  • PUSRI II-B PROJECT

    2000 MTPD AMMONIA / 2750 MTPD UREA PLANT

    PT. PUPUK SRIWIDJADJA (Persero) PALEMBANG

    JOB NO : PLP.9.13.002

    PT. REKAYASA INDUSTRI (Persero)

    LAPORAN BULANAN

    No. 005

    PERIODE :

    20 MARET 2014

    PT. BARATA INDONESIA (Persero)

  • PUSRI IIB PROJECT

    2000 MTPD AMMONIA/2750 MTPD UREA PLANT

    No Order : PLP.9.13.002 No. Dokumen :P2B-30-22-PO-PO-043-R

    Halaman : Page 1 of 3 LAPORAN BULANAN

    I IKHTISAR MANAJEMEN

    1.1 PENDAHULUAN

    Laporan bulanan pekerjaan ini merupakan Laporan ke-005 (ke lima) yang dibuat oleh Sub-

    Kontraktor (PT. Barata Indonesia) untuk melaporkan kegiatan proyek PUSRI-IIB PROJECT

    Palembang. Laporan ini menggambarkan status dan kegiatan proyek dari tanggal 21 Februari 2014

    sampai dengan 20 Maret 2014.

    Pada laporan bulanan ini pencapaian komulatif aktual progress adalah 63,53% dan kurang (-)

    36,47% dari komulatif rencana progress 100,00%.

    Pada periode ini secara garis besar dapat disampaikan aktivitas sbb:

    Pekerjaan Engineering : Status Progress

    1. Strenght Calculation terdiri:

    a. Condensate Storage Tank (6003-F) 80,00%

    b. Demin Water Storage Tank (6001-F) 100,00%

    c. Filtered Water Storage Tank (6201-F) 100,00%

    d. Potable Water Storage Tank (6202-F) 80,00%

    e. Oase Solution Storage Tank (114-F) 80,00%

    2. Drawing terdiri:

    a. Condensate Storage Tank (6003-F) 69,00%

    b. Demin Water Storage Tank (6001-F) 80,56%

    c. Filtered Water Storage Tank (6201-F) 74,74%

    d. Potable Water Storage Tank (6202-F) 71,18%

    e. Oase Solution Storage Tank (114-F) 73,68%

    Pekerjaan Procurement& Fabrikasi:

    1. Plate Material Cost 100,00%

    2. Other Material Cost 71,67%

    3. Fabrikasi :

    a. Condensate Storage Tank (6003-F) 40,16%

    b. Demin Water Storage Tank (6001-F) 93,06%

    c. Filtered Water Storage Tank (6201-F) 94,06%

    d. Potable Water Storage Tank (6202-F) 0,40%

    e. Oase Solution Storage Tank (114-F) 0,06%

    Pekerjaan Construction

    1. Preparatory 92,90%

    2. Installation (Laying,install/fit-up,welding) untuk :

    a. Condensate Storage Tank (6003-F) 0,00%

    b. Demin Water Storge Tank (6001-F) 32,13%

    c. Filtered Water Storage Tank (6201-F) 28,14%

  • PUSRI IIB PROJECT

    2000 MTPD AMMONIA/2750 MTPD UREA PLANT

    No Order : PLP.9.13.002 No. Dokumen :P2B-30-22-PO-PO-043-R

    Halaman : Page 2 of 3 LAPORAN BULANAN

    d. Potable Water Storage Tank (6202-F) 0,00%

    e. Oase Solution Storage Tank (114-F) 0,00%

    3. Inspeksi & Testing (Visual check, Leak test, Hydro test) 0,00%

    4. Finish Painting 0,00%

    5. MDR & As Built Drawing 0,00%

    1.2 RINGKASAN PROGRESS PROYEK

    Kegiatan pekerjaan selama periode bulan ini secara umum dapat disampaikan sebagai berikut :

    II RINGKASAN KEGIATAN PROYEK

    Ringkasan Kegiatan Proyek dapat disampaikan sebagai berikut :

    Pekerjaan Engineering

    Sampai bulan ini pekerjaan Engineering sudah mencapai 77,82%, dan melanjutkan sisa

    pekerjaan yang harus direvisi.

    Pekerjaan Procurement

    Sampai dikeluarkan laporan bulanan ini, pekerjaan Procurement mencapai 89,02%, dan

    melanjutkan percepatan proses PO untuk semua other material cost dan mendatangkan

    semua material yang sudah di PO.

    Pekerjaan Fabrikasi

    Untuk Demin Water Storage Tank sudah mencapai 93,06%

    Untuk Filtered Water Storage Tank sudah mencapai 94,06%

    Untuk Condensate Water Storage Tank sudah mencapai 40,16%

    Untuk Potable Water Storage Tank baru 0,40%

    Untuk Oase Solution Water Tank baru 0,06%

  • PUSRI IIB PROJECT

    2000 MTPD AMMONIA/2750 MTPD UREA PLANT

    No Order : PLP.9.13.002 No. Dokumen :P2B-30-22-PO-PO-043-R

    Halaman : Page 3 of 3 LAPORAN BULANAN

    Pekerjaan Construction

    Pekerjaan instalasi untuk Demin Water Storage Tank sudah mencapai 32,13%.

    Untuk Filtered Water Storage Tank baru 28,14%

    III AKTIVITAS & TARGET UNTUK BULAN DEPAN

    Pekerjaan Engineering

    Mempercepat semua pekerjaan engineering yang masih perlu direvisi dan segera mengirimkan

    kembali ke pihak Engineering PT. Rekayasa Industri untuk direview.

    Pekerjaan Procurement

    Mempercepat proses PO untuk Other Material Cost terutama material SUS304 dan

    mendatangkan semua material yang sudah di PO.

    Pekerjaan Fabrikasi.

    Memulai pekerjaan fabrikasi untuk tangki Potable Water Storage Tank (6202-F)

    Memulai pekerjaan fabrikasi untuk tangki Oase Solution Water Tank (114-F)

    Pekerjaan Construction.

    Melanjutkan Instalasi Shell Demin Water Storage Tank

    Melanjutkan Instalasi Shell Filtered Water Storage Tank

  • Y YEAR

    Sep-13 Oct-13 Nov-13 Dec-13 Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-14

    1 2 3 4 5 6 7 8 9 10 11

    W 1 - 2 - 3 - 4 1 - 2 - 3 - 4 1 - 2 - 3 - 4 1 - 2 - 3 - 4 1 - 2 - 3 - 4 1 - 2 - 3 - 4 1 - 2 - 3 - 4 1 - 2 - 3 - 4 1 - 2 - 3 - 4 1 - 2 - 3 - 4 1 - 2 - 3 - 4

    PUSRI PROJECT

    I ENGINEERING 10.00%

    a. Demin Water Storage Tank 6001-F 2.00% Plan 0.40% 0.60% 0.60% 0.40%Actual 1.69% -0.02% 0.03% 0.00% 0.02%

    b. Condensate Storage Tank 6003-F 2.00% Plan 0.40% 0.60% 0.60% 0.40%Actual 1.23% 0.12% 0.09% 0.00% 0.00%

    c. Filtered Water Storage Tank 6201-F 2.00% Plan 0.40% 0.60% 0.60% 0.40%Actual 1.46% -0.02% 0.15% 0.00% 0.05%

    d. Potable Water Storage Tank 6202-F 2.00% Plan 0.40% 0.60% 0.60% 0.40%Actual 1.33% 0.19% -0.05% 0.00% 0.00%

    e. Oase Solution Storage Tank 114-F 2.00% Plan 0.40% 0.60% 0.60% 0.40%Actual 1.49% 0.00% 0.02% 0.00% 0.00%

    II PROCUREMENT 50.00%

    a. Demin Water Storage Tank 6001-F 25.44% Plan 5.09% 7.63% 7.63% 5.09%Actual 15.18% 3.98% 3.13% 1.41% 0.07%

    b. Condensate Storage Tank 6003-F 9.22% Plan 1.84% 2.76% 2.76% 1.84%Actual 1.75% 3.90% 1.01% 0.78% 0.48%

    c. Filtered Water Storage Tank 6201-F 7.09% Plan 1.42% 2.13% 2.13% 1.42%Actual 2.42% 1.49% 1.79% 1.02%

    d. Potable Water Storage Tank 6202-F 0.72% Plan 0.22% 0.29% 0.22%Actual 0.11% 0.15% 0.04% 0.14%

    e. Oase Solution Storage Tank 114-F 7.54% Plan 1.51% 2.26% 2.26% 1.51%Actual 0.90% 0.00% 4.59% 0.15%

    III CONSTRUCTION 35.00%

    a. Demin Water Storage Tank 6001-F 12.27% Plan 2.21% 2.45% 2.95% 2.45% 2.21%Actual 2.14% 0.91% 0.89%

    b. Condensate Storage Tank 6003-F 4.42% Plan 0.88% 1.33% 1.33% 0.88%Actual 0.77% 0.33% 0.32%

    c. Filtered Water Storage Tank 6201-F 10.42% Plan 1.88% 2.08% 2.50% 2.08% 1.88%Actual 1.81% 0.77% 0.76%

    d. Potable Water Storage Tank 6202-F 0.90% Plan 0.18% 0.27% 0.27% 0.18%Actual 0.16% 0.07% 0.07%

    e. Oase Solution Storage Tank 114-F 6.99% Plan 1.40% 2.10% 2.10% 1.40%Actual 1.22% 0.52% 0.51%

    IV MDR & HAND OVER 5.00% Plan 0.45% 0.65% 0.90% 1.00% 0.90% 0.65% 0.45%Actual

    100.00%

    0.40% 8.33% 14.41% 15.32% 15.44% 10.63% 9.91% 10.46% 8.44% 4.80% 1.85%

    0.40% 8.73% 23.15% 38.47% 53.91% 64.54% 74.45% 84.91% 93.35% 98.15% 100.00%

    0.00% 0.00% 24.13% 11.59% 12.12% 11.22% 4.48% 0.00% 0.00% 0.00% 0.00%

    0.00% 0.00% 24.13% 35.71% 47.83% 59.05% 63.53%

    -0.40% -8.33% 9.71% -3.74% -3.32% 0.59% -5.43%

    -0.40% -8.73% 0.98% -2.76% -6.08% -5.49% -10.92%

    PER As 20 MARET 2014

    A C T I V I T I E S INDEX %

    Plan

    REMARK'SM

    Actual

    Total Index

    PROGRESS

    PLANPer Month

    Cumulatif

    ACTUALPer Month

    Cumulatif

    DEVIASICumulatif

    Per Month

    PROGRESS S-CURVE

    PROJECT PUSRI-IIB PALEMBANG

    NO.

    0%

    20%

    40%

    60%

    80%

    100%

    PlanAct

    Prepared byPT. BARATA INDONESIA

    (Meisa Irianto)PROJECT MANAGER

    Checked and Approved byPT. REKAYASA INDUSTRI

    (Redy Feryanto)PROJECT MANAGER

  • CLIENT : PT. PUPUK SRIWIDJADJA PALEMBANGCONTRACTOR : CONSORTIUM OF PT. REKAYASA INDUSTRI - TOYO ENGINEERING CORPORATIONVENDOR : PT. BARATA INDONESIALOCATION : PALEMBANGREV. : 0

    No. Last Month This Month Commulative Last Month This Month Commulative Remark

    A B C = A+B E F G = E + F

    1 ENGINEERING 10.00 77.12% 0.69% 77.82% 7.7123 0.0693 7.7817

    2 PROCUREMENT 50.00 85.29% 3.73% 89.02% 42.6456 1.8628 44.5084

    3 CONSTRUCTION 40.00 21.72% 6.37% 28.10% 8.6881 2.5500 11.2381

    TOTAL 100.00 59.05% 4.48% 63.53% 59.05 4.48 63.53

    DescriptionWeight

    Factor (%)

    Progress Progress to WF

    PUSRI - IIB

    2000 MTPD AMMONIA / 2750 MTPD UREA PLANT

    SUMMARY OVERALL PROGRESS

    As PER 20 MARET 2014

    Checked and Approved byPrepared by

    PT. BARATA INDONESIA

    ( Meisa Irianto )

    PROJECT MANAGER

    PT. REKAYASA INDUSTRI

    ( Redy Feryanto )

    PROJECT MANAGER

    Page 1 of 1

  • CLIENT : PT. PUPUK SRIWIDJADJA PALEMBANGCONTRACTOR : CONSORTIUM OF PT. REKAYASA INDUSTRI - TOYO ENGINEERING CORPORATIONVENDOR : PT. BARATA INDONESIALOCATION : PALEMBANGREV. : 0

    No. Last Month This Month Commulative Last Month This Month Commulative Remark

    A B C = A+B E F G = E+F

    4.0000

    1 ENGINEERING 10.0000

    1.1 Calculation 2.8132 24.76% 0.00% 24.76% 2.4756 0.0000 2.4756

    a. Condensate Storage tank 6003-F 0.5626 80.00% 0.00% 80.00% 0.4501 0.0000 0.4501

    b. Demin Water Storage Tank 6001-F 0.5626 100.00% 0.00% 100.00% 0.5626 0.0000 0.5626

    c. Filtered Water Storage tank 6201-F 0.5626 100.00% 0.00% 100.00% 0.5626 0.0000 0.5626

    d. Potable Water Storage tank 6202-F 0.5626 80.00% 0.00% 80.00% 0.4501 0.0000 0.4501

    e. Oase Solution Storage Tank 114-F 0.5626 80.00% 0.00% 80.00% 0.4501 0.0000 0.4501

    1.2 Drawing 7.1868 52.37% 0.69% 53.06% 5.2367 0.0693 5.3061

    a. Condensate Storage tank 6003-F 1.4374 69.00% 0.00% 69.00% 0.9918 0.0000 0.9918

    b. Demin Water Storage Tank 6001-F 1.4374 78.89% 1.67% 80.56% 1.1339 0.0240 1.1579

    c. Filtered Water Storage tank 6201-F 1.4374 71.58% 3.16% 74.74% 1.0288 0.0454 1.0742

    d. Potable Water Storage tank 6202-F 1.4374 71.18% 0.00% 71.18% 1.0231 0.0000 1.0231

    e. Oase Solution Storage Tank 114-F 1.4374 73.68% 0.00% 73.68% 1.0591 0.0000 1.0591

