Monthly Progress Report No. 45 Covering Project Activities During September 2016

Upload: dodan

Post on 04-May-2019

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report No. 45Covering Project Activities During

September 2016

Page 2: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

PT. PERENTJANA DJAJA in subconsultanty with e Yangma Engineering Ca. Ltd and aJPT ••Epadascon Permata Engineering ConsultanteTC Office: JI. Ciniru VII No. 25, Kebayoran Baru, Jakarta Selatan, 12180

Phone /Fax: (021) 7229823

uH' .•a 't: . rena r •WINRli>/ ... /'

~ oJ'''''''' "()~'\~~~ ~ij!~\1

;lflIJE C l" •• ,.1..\>-. . flng 0, ", ,)'

Direktur enderal Bina MargaInspektorat Jenderal, Kementerian PU-PERADirektur Transpertasi - BappenasDirektur Pengelolaan Kas Negara (PKN), Kementerian KeuanganDirektur Pengembangan Jaringan Jalan. DitJen Bina MargaDirektur Jalan Bebas Hambatan, Perko"taan dan Fasilitasi Jalan Daerah, Dit.Jen Bina MargaDirektur Pembangunan' Jalan, Dit.Jen Bina MargaDirektur Preservasi Jalan, Dit.Jen Bina Marga

9. Biro Perencanaan& KLN. KemenmanPU-PERA10. Kepala Balai Besar Pelaksanaan Jalan Naslonal II Medan11. Kepala Balai Besar Pelaksanaan Jalan Nasional fll Padang12. Kepala Balai Besar Pelaksanaan Jalan Nasional V Palembang13. Kasubdit Keterpaduan Perencanaan & Sistem Jaringan, DPJJ - DJBM14. Kasubdit Manajemen Konstruksi, DPJ - DJBM15. Kepala Satker Pembinaan Administrasi dan Pelaksanaan Pengendalian PHLN16. PT. Perentjana Djaja17. Yongma Engineering Co, Ltd18. PT. Epadascon Psrmata Engineering Consultant19. File

\.

This Report is reproduced in twenty (20) copies for distribution to all concerned authorities.

Should you have any comment or additional information that need to be incorporated in the Report, pleasefeel free to get in touch with us.

In compliance with the Terms of Reference of our Consultancy Contract. we submit herewith the MonthlyProgress Report No.45 covering the month of September 2016.

:-',1

Dear Sir,

Attentjon: It.Agusta &l'6ada Sinulingga, MTOfficer In Charge PMUWlNRIP

Subject : Submission of September 2016 Monthly Progress Report No.4S;WINRIP Loan IBRDNO.8043·ID

Directorate General of Highways. MPWHJI. Patimura 20 Kebayoran BaruJakarta SelatanIndonesia

Jakarta, October 11J 2016: 03_02/CT AlO/M-09.2016Our Ref.No.

Perentjana Ojaja

MINISTRY OF PUBLIC WORKS & HOUSINGDIRECTORATE GENERAL OF HIGHWAYSDIRECTORATE OF ROAD NETWORK DEVELOPMENT

CoreTeamConsultant forWestern Indonesia National Roads Improvement Project (WINRJP)

IBRDLoan No. 8043-ID

Page 3: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering
Page 4: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

Table of Contents

1 EXECUTIVE SUMMARY............................................................................................................ 1-1

1.1 Current Implementation Situation.......................................................................................................1-1

1.2 Disbursement..........................................................................................................................................1-4

1.3 World Bank Implementation Review Mission and Site Visit...............................................................1-5

1.4 Procurement of Civil Works Contract Under Category 1 of the Loan Agreement...........................1-5

2 PROJECT DESCRIPTION ........................................................................................................... 2-1

2.1 Background.............................................................................................................................................2-1

2.2 Project Development.............................................................................................................................2-1

2.3 Project Objective ......................................................................................................................................2-6

3 CONSULTANCY SERVICES ........................................................................................................... 3-1

3.1 CTC Consultants ......................................................................................................................................3-1

3.1.1 Scope of Services ........................................................................................................... 3-1

3.1.2 CTC Manning ................................................................................................................. 3-2

3.1.3 CTC Contract.................................................................................................................. 3-33.2 DSC Consultants.....................................................................................................................................3-6

3.3 Technical Assistance for Development of Slope Stabilization, Design and Management............3-7

4 CIVIL WORKS............................................................................................................................ 4-1

4.1 Detailed Design Preparation...................................................................................................................4-1

4.2 Procurements ............................................................................................................................................4-1

4.3 Civil Works Implementation ...................................................................................................................4-1

4.4 Civil Works Progress.................................................................................................................................4-3

4.5 Quality Assurance.....................................................................................................................................4-8

4.6 Environmental and Social Considerations.............................................................................................4-9

4.6.1 Current Overall Situation.............................................................................................. 4-9

4.6.2 Environmental and Social Issues................................................................................ 4-104.7 Anti Corruption Issues..........................................................................................................................4-22

4.7.1 Anti‐Corruption Action Plan (ACAP) ........................................................................... 4-22

4.7.2 Community Representative Observers (CRO)........................................................... 4-22

4.7.3 Publication / Disclosure ............................................................................................... 4-23

4.7.4 Complaints Handling Mechanism (CHS) .................................................................... 4-24

4.7.5 Third Party Monitoring (TPM)..................................................................................... 4-254.8 Road Safety Audit ...............................................................................................................................4-25

5 FINANCIAL & MANAGEMENT INFORMATION SYSTEMS.......................................................... 5-1

5.1 Draw‐Downs and Future Costs..............................................................................................................5-1

5.2 Disbursement..........................................................................................................................................5-1

Page 5: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

5.3. Management Information System ......................................................................................................5-1

6 PROJECT PERFORMANCE ........................................................................................................ 6-1

6.1 World Bank and GOI Compliance........................................................................................................6-1

6.1.1 World Bank Missions .................................................................................................... 6-1

6.1.2 Agreed Key Actions and Mission Plans during Recent World Bank Mission ........... 6-1

6.1.3 Performance Indicators ................................................................................................ 6-26.2 Implementation Support Components...............................................................................................6-4

6.2.1 Core Team Consultant (CTC)........................................................................................ 6-4

6.2.2 Design and Supervision Consultant (DSC)................................................................... 6-4

6.2.3 Study on Development of Slope Stabilization Design and Management................ 6-56.3 Anti‐Corruption Issues .............................................................................................................................6-5

6.3.1 Anti-Corruption Action Plan (ACAP) ............................................................................ 6-5

6.3.2 Community Representative Observers (CRO)............................................................ 6-6

6.3.3 Third Party Monitoring (TPM)...................................................................................... 6-6

6.3.4 Complaint Handling System (CHS)............................................................................... 6-8

6.3.5. Public Disclosures / Publication.................................................................................... 6-86.4 Road Safety Audit ..................................................................................................................................6-9

6.5 Management Information System ....................................................................................................6-10

6.6 Quality Assurance................................................................................................................................6-15

6.7 Project Risks and Mitigation Measures ...............................................................................................6-15

6.7.1 Risks Related to Delays ............................................................................................... 6-15

6.7.2 Financial Risks.............................................................................................................. 6-15

6.7.3 Risks Related to Quality .............................................................................................. 6-156.8 Training to Support Project Implementation......................................................................................6-16

7 ISSUES and RECOMMENDATIONS .......................................................................................... 7-1

7.1 Current Situation ...................................................................................................................................7-1

7.2 Actions Required....................................................................................................................................7-1

8 CORRESPONDENCES ............................................................................................................... 8-1

Page 6: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

ABBREVIATIONS AND ACRONYMS

ACAP : Anti Corruption Action PlanAER : Application Evaluation ReportAIP : Australian Indonesia PartnershipAMDAL : Environmental Management (Analisis Mengenai Dampak

Lingkungan)ANDAS : Analisis Dampak SosialAWPs : Annual Work ProgramsBalai : Regional Office for National Roads ImplementationBAPPENAS : Badan Perencanaan Pembangunan Nasional (National

Development Planning Agency of GOI)Bappedalda : Regional Environmental Impact AgenciesBBPJN : Balai Besar Pelaksanaan Jalan Nasional (Regional Office for

National Roads Implementation)BER : Bid Evaluation Report

BLH : Badan Lingkungan Hidup

BPK : Badan Pemeriksaan Keuangan (Audit Board of the Government

of Indonesia)

CAD : Computer Aided Design

CHS : Complaint Handling System

CTC : Core Team Consultant

CHU : Complaint Handling Unit

CRO : Community Representative Observer ( = WPM)

DIA : Directorate of Implementing Affairs

DOP : Directorate of Planning

DGH : Directorate General of Highways

DMS : Document Management System

DTA : Directorate of Technical Affairs

DMS : Document Management System

DSC : Design and Supervision Consultants

EA : Executing Agency

EINRIP : Eastern Indonesian National Roads Improvement Project

EIRTP-1 : Eastern Indonesia Regional Transport Project First Project

ESAMP : Environmental and Social Assessment Plan

ESS : Environmental and Social Safeguards

FMIS : Financial Management Information System

FIDIC : Federation Internationale des Ingenieur Conseils

Page 7: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

FMIS : Financial Management Information System

GIS : Geographic Information System

GOI : Government of Indonesia

IA : Implementation Agency

IBRD : International Bank for Reconstruction and Development

IFR : Interim Financial Report

IRMS : Integrated Road Management System

Kabupaten : Regency

KPIs : Key Performance Indicators

KPPN : Kantor Pelayanan Perbendaharaan Negara (Indonesian: State

Treasury Service Office)

LAN : Local Area Network

LARAP : Land Acquisition and Resettlement (Rencana Tindak Pengadaan

Tanah dan Pemukiman Kembali)

MIS : Management Information System

MOF : Ministry of Finance

MPW : Ministry of Public Work

MPRs : Monthly Progress Reports

P2JN : Perencanaan Pengawasan Jalan dan Jembatan Nasional

PDF : Portable Document Format

PMU : Project Management Unit

PAPs : Project Affected Peoples

PMM : Project Management Manual

PMU : Project Management Unit (WINRIP)

POKJA : Bina Marga Project Managers and Procurement Committes

PPC : Project Preparation Consultants

PP3 : Pemantau Pihak ke 3

PPK : Sub Project Manager

PPR : Project Progress Report

QPRs : Quarterly Progress Reports

RKL/RPL : Rencana Pengelolaan/Pemantauan Lingkungan

RS : Road Safety

Satker : Satuan Kerja (Work Unit for Road Project Implementation)

SPPL : Surat Pernyataan Pengelolaan Lingkungan

SRIP : Strategic Road Infrastructure Project

TA : Technical Assistance

Page 8: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

TOR : Terms of Reference

UKL/UPL : Upaya Pengelolaan Lingkungan / Upaya Pemantauan Lingkungan

(Site Specific Environmental and Monitoring Plan)

WINRIP : Western Indonesia Roads Improvement Project

WB : World Bank

WP : Work Program

WPs : Works Programs

WPM : Wakil Pengamat dari Masyarakat (or Community Representative

Observer / CRO )

Page 9: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

APPENDICES

Appendix A : Overall Loan Progress

Appendix B : Road Safety Audit Progress

Appendix C : Financial Progress

Appendix D : Quality Assurance Progress

Appendix E : Environmental and Social Progress

Appendix F : Procurement Plan and Progress

Appendix G : WINRIP Website Progress

Appendix H : ACAP Training/Dissemination Progress

Appendix I : Performance Indicator

Appendix J : Correspondences

ANNEXES

Annex P-1 : Package No. 1

Annex P-2 : Package No. 2

Annex P-3 : Package No. 3

Annex P-4 : Package No. 4

Annex P-5 : Package No. 5

Annex P-6 : Package No. 6

Annex P-7 : Package No. 7

Annex P-8 : Package No. 8

Annex P-11 : Package No. 11

Annex P-12 : Package No. 12

Annex P-13 : Package No. 13

Annex P-14 : Package No. 14

Annex P-15 : Package No. 15

Annex P-17 : Package No. 17

Annex P-19 : Package No. 19

Annex P-20 : Package No. 20

Annex P-21 : Package No. 21

ATTACHMENTAttachment 1 : Summary of Studies and Reports on Environmental Activity

Page 10: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

1- 1

1 EXECUTIVE SUMMARY

1.1 Current Implementation SituationCivil Works

Implementation of the WINRIP Project is scheduled to be implemented into three (3) Annual WorkPrograms (AWP’s). The implementation starts with the preparation of tender documents (detaileddesign drawings including associated bidding documents), tendering stage (procurement of works)and the actual civil works construction implementation.

The original implementation schedules of the three (3) Annual Work Programs (AWPs) arescheduled in three (3) phases namely ; AWP-1 to start in mid-2011 and to be completed on the lastquarter of 2014, AWP-2 is expected to begin in mid 2012 with target date of completion by mid-2016 and AWP-3 is expected to start during the early part of 2013 and to be completed during themiddle part of 2017.

However, due to some unavoidable circumstances the original implementation schedules did notmaterialized.

Based on the present status of the program implementation progress, a revised implementationschedule, the “Project Implementation Timeline” (as shown on Page 1-2) is to be implemented inorder to accommodate the originally delayed schedule into the remaining time frame of theWINRIP Program until the expiry date of the loan agreement by the end of December 2017. Shownon Page 1-3 is the current actual status of the implementation relative to the “ProjectImplementation Timeline”.

Implementation Status as of September 30, 2016.

Pack

Package Name

Contract Under Contract Proc UnderDefect

LiabilityPeriod

No. Sign Construct SignPreparation Process

1 Krui - Biha √ Completed √2 Padang Sawah - Sp.Empat √ Completed √3 Manggopoh - Padang Sawah √ Completed √4 Ipuh - Bantal √ Completed √5 Sp. Rampa - Poriaha √ √6 Ps. Pedati - Kerkap √ √7 Indrapura - Tapan √ √8 Bts.Pariaman - Manggopoh √ √

10 Sp. Empat - Sp. Air Balam √11 Bantal - Mukomuko √ √12 Kambang - Indrapura √ √13 Sp. Rukis - Tj.Kemuning √ √14 Painan - Kambang √ √15 Sibolga - Bts.Tap Sel √ √16 Seblat - Ipuh √ √17 Sp.Gn.Kemala - Pg.Tampak √ √19 Lais - Bintunan √ Completed √20 Lubuk Alung - Sicincin √ √21 Lubuk Alung - Kuraijati √ √

T O T A L : 17 12 1 2 5

Note : Package No.9 (Rantau Tijang – Kota Agung) and Package No.18 (Mukomuko – Bts. Sumbar) are cancelled from the program.

Page 11: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

1 - 2

Project Implementation Timeline Schedule

Length C'tion

Km Period J N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D

1 Krui - Biha 25,00 21 mth

2 Padang Sawah - Sp.Empat 40,90 24 mth

3 Manggopoh - Padang Sawah 32,00 24 mth

4 Ipuh - Bantal 42,40 24 mth

5 SIMPANG RAMPA - PORIAHA 11,10 18 mth

11 BANTAL - MUKOMUKO 50,10 24 mth

13 SP RUKIS - TJ KEMUNING 56,30 24 mth

17 Sp.Gn.KEMALA - Pg. TAMPAK 36,80 24 mth

6 PS. PEDATI - KERKAP 25,00 15 mth

19 LAIS - BINTUNAN 11,60 10 mth

15 SIBOLGA - BATAS TAPSEL 36,00 27 mth

7 INDRAPURA - TAPAN 19,50 21 mth

8 BTS.Kt PARIAMAN-MANGGOPOH 46,80 24 mth

10 SIMPANG EMPAT - SP.AIR BALAM 61,70 24 mth

12 KAMBANG - INDRAPURA 55,20 24 mth

14 PAINAN – KAMBANG 31,50 21 mth

16 SEBLAT – IPUH 34,50 21 mth

20 LUBUK ALUNG – SICINCIN 14,60 18 mth

21 LUBUK ALUNG – KURAITAJI 16,80 18 mth

9 RANTAU TIJANG-KOTA AGUNG 42,00 The Road has been constructed by MPW within 2011-2013. Road condition is good. Proposed to be deleted from the list of WINRIP's work program

18 MUKOMUKO-BTS SUMBAR 25,80 The Road has been constructed by MPW within 2011-2013. Road condition is good. Proposed to be deleted from the list of WINRIP's work program

Original target : 715,60 km ENVIRONMENT & SOCIAL SAFEGUARD

Revised target : 640,00 km Prequalification Detail Eng Design LARAP Study

Road Safety Owner's Estimate Appraisal & Public Consultation

Procurement & Sign Contr Bid Document LARAP Implementation

Preparation for Commencement of Work

Standard Biding Document

COW

PROC COW

PROC COW

PROC

CONSTRUCTION

CONSTRUCTION

PROC COW

PROC COW

PROC COW

PROC COW

CONSTRUCTION

CONSTRUCTION

CONSTRUCTION

CONSTRUCTION

CONSTRUCTION

Pack# PACKAGE NAME

2012 2013 2014 2015 2016 2017 2018

OE & BD

DED RSA & REVISED DED OE & BD

CONSTRUCTION

PROC COW

Review DED & RS

Review DED & RS

Review DED & RS

Review DED & RS

Review DED & RS PQ

CONSTRUCTION

Review DED & RS PQ PROC COW

Review DED & RS PQ

CONSTRUCTION

COW CONSTRUCTION

PROC

CONSTRUCTION

PQ

RS

Proc

COW

SBD

CONSTRUCTION

CONSTRUCTION

CONSTRUCTION

DED RSA & REVISED DED OE & BD

DED RSA & REVISED DED OE & BD

OE

BD

DED

SBD & OE + BD

Rev-DED RS

DED Rev-DED RS

Rev-DED RS

DED

COWPROC

COW CONSTRUCTION

OE & BD

DED Rev-DED RS OE & BD

OE & BD

DED OE & BD

COW

CONSTRUCTION

SBD & OE + BD

SBD & OE + BD

PQ PROC

PROC

CONSTRUCTION

CONSTRUCTION

DED RSA & REVISED DED

December 31, 2017

Page 12: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

1 - 3

Updated : September 30, 2016

Length C'tion

Km Period J N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D

Core Team Consultant (CTC) 40 mth IMPLEMENTATION Time extension for sevices

Design & Supervision Cslt (DSC) 42 mth IMPLEMENTATION Proposed time extension for sevices

TA for Dev.of Slope Stabilization, Design & Management PROCUREMENT

1 Krui - Biha 25,00 21 mth 8 Jan'14

2 Padang Sawah - Sp.Empat 40,90 24 mth 6 Jan'14

3 Manggopoh - Padang Sawah 32,00 24 mth 6 Jan'14

4 Ipuh - Bantal 42,40 24 mth 10 Jan'14

5 SIMPANG RAMPA - PORIAHA 11,10 18 mth 18 Jun'15 8 Dec'16

11 BANTAL - MUKOMUKO 50,10 24 mth 23 Feb'15 11 Feb'17

13 SP RUKIS - TJ KEMUNING 56,30 24 mth 11 Feb'17

17 Sp.Gn.KEMALA - Pg. TAMPAK 36,80 24 mth 04 Sep'15 23 Agt'17

6 PS. PEDATI - KERKAP 25,00 15 mth 11 Mar'15 31 Aug'16

19 LAIS - BINTUNAN 11,60 10 mth 11 Mar'15 CONSTRUCTION 300+125 days 08 May'16

15 SIBOLGA - BATAS TAPSEL 36,00 27 mth 20 Nov'15 06 Feb'18

7 INDRAPURA - TAPAN 19,50 21 mth 10 Dec'15 30 Agt'17

8 BTS.Kt PARIAMAN-MANGGOPOH 46,80 24 mth PROC 23 Mar'16 31 Dec'17

10 SIMPANG EMPAT - SP.AIR BALAM 61,70 24 mth

12 KAMBANG - INDRAPURA 55,20 24 mth 23 May'16 CONSTRUCTION 604days 16 Jan'18

14 PAINAN – KAMBANG 31,50 21 mth PROC 3 aug'16 CONSTRUCTION 516 days 31 Dec'17

16 SEBLAT – IPUH 34,50 21 mth CONSTRUCTION

20 LUBUK ALUNG – SICINCIN 14,60 18 mth CONSTRUCTION 486 days 31 Dec'17

21 LUBUK ALUNG – KURAITAJI 16,80 18 mth CONSTRUCTION 486 days 31 Dec'17

Original target : 715,60 km ENVIRONMENT & SOCIAL SAFEGUARD

Revised target : 640,00 km Prequalification Detail Eng Design LARAP Study

Road Safety Owner's Estimate Appraisal & Public Consultation

Procurement & Sign Contr Bid Document LARAP Implementation

Preparation for Commencement of Work

Standard Biding Document

ICB

1 Sep' 16

1 Sep' 16

IMPLEMENTATION

SBD & OE + BD

Rev-DED RS

Rev-DED RS

Rev-DED RS

PQ PROC

CONSTRUCTION 450+90 days

CONSTRUCTION

RSA & REVISED DED OE & BD

Review DED & RS

Review DED & RS PQ

PQ

Review DED & RS

Review DED & RS

PROC

CONSTRUCTION 720 days

CONSTRUCTION 720 days

CONSTRUCTION 649 days

PROC

PROC

DED

CONSTRUCTION 630 days

Review DED & RS SBD & OE + BD

RSA & REVISED DED OE & BD

DED RSA & REVISED DED OE & BD

SBD & OE + BD

DED RSA & REVISED DED OE & BD

DED

DED

30-Des-17

18-Des-16

6-Nov-12

19-Jun-13

PROC

PROC

DED

Rev-DED RS

ICB

ICB

NCB

NCB

DED

PROC

CONSTRUCTION 720 daysICB

ICB

NCB

NCB

NCB

Review DED & RS

PQ

RS

Proc

COW

SBD

DED

OE

BD

DED

NCB

NCB

Pack# PACKAGE NAME

2012 2013 2014 2015 2016 2017 2018

ICB

ICB

ICB

ICB

ICB

#########CONSTRUCTION 640 + 93 days

19-Apr-16

PROC

20-Mar-16

08-Apr-16

CONSTRUCTION 540 days

CONSTRUCTION 730 + 105 days

CONSTRUCTION 730 + 75 days

CONSTRUCTION 730 + 90 days

Review DED & RS PQ

ICB

ICB

Proc

CONSTRUCTION 810 days

Actual Implementation Timeline of WINRIP

Page 13: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

1 - 4

1.2 Disbursement

Loan Allocation and Percent (%) Disbursement To Date

#REF! 1.25

0.00

10.00

20.00

30.00

40.00

50.00

60.00

70.00

80.00

90.00

100.00

Month

% C

ompl

ete

Actual Expenditure USD 74.39mil (29.75 %)

WINRIP ACTUAL PROGRESS UP TO SEPTEMBER 2016 AND FORECAST UP TO JUNE 2018

ACTUAL Sept 2016

Original Forecast

Forecast Expenditure Rev USD 54.75 mil(21.90%)

Forecast Sept 2016

Deviation = + 7.85 %

The total disbursement summary from the loan by The World Bank to the end of September2016 was USD 74,387,379.27 equivalent to approximately 29.75% of the loan funds. Thefollowing table summarizes the individual disbursements as calculated by CTC but retainingthe total disbursement from Client Connection at the end of September 2016. Appendix Ashows the Overall Loan Progress Status.

Category DescriptionLoan

RestructuringAmount US$

DisbursementThis Period

PreviousDisbursement

Totals Disbursedto End

September 2016in US$

%Disbursed

1Part 1 Betterment andCapacity Expansion of

National Roads.220,400,000.00 3,540,879.48 65,262,618.96 68,803,498.44 31.22

2Part 2

Implementation Support17,000,000.00 0 5,583,880.83 5,583,880.83 32.85

3Part 3

Road Sector InstitutionalDevelopment

0 0 0 0 0

4Part 4

Contingency for DisasterRisk Response

0 0 0 0 0

Unallocated 12,600,000.00 0 0 0 0Original Loan

Amount 250,000,000.00 3,540,879.48 70,846,499.79 74,387,379.27 29.75

Breakdown of amount disbursed during the period (September 2016) are for “Statement of WorkAccomplished” for the following civil works contract packages :

Package No.05 : MC Nos. 01 - 13 USD 1,377,210.26 Package No.06 : IPC Nos. 05 USD 502,666.02 Package No.06 : IPC Nos. 06 USD 517,522.76 Package No.08 : IPC Nos. 02 USD 426,814.11 Package No.08 : IPC Nos. 03 USD 449,508.12 Package No.17 : IPC Nos. 11 - 12 USD 267,158.21

The Ending balance for Special Account end of September 2016 USD 273,524.89 (Include Follow up on BPKaudit findings for FY 2014 USD 11,765.00).

Page 14: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

1 - 5

1.3 World Bank Implementation Review Mission and Site Visit

During this month, there was no mission by the World Bank.

1.4 Procurement of Civil Works Contract Under Category 1 of the Loan Agreement

As of end this reporting month, seventeen (17) out of the nineteen (19) contract packages arealready procured and are either completed, under construction and awaiting the issuance ofNotice To Proceed (NTP) to commence the Works. The remaining two (2) packages are stillunder final procurement stages.

The current status of Contract Packages which are under final procurement stage are asfollows:

1. Package No.10 (Sp. Empat – Sp. Air Balam) AWP-2

This sub-project is under implementation schedule AWP-2. The project roadline islocated in the Province of Sumatera Barat having an approximate length of61.70 kilometers.

The Contract Package is procured thru the post qualification and InternationalCompetitive Bidding (ICB) procurement method using the Full e-Procurement System.

As mentioned in previous reports, the revised Bid Evaluation Report (BER) has beenissued No Objection Letter (NOL) by the World Bank to award the contract to the jointoperation of PT. Lancarjaya Mandiri Abadi and PT. Cahaya Tunggal Abadi in theamount of Rp.424,285,260,782.50 with 720 calendar days time completion.

The revised Bid Evaluation Report (BER) and contract award recommendation is stillbeing thoroughly evaluated by the Ministry before rendering decision whether toaccept and confirm POKJA’s evaluation report.

2. Package No.16 (Seblat-Ipuh) AWP-3

The sub-project is to be implemented under implementation schedule AWP-3. TheProject road length covers 34.50 kilometers and is located in the Province of Bengkulu.

The Contract Package is procured thru post qualification criteria and NationalCompetitive Bidding (NCB) method using the Full e-Procurement System.

As a result of series of meetings to address the issues raised by the World Bank anddiscussions between World Bank, MPW and POKJA, the 2nd Revision of the BidEvaluation Report has been finalized recommending the award of contract to the 2nd

lowest evaluated responsive bidder, KSO PT. Yasa Patria Perkasa in joint venture withPT. Multi Structure.

The revised Bid Evaluation Report (BER) was forwarded to the World Bank on August22, 2016 and on August 24, 2016 the Bank issued No Objection Letter (NOL) to awardthe contract to PT. Yasa in joint venture with PT. Multi Structure , at a cost notexceeding Rp. 211,374,500,000 (including 10% VAT).

During the period on September 26, 2016, Ministry confirmed the result of the revisedBid Evaluation Report (BER) and POKJA’s recommendation to award the contract toPT. Yasa/PT. Multi Structure.

Page 15: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

1 - 6

3. Package No.20 (Lubuk Alung - Sicincin) AWP-3

The sub-project is to be implemented under implementation schedule AWP-3. TheProject road length covers 14.60 kilometers and is located in the Province of WestSumatera.

The Contract Package is procured thru post qualification criteria and NationalCompetitive Bidding (NCB) using the Full e-Procurement System.

Notice To Proceed (NTP) to commence the Works has been issued on September 1,2016 and pre-construction meeting was held on September 20, 2016 in Padang City.

4. Package No.21 (Lubuk Alung - Kuraitaji) AWP-3

The sub-project is to be implemented under implementation schedule AWP-3. TheProject road lenght covers 16.80 kilometers and is located in the Province of WestSumatera.

The Contract Package is procured thru post qualification criteria and NationalCompetitive Bidding (NCB) using the Full e-Procurement System.

Notice To Proceed (NTP) to commence the Works has been issued on September 1,2016 and pre-construction meeting was held on September 20, 2016 in Padang City..

1.5 Procurement of Consultancy Package Under Category 2 of the Revised Loan AgreementReallocation.

Technical Assistance for Development of Slope Stabilization, Design andManagement

The Technical Assistance for Disaster Risk Reduction was canceled based on theresults of meeting between DGH and the WB on October 12, 2015. It was decided tocancel the Technical Assistance and replaced by a “Technical Assistance forDevelopment of Slope Stabilization, Design and Management” (under Loan Category-2).

As mentioned in previous Monthly Report, eight (8) interested consultants met thedeadline for submission of “Expression of Interest”. After POKJA’s evaluation, six (6)consulting firms made the shortlist, four (4) international and two (2) local companies.

The revised shortlisting proposal from POKJA is under finalization for submission toWorld Bank. While the revised “Request For Proposal (RFP) have already beensubmitted to World Bank for request of No Objection Letter (NOL).

Page 16: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

2 - 1

2 PROJECT DESCRIPTION

2.1 Background

The Government of Indonesia wishes to continue strengthening of the National Road system inIndonesia while the Eastern Indonesia National Roads Improvement Project (EINRIP which isassisted by AusAID through the Australian Indonesia Partnership or AIP), is providing supportprogram of National road and bridge improvement works in Eastern Indonesia. The WesternIndonesia National Road Improvement Project (WINRIP) will provide similar support for Nationalroad and bridge in the Sumatera region of Indonesia. The focus of WINRIP will be roadsadministered directly by the National Government, including those currently classified asProvincial, Kabupaten (District) or non-status roads which are in process of being reclassified asNational roads. In addition, provision will be made for major bridge repair works, rehabilitation,duplication and replacement as necessary to complement road betterment works.

2.2 Project Development

The loan effectiveness date for the WINRIP is 12 March 2012 and key project data is shown in thefollowing detail.

Key Project Data WINRIP Loan No. 8043-ID

Project Cost US$350 million

Original Loan Amount US$250 million

Revised Loan Amount N/A

Board Approval Date 26 May 2011

Loan Signing Date 14 December 2011

Effectiveness Date 12 March 2012

Disbursement (as of September 30, 2016) US$ 74,387,379.27 million (29.75%)

Original Closing Date 31 December 2017

Environmental Category B-Partial Assessment

The IBRD loan amount is US$250 million. The Project is intended to finance a part of the DGHinvestment program for national roads with a particular focus on the Western corridor ofSumatera. The corridor is one of the three main corridors in Sumatera and connects the city ofPadang (with a population of around one million) to major towns along the west coast (Bukittinggi,Sibolga and Bengkulu). It also connects through connector roads on the West coast to Medan inthe northeast and to Pekanbaru in the centre of the island. The project has four components:

Project Component 1: Betterment and Capacity Expansion of National Roads

According to the Amendment No.2 Loan Agreement, this component will cover three workprograms of betterment and capacity expansion of approximately 640 km including replacement of160 meters of bridges. This civil works program will be executed in three Annual WorkPrograms(AWP), as summarized in Table 2.1. The table shows the IBRD assisted scope and costs ofcivil works at estimated current (year of implementation) prices, excluding taxes.

Page 17: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

2 - 2

Table 2.1 Proposed Physical Works by DGH Program

Type of WorksAWP-1 AWP-2 AWP-3

Km USDMillion

Km USDMillion

Km USDMillion

Road Betterment - - 53.10 22.77 - -

Capacity Expansion 137.10 79.70 314.60 127.67 207.60 74.58

Bridge works 0.100 1.94 - - 0.08 2.06

TOTAL(excluding tax @ current prices)

137.20 81.64 367.70 150.45 207.68 76.65

The batches of projects are termed Annual Work Programs (AWPs) in line with terminology used inother Bina Marga projects. They are not in fact “annual” programs as such but rather a series ofmulti-year programs, each commencing in consecutive years. Hence, hereinafter it will call as justWork Programs (WPs). It is expected that implementation of the first Works Program (WP-1) willcommence in the third quarter of 2013 and be completed by third quarter or late 2015. Thesecond Work Program (WP-2) is expected to commence in early 2014 and be completed by late2015 or middle 2016. The third Work Program (WP-3) is expected to commence in early 2015 andbe completed by mid-2017. The loan will be closed on December 2017.

Table 2.2 presents details of the First Works Program (WP-1). The four packages in this groupshould have been free from any land acquisition issues, but in fact two packages (Krui – Biha andManggopoh – Padang Sawah) had land issues which were solved by the DGH properly. Thus, thereare no foreseeable impediments to implementation.

Table2.2 IBRD Assisted WINRIP Civil Work WP-1

No Province LinkNo.

LinkName

Clas

s

Road

Typ

e

Road Works Bridge Works Total Cost

From

To Leng

th

Trea

tmen

t

Cost

(201

0)

No

Leng

th

Cost

(201

0)

2010

Pric

es

Equi

vale

nt

Km Km Km Rp mill m Rp mill Rp mill US$ mill

1 Lampung 053.0 Krui –Biha K1 IU 221.5 246.5 25.0 Bett’nt

to 7 m. 148,668 148,668 16.52

2 WestSumatera 047.2

PadangSawa –SimpangEmpat

K1 IU 0.0 40.9 40.9 Bett’ntto 7 m. 189,810 189,810 21.09

2a WestSumatera 34.1 AirGadan

gBridge K1 IU NewBridge 1 100 17.580 17,580 1.95

3 WestSumatera 047.1

Manggopoh –PadangSawah

K1 IU 102.2 134.2 32.0 Bett’ntto 7 m. 152,435 152,435 16.94

4 Bengkulu 015.3 Ipuh -Bantal K1 IU 0.0 42.40 42.40 Bett’nt

to 7 m. 226,275 226,275 25.14

Page 18: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

2 - 3

It should be noted that all road sub-projects have been subject to economic appraisal and haveestimated Economic Internal Rates of Return (EIRR) in excess of 15%. These were selected forinclusion and are subject to completion of environmental and social screening, to confirm thatthere is no land acquisition or resettlement requirements remain outstanding.

Final Engineering Designs, Engineer’s Estimates and bidding documents have been completed forall projects proposed for WP-1.

Sub-projects to be included in WP-2 and WP-3 have also been determined as listed in Table 2.3.Final Engineering Designs and Engineer’s Estimates for all WP-2 and WP-3 proposed works requirepreparation or finalization. In the cases of some projects, preliminary Engineering Designs wereprepared during Project preparation which will require review and possible amendment by theDesign and Supervision Consultant prior to procurement.

The revised costs presented in Table 2.3 are planning estimates only, and the revisedimplementation plan is based on the “Revised Implementation Timeline Schedule” of the civilworks.

Table2.3: IBRD Loan WINRIP Civil Work WP-2 and WP-3

NO. SUBPROJECT LINK NO. AND NAME LENGTH(KM)

ENGINEER’SESTIMATE(RP. MILL)

WIDTH(M)

REVISED IMPLEMENTATION PLAN

START DURATION(MONTHS)

WP-2

5. Sumut : Link No. 015.xx,Sp. Rampa – Poriaha 11.10 152,870 6.0 Mar 2015 18

6. Bengkulu : Link No. 010.0,Ps. Pedati – Kerkap 25.00 92,127 7.0 Mar 2015 15

7. Sumbar : Link No. 019.0,Indrapura – Tapan 19.50 178,600 7.0 Jan 2016 21

8. Sumbar : Link No. 024.0,Bts. Pariaman – Manggopoh 46.80 379,034 7.0 Jan 2016 24

9. Lampung : Link No. 026.1,Rantau Tijang - Kota Agung - - - - Cancelled

10. Sumbar : Link No. 034.1,Sp. Empat - Sp. Air Balam 61.70 515,842 7.0 Jan 2016 24

11. Bengkulu : Link No. 015.2,Bantal – Mukomuko 50.10 246,500 6.0 Feb 2015 24

12. Sumbar : Link No. 017.2,Kambang – Indrapura 55.20 451,810 7.0 Jan 2016 24

13. Bengkulu : Link No. 006.1,Simpang Rukis - Tanjung Kemuning 56.30 316,305 7.0 Jun 2015 24

WP-3

14.Sumbar : Link No. 017.1,Painan – Kambang 31.50 252,000 7.0 May 2016 21

Page 19: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

2 - 4

NO. SUBPROJECT LINK NO. AND NAME LENGTH(KM)

ENGINEER’SESTIMATE(RP. MILL)

WIDTH(M)

REVISED IMPLEMENTATION PLAN

START DURATION(MONTHS)

15. Sumut : Link No. 016.0,Sibolga - Bts. TapSel 36.00 376,479 7.0 Oct 2015 27

16.Bengkulu : Link No. 009.4,Seblat – Ipuh, including Air Galang andAir Guntung Bridges

34.500.052 241,500 6.0 May 2016 21

17. Lampung : Link No. 061.1,Sp. Gunung Kemala - Pugung Tampak

36.80 255,269 6.0 May 2015 24

18. Bengkulu : Link No. 015.3,Mukomuko - Bts. Sumbar - - - - Cancelled

19. Bengkulu : Link No. 009.1,Lais – Bintuan 11.60 35,886 7.0 Feb 2015 10

20. Sumbar : Link No. 002.0,Lubuk Alung – Sicincin 14.60 116.800 7.0 May 2016 18

21. Sumbar : Link No. 027.0Lubuk Alung – Kuraitaji 16.80 65,788 7.0 May 2016 18

Project Component 2: Implementation Support

This component provides consulting services to support project management and implementationso as to ensure implementation efficiency and overall quality of the works. It also includes fundsfor a small amount of training of DGH staff and for incremental operating costs for the project. Thiswill provide support to the MPW for the implementation of the civil works, including: (a) provisionof Core Team Consultants (CTC), Design and Supervision Consultants (DSC) and road safety audits;(b) Project management support and technical audits. This is directly related to theimplementation of the civil works and covers consulting services for design and supervision of thecivil works in Component 1; management support and technical audits to help improve the qualityof construction and support to governance improvements during procurement andimplementation; and a series of systematic road safety audits of road designs for all project roadsin Component 1. This is to ensure compliance with road safety standards and regulations, identifyroad hazards and undertake remedial treatments for safety improvements, (c) slope protectiondesign and management. This is related to Technical Assistance and Support to StrengthenDisaster Risk Mitigation in the Road Sector mainly to deal with stabilizing and strengthening, inparticular roadway side cut and high embankment slopes by providing appropriate slopeprotection structures. These activities initially is part of Component-3 : Road Sector InstitutionalDevelopment, however, due to reallocation or realignment of funds, the propose work, “TechnicalAssistance for Development of Slope Stabilization, Design and Management” implementation hasbeen realigned to Component-2 : Implementation Support. This activity covers consulting servicefor design and management of slope protection. The revised Loan Category restructuring ispresented in Table 2.4 and revised implementation is based on the approval of GOI and WorldBank.

