MONTHLY PROGRESS REPORT OF “AKANKSHA PROJECT” AT NEW TOWN AS STOOD ON 09/09/2020 Sl
No Name of The
Work Name
of The
Agency
Estimated Amount
(Rs.)
Tender Amount
(Rs.)
Date of
Commencement
Date Of
Completion
Cumulative Physical Progress Achieved
(Civil)
Financial Progress (Civ+Ele)
Balance Work
1 Construction of 3 (Three) nos B type (Classic) G+10 storied Residential Building including Structural, Sanitary and Plumbing and Electrical works under AKANKHA Scheme at Rajarhat Action Area -1D during the year 2015-16. (Tender NO:- 12 of 2016-17 of SE/S.C, Housing Directorate ) M
ack
into
sh B
urn
Lim
ited
52
,24
,32
,81
3.0
0
46
,92
,49
,15
2.0
0
01
/12
/20
16
20
/0
9/
20
20
98.00% 92.00 %
Marble Floor& Kota StoneAt Lobby :- Classic-1:- completed Classic-2:- completed Classic-3:- completed .Aluminum work at Lobby . Classic-1:- completed (except ground floor). Classic-2:- completed (except ground floor). Classic-3:- completed (except ground floor). Flush Door Polishing & Panel shutter Painting Classic-1:- completed Classic-2:- completed Classic-3:- completed External Painting Classic-1:- Completed (except ground floor). Classic-2:- Completed (except ground floor). Classic-3:- Completed (except ground floor).
Lobby Portion Colour Painting Classic-1:- completed Classic-2:- Completed (except ground floor). Classic-3:- completed Stair Portion Colour Painting Classic-1:- Ground floor to 10 th floor single coat completed. Classic-2:- Ground floor to 10 th floor single coat completed. Classic-3:- Ground floor to 10 th floor single coat completed. Grill & Collapsible gate Painting Work Classic-1:- completed Classic-2:- 50% completed Classic-3:- completed
MONTHLY PROGRESS REPORT OF “AKANKSHA PROJECT” AT NEW TOWN AS STOOD ON 09/09/2020 Sl No
Name of The Work Name of
The Agency
Estimated Amount
(Rs.)
Tender Amount
(Rs.)
Date of
Commencement
Date Of
Completion
Cumulative Physical Progress Achieved
(Civil)
Financial Progress (Civ+Ele)
Remarks
2 Construction of 3 (Three) nos (G+10) Storied A1 Type (Premium), One no (G+10) Storied A2 Type (Elegant) Residential Building, Community Hall and Substation Building [2 nos.] including Main Sewer Line, Under Ground water Supply System, Rainwater Harvesting pit, Rain water Recharge pit [3 Nos.], Horticulture & Bituminous Road under AKANKSHA Scheme at Rajarhat, New Town Action area-1D during the year 2015-16: Structural, S & P, Electrical and Roads works. (Tender No:-18 of 2016-17 of theS.E/S.C,Housing Directorate)
Del
ta C
on
stru
ctio
n
73
,44
,71
,94
2.0
0
61
,83
,51
,92
8.0
0
16
/01
/20
17
20
/0
9/
20
20
99.00% 90.00 %
Marble Floor& Kota StoneAt Lobby :- PR 1:- completed. PR-2:- completed PR-3:- completed Elegant; completed Flush Door Polishing & Panel shutter Painting PR 1:- 98 %completed PR-2:- 98 %completed PR-3:- 98 %completed Elegant: 97 %completed External Painting PR 1:- 99 % completed PR-2:- 99 % completed PR-3:- 99 % completed Elegant; 99 % completed Lobby Portion Colour Painting PR 1:- completed PR-2:- completed PR-3:- completed Elegant: completed Grill & Collapsible gate Painting Work PR 1:- completed PR-2:- completed PR-3:- completed Elegant: completed Ground Floor screte concrete work:- PR-I, II, III & Elegant:- started.
MONTHLY PROGRESS REPORT OF “AKANKSHA PROJECT” AT NEW TOWN AS STOOD ON 09/09/2020
Sl No
Name of The Work
Name of
The Agency
Estimated Amount
(Rs.)
Tender Amount
(Rs.)
Date of
Commencement
Date Of
Completion
Cumulative Physical Progress Achieved
Financial Progress
Remarks
1 Sewerge Treatment plant(S.T.P) of
capacity 420 m3/day for Akanksha Project at New Town, Rajarhat at Plot DB-2, Action Area-ID(Civil Work)
Maste
r C
on
str
ucti
on
1,2
4,5
2,8
22.0
0
1,2
2,5
1,0
86.0
0
12/02/2019
20/09/2020
98.00 % 67.40 %
External & Internal Painting work balance.
2 specified price schedule for the work supply ,
installation and commissioning of Mechanical Equipment (based
on MBBR) for sewage treatment plan of capacity 420
m3/day for AKANKSHA Project at New Town , Rajarhat
EN
VIR
OS
PE
49,0
0,0
00.0
0
49,0
0,0
00.0
0
01/10/2019
20/09/2020
75.00 % 34.59 %
MONTHLY PROGRESS REPORT OF “AKANKSHA PROJECT” AT NEW TOWN AS STOOD ON 09/09/2020
Sl
No
Name of The Work Name
of
The
Agency
Estimat
ed
Amount
(Rs.)
Tender
Amount
(Rs.)
Date
of
Commence
ment
Date
Of
Completion
Cumulative
Physical
Progress
Achieved
Financial
Progress
Remarks
1 ” Construction of 3 (Three) nos (G+10) Storied A1 Type (Premium), One no (G+10) Storied A2 Type (Elegant) Residential Building, Community Hall and Substation Building [2 nos.] including Main Sewer Line, Under Ground water Supply System, Rainwater Harvesting pit, Rain water Recharge pit [Three Nos.], Horticulture & Bituminous Road under AKANKSHA Scheme at Rajarhat, New Town Action area-1D during the year 2015-16: structural, S & P, Electrical and Roads works"—Balance Work(Extension of Tender No-18 A of 2016-17 of SE/SC, H.Dte.
Delt
a C
on
str
ucti
on
19,2
3,1
8,5
04.0
0
16,1
9,1
2,9
49.0
0
15/03/2019
20/09/2020
92.0
31.92 %
1.Under Ground Reservoir- completed.
2. Community Hall:- i)Brick work:- Completed(1st and 2nd floor).
ii) Internal & outside plaster:- completed. iii) Flooring work to be started.
3.Cable Trench :-95 % completed.
4. Road Work:- 99% completed. 5. Sewer line & Inspection Pit
99% completed.
6. Drinking water line:- 95 % completed
MONTHLY PROGRESS REPORT OF “AKANKSHA PROJECT” AT NEW TOWN AS STOOD ON 09/09/2020
Sl No
Name of The Work
Name of
The
Agency
Estimated Amount
(Rs.)
Tender Amount
(Rs.)
Date of
Commence
ment
Date Of
Completion
Cumulative Physical
Progress
Achieved
Financial Progress
Remarks
1 Construction of boundary wall for Akanksha Project at New Town
S.S
. E
nte
rpri
se
97,5
9,2
34.0
0
96,1
2,8
45.0
0
16/01/2019
20/09/2020
85.00 % 38.31 %
Balance of Priming
& Painting Work,
for boundary wall
and Security Room,