    TOTAL 10.00 77.12% 0.69% 77.82% 7.71 0.07 7.78

    PUSRI - IIB

    2000 MTPD AMMONIA / 2750 MTPD UREA PLANT

    Progress

    Description

    SUMMARY ENGINEERING PROGRESS

    As PER 20 MARET 2014

    Weight Factor

    Progress to WF

    Check and Approved By

    PT. REKAYASA INDUSTRI

    ( Sigih )

    LEAD MECHANICAL

    ( Meisa Irianto)

    PROJECT MANAGER

    Prepared and Checked by

    PT. BARATA INDONESIA

    ( Fauzan )

    CHIEF ENGINEER

    Page 1 of 1

  • CLIENT : PT. PUPUK SRIWIDJADJA PALEMBANGCONTRACTOR : CONSORTIUM OF PT. REKAYASA INDUSTRI - TOYO ENGINEERING CORPORATIONVENDOR : PT. BARATA INDONESIALOCATION : PALEMBANGREV. : 0

    No. Last Month This Month Commulative Last Month This Month Commulative Remark

    A B C = A+B E F G = E+F

    1 PROCUREMENT 50.0000

    1.1 PLATE MATERIAL COST 31.9643 100.00% 0.00% 100.00% 31.9643 0.0000 31.9643

    a. Condensate Storage tank 6003-F 5.6447 100.00% 0.00% 100.00% 5.6447 0.0000 5.6447

    b. Demin Water Storage Tank 6001-F 17.6501 100.00% 0.00% 100.00% 17.6501 0.0000 17.6501

    c. Filtered Water Storage tank 6201-F 3.9125 100.00% 0.00% 100.00% 3.9125 0.0000 3.9125

    d. Potable Water Storage tank 6202-F 0.2648 100.00% 0.00% 100.00% 0.2648 0.0000 0.2648

    e. Oase Solution Storage Tank 114-F 4.4922 100.00% 0.00% 100.00% 4.4922 0.0000 4.4922

    1.2 OTHER MATERIAL COST 11.1532 64.00% 7.66% 71.67% 7.1385 0.8545 7.9930

    a. Condensate Storage tank 6003-F 2.6495 67.87% 4.26% 72.13% 1.7982 0.1130 1.9111

    b. Demin Water Storage Tank 6001-F 5.2297 70.41% 1.10% 71.51% 3.6824 0.0573 3.7397

    c. Filtered Water Storage tank 6201-F 1.2643 48.85% 31.43% 80.29% 0.6176 0.3974 1.0150

    d. Potable Water Storage tank 6202-F 0.2912 14.74% 48.34% 63.09% 0.0429 0.1408 0.1837

    e. Oase Solution Storage Tank 114-F 1.7186 58.03% 8.51% 66.53% 0.9973 0.1462 1.1434

    1.3 FABRICATION 6.8824 51.48% 14.65% 66.13% 3.5428 1.0083 4.5511

    a. Condensate Storage tank 6003-F 0.9214 0.00% 40.16% 40.16% 0.0000 0.3701 0.3701

    b. Demin Water Storage Tank 6001-F 2.5594 92.48% 0.58% 93.06% 2.3670 0.0147 2.3817

    c. Filtered Water Storage tank 6201-F 1.9113 61.52% 32.55% 94.06% 1.1758 0.6220 1.7978

    d. Potable Water Storage tank 6202-F 0.1639 0.00% 0.40% 0.40% 0.0000 0.0007 0.0007

    e. Oase Solution Storage Tank 114-F 1.3264 0.00% 0.06% 0.06% 0.0000 0.0008 0.0008

    TOTAL 50.00 85.29% 3.73% 89.02% 42.65 1.86 44.51

    ( Meisa Irianto )

    PROJECT MANAGER

    ( Izatul Fitriani )

    PROCUREMENT CORD.

    ( Hendrizal )

    PROJECT PROC. MANAGER

    Prepared and Checked by

    PT. BARATA INDONESIA

    PUSRI - IIB

    2000 MTPD AMMONIA / 2750 MTPD UREA PLANT

    SUMMARY PROCUREMENT PROGRESS

    As PER 20 MARET 2014

    Weight Factor

    Progress Progress to WF

    Description

    Check and Approved By

    PT. REKAYASA INDUSTRI

    Page 1 of 1

  • CLIENT : PT. PUPUK SRIWIDJADJA PALEMBANGCONTRACTOR : CONSORTIUM OF PT. REKAYASA INDUSTRI - TOYO ENGINEERING CORPORATIONVENDOR : PT. BARATA INDONESIALOCATION : PALEMBANGREV. : 0

    No. Last Month This Month Commulative Last Month This Month Commulative Remark

    A B C = A+B E F G = E+F

    4.0000

    1 ENGINEERING 10.0000 100.000% 77.12% 0.69% 77.82% 7.7123 0.0693 7.7817

    1.1 Calculation 2.8132 28.132% 24.76% 0.00% 24.76% 2.4756 0.0000 2.4756

    a. Condensate Storage tank 6003-F 0.5626 5.626% 80.00% 0.00% 80.00% 0.4501 0.0000 0.4501

    b. Demin Water Storage Tank 6001-F 0.5626 5.626% 100.00% 0.00% 100.00% 0.5626 0.0000 0.5626

    c. Filtered Water Storage tank 6201-F 0.5626 5.626% 100.00% 0.00% 100.00% 0.5626 0.0000 0.5626

    d. Potable Water Storage tank 6202-F 0.5626 5.626% 80.00% 0.00% 80.00% 0.4501 0.0000 0.4501

    e. Oase Solution Storage Tank 114-F 0.5626 5.626% 80.00% 0.00% 80.00% 0.4501 0.0000 0.4501

    1.2 Drawing 7.1868 71.868% 52.37% 0.69% 53.06% 5.2367 0.0693 5.3061

    a. Condensate Storage tank 6003-F 1.4374 14.374% 69.00% 0.00% 69.00% 0.9918 0.0000 0.9918

    b. Demin Water Storage Tank 6001-F 1.4374 14.374% 78.89% 1.67% 80.56% 1.1339 0.0240 1.1579

    c. Filtered Water Storage tank 6201-F 1.4374 14.374% 71.58% 3.16% 74.74% 1.0288 0.0454 1.0742

    d. Potable Water Storage tank 6202-F 1.4374 14.374% 71.18% 0.00% 71.18% 1.0231 0.0000 1.0231

    e. Oase Solution Storage Tank 114-F 1.4374 14.374% 73.68% 0.00% 73.68% 1.0591 0.0000 1.0591

    2 PROCUREMENT & FABRICATION 50.0000 100.000% 85.29% 3.73% 89.02% 42.6456 1.8628 44.5084

    2.1 PLATE MATERIAL COST 31.9643 100.000% 100.00% 0.00% 100.00% 31.9643 0.0000 31.9643

    a. Condensate Storage tank 6003-F 5.6447 17.659% 100.00% 0.00% 100.00% 5.6447 0.0000 5.6447

    b. Demin Water Storage Tank 6001-F 17.6501 55.218% 100.00% 0.00% 100.00% 17.6501 0.0000 17.6501

    c. Filtered Water Storage tank 6201-F 3.9125 12.240% 100.00% 0.00% 100.00% 3.9125 0.0000 3.9125

    d. Potable Water Storage tank 6202-F 0.2648 0.828% 100.00% 0.00% 100.00% 0.2648 0.0000 0.2648

    e. Oase Solution Storage Tank 114-F 4.4922 14.054% 100.00% 0.00% 100.00% 4.4922 0.0000 4.4922

    2.2 OTHER MATERIAL COST 11.1532 100.000% 64.00% 7.66% 71.67% 7.1385 0.8545 7.9930

    a. Condensate Storage tank 6003-F 2.6495 23.756% 67.87% 4.26% 72.13% 1.7982 0.1130 1.9111

    b. Demin Water Storage Tank 6001-F 5.2297 46.890% 70.41% 1.10% 71.51% 3.6824 0.0573 3.7397

    c. Filtered Water Storage tank 6201-F 1.2643 11.335% 48.85% 31.43% 80.29% 0.6176 0.3974 1.0150

    d. Potable Water Storage tank 6202-F 0.2912 2.611% 14.74% 48.34% 63.09% 0.0429 0.1408 0.1837

    e. Oase Solution Storage Tank 114-F 1.7186 15.409% 58.03% 8.51% 66.53% 0.9973 0.1462 1.1434

    PUSRI - IIB

    2000 MTPD AMMONIA / 2750 MTPD UREA PLANT

    DETAIL OVERALL PROGRESS

    As PER 20 MARET 2014

    Description Weight Factor Physic

    Progress to WFProgress

    Page 1 of 3

  • CLIENT : PT. PUPUK SRIWIDJADJA PALEMBANGCONTRACTOR : CONSORTIUM OF PT. REKAYASA INDUSTRI - TOYO ENGINEERING CORPORATIONVENDOR : PT. BARATA INDONESIALOCATION : PALEMBANGREV. : 0

    No. Last Month This Month Commulative Last Month This Month Commulative Remark

    A B C = A+B E F G = E+F

    PUSRI - IIB

    2000 MTPD AMMONIA / 2750 MTPD UREA PLANT

    DETAIL OVERALL PROGRESS

    As PER 20 MARET 2014

    Description Weight Factor Physic

    Progress to WFProgress

    2.3 FABRICATION 6.8824 100.00% 51.48% 14.65% 66.13% 3.5428 1.0083 4.5511

    a. Condensate Storage tank 6003-F 0.9214 13.39% 0.00% 40.16% 40.16% 0.0000 0.3701 0.3701

    b. Demin Water Storage Tank 6001-F 2.5594 37.19% 92.48% 0.58% 93.06% 2.3670 0.0147 2.3817

    c. Filtered Water Storage tank 6201-F 1.9113 27.77% 61.52% 32.55% 94.06% 1.1758 0.6220 1.7978

    d. Potable Water Storage tank 6202-F 0.1639 2.38% 0.00% 0.40% 0.40% 0.0000 0.0007 0.0007

    e. Oase Solution Storage Tank 114-F 1.3264 19.27% 0.00% 0.06% 0.06% 0.0000 0.0008 0.0008

    3 CONSTRUCTION 40.0000 100.00% 21.72% 6.37% 28.10% 8.6881 2.5500 11.2381

    3.1 PREPARATORY WORK 6.9846 100.00% 92.90% 0.00% 92.90% 6.4889 0.0000 6.4889

    a. Mobilization 0.8955 12.82% 44.64% 0.00% 44.64% 0.3998 0.0000 0.3998

    b. Temporary facility 4.4773 64.10% 100.00% 0.00% 100.00% 4.4773 0.0000 4.4773

    c. Utility Facility 1.6118 23.08% 100.00% 0.00% 100.00% 1.6118 0.0000 1.6118

    3.2 INSTALLATION 24.0327 100.00% 9.15% 10.61% 19.76% 2.1992 2.5500 4.7492

    a. Condensate Storage tank 6003-F 3.2177 13.39% 0.00% 0.00% 0.00% 0.0000 0.0000 0.0000

    b. Demin Water Storage Tank 6001-F 8.9374 37.19% 23.25% 8.88% 32.13% 2.0777 0.7935 2.8712

    c. Filtered Water Storage tank 6201-F 6.6740 27.77% 1.82% 26.32% 28.14% 0.1215 1.7565 1.8780

    d. Potable Water Storage tank 6202-F 0.5722 2.38% 0.00% 0.00% 0.00% 0.0000 0.0000 0.0000

    e. Oase Solution Storage Tank 114-F 4.6314 19.27% 0.00% 0.00% 0.00% 0.0000 0.0000 0.0000

    3.3 INSPECTION AND TESTING 3.0014 100.00% 0.00% 0.00% 0.00% 0.0000 0.0000 0.0000

    a. Condensate Storage tank 6003-F 0.3189 10.63% 0.00% 0.00% 0.00% 0.0000 0.0000 0.0000

    b. Demin Water Storage Tank 6001-F 0.8859 29.52% 0.00% 0.00% 0.00% 0.0000 0.0000 0.0000

    c. Filtered Water Storage tank 6201-F 1.0863 36.19% 0.00% 0.00% 0.00% 0.0000 0.0000 0.0000

    d. Potable Water Storage tank 6202-F 0.0931 3.10% 0.00% 0.00% 0.00% 0.0000 0.0000 0.0000

    e. Oase Solution Storage Tank 114-F 0.6171 20.56% 0.00% 0.00% 0.00% 0.0000 0.0000 0.0000

    3.4 Finish Painting 0.9813 100.00% 0.00% 0.00% 0.00% 0.0000 0.0000 0.0000

    a. Filtered Water Storage tank 6201-F 0.5793 59.03% 0.00% 0.00% 0.00% 0.0000 0.0000 0.0000

    b. Potable Water Storage tank 6202-F 0.0543 5.53% 0.00% 0.00% 0.00% 0.0000 0.0000 0.0000

    c. Oase Solution Storage Tank 114-F 0.3477 35.44% 0.00% 0.00% 0.00% 0.0000 0.0000 0.0000

    Page 2 of 3

  • CLIENT : PT. PUPUK SRIWIDJADJA PALEMBANGCONTRACTOR : CONSORTIUM OF PT. REKAYASA INDUSTRI - TOYO ENGINEERING CORPORATIONVENDOR : PT. BARATA INDONESIALOCATION : PALEMBANGREV. : 0

    No. Last Month This Month Commulative Last Month This Month Commulative Remark

    A B C = A+B E F G = E+F

    PUSRI - IIB

    2000 MTPD AMMONIA / 2750 MTPD UREA PLANT

    DETAIL OVERALL PROGRESS

    As PER 20 MARET 2014

    Description Weight Factor Physic

    Progress to WFProgress

    3.5 MDR & Hand Over 5.0000 100.00% 0.00% 0.00% 0.00% 0.0000 0.0000 0.0000

    a. Condensate Storage tank 6003-F 0.5308 10.62% 0.00% 0.00% 0.00% 0.0000 0.0000 0.0000

    b. Demin Water Storage Tank 6001-F 1.4752 29.50% 0.00% 0.00% 0.00% 0.0000 0.0000 0.0000

    c. Filtered Water Storage tank 6201-F 1.8101 36.20% 0.00% 0.00% 0.00% 0.0000 0.0000 0.0000

    d. Potable Water Storage tank 6202-F 0.1557 3.11% 0.00% 0.00% 0.00% 0.0000 0.0000 0.0000

    e. Oase Solution Storage Tank 114-F 1.0281 20.56% 0.00% 0.00% 0.00% 0.0000 0.0000 0.0000