Page 20: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

2 - 5

Tabel 2.4

Project Management Core Team Consultants (CTC)

The CTC will provide support to the PMU and DGH in the management of the Project, based inJakarta. Their tasks include financial and progress monitoring and reporting, informationmanagement and dissemination, quality assurance and performance review for the Design andSupervision Consultants, implementation and monitoring of the anti-corruption action plan,support for project monitoring and evaluation, and support for implementation of a trainingprogram to support project management and implementation. The CTC contract No. 06-20/CTC/TA/LN/8043/1112 was signed on 5 November 2012 by both DGH and a Joint Venture ofPT. Perentjana Djaja, Yongma Engineering Co,Ltd, and PT. Epadascon Permata EngineeringConsultant.

Design and Supervision Consultants (DSC)

A Design and Supervision Consultant (DSC) will be responsible for design of WP-2 and WP-3 civilworks and supervision of all civil works. They will have the role of ‘Engineer’ under a FIDIC-typecontract. The tasks include the preparation and maintenance of a quality assurance plan,validation and updating of designs, supervision of all civil works, environmental and socialmonitoring and management, and support for financial and progress monitoring and reporting.The DSC will also be responsible for quality assurance of materials and workmanship, certifyingwhether or not contractors have achieved the required results, as well as documentation andreporting based on the financial management plan. They will prepare a Quality Assurance systemcovering all subprojects, and continuously monitor the effectiveness of their supervisionprocedures. The team will be contracted and managed by DGH through the Bina Marga RegionalOffice (Balai II), and will be based in Padang, West Sumatera.

CategoryOriginal Amount ofthe Loan Allocated

(expressed in USD)

Revised Amountof the Loan

Allocated(expressed in

USD)

Percentage ofExpenditures to be

financed (inclusive ofTaxes)

(1) Civil Works under Part 1 of theProject WP-l 220,400,000 220,400,000 70%

(2) Goods, Non-consulting Services,Consultants Services andIncremental Operating Costs* underPart 2 of the Project

16,000,000 17,000,000 100%

(3) Goods, Non-consulting services andConsultants' Services under Part 3of the Project

1,000,000 Cancelled Cancelled

(4) Works, Goods, Non-ConsultingServices, Consultants' Services andIncremental Operating Costs* underPart 4 of the Project

0 0 0%

(5) Unallocated 12,600,000 12,600,000 100%T O T A L : 250,000,000 250,000,000

Page 21: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

2 - 6

Project Component 3: Road Sector Institutional Development

This component which is originally intended to provide technical assistance and support tostrengthen disaster risk mitigation in the road sector, including capacity building support for thenew environment/risk mitigation and road safety unit of DGH has been cancelled due to revisionof the loan allocation. In the meeting, DGH and World Bank agreed upon that DGH will conductanalytical work of an alternative design for road segment that pass through critical environmentalassets and vulnerable areas especially on slope protection design and management. Due todeletion of the allocated funds for Category 3 of the loan agreement and reallocated to Category 2to accommodate the implementation of Technical Assistance for Development of SlopeStabilization, Design and Management, into Component-2. The Loan Category restructuring can beseen in Table 2.4 page 2-5.

Project Component 4: Contingency for Disaster Risk Response

This special component will provide preparedness and rapid response to disaster, emergencyand/or catastrophic events as needed. This provisional zero dollar component will be added underthis project to allow for rapid reallocation of loan proceeds from other components understreamlined procurement and disbursement procedures.

2.3 Project Objective

The main objective of the program will be to increase the effective use of selected sections ofNational roads along the Western Sumatera Corridor by reducing road user costs, throughimproving the National road network especially in 4 (four) Provinces of Sumatera (North Sumatera,West Sumatera, Bengkulu and Lampung) and, where desirable, raise the road standard to that setby the Directorate General of Highways. This will contribute significantly to ensuring that thenational road network in the region provides acceptable standards of service and accessibility, andis capable of supporting local and regional economic development.

Page 22: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

3 - 1

3 CONSULTANCY SERVICES

3.1 CTC Consultants

3.1.1 Scope of Services

The CTC contract services originally were structured in its different project management elements.

* Inception Phase

A key activity during the inception phase will be to establish lines of communication with PMU-WINRIP and DSC’s Team Leader as well as with all Provincial Project Managers (Satkers) wherethe first works are to be constructed under WP-1.

* Project Management and Support to PMU, including acting DSC until the DSC is established

The Terms of Reference (TOR) identify a number of sub-items to be performed by CTC. The keyfactor that will ensure success is that the CTC must work pro-actively and alongside PMUcounterparts and with DSC team in a professional manner based on mutual respect and trust.

* Preparation of Work Programs

The tendering process for WP 1 sub-projects began as soon as procurement committees havebeen formed and received appropriate training in the procurement procedures required. Theindicative work programs and cost estimates identified for WP-2 and WP-3 are subject toverification, and are likely to change following more detailed investigations. Furtherpreparation for WP-2 and WP-3 will be managed by the PMU supported by the CTC.

* Financial Monitoring

It will be the role of the CTC to first assess the level of understanding of the financialmanagement, monitoring and reporting procedures by the finance staff at the provincial andcentral level and subsequently devise an appropriate training program and assist the PMU intraining delivery.

* Project Progress and Performance Monitoring

CTC will monitor the loan project progress and prepare the report in monthly basis. In themeantime, GOI and the World Bank have agreed on a set of Key Performance Indicators (KPIs)to measure the project’s performance in achieving its stated development objectives. CTC willtherefore first concentrate on the establishment of precise definitions, calculation methodsand data collection procedures to monitor the KPIs.

* Support for the Implementation of the ACAP

The CTC will assist PMU and be responsible for ensuring the ACAP is properly implemented.And for revising the Project Management Manual on an annual basis to incorporate necessaryimprovements to processes and procedure.

Page 23: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

3 - 2

* ESAMP and LARAP Implementation Monitoring

CTC will closely work with BLH and DSC and will monitor and report the action of theEnvironmental Management Plan on a periodical basis and/or as required.

* Training to Support Project Implementation

CTC is responsible for preparation and management of all training program required underWINRIP.

* Reporting

CTC is responsible for all reports required under the contract agreement with standardizeforms, charts and tables.

3.1.2 CTC Manning

CTC professional staffs involved in the project as of end of September 2016 are listed in Table3.1.

The International Staff (Senior Highway Engineer, Senior Road Safety Audit Engineer and SeniorProcurement Specialist) have completed their respective engagements and man-months havedemoblized on March 31, 2014 and May 31, 2015, respectively.

The task of conducting final Road Safety Audit during post-construction phase which is supposedto be conducted by the Senior Road Safety Audit Engineer will be performed by the local RoadSafety Audit Engineer with man-months for the task to be covered by Amendment No.4 of theConsultancy Contract.

The Training Specialist has been demobilized since the end of August 2016 due to completion ofhis allocated man-month under Amendement No.4 of the Consultancy Contract.

Page 24: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

3 - 3

Table 3.1

40.00 - - Mahbub urRahman

- - - - A

- 35.25 12.25 12.25 12.25Per WeissPedersen

Apr-2013 Mar-2014 12,25 0,00 B

- - 23.00 23.00 44,83 C.T. Arenas Apr-2014 - 24,31 20,52

Senior HighwayEngineer

8.00 12.50 14.00 14.00 14,00Moon, Sung

HyungMar-2013 Mar-2014 14,00 0,00 C

Senior RoadSafety Audit

6.00 11.00 13.00 13.00 11,00 Cho, Woo Sung Jun-2013 Mar-2014 11,00 0,00 C

18.00 - -Wasim urRahman

- - - - A

- 16.00 16.00 16.00 16,00Sanjeev Kumar

AgarwalJan-2014 May-2015 16,00 0,00 C

40.00 9,67 9,67 9.67 9,67Besar Awiat

BowoNov-2012 Sep-2013 9.67 0,00 B

- 30,33 6,66 6.66 6,66 Agus Setiawan Sep-2013 Mar-2014 6,66 0,00 B

- - 23.67 23.67 45,50 Julius J. Sohilait Apr-2014 - 30,00 15,50

36.00 7,37 7,37 7.37 7,37 Whiliyanto Nov-2012 Jun-2013 7.37 0,00 B

- 28.40 28,63 32.13 38,96 Lebiyartono Jul-2013 - 38,97 0,00 E

QualityAssuranceEngineer

30.00 30.00 30.00 32.00 53,83Uray Abdul

ManafJul-2013 - 38,97 14,86

36.00 10.37 10.37 10.37 10,37 Uus Martawijaya Nov-2012 Oct-2013 10,37 0,00 B

- 25,63 25,63 29.13 50,96 YD Tarwanto Oct-2013 - 35,97 14,99

EnvironmentalSpecialist

30.00 30.00 30.00 38.50 60,33 Leti Hermawati Dec-2012 - 45,53 14,90

36.00 9,37 9.37 9.37 9,37 M. Sutopo Nov-2012 Oct-2013 9,37 0,00 B

- 26,63 26,63 30.13 39,96 Witono Sep-2013 - 36,93 3,03

12.00 - - Darmansiri - - - - A

- 12.00 12.00 Muhdi - - - - A

- - 12.00 7.00 7,00 Mardiansyah Jul-2014 Mar-2015 7,00 0,00 B

12.00 - 4.10 4.10 4,10 Rudi Rungkat Nov-2012 Mar-2015 4.10 0,00 B

- 24.00 24.00 35.40 40,23 M. Edhi Fachri Mar-2013 - 42,00 - E

30 - - Agung Lukito - - - - A

- 25.00 25.00 34.00 55,83 Sony Thamrin May-2013 - 40,97 14,86

CommunityDevelopment

Officer 36.00 36.00 36.00 38.00 59,83 Yakobus Jan-2013 - 44,90 14,92

Road SafetyAudit Engineer

25.00 25.00 19.00 21.00 42,83Aditya Moraza

AlwiJun-2014 - 28,00 14,83

Bridge Engineer 5.00 5.00 5.00 5.00 5,00Harimurti

SuprihantoroApr-2013 Aug-2013 5.00 0.00 C

TrainingSpecialist

- 12.00 12.00 25.00 30,83 Roedjitarjo Jan-2014 Aug-2016 30,83 0,00 C

Traffic Engineer - - - 1,00 7,00 Harianto Parman Mar-2015 - 1,00 6,00 DRemarks

A - Not able to mobilizied due to poor health or personal reasonsB - Resigned due to personal reasons or poor healthC - Task assigment completedD - Intermittent assignment to update AADTE - Man-months until December 31, 2016 to be covered Amendment No.5

FinancialManagement

Specialist

Social ImpactSpecialist

ProcurementSpecialist-2

ManagementInformationSpecialist

ProcurementSpecialist-1

OriginalContract

AmendNo.1

AmendNo.2

HighwayEngineer

POSITION

Team Leader

SeniorProcurement

Specialist

Assistant TeamLeader

Man - Months Duration

RemarksAmendNo.3

MobilizedDemob-

ilized

Man - MonthUsed as of end ofSeptember 2016

Man - MonthRemaining

NameAmendNo.4

Page 25: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

3 - 4

3.1.3 CTC Contract

The CTC contract for “Western Indonesia National Roads Improvement Project” (Contract No.06-20/CTC/TA/LN/8043/1112) was signed on 05 November 2012. The contract is between theGovernment of Indonesia represented by Directorate General of Highways in the Ministry of PublicWorks and PT. Perentjana Djaja in joint venture with Yongma Engineering Co.Ltd. and PT.Epadascon Permata Engineering Consultant.

The Notice To Proceed was issued by letter dated 6 November 2012 from the PPK, and the officialstarting date of the contract was set at 6 November 2012.

Likewise, Amendment No. 1 to the original contract was signed on 25 October 2013 to coverall requirements of the CTC are summarized below.

* Replacement of the Senior Procurement Specialist* Extending the assignment of the Senior Highway Engineer.* Extending the assignment of the Senior Road Safety Audit Engineer.* Extending the assignment of the Procurement Specialist 2 and replacement of the

Procurement Specialist 1.* Adding the new position of Bridge Engineer.* Adding the new position of Training Specialist, and* Adding the new position of Road Safety Engineer.

Amendment No. 2 to the Original Contract and Amendment No. 1 was signed on September 3,2014 to cover requirements of CTC are enumerated as follows :

* Additional / Modification to Terms of Reference (TOR)* Amendment to the Team Composition and Staffing Schedule* Replacement of Foreign and Local Consultants* Adjustments of Remuneration paid in foreign currency and local currency* Adjustment inputs of personnel* Modification to various reimbursable and provisional sum to match the actual requirement

Amendment No.3 to the current CTC Contract (Original Contract and Amendments 1 and 2 wassigned on November 30, 2015 which is in line with the Updated Timeline Bar Schedule takinginto consideration the current and look ahead situations of the WINRIP program.

Based on the current progress of the Project, the services of several local professional and sub-professional staff have been extended beyond the end of the respective dates of completionassignments under Amendment No. 2.

In addition, new position of Traffic Engineer for local professional staff have been added toconduct traffic surveys on six (6) selected road links within the WINRIP Program in order toupdate the AADTs and to prepare a “Technical Analysis of the Annual Average Daily Traffic”.

Page 26: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

3 - 5

Amendment No.3 covers the requirements of CTC are as follows :

* Amendment to the team composition and staffing schedule* Adjustment of inputs of personnel* Adjustment of remuneration paid in local currency* Adding the new position of Traffic Engineer* Modification to various reimbursable to match the actual requirements.

Amendment No. 4 to the current CTC Contract (Original Contract and Amendements 1, 2 and 3)was signed on March 4, 2016 and to expire or completed on December 31, 2017, the same dateas the expiry/closing date of the loan agreement.

Based on the current progress of the Project, services of professional international and local staffas well as local sub-professional staff have been extended beyond their respective dates ofassignment engagement covered by Amendment No. 3.

Amendment No.4 covers the requirements of CTC are as follows :

* Consultancy services time extension* Additional/Modification to TOR/Terms of Reference* Adjustment of input schedule for Professional Staff, Sub Professional and Supporting Staff* Amendment to the Team Composition* Amendment of the Staffing Schedule* Modification to the Provisional Sums* Adjustment of Remuneration paid in foreign currency and local currency* Adjustment to the reimbursable expenses* Amendment to Clause 6.1(b) of the Special Condition of Contract

Proposed Amendment No.5 to the current CTC Contract will cover the following requirementsof CTC :

* Adjustment of input schedule for professional staff, sub-professional and supporting staff.* Amendment of Staffing schedule.* Adjustment of remuneration covered by Special Conditions of the Contract, Clause 6.2 (a).* Adjustment of cost estimates for foreign and local curriencies.

Presented in Table 3.2 is the current status of CTC contract.

Table 3.2

Description USD IDR

Original Contract including 10% VAT 1,404,370 23,556,940,000

Amendment No.1 including 10% VAT 1,447,517 24,668,792,500

Variance Against Original Contract +3,07% +4,72%

Combine Variance Against Original Contract +4.12%

Amendment No. 2 including 10% VAT 1,509,117 24,704,544,150

Variance Against Original Contract +7,46% +4,87%

Combine Variance Against Original Contract +5.81%

Page 27: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

3 - 6

Description USD IDR

Amendment No.3 including 10% VAT 1,473,917 26,328,054,500

Variance Against Original Contract +4.95% +11.76%

Combine Variance Against Original Contract +9.29%

Amendment No. 4 including 10% VAT 1,918,158 40,878,169,529

Variance Against Original Contract +36.58% +73.53%

Combine Variance Against Original Contract +60.12%

Amendment No. 5 including 10% VAT *1,914,495 *40,952,551,529

Variance Against Original Contract *36.32% *73.84%

Combine Variance Against Original Contract *60.22%* Tentative, pending approval of Amendment No. 5.Note : Combine variance (USD+IDR) is based on 1 USD = Rp. 9,558 exchange rate used during the

time of signing the original Contract Agreement.

3.2 DSC Consultants

The Design and Supervision Consultant (DSC) is responsible to design of WP-2 and WP-3 civil worksand supervision of all civil works. They will assume the role of ‘Engineer’ under a FIDIC-typecontract. The tasks include the preparation and maintenance of a quality assurance plan,validation and updating of designs, supervision of all civil works, environmental and socialmonitoring and management, and support for financial and progress monitoring and reporting.The DSC is also be responsible for quality assurance of materials and workmanship, certifyingwhether or not contractors have achieved the required results, as well as documentation andreporting based on the financial management plan. They will prepare a Quality Assurance systemcovering all subprojects, and continuously monitor the effectiveness of their supervisionprocedures. The team is being contracted and managed by DGH through the Bina Marga RegionalOffice (Balai II), and is being based in Padang, West Sumatera.

DSC has been established in Balai II Padang following the contract signing on 11 June 2013between Balai II and Renardet SA in joint venture with PT. Cipta Strada, PT. Daya Creasi Mitrayasa,PT. Seecons and PT. Yodya Karya. The Notice To Proceed was issued by the Balai II on 19 June2013.

Shown in Table 3.3 is the present status of the Design Supervision Consultant (DSC) contract.

Table 3.3

Description USD IDR

Original Contract plus 10% VAT 902.660 57,000,575,500

Addendum No.1 plus 10% VAT *1,147,190 *60,541,139,347

Variance Against Original Contract *+27.09% *+6.21%Note :

1) Addendum No.1 is still subject to approval by DGH with World Bank concurrence and issuance ofNo Objection Letter (NOL).

2) Figures with asterisk (*) are tentative pending approval of Addendum No.1

Page 28: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

3 - 7

3.3 Technical Assistance for Development of Slope Stabilization, Design andManagement

The TA’s objective is to provide technical support to DGH in improving their capacity for roadslope/embankment protection and management. It will include identification and inventory ofthe existing slope and embankment conditions, assesment of future potential land slide /roaderosion problems, development of risk maps, prioritization of high problem/high risk areas,and development of the Detail Engineering Design for a limited amount of areas in theWestern corridor of Sumatra. It will also include the review (and revision) of the NationalStandard and Manual (NSPM) related to the slope protection, and capacity building.

Consultant to undertake the tasks in under the early stages to procurement.

Page 29: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

4 - 1

4 CIVIL WORKS

4.1 Detailed Design Preparation

Final Engineering Designs, Engineer’s Estimates and bidding documents have been completed for allprojects proposed for WP-1, WP-2, WP-3.

A brief status of the nineteen (19) sub-projects relative to the procurement of Civil works contractsand implementation can be found in “Implementation Status” table on Page 1-1 of this Report.While progress of road safety audit at detailed design stage are shown in Appendix B.

4.2 Procurements

Procurement shall be conducted under the Bank’s Procurement Procedures as mentioned in the LoanAgreement. The International Competitive Bidding (ICB) based on the Bank letter Ref. WINRIP/136 willapply to the packages with the construction estimated cost of more than US$ 25 Million to comply withthe new Bank’s threshold for ICB. According to the GOI regulation, a prequalification shall be applied forthe packages with the construction estimated cost more than IDR 10 Billion. Review from previousprocurement process, the World Bank in the Aide Memoire requested to GOI, for next 4 ICB subprojectsqualification still used Pre-Qualification and for remaining sub-project must be process with PostQualification. As well as for all NCB the World Bank also requested to follow Post Qualification inprocurement process.

As of this reporting month (September 2016), a more detailed current updates are fully indicated inSub-Chapter 1.4 Procurement of Civil Works Contract Under Category 1 on Page 1-5 of this Report .

Under Category 3 of Loan Agreement the three (3) consultancy packages (capacity building for disasterrisk reduction, environmental management and road safety) has been cancelled. As a result of thecancellation of the three (3) Technical Assistance, the “Technical Assistance for Development of SlopeStabilization, Design and Management” has been included as replacement, but to be part of the LoanCategory-2 ;

Procurement update of the new consultancy package can be found in Sub-Chapter 1.5 Procurement ofConsultancy Package Under Category 2 on Page 1-6 of this Report.

The WINRIP updated Procurement Plan and Progress are shown in Appendix F.

4.3 Civil Works Implementation

As of end of this reporting month (September 2016), five (5) of contract packages were previouslycompleted and currently under defects liability period for twenty four (24) months effective on theday the TOCs were issued and twelve (12) packages are currently under construction.

Details of each contract package are shown in Table 4.1.

Page 30: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

4 - 2

Table 4.1

ProgramContractPackage

#Contractor Name of Road Province Contract

Signed

Commencement of

Work

Original

TimeExtension

Revised

ContractAmount

ContractTime

CompletionDate Contract Amount Contract

TimeCompletion

Date

AWP-1

1 PT. Jaya KonstruksiManggala Pratama Tbk Biha - Krui Lampung Nov 25,

2013 Jan 8, 2014 134,909,211,000 640 CD Oct 9, 2015 93 CD 140,255,020,000 733 CD Jan 10, 2016

2PT.Jaya Konstruksi ManggalaPratama Tbk

Padang Sawah –Sp. Empat includingAir Gadang

WestSumatera Dec 6, 2013 Jan 6, 2014 197,936,699,000 730 CD Jan 5, 2016 105 CD 249,348,931,000 835 CD Apr 19,

2016

3 PT. Jaya KonstruksiManggala Pratama Tbk

Manggopoh –Padang Sawah

WestSumatera Dec 6, 2013 Jan 6, 2014 143,688,963,000 730 CD Jan 5, 2016 75 CD 183,940,872,000 805 CD Mar 20,

2016

4 PT. Waskita Karya and PT.Mulya Turangga (JO) Ipuh - Bantal Bengkulu Nov 14,

2013 Jan 13, 2014 186,936,750,000 730 CD Jan 12, 2016 90 CD 194,902,179,000 820 CD Apr 11,2015

AWP-2

5 PT. Nusa KonstruksiEnjiniring Tbk.

Sp. Rampa -Poriaha

NorthSumatera

March 17,2015

June 18,2015 107,321,260,310 540 CD Dec 8, 2016 - - -

6 PT. Waskita Karya (Persero)Tbk. Ps. Pedati - Kerkap Bengkulu Feb 27,

2015Mar 11,

2015 86,517,470,000 450 CD Jun 2, 2016 240 CD 118,444,156,000 690 CD Jan 28, 2017

7 PT. Adhi Karya Indrapura – Tapan WestSumatera

Nov 26,2015

Dec 10,2015 129,699,900,000 630 CD Aug 30,

2017 - - -

8 PT. PP/PT. Statika MitraSarana J.O

Bts. Kota Pariaman- Manggopoh

WestSumatera Jan 28, 2016 Mar 23,

2016355,500,000,000 720 CD Mar 12,

2018 - 71 CD 649 CD Dec 31,2017

11 PT. Hutama Karya/PT. DayaMulya J.O.

Bantal –Mukomuko Bengkulu Dec 18,

2014Feb 23,

2015228,899,717,000 720 CD Feb 11,

2017 - 262,611,303,000 - -

12 PT. Lancar Jaya/PT. CahayaT.A. J.O

Kambang –Indrapura

WestSumatera Jan 28, 2016 May 23,

2016358,650,400,000 720 CD May 12,

2018 -116 CD 604 CD Jan 16, 2018

13 PT. Waskita Karya (Persero)Tbk.

Sp. Rukis – TJ.Kemuning Bengkulu Dec 18,

2014July 22,

2015 292,700,000,000 720 CD July 10,2017 - - -

AWP-3

14 PT. Yasa PatriaPerkasa/Conbloc, JO Painan – Kambang West

Sumatera Jun 1, 2016 Aug 3, 2016 214,327,429,680 630CD Apr 12,2018 -114 CD - 516 CD Dec 31,

2017

15 PT. PembangunanPerumahan (Persero)

Sibolga – Bts.Tapsel

NorthSumatera

July 13,2015

Nov 20,2015 260,100,000,000 810 CD Feb 6, 2018 - - -

17 PT. Jaya KonstruksiManggala Pratama Tbk

Sp. Gunung Kemala– Pugung Tampak Lampung Nov 17,

2014 Sept 4, 2015 199,551,000,000 720 CD Aug 23,2017 - - -

19 PT. Roda Tekindo Purajaya Bintunan - Lais Bengkulu Feb 27,2015

Mar 11,2015 33,689,452,000 300 CD Jan 4, 2016 125CD 44,419,760.000 425CD May 8, 2016

20 PT. Nindya Karya Lubuk Alung –Sicincin

WestSumatera Jun 1, 2016 Sept 1, 2016 113,818,300,000 540CD Feb 22,

2018 - 54 CD - 486 CD Dec 31,2017

21 PT. Multi Structure Lubuk Alung –Kuraitaji

WestSumatera Jun 1, 2016 Sept 1, 2016 126,301,900,000 540CD Feb 22,

2018 - 54 CD - 486 CD Dec 31,2017

Page 31: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

4 - 3

4.4 Civil Works ProgressActivities done during this month on the on-going construction packages were repair and restoration ofdeteriorated existing pavements, roadway excavation, embankment formation, spreading of granularpavement for roadway widening, asphalt paving, structural works, construction of stone masonry sideditches, stockpiling of raw material, production of crush aggregates, other minor works, bridge construction,finalization of “Field Engineering” surveys and mobilization of resources of the newly started contractpackage.

The four (4) contract packages under implementation program AWP-1 were already completed and nowunder defects liability period for two (2) since the issuance of TOCs.

Under the implementation program AWP-2 and AWP-3, there are currently twelve (12) contract packagesthat are on-going construction implementation and one (1) package on AWP-3 is already completed.Physical progress of two (2) of the packages are lagging far behind schedule with negative slippages of-57.51% and -44.31% while progress for the other ten (10) packages are still slightly on or behind schedule.

Progress status of the on-going civil works contracts as of this reporting period are shown in Table 4.2.

Following are brief status of the on-going construction contract packages :

Package No. 1 : Biha – KruiThe contract package is completed on January 20, 2016 and provisionally handed over to the Employeer andcurrently under “Defects Notification Period” until after two (2) years reckoned from the issuance of theTOC.

A more detailed previous status during the whole duration of the contract implementation of this Package ispresented in ANNEX P-I Executive Summary Report.

Package No. 2 : Padang Sawah – Sp. Empat (Including Air Gadang Bridge)The contract package is completed on April 19, 2016 and provisionally handed over to the Employeer andcurrently under “Defects Notification Period” until after two (2) years reckoned from the issuance of theTOC.

ANNEX P-2 Executive Summary Report present a more detailed status during the whole duration of thecontract implementation of the Contract Package.

Package No. 3 : Manggopoh – Padang SawahThe contract package is completed on March 20, 2016 and provisionally handed over to the Employeer onMarch 17, 2016 and currently under “Defects Notification Period” until after two (2) years reckoned fromthe issuance of the TOC.

A more detailed status of the project progress during the whole duration of the contract implementationare shown in ANNEX P-3 “Executive Summary Report”.

Package No. 4 : Ipuh – BantalThe contract package is completed on May 29, 2016 and provisionally handed over to the Employeer onMay 31, 2016 and currently under “Defects Notification Period” until after two (2) years reckoned from theissuance of the TOC.

Shown in ANNEX P-4 “Executive Summary Report” showing the details and status of the project.

Page 32: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

4 - 4

Table 4.2

ProgramContractPackage

#Contractor Name of Road

Target ProgressSchedule EndingSeptember 2016

Actual ProgressAccomplished Slippage Time Elapsed Remaining

Time Remarks

AWP-1

1 PT. Jaya Konstruksi ManggalaPratama Tbk Biha - Krui * - - - - Completed

PHO : Jan 20, 2016

2PT. Jaya Konstruksi ManggalaPratama Tbk Padang Sawah –

Sp.Empat incl.Air Gadang * - -- - -Completed

PHO : April 19, 2016

3 PT. Jaya Konstruksi ManggalaPratama Tbk

Manggopoh – PadangSawah * - - - -

CompletedPHO : Mar 17, 2016

4 PT. Waskita Karya and PT.Mulya Turangga (JO) Ipuh - Bantal * * - - -

CompletedPHO : May 31, 2016

AWP-2

5 PT. Nusa Konstruksi Enjiniring Sp. Rampa - Poriaha 88.79% 31.28% -57.51% 86.27% 74 CD Based on original contract timeand schedule

6 PT. Waskita Karya Tbk Ps. Pedati – Kerkap 70.27% 64.44% -5.83% 81.86% 125 CDBased on 2nd revised contracttime and schedule

7 PT. Adhi Karya Indrapura - Tapan 16.79% 16.70% -0.09% 46.10% 339 CDBased on original contracttime and schedule

8 PT. PP/PT. Statika Mitra J.O Bts. Kota Pariaman –Manggopoh 7.58% 9.69% +2.11% 28.70% 462 CD

Based on original contracttime and schedule

11 PT. Hutama Karya/ PT. DMT Mukomuko - Bantal 84.00% 71.00% -13.01% 80.67% 139 CDBased on original contracttime and revised schedule

12 PT. Lancarjaya/PT. CahayaT.A. JO Kambang – Indrapura 1.61% 1.05% -0.56% 21.26% 462 CD

Based on original contracttime and revised schedule

13 PT. Waskita Karya (Persero)Tbk Sp. Rukis – Tj. Kemuning 63.60% 19.25% -44.34% 59.94% 288 CD

Based on original contracttime and schedule

AWP-3

14 PT. Yasa – PT. Conbloc (JO) Painan – Kambang 0.56% 0.47% -0.09% 10.29% 462 CDBased on revised contracttime and schedule

15 PT. PembangunanPerumahan (Persero) Sibolga – Bts. Tapsel 23.77% 8.99% -14.78% 40.16% 462 CD

Based on revised contracttime and schedule

17 PT. Jaya Konstruksi ManggalaPratama Tbk

Sp. Gn Kemala – Pg.Tampak 33.01% 28.34% -4.68% 53.82% 332 CD

Based on original contracttime and schedule

19 PT. Rodatekindo Purajaya Lais - Bintunan 100% 100% - - - Completed. TOC still to beissued

20 PT. Nindya Karya Lubuk Alung – Sicincin 0.30% 0.39% +0.09% 4.94% 462 CD Based on revised contract time21 PT. Multi Structure Lubuk Alung – Kuraitaji 0.56% 0.78% +0.22% 4.94% 492 CD Based on revised contract time

* Under defects liability period for 720 calendar days.

Page 33: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

4 - 5

Package No. 5 : Sp. Rampa – Poriaha

As of end of this period, the actual physical work progress is only 31.28% of the scheduled work progress of88.79%. The delayed works relative to the program schedule farther dropped down to -57.71%.

Based on the original schedule, barely two (2) months of contract time are left and a huge deficit of stillunfinish work of almost 70% to be done which is impossible for the Contractor to finish the remainingworks in such short period of time.

However, it is anticipated, that the original contract time maybe extended due to pending finalization ofthe field engineering results and technical justifications.

ANNEX P-5 “Executive Summary Report” shows the Contractor’s Progress Schedule.

Package No. 6 : Kerkap – Ps. Pedati

Based on the 2nd revised progress schedule, the actual overall physical work accomplished is 64.44% whichis still behind schedule by -5.83%.

Basically the only remaining major work item to be completed is the asphalt pavement which is 70%component of the whole contract and the end of this period, 37% of the work item is already completedwith still 33% to be done.

For the Contractor to catch-up with the revised completion date on January 28, 2017, at least a minimumof 9% progress must be attained per month during the remaining four (4) months of the revised contracttime.

ANNEX P-6 “Executive Summary Report” shows the complete details of the contract package.

Package No. 7: Indrapura – TapanDuring the month, the Contractor seemed to have slowed down as only 3.83% progress had been achievedas compared with 7.24% progress in the preceeding month, however the actual overall progress is stillmore or less on schedule by 4.15%.

Barring any unforeseen circumstances that will interupt or disrupt the execution of the works, the targetdate of completion on August 30, 2017 can be easily achieved, provided the Contractor shall produce atleast minimum 7% progress every month during the remaining contract time of eleven (11) months..

ANNEX P-7 “Executive Summary Report” shows the complete details of the contract package.

Package No. 8 : Bts. Kota Pariaman - ManggopohAs the month ended, the overall actual physical/work progress achieved is 9.69% which is ahead ofschedule by +2.12% relative to the progress schedule of 7.58%.

At the rate the Contractor implement the works, there is no reason that the project cannot be completedon time.

Based on simple analysis, at least a monthly progress of 6.0% shall be attained by the Contractor to metthe target date of completion on December 31, 2017.

ANNEX P-8 “Executive Summary Report” shows the complete details of the contract package.

Package No. 11 : Bantal - MukomukoBased on the revised schedule due to approval of the results of “Field Engineering”, the actual overall

Page 34: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

4 - 6

progress attained by the Contractor up to end of this period is 71.00% against 84.00%.

At the end of the 19th month of the contract period, Contractor’s performance with respect to their workprogress drastically slowed down as the negative slippage further dropped down to -13.01% as comparedwith -12.15% the previous month. Based on the schedule, there are only 4,5 months remaining contracttime with 29% of the works still to be done. Considering the Contractor’s performance in the previousmonths, the target date of completion is still attainable by achieving at least 6% per month progress.

For more details of the Contract Package, refer to ANNEX P-11 “Executive Summary Report”.

Package No. 12 : Kambang - IndrapuraWork done during the month were mainly mobilization of equipment, manpower and other necessaryresources.

Earthworks and and granular pavement has also been done during the month but the progress attained isvery minimal with a combine total of only 0.04% for the whole month.

After four (4) months, since the Contractor commenced the Works, the overall total progress as of end ofthis period is only 1.05% and still behind schedule by -0.50%

Considering the magnetude of the project and the upcoming target monthly progress of 4% this comingOctober 2016 and gradually increases to as high as 15% in the month of May 2017, the negative slippagewill drastically farther drop down to an uncontrollable situation if the Contractor will not improve thecurrent situation.

Details of the Contract Package are shown in ANNEX P-12 “Executive Summary Report”.

Package No. 13 : Sp. Rukis – Tj. KemuningDuring the period, it was still the same situation as in previous month as the Contractor almost did nothingto improve the work progress with only 0.19% of progress to show for the whole period.

At the end of the month, the overall work accomplished is 19.25% and negative slippage farther droppedfrom -39.26% in the preceeding month to -44.34% this month.

To date, there are still 81% remaining works which are to be done during the remaining contract time of 10months and at least a minimum of 8% progress per month have to be attained in order to meet the targetdate of completion on July 10, 2017. However, at the present rate the Contractor implement the Works,there is no way the Project can be completed as scheduled.

As the current progress situation further worsen as months passed by, it is time to hold a high levelmeeting between the DGH and the higher management of the Contractor.

Details of the work progress are shown in ANNEX P-13 “Executive Summary Reports.

Package No. 14: Painan - KambangNotice To Proceed (NTP) to commence the works has been issued on August 3, 2016 and pre-constructionconference was held on August 15, 2016 at BALAI III office in Padang City.

During the period, Contractor still concentrated on preparation to mobilize their resources, such aspreparation to construct base camp, man-power and equipment.

Based on the revised schedule, the overall actual progress of 0,47% has been achieved during the period

Page 35: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

4 - 7

mainly on the General Work Item.

ANNEX P-14 “Ëxecutive Summary Report” shows the complete details of the project.

Package No. 15: Sibolga – Bts. TapselAt the end of this reporting month actual overall progress achieved is 8.99% of the 23.80% revisedschedule for the end of the month.Based on the Contractor’s performance during the past II months ending this period, the negative slippagekept on dropping down at an alarming rate. Taking into consideration that the remaining works is still 91%and only 60% of the contract time remains, the target date of completion on December 2017 may not beattained unless the contractor implements a workable and realistic action plan.

To attain the target date of completion, the Contractor shall deliver at least a minimum monthly progressof 6.00% during the remainder of the revised contract period.

Detailed and work progress of the contract package are shown in ANNEX P-15 “Executive SummaryReport”.

Package No. 17 : Sp. Gunung Kemal – Pg. TampakThe current status of the sub-project is fairly being implemented as evidenced by the single digit andmenegeable negative slippage since the Contractor commenced works way back in September 4, 2015.

Overall progress to date is 28.34% against 33.01% schedule, or the progress is slighty behind schedule by -4.68%.

If Contractor can maintain the trend of their monthly progress, there is no reason that the works could notbe completed on or before the target date of completion on August 23, 2017.

ANNEX P-17 “Executive Summary Report” shows the complete details and work progress of the project.

Package No. 19 : Lais – BintunanAt the end of the contract period last May 8, 2016, the total overall progress attained is 99.11%.

Basically the Project is fully completed, however, Taking Over Certificate is still to be issued by DSC.

Complete details of the contract package are shown in ANNEX P-19 “Executive Summary Report”

Package No. 20 : Lubuk Alung - SicincinContractor is currently on mobilization stage.

Notice To Proceed (NTP) to commence the Works has been issued on September 1, 2016 and pre-construction meeting was held on September 20, 2016 in Padang City.

ANNEX P-20 “Executive Summary Report” shows the Contractor’s schedule and work progress.

Package No. 21 : Lubuk Alung - KuraitajiContractor is currently on mobilization stage.

Notice To Proceed (NTP) to commence the Works has been issued on September 1, 2016 and pre-construction meeting was held on September 20, 2016 in Padang City.

