Mortezagholi Osanloo, "Mine closure risk assessment using the 3D risk assessment model",, May 2019 Vol. 42, Num. 1, Page 69-78, May 2019,

13 Mehrnoosh Heydari, Mortezagholi Osanloo, "Evaluation of sustainable development of Iranian Anguran lead andzinc mining complex by Dimatel method", , May 2019 Vol. 42, Num. 1, Page 47-55, May 2019,

14 Hamidreza Nourali, Mortezagholi Osanloo, "A new cost model for estimation of open pit copper mine capitalexpenditure", International Journal of Engineering, February 2019 Vol. 32, Num. 2, Page 346-353, February 2019,

15 Mir Sina Amirshenava, Mortezagholi Osanloo, "A hybrid semi-quantitative approach for impact assessment ofmining activities on sustainable development indexes", JOURNAL OF CLEANER PRODUCTION, February 2019 Vol.218, Num. 0, Page 823-834, February 2019,

16 Mortezagholi Osanloo, Morteza Paricheh, "In-pit crushing and conveying technology in open-pit mining operations:a literature review and research agenda", International Journal of Mining ,Reclamation and Environment, January2019 Vol. -, Num. 0, Page 1-28, January 2019,

17 Hamidreza Nourali, Mortezagholi Osanloo, "Mining capital cost estimation using Support Vector Regression (SVR)",RESOURCES POLICY, November 2018 Vol. 0, Num. 0, Page 1-14, November 2018,

18 Hamidreza Nourali, Mortezagholi Osanloo, "A regression-tree-based model for mining capital cost estimation",International Journal of Mining ,Reclamation and Environment, September 2018 Vol. 0, Num. 0, Page 1-13,September 2018,

19 Morteza Paricheh, Mortezagholi Osanloo, "A simulation-based risk management approach to locating facilities inopen-pit mines under price and grade uncertainties", SIMULATION MODELLING PRACTICE AND THEORY,September 2018 Vol. -, Num. 0, Page 0-0, September 2018,

20 Mohsen Jamshidi, Mortezagholi Osanloo, "Optimizing mine production scheduling for multiple destinations of oreblocks", Bangladesh Journal of Scientific and Industrial Research, May 2018 Vol. 53, Num. 2, Page 99-110, May2018,

21 Mohsen Jamshidi, Mortezagholi Osanloo, "Reliability analysis of production schedule in multi-element depositsunder grade-tonnage uncertainty with multi-destinations for the run of mine material", International Journal ofMining Science and Technology, April 2018 Vol. 0, Num. 0, Page 1-7, April 2018,

22 Mir Sina Amirshenava, Mortezagholi Osanloo, "Mine closure risk management: an integration of 3D risk model andMCDM techniques", JOURNAL OF CLEANER PRODUCTION, February 2018 Vol. 0, Num. 0, Page 0-0, February 2018,

23 Mohsen Jamshidi, Mortezagholi Osanloo, "Multiple Destination Influence on Production Scheduling in Multi-element Mines", International Journal of Engineering, December 2017 Vol. 31, Num. 1, Page 173-180, December2017,

24 Mohsen Jamshidi, Mortezagholi Osanloo, "UPL determination of multi-element deposits under grade uncertainty bya new BEV calculation approach", Journal of Mining and Environment, October 2017 Vol. 8, Num. 4, Page 321-336,October 2017,

25 Morteza Paricheh, Mortezagholi Osanloo, "A simulation-based framework for estimating probable open-pit mineclosure time and cost", JOURNAL OF CLEANER PRODUCTION, August 2017 Vol. 167, Num. 0, Page 337-345,August 2017,

26 Mehdi Rahmanpour, Mortezagholi Osanloo, "Application of fuzzy linear programming for short-term planning andquality control in mine complexes", Journal of the Southern African Institute of Mining and Metallurgy, July 2017Vol. 117, Num. 0, Page 1-10, July 2017,

Page 6: MortezaGholi Osanloo - Amirkabir University of Technology

27 Morteza Paricheh, Mortezagholi Osanloo, Mehdi Rahmanpour, "in-pit crusher location as a dynamic locationproblem", Journal of the Southern African Institute of Mining and Metallurgy, June 2017 Vol. 117, Num. 0, Page 1-10, June 2017,

28 Mortezagholi Osanloo, Mehdi Rahmanpour, "optimizing short-term production plan using a portfolio optimizationmodel", REM-REVISTA ESCOLA DE MINAS, January 2017 Vol. 70, Num. 1, Page 109-116, January 2017,

29 Morteza Paricheh, Mortezagholi Osanloo, Mehdi Rahmanpour, "A heuristic approach for in pit crusher and conveyorsystem s time and location problem in large open pit mining", International Journal of Mining ,Reclamation andEnvironment, October 2016 Vol. 0, Num. 0, Page 0-0, October 2016,

30 Mehdi Rahmanpour, Mortezagholi Osanloo, "A decision support system for determination of a sustainable pit limit",JOURNAL OF CLEANER PRODUCTION, September 2016 Vol. 0, Num. 0, Page 1-9, September 2016,

31 Mehdi Rahmanpour, Mortezagholi Osanloo, "Resilient decision making in open pit short-term production planning inpresence of geologic uncertainty", International Journal of Engineering, July 2016 Vol. 29, Num. 7, Page 1022-1028, July 2016,

32 Mehdi Rahmanpour, Mortezagholi Osanloo, "Determination of value at risk for long-term production planning inopen pit mines in the presence of price uncertainty", JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MININGAND METALLURGY, March 2016 Vol. 116, Num. 3, Page 1-8, March 2016,

33 Golnaz Moradi, Mortezagholi Osanloo, "Prioritizing Sustainable Development Criteria Affecting Open Pit MineDesign: A Mathematical Model", Procedia Earth and Planetary Science-OPEN, September 2015 Vol. 15, Num. 0,Page 813-820, September 2015,

34 Hamidreza Nourali, Mortezagholi Osanloo, "Prediction of Essential Amount of Exploration Drilling in Primary Stageof Open Pit Mine Planning", Procedia Earth and Planetary Science-OPEN, September 2015 Vol. 15, Num. 0, Page754-761, September 2015,

35 Somayye Narrei, Mortezagholi Osanloo, "Optimum cut-off grade’s calculation in open pit mines with regard toreducing the undesirable environmental impacts", International Journal of Mining ,Reclamation and Environment,May 2015 Vol. 29, Num. 3, Page 226-242, May 2015,

36 Saeid Reza Dindarloo, Mortezagholi Osanloo, S. Frimpong, "A stochastic simulation framework for truck and shovelselection and sizing in open pit mines", JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING ANDMETALLURGY, March 2015 Vol. 115, Num. 0, Page 209-219, March 2015,