    TOTAL 100.00 59.05% 4.48% 63.53% 59.05 4.48 63.53

    Checked and Approved byPT. REKAYASA INDUSTRI

    (Redy Feryanto)PROJECT MANAGER

    Prepared byPT. BARATA INDONESIA

    (Meisa Irianto)PROJECT MANAGER

    Page 3 of 3

  • PROJECT : PUSRI - II B

    CLIENT : PT. PUPUK SRIWIDJADJA (PERSERO)

    CONTRACTOR : PT. REKAYASA INDUSTRI (PERSERO)

    LOCATION : PALEMBANG, SUMSEL-INDONESIA

    SUBMIT STATUS (B) STATUS (A)

    50% 30% 20% 100%

    A CALCULATION

    1. P2B-E4-6001F-CS-001 CALCULATION DEMIN WATER STORAGE TANK 1 100.00% 5 A 66 09-01-14 1 1 1 100% 100.00%

    2. P2B-E4-6201F-CS-001 CALCULATION FILTERED WATER STORAGE TANK 1 100.00% 4 A 66 09-01-14 1 1 1 100% 100.00%

    3. P2B-E4-6003F-CS-001 CALCULATION CONDENSATE WATER TANK 1 100.00% 4 B 67 13-01-14 1 1 80% 80.00%

    4. P2B-E4-6202F-CS-001 CALCULATION POTABLE WATER TANK 1 100.00% 3 B 67 13-01-14 1 1 80% 80.00%

    5. P2B-E4-114F-CS-001 CALCULATION OASE SOLUTION TANK 1 100.00% 3 B 69 15-01-14 1 1 80% 80.00%

    B DRAWING

    I

    1. P2B-E4-6001F-LD-001 LOADING DATA 1 5.56% 1 B 41 07-01-14 1 1 80% 4.44%

    2. P2B-E4-6001F-GA-001 GENERAL ARRANGEMENT 1 5.56% 2 B 77 15-01-14 1 1 80% 4.44%

    3. P2B-E4-6001F-DW-001 ROOF DETAIL 1 5.56% 0 B 15 06-11-13 1 1 80% 4.44%

    4. P2B-E4-6001F-DW-002 NOZZLE SHELL DETAIL - 1 1 5.56% 1 B 56 18-01-14 1 1 80% 4.44%

    5. P2B-E4-6001F-DW-003 ANCHOR BOLT DETAIL 1 5.56% 1 B 64 07-01-14 1 1 80% 4.44%

    6. P2B-E4-6001F-DW-004 NOZZLE ROOF DETAIL 1 5.56% 1 B 56 18-01-14 1 1 80% 4.44%

    7. P2B-E4-6001F-DW-005 MANHOLE SHELL DETAIL 1 5.56% 1 B 56 18-01-14 1 1 80% 4.44%

    8. P2B-E4-6001F-DW-006 MANHOLE ROOF DETAIL 1 5.56% 0 B 4 18-10-13 1 1 80% 4.44%

    9. P2B-E4-6001F-DW-007 DEVELOPMENT DETAIL 1 5.56% 2 B 75 15-01-14 1 1 80% 4.44%

    10. P2B-E4-6001F-DW-008 NAME PLATE DETAIL 1 5.56% 0 C 13 06-11-13 1 50% 2.78%

    11. P2B-E4-6001F-DW-009 EXTERNAL ATTACHMENT 1 5.56% 1 B 63 15-01-14 1 1 80% 4.44%

    12. P2B-E4-6001F-DW-010 (1/2) STAIRWAY - 1 DETAIL 1 5.56% 1 B 63 15-01-14 1 1 80% 4.44%

    13. P2B-E4-6001F-DW-010 (2/2) STAIRWAY - 1 DETAIL 1 5.56% 1 B 63 15-01-14 1 1 80% 4.44%

    14. P2B-E4-6001F-DW-011 HANDRAIL DETAIL 1 5.56% 0 B 11 06-11-13 1 1 80% 4.44%

    15. P2B-E4-6001F-DW-012 RAFTER DETAIL 1 5.56% 1 A 58 18-01-14 1 1 1 100% 5.56%

    16. P2B-E4-6001F-DW-013 INTERNAL DETAIL 1 5.56% 3 B 84 18-01-14 1 1 80% 4.44%

    17. P2B-E4-6001F-DW-014 PLATFORM DETAIL 1 5.56% 0 B 14 06-11-13 1 1 80% 4.44%

    18. P2B-E4-6001F-DW-015 BOTTOM DETAIL 1 5.56% 1 A 56 18-01-14 1 1 1 100% 5.56%

    18 100.00% 18 17 2

    100% 94% 11%

    II

    PROGRESS CALCULATION ENGINEERING

    DOCUMENT NUMBER

    DEMIN WATER STORAGE TANK

    FILTERED WATER STORAGE TANK

    PROGRESS

    to WF (%)REMARKS

    80.56%TOTAL

    PROGRESS

    No DOCUMENTQTY of

    DOC

    PROGRESS

    TOTAL

    Work Step

    WF (%)Latest Issued

    Rev Status TA. No Date

    Page 1 of 4

  • SUBMIT STATUS (B) STATUS (A)

    50% 30% 20% 100%

    DOCUMENT NUMBERPROGRESS

    to WF (%)REMARKSNo DOCUMENT

    QTY of

    DOC

    PROGRESS

    TOTAL

    Work Step

    WF (%)Latest Issued

    Rev Status TA. No Date

    1. P2B-E4-6201F-LD-001 LOADING DATA 1 5.26% 1 B 42 07-01-14 1 1 80% 4.21%

    2. P2B-E4-6201F-GA-001 GENERAL ARRANGEMENT 1 5.26% 1 B 40 28-11-13 1 1 80% 4.21%

    3. P2B-E4-6201F-DW-001 ROOF DETAIL 1 5.26% 2 B 82 18-01-14 1 1 80% 4.21%

    4. P2B-E4-6201F-DW-002 NOZZLE SHELL DETAIL - 1 1 5.26% 1 C 35 16-12-13 1 50% 2.63%

    5. P2B-E4-6201F-DW-003 NOZZLE ROOF DETAIL-1 1 5.26% 1 - 35 16-12-13 1 50% 2.63%

    6. P2B-E4-6201F-DW-004 NOZZLE ROOF DETAIL-2 1 5.26% 1 B 35 16-12-13 1 1 80% 4.21%

    7. P2B-E4-6201F-DW-005 MANHOLE SHELL DETAIL 1 5.26% 0 B 7 18-10-13 1 1 80% 4.21%

    8. P2B-E4-6201F-DW-006 MANHOLE ROOF DETAIL 1 5.26% 0 B 7 18-10-13 1 1 80% 4.21%

    9. P2B-E4-6201F-DW-007 DEVELOPMENT DETAIL 1 5.26% 3 B 90 31/1213 1 1 80% 4.21%

    10. P2B-E4-6201F-DW-008 NAME PLATE DETAIL 1 5.26% 1 B 65 30-10-13 1 1 80% 4.21%

    11. P2B-E4-6201F-DW-009 EXTERNAL ATTACHMENT 1 5.26% 0 B 13 06-11-13 1 1 80% 4.21%

    12. P2B-E4-6201F-DW-010 (1/2) STAIRWAY - 1 DETAIL 1 5.26% 1 B 55 18-01-14 1 1 80% 4.21%

    13. P2B-E4-6201F-DW-010 (2/2) STAIRWAY - 2 DETAIL 1 5.26% 1 B 55 18-01-14 1 1 80% 4.21%

    14. P2B-E4-6201F-DW-011 HANDRAIL DETAIL 1 5.26% 0 B 11 08-11-13 1 1 80% 4.21%

    15. P2B-E4-6201F-DW-012 RAFTER DETAIL 1 5.26% 1 A 54 18-01-14 1 1 1 100% 5.26%

    16. P2B-E4-6201F-DW-013 INTERNAL DETAIL 1 5.26% 0 B 11 30-10-13 1 1 80% 4.21%

    17. P2B-E4-6201F-DW-014 PLATFORM DETAIL 1 5.26% 1 B 55 18-01-14 1 1 80% 4.21%

    18. P2B-E4-6201F-DW-015 BOTTOM DETAIL 1 5.26% 3 B 76 10-01-14 1 1 80% 4.21%

    19. P2B-E4-6201F-DW-016 ANCHOR BOLT DETAIL 1 5.26% 0 A 44 24-12-14 1 1 1 100% 5.26%

    19 94.74% 19 17 2

    100% 89% 11%

    III

    1. P2B-E4-6003F-GA-001 GENERAL ARRANGEMENT 1 5.00% 1 B 44 24-12-13 1 1 80% 4.00%

    2. P2B-E4-6003F-LD-001 LOADING DATA 1 5.00% 0 B 42 07-01-14 1 1 80% 4.00%

    3. P2B-E4-6003F-DW-001 DETAIL ROOF 1 5.00% 1 B 83 06-11-13 1 1 80% 4.00%

    4. P2B-E4-6003F-DW-002 NOZZLE SHELL DETAIL 1 5.00% 0 B 14 06-11-13 1 1 80% 4.00%

    5. P2B-E4-6003F-DW-003 ANCHOR BOLT DETAIL 1 5.00% 0 B 65 08-01-14 1 1 80% 4.00%

    6. P2B-E4-6003F-DW-004 NOZZLE ROOF DETAIL 1 5.00% 0 B 14 06-11-13 1 1 80% 4.00%

    7. P2B-E4-6003F-DW-005 MANHOLE SHELL DETAIL 1 5.00% 0 B 14 06-11-13 1 1 80% 4.00%

    8. P2B-E4-6003F-DW-006 MANHOLE ROOF DETAIL 1 5.00% 0 B 14 06-11-13 1 1 80% 4.00%

    9. P2B-E4-6003F-DW-007 DEVELOPMENT DETAIL 1 5.00% 0 B 11 06-11-13 1 1 80% 4.00%

    10. P2B-E4-6003F-DW-008 NAME PLATE DETAIL 1 5.00% 0 C 14 06-11-13 1 50% 2.50%

    11. P2B-E4-6003F-DW-009 (1/2) EXTERNAL ATTACHMENT - 1 1 5.00% 0 B 11 06-11-13 1 1 80% 4.00%

    12. P2B-E4-6003F-DW-009 (2/2) EXTERNAL ATTACHMENT - 2 1 5.00% 1 B 50 18-01-14 1 1 80% 4.00%

    13. P2B-E4-6003F-DW-010 STAIRWAY (1 OF 2) 1 5.00% 0 B 11 30-10-13 1 1 80% 4.00%

    CONDENSATE WATER TANK

    TOTAL74.74%

    PROGRESS

    Page 2 of 4

  • SUBMIT STATUS (B) STATUS (A)

    50% 30% 20% 100%

    DOCUMENT NUMBERPROGRESS

    to WF (%)REMARKSNo DOCUMENT

    QTY of

    DOC

    PROGRESS

    TOTAL

    Work Step

    WF (%)Latest Issued

    Rev Status TA. No Date

    14. P2B-E4-6003F-DW-010 STAIRWAY (2 OF 2) 1 5.00% 0 B 11 30-10-13 1 1 80% 4.00%

    15. P2B-E4-6003F-DW-011 HANDRAIL DETAIL 1 5.00% 0 B 11 30-10-13 1 1 80% 4.00%

    16. P2B-E4-6003F-DW-012 RAFTER DETAIL 1 5.00% 1 B 83 30-10-13 1 1 80% 4.00%

    17. P2B-E4-6003F-DW-013 INTERNAL DETAIL 1 5.00% 0 B 11 30-10-13 1 1 80% 4.00%

    18. P2B-E4-6003F-DW-014 BOTTOM DETAIL 1 5.00% 1 B 84 08-01-14 1 1 80% 4.00%

    19. P2B-E4-6003F-DW-015 PLATFORM SHELL DETAIL 1 5.00% 1 B 50 18-01-14 1 1 80% 4.00%

    20. P2B-E4-6003F-DW-016 PLATFORM ROOF DETAIL 1 5.00% 0 C 11 30-10-13 1 50% 2.50%

    20 100.00% 20 18 0

    100% 90% 0%

    IV

    1. P2B-E4-6202F-GA-001 GENERAL ARRANGEMENT 1 5.88% 3 B 67 24-12-13 1 1 80% 4.71%

    2. P2B-E4-6202F-LD-001 LOADING DATA 1 5.88% 0 B 42 07-01-14 1 1 80% 4.71%

    3. P2B-E4-6202F-DW-001 ROOF DETAIL 1 5.88% 1 C 36 24-12-14 1 50% 2.94%

    4. P2B-E4-6202F-DW-002 NOZZLE SHELL DETAIL - 1 1 5.88% 0 B 5 26-10-13 1 1 80% 4.71%

    5. P2B-E4-6202F-DW-003 NOZZLE SHELL DETAIL - 2 1 5.88% 0 B 5 26-10-13 1 1 80% 4.71%

    6. P2B-E4-6202F-DW-004 NOZZLE ROOF DETAIL 1 5.88% 0 B 5 26-10-13 1 1 80% 4.71%

    7. P2B-E4-6202F-DW-005 MANHOLE SHELL DETAIL 1 5.88% 1 B 50 18-01-14 1 1 80% 4.71%

    8. P2B-E4-6202F-DW-006 MANHOLE ROOF DETAIL 1 5.88% 0 B 6 18-10-13 1 1 80% 4.71%

    9. P2B-E4-6202F-DW-007 DEVELOPMENT DETAIL 1 5.88% 1 C 36 24-12-13 1 50% 2.94%

    10. P2B-E4-6202F-DW-008 NAME PLATE DETAIL 1 5.88% 0 C 11 30-10-13 1 50% 2.94%

    11. P2B-E4-6202F-DW-009 EXTERNAL ATTACHMENT 1 5.88% 1 B 50 18-01-14 1 1 80% 4.71%

    12. P2B-E4-6202F-DW-010 LADDER DETAIL 1 5.88% 1 B 36 24-12-13 1 1 80% 4.71%

    13. P2B-E4-6202F-DW-011 HANDRAIL DETAIL 1 5.88% 1 C 36 24-12-13 1 50% 2.94%

    14. P2B-E4-6202F-DW-012 RAFTER DETAIL 1 5.88% 1 B 36 24-12-13 1 1 80% 4.71%

    15. P2B-E4-6202F-DW-013 PLATFORM DETAIL 1 5.88% 1 B 50 18-01-14 1 1 80% 4.71%

    16. P2B-E4-6202F-DW-014 ANCHOR BOLT DETAIL 1 5.88% 0 C 48 31-12-13 1 50% 2.94%

    17. P2B-E4-6202F-DW-015 BOTTOM DETAIL 1 5.88% 1 B 36 24-12-13 1 1 80% 4.71%

    17 100.00% 17 12 0

    100% 71% 0%

    V

    1. P2B-E4-114F-GA-001 GENERAL ARRANGEMENT 1 5.26% 0 B 5 26-10-13 1 1 80% 4.21%

    2. P2B-E4-114F-LD-001 LOADING DATA 1 5.26% 0 B 45 07-01-14 1 1 80% 4.21%

    3. P2B-E4-114F-DW-001 DETAIL ROOF 1 5.26% 1 B 48 18-01-14 1 1 80% 4.21%

    4. P2B-E4-114F-DW-002 NOZZLE SHELL DETAIL - 1 1 5.26% 0 B 5 26-10-13 1 1 80% 4.21%

    5. P2B-E4-114F-DW-003 NOZZLE SHELL DETAIL - 2 1 5.26% 0 B 5 26-10-13 1 1 80% 4.21%

    POTABLE WATER TANK

    TOTAL69.00%

    PROGRESS

    TOTAL71.18%

    PROGRESS

    OASE SOLUTION TANK

    Page 3 of 4

  • SUBMIT STATUS (B) STATUS (A)