ANNEX P-21 “Executive Summary Report” shows the Contractor’s schedule and work progress.

Page 36: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

4 - 8

4.5 Quality AssuranceThe DSC will be responsible for quality assurance of materials and workmanship, certifying whether or notcontractors have achieved the required results, as well as documentation and reporting based on thefinancial management plan. They will prepare a Quality Assurance system covering all subprojects, andcontinuously monitor the effectiveness of their supervision procedures.

Following are current problems which were the same problems during the preceeding month and issues

relative to the execution of the works and quality assurance:

Package No.1 : Krui - Bihaa) Completed.b) Currently under defects notification period for two (2) years until January 17, 2018.

Package No.2 : Padang Sawah – Sp. Empata) Completed.b) Presently under defects notification period for twenty four (24) months until April 18, 2018.c) Since the design and construction of side cut slope protection works were not included in the

original contract design/construction have to be implemented under a new contract.

Package No.3 : Manggopoh – Padang Sawaha) Completed.b) Currently under defects notification period for two (2) years until March 16, 2018.c) Since the Design and construction of side cut slope protection works were not included n the

original contract design/construction have to be implemented under a new contract.

Package No.4 : Ipuh - Bantala) Even through the contract time have been extended, contractor still failed to complete and turned

over the Project to the Employeer on the revised target date of completion on April 11, 2016.b) Contractor under liquidated damages.c) Substantially completed, Taking Over Certificate issued by DSC on May 31, 2016.

Package No.5 : Sp. Rampa - Poriahaa) Field Engineering still to be finalized and approve by DGH.b) Contractor to prepare and implement catch-up schedule to reduce the huge progress negative

slippage.c) Non-conformance findings during TFAC audit inspection during last month shall be immediately

corrected and rectified and conformance report to be submitted.d) The on-going design revision involving massive quantities of rock excavation shall be thoroughly

evaluated.

Package No.6 : Ps. Pedati - Kerkapa) Non-conformance findings during TFAC audit inspection during last month shall be immediately

corrected and rectified and conformance report to be submitted.

Package No.11 : Bantal - Mukomukoa) Non-conformance findings during TFAC audit inspection during last month shall be immediately

corrected and rectified and conformance report to be submitted.b) Contractor shall be issued warning letter as the negative slippage is more than -10%.

Page 37: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

4 - 9

Package No.13 : Sp. Rukis – Tj. Kemuninga) Contractor to finalize technical justifications relative to results of Field Engineering.b) Non-conformance findings during TFAC audit inspection during last month shall be immediately

corrected and rectified and conformance report to be submitted.

Package No.15 : Sibolga – Bts. Tapsela) Field Engineering and Technical Justifications are still to be finalized.b) Non-conformance findings during TFAC audit inspection on August 22, 2016 shall be immediately

corrected and rectified and conformance report to be submitted.

Package No.17 : Sp. Gn. Kemala – Pugung Tampaka) Field Engineering and Technical Justification are still to be finalized

Package No.19 : Lais - Bintunana) Embankment settlement shall be closely monitored.b) Completed, but of Taking Over Certificate have not yet been issued by DSC.

4.6 Environmental and Social Considerations

4.6.1 Current Overall Situation

A project category is assigned to each package as either Category A, B or C depending on the likely degreeof influence on environmental issues with a brief explanation as follows:

Category A project is one which will have a significant negative impact on the environment and may havean influence on areas outside the actual project area. A project classified as such requires an AMDAL(ANDAL, RKL/RPL) study.

Category B project is one which affects the people or the environment to some extent but with a smallerimpact than a Category A. The required environmental analysis is a UKL/UPL study only.

Category C project has minimal effect on the people or environment and an environmental analysis is notrequired. SPPL are used to handle any minor problem which may arise.

Details of packages that require environmental and social safeguard are given in Appendix E and thefollowing Table 4.3 provides a summary of the work involved in the 21 WINRIP packages.

All the twenty one (21) packages require environmental impact investigations and studies which need theapproval by Environmental Agency (BLH).

Nine (9) of the twenty one (21) packages are categorized under “Category A” projects wherein AMDAL/EIAstudies are required and have to be approved by World Bank. The nine (9) packages are covered only byfive (5) AMDAL/EIA studies as some single study covers a combination of two (2) or three (3) sub-projects asindicated in Table 4.3. While 21 social studies (SLARAP and LARAP) require the approval of the World Bank.All the 22 environmental studies for the twenty one (21) sub-projects including a separate study (UKL/UPL)for Air Gadang Bridge on Package No.2 were approved by BLH with 5 of these studies (AMDAL/EIA) weregranted No Objection Letter (NOL) from the World Bank while all the 21 social studies (LARAP) were alreadyissued No Objection Letter (NOL) from the World Bank.

Page 38: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

4 - 10

Table 4.3Works

ProgramNo of

PackagesNo of Investigations Approval by Remarks

BLH World Bank

AWP-1 4 9

1 - AMDAL2 - UKL&UPL2 - SPPL4 - Full LARAP

1 - AMDAL2 - UKL&UPL2 - SPPL

1 - EIANo NeedNo Need4 - Full LARAP

Coverage of Single AMDAL/EIAstudy are the following Packages :

a) Packages 1 and 17b) Package 7,12 and 14c) Package 11 and 16d) Package 8e) Package 10

AWP-2 9 18

5 - AMDAL4 - UKL&UPL1 - Simple LARAP8 - Full LARAP

5 - AMDAL4 - UKL&UPL

4 - EIANo Need1 - SLARAP8 - Full LARAP

AWP-3 8 163 - AMDAL5 - UKL&UPL8 - Full LARAP

3 - AMDAL5 - UKL&UPL

1 - EIANo Need8 - Full LARAP

Total 21 43 Env=22,Soc=21 22 Env= 5, Soc=21

Note: 1) UKL & UPL do not need a NOL from WB, and SPPL not necessary to submit to the WB.2) Environmental ans Social Impact studies were already done and completed before Packages 9 and 18 were cancelled from the WINRIP Program.3) Air Gadang Bridge have separate investigation, hence, total equals 22.

Appendix E shows the Progress of Environmental Safeguard Studies and issues of each sub-project.

4.6.2 Environmental and Social Issues

This section outlines the activities of the Social Impact Specialist and the Environmental Specialist duringSeptember 2016.

4.6.2.1 Environmental Issues

The main environmental issues are the implementation of mitigating measures on pollution of spilled oil,grease and solid waste in the Contractors Base Camps. Air and dust pollution along stretches of thicklypopulated areas are not properly addressed by the Contractors, as water spraying is not continuouslyimplemented. Dump trucks transporting construction material are not fully covered and trafficmanagement plan is not fully implemented. In addition there exist negative impact on the quarryingoperations as existing river banks are eroded causing water pollutions. Deep excavation at the quarry siteswere not restored to its original level. Provisions for Personell Protection Equipment (PPE) for workerssafety were not fully implemented.

Monitoring of Environmental Aspects During Construction

CTC provided revised monitoring forms to DSC and Contractor for use in monitoring of environmental andsocial impacts. These forms are to be used every month by the DSC Site Engineers.

CTC’s environmental staffs actively advises DSC on environmental monitoring, DSC have directly carried outmonitoring or to implement the Environmental and Social Analysis Management Plan (ESAMP) for WINRIP.

CTC’s Environment Specialist regularly monitored the implementation of environmental mitigations duringthe past months until end of this month and the following were observed :

Page 39: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

4 - 11

Package No.1 : Krui – Biha

a) The supplier did not implement UKL&UPL implementation report of quarry, not yet submitted.

b) HIV-AIDS campaign, completed.

c) External monitoring to BLH for UKL/UPL implementation on post construction stage still have to beprepared by CTC.

Package No.2 : Pd. Sawah – Sp. Empat and Air Gadang Bridge

a) HIV-AIDS campaign, completed.

b) UKL/UPL implementation report for quarries not available.

Package No.3 : Manggopoh – Pd. Sawah

a) Oil and grease pollution in the workshop at base camp were not properly managed as perEnvironmental Management Plan.

b) The monitoring report prepared by the DSC site supervision team lack some necessary informationssuch as; photograph not provided, remarks not filled up.

c) The quarry areas not manage by the supplier, as deep excavation areas still exist.

d) HIV-AIDS campaign, completed.

Package No.4 : Ipuh - Bantal

a) Oil and grease pollution in the workshop at base camp were not properly managed as perEnvironmental Management Plan.

b) Roadway excavations along the existing shoulders were provided with barriers, road signs andflagmen.

c) The quarry areas not manage by the supplier, as deep excavation areas still exist.

d) HIV-AIDS campaign, completed.

Package No.5 : Sp.Rampa - Poriaha

a) Traffic management plan is not implemented as there were no road barriers, traffic signs andflagmen on sight at the project site.

b) Roadworks on some sections cannot get started due to land acquisition problems

c) Soil erosion in some locations are taking place.

d) HIV-AIDS campaign, completed.

Package No.6 : Ps. Pedati - Kerkap

a) Oil and grease pollution at base camp not properly managed.

b) Roadway excavations along the existing shoulders were not provided with barriers, road signs andflagmen.

c) HIV-AIDS campaign, completed.

d) Monitoring Report prepared by DSC site supervision team is incomplete. Important imformationsand photographs were not provided.

e) UKL/UPL implementation report for quarries not available.

Page 40: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

4 - 12

Package No.11 : Ipuh - Bantal

a) The quarry location is not inside the protected areas but located on APL (Area Peruntukan Lain)with approximate total area of 4 hectares.

b) The quarry areas not manage by the supplier, as deep excavation areas were not yet backfilled.

c) Traffic management along work areas not properly implemented.

d) Roadway excavation for shoulders were left open.

e) HIV-AIDS campaign, completed.

Package No.13 : Sp. Rukis – Tj. Kemuning

a) The quarry areas not manage by the supplier, as deep excavation areas were not yet restored tooriginal levels.

b) Monitoring Report prepared by DSC site supervision team is incomplete. Important informationsand photographs were not provided.

c) HIV-AIDS campaign, completed.

Package No.15 : Sibolga - Bts Tapsel

a) Permits to operate stone crusher, asphalt mixing plant (AMP), material quarries and generator setsnot yet issued.

b) Traffic management plan is not implemented as there were no road barriers, traffic signs andflagmen on sight at the project site.

c) Layouts stockpilling of processed material shall be improved to avoid water ponding,

d) Contractors have not yet submitted the revised RKPPL.

e) HIV-AIDS campaign, completed.

Package No.17 : Sp. Gn. Kemala – Pugung Tampak

a) Base Camp has been built on a top of a hill which is potentially prone to landslide.

b) Contractor have not yet submitted RKPPL.

c) AMP, Stone Crusher and Quarry permits on-going proceesing at the Governor’s Office.

d) HIV-AIDS campaign, completed.

Package No.19 : Lais - Bintunan

a) HIV-AIDS campaign, completed.

b) Roadway excavations along the existing shoulders were not provided with barriers, road signs andflagmen

c) The base camp condition very poor for worker, very dirty, bad, smell, building damage not feasiblefor living worker.

As of this writing, DSC Site Supervision Team have not yet submitted the environmental monitoring reportfor September 2016.

1. Review Design Integration, Road Safety Aspects and Monitoring of Environmental Studies

Task 5.8.0 of CTC-2 TOR (Implement the Environmental and Social Analysis Management Plan/ESAMP) and

Page 41: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

4 - 13

paragraph 10.9 of the PMM requires ensuring that environmental management aspects of contracts havebeen implemented in accordance with AMDAL, UKL&UPL, SPPL studies and Environmental issues will beintegrated in the design and to prepare environmental mitigation on construction stage for contractor(Contractor Program for Executing Environmental Management Plan CPEMP/RKPPL). CTC has submitted toPMU all of reports of Review Integration AMDAL,UKL&UPL and SPPL.

2. External Monitoring Report (Satker/PPK to BLH) for Implementation of AMDAL/UKL&UPL/SPPL onPre Construction Phase, Construction Phase and Post Construction Phase.

The First (1st) External Monitoring Report during construction phase of Packages 5, 6, 7, 8, 11, 13, 15 and 19for BLH were already formally submitted to World Bank.

3. The Contractor Action Plan on Environmental Management and Monitoring (RKPPL)

RKPPL for Packages 1, 2, 3, 5, 6, 8, 11, 13, 15, 17 and 19 has been completed and already submitted toPMU/WB. While the RKPPL for Packages 7 and 12 are under final preparation based on CTCs comments.The remaining RKPPL for Packages No.10, 14, 16, 20 and 21 will be prepared by Contractor after completionof training.

4. Environmental Quarterly Report

Environmental Quarterly Reports for the period April to June 2015 covering the Packages 1, 2, 3, and 4, hasbeen submitted to PMU and WB on July 3 2016. While Quarterly Reports for 2nd Quarter (April to June) forPackages 2, 4, 6, 11, 13, 15, 17 and 19 are current under preapration.

5. Socialization of HIV-AIDs Campaign

The socialization of HIV-AIDS activities on thirten (13) contract packages has been completed. The packagescovered are as follows :

Package No.1 : Krui – Biha November 10, 2015

Package No.2 : Padang Sawah – Sp. Empat November 17, 2015

Package No.3 : Manggopoh – Pd. Sawah November 17, 2015

Package No.4 : Ipuh – Bantal December 4, 2015

Package No.5 : Sp. Rampa – Poriaha January 27, 2016

Package No.6 : Ps. Pedati - Kerkap January 12, 2016

Package No.7 : Indrapura - Tapan September 6, 2016

Package No.11: Bantal – Mukomuko December 5, 2015

Package No.12 : Kambang - Indrapura September 6, 2016

Package No.13 : Sp. Rukis – Tj. Kemuning January 19, 2016

Package No.15 : Sibolga – Bts. Tapsel January 28, 2016

Package No.17 : Sp. Gn. Kemala – Pg. Tampak November 10, 2016

Package No.19 : Lais – Bintunan January 13, 2015

Presented in Attachment No.1 is the status and Summary of Studies and Submitted Reports endingSeptember 2016.

Page 42: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

4 - 14

4.6.2.2 Social Issues

1. Monitoring Report of the LARAPPackage No. 1 : Krui – BihaProvince : Lampung

A. Previous Status :

LARAP implementation documents approved by World Bank on January 4, 2013

Monitoring Report No.1 (revised) approved by World Bank on June 26, 2013

Monitoring Report No.2 approved by World Bank on October 20, 2015.

B. Pending Issues, Concern and Actions

No more issue, LARAP fully completed.

C. Update during this reporting month of September 2016

a) Construction completed in January 20, 2016.

b) Total PAP = 2,815 ; Compensated = 2,815 ; Percent complete = 100%.

2. Monitoring Report of the LARAPPackage No. 2 : Padang Sawah – Sp. EmpatProvince : Sumatera Barat

A. Previous Status :

LARAP documents approved by World Bank on January 13, 2013

Monitoring Report No.1 (revised) approved by World Bank on July 19, 2013

Additional LARAP Implementation documents approved by World Bank on July 21, 2014

Monitoring Report No.2 approved by World Bank on Feb. 12, 2015

Satker PJN I West Sumatera has issued certification that 1 PAP along Air Gadang Brridge is nolonger identified and land acquisition plan belonging to 24 peoples as an additional LARAPdocuments August 16, 2016.

B. Pending Issues, Concern and Actions

a) Compensation for 24 PAP along the road link is under compensation payment process byLocal Government of West Sumatera Province

C. Update during this reporting month of September 2016

a) Construction completed in April 19, 2016.

b) Total PAP = 466 ; Compensated = 442 ; Percent complete = 94,85%.

3. Monitoring Report of the LARAPPackage No. 3 : Manggopoh – Padang SawahProvince : Sumatera Barat

A. Previous Status :

LARAP documents approved by World Bank on January 4, 2013

Monitoring Reports No.1, 2, 3, 4 and 5 already approved and World Bank issued No ObjectionLetter (NOL).

Monitoring Report for the remaining 1 PAP already submitted to WB

B. Pending Issues, Concerns and Actions

Page 43: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

4 - 15

No more issue, LARAP fully completed.

C. Update during this reporting month of September 2016

a) Construction completed on March 17, 2016.

b) Total PAP = 1,338 ; Compensated = 1,338 ; Percen complete = 100%.

4. Monitoring Report of the LARAPPackage No. 4 : Ipuh – BantalProvince : Bengkulu

A. Previous Status :

LARAP documents approved by World Bank on December 10, 2012

Monitoring Report No.1, 2 and 3 already approved and No Objection Letter (NOL) were issued byWorld Bank

B. Pending Issues, Concern and Actions

No more issue, LARAP fully completed.

C. Update during this reporting month of September 2016

a) Construction completed in April 11, 2016.

b) Total PAP = 261 ; Compensated = 261 ; Percent complete = 100%.

5. Monitoring Report of the LARAPPackage No. 5 : Sp. Rampa – PoriahaProvince : Sumatera Utara

A. Previous Status :

LARAP documents approved by World Bank on September 16, 2013.

World Bank accepted the revised LARAP documents and issued No Objection Letter on November12, 2013 to the action plan implementation of the LARAP.

Additional LARAP documents approved by World Bank on January 8, 2016.

B. Pending Issues, Concern and Actions

a) Still to be submitted is the implementation report from Satker of the completed relocationof the kiosk.

b) Existing permit on forest land for road project from Ministry of Forest still need to beclarified..

c) Monitoring Report for the LARAP implementation of the completed relocation of the kioskstill to be prepared for submission to World Bank.

d) Monitoring Report for the compensation payments of the 68 PAP still to be prepared forsubmission to WB.

C. Update during this reporting month of September 2016

a) Monitoring Report for the payments of the 68 PAPs are under preparation.

b) Total PAP = 71 ; Compensated = 68; Percent Complete = 96%.

6. Monitoring Report of the LARAPPackage No. 6 : Pasar Pedati - KerkapProvince : Bengkulu

A. Previous Status :

World Bank issued on May 30, 2015 a No Objection Letter on the revised LARAP documents for

Page 44: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

4 - 16

implementation.

Monitoring Report concerning the compensation payment for 546 out of 637 PAP was given NoObjection Letter (NOL) on March 23, 2015.

Monitoring Report regarding compensation payment for the remaining 91 PAPs out of 637 PAPswas given No Objection Letter (NOL) on January 5, 2016.

B. Pending Issues, Concern and Actions

No more issue, LARAP fully completed.

C. Update during this reporting month of September 2016

a) On-going construction.

b) Total PAP = 637 ; Compensated = 637 ; Percent complete = 100%.

c) No update for certification process of PAP lands.

7. Monitoring Report of the LARAPPackage No. 7 : Indrapura - TapanProvince : Sumatera Barat

A. Previous Status :

LARAP documents approved by World Bank on October 14, 2014.

Implementation action plan of the LARAP was issued No Objection Letter (NOL) on March 17,2015 by the World Bank.

A report of the compensation payment for 276 from total 861 PAPs already submitted to WorldBank on February 9, 2016 and No Objection Letter (NOL) was issued on March 16, 2016.

Monitoring Report No. 2 for the compensation payments of 207 PAPs submitted to WB on May17, 2016.

B. Pending Issues, Concern and Actions

a) Compensation payment for 78 from the remaining PAPs is under payment preparation byPPK/Satker PJN Il West Sumatera.

C. Update during this reporting month of September 2016

a) The Monitoring Report on the payments of 300 PAPs is under preparation by Satker PJN IIWest Sumatra.

b) Total PAP = 861 ; Compensated = 783 ; Percent Complete = 90.94%.

8. Monitoring Report of the LARAPPackage No. 8 : Bts. Pariaman - ManggopohProvince : Sumatera Barat

A. Previous Status :

LARAP documents submitted to World Bank on August 7, 2014.

LARAP documents approved by World Bank on August 12, 2014.

Monitoring Report for the payment of 840 PAPs has been submitted to World Bank on January 14,2016 and No Objection Letter (NOL) issued on March 8, 2016.

Monitoring Report for compensation payment of 926 PAPs submitted to WB on May 9, 2016.

B. Pending Issues, Concern and Actions

a) Compensation payment for the remaining 400 PAPs not yet paid by PPK/Satker PJN I WestSumatera and Local Government.

Page 45: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

4 - 17

C. Update during this reporting month September 2016

a) PPK/Satker PJN I West Sumatera and Local Government continue payment proceessing ofthe remaining PAP.

b) Total PAP = 2,166 (updated) ; Compensated = 1,766 ; Percent complete = 81,53%.

9. Monitoring Report of the LARAPPackage No. 9 : Rantau Tijang – Kota AgungProvince : Lampung

Cancelled from the WINRIP Program.

10. Monitoring Report of the LARAPPackage No. 10 : Sp. Empat – Sp. Air BalamProvince : Sumatera Barat

A. Previous Status :

LARAP documents submitted to World Bank on August 7, 2014.

LARAP documents approved by World Bank on August 12, 2014.

Monitoring Report for payment of 1,421 PAPs has been submitted to World Bank on January 14,2016 and Bank issued No Objection Letter (NOL) on March 8, 2016.

B. Pending Issues, Concern and Actions

a) Payments for the remaining 1,190 PAPs not yet paid by PPK/Satker PJN I West Sumateraand Local Government.

C. Update during this reporting month of September 2016

a) Monitoring Report for payment of 138 PAPs on-going preparation by Satker PJN I SumateraBarat/CTC.

b) PPK/Satker PJN I West Sumatera and Local Government continue the appraisal andpayment proceessing of the remaining PAP.

c) Total PAP = 2,915 ; Compensated = 1,725 ; Percent complete = 59,18%.

11. Monitoring Report of the LARAPPackage No. 11 : Bantal - MukomukoProvince : Bengkulu

A. Previous Status :

World Bank issued on May 30, 2014 a No Objection Letter (NOL) on the revised LARAP documentsfor implementation.

Monitoring Report No.1 and No.2 were issued No Objection Letters (NOL) from the World Bank.

Monitoring Report for 15 of the remaining 123 PAPs was given No Objection Letter (NOL) onNovember 26, 2015

B. Pending Issues, Concern and Actions

a) No more issue.

C. Update during this reporting month of September 2016

a) Monitoring Report for payment progress of the remaining 108 PAPs is under preparation bySatker PJN l Bengkulu and CTC.

b) Total PAP = 262 ; Compensated = 262 ; Percent complete =100%.

Page 46: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

4 - 18

12. Monitoring Report of the LARAPPackage No. 12 : Kambang - IndrapuraProvince : Sumatera Barat

A. Previous Status :

LARAP documents approved by World Bank on October 14, 2014.

Signed Action Plan of LARAP was given No Objection Letter (NOL) by the World Bank.

Monitoring Report for compensation payment of 216 PAPs submitted to WB on May 26, 2016.

B. Pending Issues, Concern and Actions

a) Compensation payments to PAPs are under going finalization by Satker PJN ll WestSumatera .

C. Update during this reporting month of September 2016

a) Currently there are 28 Km out of the total length of 56 Km, that land aquisition is notneeded.

b) Monitoring Report for the compensation payment of 60 PAPs is under preparation bySATKER PJN II, West Sumatera.

c) Total PAP = 2,337 ; Compensated = 350; Percent complete = 14,98%.

13. Monitoring Report of the LARAPPackage No. 13 : Sp. Rukis – Tj. KemuningProvince : Bengkulu

A. Previous Status :

World Bank issued on May 30, 2014 a No Objection Letter (NOL) on the revised LARAP documentsfor implementation.

Signed Action Plan of LARAP was given No Objection Letter (NOL) by the World Bank.

World Bank issued on August 18, 2015 No Objection Letter (NOL) on the monitoring Report No.1.

World Bank issued on October 13, 2015 No Objection Letter (NOL) on the monitoring Report No.2.

Monitoring Report No.3 for compensation payments of 193 PAPs in Kab. Kaur submitted to WBon February 23, 2016 has been issued by the Bank the NOL on March 8, 2016.

B. Pending Issues, Concern and Actions

a) Compensation payments for 2,624 PAPs can be started upon completion of the revision ofDIPA 2016.

C. Update during this reporting month of September 2016

a) Revision of DIPA 2016 amounting to RP. 14 Billion is under process.

b) Total PAP = 3,198 ; Compensated = 574 ; Percent complete = 17,90%.

c) Monitoring Report for the compensation payments of 188 PAPs submitted to World Bankon September 26, 2016.

d) Payments of 828 PAPs within 13 kilometer (Sta. 43+100 – Sta. 56+200) will be completed byend of October 2016. For Sta.26+000 – Sta 43+100 with 1.796 PAPs, 50% of the total PAPswill be paid before the end of this year, while the remaining 50% will be compensatedduring FY 2017.

Page 47: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

4 - 19

14. Monitoring Report of the LARAPPackage No. 14 : Painan - KambangProvince : Sumatera Barat

A. Previous Status :

World Bank issued on December 19, 2014 the No Objection Letter to the LARAP documents.

LARAP’s signed action plan was given No Objection Letter (NOL) by World Bank.

Monitoring Report No.1 for payments of 126 PAPs has been submitted to World Bank on July 20,2016.

B. Pending Issues, Concern and Actions

a) Process of compensation payment is on-going for remaining PAPs.

C. Update during this reporting month of September 2016

a) Monitoring Report for the compensation payments for 64 PAPs still to be prepared forsubmission to World Bank.

b) Total PAP = 1,087 ; Compensated = 226 ; Percent complete = 20.79%.

15. Monitoring Report of the LARAPPackage No. 15 : Sibolga – Bts. TapselProvince : Sumatera Utara

A. Previous Status :

World Bank approved the LARAP documents on February 6, 2014 for implementation in acquiringRoad Right of Ways and removal of obstruction.

Monitoring report No.1 for 40 of the remaining 1.554 PAPs was given No Objection Letter (NOL)on November 16, 2015.

Monitoring Report No.2 for payment of remaining 72 PAPs already submitted to Wolrd Bank.

Monitoring Report-3 for the compensation payment for 237 from the remaining 1.439 PAPsalready be submitted to WB on February 19, 2016 and Bank issued no objection letter (NOL) onMarch 16, 2016.

Monitoring Report No.4 for compensation payment of 55 PAPs submitted to WB on April 13,2016.

Monitoring Report No. 5 for the compensation payments of 34 PAP’s has been issued NOL byWorld Bank on August 15, 2016.

B. Pending Issues, Concern and Actions

a) Due limited to limited suppy of map fields as one of the documents needed for funddisbursement by Treasury Office affect the progress of payments release.

C. Update during this reporting month of September 2016

a) Compensation payment for the remaining PAPs is under process.

b) Total PAP = 1,554 ; Compensated = 580 ; Percent complete = 37,32%.

16. Monitoring Report of the LARAPPackage No.16 : Seblat - IpuhProvince : Bengkulu

A. Previous Status :

World Bank issued on May 30, 2014 a No Objection Letter (NOL) on the revised LARAP documentsfor implementation.

Page 48: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

4 - 20

World Bank issued No Objection Letter (NOL) on Monitoring Report No.1 and 2 for LARAPimplementation.

Monitoring report for 102 of the remaining 120 PAPs was given No Objection Letter (NOL) onNovember 26, 2015.

Updated LARAP documents submitted on February 22, 2016 to World Bank with NOL issued byBank on March 8,2016.

B. Pending Issues, Concern and Actions

a) LARAP documents for this Package covers only land acquisition for the road link. If there areland acquisition for the bridge site, a separate LARAP documents need to be prepared.

b) LARAP Implementation is underway for the remaining 18 PAP be allocated 2015 nationalbudget and schedule to be settled on Dec 2015.

c) Monitoring Report for the compensation payments of previously paid PAPs still to beprepared for submission to World Bank.

C. Update during this reporting month of September 2016

a) Data of the payments to the 18 PAP (Balance from 259 PAPs) are under preparation bySatker PJN I Bengkulu.

b) Total PAP = 259 ; Compensated = 254 ; Percent complete = 98,07%.

17. Monitoring Report of the LARAPPackage No.17 : Sp. Gunung Kemala – Pg. TampakProvince : Lampung

A. Previous Status :

World Bank approved the corrected LARAP documents on November 12, 2013

Monitoring Report for 154 of the total 2.273 PAPs was given No Objection Letter (NOL) onOctober 13, 2015.

Monitoring Report for 735 of the remaining 2.119 PAPs was given No Objection Letter (NOL) onNovember 26, 2015.

Monitoring Report for the compensation payments for the remaining 1.384 PAPs has been issuedNo Objection Letter (NOL) on March 16, 2016 by the World Bank.

B. Pending Issues, Concern and Actions

a) Monitoring Report for the compensation payments of the 451 PAPs still to be prepared.

A. Update during this reporting month of September 2016

a) Compensation payments for the remaining 451 PAPs is under process.

b) DIPA 2016 of about 20 billion IDR ready for disbursment.

c) Total PAP = 2,014; Compensated = 1,536; Percent complete = 76.26%.

18. Monitoring Report of the LARAPPackage No.18 : Mukomuko – Bts. SumbarProvince : Bengkulu

Cancelled from the WINRIP Program.

19. Monitoring Report of the LARAPPackage No.19 : Lais - BintunanProvince : Bengkulu

B. Previous Status :

Page 49: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

4 - 21

World Bank issued on May 30, 2014 No Objection Letter (NOL) on the revised LARAP documentsfor implementation

World Bank issued No Objection Letter (NOL) on Monitoring Report No.1 for the LARAPimplementation.

Monitoring Report for 208 of the remaining 290 PAPs was given No Objection Letter (NOL) onNovember 26, 2015.

C. Pending Issues, Concern and Actions

No more issue LARAP fully completed.

D. Update during this reporting month of September 2016

a) Total PAP = 556 ; Compensated = 556 ; Percent complete = 100%.

20. Monitoring Report of the LARAPPackage No. 20 : Lubuk Alung - SicincinProvince : Sumatera Barat

A. Previous Status :

World Bank issued NOL to LARAP documents on December 19, 2014.

B. Pending Issues, Concern and Actions

a) LARAP implementation to be implemented by Local Government.

C. Update during this reporting month of September 2016

a) Monitoring Report for compensation payments for 515 PAPs has been issued NOL by WorldBank on September 26, 2016.

b) Total PAP = 892; Compensated = 515; Percent complete = 76.50%.

21. Monitoring Report of the LARAPPackage No. 21 : Lubuk Alung - KuratajiProvince : Sumatera Barat

A. Previous Status :

World Bank issued NOL to LARAP documents on December 19, 2014.

Monitoring Report No.1 for compensation payment of the 515 PAPs has been issued NOL byWorld Bank on August 23, 2016.

B. Pending Issues, Concern and Actions

a) LARAP implementation to be implemented by Local Government.

C. Update during this reporting month of September 2016

a) Total PAP = 1,245; Compensated = 908; Percent complete = 72.93%.

Page 50: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

4 - 22

4.7 Anti Corruption Issues

4.7.1 Anti‐Corruption Action Plan (ACAP)

ACAP for WINRIP was developed from the previous SRIP experiences. Basically, it has the same maincomponents of involving the Community Representative Observers (CRO) in the bid opening and ThirdParty Monitoring (TPM) during the construction supervision although modification was made on theselection process of the CROs for SRIP. Within this plan there are four main pillars as indicated separatelybelow

a) Community Representative Observers (CRO)b) Publication / Disclosurec) Complaints Handling System (CHS)d) Third Party Monitoring (TPM)

4.7.2 Community Representative Observers (CRO)

The Community Representative Observers, who are required to observe the actual bidding activities, wereappointed for WP-1 group. All of the CROs were university staff, selected in accordance with the WorldBank suggestion to request assistance from local universities.

CRO is the independent observer who is not related directly or indirectly to the Contractors, Consultants,and Suppliers or not be part of the WINRIP’s management, and not a member of any political party.

CROs selection procedures:

a. Review the criteria and qualifications of candidates for the CRO.b. Director of Planning, DGH/ as Chairman of the Project Management Unit, delegated the authority to

the selection of the CRO to the Head of National Roads Implementation Agency(BBPJN) / Head of Procurement Services Unit (Unit Layanan Pengadaan - ULP), hereinafter referred to asHead of Balai.

c. Head of Balai to invite CRO candidates from the local universities or colleges.d. Selection of CRO to be facilitated by Balai (BBPJN) / Procurement Services Unit (Unit Layanan

Pengadaan - ULP).e. Elected CRO and substitute CRO must attend one day training to be conducted by the PMU / CTC

WINRIP.f. Head of Balai to report the result of CRO selection by attaching the Minutes of Election Meeting and

send an approval application letter of the CRO to Director of Planning DGH as the Chairman of PMU.g. Based on the report and a written request from the Head of Balai, the Director of Planning DGH as the

Chairman of PMU must sign a Letter of Agreement and the Decree of the Establishment of CROs.

The duties and obligations of CRO are:

a. CRO must be present in any procurement activity (Pre-Bid Meeting, Site Visit, Bids Submission andOpening of Bids, and Announcement of Bids Winner) by invitation of the Procurement Committee, andare required to sign the attendance list

b. If the elected CRO is unable to attend on procurement activities, a Substitute CRO shall be appointed toattend these activities.

c. In discharging of duties the Substitute CRO have the same responsibilities as elected CRO.

Page 51: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

4 - 23

d. The CRO / Substitute CRO, after attending the Procurement activities, required to make a report ofhis/her activities and submit them to the PMU and copy furnished to the related Head of Balai.

CRO as the representative of the community is to be independent observers and in performing their dutiesvoluntarily and not demanding benefits of their works.

In the performance of its duties, the CROs receive transportation cost from their home / office to thelocation of procurement meeting, and also he / she also receives per diem or Out Station Allowance (OSA)and hotel accommodation if necessary to stay. CROs also get additional charged for their reporting costs.The financing standards adjusted to the General Cost Standard (Standar Biaya Umum) issued by theMinistry of Finance.

The CRO’s financing charged to the Contract for Consulting Services for Technical Assistance for Core TeamConsultants (CTC) No: 06-20/CTC/TA/LN/8043/1112, dated 5 November 2012.

4.7.3 Publication / Disclosure

The second task under ACAP is publication of related ACAP documents for public disclosure with easyaccess to the general public and this is mainly manifested in the ACAP segment of the WINRIP website. ThisACAP section has been being designed to attain the best possible transparency of the project.

Ministry of Public Work (MPW) will provide necessary information in the Project Implementation Plan (PIP),Project Management Manual (PMM) on its website, and in the bidding documents, such as contact pointfor complaint (mail and e-mail address, phone, fax, text message). The contact will also include the Bank’sFraud and Corruption Hotline. MPW will hold Annual Accountability Meetings to enhance accountabilityand project information sharing with civil society. The PMM will provide guidelines on disclosure ofinformation related to the project. MPW official website will display critical information on WINRIP toenhance both internal and external monitoring of the project:

Work Plan and Procurement Plan.

Quarterly newsletter containing information on the list of contracts, implementation progress, projectsrelated activities, number, types and status of complaints in each location. The newsletter will also bemade available to civil society in hard copy and through electronic mailing system.

Mid-Term Review Report, promptly after completion of the mid-term review implementation support iscarried out in accordance with the loan agreement;

All final audit reports (financial or otherwise, including qualified audit reports) prepared in accordancewith the loan agreement and all formal responses of the government in relation to such reports. Thepublication should be done within one month after the report is accepted as final.

Contracts awarded with information on general scope of work (with location), value, and summaryinformation of the awarded firms/ contractors. The practice in other projects demonstrates thatdisclosure of contracts awarded will help in reducing fraudulent practices

Ministry of Public Works (MPW) maintains a website: http://www.pu.go.id/, with a link to 'eproc.pu.go.id'for information on semi e-procurement or e-procurement. PMU WINRIP supported by CTC will developtheir own website: http://www.winrip-ibrd.com, and with it all the information and data about WINRIP be

Page 52: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

4 - 24

inputted or uploaded on this site.

In the application of one of the components of ACAP, the public disclosure and transparency, it is necessaryto spread information and increase the capacity of all stakeholders involved in the implementation of thisWINRIP project, through a variety of relevant training. The trainings have been expressed in the TOR of CTCWINRIP and described in the Project Implementation Plan (PIP).

One of the major risks to effective project implementation and management derives from the likelihoodthat project management staff does not have adequate training in or experience of the management oflarge-scale projects.

4.7.4 Complaints Handling Mechanism (CHS)

The ACAP as adopted by the Ministry of Public Works for WINRIP states on the subject of “ComplaintsHandling System”. The Community Development Specialist and the Management Information Specialist willplay a crucial role in the set-up of the Complaints Handling System (CHS) within PMU, in cooperation withthe PMU officer(s) in charge of the Complaints Handling Unit (CHU).

CHS essentially has four main components as follows:

Data Entry.

All complaints are expected to be submitted through the WINRIP website but in fact, to date, mostcomplaints have been received by letter, either directly or indirectly, although a few were sent by faxor email. However, to attain the best possible transparency of the project, complaints submittedmanually through letter, facsimile, telephone, e‐ mail or visit to the Public Works regional offices willbe entered in the WINRIP website by the CHS team of CTC. The possibility of using the ‘short messageservice’ (SMS) from a cell phone for complaints was considered and it was decided that all SMSmessages, although not treated as formal complaints, will be recorded as additional information.

Complaint Registration.

Every submitted complaint is registered and stored into the CHS database, categorized, and sent tothe correlated expert for future consultation in order to formulate a response.

Complaint Assessment.

The CHS Team assesses the urgency and complexity of all complaints. Simple complaints are followedby the formulation of a response for PMU’s approval before uploading the formal response into theWINRIP website. Complex complaints are followed by a thorough investigation.

Field Investigation and Analysis.

In the case of an investigation being required, the CHS team will make field visits and take necessaryaction such as discussion with related institutions (Satker, Dinas, Supervision Consultant, etc); invitethe complainer; interview the contractor; etc. Findings will be used for analysis to formulate aconclusion, solution, next action and any further decision.