37 Mehdi Rahmanpour, Mortezagholi Osanloo, Nabiollah Adibee, Mohsen Akbarpour Shirazi, "An Approach to Locatean In Pit Crusher in Open Pit Mines", International Journal of Engineering, September 2014 Vol. 27, Num. 9, Page1475-1484, September 2014,

38 Ali Moradi Afrapoli, Mortezagholi Osanloo, "Determination and stability analysis of ultimate open-pit slope undergeomechanical uncertainty", International Journal of Mining Science and Technology, January 2014 Vol. online,Num. 0, Page 1-6, January 2014,

39 Yoosef Azimi, Mortezagholi Osanloo, Akbar Esfahanipour, "An uncertainty based multi-criteria ranking system foropen pit mining cut-off grade strategy selection", RESOURCES POLICY, March 2013 Vol. 38, Num. 1, Page 212-223,March 2013,

40 Nabiollah Adibee, Mortezagholi Osanloo, Mehdi Rahmanpour, "Adverse effects of coal mine waste dumps on theenvironment and their management", ENVIRONMENTAL EARTH SCIENCES, January 2013 Vol. online, Num. 1, Page1-12, January 2013,

41 Mohammad Esmaeili, Mortezagholi Osanloo, Farshad Rashidinejad, Abbas Aghajani Bazzazi, Mohammad Taji,"Multiple regression, ANN and ANFIS model for prediction of backbreak in the open pit blasting", ENGINEERINGWITH COMPUTERS, November 2012 Vol. 28, Num. 4, Page 0-12, November 2012,

42 Yoosef Azimi, Mortezagholi Osanloo, Akbar Esfahanipour, "Selection of the open pit mining cut-off grade strategyunder price uncertainty using a risk based multi-criteria ranking system", ARCHIVES OF MINING SCIENCES,November 2012 Vol. 57, Num. 3, Page 741-768, November 2012,

43 Mortezagholi Osanloo, "Future challenges in mining division, Are we ready for these challenges? Do we have solideducational programs?", Cuprum, July 2012 Vol. 3, Num. 64, Page 61-70, July 2012,

Page 7: MortezaGholi Osanloo - Amirkabir University of Technology

44 Somayye Narrei, Mortezagholi Osanloo, "post-mining land-use methods optimum ranking, using multi attributedecision techniques with regard to sustainable resources management", OIDA International Journal of SustainableDevelopment, December 2011 Vol. 2, Num. 11, Page 65-76, December 2011,

45 Abbas Aghajani BazzaziَAb, Mortezagholi Osanloo, Behrooz Karimi, "A new fuzzy multi criteria decision makingmodel for open pit mines equipment selection", ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, May 2011Vol. 28, Num. 3, Page 279-300, May 2011,

46 Asieh Hekmat, Mortezagholi Osanloo, Parviz Maarefvand, "Block size selection with the objective of minimizing thediscrepancy in real and estimated block grade", Arabian Journal of Geosciences, March 2011 Vol. xxxx, Num. 0,Page 0-0, March 2011,

47 Mortezagholi Osanloo,, "A new approach to mining method selection based on modifying the Nicholas technique",Applied Soft Computing, September 2010 Vol. 10, Num. 4, Page 0-0, September 2010,

48 Yoosef Azimi, Mortezagholi Osanloo, Mohsen Akbarpour Shirazi, Abbas Aghajani Bazzazi, "Prediction of theblastability designation of rock masses using fuzzy sets", International Journal of Rock Mechanics and MiningSciences, July 2010 Vol. 47, Num. 7, Page 0-0, July 2010,

49 Hossein Soltan Mohammadi, Mortezagholi Osanloo, Abbas Aghajani Bazzazi, "An analytical approach with areliable logic and a ranking policy for post-mining land-use determination", , April 2010 Vol. , Num. 27, Page 0-0,April 2010,

50 Afshin Akbari, Mortezagholi Osanloo, Mohsen Akbarpour Shirazi, "Reverse estimation on open pit mine under priceuncertainity by real option approach", Mining Science and Technology (China) on ScienceDirect, January 2010 Vol.2009, Num. 19, Page 709-717, January 2010,

51 Seyedhadi Hosseini, Mohammad Ataei, Mortezagholi Osanloo, "A new classification system for evaluating rockpenetrability", , December 2009 Vol. , Num. 46, Page 0-0, December 2009,

52 Hossein Soltan Mohammadi, Mortezagholi Osanloo, Abbas Aghajani Bazzazi, "Deriving preference order of post -mining land -uses through mlsa Framework:Application of an Outranking Technique", , September 2009 Vol. , Num.58, Page 0-0, September 2009,

53 A.D.Akbari, Mortezagholi Osanloo, Mohsen Akbarpour Shirazi, "Minable reserve estimation while determiningultimate pit limits under price uncertainity by real option approach(ROA)", ARCHIVES OF MINING SCIENCES,September 2009 Vol. 54, Num. 2, Page 321-339, September 2009,

54 Afshin Akbari Dehkharghani, Mortezagholi Osanloo, Mohsen Akbarpoor Shirazi H., "determination of Ultimate PitLimits in Open Mines Using Real Option Approach", , May 2009 Vol. , Num. 5, Page 0-0, May 2009,

55 [en-name N/A], Mortezagholi Osanloo, "Effect of grout pressure and grout flow on soil physical and mechanicalproperties in jet grouting operations", , April 2009 Vol. , Num. 46, Page 0-0, April 2009,

56 Afshin Akbari Dehkharghani, Mortezagholi Osanloo, "Minable Reserve Estimation While Determining Ultimate PitLimits (UPL)Under Price Uncertainty by Real Option Approach (ROA)", , March 2009 Vol. , Num. 2, Page 0-0, March2009,

57 , Mortezagholi Osanloo, Dr.Bahram Rezai, "cutoff grades optimization with environmental managament;A casestudy:Sungun copper project", IUST International journal of Engineering Science, March 2009 Vol. 19, Num. 0, Page0-0, March 2009,

58 Abbas Aghajani Bazzazi, Mortezagholi Osanloo, Behrooz Karimi, "Optimal Open Pit Mining Equipment SelectionUsing Fuzzy Multiple Attribute Decision Making Approach", , February 2009 Vol. , Num. 2, Page 0-0, February 2009,

59 Mortezagholi Osanloo, [en-name N/A], Dr.Bahram Rezai, "Incorporating environmental issues into optimum cut-offgrades modeling at porphyry copper deposits", , December 2008 Vol. , Num. 33, Page 0-0, December 2008,