    50% 30% 20% 100%

    DOCUMENT NUMBERPROGRESS

    to WF (%)REMARKSNo DOCUMENT

    QTY of

    DOC

    PROGRESS

    TOTAL

    Work Step

    WF (%)Latest Issued

    Rev Status TA. No Date

    6. P2B-E4-114F-DW-004 NOZZLE ROOF DETAIL 1 5.26% 0 C 5 26-10-13 1 50% 2.63%

    7. P2B-E4-114F-DW-005 MANHOLE SHELL DETAIL 1 5.26% 1 B 57 18-01-14 1 1 80% 4.21%

    8. P2B-E4-114F-DW-006 MANHOLE ROOF DETAIL 1 5.26% 0 B 5 26-10-13 1 1 80% 4.21%

    9. P2B-E4-114F-DW-007 DEVELOPMENT DETAIL 1 5.26% 1 B 48 31-12-13 1 1 80% 4.21%

    10. P2B-E4-114F-DW-008 NAME PLATE DETAIL 1 5.26% 0 C 11 06-11-13 1 50% 2.63%

    11. P2B-E4-114F-DW-009 EXTERNAL ATTACHMENT 1 5.26% 0 B 11 06-11-13 1 1 80% 4.21%

    12. P2B-E4-114F-DW-010 STAIRWAY ( 1 OF 2) 1 5.26% 0 B 11 06-11-13 1 1 80% 4.21%

    13. P2B-E4-114F-DW-010 STAIRWAY (2 OF 2) 1 5.26% 0 B 11 06-11-13 1 1 80% 4.21%

    14. P2B-E4-114F-DW-011 TOP HANDRAIL DETAIL 1 5.26% 1 B 48 31-12-13 1 1 80% 4.21%

    15. P2B-E4-114F-DW-012 RAFTER DETAIL 1 5.26% 1 B 48 31-12-13 1 1 80% 4.21%

    16. P2B-E4-114F-DW-013 DEVELOPMENT DETAIL STRINGER 1 5.26% 0 B 11 06-11-13 1 1 80% 4.21%

    17. P2B-E4-114F-DW-014 PLATFORM DETAIL 1 5.26% 1 C 48 31-12-13 1 50% 2.63%

    18. P2B-E4-114F-DW-015 BOTTOM DETAIL 1 5.26% 1 B 48 31-12-13 1 1 80% 4.21%

    19. P2B-E4-114F-DW-016 ANCHOR BOLT DETAIL 1 5.26% 0 C 48 31-12-13 1 50% 2.63%

    19 100.00% 19 15 0

    100% 79% 0%

    (Fauzan)

    CHIEF ENGINEER

    TOTAL73.68%

    PROGRESS

    Check and Approved By

    PT. REKAYASA INDUSTRI

    ( Sigih )

    LEAD MECHANICAL

    Prepared and Checked by

    PT. BARATA INDONESIA

    ( Meisa Irianto )

    PROJECT MANAGER

    Page 4 of 4

  • PROJECT : PUSRI - II B

    CLIENT : PT. PUPUK SRIWIDJADJA (PERSERO)

    CONTRACTOR : PT. REKAYASA INDUSTRI (PERSERO)

    LOCATION : PALEMBANG, SUMSEL-INDONESIA

    POAT

    SHOP

    PROGRESS

    TOTAL20% 80% 100.00% Last Month This Mont Commulative

    A MATERIAL SUPPLY (BOTTOM, SHELL, ROOF PLATE)

    1 DEMIN WATER STORAGE TANK (6001-F) 90078.7876 100.000% 100.000% 0.000% 100.000%

    a. SHELL , MANHOLE A 20-304 PL 10 x 1524 x 6096 10 743.224 7432.2432 8.251% 10 10 100.00% 8.25% 0.00% 8.25%

    b. SHELL, ROOF, BUTTOM, PAD A 20-304 PL 8 x 1524 x 6096 88 594.579 52322.9921 58.086% 88 88 100.00% 58.09% 0.00% 58.09%

    c. SHELL A 20-304 PL 6 x 1524 x 6096 68 445.935 30323.5523 33.663% 68 68 100.00% 33.66% 0.00% 33.66%

    2 CONDENSATE STORAGE TANK (6003-F) 28985.7485 100.000% 100.000% 0.000% 100.000%

    a. MANHOLE A 20-304 PL 10 x 1524 x 6096 1 743.224 743.22432 2.564% 1 1 100.00% 2.56% 0.00% 2.56%

    b. SHEL, BOTTOM A 20-304 PL 8 x 1524 x 6096 16 594.579 9513.2713 32.821% 16 16 100.00% 32.82% 0.00% 32.82%

    c. SHEL, ROOF A 20-304 PL 6 x 1524 x 6096 42 445.935 18729.2529 64.615% 42 42 100.00% 64.62% 0.00% 64.62%

    3 FILTERED WATER STORAGE TANK (6201-F) 127338.027 100.00% 61.90% 38.10% 100.00%

    a. SHELL A 283 GR.C PL 15 x 2438 x 9144 6 2675.169 16051.0118 12.61% 6 6 100.00% 2.52% 10.08% 12.61%

    b. SHELL A 283 GR.C PL 14 x 2438 x 9144 6 2496.824 14980.9444 11.76% 6 6 100.00% 2.35% 9.41% 11.76%

    c. SHELL & MANHOLE A 283 GR.C PL 12 x 2438 x 9144 8 2140.135 17121.0793 13.45% 8 8 100.00% 13.45% 0.00% 13.45%

    d. SHELL, BOTTOM & MANHOLE A 283 GR.C PL 10 x 2438 x 9144 31 1783.446 55286.8186 43.42% 31 31 100.00% 31.09% 12.32% 43.42%

    e. SHELL, ROOF & PAD A 283 GR.C PL 8 x 2438 x 9144 7 1426.757 9987.29626 7.84% 7 7 100.00% 1.57% 6.27% 7.84%

    f. SHELL A 283 GR.C PL 6 x 2438 x 9144 13 1070.067 13910.8769 10.92% 13 13 100.00% 10.92% 0.00% 10.92%

    4 POTABLE WATER STORAGE TANK (6202-F) 11770.742 100.00% 41.82% 58.18% 100.00%

    a. SHELL, BOTTOM & ROOF A 283 GR.C PL 8 x 2438 x 9144 6 1426.757 8560.53965 72.73% 6 6 100.00% 14.55% 58.18% 72.73%

    b. SHELL A 283 GR.C PL 6 x 2438 x 9144 3 1070.067 3210.20237 27.27% 3 3 100.00% 27.27% 0.00% 27.27%

    5 OASE SOLUTION STORAGE TANK (114-F) 75261.4111 100.00% 20.00% 80.00% 100.00%

    a. MANHOLE A516 GR.70N PL 14 x 2438 x 9144 1 2496.824 2496.82406 3.32% 1 1 100.00% 0.66% 2.65% 3.32%

    b. SHELL A516 GR.70N PL 12 x 2438 x 9144 5 2140.135 10700.6746 14.22% 5 5 100.00% 2.84% 11.37% 14.22%

    c. BOTTOM, ROOF & SHELL A516 GR.70N PL 10 x 2438 x 9144 22 1783.446 39235.8067 52.13% 22 22 100.00% 10.43% 41.71% 52.13%

    d. SHELL A516 GR.70N PL 8 x 2438 x 9144 16 1426.757 22828.1057 30.33% 16 16 100.00% 6.07% 24.27% 30.33%

    B OTHER MATERIAL

    1 DEMIN WATER STORAGE TANK (6001-F) 24293.14 100.00% 71.51%

    1. Blind Flange MH1, MH2 & MH3 A182 F 304 B. FLANGE 24" ANSI 150 RF 3 196.0 588.00 2.420% 3 - 20.00% 0.48% 0.00% 0.48%

    2. Flange for MH1, MH2 & MH3 A182 F 304 FLANGE 24" ANSI 150 SORF 3 100.00 300.00 1.235% 3 - 20.00% 0.25% 0.00% 0.25%

    3. Flange for N6 A182 F 304 FLANGE 10" ANSI 150 SORF 1 19.5 19.50 0.080% 1 1 100.00% 0.02% 0.06% 0.08%

    4. Flange for N2,N3,N9,N11 & GH A182 F 304 FLANGE 8" ANSI 150 SORF 5 13.7 68.50 0.282% 5 5 100.00% 0.06% 0.23% 0.28%

    5. Flange for N4 A182 F 304 FLANGE 6" ANSI 150 SORF 1 8.6 8.60 0.035% 1 1 100.00% 0.01% 0.03% 0.04%

    6. Flange for N5 A182 F 304 FLANGE 4" ANSI 150 SORF 1 5.9 5.90 0.024% 1 1 100.00% 0.00% 0.02% 0.02%

    7. Flange for N10 A182 F 304 FLANGE 3" ANSI 150 SORF 1 3.7 3.70 0.015% 1 1 100.00% 0.00% 0.01% 0.02%

    8. Flange for N1 A182 F 304 FLANGE 2" ANSI 150 SORF 1 2.3 2.30 0.009% 1 1 100.00% 0.00% 0.01% 0.01%

    PROGRESS CALCULATION PROCUREMENT

    NO SPECIFICATION QTY DDESCRIPTION REMARKS WEIGHT

    FACTOR (%)

    INDEK FACTOR PROGRESS

    UNIT (Kg) TOTAL (Kg)PROGRESS WF (%)

    DIMENSION

    Page 1 of 6

  • POAT

    SHOP

    PROGRESS

    TOTAL20% 80% 100.00% Last Month This Mont Commulative

    NO SPECIFICATION QTY DDESCRIPTION REMARKS WEIGHT

    FACTOR (%)

    INDEK FACTOR PROGRESS

    UNIT (Kg) TOTAL (Kg)PROGRESS WF (%)