Page 53: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

4 - 25

4.7.5 Third Party Monitoring (TPM)

All WINRIP packages are designed to have external parties involved in conducting an independentassessment of the project throughout construction. Project information is accessible through the WINRIPwebsite (under construction), project information booth which is normally maintained in thePPK/Satker/Dinas office or, project announcement (billboard) at each site. ACAP requires a third party, fromoutside the project, to independently monitor the progress of construction work of each link and thesepersonnel are provided by universities nearby each package.

It was decided that the best method of recruitment for TPM was through the universities closest to eachpackage and PMU mailed invitations asking them to express their interest in forming independentmonitoring teams of Third Party Monitors. This concept is based on the fact that Universities/TechnicalFaculties have the engineers available for recruitment and Universities could use this opportunity to beinvolved in public service. It is hoped that this concept will be more effective and more efficient in gettinglegitimate, competent, independent Third Party Monitoring (TPM).

The duties of a TPM included:

a) Report to the PPK for his intended package and obtain copies of all drawings and contractdocumentation.

b) Make at least three (3) separate visits to site, with each visit up to four (4) days long, and ascertain thatthe works are being carried out in compliance with the drawings and documentation.

c) Prepare and submit a report for the PMU following each visit with their last report post PHO.

4.8 Road Safety Audit

Since the Senior Road Safety Audit Engineer has been mobilized on 1st May 2013 until hisdemobilization on April 1st 2014, technical design and road safety engineering review and road safetyaudit for several packages in AWP-2 and AWP-3 sub-projects has been implemented.

However, there were still some task which were not covered by the Senior Road Safety Engineer duringthe duration of the road safety audit stage. Upon mobilization of the National Road Safety Engineer andthe Assistant Road Safety Engineer who were mobilized on June 2, 2014 and November 3, 2014respectively, the remaining road safety audit works were continued.

The remaining works are as follows :

1. Road Safety Audit Construction Stage, for :a. AWP-1 sub-projects (Packages 1, 2, 3 and 4)b. AWP-2 sub-projects (Packages 4, 5, 6, 7, 8, 10, 11, 12 and 13)c. AWP-3 sub-projects (Packages 14, 16, 17, 19, 20 and 21)

2. Road Safety and Traffic Management Monitoring, for :a. AWP-2 sub-projects (Packages 4, 5, 6, 7, 8, 10, 11, 12 and 13)b. AWP-3 sub-projects (Packages 14, 16, 17, 19, 20 and 21)

Road Safety Audit at detailed design stage is to identify the road safety weaknesses in design drawingsthrough site visiting, review of design drawings and official meeting with stake holder. Road SafetyAudit report is the recommendation for improvement of road safety.

Road Safety Engineering Review is to conduct a study of road safety on the packages that road safety

Page 54: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

4 - 26

audit were not performed during the detail design stage. The objective is same with road safety audit atdesign stage.

Traffic Management and Safety Monitoring is to check the performance of contractors related to theimplementation of application management and traffic safety in the field.

The overall progress of the different stages of Road Safety Audit are shown in Appendix B.

Page 55: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

5 - 1

5 FINANCIAL & MANAGEMENT INFORMATION SYSTEMS

5.1 Draw‐Downs and Future Costs

Details of the disbursements already made from the loan are listed in the followingsub‐section.

5.2 Disbursement

The total disbursement by World Bank from the loan to the end of September 2016 wasUSD 74,387,379.27 equivalent to approximately 29.75% of the loan funds. A totaldisbursement of USD 3,540,879.48 was made during the month of September 2016 for thepayment Interim Payment Certificates for the Statement of Work Accopmplished underCategory 1 Part 1 of the loan agreement.

The total expenditure to date measured in the term of the World Bank commitment, notincluding the Special Account advance, is shown in Appendix C. The following tablesummarizes the individual disbursements as calculated by CTC but retaining the totaldisbursement from Client Connection at the end of September 2016.

Category DescriptionLoan Restructuring

Amount USDTotals Disbursed to

End September2016 in USD

% Disbursed

1Part 1 Betterment andCapacity Expansion of

National Roads.220,400,000.00 68,803,498.44 31.22

2Part 2

Implementation Support17,000,000.00 5,583,880.83 32.85

3Part 3

Road Sector InstitutionalDevelopment

0 0 0

4Part 4

Contingency for DisasterRisk Response

0 0 0

Unallocated 12,600,000.00 0 0

Original LoanAmount

250,000,000.00 74,387,379.27 29.75

5.3. Management Information System

5.3.1. General OverviewThe Management Information System tasks are as follows:

1) Information Systema. Develop and manage the File Storage as database system to store soft copy

documents into the server.b. Establish the Document Management System (DMS) to provide:

Letter Database System, used to record all information of incoming andoutgoing letter.

Document Library System, used to record all information of hard copydocuments then store it into library shelves.

c. Create and updated content of the WINRIP official website.

Page 56: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

5 - 2

d. Develop and update content of the Website Geographic Information System(WebGIS) of spatial and roads information that overlay into Google Maps.

e. Develop, manage and update content of the Financial ManagementInformation System (FMIS), the web based application to monitoring thefinancial report and the physical progress report.

f. Provide and manage the Complaint Handling System (CHS), use and supportthe ACAP activities to accommodate complaints from the public.

2) Data Collection and Document Uploada. Collecting data and updating list of data catalog every month.b. Uploading documents into a file storage server.

3) Technical and Computer Troubleshootinga. Setting up and manage cable network of local area network and internet

connection.b. Setting up and manage hardware problem of the computer, printer, copier

and phone.c. Software installation and cleaning up of computer virus.

5.3.2. Database

Incoming andOutgoing Data Administrator Saved

Stored

Inputted

File StorageServer

Shelves

DatabaseApplication

Soft File

Hard Copy

DataInformation

Typical Workflow ofDatabase Management

A typical workflow in management of incoming and outgoing data is divided into 3

types of data handling, below:

1. Hardcopy, the document is stored in a rack.

2. Soft files, saved in the File Storage Server.

3. Data information, inputted in database applications.

For further handling that needs to be made an integrated database management

system so that all data can be stored properly. The database system has been

prepared to store all of WINRIP project information in a systematic, easily

traceable, maintainable, and manageable format as outlined below with the following

systems:

Page 57: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

5 - 3

a. File Storage Server, used to stored all files of report and other document. Pleasecheck the URL address http://storage.winrip-ibrd.com.

b. Document Management System (DMS), used to record all information of letter anddocument files. The URL address of the DMS application will be athttp://dms.winrip-ibrd.com. The DMS have 2 main modules below:

1. Letter Database System, used to record all information of incoming andoutgoing letter.

2. Document Library System, used to record all information of document andreport files.

Page 58: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project1

6 - 1

6 PROJECT PERFORMANCE

6.1 World Bank and GOI Compliance

6.1.1 World Bank Missions

During the month, there was no mission by the World Bank nor monthly coordination meetingto update the Action Plans.

6.1.2 Agreed Key Actions and Mission Plans during Recent World Bank Mission

A list of the key actions monitored during the period are listed below.

No. Action By Whom Target dates

1. Send the BER of package 16 PMU and CTC August 12, 2016

2. Inform the Bank about the decision taken for Package 10 PMU and CTC As soon aspossible

3.

Inform the Bank about the steps DGH has taken/will take in the caseof the misrepresentation of facts in the bidding of Package 8 inresponse to the letter WINRIP/265 of December 9, 2015. If DGH isnot taking any steps, this needs to be reported too.

PMU/CTC As soon aspossible

4. Send to the Bank the draft RfP and the budget for the slopestabilization, design, and management PMU and CTC August 12, 2016

5. Send to the Bank the shortlist for the slope stabilization, design, andmanagement PMU and CTC August 19, 2016

6. Send the NOL to the contract modification #1 of the DSC contract Bank August 12, 20167. Send the NOL for the replacement of the DSC team leader Bank August 10, 2016

8. Send request to the Bank for the replacement of DSC staff forpackages 14, 20 and 21

PMU and CTC August 12, 2016

9.Send to the Bank the #2 DSC contract modification for priceescalation and other changes (staff) under the DSC contract

PMU and CTC September2016

10. Send to the Bank the revised version of the procurement plan PMU August 12, 2016

11. Send the environmental management and monitoring plans (RKPPL)for packages 7, 8 and 15 to the Bank PMU and CTC September 5,

2016

12. Send the environmental management and monitoring plans (RKPPL)for packages 14, 20 and 21 to the Bank October 5, 2016

13. Cary out HIV/AIDS workshops PMU/CTC/ DSC

Package 7 Sept.22, 2016

Package 8 onSept. 20, 2016

Package 12 onSept. 23, 2016

14.Send a letter to the local Environmental Agencies, with copy to theBank, to urge them to follow-up on inadequate quarry managementand reporting by third party quarry owners

PMU and CTC August 31, 2016

15.Collect the environmental permits for all quarries both owned bythird parties and contractors, including evidence of compliance ofthe owner with the environmental license

PMU and CTC September 5,2016

16. Send to the Bank an update of the environmental monitoring tablein annex 4, including an update for the information on the quarries PMU and CTC October 5, 2016

17. Update the project website with the implementation reports ofRKPPL and RKL/RPL, UKL/UPL or SPPLH for all packages PMU and CTC September 5,

201618. Send to the Bank confirmation letter on status of the affected PMU and CTC August 16, 2016

Page 59: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project2

6 - 2

person (1) due to the bridge development and status of additionalLARAP for package 2

19. Send to the Bank final LARAP document of package 5 signed by therelevant Government authority PMU and CTC August 16, 2016

20. Send to the Bank the right of use permission letter for the ForestryDepartment for the existing road of package 5 PMU and CTC End of August

201621.

Carry out remedial actions for the LARAP implementation ofpackage 5 PMU

As soon as theDIPA revision isdone

22.Send to the Bank the monitoring report of LARAP implementation ofpackage 5 PMU

Aftercompletion ofremedialactions

23. Submit LARAP monitoring reports for packages 11, 15, 16 and 19 tothe Bank PMU End of August

24.Submit LARAP monitoring report for package 7

Beginning ofSeptember2016

25.Submit LARAP monitoring reports for package 10, 12, and 14 Mid-September

201626.

Submit LARAP monitoring report for package 8 Mid-October2016

27. Submit LARAP monitoring report for package 13 for 590 APs PMU End of August28. Submit LARAP monitoring report for package 21 formally (515 APs) PMU August 16, 2016

29. Submit LARAP monitoring report for package 20 PMU and CTC End of August2016

30. Completely follow up on the FY2015 audit findings and report to theBank

December 31,2016

31. Submit the quarterly IFR for April to June 2016 to the Bank PMU August 15, 2016

32. Provide additional follow-up response to the quality improvementsupport inspection reports TFAC for packages 1, 6 and 19 PMU/DSC August 12, 2016

33. Send the revised TFAC response for package 3 informally to theBank PMU/DSC August 11, 2016

34. Send the TFAC response formally to the Bank for packages 1, 2, 3, 4,6, 19 and 11 PMU/DSC September 2,

201635. Put the Mid-term review report on WINRIP website PMU/CTC August 20, 2016

36. Submit to the Bank the 2015IRMS traffic data for the 19 roadpackages PMU/CTC September 15,

2016

37. Regularly submit the quarterly progress reports to the Bank PMU Noted for each

calendarquarter

38. Disclose updated procurement plan after Bank approval in theWinrip website linked to MPW Website PMU After Bank

approval

39.Update the newsletter quarterly, including the list of contracts,implementation progress, project related workshops and number,typology and status of complaints

PMU Every quarter

40. Send quarterly newsletter to the civil society forum in each projectprovince in hard copy or through an electronic mailing system PMU Every quarter

6.1.3 Performance Indicators

Key Performance Indicators are developed and agreed between the World Bank and GOI,and will be monitored over the whole project period the changes in variables will be

Page 60: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project3

6 - 3

calculated annually. The set indicators are describe in the project Appraisal Document(PAD) and the Loan Agreement between the GOI and the World Bank.

The overall progress towards achieving the PDO of increasing the effective use of selectedsections of national roads along the Western Sumatra Corridor by reducing road user costsis considered moderately satisfactory. Progress in implementation has picked up, andthere has been an advance with respect to several project indicators. In addition, a projectrestructuring is being processed which should bring the project largely back on track.

The PMU provided an update on the achievement of the indicator targets. There has beenrelatively good progress on three of the five intermediate indicators. For one of theremaining intermediate indicators on bridge improvement, progress is expected within thenext semester. The last intermediate indicator related to institutional strengthening will becancelled in the framework of project restructuring. For the PDO indicator on AADT, CTCcarried out static traffic counts in March 2015 and confirmed that the original indicatortargets are adequate. The mission refined a few indicators definitions/baselines andupdated some indicator targets to take into account the project implementation delays.These changes will be reflected in the upcoming project restructuring.

From the “baseline 2010 AADT and estimated AADT for the year 2014/2015, theextrapolated AADT for the year 2013 resulted to 11,254 vehicles per day or 8.8% above thetargeted 10,347 vehicles per day in 2013. Shown in Table 6.1 is the comparison betweentarget and actual estimated AADT.

Table 6.1Year Targeted AADT EstimatedBaseline (2010) 7,837

FY1 (2013) target 10,347FY1 (2013) actual 11,254FY2 (2014) target 11,351FY2 (2014) actual 12,696FY3 (2015) target 12,453FY4 (2016) target 13,304

FY5 (2017) end target 14,214

Appendix I shows the updated WINRIP Performance Indicators.

Page 61: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project4

6 - 4

6.2 Implementation Support Components

6.2.1 Core Team Consultant (CTC)

The CTC is responsible to provide support to the PMU and DGH in the management of the Project,based in Jakarta. The CTC tasks include financial and progress monitoring and reporting, informationmanagement and dissemination, quality assurance and performance review for the Design andSupervision Consultants (DSC), implementation and monitoring of the anti-corruption action plan,support for project monitoring and evaluation, and support for implementation of a trainingprogram to support project management and implementation.

The CTC contract No. 06-20/CTC/TA/LN/8043/1112 was signed on 5 November 2012 by both DGHand a Joint Venture of PT. Perentjana Djaja, Yongma Engineering Co.Ltd., and PT. EpadasconPermata Engineering Consultant.

The main CTC activities during September 2016 are as follows:

Preparation of Monthly and Quarterly Progress Reports. Monitoring the implementations of the ESAMP, anti-corruption action plans, complains from project

site, progress of LARAP, procurement activities and financial progress. Prepared and issued various letters to PMU. Submitted various Reports to PMU concerning environmental, the status of LARAP implementations

and Site Visit Reports of each Specialist who conducted site inspection. Monitored the actual construction progresses of the on-going contract packages and advised PMU

of the current situations of the sub-projects. Review technical justification variation order Package 5. Assisted in POKJA in finalization of shortlisting of interested firms for the procurement of

consultancy service for Technical Assistance for Development of Slope Stabilization Design andManagement.

Assisted the TFAC Team in conducting site audit inspection on Package 13. Review additional Quantity of Variation order Package No.17. Monitoring and review IFR of some Packages in the Bengkulu Province. Community Development Team carried out preparatory training of TPMs for Packages 12 and 14

and reviewed Monitoring Reports submitted by TPMs for Packages 3 and 11. Conducted HIV-AIDS socializations for Package 7 and 12. Attended PCM Packages 20 and 21. Meeting with Ministry of Financial.

6.2.2 Design and Supervision Consultant (DSC)

The Design and Supervision Consultant (DSC) will be responsible for design of WP 2 and WP 3 civilworks and supervision of all civil works. They will have the role of ‘Engineer’ under a FIDIC-typecontract. The tasks include the preparation and maintenance of a quality assurance plan, validationand updating of designs, supervision of all civil works, environmental and social monitoring andmanagement, and support for financial and progress monitoring and reporting.

The DSC will also be responsible for quality assurance of materials and workmanship, certifyingwhether or not contractors have achieved the required results, as well as documentation andreporting based on the financial management plan. They will prepare a Quality Assurance system

Page 62: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project5

6 - 5

covering all subprojects, and continuously monitor the effectiveness of their supervision procedures.The team will be contracted and managed by DGH through the Bina Marga Regional Office (Balai II),and will be based in Padang, West Sumatera.

DSC contract was negotiated in Balai Besar Pelaksanaan Jalan Nasional II (Balai-II) of DGH. Thenegotiation result and draft contract have been sent to WB on 25 March 2013 for review andapproval. The Bank issued no objection letter on the negotiation results and draft contract withletter dated 19 April 2013.

6.2.3 Study on Development of Slope Stabilization Design and Management

This component consists of technical assistance for analytical work of an alternative design for roadsegment that pass through critical environmental assets and vulnerable areas especially on slopeprotection design and management.

6.3 Anti‐Corruption Issues

6.3.1 Anti-Corruption Action Plan (ACAP)

The main duties of the Community Development Officer are to implement Anti-CorruptionMeasures, and Monitoring their Effectiveness. Provide assistance as required with the establishmentof anti-corruption measures necessary to support the project, and monitor and report theireffectiveness based on the Anti-Corruption Action Plan (ACAP) agreed between the World Bank andthe DGH.

The following tasks particularly need to establish procedures to be undertaken:

Selection of Community Representative Observers (CROs) of civil society groups to attend theprocurements process on key procurement steps including pre-bid meeting and site visit, bidssubmission and bids opening, and the announcement of the bid winner. These CROs will beinvited from local universities or other selected independent institutions, and will sign theattendance list for the procurement/selection process.

Establishment of a Third Party Monitoring (TPM) mechanism, whereby the media and civilsociety groups can become involved in monitoring the progress of the project. This Mechanismwill include regular sharing of information with the media.

Establishment and Management of a Complaints Handling Mechanism System (CHS), whichincludes maintaining project complaint log and filing to monitor status of follow-up of eachcomplaint. This mechanism will include provision for follow up investigations of substantialcomplaints by the Inspectorate General of Ministry of Public Works or third party audit to ensureindependence and reliability of the system. The CTC assignment concerns the monitoring of theaspects of Anti-Corruption Action Plan (ACAP) implementation and where required act pro-active in resolving issues when such a matter arises. The Community Development Officer has amajor role in monitoring performance and assists PMU in the set-up and follow-through of theComplaints Handling Unit (CHU) for the ACAP related incidents

Page 63: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project6

6 - 6

Enhanced Disclosure Provisions and Transparency, Ministry of Public Work (MPW) have beenprovided necessary information in the Project Implementation Plan (PIP), Project ManagementManual (PMM) on their website, and in the bidding documents, such as contact point forcomplaint (mail and e-mail address, phone, fax, text message). The contact will also include theBank’s Fraud and Corruption Hotlines. MPW will hold Annual Accountability Meetings toenhance accountability and project information sharing with civil society. The PMM will provideguidelines on disclosure of information related to the project. MPW official website will displaycritical information on WINRIP to enhance both internal and external monitoring of the project

6.3.2 Community Representative Observers (CRO)

The Anti-Corruption Action Plan (ACAP) activity of Community Representative Observers (CROs)aspect as are follow:

The selection and establishment of CROs for all 19 packages was completed on November 2015.

In September 2016 the CROs for Packages 10 and 16 are awaiting the issuance of theannouncement of the tender winner /No Objection Letter from the World Bank and from theMinistry of Public Works and Housing and this document is for the attachment of theirObserving Report on Bid-Opening process.

The activities progress of Community Representative Observers (CROs) from January 2013 untilSeptember 2016, as shown in Appendix H1.

6.3.3 Third Party Monitoring (TPM)

The Third Party Monitoring (TPM) component activity during September 2016 are as follows :

The activities of Community Development Team during September 2016 was checked andreviewed the TPM’s Monitoring Report as is follow:

- Check and reviewed the monitoring report of TPM on Package 11 (Bantal – Mukomuko)phase II.

- Check and reviewed the monitoring report of TPM on Package 03 (Manggopoh – PadangSawah) phase III.

Community Development Team carried out Preparatory Training for TPM of package 12(Kambang - Indrapura) and package 14 (Painan – Kambang) in West Sumatera Province, inPadang on September 27, 2016.

The Training was held in Meeting Room BPJN III Padang, Jalan Jati No. 109 Padang, and openedby Head of Planning Section (Kepala Seksi Perencanaan) (Ms. Yulia Rahmadani) on behalf of theHead of BPJN III Padang, and accompanied by PPK 15 (Mr. Paides Tabril) and PPK 14 (Mr. Yahya).

The Objectives of this training is to provide the basic information necessary to support theimplementation of the project, so that the TPM personnel can implement monitoring in

Page 64: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project7

6 - 7

accordance with the provisions and procedures prescribed. Upon completion of the training,participants are expected to:

- Explain about ACAP and its implementation;- Describe the scope of monitoring on the construction works by the TPM;- Describe provisions on reporting and financial accountability.

The training contents include:

- Anti-Corruption Action Plan - ACAP (from PMM Chapter. 11);

- The scope of TPM responsibility;

- Introduction of Disclosure and Transparencies, Complaint Handling System (CHS), andWebsite of WINRIP;

- Monitoring on management of the contract implementation, Quality Control and QualityAssurance;

- Monitoring on implementation of the Roads Construction (Management, Technical Works,Environmental and Social Aspects;

- Monitoring Implementation Reporting by TPM, and

- Financial Accountability;

The main target group is the TPM team of Package 12 from State Polytechnic of Padang andTPM team of Package 14 from Pasca Sarjana of Bung Hatta University ‘UBH’ Padang, as well asof other elements related to the construction project, namely National Roads ImplementationAgency (BPJN) III Padang, Satker/PIU of National Roads Implementation Region II; PPK relatedpackage; DSC Consultant/Field Supervision Consultant and Contractors. Invited were 26trainees and attended by 24 participants, as shown below.

No Groups of Participants Invited Attending Remarks

1 BPJN II Padang 2 2

2 Satker PJN Reg. II 2 - -

3 PPK 15 (Pack. 12) 2 2 PPK and Ka. TU.

4 PPK 14 (Pack. 14) 2 2 PPK and Ka. TU

5 TPM Team Package 12 3 3 Politeknik Negeri Padang

6 TPM Team Package 14 3 3 Univ. Bung Hatta (UBH)

7 Supervision Consultants (P. 12) PT. DACREA 3 2 QE and CI

8 Supervision Consultants (P. 14) PT. Cipta Strada 3 4 SSE, VE, QE, CI

9 Contractors Pack. 12 (PT. LMA) 3 2 CC, QC

10 Contractors Pack. 14 (PT. Yasa – Conbloc KSO) 3 4 DGSI, QCM, ESI, SM

TOTAL : 26 24

The Facilitators who delivered the Training were from CTC Professional Staff (Specialist) who areresponsible on its subject matters. The Facilitators were Community Development Officer (Mr.Yakobus), MIS Specialist (Mr. Sony Thamrin), Quality Assurance Engineer (Mr. Uray A. Manaf),Assistant Community Development Officer (Ms. Siti Rosmiati) and one official from SatkerPAP2PHLN (Mr. Deddy Firdaus).

Note of TPM activities during September 2016:

Page 65: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project8

6 - 8

1. The 2nd monitoring stage of TPM Package 06.

2. TPM monitoring of package 11 for 3rd stage.

Program of TPM for the near future. The TPM for package 05 plan for monitor / field visit for the 1st stage, The TPM for package 15 plan for monitor / field visit for the 1st stage, The TPM for package 13 plan for monitor / field visit for the 1st stage, The TPM for package 17 plan for monitor / field visit for the 1st stage

The activities progress of the Third Party Monitoring (TPM) from January 2013 until September 2016,as shown in Appendix H2.

6.3.4 Complaint Handling System (CHS)

The Community Development Officer with collaboration with MIS Specialist has developed asoftware application of Complaint Handling System (CHS) in integrated to website of WINRIPhttp://www.winrip-ibrd.com.

In the implementation of Complaint Handling System (CHS) essentially there are five (5) maincomponents as follows:

Data Entry. Complaint Registration. Complaint Assessment. Field Clarification and Analysis. Problem Solving and taking the Decision

The final draft of Complaint Handling System (the framework of the complaint procedures on theweb site of WINRIP and provided ACAP inputting data in the web site) is ready to be operated.

However these applications still continuously to be refined by considering input from various parties.The CHS team has been monitored and noted the public complaints via website of Sytem InformasiPemantauan Proyek “SiPP” / Project Monitoring Information System and WINRIP website.

During September 2016 Community Development Officer and Information Management have notreceived any complaint from the communities or any parties.

The Complaints Handling Mechanism System (CHS) Activities is shown in Appendix H3.

6.3.5. Public Disclosures / Publication

Publication and disclosure is an attempt to increase transparency of information to the public, sothe public can easily to access information about the project WINRIP. Some components ofpublication and disclosures are as follows: a) announcing the information about the project throughdissemination activities and provision the leaflets, b) installation of the project information boards,c) the provision of space / project information booth, d) providing important information that canonly be accessed by public with submitted an officially applications to the authorities, and e) theprovision of information in the website which can be accessed via the internet.

The Community Development Team has sent the CRO’s activities and Third Party Monitoring (TPM)

Page 66: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project9

6 - 9

activities and has been up load to the website of WINRIP.

All data and report documents of the Community Development activities on CommunityRepresentative Observers (CROs) for 19 packages (# 01, 02, 03, 04, 05, 06, 07, 08, 10, 11, 12, 13,14, 15, 16, 17, 19, 20 and 21#) has been uploaded on the website of WINRIP.

The Third Party Monitoring (TPM) for all of 19 packages was completed selected / appointed andall of the TPM’s data has been entry /uploaded to the website of WINRIP (# 01, 02, 03, 04, 05,06, 07, 08, 10, 11, 12, 13, 14, 15, 16, 17, 19, 20 and 21).

On September 27, 2016 the CTC (Community Development Team) has been carried outpreparatory training for Third Party Monitoring (TPM) of packages 12 ang 14 in Padang, WestSumatera.

The Works Activities for Publication / Disclosure is shown in Appendix H4.

6.3.6. Action Plan for Next Months (October 2016)

The Activities plan for future months, in order of priority are as follows:

1. Preparatory Training of TPM team for package 20 (Lubuk Alung – Sicincin) and package 21(Lubuk Alung – Kuraitaji) in West Sumatera Province

2. Monitoring TPM package 11 and 13 in Bngkulu Province.

6.4 Road Safety Audit

6.4.1 Activities during This Month (September 2016)The Road Safety activities of this month are:

1. Regularly Road Safety Design check at the office.2. Site visit to Simpang Empat – Air Balam (Package #10), Padang, August 31 – September 2, 20163. AADT Object Indicator Socialisation for Bengkulu Province, September 14-16, 2016

6.4.2 Current status of the project for technical field as of September 2016

The Details of Program of Road Safety Audit as of the end of September 2016 are shown in the tableon Appendix B.

Page 67: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project10

6 - 10

6.5 Management Information System

Since the hosting provider Masterweb migrating online server of WINRIP, we always fail toupload a large file using DMS applications. Then the letters and documents archiving activityis undermined. It is very disturbing performance of our activities.

We have done a lot to overcome this, such as deleting a big backup files so that free spacebecomes larger, and we disable firewall internet access in the Ciniru office, then weexpanding cache memory of upload files. But all these efforts have fail, we still can notupload large files using DMS applications.

We believe this upload error occurred on the Masterweb server side. We have asked forhelp to Masterweb do to overcome this. But until now there has been no encouragingresults. Hopefully Masterweb managed to overcome this problem, so that archivaldocuments activities in DMS applications can run well again.

This error upload file resulting document archive process does not increase. The data thathas been uploaded to the DMS database until the end of September are: 796 records ofletters and 402 records of documents.

6.5.1 Building The Hard Copy Storage

1) BackgroundSeveral reports has been collected because its activities had almost finished, such asprocurement, land acquisition and training activities. Then need to build a file system in hardcopy form. That reports including all of documents and letters in DMS application will beprinted and binded then stored in a big file box that is neatly arranged.

2) Objectives We have two versions of storage documents and letters that is in soft files version

and hard copies version. To make it easier in finding documents or letters in DMS applications and files box in

the same time. Simplify the administration and reporting process of handing over at the ends of

WINRIP project.3) Document Codification and Categorization

The folder structure using the same system with DMS applications. The root folders aresorted based on the WINRIP components, namely:

Component 1 abbreviated C01 is root folder of Betterment and Capacity Expansionof National Roads that divided into 21 sub-components of civil work projects:

o Sub-component 1.1 abbreviated C01.01 is root folder of Package 01.o Sub-component 1.2 abbreviated C01.02 is root folder of Package 02.o Sub-component 1.3 abbreviated C01.03 is root folder of Package 03.o Etco Sub-component 1.21 abbreviated C01.21 is root folder of Package 21.

Component 2 abbreviated C02 is root folder of Implementation Support thatdivided into 3 sub-components:

o Sub-component 2.1 abbreviated C02.01 is root folder of PMU.o Sub-component 2.2 abbreviated C02.02 is root folder of CTC.

Page 68: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project11

6 - 11

o Sub-component 2.3 abbreviated C02.03 is root folder of DSC. Component 3 abbreviated C03 is root folder of Road Safety Environment. Component 4 abbreviated C04 is root folder of Disaster Management.

4) Box File CabinetAll the documents must be stored that it needs to be made box file cabinet. It is made fromsteel frame that can be installed flexibly, big and strong. Box file cabinet must be able toaccommodate all of container box which contain documents.

In the first and second row have placed the container box of documents from theComponent 1. After that in the third row just placed a container box of documents from theComponent 2. Component 3 and 4 have not been implementation. Then there is nodocument that can be produced for both Components. The layout arrangement asillustrated below.

In addition, each container box will contain the appropriate documentation to itscomponents. For documents of Component 1 is contains the following documents:

DAFTAR DOKUMEN P01

TAHAP PERSIAPAN TAHAP PELELANGAN TAHAP KONSTRUKSI TAHAP PHO

ACAP 1.Standard BiddingDocument

□1. Kontrak

□1.

Provisional Hand OverReport

1.CommunityRepresentativeObserver

□2. DED

□2.

Pre-ConstructionMeeting

□2. Road Safety Audit

2.Complaint HandlingUnit

□3. BOQ

□3.

Project Monitoringand EvaluationReport

3. Third Party Monitoring

4. OE

4.

Road Safety andTrafficManagementMonitoring Report

5.GeneralSpecification

□5. Addendum

ENVIRONMENT 6. Bid Evaluation □ 6. Amendment □

Page 69: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project12

6 - 12

ProcurementReport

1. AMDAL□

7.ProcurementReadinesAssessment Report

2. HIV/AIDS □3. RKPPL □4. SPPL □5. UKL/UPL □

ROAD SAFETY

1. Design Reiew □

SOCIAL IMPACT

1. LARAP □

And for container box that contain documents of Component 2 are lists the followingdocuments:

DAFTAR DOKUMEN PMU1. Loan Agreement □ 16. □ 31. □

2.Project ImplementationPlan

□17.

□32.

3.Project AppraisalDocument

□18.

□33.

4. Term of Reference □ 19. □ 34. □

5.Project ManagementManual

□20.

□35.

6. □ 21. □ 36. □7. □ 22. □ 37. □8. □ 23. □ 38. □9. □ 24. □ 39. □

10. □ 25. □ 40. □11. □ 26. □ 41. □

12. □ 27. □ 42. □

13. □ 28. □ 43. □

14. □ 29. □ 44. □

15. □ 30. □ 45. □

DAFTAR DOKUMEN CTC

PENDAHULUAN BULANAN KEUANGAN TRIWULANAN SEMESTER

1.InceptionReport

□1. MPR No. 01 2013-01

□1. IFR Q1 2013

□1. QPR Q1 2014

□1.

Mid Term S22014

2. MPR No. 02 2013-02 □ 2. IFR Q2 2013 □ 2. QPR Q2 2014 □ 2. Mid Term S1 □

Page 70: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project13

6 - 13

2015

3. MPR No. 03 2013-03□

3. IFR Q3 2013□

3. QPR Q3 2014□

3Mid Term S22015

4. MPR No. 04 2013-04□

4. IFR Q4 2013□

4. QPR Q4 2014□

4.Mid Term S12016

5. MPR No. 05 2013-05 □ 5. IFR Q1 2014 □ 5. QPR Q1 2015 □6. MPR No. 06 2013-06 □ 6. IFR Q1 2014 SA □ 6. QPR Q2 2015 □7. MPR No. 07 2013-07 □ 7. IFR Q2 2014 □ 7. QPR Q3 2015 □8. MPR No. 08 2013-08 □ 8. IFR Q2 2014 SA □ 8. QPR Q4 2015 □9. MPR No. 09 2013-09 □ 9. IFR Q3 2014 □ 9. QPR Q1 2016 □

10. MPR No. 10 2013-10 □ 10. IFR Q3 2014 SA □ 10. QPR Q2 2016 □11. MPR No. 11 2013-11 □ 11. IFR Q4 2014 □12. MPR No. 12 2013-12 □ 12. IFR Q4 2014 SA □13. MPR No. 01 2014-01 □ 13. IFR Q1 2015 □14. MPR No. 02 2014-02 □ 14. IFR Q1 2015 SA □15. MPR No. 03 2014-03 □ 15. IFR Q2 2015 □16. MPR No. 04 2014-04 □ 16. IFR Q2 2015 SA □17. MPR No. 05 2014-05 □ 17. IFR Q3 2015 □18. MPR No. 06 2014-06 □ 18. IFR Q3 2015 SA □

5) Schedule to Collecting of DocumentsThe collection of hard copy documents and reports starting from now until the end ofWINRIP project at the end of 2017. This activities are done in a gradual way to reduceworkload at the end of the project.

6) Task to be PerformedAll of documents and reports that have been produced must be retain one copy for archive.Then we need cooperation from all specialists, assistants and supporting staff in orderindependently to submit an archive document to the database administrator. Then thedatabase administrator will store the archived documents in the box file cabinet.

6.5.2 DMS StatisticToday the DMS application already stored many file of Letters and Documents. And the nextdays will be more files are stored in the DMS database. At the end, it is expected to store allof files that related with WINRIP project.

Below is the number of Letter files that have been stored in DMS database, updates until theend of September 2016. This Letter statistics have sorted by "Package".

Page 71: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project14

6 - 14

0

10

20

30

40

50

60

70

P1 K

rui -

Bih

a

P2 P

adan

g Sa

wah

- Sp

Em

pat

P3 M

angg

opoh

- Pa

dang

Saw

ah

P4 Ip

uh -

Bant

al

P5 S

p Ra

mpa

- Po

riaha

P6 P

asar

Ped

ati -

Ker

kap

P7 In

drap

ura

- Tap

an

P8 B

ts K

ota

Paria

man

- M

angg

opoh

P9 R

anta

u Ti

jang

- Ko

ta A

gung

P10

Sp E

mpa

t - S

p Ai

r Bal

am

P11

Bant

al -

Muk

omuk

o

P12

Kam

bang

- In

drap

ura

P13

Sp R

ukis

- Tj K

emun

ing

P14

Pain

an -

Kam

bang

P15

Sibo

lga

- Bat

as T

apse

l

P16

Sebl

at -

Ipuh

P17

Sp G

n Ke

mal

a - P

g Ta

mpa

k

P18

Muk

omuk

o - B

ts S

umba

r

P19

Lais

- Bin

tuna

n

P20

Lubu

k Al

ung

- Sic

inci

n

P21

Lubu

k Al

ung

- Kur

aita

ji

WIN

RIP

36

28

61

25

15 1711

70

6

1612 12

6 8 5 40

14

2 2

66

Package

Letter StatisticSorted by Package

And here are the number of Document files that have been stored in DMS database,updates until the end of September 2016. This Document statistics have sorted by"Document Type".

0

10

20

30

40

50

60

70

7

38

0

66

33

15 13

6 8

18

10

28

0

8

Document StatisticSorted by Document Type

Document Type

WINRIP Website Application Progress are shown in Appendix G.

Page 72: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project15

6 - 15

6.6 Quality AssuranceDuring the period September 2016 the Quality Assurance Engineer conducted final review ofTFAC Comformance Reports, prepared site visit reports for Packages 11, 13 and 16.

Appendix D shows the activities of the Quality Assurance Engineer during this period.

6.7 Project Risks and Mitigation Measures

6.7.1 Risks Related to Delays

Since the detailed engineering design (DED) is under responsibility of the Design andSupervision Consultant (DSC), delay on DSC establishment affected the procurement ofAWP-2 and AWP-3 sub-projects. The DED of several subprojects of WP-2 and WP-3 wereprepared and completed by respective P2JN. The CTC has then been instructed by DGH toreview the DEDs of seven packages completed by the P2JNs (package 5, 6, 11, 13, 15, 17 and19).

6.7.2 Financial Risks

The following factors will be monitored during implementation of the loan project. Loan Amount Actual Tender Prices Price Adjustments Contract Amendments (Additive or Deductive Variations) Currency Fluctuation Current Estimated Situation

No risk was detected until preparation of this report, however CTC prepared revised costestimates in anticipation of future cost claims to cover contract price escalations andvariation orders. A revised factor from 10% have been reduced to 5% for both additionalcost components is applied on the original cost.

6.7.3 Risks Related to Quality

The quality of work is inherently tied to the competence of the Contractors and the diligenceof the Supervision Teams. The competence of contractors shall be considered at the time ofbid evaluation and prior to the award of any contract.

The quality of supervision however is influenced by the following factors:

Ensuring that supervision staff levels are fully manned with competent, honest,qualified and experienced personnel.

The provision of properly equipped laboratories with properly trained operators foreach package.

Package supervision comes under the responsibilities of the immediate supervision teamsand the relevant DSC and the Quality Assurance Engineer from CTC.

Page 73: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project16

6 - 16

6.8 Training to Support Project ImplementationAs of end of this reporting month and for the whole month of September 2016, there was nomore Training Team as the Training Specialist and his Assistant were already demobilized inAugust 2016.

To date, there a total of twenty six (26) training, workshop, seminars and socialization that weredelivered and/or completed by CTC, the World Bank and the Project Preparation Committee.

Out of the twenty six (26) training, twenty two (22) were conducted or delivered by CTC, whilethe other four (4) were either conducted by Project Preparation Committee and the World Bank.