60 Javad Gholam Nejad, Mortezagholi Osanloo, Esmaile Khorram, "A Chance Constrained Integer Programming Modelfor Open Pit Long -Term Production Planning", , November 2008 Vol. , Num. 4, Page 0-0, November 2008,

61 Abbas Aghajani Bazzazi, Mortezagholi Osanloo, Hossein Soltan Mohammadi, "Loading-haulage equipmentselection in open pit mines based on fuzzy-topsis method", Mineral Resources Management, October 2008 Vol. 24,Num. 3, Page 0-0, October 2008,

Page 8: MortezaGholi Osanloo - Amirkabir University of Technology

62 Hossein Soltan Mohammadi, Mortezagholi Osanloo, Dr.Bahram Rezai, Abbas Aghajani Bazzazi, "Achieving to SomeOutranking Relationships Between Post Mining Land Uses Through Mined Land Suitability Analysis", , July 2008Vol. , Num. 5, Page 0-0, July 2008,

63 Asieh Hekmat, Mortezagholi Osanloo, Mohsen Akbarpoor Shirazi H., "New Approach for Selection of Waste DumpSites in Open Pit Mines", , May 2008 Vol. 0, Num. 1, Page 0-0, May 2008,

64 [en-name N/A], Mortezagholi Osanloo, Dr.Bahram Rezai, "An Environmental-Oriented Model for Optimum Cut -offGrades in Open Pit Mining Projects to Minimize Acid Mine Drainge", , March 2008 Vol. , Num. 5, Page 0-0, March2008,

65 Mortezagholi Osanloo, Javad Gholam Nejad, Behrooz Karimi, "Long -Term Open Pit Mine Production Planning : AReview of Models and Algorithms", , July 2007 Vol. 0, Num. 2007, Page 0-0, July 2007,

66 Javad Gholam Nejad, Mortezagholi Osanloo, "Incorporation of Ore Grade Uncertainty Into The Push Back DesignProcess", , March 2007 Vol. , Num. 107, Page 0-0, March 2007,

67 Javad Gholam Nejad, Mortezagholi Osanloo, "Using Chance Constrained Binary Integer Programming in Optimisinglong term production scheduling for open pit Mine Design", , January 2007 Vol. 0, Num. 2, Page 0-0, January 2007,

68 Javad Gholam Nejad, Mortezagholi Osanloo, Behrooz Karimi, "A Chance-Constrained Programming Approach forOpen Pit Long -Term Production Scheduling in Stochastic Environments", , February 2006 Vol. , Num. 106, Page 0-0, February 2006,

69 Mortezagholi Osanloo, "The Importance of Long Range Production Planning in Open- Pit Mines", , January 2006Vol. , Num. 1, Page 0-0, January 2006,

70 Esmaeil Jorjani, Dr.Bahram Rezai, [en-name N/A], Mortezagholi Osanloo, "Biodesulfurization of Tabas coal bymicroorganisms isolated from coal washery plant tailing dump", , September 2004 Vol. 0, Num. 3, Page 0-0,September 2004,

71 Esmaeil Jorjani, Dr.Bahram Rezai, [en-name N/A], Mortezagholi Osanloo, "Biodesulfurization of The Tabas DepositCoal by Microorganisms", , June 2004 Vol. , Num. 3, Page 0-0, June 2004,

72 Dr.Bahram Rezai, Mortezagholi Osanloo, Esmaeil Jorjani, [en-name N/A], "Desulfurization of tabas coal withmicrowave irradiation / peroxyacetic acid washing at 25, 55 and 85c", , May 2004 Vol. , Num. 1, Page 0-0, May2004,

73 Dr.Bahram Rezai, Mortezagholi Osanloo, [en-name N/A], [en-name N/A], "Oxidation pretreatment for enhancingdesulfurization of coal with sodium butoxide", , April 2004 Vol. , Num. , Page 0-0, April 2004,

74 Mortezagholi Osanloo, Mohammad Ataei, "Using combination of genetic algorithm and grid search method to determine optimum cut off grade of multiple-metal deposit", , March 2004 Vol. 0, Num. 0, Page 0-0, March 2004,

75 Mortezagholi Osanloo, Mohammad Ataei, "Factors influnced to select the suitable site for waste diposal in surfacemine", , December 2003 Vol. , Num. 2, Page 0-0, December 2003,

76 Mortezagholi Osanloo, "Methods for calculation of optimal cutoff grades in complex ore deposits", , October 2003Vol. , Num. , Page 0-0, October 2003,

77 Mohammad Ataei, Mortezagholi Osanloo, "Deposits by iterated grid search method", , June 2003 Vol. , Num. , Page0-0, June 2003,

78 Mohammad Ataei, Mortezagholi Osanloo, "Determination of optimum cut off grade of multiple metal deposits byiterated grid search method", , June 2003 Vol. , Num. 3, Page 0-0, June 2003,

79 Mortezagholi Osanloo, Mohammad Ataei, "Factors affecting the selection of site for arrangement of pit rock _dumps", , April 2003 Vol. , Num. , Page 0-0, April 2003,

80 Mortezagholi Osanloo, Mohammad Ataei, "Using equivalent grade factors to find the optimum cut off grades ofmultiple metal deposit", , April 2003 Vol. , Num. , Page 0-0, April 2003,

81 Mortezagholi Osanloo, Mohammad Ataei, "Multi-grades: software developed for calculation af optimum cut offgrade of multiple metal deposit", , March 2003 Vol. , Num. , Page 0-0, March 2003,

Page 9: MortezaGholi Osanloo - Amirkabir University of Technology

82 Mortezagholi Osanloo, Mohammad Ataei, "Determination of optimum cut off grade of open-pit mine with theobjective of increasing NPV", , March 2003 Vol. , Num. , Page 0-0, March 2003,

83 Dr.Bahram Rezai, Mortezagholi Osanloo, Esmaeil Jorjani, [en-name N/A], Mahmoud Abdollahy, "The charactersticof coal mine of tabbas (Layer-C1)", , March 2003 Vol. , Num. , Page 0-0, March 2003,

84 Mortezagholi Osanloo, Ali Sepahvand, "Optimisation of haulage systems of choghart iron mine of Iran", , March2001 Vol. , Num. 22, Page 0-0, March 2001,

85 Mortezagholi Osanloo, Mohammad Ataei, "Using 2d lerchs & grossmann algorithm to design final pit limits ofsungun copper deposit of iran", , January 2000 Vol. , Num. 4, Page 0-0, January 2000,

86 Mortezagholi Osanloo, "Classification of mathamatical model for prediction of fragmented rock", , March 1999 Vol., Num. 66, Page 0-0, March 1999,