    DIMENSION

    9. Flange for N7 & N8 A182 F 304 FLANGE 1 1/2" ANSI 150 SORF 2 1.4 2.80 0.012% 2 2 100.00% 0.00% 0.01% 0.01%

    10. Gasket for MH1, MH2 & MH3 SWRR-304-GR GASKET 24" ANSI 150 x 3 3 0.7 1.98 0.008% - - 0.00% 0.00% 0.00% 0.00%

    11. Plate for NAME PLATE SUS 304 PLATE 260 x 280 x 3 1 1.7 1.71 0.007% - - 0.00% 0.00% 0.00% 0.00%

    12. Plate for NAME PLATE SUS 304 PLATE 260 x 410 x 6 1 5.0 5.02 0.021% - - 0.00% 0.00% 0.00% 0.00%

    13. UNP SUS 304 UNP 12 x 90 x 200 x 6000 20 216.1 4322.88 17.795% 20 20 100.00% 17.79% 0.00% 17.79%

    14. UNP SUS 304 UNP 12 x 80 x 200 x 6000 26 204.8 5323.97 21.916% 26 26 100.00% 21.92% 0.00% 21.92%

    15. SIKU (L) SUS 304 L 5 x 60 x 60 x 6000 20 28.4 568.80 2.341% 20 20 100.00% 2.34% 0.00% 2.34%

    16. SIKU (L) SUS 304 L 6 x 50 x 50 x 6000 10 28.4 284.40 1.171% 10 10 100.00% 1.17% 0.00% 1.17%

    17. Pipa for Colomn SUS 304 PIPE 12" x 6000 Sch.80 3 925.3 2775.78 11.426% 3 3 100.00% 11.43% 0.00% 11.43%

    18. Pipa for Nozzle Neck A312 TP 304 PIPE 1 1/2" x 1500 Sch.80 1 16.2 16.23 0.067% 1 1 100.00% 0.07% 0.00% 0.07%

    19. Pipa for Nozzle Neck A312 TP 304 PIPE 2" x 500 Sch.80 1 22.4 22.40 0.092% 1 1 100.00% 0.09% 0.00% 0.09%

    20. Pipa for Nozzle Neck A312 TP 304 PIPE 3" x 1000 Sch.80 1 45.8 45.80 0.189% 1 1 100.00% 0.19% 0.00% 0.19%

    21. Pipa for Nozzle Neck A312 TP 304 PIPE 4" x 500 Sch.80 1 67.0 66.96 0.276% 1 1 100.00% 0.28% 0.00% 0.28%

    22. Pipa for Nozzle Neck A312 TP 304 PIPE 6" x 6000 Sch.40 1 255.4 255.40 1.051% 1 1 100.00% 1.05% 0.00% 1.05%

    23. Pipa for Nozzle Neck A312 TP 304 PIPE 6" x 1000 Sch.80 1 42.6 42.56 0.175% 1 1 100.00% 0.18% 0.00% 0.18%

    24. Pipa for Nozzle Neck A312 TP 304 PIPE 8" x 6000 Sch.40 7 387.8 2714.60 11.174% 7 7 100.00% 11.17% 0.00% 11.17%

    25. Pipa for Nozzle Neck A312 TP 304 PIPE 10" x 1000 Sch.80 1 302.2 302.20 1.244% 1 1 100.00% 1.24% 0.00% 1.24%

    26. Pipe for Handrail A 53 PIPE 1 1/2" x 6000 STD 18 20.5 368.28 1.516% - - 0.00% 0.00% 0.00% 0.00%

    27. SIKU (L) for Accesories A36/SS400 L 75 x 75 x 6 x 6000 23 42.1 968.76 3.988% - - 0.00% 0.00% 0.00% 0.00%

    28. SIKU (L) for Accesories A36/SS400 L 50 x 50 x 6 x 6000 4 28.1 112.32 0.462% - - 0.00% 0.00% 0.00% 0.00%

    29. SIKU (L) for Accesories A36/SS400 L 50 x 50 x 5 x 6000 11 23.4 257.40 1.060% - - 0.00% 0.00% 0.00% 0.00%

    30. Kanal (C) for Accesories A36/SS400 C 150 x 75 x 6.5 x 6000 2 91.3 182.52 0.751% - - 0.00% 0.00% 0.00% 0.00%

    31. Kanal (C) for Accesories A36/SS400 C 100 x 50 x 5.5 x 6000 2 51.5 102.96 0.424% - - 0.00% 0.00% 0.00% 0.00%

    32. Flat Bar for Accesories A36/SS400 FB 200 x 9 x 6000 10 84.2 842.40 3.468% - - 0.00% 0.00% 0.00% 0.00%

    33. Flat Bar for Accesories A36/SS400 FB 150 x 9 x 6000 2 63.2 126.36 0.520% - - 0.00% 0.00% 0.00% 0.00%

    34. Flat Bar for Accesories A36/SS400 FB 100 x 6 x 6000 11 28.1 308.88 1.271% - - 0.00% 0.00% 0.00% 0.00%

    35. Flat Bar for Accesories A36/SS400 FB 50 x 6 x 6000 15 14.0 210.60 0.867% - - 0.00% 0.00% 0.00% 0.00%

    36. Elbow SUS 304 ELBOW 8" x 90 Sch.80/XS 2 29.9 59.80 0.246% 2 2 100.00% 0.25% 0.00% 0.25%

    37. Elbow for Handrail & Stairway A36/SS400 ELBOW 1 1/2" x 90 LR 5 0.4 2.00 0.008% - - 0.00% 0.00% 0.00% 0.00%

    38. Elbow for Handrail & Stairway A36/SS400 ELBOW 1 1/2" x 45 LR 4 0.2 0.80 0.003% - - 0.00% 0.00% 0.00% 0.00%

    39. Cap for Handrail & Stairway A36/SS400 CAP 1 1/2" 21 0.2 4.20 0.017% - - 0.00% 0.00% 0.00% 0.00%

    40. Tee for Support A240 TP 304 TEE 80 x 80 x 564 LG 2 5.0 10.00 0.041% - - 0.00% 0.00% 0.00% 0.00%

    41. Anchor Bolt A307 Gr. B M 36 x 830 L 20 6.7 133.00 0.547% 20 20 100.00% 0.00% 0.55% 0.55%

    42. Hext Nut A307 Gr. B M 36 80 0.1 8.00 0.033% 80 80 100.00% 0.00% 0.03% 0.03%

    43. Washer A307 Gr. B M 36 40 0.9 36.00 0.148% 40 40 100.00% 0.00% 0.15% 0.15%

    44. Hinge Bolt + 2 Nut for Manhole SS 304 UNC 3/4" x 420 3 2.0 6.00 0.025% - - 0.00% 0.00% 0.00% 0.00%

    45. Bolt & Nut for Manhole A193 B7 UNC 3/4" x 100 168 0.40 67.20 0.277% - - 0.00% 0.00% 0.00% 0.00%

    46. Hext,Bolt,Nut & Washer for Rafter SS304 UNC 3/4" x 45 LB 208 0.2 41.60 0.171% 208 208 100.00% 0.17% 0.00% 0.17%

    47. Hext,Bolt,Nut & Washer for Rafter SS304 UNC 1/2" x 35 LB 312 0.2 62.40 0.257% 312 312 100.00% 0.26% 0.00% 0.26%

    48. Hext,Bolt,Nut & Washer for Internal Colm SS304 UNC 3/4" x 60 LB 12 0.2 2.40 0.010% - - 0.00% 0.00% 0.00% 0.00%

    49. Handle for Manhole SS304 RB 20 x 322 LG 3 0.9 2.55 0.010% - - 0.00% 0.00% 0.00% 0.00%

    50. Grating for Stairway A36/SS400 25 x 775 x 950 2 26.7 53.30 0.219% - - 0.00% 0.00% 0.00% 0.00%

    51. Grating for Stairway A36/SS400 25 x 775 x 750 82 21.0 1725.38 7.102% - - 0.00% 0.00% 0.00% 0.00%

    52. Grating A36/SS400 25 x 795 x 1840 12 53.0 635.44 2.616% - - 0.00% 0.00% 0.00% 0.00%

    53. Grating A36/SS400 25 x 615 x 1500 1 33.4 33.39 0.137% - - 0.00% 0.00% 0.00% 0.00%

    Page 2 of 6

  • POAT

    SHOP

    PROGRESS

    TOTAL20% 80% 100.00% Last Month This Mont Commulative

    NO SPECIFICATION QTY DDESCRIPTION REMARKS WEIGHT

    FACTOR (%)

    INDEK FACTOR PROGRESS

    UNIT (Kg) TOTAL (Kg)PROGRESS WF (%)

    DIMENSION

    54. Grating A36/SS400 25 x 1000 x 1500 1 54.3 54.30 0.224% - - 0.00% 0.00% 0.00% 0.00%

    55. Grating A36/SS400 25 x 500 x 1500 1 27.2 27.15 0.112% - - 0.00% 0.00% 0.00% 0.00%

    56 Grating A36/SS400 25 x 300 x 750 12 8.1 97.74 0.402% - - 0.00% 0.00% 0.00% 0.00%

    2 CONDENSATE STORAGE TANK (6003-F) 11722.46 100.000% 72.13%

    1. Blind Flange for MH1 & MH2 A182 F 304 B. FLANGE 24" ANSI 150 RF 2 196.0 392.00 3.344% 2 - 20.00% 0.67% 0.00% 0.67%

    2. Blind Flange for N11 A182 F 304 B. FLANGE 8" ANSI 150 RF 1 20.5 20.50 0.175% 1 1 100.00% 0.00% 0.17% 0.17%

    3. Flange for MH1 & MH2 A182 F 304 FLANGE 24" ANSI 150 SORF 2 100.00 200.00 1.706% 2 - 20.00% 0.34% 0.00% 0.34%

    4. Flange for N9 A182 F 304 FLANGE 12" ANSI 150 SORF 1 29.0 29.00 0.247% 1 1 100.00% 0.05% 0.20% 0.25%

    5. Flange for N6 A182 F 304 FLANGE 10" ANSI 150 SORF 1 19.5 19.50 0.166% 1 1 100.00% 0.03% 0.13% 0.17%

    6. Flange for N1,N3,N4,N11,N12,GH A182 F 304 FLANGE 8" ANSI 150 SORF 6 13.7 82.20 0.701% 6 6 100.00% 0.14% 0.56% 0.70%

    7. Flange for N2 A182 F 304 FLANGE 6" ANSI 150 SORF 1 8.6 8.60 0.073% 1 1 100.00% 0.01% 0.06% 0.07%

    8. Flange for N10 A182 F 304 FLANGE 3" ANSI 150 SORF 1 3.7 3.70 0.032% 1 1 100.00% 0.01% 0.03% 0.03%

    9. Flange for N7 & N8 A182 F 304 FLANGE 1 1/2" ANSI 150 SORF 2 1.4 2.80 0.024% 2 2 100.00% 0.00% 0.02% 0.02%

    10. Gasket for MH1 & MH2 SWRR-316-GR 24" ANSI 150 x 3 2 0.7 1.32 0.011% - - 0.00% 0.00% 0.00% 0.00%

    11. Plate for NAME PLATE SUS 304 PL 260 x 410 x 6 1 5.0 5.02 0.043% - - 0.00% 0.00% 0.00% 0.00%

    12. Plate for NAME PLATE SUS 304 PL 260 x 280 x 3 1 1.7 1.71 0.015% - - 0.00% 0.00% 0.00% 0.00%

    13. UNP for Rafter SS304 UNP 12 x 80 x 200 x 6000 16 204.8 3276.29 27.949% 16 16 100.00% 27.95% 0.00% 27.95%

    14. Siku (L) for Top Angle SS304 L 6 x 50 x 50 x 6000 5 28.4 142.20 1.213% 5 5 100.00% 1.21% 0.00% 1.21%

    15. Pipa for Colomn A312 TP 304 PIPE 6" x 6000 Sch.40 2 169.6 339.12 2.893% 2 2 100.00% 2.89% 0.00% 2.89%

    16. Pipa for Nozzle Neck A312 TP 304 PIPE 1 1/2" x 3000 Sch.80 1 16.2 16.23 0.138% 1 1 100.00% 0.03% 0.11% 0.14%

    17. Pipa for Nozzle Neck A312 TP 304 PIPE 2" x 3000 Sch.80 1 22.1 22.14 0.189% 1 1 100.00% 0.04% 0.15% 0.19%

    18. Pipa for Nozzle Neck A312 TP 304 PIPE 3" x 3000 Sch.80 1 45.8 45.81 0.391% 1 1 100.00% 0.08% 0.31% 0.39%

    19. Pipa for Nozzle Neck A312 TP 304 PIPE 4" x 3000 Sch.80 1 66.9 66.90 0.571% 1 1 100.00% 0.11% 0.46% 0.57%

    20. Pipa for Nozzle Neck A312 TP 304 PIPE 6" x 6000 Sch.40 1 255.4 255.36 2.178% 1 1 100.00% 2.18% 0.00% 2.18%

    21. Pipa for Nozzle Neck A312 TP 304 PIPE 8" x 6000 Sch.40 7 387.8 2714.88 23.160% 7 7 100.00% 23.16% 0.00% 23.16%

    22. Pipa for Nozzle Neck A312 TP 304 PIPE 10" x 3000 Sch.80 1 302.2 302.19 2.578% 1 1 100.00% 0.52% 2.06% 2.58%

    23. Pipa for Nozzle Neck A312 TP 304 PIPE 12" x 500 Sch.80 1 925.3 925.30 7.893% 1 1 100.00% 7.89% 0.00% 7.89%

    24. Siku (L) for Accesories A36/SS400 L 40 x 40 x 5 x 6000 17 85.3 1450.44 12.373% - - 0.00% 0.00% 0.00% 0.00%

    25. Siku (L) for Accesories A36/SS400 L 75 x 75 x 6 x 6000 2 288.0 575.91 4.913% - - 0.00% 0.00% 0.00% 0.00%

    26. Pipe for Handrail at Stairway SGP PIPE 1 1/2" x 6000 x STD 6 20.5 122.76 1.047% - - 0.00% 0.00% 0.00% 0.00%

    27. Pipa for Top Hnadrail SGP PIPE 1" x 6000 x STD 10 14.5 144.60 1.234% - - 0.00% 0.00% 0.00% 0.00%

    28. Anchor Bolt A 307 B M 30 x 800 LG 12 5.2 62.16 0.530% - - 0.00% 0.00% 0.00% 0.00%

    29. Nut A 307 B M 30 48 0.4 21.12 0.180% - - 0.00% 0.00% 0.00% 0.00%

    30. Hinge Bolt + 2 Nut for Manhole SS 304 UNC 3/4" x 420 L 2 0.1 0.20 0.002% - - 0.00% 0.00% 0.00% 0.00%

    31. Bolt & Nut for Manhole A193 B7 UNC 3/4" x 100 112 0.40 44.80 0.382% - - 0.00% 0.00% 0.00% 0.00%

    32. Bolt & Nut for Rafter A193 B7 UNC 5/8" x 1 1/2" 128 0.0 4.61 0.039% 128 128 100.00% 0.04% 0.00% 0.04%

    33. Elbow for N11 SUS 304 ELBOW 8" x 90 2 29.9 59.80 0.510% 2 2 100.00% 0.51% 0.00% 0.51%

    34. Handle for Manhole SS304 RB 20 x 322 LG 4 0.9 3.40 0.029% - - 0.00% 0.00% 0.00% 0.00%

    35. Internal Lader Ring for Manhole Shelll SS304 RB 25 x 710 LG 2 2.8 5.60 0.048% - - 0.00% 0.00% 0.00% 0.00%

    36. Flat Bar for Top Handrail A36/SS400 FB 50 x 6 x 6000 20 14.0 280.80 2.395% - - 0.00% 0.00% 0.00% 0.00%

    37. Grating for Stairway A36/SS400 25 x 300 x 750 1 8.1 8.15 0.069% - - 0.00% 0.00% 0.00% 0.00%

    38. Grating for Platform A36/SS400 25 x 950 x 950 2 32.7 65.34 0.557% - - 0.00% 0.00% 0.00% 0.00%

    3 FILTERED WATER STORAGE TANK (6201-F) 23647.50 100.000% 80.29%

    Page 3 of 6

  • POAT

    SHOP

    PROGRESS

    TOTAL20% 80% 100.00% Last Month This Mont Commulative

    NO SPECIFICATION QTY DDESCRIPTION REMARKS WEIGHT

    FACTOR (%)

    INDEK FACTOR PROGRESS

    UNIT (Kg) TOTAL (Kg)PROGRESS WF (%)