Although the Training Team of CTC was already demobilized, CTC still to continue conducting ordelivering trainings for different disciplines, this time the trainings will be managed by theSpecialist of the discipline of the particular training to be delivered.

In the coming month of October 2016, training on management of road works environmentalimpacts during construction phase and preparation environmental management and monitoringwork plan (RKPPL Training No.8) will be delivered to staff of Packages 14, 20 and 21. It will beorganized and managed by the Environmental Specialist, Ms, Leti Hermawati.

Page 74: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project1

7 - 1

7 ISSUES and RECOMMENDATIONS

7.1 Current Situation

The main issues during this month of September 2016 are as follows:a) The big negative slippage (behind schedule) of three (3) on-going construction sub-

projects, Packages 5, 11 and 13.b) Delayed execution of Contract Agreement and issuance of Notice to Proceed will affect

the twenty one (21) months time of completion of Contract Package 16. If the ContractPackage could not get started soon, the completion date will keep on stretching fartherbeyond the expiry date of the loan agreement on December 31, 2017.

c) For almost seven (7) months now since the 2nd week of March 2016, there was noregular Team Leader of the Design Supervision Consultants (DSC) as he cannot continueanymore to discharge his duties due to serious ilness.

d) Taking Over Certificate (TOC) for Contract Package No.19 has not yet been issued inspitethe project have already been completed since last May 8, 2016.

7.2 Actions Requireda) Three (3) of the on-going construction packages are on critical situation due to big

negative progress slippages which may affect the timely completion of the projects.Design Supervision Consultant (DSC) shall closely monitor, preferably on a weekly basis,the Contractors progress output once the pending Contractors request for timeextensions are granted and approved. Contractors shall prepare a “Catch-Up’ Scheduleon how to complete the remaining works within the extended contract time. High levelmanagement meeting is urgently suggested to address the issues behind the delayedwork progress.

b) Processing time up to the issuance of Notice To Proceed shall be prioritized andexpedited in order to minimize the completion dates from going farther beyond theDecember 31, 2017 loan closing date.

c) BALAI II as the other part of the contracting parties with Renardet “the Engineer” of theWINRIP Projects shall have to clarify from the Company how soon the replacement TeamLeader will mobilize to the site.

d) DSC shall not delay the issuance of TOC if all documentation requirements are alreadycompleted.

Page 75: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project1

8 - 1

8 CORRESPONDENCESDuring the period the CTC received and issued letters. Lists of letters received and issued areshown in Appendix J.

Page 76: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

ANNEXES

Annex P-1 : Package No. 1

Annex P-2 : Package No. 2

Annex P-3 : Package No. 3

Annex P-4 : Package No. 4

Annex P-5 : Package No. 5

Annex P-6 : Package No. 6

Annex P-7 : Package No. 7

Annex P-8 : Package No. 8

Annex P-11: Package No.11

Annex P-12: Package No.12

Annex P-13: Package No.13

Annex P-14: Package No.14

Annex P-15: Package No.15

Annex P-17: Package No.17

Annex P-19 : Package No.19

Annex P-20 : Package No.20

Annex P-21 : Package No.21

Page 77: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

05-Jul-15 Status tanggal : 25-Sep-16

Amount Time ellaps Remaining (incl VAT) days days Target Highest Avg The lastIDR million % % % % % %

BIHA - KRUI 25-Nov-13 640 10-Jan-16 154.073 100 100 -PT Jaya Konstruksi MP, Tbk 8-Jan-14 93 154.073 154.073PADANG SAWAH-SIMPANG EMPAT 6-Dec-13 730 19-Apr-16 226.713 100 100 -PT Jaya Konstruksi MP, Tbk 6-Jan-14 105 226.713 226.713MANGGOPOH - PADANG SAWAH 6-Dec-13 730 20-Mar-16 165.157 100 100 -PT Jaya Konstruksi MP, Tbk 6-Jan-14 75 165.157 165.157IPUH - BANTAL 14-Nov-13 730 11-Apr-16 196.438 100 100 -PT WASKITA KARYA - PT DMT, JO 13-Jan-14 90 196.438 196.438 SIMPANG RAMPA - PORIAHA 17-Mar-15 540 8-Dec-16 107.321 88,79 31,28 (57,51) 466 74 22,91 8,40 2,41 1,28PT. NUSA KONSTRUKSI ENJ Tbk. 18-Jun-15 - 95.291 33.573 86,27% 13,73%KERKAP - PASAR PEDATI 27-Feb-15 450 28-Jan-17 118.444 70,27 64,44 (5,83) 325 125 8,89 11,16 3,79 8,13PT. WASKITA KARYA Tbk 11-Mar-15 240 83.233 76.323 81,86% 18,14%INDRAPURA-TAPAN 26-Nov-15 630 30-Aug-17 129.700 16,79 16,70 (0,09) 291 339 7,57 7,24 2,09 3,83PT. ADHI KARYA 10-Dec-15 - 21.771 21.660 46,10% 53,90%BANTAL - MUKOMUKO 18-Dec-14 720 11-Feb-17 262.611 84,00 71,00 (13,01) 581 139 5,80 7,22 4,44 5,97PT. HUTAMA KARYA - PT. DMT, JO 23-Feb-15 - 220.601 186.443 80,67% 19,33%SIMPANG RUKIS-TANJUNG KEMUNING 18-Dec-14 720 10-Jul-17 292.700 63,60 19,25 (44,34) 432 288 8,07 10,31 1,60 0,19PT. WASKITA KARYA 22-Jul-15 - 186.152 56.356 59,94% 40,06%SIBOLGA - Batas TAPSEL 13-Jul-15 810 31-Dec-17 260.100 23,77 8,99 (14,78) 348 462 5,35 2,99 1,12 2,99 PT. PEMBANGUNAN PERUMAHAN 20-Nov-15 -37 61.817 23.378 40,16% 59,84%Sp.Gn KEMALA-PUGUNG TAMPAK 17-Nov-14 720 23-Aug-17 199.551 33,01 28,34 (4,68) 388 332 5,97 8,00 2,83 8,00PT Jaya Konstruksi MP, Tbk 4-Sep-15 - 65.875 56.543 - 53,82% 46,18% BINTUNAN-LAIS 27-Feb-15 300 8-May-16 44.418 100 100 -PT RODATEKNINDO PURAJAYA 11-Mar-15 125 44.418 44.418BATAS KOTA PARIAMAN-MANGGOPOH 28-Jan-16 720 31-Dec-17 355.500 7,58 9,69 2,12 187 462 5,64 3,48 3,23 3,48PT PP - STATIKA JO 23-Mar-16 -71 26.932 34.461 28,70% 71,30%KAMBANG-INDERAPURA 28-Jan-16 720 31-Dec-17 358.650 1,61 1,05 (0,56) 126 462 4,95 0,43 0,26 0,07PT LANCARJAYA MA-CAHAYA TA,JO 23-May-16 -132 21,29% 78,71%PAINAN - KAMBANG 1-Jun-16 630 31-Dec-17 214.327 0,56 0,47 (0,09) 54 462KSO YASA - CONBLOC 3-Aug-16 -114 10,29% 89,71%LUBUK ALUNG - SICINCIN 1-Jun-16 540 31-Dec-17 113.818 0,30 0,39 0,09 25 462PT NINDYA KARYA 1-Sep-16 -53 4,94% 95,06%KURAI TAJI - LUBUK ALUNG 1-Jun-16 540 31-Dec-17 126.301 0,56 0,78 0,22 25 462PT MULTI STRUCTURE 1-Sep-16 -53 4,94% 95,06%SEBLAT - IPUH 630 211.375PT YASA - MULTI STRUCTURE, JO -16

01

02

03

Contractor

12

08

14

20

21

Timeextension

04

06

19

05

13

15

17

11

07

Time for Complation

Actual Dev

Physical Progress (%)

Sch

CONTRACTSIGN DATE

COW

CIVIL WORKS PROGRESSWESTERN INDONESIA ROAD IMPROVEMENT PROJECT (WINRIP)

Package No. & Name TakingOver

Certificate(PHO)

ContractPROGRESS ACHIEVEMENT

Time forCompletion

?

?

9 ESR Sept 2016_C3212A

Page 78: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

ANNEX P-1

MONTH :

Package No. Time Elapsed (Days)

Name Time Elapsed (%)

Project Manager Scheduled Progress (%) 100,00 Contractor Actual Overall Progress (%) 100,00 Supervision Consultant Balance (%)Contract Sign Progress This Month (%) Commencement Date Time for Complation (Days) 733 Take Over Date Status date Contract Amount Rp. Accumulative Rp. 93,00% Contract Amount Add-1 (+ VAT) Rp. *) Include advance payment Contract Amount Add-5 (+ VAT) Rp.

Comp Add.2 Accum Actual Accum AccumTotal Total Last this to this Sch to

% % Month Month Month thisMonth

I G e n e r a l 8,25 7,22 7,54 8,36II D r a i n a g e 34,19 23,78 25,35 20,11III Earthworks 3,95 6,56 4,65 7,41

IV Pavement Widening &Shoulders

1,47 0,94 1,02 0,80

V Granular Pavement 9,22 7,04 7,49 6,94VI Asphalt Pavement 40,14 46,76 41,07 44,78VII S t r u c t u r e s 1,09 5,36 6,41 5,96

VIII Reinstatement &Minor Works

1,20 1,91 6,05 5,16

IX Day Work 0,14 0,12 0,09 0,11

X Routine MaintenanceWorks

0,36 0,32 0,33 0,37

TOTAL 100,00 100,00 - - 100,0 100,0Note :

2016Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 250,22 0,87 1,69 5,62 11,11 18,06 24,50 31,58 38,99 46,36 52,53 60,68 67,46

31,90 35,31 40,53 47,72 56,69 65,59 75,18 84,21 94,42 100,0088,43 91,76 96,08 100,00

0,10 0,58 0,79 1,59 2,93 3,71 4,79 5,98 8,60 11,28 12,62 16,08 18,71 21,04 25,88 32,67 37,50 42,27 45,05 55,51 65,00 70,08 76,56 91,02 100,00(0,12) (0,29) (0,90) (4,03) (8,18) (14,35) (19,71) (25,60) (30,39) (35,08) (39,91) (44,60) (48,75) (14,27) (14,65) (15,06) (19,18) (23,31) (30,13) (28,70) (29,43) (18,34) (15,19) (5,06) -

0,48 0,21 0,80 1,34 0,78 1,08 1,19 2,62 2,68 1,34 3,46 2,63 2,33

MAJOR PROBLEMS ACTION TO BE TAKEN

01

TIM

E September 25, 2016

BIHA - KRUI

RENARDET S.A JV

Joko Wisargo, ST, MT

AMO

UN

T

08-Jan-1425-Nov-13

DISBURSEMENT *)

130.437.168.597

EXECUTIVE SUMMARY REPORTSep-16

PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS

30-Sep-16

PHYSICAL PROGRESS MONITORING TABLE2014 Year

10-Jan-16

PHYSICAL WORK PROGRESS BY CATEGORY

134.909.211.000154.073.015.000

2015

PT JAYA KONSTRUKSI MP, Tbk

Actual Progress (%) Balance (%)

Div Description

The month of time for complation

Rivised Progress Schedul Add.1 (%) Original Progress Schedul (%)

Month

Rivised Progress Schedul Add.2 (%)

140.255.020.000

1. 100% completed on January 2016 2. Taking-Over Certificate issued on January 18, 2016 3. Defects Liability Periode until January 17, 2018

0

10

20

30

40

50

60

70

80

90

100

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

PHYS

ICAL

PRO

GRES

(%)

THE MONTH OF TIME FOR COMPLATION

PROGRESS SCHEDULEPACKAGE # 01

Original

1st Revised Shc

2nd Revised Sch

ACTUAL

9 ESR Sept 2016_C3212A P-1

Page 79: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

ANNEX P-2

MONTH :

Package No. Time Elapsed (Days) Name Time Elapsed (%) Project Manager Scheduled Progress (%) 100,00 Contractor PT JAYA KONSTRUKSI MP, Tbk Actual Overall Progress (%) 100,00 Supervision Consultant Balance (%)Contract Sign Progress This Month (%) Commencement Date Time for Complation (Days) 730 Time for Complation (Days) 835 Status date Take Over Date Accumulative Rp. 96,46% Contract Amount Rp. *) Include advance payment Contract Amount Add-1 (+ VAT) Rp.

Comp Accum Actual Accum AccumTotal Last this to this Sch to

% % Month Month Month thisMonth

I G e n e r a l 10,46 3,378 3,38 3,38

II D r a i n a g e 3,53 3,244 3,24 3,24

III Earthworks 4,44 4,691 4,69 4,69

IV Pavement Widening &Shoulders

2,26 1,948 1,95 1,95

V Granular Pavement 10,49 10,944 10,94 10,94

VI Asphalt Pavement 52,09 57,028 57,03 57,03

VII S t r u c t u r e s 14,35 16,115 16,12 16,12

VIII Reinstatement & MinorWorks

1,65 2,002 2,00 2,00

IX Day Work 0,12 0,108 0,11 0,11

X Routine MaintenanceWorks

0,62 0,541 0,54 0,54

TOTAL 100,00 100,00 - - 100,00 100,00

Note :

Year Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Original Progress Schedul (%) 0,45 0,90 2,20 3,45 7,17 13,58 17,48 20,63 27,88 33,56 38,81 44,72 50,52 56,13 62,58 67,95 73,65 79,35 1st Revised Progress Schedul (%) 66,92 71,10 81,03 87,07 91,35 95,62 100,00 2nd Revised Progress Schedul (%) 92,53 95,62 96,75 97,25 98,21 100,00Actual - 0,13 1,02 2,19 4,11 5,96 9,69 13,85 22,55 25,61 31,45 33,73 40,41 44,25 49,98 55,715 58,61 58,35 63,76 71,36 77,80 83,27 92,53 93,20 92,85 95,73 96,83 100,00Balance (0,45) (0,77) (1,17) (1,26) (3,07) (7,62) (7,80) (6,78) (5,33) (7,95) (7,36) (10,99) (10,11) (11,88) (12,59) (12,23) (15,04) (8,57) (7,35) (9,67) (9,27) (8,08) (3,09) (2,41) (3,90) (1,52) (1,37)

0,89 1,17 1,91 1,86 3,72 4,17 8,69 3,07 5,84 2,28 6,68 3,84 38,29

The month of time for complation

DISBURSEMENT *)30-Sep-16

218.697.678.420

PHYSICAL WORK PROGRESS BY CATEGORY

Div Description

PHYSICAL PROGRESS MONITORING TABLE2014 2015 2016

226.713.217.000

19-Apr-16

EXECUTIVE SUMMARY REPORT

PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS

Sep-16

1. 100% completed April 20162. Taking-Over Certificate issued on April 19, 20163. Defects Liability Periode until April 18, 2018

197.936.699.000

Amandm04

September 25, 2016PADANG SAWAH-SIMPANG EMPAT02

TIM

E

MAJOR PROBLEMS ACTION TO BE TAKENISMAN, ST

AMO

UN

T

RENARDET S.A JV06-Dec-1306-Jan-14

0

10

20

30

40

50

60

70

80

90

100

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

PHYS

ICAL

PRO

GRES

(%)

THE MONTH OF TIME FOR COMPLATION

PROGRESS SCHEDULEPACKAGE # 02

ORIGINAL

1st Revised Sch

2nd Revised Sch

ACTUAL

9 ESR Sept 2016_C3212A P-2

Page 80: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

ANNEX-P3

MONTH :

Package No. Time Elapsed (Days)

Name Time Elapsed (%) Project Manager Scheduled Progress (%) 100,00 Contractor claim quantiry in excess of U-ditch equivalent to Review site instruction and prepare final addendum Contractor Actual Overall Progress (%) 100,00 Rp. 2.451.226.000,- to be considered in final quantity. Supervision Consultant Balance (%)Contract Sign Progress This Month (%) Commencement Date Time for Complation (Days) 730 Time for Complation (Days) 805 Status date Take Over Date Accumulative Rp. 89,00% Contract Amount Rp. *) Include advance payment Contract Amount Add-1 (+ VAT) Rp.

Comp Revised Accum Actual Accum AccumTotal Total Last this to this Sch to

% % Month Month Month thisMonth

I G e n e r a l 10,21 10,21 2,39 2,39II D r a i n a g e 13,17 13,17 10,09 10,09III Earthworks 3,04 3,04 6,99 6,99

IV Pavement Widening &Shoulders

2,45 2,45 1,92 1,92

V Granular Pavement 11,27 11,27 11,25 11,25VI Asphalt Pavement 55,81 55,81 59,72 59,72VII S t r u c t u r e s 0,80 0,80 5,28 5,28

VIII Reinstatement &Minor Works

2,27 2,27 1,02 1,02

IX Day Work 0,22 0,22 0,69 0,69

X Routine MaintenanceWorks

0,76 0,76 0,65 0,65

TOTAL 100 100 - - 100 100Note :

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 270,26 1,00 1,67 2,45 4,78 7,45 10,70 14,27 21,53 30,10 36,95 44,01 51,62 58,67 65,63 73,03 79,97 87,04

70,14 74,54 82,69 89,96 95,17 97,89 100,0093,78 98,11 99,31 100,00

0,24 0,48 2,07 2,43 2,87 5,45 5,70 7,01 12,43 14,45 19,30 24,38 29,11 30,11 32,97 39,72 43,28 43,98 48,56 54,37 65,63 85,01 91,15 96,30 98,38 99,13 100,00(0,02) (0,52) 0,40 (0,02) (1,91) (2,00) (5,00) (7,26) (9,10) (15,65) (17,65) (19,63) (22,51) (28,56) (32,66) (33,31) (36,69) (26,16) (25,98) (28,32) (24,33) (10,16) (6,74) 2,52 0,27 (0,18) -

0,24 1,59 0,36 0,44 2,58 0,25 1,31 5,42 2,02 4,85 5,08 4,73 1,00

03

TIM

E September 25, 2016MANGGOPOH - PADANG SAWAH MAJOR PROBLEMS ACTION TO BE TAKEN

EXECUTIVE SUMMARY REPORT

PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS

Sep-16

Agung Setyawan, ST. MT

AMO

UN

T

RENARDET S.A JV06-Dec-13

PT JAYA KONSTRUKSI MP, Tbk

06-Jan-14

1. 100% completed on March 2016 2.Taking-Over Certificate issued on March 17, 2016 3.Defects Liability Periode until March 16, 2018

DISBURSEMENT *)

20-Mar-1630-Sep-16

Div Description

146.989.411.192143.688.963.000

Balance (%)

2016

Rivised Progress Schedul (%)

165.157.772.000

Rivised Progress Schedul (%)

Actual Progress (%)

PHYSICAL PROGRESS MONITORING TABLE Year 2014 Month The month of time for complation

2015

PHYSICAL WORK PROGRESS BY CATEGORY

Original Progress Schedul (%)

0

10

20

30

40

50

60

70

80

90

100

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

PHYS

ICAL

PRO

GRE

S (%

)

THE MONTH OF TIME FOR COMPLATION

PROGRESS SCHEDULEPACKAGE # 03

ORIGINAL

1st Revised Sch

2nd Revised Sch

ACTUAL

9 ESR Sept 2016_C3212A P-3

Page 81: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

ANNEX P-4

MONTH :

Package No. Time Elapsed (Days)

Name Time Elapsed (%)

Project Manager Scheduled Progress (%) 100,00 Contractor PT WASKITA KARYA - PT DAYA JO Actual Overall Progress (%) 100,00 Supervision Consultant Balance (%)Contract Sign Progress This Month (%) Commencement Date Time for Complation (Days) 730 Time for Complation (Days) 820 Status date Take Over Date Accumulative Rp. 73,9% Contract Amount Rp. *) Include advance payment

Contract Amount Add-1 (+ VAT) Rp.

Comp Accum Actual Accum AccumTotal Last this to this Sch to

% Month Month Month thisMonth

I G e n e r a l 7,59 0,52 5,99II D r a i n a g e 12,26 8,18 8,18III Earthworks 3,58 3,06 3,06

IV Pavement Widening &Shoulders

3,39 3,05 3,05

V Granular Pavement 18,07 16,82 16,82VI Asphalt Pavement 49,27 47,02 47,02VII S t r u c t u r e s 2,55 4,82 4,82

VIII Reinstatement & MinorWorks

2,95 10,88 10,88

IX Day Work 0,14 0,00 0,00

X Routine MaintenanceWorks

0,20 0,18 0,18

TOTAL 100 - - 94,53 100,00Note :

Year Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Schedl Progress Original (%) 0,11 0,32 0,75 1,14 6,57 10,29 12,85 15,81 20,08 24,22 32,76 40,88 47,93 55,61 63,451st Revised Schedule (%) 28,57 37,28 48,18 56,89 64,18 73,78 84,47 91,89 98,53 2nd Revised Schedule (%) 61,23 62,14 76,26 86,77 96,29 100,0 Actual Progress (%) - 0,18 0,40 0,53 0,56 0,78 0,87 1,45 3,73 5,35 8,10 9,35 13,79 21,76 27,67 35,43 39,36 42,14 44,24 46,28 50,09 53,17 61,23 70,32 78,69 84,64 91,62 94,53 Balance (%) (0,11) (0,14) (0,35) (0,61) (6,01) (9,51) (11,98) (14,36) (16,35) (18,88) (24,66) (31,53) (34,14) (33,85) (0,91) (1,86) (8,81) (14,75) (19,95) (27,51) (34,38) (38,72) (37,30) 8,18 2,43 (2,13) (4,67) (5,47)

0,22 0,13 0,03 0,22 0,09 0,58 2,27 1,62 2,76 1,25 4,44 7,97

RENARDET S.A JV

MAJOR PROBLEMS ACTION TO BE TAKEN

2015 20162014PHYSICAL PROGRESS MONITORING TABLE

PHYSICAL WORK PROGRESS BY CATEGORY

Div Description

196.438.084.000

EXECUTIVE SUMMARY REPORTSep-16

PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS

13-Jan-1414-Nov-13

04

TIM

E September 25, 2016

IPUH - BANTALDICKY ERLANGGA ST. MSi

AMO

UN

T

DISBURSEMENT *)

186.936.750.000145.172.256.263,0011-Apr-16

30-Sep-16

0

10

20

30

40

50

60

70

80

90

100

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

PHYS

ICAL

PRO

GRES

(%)

THE MONTH OF TIME FOR COMPLATION

PROGRESS SCHEDULEPACKAGE # 04

ORIGINAL

1st Revised Sch

2nd Revised Sch

ACTUAL

9 ESR Sept 2016_C3212A P-4

Page 82: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

ANNEX P-5

MONTH :

Package No. Time Elapsed (Days) 465

Name SIMPANG RAMPA - PORIAHA Time Elapsed (%) 86,11% Project Manager Scheduled Progress (%) 88,79 Field engineering and technical justification Speed up the process of field engineering Contractor PT. NUSA KONSTRUKSI ENJ Tbk. Actual Overall Progress (%) 31,28 unfinished Supervision Consultant Balance (%) -57,51Contract Sign Progress This Month (%) 1,28 Commencement Date Time for Complation (Days) 540 Take Over Date Status date Contract Amount Rp. Accumulative Rp. 13,58%

*) Include advance payment

Comp Accum Actual Accum AccumTotal Last this to this Sch to this

% Month Month Month Month

I G e n e r a l 8,09 1,19 0,02 1,21 7,22II D r a i n a g e 2,77 0,28 0,02 0,30 2,56III Earthworks 21,28 10,68 0,68 11,35 20,81

IV Pavement Widening &Shoulders

1,28 - - - 0,02

V Granular Pavement 8,04 2,10 0,57 2,67 7,80VI Asphalt Pavement 38,75 - - - 32,53VII S t r u c t u r e s 16,22 15,74 - 15,74 16,07

VIII Reinstatement & MinorWorks

3,48 - - - 1,70

IX Day Work 0,10 0,01 - 0,01 0,09

X Routine MaintenanceWorks

- - - - -

TOTAL 100,0 30,00 1,28 31,28 88,79Note :

Year Month Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Schedl Progress Original (%) 0,22 0,99 3,89 8,90 16,87 23,69 36,44 40,23 46,08 50,69 56,28 60,45 66,93 69,02 78,66 88,79 96,82 100 100 Actual Progress (%) - 0,57 1,09 1,69 2,72 3,08 3,53 5,77 7,37 10,11 16,66 18,44 26,83 28,19 30,00 31,28 Balance (%) (0,22) (0,42) (2,80) (7,20) (14,16) (20,61) (32,91) (34,45) (38,70) (40,58) (39,63) (42,02) (40,10) (40,83) (48,66) (57,51)

0,57 0,52 0,60 1,03 0,37 0,44 2,25 1,60 2,74 6,55 1,78 8,40 1,36

2015PHYSICAL PROGRESS MONITORING TABLE

107.321.260.310

2016

RENARDET S.A JV

05

TIM

E September 25, 2016

MAJOR PROBLEMS ACTION TO BE TAKEN

AMO

UN

THerison Manjerang, ST,MT

EXECUTIVE SUMMARY REPORTSep-16

PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS

DISBURSEMENT *)18-Jun-1517-Mar-15

Div Description

PHYSICAL WORK PROGRESS BY CATEGORY

30-Sep-1614.576.527.316

08-Des-16

0

10

20

30

40

50

60

70

80

90

100

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

PHYS

ICAL

PRO

GRE

S (%

)

THE MONTH OF TIME FOR COMPLATION

PROGRESS SCHEDULEPACKAGE # 05

Schedule

Actual

9 ESR Sept 2016_C3212A P-05

Page 83: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

ANNEX P-06

MONTH :

Package No. Time Elapsed (Days) 564 Name Time Elapsed (%) 81,74% Project Manager FERRY SUTIMARJAYA,ST.MT Scheduled Progress (%) 70,27 Conractor still hasn't license for Quary Exploitation Buy material from local supplier Contractor PT. WASKITA KARYA Tbk Actual Overall Progress (%) 64,44 Limited license for GENSET operation (3 units then Supervision Consultant RENARDET S.A JV PT. CIPTA STRADA Balance (%) -5,83 5 units needed) Contract Sign Progress This Month (%) 8,13 Commencement Date Time for Complation (Days) 450 240 Take Over Date Status date Contract Amount Rp. Accumulative Rp. 37,10%

*) Include advance payment

Comp Accum Actual Accum AccumTotal Last this to this Sch to this

% Month Month Month Month

I G e n e r a l 0,83 0,52 - 0,52 1,31II D r a i n a g e 2,09 0,75 0,18 0,92 1,40III Earthworks 7,20 7,54 0,26 7,80 8,30

IV Pavement Widening &Shoulders

4,02 - - - -

V Granular Pavement 11,07 13,97 0,51 14,48 15,87VI Asphalt Pavement 70,65 30,15 6,70 36,85 37,47VII S t r u c t u r e s 0,92 2,59 0,42 3,01 4,83

VIII Reinstatement & MinorWorks

2,38 0,33 0,04 0,36 0,60

IX Day Work - - - - -

X Routine MaintenanceWorks

0,85 0,46 0,03 0,50 0,49

TOTAL 100 56,31 8,13 64,44 70,27

Note :

Year 2017 Month March Apr May June July August Sep Oct Nop Dec Jan Feb March Apr May June July August Sep Oct Nop Dec Jan The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Schedl Progress Original (%) 0,17 0,59 1,28 3,09 4,38 8,17 14,27 25,82 38,49 49,93 62,08 75,00 85,36 95,41 100,001st Revised schedul 56,000 60,47 74,94 100,002nd Revised schedul 58,86 70,27 79,80 88,09 96,07 100 Actual Progress (%) 0,07 0,33 0,76 1,04 1,18 2,27 10,03 15,13 18,75 20,54 23,04 25,89 27,55 32,701 36,020 39,34 45,15 56,31 64,44 Balance (%) -0,15 -0,26 -0,53 -2,04 -3,20 -5,90 -4,24 -10,69 -19,74 -29,38 -39,04 -49,11 -57,81 -62,71 -63,98 -21,12 -29,79 -2,56 -5,83

0,42 0,29 0,13 1,10 7,76 5,09 3,62 1,79 2,49 2,85 1,67 5,15

30-Sep-1628-Jan-17DISBURSEMENT *)

ACTION TO BE TAKEN

AMO

UN

T

27-Feb-1511-Mar-15

Calendar Days +

6

TIM

E September 25, 2016KERKAP - PASAR PEDATI MAJOR PROBLEMS

EXECUTIVE SUMMARY REPORTSep-16

PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS

PHYSICAL PROGRESS MONITORING TABLE2015

118.444.155.000

PHYSICAL WORK PROGRESS BY CATEGORY

Div Description

2016

43.937.491.623

0

10

20

30

40

50

60

70

80

90

100

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

PHYS

ICAL

PRO

GRE

S (%

)

THE MONTH OF TIME FOR COMPLATION

PROGRESS SCHEDULEPACKAGE # 06

Original Sch

1st Revised Sch

2nd Revised Sch

Actual

9 ESR Sept 2016_C3212A P-06

Page 84: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

ANNEX P-07

MONTH :

Package No. Time Elapsed (Days) 290 Name Time Elapsed (%) 46,03% Sub Project Manager / PPK Scheduled Progress (%) 16,79 Contractor PT ADHI KARYA Actual Overall Progress (%) 16,70 Supervision Consultant Balance (%) -0,09Contract Sign Progress This Month (%) 3,83 Commencement Date Time for Complation (Days) 630

Take Over Date Status date Contract Amount (+ PPN) Rp. Accumulative Rp. 16,6%

*) Include advance payment

Comp Accum Actual AccumTotal Last this to this

% % Month Month Month

I G e n e r a l 2,45 1,05 0,08 1,12 1,59II D r a i n a g e 21,84 0,19 1,05 1,24 4,29III Earthworks 5,38 1,51 0,58 2,09 2,26IV

Pavement Widening &Shoulders

1,09 - - - -V Granular Pavement 9,22 1,67 0,63 2,29 0,61VI Asphalt Pavement 51,16 5,85 1,02 6,87 5,74VII S t r u c t u r e s 6,08 2,38 0,30 2,68 1,73VIII

Reinstatement & MinorWorks

2,48 - 0,16 0,16 0,42IX Day Work 0,09 0,08 0,01 0,08 0,05X

Routine MaintenanceWorks

0,20 0,15 0,01 0,16 0,10 TOTAL 100,0 - 12,87 3,83 16,70 16,79

Note :

Year 2015 Month Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug The month for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Original Progress Schedul (%) 0,16 0,31 0,59 0,67 1,24 1,92 3,90 5,63 8,72 16,79 24,44 32,37 43,74 53,15 62,90 72,65 80,61 87,11 94,03 98,20 100,0 Actual Progress (%) - 0,31 0,59 0,73 0,80 3,62 4,75 5,63 12,87 16,70 Balance (%) (0,16) - - 0,06 (0,43) 1,70 0,85 0,00 4,15 (0,09)

0,59 0,14 0,08 2,81 1,14 0,88 7,24 3,83 (16,70) - - - (3,62)

2017

September 25, 2016MAJOR PROBLEMS ACTION TO BE TAKEN

DISBURSEMENT *)

21.496.663.170

2016

7

TIM

E

INDRAPURA - TAPAN

129.699.900.000

PHYSICAL PROGRESS MONITORING TABLE

30-Agust-17 30-Sep-16

10-Des-15

Paides Tabril, ST,MT

AMO

UN

T

RENARDET S.A JV PT. SEECONS03-Dec-15

PHYSICAL WORK PROGRESS BY CATEGORY

Div DescriptionAmandment

Accum Schto thisMonth

EXECUTIVE SUMMARY REPORTSep-16

PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS

0

10

20

30

40

50

60

70

80

90

100

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

PHYS

ICAL

PRO

GRE

S (%

)

THE MONTH OF TIME FOR COMPLATION

PROGRESS SCHEDULEPACKAGE # 07

Schecule Actual

9 ESR Sept 2016_C3212A P-07

Page 85: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

ANNEX P-08

MONTH :

Package No. Time Elapsed (Days) 186 Name Time Elapsed (%) 28,66% Sub Project Manager / PPK Scheduled Progress (%) 7,58 Field engineering and technical justification Speed up the process of field engineering Contractor PT. PP - STATIKA CONSORTIUM Actual Overall Progress (%) 9,69 unfinished Supervision Consultant Balance (%) 2,12

Contract Sign Progress This Month (%) 3,48

Commencement Date Time for Complation (Days) 649

Take Over Date Status date Contract Amount (+ PPN) Rp. Accumulative Rp. 10,2%

*) Include advance payment

Comp Actual Accum

Total this to this% % Month Month Month

I G e n e r a l 2,13 0,221 0,000 0,221 1,018II D r a i n a g e 19,56 - - - 3,744III Earthworks 6,43 0,847 0,123 0,970 0,759IV

Pavement Widening &Shoulders

3,43 - - - -V Granular Pavement 14,77 1,010 0,842 1,852 1,521VI Asphalt Pavement 48,29 3,813 2,597 6,410 -VII S t r u c t u r e s 2,97 0,000 - 0,000 0,484VIII

Reinstatement & MinorWorks

2,16 0,028 0,125 0,153 -IX Day Work 0,05 - - - 0,009X

Routine MaintenanceWorks

0,20 0,293 (0,205) 0,089 0,041 TOTAL 100,0 - 6,21 3,48 9,69 7,576

Note :

Year Month Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Jan Feb The month for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Original Progress Schedul (%) 0,02 0,09 0,17 0,31 0,44 2,77 7,58 13,22 22,21 30,85 39,60 48,22 55,71 66,39 74,64 78,72 83,79 90,13 94,80 97,82 99,27 99,96 100,00 Actual Progress (%) 0,27 1,12 2,37 3,59 6,21 9,69 Balance (%) 0,18 0,96 2,06 3,15 3,44 2,12

0,94 1,25 1,22 2,62 3,48 (9,69) - - - - - - (6,21)

2018Dec

Div DescriptionAmandment

AccumLast

AccumSch to

thisMonth

PHYSICAL PROGRESS MONITORING TABLE2016 2017

PHYSICAL WORK PROGRESS BY CATEGORY

355.500.000.000

Agung Setyawan, ST. MT

AMO

UN

T

DISBURSEMENT *)31-Des-17 30-Sep-16

36.336.166.710

RENARDET S.A JV PT. SEECONS

28-Jan-16

23-Mar-16

EXECUTIVE SUMMARY REPORTSep-16

PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS08

TIM

E September 25, 2016Bts Kota Pariaman - Manggopoh MAJOR PROBLEMS ACTION TO BE TAKEN

0

10

20

30

40

50

60

70

80

90

100

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

PHYS

ICAL

PRO

GRE

S (%

)

THE MONTH OF TIME FOR COMPLATION

PROGRESS SCHEDULEPACKAGE # 08

SCHEDULE

ACTUAL

Page 86: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

ANNEX P-11

MONTH :

Package No. Time Elapsed (Days) 580 Name Time Elapsed (%) 80,56% Project Manager Scheduled Progress (%) 84,00 Shorted of budget allocation Need additional budget for FY 2016 Contractor PT. HUTAMA KARYA, Tbk JO PT. DMT Actual Overall Progress (%) 71,00 Supervision Consultant RENARDET S.A JV PT. CIPTA STRADA Balance (%) (13,01) Contract Sign Progress This Month (%) 5,97 Commencement Date

Take Over Date

Time for Complation (Days) 720 Calendar Days Status date Contract Amount Rp. Accumulative Rp. 52,31% Contract Amount Add-1 (+ VAT) Rp. *) Include advance payment

Comp Accum Actual Accum AccumTotal Last this to this Sch to this

% % Month Month Month Month

I G e n e r a l 0,89 0,854 0,874 - 0,874 0,854II D r a i n a g e 1,97 2,493 2,047 0,24 2,291 2,493III Earthworks 26,30 11,273 10,181 0,08 10,257 11,199

IV Pavement Widening &Shoulders

5,13 3,597 0,865 - 0,865 2,680

V Granular Pavement 7,31 14,409 13,073 0,92 13,993 13,919VI Asphalt Pavement 48,54 52,347 29,627 2,59 32,220 42,129VII S t r u c t u r e s 5,54 9,879 8,057 2,12 10,182 9,878

VIII Reinstatement & MinorWorks

4,00 4,873 0,080 - 0,080 0,628

IX Day Work - - - - - -

X Routine MaintenanceWorks

0,32 0,278 0,226 0,01 0,234 0,224

TOTAL 100,00 100,00 65,03 5,97 71,00 84,00Note :

Year Month March Apr May June July August Sep Oct Nop Dec Jan Feb March Apr May June July August Sep Oct Nop Dec Jan Feb The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Schedl Progress Original (%) 0,39 2,18 4,68 7,70 9,91 14,17 18,72 22,96

20,01 22,98 25,39 29,15 36,74 43,85 51,45 58,80 66,39 70,16 77,18 84,00 89,39 93,63 96,19 99,45 100,00 Actual Progress (%) 1,477 5,59 6,59 9,13 10,00 11,28 15,09 17,23 23,22 24,82 26,84 33,04 38,87 44,59 51,81 56,74 58,88 65,03 71,00 Balance (%) 1,08 3,42 1,92 1,43 0,09 (2,89) (3,64) (2,78) 0,23 (0,56) (2,31) (3,70) (4,98) (6,86) (6,99) (9,65) (11,28) (12,15) (13,01)

1,00 2,54 0,87 1,28 3,80 2,15 5,99 1,61 2,02 6,20 5,83 5,71

Rivised Progress Schedul (%)

PHYSICAL PROGRESS MONITORING TABLE2015 2016 2017

228.899.717.000262.611.303.000

PHYSICAL WORK PROGRESS BY CATEGORY

Div DescriptionAmend-

02

124.890.225.71730-Sep-16

23-Feb-15

DISBURSEMENT *)11-Feb-17

18-Dec-14 AMO

UN

TDICKY ERLANGGA ST. MSi

EXECUTIVE SUMMARY REPORTSep-16

PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS11

TIM

E September 25, 2016BANTAL - MUKOMUKO MAJOR PROBLEMS ACTION TO BE TAKEN

0

10

20

30

40

50

60

70

80

90

100

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

PHYS

ICAL

PRO

GRE

S (%

)

THE MONTH OF TIME FOR COMPLATION

PROGRESS SCHEDULEPACKAGE # 11

Original Sch

Revised Sch

Actual

9 ESR Sept 2016_C3212A P-11

Page 87: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

ANNEX P-12

MONTH :

Package No. Time Elapsed (Days) 125 Name Time Elapsed (%) 21,26% Sub Project Manager / PPK PAIDES TABRIL , ST,MT Scheduled Progress (%) 1,61 Contractor Actual Overall Progress (%) 1,05

Balance (%) (0,56) Supervision Consultant RENARDET S.A JV PT. Daya Creasi Mitrayasa Progress This Month (%) 0,07 Contract Sign Commencement Date Take Over Date Status date Time for Complation (Days) 720 Calendar Days (Contract) Accumulative Rp. 9,30% Time for Complation (Days) 588 Calendar Days (Addendum) *) Include advance payment Contract Amount Rp.