87 Mortezagholi Osanloo, "The design of mouteh gold deposit of iran", , January 1999 Vol. 0, Num. 10, Page 0-0,January 1999,

88 Mortezagholi Osanloo, "Mechanism of jet drills", , March 1998 Vol. , Num. 63, Page 0-0, March 1998,

89 Mortezagholi Osanloo, "Determination of blast hole parameters based on field results", , January 1997 Vol. , Num.4, Page 0-0, January 1997,

90 Mortezagholi Osanloo, "Determination of final pit limits of jallal.abad iron mine of Iran by dynamic programming", ,March 1995 Vol. , Num. 2, Page 0-0, March 1995,

91 Mortezagholi Osanloo, [en-name N/A], "Engineering classification of rock mass by RMR and SMR with the objectiveof pit slope determination", , March 1995 Vol. , Num. 10, Page 0-0, March 1995,

92 Mortezagholi Osanloo, "The possibility of using controlled blasting methods in quarry mines", , March 1994 Vol. ,Num. , Page 0-0, March 1994,

93 Mortezagholi Osanloo, "The possibility of using controlled blasting technics in marble mine of hezardareh(lashotor) of isfahan", , March 1994 Vol. , Num. , Page 0-0, March 1994,

94 Mortezagholi Osanloo, "Iranian gold development", , April 1993 Vol. 0, Num. 0, Page 0-0, April 1993,

95 Mortezagholi Osanloo, "Iran,s mouteh gold deposit", , January 1993 Vol. 0, Num. 0, Page 0-0, January 1993,

96 Mortezagholi Osanloo, "Energy,consumption,reserve and future", , March 1992 Vol. , Num. , Page 0-0, March 1992,

97 Mortezagholi Osanloo, "Mathematical model developed .to perdict drilling speed and those parameters areeffecting rock penetration", , March 1992 Vol. , Num. , Page 0-0, March 1992,

98 Mortezagholi Osanloo, "The study and comparison of present drilling speed mathematical models", , March 1992Vol. , Num. 31, Page 0-0, March 1992,

99 Mortezagholi Osanloo, "Economic development and importance of using advanced mining methods", , March 1990Vol. , Num. 26, Page 0-0, March 1990,

100 Mortezagholi Osanloo, "Effect of vibration of surface mining blast on near structure", , March 1986 Vol. , Num. ,Page 0-0, March 1986,

101 Mortezagholi Osanloo, "The possibility of using CO2 + H2O as a solvent for extraction of deep and thin coal", ,March 1985 Vol. , Num. 1, Page 0-0, March 1985,

Conference Papers

Portal Records

1 Mehrnoosh Heydari, Mortezagholi Osanloo, Ataç Ba?çetin, "LIFE CYCLE ASSESSMENT IN DEEP OPEN-PIT COPPERMINES ", IMCET 2022 27TH INTERNATIONAL MINING CONGRESS AND EXHIBITION OF TURKEY, March 2022

Page 10: MortezaGholi Osanloo - Amirkabir University of Technology

2 Mir Sina Amirshenava, Mortezagholi Osanloo, "Post-mining land-use planning: An integration of mined landsuitability assessment and SWOT analysis in Chadormalu iron ore mine of Iran ", 27th International MiningCongress and Exhibition of Turkey (IMCET 2022), March 2022

3 Mahsa Zangeneh, Mortezagholi Osanloo, Sina Amirshenava, "PREMATURE MINE CLOSURE, RISK ASSESSMENTAND POST-MINING LAND-USE OF GALALI OPEN-PIT IRON MINE OF IRAN ", 27TH INTERNATIONAL MININGCONGRESS AND EXHIBITION OF TURKEY_IMCET 2022, March 2022

4 Mehrnoosh Heydari, Mortezagholi Osanloo, Ataç Ba?çetin, "Environmental Impact Assessment Footprint in Open-Pit Copper Mining ", 27TH INTERNATIONAL MINING CONGRESS AND EXHIBITION OF TURKEY_IMCET 2022, March2022

5 Nima Samadinia, Mortezagholi Osanloo, Mir Sina Amirshenava, "A hybrid semi-quantitative approach for mineclosure risk management in Anguran mine, Iran ", International Mining Congress and Exhibition of Turkey_(IMCET2022), March 2022

6 Mehrnoosh Heydari, Mortezagholi Osanloo, "A review of environmental impact assessment (EIA) and life cycleassessment (LCA) methods in the mining project ", The second national conference on Data Mining in Earthsciences, November 2021

7 Mir Sina Amirshenava, Mortezagholi Osanloo, Akbar Esfahanipour, "Strategic Planning to Select a Sustainable Post-Mining Land-Use Option ", The Second National Conference on Data Mining in Earth Sciences, November 2021

8 Mir Sina Amirshenava, Mortezagholi Osanloo, "Top 10 approaches to keep mining in a sustainable developmentpath ", SME Annual Meeting, February 2020

9 Morteza Paricheh, Mortezagholi Osanloo, Setareh Afrouz, "CRUSHER LOCATION AND CONVEYOR NETWORKPLANNING IN MULTIPLE-PITS AND MULTIPLE-PLANTS OPEN PIT MINES ", SME Annual Meeting, February 2020

10 Hamid Mergani, Mortezagholi Osanloo, Morteza Paricheh, "Ultimate Pit Limit Determination Considering MiningRoyalty in Open-Pit Copper Mines ", Proceedings of the 28th International Symposium on Mine Planning andEquipment Selection - MPES 2019, December 2019

11 Morteza Paricheh, Mortezagholi Osanloo, "A New Search Algorithm for Finding Candidate Crusher Locations InsideOpen Pit Mines ", Proceedings of the 28th International Symposium on Mine Planning and Equipment Selection -MPES 2019, December 2019

12 Mahdi Pouresmaieli, Mortezagholi Osanloo, "A Valuation Approach to Investigate the Sustainability of Sorkhe-DizajIron Ore Mine of Iran ", Mine Planning & Equipment Selection 2019, December 2019

13 Mehrnoosh Heydari, Mortezagholi Osanloo, Mohammadmahdi Akbari, "A review of Environmental ImpactAssessment of copper mines: a statistical survey. ", The 2nd Iranian Conference Of Green Mining & Mine Industry,December 2019

14 Ali Soltani Khaboushan, Mortezagholi Osanloo, "The status of open pit to underground transitioning problem in theprocess of sustainability assessment of mining societies ", The second Iranian conference of Green Mining & Mineindustry, December 2019

15 Mahdi Pouresmaieli, Mortezagholi Osanloo, "Establishing a Model to Reduce the Risk of Premature Mine Closure ",World Multidisciplinary Earth Sciences Symposium (WMESS 2019), September 2019