    DIMENSION

    1. Blind Flange MH1, MH2 & MH3 A 105 B. FLANGE 24" RF 3 196.0 588.00 2.487% - - 0.00% 0.00% 0.00% 0.00%

    2. Flange for MH1, MH2 & MH3 A 105 FLANGE 24" ANSI 150 SORF 3 100.0 300.00 1.269% - - 0.00% 0.00% 0.00% 0.00%

    3. Flange for N4 A 105 FLANGE 16" ANSI 150 SORF 1 54.0 54.00 0.228% 1 1 100.00% 0.00% 0.23% 0.23%

    4. Flange for N15 A 105 FLANGE 14" ANSI 150 SORF 1 41.0 41.00 0.173% 1 1 100.00% 0.00% 0.17% 0.17%

    5. Flange for N14 A 105 FLANGE 12" ANSI 150 SORF 1 29.0 29.00 0.123% 1 1 100.00% 0.00% 0.12% 0.12%

    6. Flange for N16 A 105 FLANGE 10" ANSI 150 SORF 1 19.5 19.50 0.082% 1 1 100.00% 0.00% 0.08% 0.08%

    7. Flange for N3,N5,N6,N9,N17 & GH A 105 FLANGE 8" ANSI 150 SORF 6 13.7 82.20 0.348% 6 6 100.00% 0.00% 0.35% 0.35%

    8. Flange for N8 & N13 A 105 FLANGE 6" ANSI 150 SORF 2 8.6 17.20 0.073% 2 2 100.00% 0.00% 0.07% 0.07%

    9. Flange for N2 A 105 FLANGE 4" ANSI 150 SORF 1 5.9 5.90 0.025% 1 1 100.00% 0.00% 0.02% 0.02%

    10. Flange for N1 & N12 A 105 FLANGE 3" ANSI 150 SORF 2 3.7 11.10 0.047% 2 2 100.00% 0.00% 0.05% 0.05%

    11. Flange for N7 A 105 FLANGE 2" ANSI 150 SORF 1 2.3 2.30 0.010% 1 1 100.00% 0.00% 0.01% 0.01%

    12. Flange for N10 & N11 A 105 FLANGE 1 1/2" ANSI 150 SORF 2 1.4 2.80 0.012% 2 2 100.00% 0.00% 0.01% 0.01%

    13. Gasket SWRR-316-GR 24" ANSI 150 x 3 3 0.66 1.98 0.008% - - 0.00% 0.00% 0.00% 0.00%

    14. Plate for NAME PLATE SUS 304 PL 260 x 410 x 6 1 5.0 5.02 0.021% - - 0.00% 0.00% 0.00% 0.00%

    15. Plate for NAME PLATE SUS 304 PL 260 x 280 x 3 1 1.7 1.71 0.007% - - 0.00% 0.00% 0.00% 0.00%

    16. UNP for Rafter SS400/A36 UNP 9 x 90 x 250 x 6000 39 214.8 8377.20 35.425% 39 39 100.00% 35.43% 0.00% 35.43%

    17. UNP for Rafter SS400/A36 UNP 6 x 65 x 125 x 6000 6 96.1 576.60 2.438% 6 6 100.00% 2.44% 0.00% 2.44%

    18. SIKU (L) for Top Angle SS400/A36 L 6 x 50 x 50 x 6000 10 28.3 282.60 1.195% 10 10 100.00% 1.20% 0.00% 1.20%

    19. Pipa for colomn A36/SS400 PIPA 12" x 6000 sch.80/XS 3 925.3 2775.78 11.738% 3 3 100.00% 2.35% 9.39% 11.74%

    20. Pipa for internal pipe A 106 GR.B PIPA 16" x 6000 sch.80/XS 3 1430.4 4291.20 18.147% 3 1 46.67% 3.63% 4.84% 8.47%

    21. Pipa for Nozzle Neck A 106 GR.B PIPA 14" x 6000 sch.80/XS 1 827.4 827.40 3.499% 1 1 100.00% 0.70% 2.80% 3.50%

    22. Pipa for Nozzle Neck A 106 GR.B PIPA 12" x 6000 sch.80/XS 1 792.5 792.48 3.351% 1 1 100.00% 0.67% 2.68% 3.35%

    23. Pipa for Nozzle Neck A 106 GR.B PIPA 10" x 3000 sch.80/XS 1 302.2 302.19 1.278% 1 1 100.00% 0.26% 1.02% 1.28%

    24. Pipa for internal pipe & Nozzle neck A 106 GR.B PIPA 8" x 6000 sch.80/XS 6 387.8 2327.04 9.841% 6 6 100.00% 1.97% 7.87% 9.84%

    25. Pipa for Nozzle Neck A 106 GR.B PIPA 6" x 3000 sch.80/XS 1 85.1 85.12 0.360% 1 1 100.00% 0.07% 0.29% 0.36%

    26. Pipa for Nozzle Neck A 106 GR.B PIPA 4" x 2000 sch.80/XS 1 44.6 44.64 0.189% 1 1 100.00% 0.04% 0.15% 0.19%

    27. Pipa for Nozzle Neck A 106 GR.B PIPA 3" x 2000 sch.80/XS 1 30.5 30.54 0.129% 1 1 100.00% 0.03% 0.10% 0.13%

    28. Pipa for Nozzle Neck A 106 GR.B PIPA 2" x 6000 sch.80/XS 1 44.9 44.88 0.190% 1 1 100.00% 0.04% 0.15% 0.19%

    29. Pipa for Nozzle Neck A 106 GR.B PIPA 1 1/2" x 6000 sch.80/XS 1 32.5 32.46 0.137% 1 1 100.00% 0.03% 0.11% 0.14%

    30. Siku (L) for Accesories A 36 L 75 x 75 x 6 x 6000 11 42.1 463.32 1.959% - - 0.00% 0.00% 0.00% 0.00%

    31. Pipe for Handrail A36/SS400 PIPA 1" x 6000 x STD 20 14.5 289.20 1.223% - - 0.00% 0.00% 0.00% 0.00%

    32. Elbow A234 WPB ELBOW 8 x 90 x sch.80/XS 2 29.9 59.80 0.253% 2 2 100.00% 0.00% 0.25% 0.25%

    33. Tee for Support pipe at Nozzle Roor A 283 Gr.C TEE 80 x 80 x 8 3 7.5 22.50 0.095% 2 2 66.67% 0.00% 0.06% 0.06%

    34. Anchor Bolt A 36 M 36 x 850 L 20 5.2 103.60 0.438% 20 20 100.00% 0.00% 0.44% 0.44%

    35. Hext Nut A 36 M 36 80 0.4 35.20 0.149% 80 80 100.00% 0.00% 0.15% 0.15%

    36. Bolt & Nut for Manhole A193 B7 UNC 3/4" x 100 168 0.40 67.20 0.284% - - 0.00% 0.00% 0.00% 0.00%

    37. Bolt & Nut + Washer for Stairway A 307 M 12 x 40 L 332 0.1 33.20 0.140% - - 0.00% 0.00% 0.00% 0.00%

    38. Bolt & Nut for Rafter A 193 Gr. B M 20 x 50 L 156 0.0 3.12 0.013% 156 156 100.00% 0.01% 0.00% 0.01%

    39. Bolt & Nut for Rafter A 193 Gr. B M 16 x 45 L 104 0.0 2.60 0.011% 104 104 100.00% 0.01% 0.00% 0.01%

    40. Handle for Manhole A36/SS400 RB 16 x 335 L 4 0.9 3.60 0.015% - - 0.00% 0.00% 0.00% 0.00%

    41. Grating for Stairway A36/SS400 36 x 935 x 1000 1 46.4 46.38 0.196% - - 0.00% 0.00% 0.00% 0.00%

    42. Grating for Stairway A36/SS400 36 x 935 x 1279 1 59.3 59.31 0.251% - - 0.00% 0.00% 0.00% 0.00%

    43. Grating for Plate form A36/SS400 25 x 893 x 1000 1 32.3 32.33 0.137% - - 0.00% 0.00% 0.00% 0.00%

    44. Grating for Plate form A36/SS400 25 x 1700 x 2000 1 123.1 123.08 0.520% - - 0.00% 0.00% 0.00% 0.00%

    45. Grating for Plate form A36/SS400 25 x 1000 x 3000 1 108.6 108.60 0.459% - - 0.00% 0.00% 0.00% 0.00%

    Page 4 of 6

  • POAT

    SHOP

    PROGRESS

    TOTAL20% 80% 100.00% Last Month This Mont Commulative

    NO SPECIFICATION QTY DDESCRIPTION REMARKS WEIGHT

    FACTOR (%)

    INDEK FACTOR PROGRESS

    UNIT (Kg) TOTAL (Kg)PROGRESS WF (%)

    DIMENSION

    46. Grating for Plate form A36/SS400 25 x 2000 x 3351 1 242.6 242.61 1.026% - - 0.00% 0.00% 0.00% 0.00%

    4 POTABLE WATER STORAGE TANK (6202-F) 3513.61 100.000% 63.09%

    1. Blind Flange for MH1 & MH2 A 105 B. FLANGE 24" ANSI 150 RF 2 196.0 392.00 11.157% - - 0.00% 0.00% 0.00% 0.00%

    2. Flange for MH1 & MH2 A 105 FLANGE 24" ANSI 150 SORF 2 100.00 200.00 5.692% - - 0.00% 0.00% 0.00% 0.00%

    3. Flange for N4 A 105 FLANGE 10" ANSI 150 SORF 1 19.5 19.50 0.555% 1 1 100.00% 0.00% 0.55% 0.55%

    4. Flange for N1, N3 & N7 A 105 FLANGE 8" ANSI 150 SORF 3 13.7 41.10 1.170% 3 3 100.00% 0.00% 1.17% 1.17%

    5. Flange for N9 & GH A 105 FLANGE 6" ANSI 150 SORF 2 8.6 17.20 0.490% 2 2 100.00% 0.00% 0.49% 0.49%

    6. Flange for N2 A 105 FLANGE 4" ANSI 150 SORF 1 5.9 5.90 0.168% 1 1 100.00% 0.00% 0.17% 0.17%

    7. Flange for N8 A 105 FLANGE 3" ANSI 150 SORF 1 3.7 3.70 0.105% 1 1 100.00% 0.00% 0.11% 0.11%

    8. Flange for N5 & N6 A 105 FLANGE 1 1/2" ANSI 150 SORF 2 1.4 2.80 0.080% 2 2 100.00% 0.00% 0.08% 0.08%

    9. Gasket SWRR-316-GR 24" ANSI 150 x 3 2 0.660 1.32 0.038% - - 0.00% 0.00% 0.00% 0.00%

    10. Plate for NAME PLATE SUS 304 PL 260 x 410 x 6 1 0.1 0.10 0.003% - - 0.00% 0.00% 0.00% 0.00%

    11. Plate for NAME PLATE SUS 304 PL 260 x 280 x 3 1 0.1 0.10 0.003% - - 0.00% 0.00% 0.00% 0.00%

    12. Siku (L) for Rafter A36/SS400 L 10 x 100 x 100 x 6000 4 93.6 374.40 10.656% 4 4 100.00% 10.66% 0.00% 10.66%

    13. Siku (L) for Top Angle A36/SS400 L 6 x 50 x 50 x 6000 5 28.1 140.40 3.996% 5 5 100.00% 4.00% 0.00% 4.00%

    14. Pipa for colomn A36/SS400 PIPE 6" x 6000 sch.40 1 169.6 169.56 4.826% 1 1 100.00% 0.00% 4.83% 4.83%

    15. Pipa for Nozzle neck A106 GR.B PIPE 1 1/2" x 3000 sch.80/XS 1 16.2 16.23 0.462% 1 1 100.00% 0.00% 0.46% 0.46%

    16. Pipa for Nozzle neck A106 GR.B PIPE 3" x 2000 sch.80/XS 1 30.5 30.54 0.869% 1 1 100.00% 0.00% 0.87% 0.87%

    17. Pipa for Nozzle neck & internal pipe A106 GR.B PIPE 4" x 6000 sch.80/XS 2 133.9 267.84 7.623% 2 1 60.00% 0.00% 4.57% 4.57%

    18. Pipa for Nozzle neck & internal pipe A106 GR.B PIPE 6" x 6000 sch.80/XS 2 255.4 510.72 14.535% 2 2 100.00% 0.00% 14.54% 14.54%

    19. Pipa for Nozzle neck & internal pipe A106 GR.B PIPE 8" x 6000 sch.80/XS 1 387.8 387.84 11.038% 1 1 100.00% 0.00% 11.04% 11.04%

    20. Pipa for Nozzle neck A106 GR.B PIPE 10" x 3000 sch.80/XS 1 302.2 302.19 8.601% 1 1 100.00% 0.00% 8.60% 8.60%

    21. Siku for Handrail A 36 L 6 x 65 x 65 x 6000 3 36.5 109.51 3.117% - - 0.00% 0.00% 0.00% 0.00%

    22. Pipe for Ladder SGP PIPE 1" x 6000 1 14.5 14.46 0.412% - - 0.00% 0.00% 0.00% 0.00%

    23. Pipe for Handrail SGP PIPE 1 1/2" x 6000 3 20.5 61.38 1.747% - - 0.00% 0.00% 0.00% 0.00%

    24. Anchor Bolt A 307 Gr. B M 30 x 958 8 5.2 41.44 1.179% - - 0.00% 0.00% 0.00% 0.00%

    25. Nut for Anchor Bolt A 307 Gr. B M 30 32 0.4 14.08 0.401% - - 0.00% 0.00% 0.00% 0.00%

    26. Bolt & Nut for Manhole A193 B7 UNC 3/4" x 100 112 0.40 44.80 1.275% - - 0.00% 0.00% 0.00% 0.00%

    26. Bolt & Nut for Rafter A193 B7 M 16 x 45 32 0.10 3.20 0.091% 32 32 100.00% 0.09% 0.00% 0.09%

    27. Elbow A 234 WPB ELBOW 6 x 90 sch.80/XS 2 15.35 30.70 0.874% 2 2 100.00% 0.00% 0.87% 0.87%

    28. Handle for Manhole A 36 RB 16 x 335 L 2 0.9 1.80 0.051% - - 0.00% 0.00% 0.00% 0.00%

    29. Plate Bar for Ladder at External A 36 FB 9 x 50 x 6000 3 21.1 63.18 1.798% - - 0.00% 0.00% 0.00% 0.00%

    30. Plate Bar for Cage Ring at External A 36 FB 6 x 50 x 6000 2 14.0 28.08 0.799% - - 0.00% 0.00% 0.00% 0.00%

    31. Plate Bar for Vert. Bar A 36 FB 6 x 38 x 6000 4 10.7 42.68 1.215% - - 0.00% 0.00% 0.00% 0.00%

    32. Grating for Platform A 36 25 x 500 x 1080 1 19.5 19.55 0.556% - - 0.00% 0.00% 0.00% 0.00%

    33. Grating for Platform A 36 25 x 765 x 1215 1 33.6 33.65 0.958% - - 0.00% 0.00% 0.00% 0.00%

    34. Grating for Platform A 36 25 x 765 x 1265 1 35.0 35.03 0.997% - - 0.00% 0.00% 0.00% 0.00%

    35. Grating for Platform A 36 25 x 965 x 1215 1 42.4 42.44 1.208% - - 0.00% 0.00% 0.00% 0.00%

    36. Grating for Platform A 36 25 x 965 x 1265 1 44.2 44.19 1.258% - - 0.00% 0.00% 0.00% 0.00%

    5 OASE SOLUTION STORAGE TANK (114-F) 9679.64 100.000% 66.53%

    1. Blind Flange for MH1, MH2 & MH3 A 105 B. FLANGE 24" ANSI 150 RF 3 196.0 588.00 6.075% - - 0.00% 0.00% 0.00% 0.00%

    2. Flange for B A 105 FLANGE 8" ANSI 150 SORF 1 13.7 13.70 0.142% 1 1 100.00% 0.00% 0.14% 0.14%

    3. Flange for F & G A 105 FLANGE 6" ANSI 150 SORF 2 8.6 17.20 0.178% 2 2 100.00% 0.00% 0.18% 0.18%

    Page 5 of 6

  • POAT

    SHOP

    PROGRESS

    TOTAL20% 80% 100.00% Last Month This Mont Commulative

    NO SPECIFICATION QTY DDESCRIPTION REMARKS WEIGHT

    FACTOR (%)