Comp Add.2 Accum Actual Accum AccumTotal Total Last this to this Sch to

% % Month Month Month thisMonth

I G e n e r a l 2,75 0,63 0,03 0,65 1,46II D r a i n a g e 10,79 - - - 0,10III Earthworks 7,72 0,24 0,01 0,25 0,02

IV Pavement Widening &Shoulders

2,96 - - - -

V Granular Pavement 17,37 - 0,03 0,03 -VI Asphalt Pavement 50,68 - - - -VII S t r u c t u r e s 5,09 0,02 0,00 0,02 -

VIII Reinstatement & MinorWorks

2,47 - 0,00 0,00 -

IX Day Work 0,04 0,01 - 0,01 -

X Routine MaintenanceWorks

0,13 0,08 0,00 0,08 0,02

TOTAL 100,00 0,98 0,07 1,05 1,61

Note :

May June July Augustus Sept October Nov Des January Feb March April May June July Augustus Sept October Nov Des January Feb March April May1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 250,09 0,58 0,84 1,26 1,61 4,10 8,31 14,09 21,50 31,99 44,07 56,50 71,44 77,99 77,99 80,17 82,88 85,50 89,12 91,76 94,29 97,31 99,45 99,78 100,00

0,192 0,44 0,87 0,98 1,050,10 (0,14) 0,03 (0,28) (0,56)

0,25 0,43 0,11 0,07 (1,05) - - - - - - - -

ACTION TO BE TAKEN

AMO

UN

T

EXECUTIVE SUMMARY REPORTSep-16

PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS12

TIM

E September 25, 2016Kambang - Indrapura MAJOR PROBLEMS

PT. LANCARJAYA MANDIRI ABADI - PT.CAHAYA TUNGGAL ABADI , JO.

28-Jan-16

The month of time for complation Original Progress Schedul (%) Actual Progress (%) Balance (%)

PHYSICAL PROGRESS MONITORING TABLE

Year

Month

2016 2017 2018

23-May-16

358.650.400.000

DISBURSEMENT *)31-Dec-17 30-Sep-16

33.354.487.200

PHYSICAL WORK PROGRESS BY CATEGORY

Div Description

0

10

20

30

40

50

60

70

80

90

100

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

PHYS

ICAL

PRO

GRE

S (%

)

THE MONTH OF TIME FOR COMPLATION

PROGRESS SCHEDULEPACKAGE # 12

SCHEDUL

ACTUAL

Page 88: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

ANNEX P-13

MONTH :

Package No. Time Elapsed (Days) 431

Name SIMPANG RUKIS-TANJUNG KEMUNING Time Elapsed (%) 59,86% Project Manager ENDRO KUSUMOJOYO, ST.MT Scheduled Progress (%) 63,60 Conractor still hasn't license for Quary Exploitation Buy material from local supplier Contractor PT. WASKITA KARYA Actual Overall Progress (%) 19,25 Main equipment often broken Supervision Consultant Balance (%) -44,34 Bad construction management Proposed replacement of General SupperintendentContract Sign Progress This Month (%) 0,19 Commencement Date Shorted of budget allocation for LARAP Need additional LARAP budget for FY 2016 (31 km road length) Time for Complation (Days) 720 25 km continues ROW have completted Take Over Date Status date Contract Amount Rp. Accumulative Rp. 21,32%

*) Include advance payment

Comp Accum Actual Accum AccumTotal Last this to this Sch to this

% Month Month Month Month

I G e n e r a l 0,38 0,36 0,00 0,36 0,37II D r a i n a g e 1,87 0,51 0,00 0,51 1,89III Earthworks 16,52 3,65 0,08 3,73 16,00

IV Pavement Widening &Shoulders

4,11 - - - 0,95

V Granular Pavement 8,43 4,93 0,04 4,97 8,39VI Asphalt Pavement 64,33 8,49 - 8,49 33,87VII S t r u c t u r e s 2,05 0,46 0,06 0,51 1,84

VIII Reinstatement & MinorWorks

2,14 0,66 0,01 0,67 0,17

IX Day Work - - - -

X Routine MaintenanceWorks

0,18 - - - 0,11

TOTAL 100,0 19,06 0,19 19,25 63,60

Note :

Year Month Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Schedl Progress Original (%) 0,02 0,21 1,65 4,18 6,69 9,61 14,62 20,36 26,94 33,58 41,24 47,87 50,63 58,32 63,60 68,28 72,97 77,66 82,62 86,79 91,19 95,75 99,36 99,74 100,00 Actual Progress (%) - 0,36 0,88 2,19 3,39 13,71 13,84 14,37 14,62 16,02 17,34 18,25 18,55 19,06 19,25 Balance (%) (0,02) 0,14 (0,77) (1,98) (3,30) 4,10 (0,78) (5,99) (12,32) (17,56) (23,90) (29,63) (32,08) (39,26) (44,34)

0,36 0,52 1,32 1,20 10,31 0,14 0,53 0,24 1,40 1,32 0,91 0,30 0,51

PHYSICAL PROGRESS MONITORING TABLE2015 2016 2017

PHYSICAL WORK PROGRESS BY CATEGORY

Div Description

DISBURSEMENT *)10-Jul-17 30-Sep-16

292.700.000.000 62.390.761.200

AMO

UN

T

RENARDET S.A JV18-Dec-1422-Jul-15

EXECUTIVE SUMMARY REPORTSep-16

PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS

13

TIM

E September 25, 2016

MAJOR PROBLEMS ACTION TO BE TAKEN

0

10

20

30

40

50

60

70

80

90

100

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

PHYS

ICAL

PRO

GRE

S (%

)

THE MONTH OF TIME FOR COMPLATION

PROGRESS SCHEDULEPACKAGE # 13

SCHEDULE

ACTUAL

9 ESR Sept 2016_C3212A P-13

Page 89: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

ANNEX P-14

MONTH :

Package No. Time Elapsed (Days) 53 Name Time Elapsed (%) 10,64% Sub Project Manager / PPK YAHYA, ST Scheduled Progress (%) 0,56 Contractor 'PT YASA JV CONBLOC Actual Overall Progress (%) 0,47 Supervision Consultant RENARDET S.A JV Balance (%) (0,09) Contract Sign Progress This Month (%) 0,29 Commencement Date Time for Complation (Days) 498 Calendar Days Take Over Date Status date Contract Amount Rp. Accumulative Rp. 8,34%

*) Include advance payment

Comp Add.2 Accum Actual Accum AccumTotal Total Last this to this Sch to

% % Month Month Month thisMonth

I G e n e r a l 0,38 0,17 0,11 0,28 0,46II D r a i n a g e 1,87 - 0,02 0,02 -III Earthworks 16,52 - 0,14 0,14 -

IV Pavement Widening &Shoulders

4,11 - - - -

V Granular Pavement 8,43 - - - -VI Asphalt Pavement 64,33 - - - -VII S t r u c t u r e s 2,05 - 0,02 0,02 -

VIII Reinstatement & MinorWorks

2,14 - 0,00 0,00 0,08

IX Day Work - 0,01 - 0,01 0,01

X Routine MaintenanceWorks

0,18 0,00 - 0,01 0,02

TOTAL 100,00 0,18 0,28 0,47 0,56

Note :

Augustus Sept October Nov Des January Feb March April May June July Augustus Sept October Nov Des January Feb March April1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 210,17 0,34 0,51 0,94 2,02 4,47 7,12 10,30 14,85 21,63 29,98 38,68 47,74 54,09 63,68 71,43 79,18 86,11 92,51 97,49 100,00,17 0,56 0,86 1,78 5,87 10,38 15,36 20,60 28,07 35,22 40,30 47,16 56,10 73,62 87,09 96,50 100,00,18 0,470,00 (0,09)

0,29 (0,47) - - - - - - - - - - -

1-Jun-163-Aug-16

13-Dec-17

The month of time for complation Original Progress Schedul (%)

PHYSICAL PROGRESS MONITORING TABLE

PHYSICAL WORK PROGRESS BY CATEGORY

Div Description

30-Sep-1629.898.676.440358.650.400.000

Actual Progress (%) Balance (%)

201820172016 Year

Month

Revise Progress Schedul (%)

ACTION TO BE TAKEN

AMO

UN

T

DISBURSEMENT *)

EXECUTIVE SUMMARY REPORTSep-16

PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS14

TIM

E September 25, 2016 Painan - Kambang MAJOR PROBLEMS

0

10

20

30

40

50

60

70

80

90

100

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

PHYS

ICAL

PRO

GRE

S (%

)

THE MONTH OF TIME FOR COMPLATION

PROGRESS SCHEDULEPACKAGE # 14

ORIGINAL SCHEDULE

REVISE SCHEDULE

ACTUAL PROGRESS

Page 90: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

ANNEX P-15

MONTH :

Package No. Time Elapsed (Days) 310 Name Time Elapsed (%) 38,3% Project Manager Scheduled Progress (%) 23,77 Main equipment often broken Improve equipment mqnqgement Contractor PT. PEMBANGUNAN PERUMAHAN Actual Overall Progress (%) 8,99 Supervision Consultant Balance (%) -14,8Contract Sign Progress This Month (%) 0,04 Commencement Date Time for Complation (Days) 810 Take Over Date Status date Contract Amount Accumulative Rp. 9,30%

*) Include advance payment

Comp Accum Actual Accum AccumTotal Last this to this Sch to this

% Month Month Month Month

I G e n e r a l 2,30 1,07 - 1,07 1,33II D r a i n a g e 5,13 0,09 0,00 0,09 2,10III Earthworks 6,34 1,95 0,00 1,95 2,47

IV Pavement Widening &Shoulders

2,16 - - - 0,31

V Granular Pavement 24,41 2,67 - 2,67 5,63VI Asphalt Pavement 40,48 1,89 - 1,89 8,77VII S t r u c t u r e s 16,75 0,90 0,04 0,94 2,63

VIII Reinstatement & MinorWorks

2,39 0,36 0,00 0,37 0,52

IX Day Work 0,04 0,00 0,00 0,00 0,01

X Routine MaintenanceWorks

- - - - -

TOTAL 100,0 8,94 0,04 8,99 23,77Note :

Year

Month Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Schedl Progress Original (%) 0,11 0,45 1,04 3,18 5,57 8,98 13,46 19,96 23,3 29,8 36,3 42,3 48,17 53,91 58,4 64,3 69,6 75,51 81,15 87,1 90,01 93,9 97,3 98,7 99,7 100,0 100,0 100,01st Revised Sch 7,4 11,8 14,1 23,8 23,8 30,1 37,5 44,4 49,9 57,0 63,5 70,6 77,5 84,7 88,2 93,1 97,6 99,4 100,0 Actual Progress (%) 0,15 0,46 0,92 1,42 1,69 2,34 4,72 5,59 5,96 8,94 8,99 Balance (%) 0,03 0,02 (0,12) (1,76) (3,88) (6,64) (2,7) (6,2) (8,2) (14,8) (14,8)

0,32 0,46 0,50 0,27 0,65 2,38 0,87 0,37 2,99 0,04 (8,99) - -

2018

SIBOLGA - BTS. TAPSEL

20-Nop-15

260.100.100.000

PHYSICAL PROGRESS MONITORING TABLE

2015 2016 2017

PHYSICAL WORK PROGRESS BY CATEGORY

Div Description

06-Feb-18 30-Sep-1624.189.300.000

A Joint Venture of Renardet, S.A.13-Jul-15

DISBURSEMENT *)

AMO

UN

THerison Manjerang, ST,MT

EXECUTIVE SUMMARY REPORT

PROGRESS STATUS15

TIM

E

Sep-16

PROJECT DATA SUMMARY OF WORK PROGRESSSeptember 25, 2016

MAJOR PROBLEMS ACTION TO BE TAKEN

0

10

20

30

40

50

60

70

80

90

100

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

PHYS

ICAL

PRO

GRE

S (%

)

THE MONTH OF TIME FOR COMPLATION

PROGRESS SCHEDULEPACKAGE # 15

Original Sch

Revised Sch

Actual

9 ESR Sept 2016_C3212A P-15

Page 91: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

ANNEX P-17

MONTH :

Package No. Time Elapsed (Days) 387

Name PUGUNG TAMPAK-Sp.Gn KEMALA Time Elapsed (%) 53,75% Project Manager Scheduled Progress (%) 33,01 Field engineering and technical justification Speed up the process of field engineering Contractor PT. JAYA KONSTRUKSI MP, Tbk Actual Overall Progress (%) 28,34 unfinished Supervision Consultant Balance (%) -4,68Contract Sign Progress This Month (%) 8,00 Commencement Date Time for Complation (Days) 720 Take Over Date Status date Contract Amount Rp. Accumulative Rp. 23,23%

*) Include advance payment

Comp Accum Actual Accum AccumTotal Last this to this Sch to this

% Month Month Month Month

I G e n e r a l 8,05 1,575 0,010 1,586 1,307II D r a i n a g e 12,92 2,32 0,537 2,86 5,70III Earthworks 16,93 11,84 0,850 12,69 8,59

IV Pavement Widening &Shoulders

7,36 0,07 0,145 0,22 1,91

V Granular Pavement 4,09 0,06 0,118 0,17 2,70VI Asphalt Pavement 42,82 2,43 6,101 8,53 10,57VII S t r u c t u r e s 1,98 1,77 0,207 1,98 1,86

VIII Reinstatement & MinorWorks

5,30 0,046 0,024 0,069 0,10

IX Day Work 0,23 0,01 0,003 0,02 0,11

X Routine MaintenanceWorks

0,34 0,21 0,007 0,22 0,17

TOTAL 100,0 20,33 8,00 28,34 33,00

Note :

Year Month Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Jul Agt The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Schedl Progress Original (%) 0,18 0,70 1,18 1,51 2,39 3,80 6,10 10,09 14,15 18,21 21,04 26,32 33,01 39,79 46,73 54,12 61,80 69,15 75,00 80,05 85,25 90,26 95,19 100,0 100,0 Actual Progress (%) 0,921 1,13 1,42 3,05 3,45 4,11 6,16 9,54 13,81 16,99 17,41 20,33 28,34 Balance (%) 0,74 0,43 0,23 1,54 1,06 0,30 0,06 (0,55) (0,34) (1,23) (3,63) (5,99) (4,68)

0,21 0,29 1,63 0,40 0,66 2,05 3,38 4,28 3,18 0,42 2,92 8,00 (28,34)

PHYSICAL PROGRESS MONITORING TABLE2015 2016 2017

PHYSICAL WORK PROGRESS BY CATEGORY

Div Description

23-Agust-17 30-Sep-16199.551.000.000 46.351.241.404,00

RENARDET S.A JV17-Nov-1404-Sep-15

DISBURSEMENT *)

AMO

UN

TJoko Wisargo, ST, MT

17

TIM

E September 25, 2016

MAJOR PROBLEMS ACTION TO BE TAKEN

EXECUTIVE SUMMARY REPORTSep-16

PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS

0

10

20

30

40

50

60

70

80

90

100

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

PHYS

ICAL

PRO

GRE

S (%

)

THE MONTH OF TIME FOR COMPLATION

PROGRESS SCHEDULEPACKAGE # 17

Schedule

Actual

9 ESR Sept 2016_C3212A P-17

Page 92: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

ANNEX P-19

MONTH :

Package No. Time Elapsed (Days) Name Time Elapsed (%) Project Manager FERRY SUTIMARJAYA,ST.MT Scheduled Progress (%) 100,0 Contractor Actual Overall Progress (%) 100,0 Supervision Consultant Balance (%) Contract Sign Progress This Month (%) Commencement Date Time for Complation (Days) 300 Calendar Days Time for Complation (Days) 425 Calendar Days Status date Take Over Date Accumulative Rp. 82,20% Contract Amount Rp. *) Include advance payment Contract Amount Add-1 (+ VAT) Rp.

Comp Accum Actual Accum AccumTotal Last this to this Sch to this

% Month Month Month Month

I G e n e r a l 0,43 0,32 0,32II D r a i n a g e 3,15 2,73 2,73III Earthworks 11,96 11,31 11,31

IV Pavement Widening &Shoulders

5,30 4,01 4,02

V Granular Pavement 10,69 8,82 8,82VI Asphalt Pavement 59,66 64,4 64,41VII S t r u c t u r e s 2,00 4,02 4,02

VIII Reinstatement & MinorWorks

6,79 3,46 4,35

IX Day Work

X Routine MaintenanceWorks

0,03 0,02 0,02

TOTAL 100,00 - - 99,1 100,00Note :

Year Month March April May June July Aug Sept Oct Nov Des Jan Feb March April May The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Schedl Progress Original (%) 0,12 1,40 8,96 18,40 21,37 23,62 37,37 58,19 87,25 100,00

43,60 52,20 67,79 79,68 98,93 100,00 Actual Progress (%) 0,15 1,30 6,28 14,54 16,21 22,41 28,90 49,74 57,15 57,48 52,77 77,34 80,78 97,14 99,11 Balance (%) 0,03 -0,10 -2,68 -3,86 -5,16 -1,21 -8,47 -8,45 -30,10 13,88 0,57 9,55 1,10 -1,79 -0,89

4,98 8,26 1,67 6,20 6,49 20,84 7,42 0,32 (4,71) 24,57 3,44 16,36

2016PHYSICAL PROGRESS MONITORING TABLE

Div

PT RODATEKNINDO PURAJAYA

2015

PHYSICAL WORK PROGRESS BY CATEGORY

30-Sep-1636.514.146.815

27-Feb-1511-Mar-15

RENARDET S.A JV

33.689.452.00044.419.760.000

Description

Rivised Progress Schedul Add.1 (%)

DISBURSEMENT *)

AMO

UN

T

EXECUTIVE SUMMARY REPORTSep-16

PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS 19

TIM

E September 25, 2016 BINTUNAN-LAIS MAJOR PROBLEMS ACTION TO BE TAKEN

08-Mei-16

0

10

20

30

40

50

60

70

80

90

100

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

PHYS

ICAL

PRO

GRE

S (%

)

THE MONTH OF TIME FOR COMPLATION

PROGRESS SCHEDULEPACKAGE # 19

ORIGINAL

REVISED SCH

ACTUAL

9 ESR Sept 2016_C3212A P-19

Page 93: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

ANNEX P-20

MONTH :

Package No. Time Elapsed (Days) 24 Name Time Elapsed (%) 4,94% Project Manager Miral Mukhazi, ST. Scheduled Progress (%) 0,3 Contractor 'PT Nindya Karya (Persero) Actual Overall Progress (%) 0,4 Supervision Consultant RENARDET S.A JV PT.Yodya Karya (Persero) Balance (%) 0,09 Contract Sign Progress This Month (%) 0,39 Commencement Date Time for Complation (Days) 486 Calendar Days Take Over Date Status date Contract Amount Rp. Accumulative Rp. 10,50%

*) Include advance payment

Comp Accum Actual Accum AccumTotal Last this to this Sch to this

% Month Month Month Month

I G e n e r a l 0,90 0,39 0,39 0,30II D r a i n a g e 32,44III Earthworks 6,64

IV Pavement Widening &Shoulders

3,78

V Granular Pavement 9,52VI Asphalt Pavement 42,49VII S t r u c t u r e s 1,83

VIII Reinstatement & MinorWorks

1,93

IX Day Work 0,04

X Routine MaintenanceWorks

0,43

TOTAL 100,00 - 0,39 0,39 0,30

Note :

Year Month Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Schedl Progress Original (%) 0,30 0,57 4,81 12,51 19,71 30,61 45,72 57,80 68,70 71,89 77,79 84,28 89,32 95,60 98,79 100,00 Actual Progress (%) 0,39 Balance (%) 0,09

- - - - - - - - - - - -

Div Description

PHYSICAL PROGRESS MONITORING TABLE

PHYSICAL WORK PROGRESS BY CATEGORY

30-Sep-1611.950.921.500

2016 2017

113.818.300.00031-Dec-17

AMO

UN

T

1-Jun-161-Sep-16

DISBURSEMENT *)

EXECUTIVE SUMMARY REPORTSep-16

PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS20

TIM

E September 25, 2016LubuK Alun - Sicincin MAJOR PROBLEMS ACTION TO BE TAKEN

0

10

20

30

40

50

60

70

80

90

100

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

PHYS

ICAL

PRO

GRE

S (%

)

THE MONTH OF TIME FOR COMPLATION

PROGRESS SCHEDULEPACKAGE # 20

ORIGINAL SCHEDULE

ACTUAL

9 ESR Sept 2016_C3212A P-20

Page 94: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

ANNEX P-21

MONTH :

Package No. Time Elapsed (Days) 24 Name Time Elapsed (%) 4,94% Project Manager Agung Setyawan, ST. MT Scheduled Progress (%) 0,6 Contractor 'PT Multi Structur Actual Overall Progress (%) 0,8 Supervision Consultant RENARDET S.A JV PT. CIPTA STRADA Balance (%) 0,22 Contract Sign Progress This Month (%) 0,78 Commencement Date Time for Complation (Days) 486 Calendar Days Take Over Date Status date Contract Amount Rp. Accumulative Rp. 15,00%

*) Include advance payment

Comp Accum Actual Accum AccumTotal Last this to this Sch to this

% Month Month Month Month

I G e n e r a l 3,34 0,780 0,780 0,56II D r a i n a g e 36,79III Earthworks 6,17

IV Pavement Widening &Shoulders

2,29

V Granular Pavement 7,72VI Asphalt Pavement 37,82VII S t r u c t u r e s 3,29

VIII Reinstatement & MinorWorks

2,24

IX Day Work 0,04

X Routine MaintenanceWorks

0,30

TOTAL 100,00 - 0,78 0,78 0,56

Note :

Year Month Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Schedl Progress Original (%) 0,56 2,40 4,37 12,27 21,33 28,48 37,16 43,98 50,80 55,91 62,73 71,26 76,82 82,58 94,28 100,00 Actual Progress (%) 0,78 Balance (%) 0,22

- - - - - - - - - - - -

Div Description

PHYSICAL PROGRESS MONITORING TABLE

PHYSICAL WORK PROGRESS BY CATEGORY

30-Sep-1618.945.285.000

2016 2017

31-Dec-17126.301.900.000

AMO

UN

T

1-Jun-161-Sep-16

DISBURSEMENT *)

EXECUTIVE SUMMARY REPORTSep-16

PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS21

TIM

E September 25, 2016LubuK Alun - Kuraitaji MAJOR PROBLEMS ACTION TO BE TAKEN

0

10

20

30

40

50

60

70

80

90

100

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

PHYS

ICAL

PRO

GRE

S (%

)

THE MONTH OF TIME FOR COMPLATION

PROGRESS SCHEDULEPACKAGE # 21

ORIGINAL SCHEDULE

ACTUAL

9 ESR Sept 2016_C3212A P-21

Page 95: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

ATTACHMENT No. 1

Summary of Submitted Environmental Reports

Page 96: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Attachment No.1 As ofSeptember 2016

1 2 3 5 6 7 8 9

1 Krui - Bha Lampung 1 SPPL November 2010 1X 24 Sep 2013 30 Sep 2013 20 Nov 2013 /NOL

2 AMDAL Environmental Feasibility : 12 Oct 2012

Environmental permits: 21 Nov 2012 1X 24 Sep 2013 30 Sep 2013 20 Nov 2013/NOL

3 Monitoring of Integration

AMDAL into Design - 1X 15 August 2014 NN NN

4 AMDAL Implementation Report

(PIU to BLH) - each 6month

17 April 2015 ; 6 Oct2015 ;

29 April 2015 ; 19 Oct2015

11 Mei 2015 ; 14 Des2015

5 RKPPL - 1X 28 Jan 2015 06 Feb 2015 23 Feb 2015/NOL

6 RKPPL Implementation Report - Quarter 3 July 2015 ; 13 Nov

2015 ; 4 Feb 2016 ; 17Feb 2016

31 July 2015 ; 24 Nov2015 ; Informal to WB 4

& 17 Feb 2016

13 August 2015:14 Dec 15 ; 19 Feb

2016

7 HIV - AIDS Campaign Report - 1X 8 January 2016 15 March 2016 NN

2 Padang Sawah - Sp Empat Sumatera Barat 1 SPPL Nov. 2013 1X - 20 Jan 2014 14 April 2014/NOL

Jembatan Air Gadang Sumatera Barat 2 UKL & UPL Recommendation: Nov 2013 1X - 09 June 2014 08 Auguts 2014/NOL

3 UKL&UPL Implementation

Report (PIU to BLH) - each 6month

17 April 2015 ; 6 Oct2015 ; 28 Jun 2016

29 April 2015 ; 19 Oct2015 : 21 Juli 2016

11 Mei 2015 ; 14 Des2015 ; 22 Juli 2016

4 RKPPL - 1X 11 Dec 2014 19 Dec 2014 30 Jan 2015/NOL

5 RKPPL Implementation Report - Quarter 3 July 2015 ; 13 Nov

2015 ; 4 Feb 2016 ; 17Feb 2016 ; 28 Jun 2016

31 July 2015 ; 24 Nov2015 ; Informal to WB 4& 17 Feb 2016 ; 21 Juli

2016

13 August 2015:14 Dec 15 ; 19 Feb2016 ; 22 Juli 2016

6 HIV - AIDS Campaign Report - 1X 8 January 2016 15 March 2016 NN

3 Manggopoh - Padang Sawah Sumatera Barat 1 SPPL 30 Dec 2013 1X - 20 Jan 2014 14 April 2014

2 SPPL Implementation Report

(PIU to BLH) - each 6month

17 April 2015 29 April 2015 11 Mei 2015

3 RKPPL - 1X 11 Dec 2014 19 Dec 2014 30 Jan 2015/NOL

4 RKPPL Implementation Report - Quarter 3 July 2015 ; 13 Nov

2015 ; 4 Feb 2016 ; 17Feb 2016

31 July 2015 ; 24 Nov2015 ; Informal to WB 4

& 17 Feb 2016

13 August 2015:14 Dec 15 ; 19 Feb

2016

5 HIV - AIDS Campaign Report - 1X 8 January 2016 15 March 2016 NN

Environmental Safeguard Sent to WB4

CTC Letters to PMUDuarations

Correspondence of Environmental Safeguard and Reporting on CTC WINRIP

Date of Recomendation/Environmental Permits

No ofPackage

Name of Link Province

Environmental Activity, CTC WINRIP

WB NOL/Letters

Page 1 of 6

Page 97: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

1 2 3 5 6 7 8 9

Environmental Safeguard Sent to WB4

CTC Letters to PMUDuarationsDate of Recomendation/Environmental Permits

No ofPackage

Name of Link Province WB NOL/Letters

4 Ipuh - Bantal Bengkulu 1 SPPL (Initial study) 20 Dec 2013 1X April 2013 - -

2 UKL & UPL Environmental permits : 6 Des 2014 1X - 06 Feb 2015

(Environment permits) 23 Feb 2015

3 UKL&UPL Implementation

Report (PIU to BLH) - each 6month

17 April 2015 ; 6 Oct2015 ; 28 Juni 2016

29 April 2015 ; 19 Oct2015 : 21 Juli 2016

11 Mei 2015 ; 14 Des2015 ; 22 Juli 2016

4 RKPPL - 1X 28 Jan 2015 06 Feb 2015 23 Feb 2015/NOL

5 RKPPL Implementation Report - Quarter 3 July 2015 ; 13 Nov

2015 ; 4 Feb 2016 ; 17Feb 2016 ; 28 Jun 2016

31 July 2015 ; 24 Nov2015 ; Informal to WB 4& 17 Feb 2016 ; 21 Juli

2016

13 August 2015:14 Dec 15 ; 19 Feb2016 ; 22 Juli 2016

6 HIV - AIDS Campaign Report - 1X 8 January 2016 15 March 2016 NN

5 Sp. Rampa - Poriaha Sumut 1 UKL & UPL Recommendation : 8 Dec 2011 1X 24 Sep 2013 30 Sep 2013 20 Nov 2013

2 Monitoring of Integration

UKL&UPL into Design - 1X 11 Nov 2014 NN NN

3 UKL&UPL Implementation

Report (PIU to BLH) - each 6month

28 Jun 2016 NN

4 RKPPL - 1X 26 April 2016 13 May 2016 30 Juni 2016

6 RKPPL Implementation Report Quarter 4 Feb 2016 ; 17 Feb2016 ; 28 Jun 2016

Informal to WB 4 & 17Feb 2016 : 21 Juli 2016

19 Feb 2016 ; 22 Juli2016

6 HIV - AIDS Campaign Report - 1X 29 February 2016 15 March 2016 NN

6 Ps. Pedati - Kerkap Bengkulu 1 UKL & UPL Recommendation : 9 Nov 2011 1X 24 Sep 2013 30 Sep 2013 20 Nov 2013

2 Monitoring of Integration

UKL&UPL into Design - 1X 29 Oct 2015 NN NN

3 UKL&UPL Implementation

Report (PIU to BLH) - Quarter 28 Jun 2016 21 Juli 2016 22 Juli 2016

4 RKPPL - one time 4 Nov 2015 24-Nop-15 14 Des 2016 (NOL)

5 RKPPL Implementation Report Quarter 13 Nov 2015 ; 4 Feb

2016 ; 17 Feb 2016 ; 28Jun 2016

24 Nov 2015; Informal toWB 4 & 17 Feb 2016; 21

Juli 2016

14 Des 2016 (NOL) ; 19Feb 2016 ; 22 Juli 2016

6 HIV - AIDS Campaign Report - 1X 12 February 2016 15 March 2016 NN

7 Indrapura - Tapan Sumatera Barat 1 AMDAL Environmental feasibility : 05 Feb 2014 ;

environmental permits : 5 Feb 2014 1X - 09 June 2014 08 August 2014

2 Monitoring of Integration

AMDAL into Design - 1X 2 Dec 2015 NN NN

3 AMDAL Implementation Report

(PIU to BLH) - each 6month

NYS NYS NN

4 RKPPL - 1X NYS NYS NYS

Page 2 of 6

Page 98: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

1 2 3 5 6 7 8 9

Environmental Safeguard Sent to WB4

CTC Letters to PMUDuarationsDate of Recomendation/Environmental Permits

No ofPackage

Name of Link Province WB NOL/Letters

5 RKPPL Implementation Report Quarter NYS NYS NN

6 HIV - AIDS Campaign Report - 1X 29 Sept 2016 UP NY

8 Bts. Kota Pariaman - Manggopoh Sumatera Barat 1 AMDAL Environmental permits : 23 July 2013 1X - 20 Jan 2014 14 April 2014

2 Monitoring of Integration

AMDAL into Design - 1X 6 Oct 2015 NN NN

3 AMDAL Implementation Report

(PIU to BLH) - each 6month

29 Sept 2016 UP NY

4 RKPPL - 1X NYS NYS NYS

5 RKPPL Implementation Report Quarter NYS NYS NN

6 HIV - AIDS Campaign Report - 1X NYS NYS NN

9 Bentungan- Tais (N.013.018 ; 43,42km)

Bengkulu

10 Sp. Empat - Air Balam Sumatera Barat 1 AMDAL Environmental permits : 23 July 2013 1X - 20 Jan 2014 14 April 2014

2 Monitoring of Integration

AMDAL into Design - 1X 6 Oct 2015 NN NN

3 AMDAL Implementation Report

(PIU to BLH) - each 6month

NYS NYS NN

4 RKPPL - 1X NYS NYS NYS

5 RKPPL Implementation Report Quarter NYS NYS NN

6 HIV - AIDS Campaign Report - 1X NYS NYS NN

11 Bantal - Mukomuko Bengkulu 1 AMDAL Environmental permits : 3 April 2014 1X - 09 June 2014 08 August 2014

2 Monitoring of Integration

AMDAL into Design - 1X 10 Dec 2014 NN NN

3 AMDAL Implementation Report

(PIU to BLH) - each 6month

28 Jun 2016 21 Juli 2016 22 Juli 2016

4 RKPPL - 1X 10 Des 2015 23-Des-15 8 Jan 2016/NOL

5 RKPPL Implementation Report Quarter 13 Nov 2015 ; 4 Feb

2016 ; 17 Feb 2016 ; 28Jun 2016

24 Nov 2015; Informal toWB 4 & 17 Feb 2016; 21

Juli 2016

14 Des 2016 (NOL) ; 19Feb 2016 ; 12 Juli 2016

6 HIV - AIDS Campaign Report - 1X 8 January 2016 15 March 2016 NN

Page 3 of 6

Page 99: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

1 2 3 5 6 7 8 9

Environmental Safeguard Sent to WB4

CTC Letters to PMUDuarationsDate of Recomendation/Environmental Permits

No ofPackage

Name of Link Province WB NOL/Letters

12 Kambang - Indrapura Sumatera Barat 1 AMDAL Environmental Feasibility : 05 Feb 2014 ;

Environmental permits : 5 Feb 2014 1X - 09 June 2014 08 August 2014

2 Monitoring of Integration

AMDAL into Design - 1X 2 Dec 2015 NN NN

3 AMDAL Implementation Report

(PIU to BLH) - each 6month

NYS NYS NN

4 RKPPL - 1X NYS NYS NYS

5 RKPPL Implementation Report Quarter NYS NYS NN

6 HIV - AIDS Campaign Report - 1X 29 Sept 2016 UP NY

13 Sp. Rukis - Tj. Kemuning Bengkulu 1 UKL & UPL Recommendation : 31 Jan 2012 (Link of Sp Rukis

Mana-Bts Kab Kaur & 4 Feb 2012 (Bts Kaur - TjKemuning)

1X - 09 June 2014 08 August 2014

2 Monitoring of Integration

UKL&UPL into Design - 1X 6 Oct 2015 NN NN

3 UKL&UPL Implementation

Report (PIU to BLH) - each 6month

28 Jun 2016 21 Juli 2016 22 Juli 2016

4 RKPPL - 1X 4 Nov 2015 24-Nop-15 14 Dec 2015/NOL

5 RKPPL Implementation Report Quarter 4 Feb 2016 ; 17 Feb2016 ; 28 Jun 2016

Informal to WB 4 & 17Feb 2016 : 21 Juli 2016

19 Feb 2016 ; 22 Juli2016

6 HIV - AIDS Campaign Report - 1X 12 February 2016 15 March 2016 NN

14 Painan - Kambang Sumatera Barat 1 AMDAL Environmental Feasibility : 05 Feb 2014 ;

Environmental permits : 5 Feb 2014 1X - 09 June 2014 08 August 2014

2 Monitoring of Integration

AMDAL into Design - 1X 2 Dec 2015 NN NN

3 AMDAL Implementation Report

(PIU to BLH) - each 6month

NYS NYS NN

4 RKPPL - 1X NYS NYS NYS

5 RKPPL Implementation Report Quarter NYS NYS NN

6 HIV - AIDS Campaign Report - 1X NYS NYS NN

15 Sibolga - Bts. Tapsel Sumut 1 UKL & UPL Recommendation : 8 Dec 2011 1X 24 Sep 2013 30 Sep 2013 20 Nov 2013

2 Monitoring of Integration

UKL&UPL into Design - 1X 11 Nov 2014 NN NN

3 UKL&UPL Implementation

Report (PIU to BLH) - each 6month

28 Jun 2016 21 Juli 2016 22 Juli 2016

Page 4 of 6

Page 100: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

1 2 3 5 6 7 8 9

Environmental Safeguard Sent to WB4

CTC Letters to PMUDuarationsDate of Recomendation/Environmental Permits

No ofPackage

Name of Link Province WB NOL/Letters

4 RKPPL - 1X UP UP NY

5 RKPPL Implementation Report Quarter 28-Jun-16 21 Juli 2016 22 Juli 2016

6 HIV - AIDS Campaign Report - 1X 29 February 2016 15 March 2016 NN

16 Sebelat-Ipuh Inc.Air Lalang & AirGunung Bridges

Bengkulu 1 AMDAL Environmental permits : 3 April 2014 1X - 09 June 2014 08 August 2014