16 Mehrnoosh Heydari, Mortezagholi Osanloo, "The role of mining in the development of industries and themodernization of societies in the years ahead ", The 1st Iranian Conference of Green Mining and Mine Industries,December 2018

17 Mohammadmahdi Akbari, Mortezagholi Osanloo, "Identification and ranking of the effective parameters in cyclelife of open pit iron ore mines aiming reducing the mine closure risk ", The 1st Iranian Conference of Green Miningand Mine Industries, December 2018

18 Hamidreza Nourali, Mortezagholi Osanloo, "Mining capital cost estimation using artificial neural network ", The 1stIranian Conference of Green Mining and Mine Industries, December 2018

19 Mir Sina Amirshenava, Mortezagholi Osanloo, "Investigating the ecosystem of iron ore mines of Iran and itsinfluence on choosing the most suitable mine reclamation plan ", The 1st Iranian Conference of Green Mining andMine Industries, December 2018

Page 11: MortezaGholi Osanloo - Amirkabir University of Technology

20 Morteza Paricheh, Mortezagholi Osanloo, "Application of in-pit crushing and conveying technology in deep open pitmines regarding sustainable development ", the 1st Iranian conference of green mining and and mine industries,December 2018

21 Morteza Paricheh, Mortezagholi Osanloo, "How to Exit Conveyor from an Open-pit Mine ; A Theoretical Approach ",27th International Symposium on Mine Planning and Equipment Selection, December 2018

22 Mehrnoosh Heydari, Mortezagholi Osanloo, "Sustainability assessment of Angouran lead and zinc mining complex", 27th International Symposium on Mine Planning and Equipment Selection, November 2018

23 Mehrnoosh Heydari, Mortezagholi Osanloo, "An Analysis of the Iron Ore Market in the World in 2030 ", The 5thAnnual International Iron Ore Conference of Iran, May 2018

24 Ali Abbasi, Mortezagholi Osanloo, "A new partial derivatives model to optimize mining capacities ", WorldMultidisciplinary Earth Sciences Symposium, October 2017

25 Mir Sina Amirshenava, Mortezagholi Osanloo, "Post-mining land-use selection by using a combination ofPROMETHEE and SIR techniques ", the 2nd International Symposium on Land Reclamation and EcologicalRestoration (LRER 2017), October 2017

26 Morteza Paricheh, Mortezagholi Osanloo, "A simulation-based framework for estimating probable open-pit mineclosure time and cost ", the 2nd International Symposium on Land Reclamation and Ecological Restoration (LRER2017), October 2017

27 Mohammad Amin Veshadi Arani, Mortezagholi Osanloo, Akbar Esfahanipour, Mehdi Rahmanpour, "Closure RiskAssessment in a Travertine Quarry Mine in Iran ", (26th International Symposium on Mine Planning & EquipmentSelection (MPES2017, August 2017

28 Morteza Paricheh, Mortezagholi Osanloo, "risk management of locating primary crusher at the edge of open-pitmines under price uncertainty ", 26th international symposium of mine planning & equipment selection, August2017

29 Ahmad Hajarian, Mortezagholi Osanloo, "prediction of acid mine drainage in coal mine waste based on artificialintelligence method ", 26th international symposium of mine planning & equipment selection, August 2017

30 Asieh Hekmat, Mortezagholi Osanloo, "block size and open-pit mining cost ", 26th international symposium of mineplanning & equipment selection, August 2017

31 Ali Soltani Khaboushan, Mortezagholi Osanloo, "Looking for Chaos in Copper Historical Prices ", 10th ChaoticModeling and Simulation International Conference, May 2017

32 Mortezagholi Osanloo, "Top 10 challenges in mining ", 6th International Conference on Computer Applications inthe Mineral Industries, October 2016

33 Mehdi Rahmanpour, Mortezagholi Osanloo, "Portfolio optimization for short-term production planning systems ",6th International Conference on Computer Applications in the Mineral Industries, October 2016

34 Morteza Shenavar, Mortezagholi Osanloo, "Land use selection and reclamation layout planning by MCDM - Casestudy: Sangan placer iron ore mine of Iran ", 16th International Symposium on Environmental Issues and WasteManagement in Energy and Mineral Production, October 2016

35 Ali Soltani Khaboushan, Mortezagholi Osanloo, Mohsen Akbarpour Shirazi, "Evaluation of mine reclamationmethods for mining areas: A case study of Sangan Iron mine ", 16th International Symposium on EnvironmentalIssues and Waste Management in Energy and Mineral Production, October 2016

36 Mohsen Jamshidi, Mortezagholi Osanloo, "Determination of block economic value in multi-element deposits ", 6thInternational Conference on Computer Applications in the Mineral Industries, October 2016

37 Mir Sina Amirshenava, Mortezagholi Osanloo, "Assessment of mining activities impacts on sustainabledevelopment using decision making methods ", 16th International Symposium on Environmental Issues and WasteManagement in Energy and Mineral Production, October 2016

38 Mohsen Jamshidi, Mortezagholi Osanloo, "Production scheduling of iron ore mines considering multipledestinations ", World Multidisciplinary Earth Science Symposium, September 2016

Page 12: MortezaGholi Osanloo - Amirkabir University of Technology

39 Mir Sina Amirshenava, Mortezagholi Osanloo, Akbar Esfahanipour, Siavash Nadimi, "Closure risk assessment inChoghart iron ore mine using 3D risk model ", SME Annual Meeting, February 2016

40 Mehrdad Fazeli Salmani, Mortezagholi Osanloo, Mohammad Rezaee, "Mine facility location selection in open pitmines using a new multistep procedure ", MPES 2015 : Mine Planning & Equipment Selection, November 2015

41 Mehdi Rahmanpour, Mortezagholi Osanloo, "Determining a reliable ultimate pit design under condition of grade,price, and slope uncertainty ", MPES 2015 : Mine Planning & Equipment Selection, November 2015

42 Mehdi Rahmanpour, Mortezagholi Osanloo, "Determination of value-at-risk for long-term production planning inopen pit mines in an environment of price uncertainty ", MPES 2015 : Mine Planning & Equipment Selection,November 2015

43 M. Minaei Mobtaker, Mortezagholi Osanloo, "Chaos in iron ore price prediction ", MPES 2015 : Mine Planning &Equipment Selection, November 2015

44 Golnaz Moradi, Mortezagholi Osanloo, "Prioritizing sustainable development criteria affecting open pit mine design:A mathematical model ", World Multidisciplinary Earth Science Symposium,WMESS 2015, September 2015