    INDEK FACTOR PROGRESS

    UNIT (Kg) TOTAL (Kg)PROGRESS WF (%)

    DIMENSION

    4. Flange for A A 105 FLANGE 4" ANSI 150 SORF 1 5.9 5.90 0.061% 1 1 100.00% 0.00% 0.06% 0.06%

    5. Flange for C A 105 FLANGE 3" ANSI 150 SORF 1 3.7 3.70 0.038% 1 1 100.00% 0.00% 0.04% 0.04%

    6. Flange for D, L1 & L2 A 105 FLANGE 2" ANSI 150 SORF 3 2.3 6.90 0.071% 3 3 100.00% 0.00% 0.07% 0.07%

    7. Flange for T1 A 105 FLANGE 1 1/2" ANSI 150 SORF 1 1.4 1.40 0.014% 1 1 100.00% 0.00% 0.01% 0.01%

    8. Flange for MH1, MH2 & MH3 A 105 FLANGE 24" ANSI 150 SORF 3 100.0 300.00 3.099% - - 0.00% 0.00% 0.00% 0.00%

    9. Gasket SWRR-316-GR 24" ANSI 150 x 4.5 3 0.660 1.98 0.020% - - 0.00% 0.00% 0.00% 0.00%

    10. Plate for NAME PLATE SUS 304 PL 260 x 410 x 6 1 5.0 5.02 0.052% - - 0.00% 0.00% 0.00% 0.00%

    11. Plate for NAME PLATE SUS 304 PL 260 x 280 x 3 1 1.7 1.71 0.018% - - 0.00% 0.00% 0.00% 0.00%

    12. Pipa for Nozzle neck A 106 GR.B PIPE 2" x 6000 sch.40 4 44.9 179.52 1.855% 4 4 100.00% 0.00% 1.85% 1.85%

    13. Pipa for Nozzle neck A 106 GR.B PIPE 3" x 2000 sch.80 1 30.5 30.54 0.316% 1 1 100.00% 0.00% 0.32% 0.32%

    14. Pipa for Nozzle neck A 106 GR.B PIPE 4" x 2000 sch.80 1 44.6 44.64 0.461% 1 1 100.00% 0.00% 0.46% 0.46%

    15. Pipa for Nozzle neck A 106 GR.B PIPE 6" x 3000 sch.80 1 85.1 85.12 0.879% 1 1 100.00% 0.00% 0.88% 0.88%

    16. Pipa for Colomn A36/SS400 PIPE 10" x 6000 sch.40 3 101.4 304.20 3.143% 3 3 100.00% 0.00% 3.14% 3.14%

    17. Pipa at Internal tangky A 106 GR.B PIPE 6" x 6000 sch.40 2 85.1 170.24 1.759% 2 - 20.00% 0.00% 0.35% 0.35%

    18. Pipa at Internal tangky A 106 GR.B PIPE 4" x 6000 sch.40 2 44.6 89.28 0.922% 2 - 20.00% 0.00% 0.18% 0.18%

    19. Pipa at Internal tangky A 106 GR.B PIPE 2" x 6000 sch.80 2 44.9 89.76 0.927% 2 1 60.00% 0.00% 0.56% 0.56%

    20. Siku (L) for Top Angle A36/SS400 L 6 x 50 x 50 x 6000 5 28.1 140.40 1.450% 5 5 100.00% 1.45% 0.00% 1.45%

    21. Siku (L) for Rafter A36/SS400 L 6 x 50 x 50 x 6000 5 63.2 316.00 3.265% 5 5 100.00% 3.26% 0.00% 3.26%

    22. UNP for Rafter A36/SS400 UNP 9 x 90 x 250 x 6000 27 189.0 5103.00 52.719% 27 27 100.00% 52.72% 0.00% 52.72%

    23. Siku for Support External A36/SS400 L 5 x 40 x 40 x 6000 14 18.7 262.08 2.708% - - 0.00% 0.00% 0.00% 0.00%

    24. Siku for Support at Nozzle A36/SS400 L 5 x 50 x 50 x 6000 1 23.4 23.40 0.242% - - 0.00% 0.00% 0.00% 0.00%

    25. Siku for Support at Nozzle A36/SS400 L 6 x 75 x 75 x 6000 2 42.1 84.24 0.870% - - 0.00% 0.00% 0.00% 0.00%

    26. Siku for Frame at Platform A36/SS400 L 7 x 75 x 75 x 6000 2 49.1 98.28 1.015% - - 0.00% 0.00% 0.00% 0.00%

    27. Handle for Manhole A 36 RB 16 x 335 L 3 0.9 2.70 0.028% - - 0.00% 0.00% 0.00% 0.00%

    28. Plate Bar for Top Hnadrail A36/SS400 FB 8 x 100 x 6000 7 37.4 262.08 2.708% - - 0.00% 0.00% 0.00% 0.00%

    29. Pipa for Handrail at Stairway SGP PIPE 1 1/2" x 6000 x SGP 21 20.5 429.66 4.439% - - 0.00% 0.00% 0.00% 0.00%

    30. Bolt & Nut A193 B7 UNC 3/4" x 100 168 0.40 67.20 0.694% - - 0.00% 0.00% 0.00% 0.00%

    30. Bolt & Nut for Rafter A193 B7 M 20 x 50 144 0.40 57.60 0.595% 144 144 100.00% 0.60% 0.00% 0.60%

    31. Elbow A234 WPB ELBOW 6" 90 sch.80/XS 1 15.35 15.35 0.159% 1 1 100.00% 0.00% 0.16% 0.16%

    32. Elbow A234 WPB ELBOW 4" 90 sch.80/XS 1 5.40 5.40 0.056% 1 1 100.00% 0.00% 0.06% 0.06%

    33. Elbow A234 WPB ELBOW 3" 90 sch.80/XS 1 3.95 3.95 0.041% 1 1 100.00% 0.00% 0.04% 0.04%

    34. Grating for Stairway A36/SS400 30 x 300 x 750 61 11.2 680.76 7.033% - - 0.00% 0.00% 0.00% 0.00%

    35. Grating for Plate form A36/SS400 30 x 950 x 950 2 44.8 89.53 0.925% - - 0.00% 0.00% 0.00% 0.00%

    36. Anchor Bolt + Nut & Washer A 307 M 30 x 1040 L 16 6.2 99.20 1.025% - - 0.00% 0.00% 0.00% 0.00%

    ( Meisa Irianto )

    PROJECT MANAGER

    Check and Approved By

    PT. REKAYASA INDUSTRI

    ( Hendrizal )

    PROJECT PROC. MANAGER

    ( Izatul Fitriani )

    PROCUREMENT CORD.

    Prepared and Checked by

    PT. BARATA INDONESIA

    Page 6 of 6

  • PROJECT : PUSRI - II B

    CLIENT : PT. PUPUK SRIWIDJADJA (PERSERO)

    CONTRACTOR : PT. REKAYASA INDUSTRI (PERSERO)

    LOCATION : PALEMBANG, SUMSEL-INDONESIA

    MARKING /

    BAVELLING /

    CUTT

    ROLL

    BENDING

    SANDBLAST

    / PRIMER

    PAINT

    FITTUP WELDING MATERIAL

    ON SITE

    30% 10% 20% 10% 20% 10%

    I BOTTOM PLATE

    1. Bottom Plate PL 8 x 1,500 x 6,096 1501 LBR 9 577.9008 5201.1072 5.1467% 9 9 9 9 9 9 5,201.11 100.0% 5.147%

    2. Bottom Plate PL 8 x 1,500 x 4,752 1502 LBR 2 450.4896 900.9792 0.8916% 2 2 2 2 2 2 900.98 100.0% 0.892%

    3. Bottom Plate PL 8 x 1,500 x 1,668 1503 LBR 4 158.1264 632.5056 0.6259% 4 4 4 4 4 4 632.51 100.0% 0.626%

    4. Bottom Plate PL 8 x 1,500 x 4,420 1504 LBR 4 419.016 1676.064 1.6585% 4 4 4 4 4 4 1,676.06 100.0% 1.659%

    5. Bottom Plate PL 8 x 1,500 x 6,096 1505 LBR 2 577.9008 1155.8016 1.1437% 2 2 2 2 2 2 1,155.80 100.0% 1.144%

    6. Bottom Plate PL 8 x 1,500 x 1,487 1506 LBR 2 140.9676 281.9352 0.2790% 2 2 2 2 2 2 281.94 100.0% 0.279%

    7. Bottom Plate PL 8 x 1,500 x 6,096 1507 LBR 2 577.9008 1155.8016 1.1437% 2 2 2 2 2 2 1,155.80 100.0% 1.144%

    8. Bottom Plate PL 8 x 1,500 x 5,441 1508 LBR 2 515.8068 1031.6136 1.0208% 2 2 2 2 2 2 1,031.61 100.0% 1.021%

    9. Bottom Plate PL 8 x 1,050 x 3,909 1509 LBR 4 259.40124 1037.60496 1.0267% 4 4 4 4 4 4 1,037.60 100.0% 1.027%

    II SHELL PLATE

    1. Shell Plate PL 10 x 1500 x 6096 701 LBR 7 722.4 5057 5.0037% 7 7 7 7 7 7 5,056.63 100.0% 5.004%

    2. Shell Plate PL 10 x 1500 x 6074 702 LBR 1 719.8 720 0.7122% 1 1 1 1 1 1 719.77 100.0% 0.712%

    3. Shell Plate PL 8 x 1500 x 6096 703 LBR 21 577.9 12136 12.0089% 21 21 21 21 21 21 12,135.9 100.0% 12.009%

    4. Shell Plate PL 8 x 1500 x 6067 704 LBR 3 575.2 1725 1.7074% 3 3 3 3 3 3 1,725.45 100.0% 1.707%

    5. Shell Plate PL 6 x 1500 x 6096 705 LBR 49 433.4 21238 21.0157% 49 49 49 49 49 49 21,237.9 100.0% 21.016%

    6. Shell Plate PL 6 x 1500 x 6061 706 LBR 7 430.9 3017 2.9850% 7 7 7 7 7 7 3,016.56 100.0% 2.985%

    7. Shell Plate PL 6 x 290 x 6096 707 LBR 7 83.8 587 0.5804% 7 7 7 7 7 7 586.57 100.0% 0.580%

    8. Shell Plate PL 6 x 290 x 6061 708 LBR 1 83.3 83 0.0824% 1 1 1 1 1 1 83.31 100.0% 0.082%

    III ROOF PLATE

    1. Roof Plate PL 8 x 1500 x 3822 101 LBR 13 362.3 4710.2 4.6610% 13 13 13 13 13 13 4,710.23 100.0% 4.661%

    2. Roof Plate PL 8 x 1500 x 3222 102 LBR 13 305.4 3970.8 3.9292% 13 13 13 13 13 13 3,970.79 100.0% 3.929%

    3. Roof Plate PL 8 x 1330 x 5250 103 LBR 26 441.3 11473.6 11.3536% 26 26 26 26 26 26 11,473.64 100.0% 11.354%

    IV NOZZLE SHELL DETAIL

    1. Flange FL 10" ANSI 150 RF 201 EA 1 24.0 24.0 0.0237% 1 1 1 1 1 - 21.60 90.0% 0.021%

    2. Flange FL 8" ANSI 150 RF 202 EA 1 18.0 18.0 0.0178% 1 1 1 1 1 - 16.20 90.0% 0.016%

    3. Flange FL 4" ANSI 150 RF 203 EA 1 7.0 7.0 0.0069% 1 1 1 1 1 - 6.30 90.0% 0.006%

    4. Flange FL 3" ANSI 150 RF 204 EA 1 5.0 5.0 0.0049% 1 1 1 1 1 - 4.50 90.0% 0.004%

    5. Flange FL 1 1/2" ANSI 150 RF 205 EA 2 2.0 4.0 0.0040% 2 2 2 2 2 - 3.60 90.0% 0.004%

    6. Nozzle Neck PIPE 10" Sch.30 x 100 206 EA 1 8.0 8.0 0.0079% - - - - - - - 0.0% 0.000%

    7. Nozzle Neck PIPE 8" Sch.80 x 80 207 EA 1 6.0 6.0 0.0059% - - - - - - - 0.0% 0.000%

    8. Nozzle Neck PIPE 4" Sch.80 x 104 208 EA 1 2.0 2.0 0.0020% - - - - - - - 0.0% 0.000%

    9. Nozzle Neck PIPE 3" Sch.80 x 80 209 EA 1 1.5 1.5 0.0015% - - - - - - - 0.0% 0.000%

    10. Nozzle Neck PIPE 1 1/2" Sch.80 x 88 210 EA 2 0.5 1.0 0.0010% - - - - - - - 0.0% 0.000%

    11. Pad PL 8 x OD.510 211 EA 1 12.0 12.0 0.0119% 1 1 1 1 1 - 10.80 90.0% 0.011%

    12. Pad PL 8 x OD.400 212 EA 1 8.0 8.0 0.0079% 1 1 1 1 1 - 7.20 90.0% 0.007%

    13. Pad PL 8 x OD.210 213 EA 1 2.0 2.0 0.0020% 1 1 1 1 1 - 1.80 90.0% 0.002%

    DEMIN WATER STORAGE TANK

    PROGRESS CALCUATION FABRIKASI

    REMARKSPROGRESS to

    WF (%)UNIT (Kg) TOTAL (Kg) No. QTYPOS

    WEIGHT

    FACTOR (%)

    INDEKS FACTOR PROGRESS FABRICATION

    DESCRIPTION UNIT

    PROGRESS

    (%) TOTAL

    WEIGHT (Kg)