2 Monitoring of Integration

AMDAL into Design - 1X 10 Dec 2014 NN NN

3 AMDAL Implementation Report

(PIU to BLH) - each 6month

NYS NYS NN

4 RKPPL - 1X NYS NYS NYS

5 RKPPL Implementation Report Quarter NYS NYS NN

6 HIV - AIDS Campaign Report - 1X NYS NYS NYS

17 Sp. Gunung Kemala-Pg. Tampak, IncWay Tauu Bridge

Lampung 1 AMDAL Environmental Feasibility : 12 Oct 2012

Environmental permits: 21 Nov 2012 1X 24 Sep 2013 30 Sep 2013 20 Nov 2013

2 Monitoring of Integration

AMDAL into Design - 1X 11 Nov 2014 NN NN

3 AMDAL Implementation Report

(PIU to BLH) - each 6month

28 Jun 2016 21 Juli 2016 22 Juli 2016

4 RKPPL - 1X 26 April 2016 13 May 2016 30 Juni 2016

5 RKPPL Implementation Report Quarter 28-Jun-16 21 Juli 2016 22 Juli 2016

6 HIV - AIDS Campaign Report - 1X 8 January 2016 15 March 2016 NN

18 Seblat - Ketahun (N.013.005 :Panjang 42,07km)

Bengkulu

19 Lais- Bintunan Bengkulu 1 UKL & UPL Recommendation : 9 Nov 2011 1X 24 Sep 2013 30 Sep 2013 20 Nov 2013

2 Monitoring of Integration

UKL&UPL into Design - 1X 6 Oct 2015 NN NN

Page 5 of 6

Page 101: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

1 2 3 5 6 7 8 9

Environmental Safeguard Sent to WB4

CTC Letters to PMUDuarationsDate of Recomendation/Environmental Permits

No ofPackage

Name of Link Province WB NOL/Letters

3 UKL&UPL Implementation

Report (PIU to BLH) - each 3month

28 Jun 2016 21 Juli 2016 22 Juli 2016

4 RKPPL - 1X 4 Nov 2015 24-Nop-15 14 Dec 2015/NOL

5 RKPPL Implementation Report Quarter 13 Nov 2015 ; 4 Feb

2016 ; 17 Feb 2016 ; 28Jun 2016

24 Nov 2015; Informal toWB 4 & 17 Feb 2016: 21

Juli 2016

14 Des 2016 (NOL) ; 19Feb 2016 ; 22 Juli 2016

6 HIV - AIDS Campaign Report - 1X 12 February 2016 15 March 2016 NN

20 Lubuk Alung - Sincin Sumatera Barat 1 UKL & UPL Recommendation : 27 Dec 2011 1X 24 Sep 2013 30 Sep 2013 20 Nov 2013

2 Monitoring of Integration

UKL&UPL into Design - 1X 29 Oct 2015 NN NN

3 UKL&UPL Implementation

Report (PIU to BLH) - each 6month

NYS NYS NN

4 RKPPL - 1X NYS NYS NYS

RKPPL Implementation Report Quarter NYS NYS NN

5 HIV - AIDS Campaign Report - 1X NYS NYS NN

21 Lubuk Alung - Kuraitaji Sumatera Barat 1 UKL & UPL Recommendation : 27 Dec 2011 1X 24 Sep 2013 30 Sep 2013 20 Nov 2013

2 Monitoring of Integration

UKL&UPL into Design - 1X 29 Oct 2015 NN NN

3 UKL&UPL Implementation

Report (PIU to BLH) - each 6month

NYS NYS NN

4 RKPPL - 1X NYS NYS NYS

5 RKPPL Implementation Report Quarter NYS NYS NN

6 HIV - AIDS Campaign Report - 1X NYS NYS NN

Keterangan :

NN : Not Need incl. 1 Document Studi Amdal

incl. 1 Document Studi Amdal

NYS: Not Yet Started incl. 1 Document Studi Amdal

NY : Not Yet

UP : Under Process

Page 6 of 6

Page 102: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

Appendix A

Overall Loan Progress

Page 103: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Estimated Contractor(s) or Total Est. BudgetStarting Completion Consultant(s) Man-Month WB + GOI Remarks

Date Date Name (Excl. the (PIP) Original Physical Man-Month Physical Man-Month Physical Man-Month

Supp. Staff) (USD, Excl.VAT) In IDR In USD Amendment No. 1 InIDR

Amendment No. 2 InIDR

Amendment No. 3 InIDR

Amendment No. 4 InIDR

Amendment No. 5 InIDR

Amendment No. 6 InIDR ( % ) ( MM ) ( % ) ( MM ) ( % ) ( MM )

1 Betterment and Capacity 308.730.000,00 $222.678.368,65Expansion of NationalRoads

1.A AWP-1 ICB DGH 81.630.000,00 $57.821.551,951.A1 08-Jan-14 10-Jan-16 1. Krui-Biha (PT. Jaya Konstruksi) 134.909.211.000,00Rp $11.757.337,74 154.073.015.000Rp 140.255.020.000Rp 100% 100% 0,00% Completed

1.A2 06-Jan-14 19-Apr-16 2. Pd. Sawah-Sp. Empat(PT.Jaya Konstruksi) 197.936.699.896,00Rp $17.250.183,32 226.713.217.000Rp 249.348.931.000Rp 100% 100% 0,00% Completed

1.A3 06-Jan-14 20-Mar-16 3. Manggopoh-Pd. Sawah(PT. Jaya Konstruksi) 143.688.963.435,00Rp $12.522.493,13 156.157.772.000Rp 183.940.872.000Rp 100% 100% 0,00% Completed

1.A4 10-Jan-14 11-Apr-16 4. Ipuh-Bantal (PT. Waskita Karya) 186.936.750.000,00Rp $16.291.537,76 196.438.084.000Rp 100% 100% 0,00% Completed

1.B AWP-2 and AWP-3 ICB & NCB DGH 227.100.000,00 $164.856.816,70

18-Jun-15 08-Des-16 5. Sp. Rampa - Poriaha (PT. NusaKonstruksi Enjiniring Tbk.) 107.321.260.000,00Rp $8.084.464,03 88,79% 31,28% -57,51% On - Going Construction

11-Mar-15 02-Jun-16 6. Ps Pedati - Kerkap (PT. Waskita KaryaTbk) 86.517.470.000,00Rp $6.641.396,33 70,27% 64,44% -5,83% On - Going Construction

10-Des-15 30-Agust-17 7. Indrapura - Tapan (PT. Adhi Karya) 129.699.900.000,00Rp $9.350.065,79 16,79% 16,70% -0,09% On-Going Construction

23-Mar-16 12-Mar-18 8. Bts. Kt Pariaman - Manggopoh (PT.PP/PT. Statika) 355.500.000.000,00Rp $25.627.995,00 7,58% 9,69% 2,11% On-Going Construction

9. R. Tikang - Kt. Agung Cancelled

10. Sp Empat - Sp Air Balam NOL on BER already issued by WB

23-Feb-15 11-Feb-17 11. Bantal - Mukomuko(PT. Hutama Karya - PT. DMT, JO) 228.899.717.000,00Rp $18.765.198,80 262.611.303.000Rp 84,00% 71,00% -13,00% On - Going Construstion

23-Mei-16 12-Mei-18 12. Kambang - Indrapura (PT.Lancarjaya/PT. Cahaya T.A) 358.650.400.000,00Rp $25.855.107,34 1,61% 1,05% -0,56% On - Going Construstion

22-Jul-15 10-Jul-17 13. Sp. Rukis - Tj. Kemuning(PT. Waskita Karya) 292.700.000.000,00Rp $23.454.051,00 63,60% 19,25% -44,35% On-going construction

03-Agust-16 24-Apr-18 14. Painan -Kambang (KSO Yasa -Conbloc) 214.327.429.680,00Rp $16.286.741,38 0,56% 0,47% -0,09% On-Going Construction

20-Nop-15 06-Feb-18 15. Sibolga - Bts Tap Sel (PT. PP) 260.100.000.000,00Rp $19.954.872,00 23,77% 8,99% -14,78% On-Going Construction16. Seblat - Ipuh NOL on BER issued by WB

04-Sep-15 23-Aug-17 17. Sp. Gunung Kemala - Pg. Tampak(PT. Jaya Konstruksi) 199.551.233.000,00Rp $16.335.263,93 33,01% 28,34% -4,67% On-going construction

18. Mukomuko - Bts. Sumbar Cancelled

11-Mar-15 08-Mar-16 19. Lais- Bintunan (PT. RodatekindoPurajaya) Rp 33.689.452.000,00 $2.586.125,12 Rp 44.419.760.000 100% 100% 0,00% Completed

20. Lubuk Alung - Sicincin (PT. NindyaKarya) Rp 133.818.300.000,00 $8.578.485,27 0,30% 0,39% 0,09% On-Going Construction

21. Lubuk Alung -Kuraitaji (PT. MultiStructure) Rp 126.301.900.000,00 $9.519.374,20 0,56% 0,78% 0,22% On-Going Construction

1.C Contingency - DGH 6.170.000,00

2 Implementation Support 16.000.000,00

2.A Core Team Consultants (CTC) QCBS DGH 06-Nop-12 06-Mar-16 PT. Perentjana Djaja 556 5.000.000,00 $1.276.700,00 $1.315.925,00 $1.371.925,00 $1.339.925,00 $1.743.780,00 212.95 187.95 25.00 Supporting PMU. Joint Venture with Rp21.415.400.000,00 Rp22.426.175.000 Rp22.458.676.500 Rp23.934.595.000 Rp37.161.972.299 Yongma Engineering Co.Ltd. Or US$ equivalent total : 25-Okt-13 03-Sep-14 30-Nop-15 04-Mar-16 PT. Epadascon Permata $3.512.681,91 $3.641.077,48

2.B Design & Superv. Consultants QCBS DGH 19-Jun-13 18-Nop-16 Renardet S.A. 1.068 10.000.000,00 $820.600,00 42.33 36.33 -6.00 Design preparation andconstruction supervision.

Joint Venture with Rp51.818.705.000,00 PT Cipta Strada Or US$ equivalent total : PT. Daya Creasi Mitrayasa $6.465.729,72 PT. Seecons PT. Yodya Karya

2.C Incremental Operating Cost Varies PMU 1.000.000,00Including Technical Audits

3 Road Sector Institutional 1.000.000,00Development

3.A Capacity Building for NCB DGH 1.000.000,00 TOR has been finalizedDisaster Risks Reduction

4 Contingency for Disaster DGH -Risk Response

5 Unallocated DGH 18.100.000,00

Total 343.830.000,00 232.656.780,28

30 September 2016

Contract ValueTotal ( WB + GOI )

PROGRESS

Respon-sibility Revised (in 000)

Appendix - AOVERALL PROGRESS STATUS

Description

WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT (WINRIP)IBRD LOAN No. 8043-ID

Proc.MethodCategory

Planned Actual Balance

Page 104: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

Appendix B

Road Safety Audit Progress

Page 105: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Appendix B. Road Safety Audit Progresss (September 2016)

Old (2004) New (2009) Site VisitingSubmission of

ReportSite Visiting

Submission ofReport

Site VisitingSubmission of

Report1. No Road Safety Audit at Design Stage.

2. Road Safety Engineering Review by CTC, Dec, 2014

3. RSA at Construction Stage/Monitoring of Traffic Mgmt & Safety by CTC, Dec, 2014

Date 13-Nop-14 29-Des-14 13-Nop-14 29-Des-14 11-Feb-16 22-Feb-16 4. RSA at PHO stage by CTC, February, 2016

1. No Road Safety Audit at Design Stage.

2. Road Safety Engineering Review by CTC, Nov, 2014

3. RSA at Construction Stage/Monitoring of Traffic Mgmt & Safety by CTC, Nov, 2014

Date 09-Okt-14 05-Nop-14 09-Okt-14 05-Nop-14 06-Apr-16 12-Apr-16 4. RSA at PHO stage by CTC, April, 2016

1. No Road Safety Audit at Design Stage.

2. Road Safety Engineering Review by CTC

3. RSA at Construction Stage/Monitoring of Traffic Mgmt & Safety by CTC, Nov, 2014

Date 09-Okt-14 05-Nop-14 09-Okt-14 05-Nop-14 17-Mar-16 23-Mar-16 4. RSA at PHO stage by CTC, March, 2016

1. No Road Safety Audit at Design Stage.

2. Road Safety Engineering Review by CTC

3. RSA at Construction Stage/Monitoring of Traffic Mgmt & Safety by CTC, Dec, 2014

Date 13-Nop-14 29-Des-14 13-Nop-14 29-Des-14 14-Apr-16 26-Apr-16 4. RSA at PHO stage by CTC, April, 2016

1. Technical Advisory Report by International RSA CTC, Sept 2013

Date 08-May-13 17-Sep-131. Technical Review & RSA at Design Stage done by International RSA CTC

3. RSA at Construction Stage/Monitoring of Traffic Mgmt & Safety by CTC, Sep, 2015

Date 18-Jul-13 17-Sep-13 25-Agust-15 08-Sep-151. Technical Advisory Report by International RSA CTC, Sept 2013

27-Sep-13 2. Road Safety Audit by Dit. EA & RS, May 2014

3. Result of Highway and RSA Final DED Review by CTC, Nov 2014

Date Apr-14 Mei-14

1. Technical Advisory Report by CTC, Sept 2013

27-Sep-13 2. Road Safety Audit by Dit. EA & RS, May 2014

3. Result of Highway and RSA Final DED Review by CTC, Nov 2014

Date Apr-14 Mei-141. Technical Advisory Report by CTC, Sept 2013

27-Sep-13 2. Road Safety Audit by Dit. EA & RS, May 2014

3. Result of Highway and RSA Final DED Review by CTC, Nov 2014

Date Apr-14 Mei-141. Technical Review & RSA at Design Stage by International RSA CTC , Jul, 2013

2. RSA at Construction Stage/Monitoring of Traffic Mgmt & Safety by CTC, Dec, 2015

Date 18-Jul-13 18-Jul-13 17-Des-15 29-Des-151. Technical Advisory Report by International RSA CTC, Sept 2013

27-Sep-13 2. Road Safety Audit by Dit. EA & RS, May 2014

3. Result of Highway and RSA Final DED Review by CTC, Nov 2014

Date Apr-14 Mei-141. Technical Advisory Report by International RSA CTC, Sept 2013

Date 18-Jul-13 18-Jul-131. RSA DED Report by CTC, June, 2015

Date 15-Apr-15 15-Jun-151. Technical Advisory Report by International RSA CTC, Sept 2013

Date08-May-1321-Aug-13

23-Sep-13

1. RSA DED Report by CTC, Sept, 2014

Date 14-Agust-14 01-Sep-14

EstimatedCost /

Excl.VAT(mil. RP)

Road Safety AuditTotal Process

(%)Remarks

StatusDesign Stage Construction Stage PHO StageNo

PkgNo.

Name of Sub-projectLink No

Length(km)

Width(m)

2 #2 Padangsawah - Simpangempat 06.047.2 06.021.0

1 #1 Biha - Krui 17.053.0 17.027.0

40.90 7 228.772Process

100%

7 163.535Process

100%25.00

4 #4 Ipuh - Bantal 13.051.1 13.003

3 #3 Manggopoh -Padangsawah 06.047.1 06.022.0

42.40 7 247.105Process

100%

7 167.678Process

100%32.00

6 #6 PS.Pedati - Kerkap 13.010.0 13.009.0

5 #5 Sp.Rampa – Poriaha xx.xxx.x 03.075.0

20.88 7 92.127Process

66%

6 152.870Process

33%9.7

9 #10 Sp.Empat – Sp. Air Balam 06.034.1 06.020.0

7 175.812Process

33%

8 #8 Bts.Pariaman – Manggopoh 06.24.0 06.23.0

7 #7 Indrapura – Tapan 06.019.0 06.34.0 19.50

61.70 7 511.375Process

33%

46.80 7 374.647Process

33%

11 #12 Kambang – Indrapura 06.17.2 06.033.0

10 #11 Bantal - Mukomuko 13.015.2 13.002.0

45.20 7 438.675Process

33%

6 262.611Process

66%50.10

14 #15 Sibolga – Bts TapSel 03.016.1 03.044.0

7 316.304,8Process

33%

13 #14 Painan – Kambang 06.017.1 06.032.0

12 #13 SP.Rukis - TJ.Kemuning 13.006.0 13.021.0 56.30

35.86 7 376.479Process

33%

31.50 7 118.993Process

33%

15 #16 Seblat – Ipuh 13.010.0 13.004.0 34.50 6 110.237Process

33%

Page 106: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Old (2004) New (2009) Site VisitingSubmission of

ReportSite Visiting

Submission ofReport

Site VisitingSubmission of

Report

EstimatedCost /

Excl.VAT(mil. RP)

Road Safety AuditTotal Process

(%)Remarks

StatusDesign Stage Construction Stage PHO StageNo

PkgNo.

Name of Sub-projectLink No

Length(km)

Width(m)

Date

1. Technical Advisory Report by International RSA CTC, Sept 2013

2. RSA at Construction Stage/Monitoring of Traffic Mgmt & Safety by CTC, Sep, 2015

3. RSA at PHO stage by CTC, May, 2016

Date 18-Jul-13 17-Sep-13 25-Agust-15 08-Sep-15 19-Mei-16 24-Mei-161. RSA DED Report by CTC, June, 2015

Date 15-Apr-15 15-Jun-151. RSA DED Report by CTC, June, 2015

Date 15-Apr-15 15-Jun-15

Date

Date

Notes :

Road Safety Engineering Review by CTC

Road Safety Audit by International RSA CTC

Road Safety Audit by Dit. EA & RS DGH

Road Safety Audit by CTC

16 #17 Sp.Gng Kemala–Pg.Tampak 17.061.1 17.025.0 36.80 6 255.269Process

0% No Road Safety Audit at Design Stage

33%

19 #21 Lubuk Alung - Kuraitaji 06.027.0 06.025.0

7 35.886Process

100%

18 #20 Lubuk Alung – Sicincin 06.009.1 06.041.0

17 #19 Lais - Bintuan 13.009.1 13.007.0 10.80

9 Rantau Tijang – Kota Agung 17.026.1 17.032.0

14.60 7 54.557Process

42.00 7 149.831Process

18 Mukomuko – Bts.Sumbar 13.015.3 13.001.0

16.80 7 65.788Process

33%

69.233Process

25.80 6

Page 107: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

Appendix C

Financial Progress

Page 108: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

Appendix C Financial Progress

The table below shows total expenditure to date measured in the terms of World BankCommitment.

DatePercentage

Completion oftime

WBExpenditureCommitment

Percentage ofAvailable

ExpenditureSource

31/03/2012 1.45% - - -30/04/2012 2.90% - - -31/05/2012 4.35% - - -30/06/2012 5.80% - - -31/07/2012 7.25% - - -30/08/2012 8.70% - - -30/09/2012 10.15% - - -31/10/2012 11.60% - - -30/11/2012 13.05% - - -31/12/2012 14.50% 800,000 0.32% Actual31/01/2013 15.95% 800,000 0.32% Actual28/02/2013 17.40% 800,000 0.32% Actual31/03/2013 18.85% 2,207,915 0.88% Actual30/04/2013 20.30% 2,207,915 0.88% Actual31/05/2013 21.75% 2,207,915 0.88% Actual30/06/2013 23.20% 2,207,915 0.88% Actual31/07/2013 24.65% 2,207,915 0.88% Actual31/08/2013 26.10% 2,207,915 0.88% Actual30/09/2013 27.55% 2,207,915 0.88% Actual31/10/2013 29.00% 2,207,915 0.88% Actual30/11/2013 30.45% 2,207,915 0.88% Actual31/12/2013 31.90% 2,207,915 0.88% Actual31/01/2014 33.35% 4,940,115 1.98% Actual28/02/2014 34.80% 4,940,115 1.98% Actual31/03/2014 36.25% 4,966,535 1.99% Actual30/04/2014 37.70% 4,966,535 1.99% Actual31/05/2013 39.15% 6,109,480 2.44% Actual30/06/2014 40.60% 6,263,610 2.51% Actual31/07/2014 42.05% 6,470,288 2.59% Actual31/08/2014 43.50% 6,470,288 2.59% Actual30/09/2014 44.95% 6,681,304 2.67% Actual31/10/2012 46.40% 6,991,757 2.80% Actual30/11/2014 47.85% 7,323,303 2.93% Actual31/12/2014 49.30% 11,533,045 4.61% Actual31/01/2015 50.75% 11,533,045 4.61% Actual28/02/2015 52.20% 12,794,201

4.61%Actual4.61%Actual

5.12% Actual31/03/2015 53.65% 14,918,776 5.97% Actual30/04/2015 55.10% 18,424,843 7.37% Actual

Page 109: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

DatePercentage

Completion oftime

WBExpenditureCommitment

Percentage ofAvailable

ExpenditureSource

31/05/2015 56.55% 21,646,890 8.66% Actual30/06/2015 58.00% 23,691,573 9.48% Actual31/07/2015 59.45% 27,426,670

9.48%10.97% Actual

31/08/2015 60.90% 27,861,670 11.14% Actual30/09/2015 62.35% 31,214,254 12.49% Actual31/10/2015 63.80% 33,538,544 13.42% Actual30/11/2015 65.25% 37,740,899 15.10% Actual31/12/2015 66.70% 48,269,952 19.31% Actual31/01/2016 68.15% 48,845,535 19.54% Actual28/02/2016 69.60% 50,144,535 20.06% Actual31/03/2016 71.05% 52,938,748 21.18% Actual30/04/2016 72.50% 58,007,328 23.20% Actual31/05/2016 73.95% 61,427,937 24.57% Actual30/06/2016 75.40% 65,009,653 26.00% Actual31/07/2016 76.85% 70,619,401 28.25% Actual31/08/2016 78.30% 70,846,499 28.34% Actual30/09/2016 79.75% 74,387,379 29.75% Actual31/10/2016 81.20%30/11/2016 82.65%31/12/2016 84.10%31/01/2017 85.55%28/02/2017 87.00%31/03/2017 88.45%30/04/2017 89.90%31/05/2017 91.35%30/06/2017 92.80%31/07/2017 94.25%31/08/2017 95.70%30/09/2017 97.15%31/10/2017 98.60%30/11/2017 99.05%31/12/2017 100.00%

Page 110: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

Appendix D

Quality Assurance Progress

Page 111: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

Appendix D: Quality Assurance Progress

No ActivitiesStatus/conditionDate of Finish/

completed1. Duty Trip to Bengkulu (package 13, package 11 and package 06) TFAC mission

and Closing meeting WB mission TFAC at Bengkulu.September 01, 2016

2. Prepared an accountability reports for budget of duty trip for WB TFACmission and attended closing meeting WB TFAC mission.

September 02, 2016

3. Prepared draft site visit reports for package 05 and package 15 of TFAC WBSibolga and attendance final addendum meeting package 03.

September 05, 2016

4. Prepared draft site visit reports for package 13, 06 and package 11andatended PMM socialization at Padang.

September 06,2016.

5. Prepared draft site visit reports for package 05 and package 15 of TFAC WBSibolga

September 07 toSeptember 08,

2016.6. Attended internal meeting of CTC and confirmation of report result package

01, package 06,and package 19 with the PPK and ask when completed.September 09,

2016.7. Public Holiday ( Idhul Adha, 10 Dzulhijjah 1437 H ) September 12,

2016.8. Prepared draft site visit reports for package 05 and package 15 of TFAC WB

Sibolga and appendix for MPR.September 13,

2016.

9. Check audit TFAC reports package 06, package 19 and package 01. September 14,2016.

10. Sick September 15 toSeptember 16,

2016.11. Attended Pre-Construction Meeting (PCM) for package 20 and package 21 at

Padang.September 19 to

September 21, 2016.

12. Prepared accountability reports for budget of site visit PCM and attended themeeting of Justek Package 05 Sibolga.

September 21,2016.

13. Prepared Site visit report of PCM package 20 and package 21. September 23 ,2016.

14. Attended as resource speaker of training TPM package 12 and package 14 atPadang.

September 26 toSeptember 28,

201615. prepared internal report of site visit training TPM and make site visit report

TFAC package 11, package 13 and package 06September 29, 2016

16. Check audit TFAC package 19 Bengkulu and prepared site visit report of TFACpackage 13, package 11 and package 06 at Bengkulu.

September 30,2016.

Page 112: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

Appendix E

Environmental Progress and Social Progress

Page 113: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Length Width

(Km) (m) Result CommentsBudget

Alocated,YearStatus BLH Approval Result Comments

BudgetAlocated,Year

Status

THE WB Approval(A=Studi LARAP ;

B=ImplementationLARAP

A. NOL LARAP 04 Jan2013 ;

ICB/Prior B. NOL Mon Report (MR)18 April 2013, Rev 26 June2013.

SOCIAL: PPK/Satker PJN II Lampung has to submit the result of the landcerticification to PMU/WB

2 Padang Sawah - Sp Empat Sumatera Barat 40,9 7 Total PAP 430 . No Land affected . Aset affected:building 149 unit = 2.110 M2 ; Fence 2 unit = 341.8 M; Kiosks BBM: 25 unit; Trees: 873 rod ; Mosque: 2 unit

A. NOL LARAP 13 Jan 2013;

2a Including Air Gadang Bridge Sumatera Barat 100 m 7 Total PAP 15. Land affected 2,110 M2 ; Aset affected:building 6 unit = 410 M2 ; Trees 72 rod.

B. NOL MR-1: 19 July2013, MR-2:12 Feb 2015

SOCIAL: complete

ICB/Prior A. NOL LARAP 04 Jan 2013

B. NOL MR-1: 26 June2013, MR-2: 5 Mar 2014,MR-3: 23 Jun 2014, MR-4:12 Feb 2015, MR-5: 17Mar 2015.

SOCIAL : Complete

A. NOL LARAP 10 Dec 2012

ICB/Prior B.NOL MR-1: 6 Jan 2014,MR-2: 5 Mar 2014, MR-3:12 Feb 2015

SOCIAL: Complete

NCB/Post A. NOL LARAP 16 Sept2013, and approvalrevision the report 12 Nov2013; Waiting NOL WB forAdditional LARAP

B= Not Yet

SOCIAL: A Monitoring report for compensation progress of 68 PAPsshould be submitted to PMU/WB

A. NOL LARAP 20November 2013;

ENVIRONMENTAL : a) The RKPPL :Complete NOL WB issued on 23 Feb 2015, b) theexternal monitoring of implementation UKL&UPL (period 1) to BLH wassubmit to the WB on 29 April 2015 & (period 2) submit to WB on 14Dec 2015 & period 3 submit to WB on 29 April 2016. The project hasbeen PHO but still remaining the civil work such as the Box Culvertunder built then some the shoulder not compact . The evaluation foranswer in the monitoring form on January and March 2016 is same(copy paste), should be the DSC monitor relevant with civil work isbeing done by the contractor, the DSC should concern related basecamp and quarry operation so if no activity in quarry or base camp isnecessary no tick/no answer then the DSC not comments forconstrains when the contractor not implement the environmentalmitigation for the activities, for example: Traffic aspec (traffic acident).c) The implementation of RKPPL (periode january to March 2016 willsubmit mid of May 2016. d) The HIV-AIDS campaign complete on 4 Dec2015. e) the quarry, AMP & Stone Crusher permits from Bupati, (thequarry owner & contractor not yet make changes the permission

Ipuh- Bantal4 Bengkulu 42,4 7

ENVIROMENTAL: a) The project PHO on 20 Jan 2016. b) The RKPPL :Complete, NOL issued from the WB on 23 Feb 2015, & RKPPLimplementation (Environmental Quarterly) was Complete until period 3(Oct - Dec 2015). c) the external monitoring of implementation AMDAL(period 3) was submit to the WB on 14 Dec 2015. d) The Integration ofrecommendation AMDAL in to the design Complete.e) The HIV-AIDS campaign complete on 10 Nov 2015. e) UKL&UPLimplementation report for quarry (prepared by quarry owner) notavailable.

Manggopoh - Padang Sawah3 Sumatera Barat 32 7 SPPL Air pollution, traffic congestion,market on street, soft soil andrivers

APBN (P2JN2010)

100% YES Recommended2010. SPPL no needNOL from the WB.

LARAP Total PAP 1.338 . No affected land . Aset affected:building 115 unit = 668,33 M2; Culvert 661,05 m;concrete & foundations 1.421,60M3 ; Soilembankment 5.564,21 M3; Trees 5.324 rod

Rp. 1.147.700.000APBD Prov Sumbar,Dinas PU, 2012/2013;4.9 M from APBD2014

Complete ENV IRONMENTAL: a) TOC 20 Mar 2016, b) The RKPPL :Complete NOLWB issued on 30 January 2015. b) the external monitoring ofimplementation SPPL was submit to the WB on 29 April2015/Complete. c) RKPPL implementation (periode October toDecember 2015)has been submit to PMU& WB on Dec 2015,d) The HIV-AIDS campaign complete on 17 Nov 2015. e) the UKL&UPLimplementation report for quarry not available (should prepare byQuarry Owners), Based on CTC monitoring at 7 April 2016 generally thecontractor not maximal handling the environmental impact on fieldafter construction such as the shoulder finding not compact, and thematerial goes into the drainage channel, the drainage system notcomplete then poor with road sign.

LARAP Total PAP 2.805 in 21 Pekon. Land affected 28.763,12M2 ; Aset affected : building 882,13 M2; Fence2.445,41 M ; Trees 653 rod ; paddy field 25 plots ;Social & Pablic Facilities

Air pollution, traffic congestion,steep slopes, soft soil and riversand beach abrasion

APBN (P2JN 2010& 2011)

100% YES Recommended SPPL2010 and AMDAL 2012& NOL WB issued on 20Nov 2013. Note:environmentalmitigation was makedetail on RKPPL

1 Krui - Bha Lampung 25 7

Satker PJN I West Sumatera has issued a statement onthe status of 1 PAP along Air Gadang Bridge, and landacquisition plan belonging of 24 peoples as inAdditional LARAP Document on August 12, 2016

LARAP Total PAP are change from 227 PAP becomes 257 PAP.257 PAP has received compensation from The LocalGovernment as : Affected Assets: house building =307,05 M2; terace = 672,84M2; fence = 503,85M ;foundation = 8,9 m; pavement = 2,632,01M2; Trees =82 rod, tomb = 7 unit

Rp.286.743.000.APBN, Satker PJN I,Bengkulu, 2013

Complete

(1). Additional LARAP approval WB on January 8,2016.(3) Compensation payment for 68 from the total 71PAPs already paid by project

SPPL 100%andUKL&UPL

Geometric, traffic congestion,steep slopes, soft soil and riversand beach abrasion

APBN (P2JN2010)

SPPL 100%,UKL&UPLcontract(100%)

YES Recommended2010 for SPPL andUKL&UPLrecommendation byBLH was issued on 30Oct 2014 &environmental permitswas publish by BupatiMuko Muko on 8 Dec2014.

100% YES Recommended2011. UKL&UPL no needNOL from the WB.

SimpleLARAP

(1). 1 PAP with aset affected : 1 kiosk BBM. Agree torelocate the kios. Relocate to the beside her house.Relocating costs be the responsibility of the project;(2). Require permit the state land use (14 ha) of theMinister of Forestry and environmental life, andcompensation payment for 4 buildings and the 7.724trees affected (Additional LARAP)

SOCIAL ENVIRONMENTAL STATUS & PROGRESS FOR WINRIP, IBRD LOAN NO.8043-ID

Remedial Action

AWP - 1

No Loan Package Name Provinces

Procur

Approval Status by Environmental Agency (BLH)Environmental Screening Social Screening Approval Status by The World Bank

YES Recommended2010. UKL&UPL no needNOL from the WB.

ICB/PriorSPPL&UKL/UPL

Bridge

LARAP Rp.2.340.600.000APBD Prov Sumbar,Dinas PU, 2012

APBN (P2JN2010)

100%

Rp. 5.172.349.955APBN, Satker PJN IILampung, 2011 - 2012

Pending issue: Certification of the land affected isunder process

SPPL &AMDAL

Appendix E : Progress of Social Environmental Safeguard Studies on WINRIPas Sep 30, 2016

one link,sensitive areas/resident,public,facilities, squater (no landacquisition), market,sopt soil andrivers

ENV IRONMENTAL: a) The RKPPL :Complete. NOL WB issued on 30 Jan2015. b) the external monitoring of implementation UKL&UPL to BLH(period 1) was submit to the WB on 29 April 2015. & (period 2) on 14Dec 2015, period 3 was submit on 29 April 2016 .the Air Gadang bridgeconstruction has been finish, the current on process PHO, contractorhas been handing part of environmental impact on package No 2 suchas install road sign etc,c) RKPPL implementation, period (October toDecember 2015) has been submit to PMU & WB on 14 Dec 2015,period Jan to March 2016 has beeb submit to WB&PMU on 28 June2016. d) The HIV-AIDS campaign complete on 17 Nov 2015. e) thequarry, AMP & Stone Crusher permits has been refer to Governordecree. (Bupati to Governor refer Law No.23 year 2014)

AWP - 25 Sp. Rampa - Poriaha Sumatera Utara 11,1 6 UKL&UPL slope stability, water quality, Run

off, bridges acces, continuedtraffic access & quarry problem

APBN (BBPJN I2011)

ENVIRONMENTAL :a)The RKPPL has been submit to PMU/WB at 27 April 2016. b). Theexternal monitoring of implementation UKL&UPL to BLH period 1complete. c) The HIV-AIDS campaign complete on 28 Jan 2016.d) the quarry, AMP & Stone Crusher permits from Bupati, (the quarryowner has been extentd licensing/the quarry permits was availablebefore new law issued) . e) the contractor has been manage the quarryarea such as reclamation & air quality & noise measurement, etc asUKL&UPL recommendation and the contractor was prepare theimplementation of UKL&UPL of quarry report and will be send to theBLH.

6 Ps Pedati - Kerkap Bengkulu 25 7 UKL&UPL Comersial areas, trafficcongestion, market on the street,air pollution & noise,

APBN (TLKJ 2011) 100% YES Recommended2010. UKL&UPL no needNOL from the WB.

LARAP Total PAP = 637. Affected land = 3,625 M2. Terrace =2,925 M2 ; Fence = 4,169 M, pavement = 4399 m2

RP. 8.049.290.000APBN, Satker PJN I,

Bengkulu, 2014

Complete, certification process for 136 plots ENVIRONMENTAL :a) The RKPPL complete, WB NOL issues on 14 Dec 2015, b) UKL&UPLimplementation for BLH not yet prepare,Based on CTC survey on 13April 2016 was found that the contractor not yet fulfill to implementthe environmental impact management such as no road sign onconstruction site, the oil & grease pollution on base camp etc. TheUKL&UPL implementation period 2 has been submit to PMU/WB at 29April 2016. b) The HIV-AIDS campaign complete on 12 Jan 2016. c)UKL&UPL implementation report for quarry (prepared by quarryowner) not available. d) the genset operation permit complete, e) moresegmen of link No 6 has been AC BC pavement.

Rp.2.900.000.000APBN, Satker PJN II,

Sumut, 2016

Page 114: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Length Width

(Km) (m) Result CommentsBudget

Alocated,YearStatus BLH Approval Result Comments

BudgetAlocated,Year

Status

THE WB Approval(A=Studi LARAP ;

B=ImplementationLARAP

Remedial ActionNo Loan Package Name Provinces

Procur

Approval Status by Environmental Agency (BLH)Environmental Screening Social Screening Approval Status by The World Bank

NCB/Post B: NOL MR-1: 23 Mar2015. NOL MR-2: 26 Nov2015

SOCIAL: LARAP implementation is completed.

ICB/Prior NOL Larap: Oct 14, 2014

B: NOL WB MonitoringReport-1 (276 PAP) onMarch 8, 2016

SOCIAL: Now, PMU/CTC waiting a data progress compensationpayment for the remainig PAPs from Satker PJN II - West SumateraProvince

A. NOL LARAP 12 Sep2014;

SOCIAL: PPK/Satker PJN I West Sumatera and Local Governmant arebeing paid the remaining PAP

A. -

A. NOL LARAP 12 Sep2014;

B: NOL WB for theMonitoring Report-1 onMarch 8, 2016

SOCIAL: PPK/Satker PJN I West Sumatera and Local Government arecontinuing the process of payments to the remaining of the PAPs

ICB/Prior A. NOL LARAP 20November 2013;

B: NOL WB-1: 2 Dec 2014,NOL WB-2: 12 Feb 2015

SOCIAL: complete

ICB/Prior NOL Larap: Oct 14, 2014

B: Monitoring Report onSep 2015 (target)

SOCIAL: Compensation payment for the remaining PAP is being done byproject

ICB/Prior A. NOL LARAP 20November 2013;

B: NOL WB-1: 18 Aug2015, NOL WB-2: 13 Oct2015

SOCIAL: The payment for 828 affected persons (APs) within 13 km atSTA. 43+100 to STA. 56+220 will be completed by end of October. Forthe STA. 26+000 to STA. 43+100 (18 km) with the number of APs is1796, 50% will be conducted this year and another 50% will becontinued in FY2017. The budget needed for the FY2017 payment isaround 4 billion IDR

ICB/Prior A. NOL LARAP 19December 2014;

B: Monitoring Report onOct 2015 (target)

SOCIAL:Compensation payment for the remaining PAP is being done byproject

YES Recommended2012.UKL&UPL no needNOL from the WB.

LARAP

APBN (TLKJ 2012) 100%

100%

100%

APBN (TLKJ 2011) 100%

YES Recommended2011. UKL&UPL no needNOL from the WB.

LARAP Total PAP: 3.412 change from original 2,564 . Affectedland = 88,852 M2. Aset affected : building 111 unit =2.196 M2 ; Fence 127 unit = 1.575 M ; Trees 363 rod ;electricity pole 25 unit

Completed/YESEnvironmental permitson Feb 2014. & NOL WBissued on 8 Aug 2014

ICB/Pr

ICB/Pr

Monitoring Report No.1 for compensation paymentsof 126 PAPs submitted to WB which was submitted onJuly 20, 2016. Monitoring report no 2 for paymentprogres for 64 PAPs is being prepared by Satker P/CTC.

Sensitive areas, social issues,market on the street, geometric,waste managemnt, continuedtraffic access, etc

LARAP is under preparation by Balai III Palembang.This package was changed to Bengkunat - Biha

RP. 8.237.443.000APBN Satker PJN I,Bengkulu, 2014

A monitoring report of the payment for 108 PAP isuder preparation by Satker PJN I BKL /CTC

RP. 11.295.833.000APBN, Satker PJN IBengkulu, 2014

Compensation for 570 out of the total 3,198 PAPsalready paid by Satker.

LARAP Rp 3,5 Billion. APBN2015,

Total PAP 262 . No affected land. House building =261.7 M2; kiosks = 147.7 m2, terrace = 412.9 m2,Fence = 249 M ; Trees= 36 rod, foundation = 17.2 m2,retaining wall = 35.1 m, pavement = 2,937 m2

Total PAP 861 change original 1,193. Partilly affectedbuilding ( houses an kiosks) = 4,013 M2 : Affectedfence = 19,206 m : Partially affected other building(terrace, decker and floors) = 9,401 M2, and trees =3,290.