45 Delaram Pahlevani, Mortezagholi Osanloo, "Resumption of deep open-pit mining as a future challenge ", 37thinternational symposium on the application of computers and operations research in the mineral industry (APCOM2015), May 2015

46 Vahagn Khechadoorian, Mortezagholi Osanloo, Seyyedpedram Mirmoini, "Evidential reasoning: potential usage fordecision making under uncertainty in mining engineering ", 37th international symposium on the application ofcomputers and operations research in the mineral industry (APCOM 2015), May 2015

47 Alireza Kamrani, Mortezagholi Osanloo, Marziyeh Minaei Mobtaker, "Prediction of open pit mine slope variationbased on Geo-mechanical uncertainty using Artificial Neural Network (ANN) ", 24th Int. Mining Congress andExhibition of Turkey, April 2015

48 Mehdi Rahmanpour, Mortezagholi Osanloo, "Long term planning in open pit mines in presence of commodity priceuncertainty ", 24th Int. Mining Congress and Exhibition of Turkey, April 2015

49 Saeid Reza Dindarloo, Mortezagholi Osanloo, "Results of discrete event simulation in a large open pit mine ", SMEAnnual Meeting, February 2015

50 Marziyeh Minaei Mobtaker, Mortezagholi Osanloo, "Positive impacts of mining activities on environment ",Legislation, Technology and Practice of Mine Land Reclamation, October 2014

51 Seyyedpedram Mirmoini, Mortezagholi Osanloo, Mehdi Rahmanpour, "Modeling the lean limitation criteria as a keyfactor for making a decision about abandoned mines in Iran ", Legislation, Technology and Practice of Mine LandReclamation, October 2014

52 Vahagn Khechadoorian, Mortezagholi Osanloo, "Mined land use selection using a modified version of TOPSISmethod, that can handle uncertainty by accepting inputs as D numbers ", Legislation, Technology and Practice ofMine Land Reclamation, October 2014

53 Mehrdad Fazeli Salmani, Mortezagholi Osanloo, هنقن هدیپس , "Mine facility location selection in open pit mines usinga new multistep procedure ", Legislation, Technology and Practice of Mine Land Reclamation, October 2014

54 Mehrdad Fazeli Salmani, Mortezagholi Osanloo, M. Rezaee, R.Q.Honaker, "mine facility location selection in openpit mines using a new multistep-procedure ", SME annual meeting & exhibit, February 2014

55 Mehrdad Fazeli Salmani, Mortezagholi Osanloo, "Mine facility location selection in open-pit mines based on a newmultistep-procedure ", Mine Planning and Equipment Selection (MPES), October 2013

56 Mortezagholi Osanloo, Mehdi Rahmanpour, "Mine design selection considering sustainable development ", MinePlanning and Equipment Selection (MPES), October 2013

57 Mohajer Mansouri, Mortezagholi Osanloo, Narges Gheisari, "Establishing a sustainable model to reduce the risk ofmine closure ", Mine Planning and Equipment Selection (MPES), October 2013

58 Mehdi Rahmanpour, Mortezagholi Osanloo, "Determining the most effective factors on open pit mine plans andtheir interactions ", Mine Planning and Equipment Selection (MPES), October 2013

Page 13: MortezaGholi Osanloo - Amirkabir University of Technology

59 Milad Barzegar Toochahi, Saba Gharehdashi, Mortezagholi Osanloo, "Damage analysis in rock rotary tricones bit- acase study ", Mine Planning and Equipment Selection (MPES), October 2013

60 Narges Gheisari, Mortezagholi Osanloo, Akbar Esfahanipour, Mohajer Mansouri, "Closure risk assessment inAtashkooh stone quarry using risk matrix ", Mine Planning and Equipment Selection (MPES), October 2013

61 S.H. Amini, Mortezagholi Osanloo, R.Q. Honaker, "The optimization of short-term iron open-pit productionscheduling while minimizing stripping ratio ", Innovations in Mining Engineering, September 2013

62 Narges Gheisari, Mortezagholi Osanloo, Mohajer Mansouri, "Prioritize utilization of abandoned stone quarries inIsfahan province using ELECTER1 ", 1st International Conference on Mining, Mineral Processing, Metallurgical andEnvironmental Engineering, September 2013

63 Mehdi Rahmanpour, Mortezagholi Osanloo, "Application of a mathematical model to assess the sustainability ofSungun copper mine ", 1st International Conference on Mining, Mineral Processing, Metallurgical andEnvironmental Engineering, September 2013

64 Marziyeh Minaei Mobtaker, Mortezagholi Osanloo, "Prediction of iron ore mine closure causes under uncertaintycondition, using Vikor technique ", 6th International Conference on Sustainable Development in the MineralsIndustry, June 2013

65 Mehrdad Fazeli Salmani, Mortezagholi Osanloo, "The impact of interaction between mine facility location selectioncriteria on final ranking of site alternatives ", 23rd International Mining Congress and Exhibition of Turkey (IMCET2013), April 2013

66 Mohsen Jamshidi, Mortezagholi Osanloo, "Selecting the suitable haulage system using HPVS method, consideringsustainable development ", 23rd International Mining Congress and Exhibition of Turkey (IMCET 2013), April 2013

67 Ali Abbasi, Mortezagholi Osanloo, R. Khalokakaie, "Developing the software program to evaluate the potentiality ofopen pit mining method of ore deposit ", 23rd International Mining Congress and Exhibition of Turkey (IMCET2013), April 2013

68 Milad Barzegar Toochahi, Saba Gharehdashi, Mortezagholi Osanloo, "Considering of damage in different parts ofrotary three cone bit - A case study of Golgohar mine ", 23rd International Mining Congress and Exhibition ofTurkey, April 2013

69 Mehdi Rahmanpour, Mortezagholi Osanloo, Nabiollah Adibee, "An approach to determine the location of an in pitcrusher in open pit mines ", 23rd International Mining Congress and Exhibition of Turkey (IMCET 2013), April 2013

70 Mehdi Rahmanpour, Mortezagholi Osanloo, "A genetic algorithm for pit limit and blending optimization ", 23rdInternational Mining Congress and Exhibition of Turkey (IMCET 2013), April 2013

71 Elham Sadat Khyireyeh, Mortezagholi Osanloo, "The optimal dispatching station site selection effective factors inopen-pit mines ", Mine Planning and Equipment Selection (MPES 2012), November 2012

72 Mehdi Rahmanpour, Mortezagholi Osanloo, "Risk analysis of mine closure considering sustainable planning ",Symposium on Environmental Issues and Waste Management in Energy and Mineral Production (SWEMP 2012),November 2012

73 Mehdi Rahmanpour, Mortezagholi Osanloo, "Pit limit determination considering blending requirements ", MinePlanning and Equipment Selection (MPES 2012), November 2012