    Page 1 of 6

  • MARKING /

    BAVELLING /

    CUTT

    ROLL

    BENDING

    SANDBLAST

    / PRIMER

    PAINT

    FITTUP WELDING MATERIAL

    ON SITE

    30% 10% 20% 10% 20% 10%

    REMARKSPROGRESS to

    WF (%)UNIT (Kg) TOTAL (Kg) No. QTYPOS

    WEIGHT

    FACTOR (%)

    INDEKS FACTOR PROGRESS FABRICATION

    DESCRIPTION UNIT

    PROGRESS

    (%) TOTAL

    WEIGHT (Kg)

    14. Pad PL 8 x OD.180 214 EA 1 1.5 1.5 0.0015% 1 1 1 1 1 - 1.35 90.0% 0.001%

    15. Pad PL 8 x OD.150 215 EA 2 1.0 2.0 0.0020% 2 2 2 2 2 - 1.80 90.0% 0.002%

    V ANCHOR BOLT DETAIL

    1. Anchor Bolt M 36 x 830 LG 301 EA 20 6.7 133.0 0.1316% 20 20 20 20 20 - 119.70 90.0% 0.118%

    2. Hext Nut M 36 302 EA 80 0.1 8.0 0.0079% 80 80 80 80 80 - 7.20 90.0% 0.007%

    3. Washer M 36 303 EA 40 1.0 38.0 0.0376% 40 40 40 40 40 - 34.20 90.0% 0.034%

    4. Reinf Pad PL 10 x 465 x 450 304 EA 20 16.6 332.7 0.3292% 20 20 20 20 20 - 299.44 90.0% 0.296%

    5. Anchor Cair PL 10 x 150 x 300 305 EA 20 3.6 71.6 0.0708% 20 20 20 20 20 - 64.40 90.0% 0.064%

    6. Anchor Cair Rib PL 10 x 150 x 287 306 EA 40 3.4 136.9 0.1355% 40 40 40 40 40 - 123.21 90.0% 0.122%

    VI NOZZLE ROOF DETAIL

    1. Flange FL 8" ANSI 150 RF 401 EA 4 18.0 72.0 0.0712% 4 4 4 4 4 - 64.80 90.0% 0.064%

    2. Flange FL 6" ANSI 150 RF 402 EA 1 12.0 12.0 0.0119% 1 1 1 1 1 - 10.80 90.0% 0.011%

    3. Flange FL 2" ANSI 150 RF 403 EA 1 3.0 3.0 0.0030% 1 1 1 1 1 - 2.70 90.0% 0.003%

    4. Nozzle Neck PIPE 8" Sch.80 x 16712 404 BTG 1 1079.0 1079.0 1.0677% - - - - - - - 0.0% 0.000%

    5. Nozzle Neck PIPE 8" Sch.80 x 97 405 BTG 2 6.0 12.0 0.0119% - - - - - - - 0.0% 0.000%

    6. Nozzle Neck PIPE 8" Sch.80 x 307 406 BTG 1 20.0 20.0 0.0198% - - - - - - - 0.0% 0.000%

    7. Nozzle Neck PIPE 6" Sch.80 x 122 407 BTG 1 5.0 5.0 0.0049% - - - - - - - 0.0% 0.000%

    8. Nozzle Neck PIPE 2" Sch.80 x 92 408 BTG 1 2.0 2.0 0.0020% - - - - - - - 0.0% 0.000%

    9. Pad PL 8 x OD.400 409 EA 3 8.0 24.0 0.0237% 3 3 3 3 3 - 21.60 90.0% 0.021%

    10. Pad PL 8 x OD.600 410 EA 1 18.0 18.0 0.0178% 1 1 1 1 1 - 16.20 90.0% 0.016%

    11. Pad PL 8 x OD.380 411 EA 1 9.0 9.0 0.0089% 1 1 1 1 1 - 8.10 90.0% 0.008%

    12. Pad PL 8 x OD.178 412 EA 1 1.5 1.5 0.0015% 1 1 1 1 1 - 1.35 90.0% 0.001%

    13. Elbow ELBOW 8" x 180 LR 413 EA 1 62.0 62.0 0.0614% - - - - - - - 0.0% 0.000%

    14 Flange PL 14 x OD.343 x ID.194 414 EA 1 7.0 7.0 0.0069% - - - - - - - 0.0% 0.000%

    15 Wire Mesh SWG 20 x OD.260 415 LBR 1 0.5 0.5 0.0005% - - - - - - - 0.0% 0.000%

    16 Support TEE 80 x 80 x 564 416 EA 2 5.0 10.0 0.0099% - - - - - - - 0.0% 0.000%

    17 Pad PL 8 x OD.400 417 EA 1 8.0 8.0 0.0079% 1 1 1 1 1 - 7.20 90.0% 0.007%

    18 Pad PL 8 x 100 x 120 418 EA 1 2.0 2.0 0.0020% 1 1 1 1 1 - 1.80 90.0% 0.002%

    VII MANHOLE SHELL (MH1 & MH3)

    1 Flange PL 14 x OD.832 x ID.613 501 EA 2 28.0 56.0 0.0554% - - - - - - - 0.0% 0.000%

    2 Cover PL 18 x OD.832 502 EA 2 77.0 154.0 0.1524% - - - - - - - 0.0% 0.000%

    3 Nozzle Neck PL 14 x ID.610 x 286 503 EA 2 59.0 118.0 0.1168% - - - - - - - 0.0% 0.000%

    4 Reif. Pad PL 10 x 1225 x 1525 504 EA 2 87.0 174.0 0.1722% 2 2 2 2 2 - 156.60 90.0% 0.155%

    5 Bolt & Nut UNC 3/4" UNC-2A x 2 1/2" 505 EA 56 0.2 11.2 0.0111% - - - - - - - 0.0% 0.000%

    6 Gasket 3 x OD.746 x ID.610 506 EA 2 1.0 2.0 0.0020% - - - - - - - 0.0% 0.000%

    7 Manhole Hinge PL 12 x 100 x 210 507 EA 4 2.0 8.0 0.0079% - - - - - - - 0.0% 0.000%

    8 Cover Hinge PL 12 x 70 x 270 508 EA 4 1.8 7.2 0.0071% - - - - - - - 0.0% 0.000%

    9 Hinge Bolt + 2 nut UNC 3/4" x UNC-2A x 420 509 EA 2 1.0 2.0 0.0020% - - - - - - - 0.0% 0.000%

    10 Split Pin 3 x 40 510 EA 2 0.1 0.2 0.0002% - - - - - - - 0.0% 0.000%

    11 Handle RB 16 x 320 511 EA 2 0.5 1.0 0.0010% - - - - - - - 0.0% 0.000%

    12 Ladder Ring RB 16 x 720 512 EA 4 1.4 5.4 0.0053% - - - - - - - 0.0% 0.000%

    VIII MANHOLE ROOF (MH2)

    Page 2 of 6

  • MARKING /

    BAVELLING /

    CUTT

    ROLL

    BENDING

    SANDBLAST

    / PRIMER

    PAINT

    FITTUP WELDING MATERIAL

    ON SITE

    30% 10% 20% 10% 20% 10%

    REMARKSPROGRESS to

    WF (%)UNIT (Kg) TOTAL (Kg) No. QTYPOS

    WEIGHT

    FACTOR (%)

    INDEKS FACTOR PROGRESS FABRICATION

    DESCRIPTION UNIT

    PROGRESS

    (%) TOTAL

    WEIGHT (Kg)

    1 Flange PL 10 x OD.762 x ID.628 601 EA 1 12.0 12.0 0.0119% - - - - - - - 0.0% 0.000%

    2 Cover PL 8 x OD.762 602 EA 1 29.0 29.0 0.0287% - - - - - - - 0.0% 0.000%

    3 Nozzle Neck PL 12.7 x OD.625 x 340 603 EA 1 66.0 66.0 0.0653% - - - - - - - 0.0% 0.000%

    4 Reif. Pad PL 8 x 1150 604 EA 1 66.0 66.0 0.0653% 1 1 1 1 1 - 59.40 90.0% 0.059%

    5 Bolt & Nut UNC 3/4" UNC-2A x 2 1/2" 605 EA 20 0.3 6.0 0.0059% - - - - - - - 0.0% 0.000%

    6 Gasket 3 x ID.610 x OD.746 606 EA 1 1.0 1.0 0.0010% - - - - - - - 0.0% 0.000%

    7 Manhole Hinge PL 12 x 84 x 155 607 EA 2 1.5 3.0 0.0030% - - - - - - - 0.0% 0.000%

    8 Cover Hinge PL 12 x 56 x 240 608 EA 2 1.5 3.0 0.0030% - - - - - - - 0.0% 0.000%

    9 Hinge Bolt + 2 nut UNC 3/4" UNC-2A x 420 609 EA 1 2.0 2.0 0.0020% - - - - - - - 0.0% 0.000%

    10 Split Pin 3 x 40 610 EA 1 0.1 0.1 0.0001% - - - - - - - 0.0% 0.000%

    11 Handle RB 16 x 320 611 EA 1 1.0 1.0 0.0010% - - - - - - - 0.0% 0.000%

    IX NAME PLATE

    1 Name Plate PL 0.8 801 EA 1 1.0 1.0 0.0010% - - - - - - - 0.0% 0.000%

    X EXTERNAL DETAIL

    1 Support L 6 x 75 x 75 x 992 901 BTG 16 6.4 102.4 0.1013% - - - - - - - 0.0% 0.000%

    2 Support L 6 x 75 x 75 x 1160 902 BTG 12 7.9 94.8 0.0938% - - - - - - - 0.0% 0.000%

    3 Support L 6 x 75 x 75 x 1400 903 BTG 16 9.6 153.6 0.1520% - - - - - - - 0.0% 0.000%

    4 Support L 6 x 75 x 75 x 200 904 BTG 24 2.2 52.8 0.0522% - - - - - - - 0.0% 0.000%

    5 Pad PL 8 x 100 x 150 905 EA 43 1.0 43.0 0.0426% - - - - - - - 0.0% 0.000%

    XI STARWAY

    A. STARWAY DETAIL (1 of 2)

    1 Sringer Frame FB 9 x 200 x 14750 1001 EA 1 210.0 210.0 0.2078% - - - - - - - 0.0% 0.000%

    2 Sringer Frame FB 9 x 200 x 14260 1002 EA 1 202.0 202.0 0.1999% - - - - - - - 0.0% 0.000%

    3 Sringer Frame FB 9 x 200 x 15650 1003 EA 1 221.0 221.0 0.2187% - - - - - - - 0.0% 0.000%

    4 Sringer Frame FB 9 x 200 x 15150 1004 EA 1 214.0 214.0 0.2118% - - - - - - - 0.0% 0.000%

    5 Frame C 10 x 75 x 75 x 150 1005 BTG 4 18.8 75.2 0.0744% - - - - - - - 0.0% 0.000%

    6 Frame C 10 x 75 x 75 x 150 1006 BTG 4 15.3 61.2 0.0606% - - - - - - - 0.0% 0.000%

    7 Bracket L 6 x 75 x 75 x 150 1007 BTG 2 1.0 2.0 0.0020% - - - - - - - 0.0% 0.000%

    8 Bracket L 6 x 75 x 75 x 130 1008 BTG 4 1.0 4.0 0.0040% - - - - - - - 0.0% 0.000%

    9 Base Plate PL 8 x 100 x 300 1009 EA 2 2.0 4.0 0.0040% - - - - - - - 0.0% 0.000%

    10 Stopper L 6 x 75 x 100 1010 BTG 4 0.8 3.2 0.0032% - - - - - - - 0.0% 0.000%

    11 Grating 25 x 775 x 950 1011 EA 2 26.7 53.3 0.0527% - - - - - - - 0.0% 0.000%

    12 Grating 25 x 300 x 750 1012 EA 82 8.1 667.9 0.6609% - - - - - - - 0.0% 0.000%

    13 Bolt / Nut 3/8" x 1 1/2" 1013 SET 328 0.1 32.8 0.0325% - - - - - - - 0.0% 0.000%

    14 Grating Clamp 1014 EA 16 0.3 4.8 0.0047% - - - - - - - 0.0% 0.000%

    15 Expansion Anchor 5/8" x 6" 1015 SET 2 0.1 0.2 0.0002% - - - - - - - 0.0% 0.000%

    B. STARWAY DETAIL (2 of 2)

    1 Support L 6 x 50 x 50 1020 EA 19 4.8 91.2 0.0902% - - - - - - - 0.0% 0.000%

    2 Support L 6 x 50 x 50 1021 EA 2 5.0 10.0 0.0099% - - - - - - - 0.0% 0.000%

    3 Top Handrail PIPE 1 1/2" 1022 EA 3 24.7 74.1 0.0733% - - - - - - - 0.0% 0.000%

    4 Top Handrail PIPE 1 1/2" 1023 EA 1 4.0 4.0 0.0040% - - - - - - - 0.0% 0.000%

    5 Top Handrail PIPE 1 1/2" 1024 EA 3 24.7 74.1 0.0733% - - - - - - - 0.0% 0.000%

    Page 3 of 6

  • MARKING /

    BAVELLING /

    CUTT

    ROLL

    BENDING

    SANDBLAST

    / PRIMER

    PAINT

    FITTUP WELDING MATERIAL

    ON SITE

    30% 10% 20% 10% 20% 10%

    REMARKSPROGRESS to

    WF (%)UNIT (Kg) TOTAL (Kg) No. QTYPOS

    WEIGHT

    FACTOR (%)

    INDEKS FACTOR PROGRESS FABRICATION

    DESCRIPTION UNIT

    PROGRESS

    (%) TOTAL

    WEIGHT (Kg)

    6 Midlle Handrail FB 6 x 50 1025 EA 3 14.0 42.0 0.0416% - - - - - - - 0.0% 0.000%

    7 Midlle Handrail FB 6 x 50 1026 EA 1 2.0 2.0 0.0020% - - - - - - - 0.0% 0.000%

    8 Midlle Handrail FB 6 x 50 1027 EA 3 14.0 42.0 0.0416% - - - - - - - 0.0% 0.000%

    9 Elbow ELBOW 1 1/2" x 90 LR 1028 EA 2 0.4 0.8 0.0008% - - - - - - - 0.0% 0.000%

    10 Elbow ELBOW 1 1/2" x 45 LR 1029 EA 4 0.2 0.8 0.0008% - - - - - - - 0.0% 0.000%

    11 Cap CAP 1 1/2" 1030 EA 2 0.2 0.4 0.0004% - - - - - - - 0.0% 0.000%

    12 Cover PL 6 x OD.60 1031 EA 4 1.0 4.0 0.0040% -