74 Ali Moradi Afrapoli, Mortezagholi Osanloo, "Open-pit slope design under geomechanical uncertainty using MonteCarlo based analysis ", Mine Planning and Equipment Selection (MPES 2012), November 2012

75 Ali Moradi Afrapoli, Mortezagholi Osanloo, "Geomechanical property uncertainty effect on stability of open pit mineslope (comparison between two important copper mines in Middle East and Europe) ", 7th Asian Rock MechanicsSymposium, October 2012

76 Mohsen Jamshidi, Mortezagholi Osanloo, "The necessity of directing mining activities towards sustainabledevelopment ", International Mining Congress & Expo 2012, October 2012

77 Mortezagholi Osanloo, "Future challenges in mining division, Are we ready for these challenges? Do we have solideducational programs? ", 23rd Annual General Meeting of the Society of Mining Professors, July 2012

Page 14: MortezaGholi Osanloo - Amirkabir University of Technology

78 Mehdi Rahmanpour, Mortezagholi Osanloo, "open pit copper mining and sustainable development ", 2ndinternational copper ore mining congress, July 2012

79 Somayye Narrei, Mortezagholi Osanloo, "Post-mining land-use methods optimum ranking, using multi attributedecision techniques with regard to sustainable resources management ", International Conference on SustainableDevelopment 2012, December 2011

80 Somayye Narrei, Mortezagholi Osanloo, "optimum cut off grade in open pit mines with considering post mining landuse revenues ", Mine planning and equipment selection(MPES 2011), October 2011

81 Fraidoun Tavakoli Shirazi, Mortezagholi Osanloo, "Rotary drilling speed prediction by linear and nonlinearregression analysis ", .mine planning and equipment selection (MPES 2011), October 2011

82 Yoosef Azimi, Mortezagholi Osanloo, Akbar Esfahanipour, "Optimisation of Mining Policy Under DifferentEconomical Conditions Using a Combination of Non-Linear Programming and Genetic Algorithm ", Application ofComputer and operations research in the minerals industry (35th APCOM 2011), September 2011

83 Asieh Hekmat, Mortezagholi Osanloo, Parviz Maarefvand, "Investigating the Effect of Different Block Dimensionson the Economic Life of Open Pit Mines ", Application of Computer and operations research in the mineralsindustry (35th APCOM 2011), September 2011

84 Maryam Abdi Oskouei, Mortezagholi Osanloo, "The effect of mine reclamation program implementation onsustainability of region ", Fifth international conference Sustainable Development in the Minerals Industry, June2011

85 Mortezagholi Osanloo, Mehdi Rahmanpour, Abdolah Sadri, "Ultimate pit limit of iron ore mines using maximum flowalgorithms ", , December 2010

86 Asieh Hekmat, Mortezagholi Osanloo, "Reducing the negative environmental impacts of mining activity in open pitmines by selecting the efficient block size ", Symposium on Environmental Issues and Waste Management inEnergy and Mineral Production (SWEMP 2010), May 2010

87 Mohsen Ghanbari, Mortezagholi Osanloo, Yoosef Azimi, "Developing a new algorithm for mine closure planning ",Symposium on Environmental Issues and Waste Management in Energy and Mineral Production (SWEMP 2010),May 2010

88 Mohammad Rezaee, Mortezagholi Osanloo, "The optimum number of open pit mine push backs ", , November 2009

89 Mortezagholi Osanloo, Abbas Aghajani Bazzazi, Behrooz Karimi, "Overburden removal equipment selection throughMADM methods Application of modified VIKOR method ", , November 2009

90 Mehdi Rahmanpour, Mortezagholi Osanloo, "Determination of ultimate pit limit using network flow theory ", ,November 2009

91 Yoosef Azimi, S.Hasan Khoshrou, Mortezagholi Osanloo, "Sasmic wave monitoring and ground vibration analysisof bench blusting in sungun open pit copper mine ", , September 2009

92 Abbas Aghajani Bazzazi, Mortezagholi Osanloo, Yoosef Azimi, "Flyrock prediction by multiple regression analysis inesfordi phosphate mine of Iran ", , September 2009

93 Yoosef Azimi, Mortezagholi Osanloo, "An application fuzzy to the blastability assesment of rock mass ", ,September 2009

94 Mortezagholi Osanloo, "what is the most effective orientation for block models in open pit mines? ", , October 2008

95 Asieh Hekmat, Mortezagholi Osanloo, "Sensitivity analysis of mining block dimensions in production planning ofopen pit mines ", , October 2008

96 Mortezagholi Osanloo, "Blasting vibration control for decreasing its destroyer effects on subsurface and surfacestructures ", , October 2008

97 Abbas Aghajani Bazzazi, Mortezagholi Osanloo, Hosain Soltanmohammadi, "loading-haulage equipment selectionin open pit mines based on fuzzy-topsis method ", 2nd mining engineering conference of Iran, October 2008

98 Abbas Aghajani Bazzazi, Mortezagholi Osanloo, Hossein Soltan Mohammadi, "Loading haulge equipment selectionin open pit mines based on fuzzy TOPSIS method ", , January 2008

Page 15: MortezaGholi Osanloo - Amirkabir University of Technology

99 Abbas Aghajani Bazzazi, Mortezagholi Osanloo, "An empirical formula for fly rock prediction in esfordi phosphatemine of iran ", , January 2008

100 [en-name N/A], Mortezagholi Osanloo, "Selection of plant species in mine reclamation plans by AHP method: casestudy sungun copper mine ", , December 2007

101 Afshin Akbari Dehkharghani, Mortezagholi Osanloo, "Real option theory and some key points for using it in miningindustry ", , December 2007

102 Mortezagholi Osanloo, [en-name N/A], "Investigation of ground vibration and its relation with specific charge in twoiran copper mines ", , December 2007

103 [en-name N/A], Mortezagholi Osanloo, "A prototype holistic cutoff grade model for prophyry coppers ", , December2007

104 [en-name N/A], [en-name N/A], Mortezagholi Osanloo, "A new approach for open pit loading machines efficiency ", ,December 2007

105 [en-name N/A], Mortezagholi Osanloo, Dr.Bahram Rezai, "A Prototype holistic cutoff grade model for porphyrycoppers ", , December 2007

106 Mortezagholi Osanloo, Javad Gholam Nejad, "The effects of rehabilitation costs on the optimum cut- off grade ", ,April 2007

107 Mortezagholi Osanloo, Mahmoud Labbaf, "Intermediate production planning of choghart open pit iron mine of iranusing mixed integer programming ", , April 2007

108 Mortezagholi Osanloo, Asieh Hekmat, Ahmad Aghajani, "reclamation of Granite Quarry - A Case Study in JostanGranite Mine ,Tehran , Iran ", , September 2006

109 [en-name N/A], Mortezagholi Osanloo, Kourosh Shahriar, "The Economic and Social Aspects of Mine closure at theCoal Mines of Kerman in Iran ", , September 2006

110 Mortezagholi Osanloo, "Explicit integration of grade uncertainty into long- term production scheduling using chance- constrained programming ", , September 2006

111 Afshin Akbari Dehkharghani, Mortezagholi Osanloo, Hadi Hamidiaan, "Selecting post mining land use throughanalytical hierarchy processing method:case study in sungun copper open pit mine of Iran ", , September 2006

112 Mortezagholi Osanloo, Javad Gholam Nejad, "Explicit integration of grade uncertainty into long-term productionscheduling using chance-constrained programming ", , September 2006

113 Ezzeddin Bakhtavar, Kourosh Shahriar, Mortezagholi Osanloo, "Old Trailings rehabilitation with regard toenvironmental Impacts At the Mooteh Gold Mine ", , March 2006

114 Javad Gholam Nejad, Mortezagholi Osanloo, "Design of Open Pit Push -backs in chadormalu Iron mine Of Iranusing Surpac ", , March 2006

115 Javad Gholam Nejad, Mortezagholi Osanloo, "Exoicit integration of grade uncertainty into long - term productionscheduling using chance - constrainded programming ", , January 2006

116 Javad Gholam Nejad, Mortezagholi Osanloo, "Disgn of open pit push- backs in chadormalu iron mine of iran usingsurpac ", , January 2006

117 Mortezagholi Osanloo, Javad Gholam Nejad, "Impact of pit lake formation on near by land ", , November 2005

118 Mortezagholi Osanloo, Afshin Akbari Dehkharghani, "Developing breakeven stripping ratio graph for sungun copperproject ", , November 2005

119 Mortezagholi Osanloo, "developing copper break - even stripping ratio craph based upoon modified O Hara costestimator ", , October 2005

120 Mortezagholi Osanloo, Afshin Akbari Dehkharghani, "Developing breakever stripping ratio graph based uponmodified OHara cost estimation ", , October 2005

Page 16: MortezaGholi Osanloo - Amirkabir University of Technology

121 Mortezagholi Osanloo, Afshin Akbari Dehkharghani, "Software developed for calculation of optimum cut off gradeand break even stripping ratio based on modified OHara estimator in CD ", , October 2005

122 Mortezagholi Osanloo, Afshin Akbari Dehkharghani, "An updated and modified OHara estimating model based onworld and Iran economic conditions ", , March 2005

123 Mortezagholi Osanloo, Hadi Hamidiaan, "opce _softwear developed for cost estimation of mined meterial (ore andwaste ) in open pits mine based on ohara , detailed and escalation methods ", , September 2004

124 Mortezagholi Osanloo, Asieh Hekmat, "prediction of loading system (shovel ) productivity based up on largefragmented rock caused by blasting operation in gol_ e_ gohar iron mine of iran ", , September 2004

125 Mortezagholi Osanloo, [en-name N/A], "The Reclamation plan priority in Gooshfil lead/ Zinc minef Iran ", , May 2004

126 Mortezagholi Osanloo, Ahmad Reza Razavi, "Evalution of physical and mechanical properties of rock to determinerock drillabi lity ", , September 2003

127 Mortezagholi Osanloo, Hooman Askari Nasab, "Optimising Ultimate Pit Limits of Gol -E- Gohar Iron Mine of IranUsing 3D Lerchs - Grossman Algorithm - ", , September 2003

128 Mortezagholi Osanloo, [en-name N/A], "Slop Stability Analysis of Gol-E- Gohar Iron Mine of Iran by Using LimitEquilibrium ", , September 2003

129 Mortezagholi Osanloo, Mohammad Ataei, Mohsen Haidary, "Selection of mining method for anormaly -no.3 of gol-gohar iron mine of iran ", , April 2003

130 Mortezagholi Osanloo, "factors influenced to select a suitable site or sites to dispose waste rock to be removedduring the surface mines life ", , October 2002

131 Mortezagholi Osanloo, Mohammad Ataei, "Application of learchs and Grossmann Algorithm to Design FinalPitlimits of Sarcheshmeh Copper Mine of Iran ", , November 2001

132 Mortezagholi Osanloo, [en-name N/A], "The Effects of open - pit Blastholes physical parameters on overbreak ", ,November 2001

133 Mortezagholi Osanloo, Soltan Mohammadi, "The potential impair of sarcheshmeh copper mine dump on the nearby Land ", , June 2000

134 Mortezagholi Osanloo, Ab Rahim Javaherian, Hassan Bakhshandeh, "prediction of sarcheshmeh copper mineblasting effect on near bay structure ", , March 2000

135 Mortezagholi Osanloo, Ali Saiedy Rashk Olya, "The possibility of using semi-dispatching systems in sarcheshmehcopper mine of IRAN ", , November 1999

136 Mortezagholi Osanloo, Mohammad Ataei, "Estimating Of Sungun Copper Deposit Of Iran by Datamine Software ", ,January 1999

137 Mortezagholi Osanloo, Mohammad Ataei, "Dising Of final Pitlimits Of Sungun Copper Deposit of Iran ", , August1998

138 Mortezagholi Osanloo, Ahmad Ghorbani, "Comparison of Mathematical and Experimental Models Developed forRock Penetration of jet Drills ", , March 1998

139 Mortezagholi Osanloo, "Software Developed for Selection of Most Suitable Mathamatical Model to Predict DrillingSpeed ", , March 1997

140 Mortezagholi Osanloo, "Determination of Blasthole parameters Based on Field Results ", , January 1997

141 Mortezagholi Osanloo, "Mathematical Model for Drilling Speed in Rock Penetration ", , January 1994

Taught Courses

# Course title Description Headlines Date

Page 17: MortezaGholi Osanloo - Amirkabir University of Technology

1 Advanced SurfaceMining

Selecting, Planning and Desing of Surface Mining (Traditional & ModernSurface Mining)

Spring2022

2 Surface MiningMethods

introduction to surface mining methods Fall2021

3 Surface MiningMethods

introduction to surface mining methods Spring2021

4 Advanced SurfaceMining

selection, design and planning of surface mining methods Spring2021

5 Surface MiningMethods

introduction to surface mining methods Fall2020

6 Advanced SurfaceMining

selection, design and planning of surface mining methods Fall2020

7 Mine Drilling Different types of drilling machines and its application in drilling projects Fall2020