B: NOL WB for theMonitoring Report-1 onMarch 8, 2016

A monitoring report no. 2 of the compensationpayment for 207 PAPs already sent to WB on May 17,2016. b) Total PAPs 861, and already compensated783. a monitoring report no 3 of payment for 90 from300 PAPs is under preaparation by Satker PJN II WsetSumatera/CTC

AWP - 3

6 Ps Pedati - Kerkap Bengkulu 25 7 UKL&UPL Comersial areas, trafficcongestion, market on the street,air pollution & noise,

APBN (TLKJ 2011) 100% YES Recommended2010. UKL&UPL no needNOL from the WB.

LARAP Total PAP = 637. Affected land = 3,625 M2. Terrace =2,925 M2 ; Fence = 4,169 M, pavement = 4399 m2

RP. 8.049.290.000APBN, Satker PJN I,

Bengkulu, 2014

Complete, certification process for 136 plots ENVIRONMENTAL :a) The RKPPL complete, WB NOL issues on 14 Dec 2015, b) UKL&UPLimplementation for BLH not yet prepare,Based on CTC survey on 13April 2016 was found that the contractor not yet fulfill to implementthe environmental impact management such as no road sign onconstruction site, the oil & grease pollution on base camp etc. TheUKL&UPL implementation period 2 has been submit to PMU/WB at 29April 2016. b) The HIV-AIDS campaign complete on 12 Jan 2016. c)UKL&UPL implementation report for quarry (prepared by quarryowner) not available. d) the genset operation permit complete, e) moresegmen of link No 6 has been AC BC pavement.

ENVIRONMENTAL; a) COW 10 Dec’15, The project under construction,AMP & stone crusher has been operete . Quarry & base campcomplete by Governor (but CTC not yet receive their license) . HIV-AIDSCampaign Done, 6 Sep 2016.

8 Bts. Kota Pariaman - Manggopoh Sumatera Barat 4680% 700% AMDAL Comersil areas, market, publicfacilities, Air pollution, trafficcongestion, market on street, softsoil and rivers

APBN (TLKJ 2011) 100% Completed/YESEnvironmental permitson July 2013. & NOL WBissued on 14 April 2014

LARAP Total PAP 1.575 change from original 1,282. Partillyaffected building ( houses an kiosks) = 8,352 M2 :Affected fence = 3,673 m : Partially affected otherbuilding (terrace, decker and floors) = 8,771 M2 andtrees = 7,863.

Rp 12.76 Billion. APBDProv Sumbar, DinasPU,

ENVIRONMENTAL; a) The project under construction, based on CTC sitefield finding that the base camp enough clean because power from PLNfor operate AMP & base camp, the civil work has been base AC along 7Km & excavation shoulder on some segment. The quarry & base camppermits (Governor) available. HIV-AIDS campaign will be carried out on4 Oct 2016.

7 Indrapura - Tapan (1 Doc Amdal) Sumatera Barat 19,5 7 AMDAL Sensitive forest areas, socialissues, slope stability, waterquality, waste management, airpollution, squater on ROW etc

a) A report of the compensation payment progress for926 PAPs already sent to WB on May 9, 2016. b) Areport of the compensation payment progress for 926PAPs already sent to WB on May 9, 2016. c)PPK/Satker PJN I West Sumatera and LocalGovernment is under payment process for theremaining PAP

ICB/Pr

ENVIRONMENTAL: Link of Bengkunat-Biha already completed byAMDAL study with environmental permit from the Governor at 2012.WILL DELETED

10 Sp Empat - Sp Air Balam Sumatera Barat 6170% 700% AMDAL Sensitive forest areas, socialissues, slope stability, waterquality, waste managemnt, bridgeaccess road & quarry problem

APBN (TLKJ 2011) 100% Completed/YESEnvironmental permitsonJuly 2013. & NOL WBissued on 14 April 2014

LARAP Total PAP 2059 change from original 1,514. Partillyaffected building ( houses an kiosks) = 11,523 M2 :Affected fence = 2,613 m : Partially affected otherbuilding (terrace, decker and floors) = 11,538 M2 andtrees = 4,369

Rp 14.02 Billion. APBDProv Sumbar, DinasPU,

a) Total PAPs 2.915, and already compensated 1.725.b) PPK/Satker PJN I West Sumatera and LocalGovernment is under payment process for theremaining PAP.

ENVIRONMENTAL; a) The commencement Date 30 Oct 2016, b) CTCneed check to field for preparing the external monitoring report ofimplementation AMDAL and will be submit to PMU/PPK/WB (ProposedDELETED)

9 Rantau Tijang - Kota Agung / Replace toBengkunat - Biha (already completed byAMDAL)

Lampung 4200% 700% UKL&UPL Sensitive areas, resident, airpollution, traffic congestion, steepslopes,soft soil and rivers andbeach abrasion

APBN (TLKJ 2011)

ENVIRONMENTAL :.a) The RKPPL complete, NOL WB issues on 23 Dec2015. b) The project under construction, based on CTC survey at April2016 was found that the contractor not implement yet theenvironmental mitigation for the activities, such as: Traffic aspec (trafficacident) and vegetation (loss of endemic trees and fauna disturbance,shoulder excavation not cover soon & no traffic sign surounding. c) theAMDAL implementation report (period 2) has been submit to WB on 29April 2016. d) The HIV-AIDS campaign complete on 5 Dec 2015. c) thequarry, AMP & Stone Crusher permits from Governor refer Law No.23year 2014, was complete

12 Kambang - Indrapura (1 Doc Amdal) Sumatera Barat 55,2 6 AMDAL Resident, productive land,Catcment areas,rivers, slopestability, squater on the street,land acquisition.

APBN (TLKJ 2011) 100% Completed/YESEnvironmental permitson Feb 2014. & NOL WBissued on 8 Aug 2014

LARAP Total PAP 2.337. Partilly affected building ( houses ankiosks) = 2,057 M2 : Affected fence = 32,741m :Partially affected other building (terrace, decker andfloors) = 17,144 M2 and trees = 3,225

Rp 9.08 Billion. APBDProv Sumbar, DinasPU,

a) Total PAPs 2.337, and already compensated 216. Amonitoring report no 1 for 216 PAPs already sent toWB on May 26, 2016. MR no 2 for payment progressof 60 PAP is under preparation by Satker

ENVIRONMENTAL; a) The project just started, b) CTC need check tofield for preparing the external monitoring report of implementationAMDAL and will be submit to PMU/PPK/WB. HIV-AIDS Campaign Done,6 Sep 2016.

11 Bantal - Mukomuko (1 Paket doc AMDAL) Bengkulu 50,1 6 AMDAL Completed/YESEnvironmental permitson April 2014. & NOLWB issued on 8 Aug2014

LARAP

ENVIRONMENTAL : a)The RKPPL complete, WB NOL issues on 14 Dec2015). b) Based on CTC survey on 12 May 2016 was found that theshoulder widening complete until 25 Km, the remaining 26 Km inKab.Kaur not yet start activities cause of land acquisition problem andthe budget (APBN available on TA.2017. other issues finding manyelectical poil should move, there are river embankment (retaining wall)also re alignment, c) the RKPPL implemetation period 1 (oct to Dec2015) was submit to PMU on firs of Feb 2016, period Jan - March 2016under preparing by CTC c) The HIV-AIDS campaign, complete on 14 Jan2016. d) the AMP & Stone Crusher permits from Governor completebut (the quarry permit from Governor under process), the contractornow buy material quarry to the peoples because the quarry permits

14 Painan -Kambang (1 doc Amdal) Sumatera Barat 31,5 7 AMDAL Sensitive forest areas, socialissues, slope stability, waterquality, waste managemnt,continued traffic access & quarryproblem

APBN (TLKJ 2011) 100% Completed/YESEnvironmental permitson Feb 2014. & NOL WBissued on 8 Aug 2014

SimpleLARAP

Total PAP 1.092. Partilly affected building ( houses ankiosks) = 10,474 M2 : Affected fence 21,735m :Partially affected other building (terrace, decker andfloors) = 20,988 M2 and trees = 1044

Rp 22.62 Billion. APBDProv Sumbar, Dinas

PU,

ENVIRONMENTAL; a) The project just started, b) CTC need check tofield for preparing the external monitoring report of implementationAMDAL and will be submit to PMU/PPK/WB

13 Sp Rukis - Tj Kemuning Bengkulu 56,3 7 UKL/UPL one link,sensitive/ steepslopes,soft soil and rivers,squater on the street, resident,productive land.

APBN (P2JN2011)

Page 115: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Length Width

(Km) (m) Result CommentsBudget

Alocated,YearStatus BLH Approval Result Comments

BudgetAlocated,Year

Status

THE WB Approval(A=Studi LARAP ;

B=ImplementationLARAP

Remedial ActionNo Loan Package Name Provinces

Procur

Approval Status by Environmental Agency (BLH)Environmental Screening Social Screening Approval Status by The World Bank

ICB/Prior A. NOL LARAP 28 October2013 and NOL revise 05Feb 2014;

B: NOL WB-1: 16 Nov 2015

SOCIAL: Compensation payment for the remaining PAP is underprocess

Seblat - Ipuh including (1 Amdal) 34,5 6 A. NOL LARAP 20November 2013;

Air Lalang & Air Guntung Bridge 64 m 6 B: NOL MR-1: 12 Feb 2015

SOCIAL: PMU waiting data of payments to the 18 PAP (Balance from259 PAPs) from PPK/Satker PJN I BKL as to be reported to WB

A. NOL LARAP 16 Sept2013

B: Monitoring Report - 1on Jul 2015 and MR-2 onNov 2015

SOCIAL: Compensation payments for the remaining 431 PAP is beingdone

A. -

NCB/Post A. NOL LARAP 20November 2013;

B: NOL MR-1: 23 Mar2015. NOL MR-2: 26 Nov2015

SOCIAL: For MR-3, PMU/CTC waiting data of payment progress for theremaining of 82 PAPs from Satker PJN I Bengkulu

NCB/Post Target LARAP approvalfrom WB is Dec 2014

B: Monitoring Report onOct 2015 (target)

SOCIAL: Compensation payment for the remaining PAP is under process

Target LARAP approvalfrom WB is Dec 2014

NCB/Post B: Monitoring Report onOct 2015 (target)

SOCIAL: Compensation payment for the remaining PAP is under process

Total PAP = 1,245; Compensated = 908; Percentcomplete = 72.93%. NOL WB of Monitoring report no.1 on Aug 26, 2016

YES Recommended2011. UKL&UPL no needNOL from the WB.

Total PAP 1.448 . Land affected 1.531 plot = 45,831M2.Aset affected : building 340 unit = 3.399 M2 ; Fence 12unit = 1.563 M ; Trees 385 rod, Terrace = 991,607 M2

Rp 19.34 Billion.APBN, Satker PJN II,Sumut, 2015

a) A monitoring report -4 of the compensationpayment for 55 PAP is already sent to WB on April 13,2016, and 34 PAP sent to WB on Aug 15, 2016. b)Total PAPs 1.554, and already compensated 580

APBN, 2015 LARAP is under preparation by Balai III Palembang.This package was changed to Sibolga - Sorkam

Rp 46.86 Billion. APBDProv Sumbar/ APBN2016

Total PAP = 892; Compensated =670; Percentcomplete = 76.5%. NOL WB for the monitoring reportno 1 on Sep 26, 2016

YES Recommended2010. UKL&UPL no needNOL from the WB.

Total PAP 259 changed from original 316. No affectedland, Affected assets: building= 658 M2 ; Terrace= 98;Fence= 232 M ; Trees 33 rod

Complete

LARAP

17 Lampung ICB/Prior YES Recommended2012. & NOL WB issuedon 20 Nov 2013

APBN (TLKJ 2011)

100%

16 Bengkulu ICB/Prior

AMDAL

100%AMDAL sensitive areas/steep slopes, softsoil and rivers and beach abrasion

ENVIRONMENTAL: The RKPPL has been submit to PMU/WB at 27 April2016. Based on CTC Survey on 27 April 2016m was found as follows:a).the PAPs were unpacking building, excavation and soil embankmentactivities ongoing, ± 150 electricity pole/tiang listrik should moving,shoulder widening ongoing, errosion in basecamp site, Oil & grease inBase camp part of not manage, part of link was soil errosion,No roadssign around construction site, Quarry permits from governor underprocess, The AMP & Stone Crusher permits was complete, b) The HIV-AIDS campaign, complete on 27 Jan 2015 . d) the quarry owner(contractor) has been manage the quarry as UKL&UPL recommendation& the contractor under prepare implementation of UKL&UPL quarryand base camp & will submit to BLH Kab. Pesisir Barat.

15 Sibolga - Bts Tap Sel Sumatera Utara 36 7 UKL/UPL resident, commersil areas,geometric etc.

APBN (BBPJN I2011)

100% Environmental: The RKPPL complete, under process submit to the PMU& WB, target will submit to PMU/WB mid of June 2016. Based on CTCsurvey on 9 May 2016 was found as follows : a)Land acquisitionproblems, PAPs not agreed to release their properties, some squaternot yet move, b) water pipes belonging was cross the road pavement,shoulder widening and mortal, c) The Contractor has been implementthe Health & road sapety aspect on project (good), d)There are puddlesin basecamp, the contractor should improve the layout stockpilestorage on basecamp, e). The Direction Kit (Office and Mess) Contractorstaff good, Clean & healthy. g) The HIV-AIDS campaign, complete on 27Jan 2015 . f) CTC not yet receive of license for quarry,AMP & StoneCrusher

Sp.Gunung Kemala - Pg. Tampak 36,8 6

ENVIRONMENTAL : a) The project not yet started, b) CTC need check tofield for preparing the external monitoring report of implementationAMDAL (Pre - Construction phase) and should submit to PMU/PPK/WB

Completed/YESEnvironmental permitson April 2014. & NOLWB issued on 8 Aug2014

sensitive areas/resident, landacquisition, steep slopes,soft soiland rivers and beach abrasion

APBN (TLKJ 2011) LARAP Total PAP 2269 . Land affected 1.926 plot = 194.278M2. Aset affected : building 440 unit = 4.557 M2 ; ;Trees 4.267 rod ;paddy field 48.602 clumps.

Rp 64.0 BillionAPBN, Satker PJN IILampung, 2015

SimpleLARAP

a) Total PAPs 1.982, and already compensated 1.531.b) CTC is preparing MR for the remaining of 642 PAPs.

ENVIRONMENTAL: Based on CTC survey for environmental screening isconclusion that this packages need completed by UKL&UPL. WILLDELETED

19 Lais- Bintunan Bengkulu 11,6 7 UKL&UPL one link,sensitive/air pollution,traffic congestion, squater on thestreet, etc

APBN (TLKJ 2011) 100% YES Recommended2010. UKL&UPL no needNOL from the WB.

LARAP Total PAP 556. Affected land = 9,504 M2. Asetaffected : floor = 1,381 M2; Terrace: 652 M2; Fence =3,276 M; Tomb = 18 units; Trees 379 rod; utilities 14unit

Rp.3.349.829.000APBN, Satker PJN IIBengkulu

Complete ENVIRONMENTAL: :a) The RKPPL complete (WB NOL issues on 14 Dec2015). b) The project has been PHO, the contractor has been managethe environmental management such as replanting, road signimplement, embankment etc. c) the RKPPL implemetation period 1(Oct to Dec 2015) was submit to PMU/WB firs of Feb 2016, period Jan -March 2016 under preparation by CTC. b) The HIV-AIDS campaign,complete on 13 Jan 2016. c) the quarry, AMP & Stone Crusher permitsfrom Governor complete.

18 Mukomuko - Bts. Sumbar / Replace toSorkam - Sibolga

Bengkulu 2580% 600% UKL&UPLNCB/

LARAPone link,sensitive/steepslopes,soft soil and rivers

APBN (TLKJ 2011) 100%

YES Recommended2011. UKL&UPL no needNOL from the WB.

SimpleLARAP

Total PAP: 940, Affected land: 46,579 m2, PT KAIAffected land: 682 m2, Partilly affected building(houses and kiosks) = 528m2, Affected fence = 294m,Irrigation channal: 2.600m.

ENVIRONMENTAL; a) The project just started, PCM complete b) CTCneed check to field for preparing the external monitoring report ofimplementation AMDAL and should submit to PMU/PPK/WB

21 Lubuk Alung -Kurataji Sumatera Barat 16,8 7 UKL&UPL one link,sensitive/steepslopes,soft soil and rivers

APBN (Balai II2011)

100% YES Recommended2011. UKL&UPL no needNOL from the WB.

SimpleLARAP

Total PAP: 1,301, Affected land: 40,612 m2, Partillyaffected building (houses and kiosks) = 360.9m2Affected fence = 284m Irrigation channal: 433m

Rp 39.64 Billion. APBDProv Sumbar/ APBN2016

ENVIRONMENTAL; a) The project just started, PCM complete b) CTCneed check to field for preparing the external monitoring report ofimplementation AMDAL and should submit to PMU/PPK/WB

20 Lubuk Alung - Sicincin Sumatera Barat 14,6 7 UKL&UPL sensitive areas/resident, landacquisition, steep slopes,soft soiland rivers

APBN (TLKJ 2011) 100%

Page 116: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

Appendix F

Procurement Plan & Progress

Page 117: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Appendix F

Procurement Plan of Civil WorksWestern Indonesia National Roads Improvement Project (WINRIP)Name of Executing Agency: Directorate General of Highways , Ministry of Public Works. Updated September 30, 201613500 Edit 250112

Qualification Schedule Submission Notification Contractor

Sub - Project Link No. Length Criteria Actual of of(Km) IDR (x10

) USD million (Pre/Post) Application Qualification IDR

A W P - 11 Krui - Biha Lampung 053.0 25,00 163.534,85 12,11 ICB Pre Prior Schedule 12-Jan-11 09-Feb-11 09-May-11 07-Aug-11 15-Dec-11 09-Feb-12 13-Sep-12 28-Feb-13 01-Mar-13 07-Mar-13 18-Apr-13 05-May-13 19-May-13 18-Jun-13

179.888,33 Revised 17-May-13 27-May-13 08-Jul-13 10-Sep-13 24-Sep-13 14-Nov-13 06-Dec-13 07-Sep-15Actual 25-Jan-11 21-Feb-11 02-Nov-11 28-Dec-11 30-Dec-11 28-Feb-12 25-Jan-13 28-Mar-13 17-May-13 27-Jun-12 31-Oct-12 27-May-13 18-Jul-13 10-Sep-13 18-Sep-13 25-Nov-13 08-Jan-14 09-Oct-15

733 10-Jan-16 140.255.020.000

2 Padang Sawah - Sp.Empat West Sumatera 047.2 40,90 228.772,24 16,95 ICB Pre Prior Schedule 12-Jan-11 09-Feb-11 09-May-11 07-Aug-11 15-Dec-11 09-Feb-12 13-Sep-12 28-Feb-13 01-Mar-13 07-Mar-13 18-Apr-13 05-May-13 19-May-13 18-Jun-13Including Air Gadang Bridge 0,10 251.649,47 Revised 17-May-13 27-May-13 08-Jul-13 10-Sep-13 24-Sep-13 14-Nov-13 06-Dec-13 06-Dec-15

Actual 25-Jan-11 21-Feb-11 02-Nov-11 28-Dec-11 30-Dec-11 28-Feb-12 25-Jan-13 28-Mar-13 17-May-13 27-Jun-12 31-Oct-12 27-May-13 18-Jul-13 10-Sep-13 18-Sep-13 06-Dec-13 06-Jan-14 05-Jan-16835 19-Apr-16 249.348.931.000

3 Manggopoh - Padang Sawah West Sumatera 047.1 32,00 167.678,40 12,42 ICB Pre Prior Schedule 12-Jan-11 09-Feb-11 09-May-11 07-Aug-11 15-Dec-11 09-Feb-12 13-Sep-12 28-Feb-13 01-Mar-13 07-Mar-13 18-Apr-13 05-May-13 19-May-13 18-Jun-13184.446,24 Revised 17-May-13 27-May-13 08-Jul-13 10-Sep-13 24-Sep-13 14-Nov-13 06-Dec-13 06-Dec-15

Actual 25-Jan-11 21-Feb-11 02-Nov-11 28-Dec-11 30-Dec-11 28-Feb-12 25-Jan-13 28-Mar-13 17-May-13 27-Jun-12 31-Oct-12 27-May-13 18-Jul-13 10-Sep-13 18-Sep-13 06-Dec-13 06-Jan-14 05-Jan-16805 20-Mar-16 183.940.872.000

4 Ipuh - Bantal Bengkulu 015.1 42,40 247.105,24 18,30 ICB Pre Prior Schedule 12-Jan-11 09-Feb-11 09-May-11 07-Aug-11 15-Dec-11 09-Feb-12 13-Sep-12 28-Feb-13 01-Mar-13 07-Mar-13 18-Apr-13 05-May-13 19-May-13 18-Jun-13271.815,76 Revised 17-May-13 27-May-13 08-Jul-13 10-Sep-13 24-Sep-13 14-Nov-13 06-Dec-13 06-Dec-15

Actual 25-Jan-11 21-Feb-11 02-Nov-11 28-Dec-11 30-Dec-11 28-Feb-12 25-Jan-13 28-Mar-13 17-May-13 27-Jun-12 31-Oct-12 27-May-13 18-Jul-13 10-Sep-13 18-Sep-13 14-Nov-13 13-Jan-14 12-Jan-16820 12-Apr-16 196.438.084.000

Sub Total AWP - 1 807.090,72 59,78 769.982.907.000A W P - 2 and 3

24317 Sp.Gng Kemala - Pugung Tampak Lampung 061.1 36,80 255.269,25 18,91 ICB Pre Prior Schedule 30-Sep-13 14-Oct-13 30-Sep-13 14-Oct-13 06-Nov-13 18-Dec-13 22-Jan-14 06-Feb-14 10-Feb-14 02-Dec-13 16-Dec-13 17-Feb-14 01-Apr-14 30-Apr-14 14-May-14 7-Jul-14 11-Aug-14 31-Jul-16

Revised 19-May-14 2-Jun-14 9-Jun-14 14-Feb-14 28-Feb-14 16-Jun-14 28-Jul-14 1-Sep-14 15-Sep-14 8-Nov-14 13-Dec-14 1-Dec-16Actual 30-Sep-13 10-Oct-13 30-Sep-13 10-Oct-13 11-Nov-13 30-Dec-13 28-Feb-14 13-Jun-14 25-Jun-14 19-Dec-14 7-Jan-14 4-Jul-14 15-Aug-14 10-Oct-14 14-Oct-14 17-Nov-14 4-Sep-15 23-Aug-17

5 Simpang Rampa - Poriaha North Sumatera 015. 9,70 152.870,49 11,32 ICB Pre Prior Schedule 06-Nov-13 20-Nov-13 06-Nov-13 20-Nov-13 22-Nov-13 6-Jan-14 7-Feb-14 21-Feb-14 24-Feb-14 2-Dec-13 16-Dec-13 4-Mar-14 15-Apr-14 19-May-14 2-Jun-14 23-Jul-14 22-Aug-14 12-Feb-16Revised 26-May-14 9-Jun-14 16-Jun-14 2-Jun-14 16-Jun-14 23-Jun-14 4-Aug-14 8-Sep-14 22-Sep-14 15-Nov-14 20-Dec-14 11-Jun-16Actual 07-Nov-13 15-Jul-14 07-Nov-13 18-Nov-13 23-Dec-13 10-Feb-14 9-Jun-14 15-Jul-14 22-Jul-14 18-Jul-14 22-Jul-14 11-Aug-14 22-Sep-14 18-Nov-14 27-Jan-15 17-Mar-15 18-Jun-15 8-Dec-16

11 Bantal - Mukomuko Bengkulu 015.2 50,10 246.499,55 18,26 ICB Pre Prior Schedule 06-Nov-13 20-Nov-13 06-Nov-13 20-Nov-13 22-Nov-13 6-Jan-14 7-Feb-14 21-Feb-14 24-Feb-14 2-Dec-13 16-Dec-13 4-Mar-14 15-Apr-14 19-May-14 2-Jun-14 23-Jul-14 22-Aug-14 11-Aug-16Revised 26-May-14 9-Jun-14 16-Jun-14 2-Jun-14 16-Jun-14 23-Jun-14 4-Aug-14 8-Sep-14 22-Sep-14 15-Nov-14 20-Dec-14 8-Dec-16Actual 07-Nov-13 25-Jun-14 07-Nov-13 18-Nov-13 23-Dec-13 10-Feb-14 16-Jun-14 25-Jun-14 11-Jul-14 21-Jul-14 6-Aug-14 22-Aug-14 3-Oct-14 4-Nov-14 13-Nov-14 18-Dec-14 23-Feb-15 11-Feb-17

720 11-Feb-17 262.611.303.000

13 Sp Rukis - Tj Kemuning Bengkulu 006.1 56,30 316.304,67 23,43 ICB Pre Prior Schedule 06-Nov-13 20-Nov-13 06-Nov-13 20-Nov-13 22-Nov-13 6-Jan-14 7-Feb-14 21-Feb-14 24-Feb-14 2-Dec-13 16-Dec-13 4-Mar-14 15-Apr-14 19-May-14 2-Jun-14 23-Jul-14 22-Aug-14 11-Aug-16Revised 26-May-14 9-Jun-14 16-Jun-14 2-Jun-14 16-Jun-14 23-Jun-14 4-Aug-14 8-Sep-14 22-Sep-14 15-Nov-14 20-Dec-14 8-Dec-16Actual 07-Nov-13 25-Jun-14 07-Nov-13 18-Nov-13 23-Dec-13 10-Feb-14 16-Jun-14 25-Jun-14 11-Jul-14 21-Jul-14 6-Aug-14 22-Aug-14 3-Oct-14 4-Nov-14 18-Nov-14 18-Dec-14 22-Jul-15 10-Jul-17

6 Ps. Pedati - Kerkap Bengkulu 010.0 20,88 92.127,40 6,82 NCB Post Post Schedule 13-Nov-13 27-Nov-13 13-Nov-13 27-Nov-13 04-Dec-13 03-Jan-14 02-Feb-14 16-Feb-14 16-Mar-14 15-Apr-14 9-Jul-15Revised 14-Nov-14 28-Nov-14 5-Dec-14 4-Jan-15 22-Feb-15 8-Mar-15 30-May-16Actual 21-Nov-13 - 19-Nov-14 24-Nov-14 29-Dec-14 - - 3-Mar-15 11-Mar-15 2-Jun-16

540 31-Aug-16 118.444.156.000

19 Lais - Bintunan Bengkulu 009.1 10,80 35.886,28 2,66 NCB Post Post Schedule 13-Nov-13 27-Nov-13 13-Nov-13 27-Nov-13 04-Dec-13 03-Jan-14 02-Feb-14 16-Feb-14 16-Mar-14 15-Apr-14 9-Feb-15Revised 14-Nov-14 28-Nov-14 5-Dec-14 4-Jan-15 22-Feb-15 8-Mar-15 1-Jan-16Actual 21-Nov-13 - 19-Nov-14 24-Nov-14 29-Dec-14 - - 3-Mar-15 11-Mar-15 4-Jan-16

425 8-May-16 44.419.760.000

15 Sibolga - Batas Tapsel North Sumatera 016.1 36,00 376.479,38 27,89 ICB Post Prior Schedule 13-Nov-13 27-Nov-13 27-Dec-13 10-Jan-14 17-Jan-14 28-Feb-14 30-Mar-14 13-Apr-14 11-May-14 10-Jun-14 28-Aug-16Revised 16-Dec-13 30-Dec-13 14-Nov-14 28-Nov-14 15-Jan-15 26-Feb-15 31-Mar-15 14-Apr-15 22-Jun-15 10-Aug-15 27-Oct-17Actual 30-Dec-13 28-Feb-14 18-Dec-14 23-Dec-14 12-Jan-15 23-Feb-15 24/04/2015 7-May-15 3-Jul-15 20-Nov-15 6-Feb-18

773 31-Dec-17

8 Bts.Kota Pariaman - Manggopoh West Sumatera 024.0 46,80 379.034,45 28,08 ICB Post Prior Schedule 14-Jul-14 28-Jul-14 04-Aug-14 18-Aug-14 25-Aug-14 06-Oct-14 10-Nov-14 24-Nov-14 17-Jan-15 16-Feb-15 5-Feb-17Revised 01-Dec-14 15-Dec-14 11-Mar-15 25-Mar-15 1-Apr-15 15-May-15 22-Jun-15 6-Jul-15 11-Sep-15 30-Oct-15 18-Oct-17Actual 18-Dec-14 22-Dec-14 12-May-15 26-May-15 28-May-15 13-Aug-15 9-Oct-15 9-Dec-15 28-Jan-16 23-Mar-16 12-Mar-18

649 31-Dec-17

10 Simpang Empat - Sp.Air Balam West Sumatera 034.1 61,70 515.842,21 38,21 ICB Post Prior Schedule 14-Jul-14 28-Jul-14 04-Aug-14 18-Aug-14 25-Aug-14 06-Oct-14 10-Nov-14 24-Nov-14 17-Jan-15 16-Feb-15 5-Feb-17Revised 01-Dec-14 15-Dec-14 11-Mar-15 25-Mar-15 1-Apr-15 15-May-15 22-Jun-15 6-Jul-15 11-Sep-15 30-Oct-15 18-Oct-17Actual 18-Dec-14 22-Dec-14 12-May-15 26-May-15 28-May-15 13-Aug-15 9-Oct-15 22-Feb-16

7 Indrapura - Tapan West Sumatera 019.0 19,50 178.600,23 13,23 NCB Post Prior Schedule 14-Jul-14 28-Jul-14 04-Aug-14 18-Aug-14 25-Aug-14 29-Sep-14 3-Nov-14 17-Nov-14 29-Dec-14 28-Jan-15 19-Oct-16Revised 01-Dec-14 15-Dec-14 11-Mar-15 25-Mar-15 1-Apr-15 6-May-15 11-Jun-15 25-Jun-15 21-Aug-15 4-Sep-15 25-May-17Actual 18-Dec-14 22-Dec-14 12-May-15 26-May-15 28-May-15 13-Aug-15 9-Oct-15 12-Oct-15 3-Dec-15 10-Dec-15 30-Aug-17

12 Kambang - Indrapura West Sumatera 017.2 55,20 451.810,58 33,47 ICB Post Prior Schedule 14-Jul-14 28-Jul-14 04-Aug-14 18-Aug-14 25-Aug-14 06-Oct-14 10-Nov-14 24-Nov-14 17-Jan-15 16-Feb-15 5-Feb-17Revised 01-Dec-14 15-Dec-14 11-Mar-15 25-Mar-15 1-Apr-15 6-May-15 11-Jun-15 25-Jun-15 21-Aug-15 4-Sep-15 23-Aug-17Actual 18-Dec-14 22-Dec-14 12-May-15 26-May-15 28-May-15 13-Aug-15 9-Oct-15 26-Nov-15 28-Jan-16 23-May-16 12-May-18

588 31-Dec-17

14 Painan - Kambang West Sumatera 017.1 31,50 267.588,30 19,82 NCB Post Prior Schedule 01-Oct-14 15-Oct-14 01-Oct-14 15-Oct-14 22-Oct-14 26-Nov-14 31-Dec-14 14-Jan-15 25-Feb-15 11-Mar-15 30-Nov-16Revised 10-Jul-15 24-Jul-15 10-Aug-15 24-Aug-15 2-Nov-15 16-Dec-15 13-Jan-16 27-Jan-16 2-Mar-16 16-Mar-16 5-Dec-17Actual 10-Sep-15 22-Oct-15 22-Oct-15 2-Nov-15 5-Jan-16 22-Mar-16 4-Apr-16 1-Jun-16 3-Aug-16 24-Apr-18

516 31-Dec-17

16 Seblat - Ipuh, Including Bengkulu 009.4 34,50 269.559,20 19,97 NCB Post Prior Schedule 01-Oct-14 15-Oct-14 01-Oct-14 15-Oct-14 22-Oct-14 26-Nov-14 31-Dec-14 14-Jan-15 25-Feb-15 11-Mar-15 30-Nov-16Air Lalang & Air Guntung Bridge 0,052 Revised 10-Jul-15 24-Jul-15 10-Aug-15 24-Aug-15 22-Oct-15 19-Nov-15 17-Dec-15 31-Dec-15 4-Feb-16 18-Feb-16 8-Nov-17

Actual 4-Sep-15 22-Oct-15 30-Sep-15 22-Oct-15 22-Oct-15 19-Nov-15 11-Jan-16 24-Aug-16

20 Lubuk Alung - Sicincin West Sumatera 002.0 14,60 131.302,20 9,73 NCB Post Prior Schedule 01-Oct-14 15-Oct-14 01-Oct-14 15-Oct-14 22-Oct-14 26-Nov-14 31-Dec-14 14-Jan-15 11-Feb-15 25-Feb-15 18-Aug-16Revised 10-Jul-15 24-Jul-15 10-Aug-15 24-Aug-15 2-Nov-15 16-Dec-15 13-Jan-16 27-Jan-16 2-Mar-16 16-Mar-16 6-Sep-17Actual 25-Aug-15 22-Oct-15 22-Oct-15 2-Nov-15 5-Jan-16 22-Mar-16 23-Mar-16 1-Jun-16 1-Sep-16 22-Feb-18

31-Dec-17

21 Lubuk Alung - Kuraitaji West Sumatera 027.0 16,80 164.629,30 12,19 NCB Post Prior Schedule 01-Oct-14 15-Oct-14 01-Oct-14 15-Oct-14 22-Oct-14 26-Nov-14 31-Dec-14 14-Jan-15 11-Feb-15 25-Feb-15 18-Aug-16Revised 10-Jul-15 24-Jul-15 10-Aug-15 24-Aug-15 2-Nov-15 16-Dec-15 13-Jan-16 27-Jan-16 2-Mar-16 16-Mar-16 6-Sep-17Actual 25-Aug-15 22-Oct-15 22-Oct-15 02-Nov-15 05-Jan-16 22-Mar-16 23-Mar-16 01-Jun-16 1-Sep-16 22-Feb-18

31-Dec-17

18 Sorkam - Sibolga North Sumatera 28,20 197.400,00 14,62 NCB Post Prior ScheduleRevised

Actual

9 Biha - Bengkunat Lampung 39,61 316.880,00 23,47 ICB Post Prior ScheduleRevisedActual

Sub Total AWP - 2 & 3 3.578.534,22 265,08 2.794.820.256.813

Total AWP - 1 , 2 & 3 4.385.624,95 324,86 3.564.803.163.813

Note:1 USD = (Exchange rate assumption for APBN-P FY 2016, Ministry of Finance)

PT. Multi Structure 126.301.991.202

214.327.429.680

PT. Nindya Karya (Persero) 113.818.304.610

Amandements

33.689.452.000300

Proposed amendment for shortened construction period so that the work is completed not later than loan closing date.

Amandements

Amandements

Amandements

PT. Nusa KonstruksiEnjiniring, Tbk. 107.321.260.310

228.899.717.000

199.551.233.000

292.700.000.000

143.688.963.000

Amandements

Proposed amendment for shortened construction period so that the work is completed not later than loan closing date.

540

810

720

720

630 PT. Adhi Karya (Persero),Tbk. 129.699.900.000

PT. Lancarjaya MandiriAbadi - PT. Cahaya TunggalAbadi, J.O.

358.650.419.000

630

630 KSO YASA - CONBLOC

720

KSO. PT. Yasa PatriaPerkasa - PT. Multi

Structure211.374.500.000

540

Proposed amendment for shortened construction period so that the work is completed not later than loan closing date.

Proposed amendment for shortened construction period so that the work is completed not later than loan closing date.

Ref. No. Province Procurement Method

Estimated CostEE

(Incl. VAT)

Estimated CostEE

(Incl. VAT)

Rp13.500,00

Bid Evaluation Report ContractSignature

DateWB NOL

CANCELED

CANCELED

640

730

730

730

720

540

720

720

450

WB Prior/Post

Rewiew

Design

Submission Date

WB NOLDate

CompletionDate

134.909.211.000

PT. Jaya KonstruksiManggala Pratama, Tbk.

WB NOLDate

Submission Date

PQ Document Invitation forPre-

qualification

Evalt.QualificationReport Bidding Document Commenc

ementDate

Construction

Period(day)

SubmissionDate NOL Date Submission

Date

PT. Jaya KonstruksiManggala Pratama, Tbk.

Amandements

197.936.699.000

Proposed amendment for shortened construction period so that the work is completed not later than loan closing date.

Proposed amendment for shortened construction period so that the work is completed not later than loan closing date.

Amandements

Invitationfor Bids

Date

BidOpening

DateWB NOLDate

SubmissionDate

PT. Hutama Karya (Persero)and PT. Daya Mulia

Turangga, J.O.

PT. Waskita Karya(Persero), Tbk.

PT. PP (Persero), Tbk.

355.500.000.000PT. PP (Persero), Tbk.- PT.Statika Mitrasarana, J.O.

260.100.000.011

PT. Jaya KonstruksiManggala Pratama, Tbk.

PT. Waskita Karya(Persero), Tbk. and PT. Daya

Mulia Turangga, J.O.186.936.750.000

PT. Waskita Karya(Persero), Tbk.

PT. Rodateknindo Purajaya.

86.517.470.000

PT. Jaya KonstruksiManggala Pratama, Tbk.

Contract Amount(Incl. VAT10%)

C:\Users\Tediero\AppData\Local\Temp\Appendix F Procurement Management for Civil Works Sep 2016 edf_C248A7

Page 118: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Procurement Plan of Implementation Support and Road Sector Institutional DevelopmentWestern Indonesia National Roads Improvement Project (WINRIP)Name of Executing Agency: Directorate General of Highways , Ministry of Public Works. STATUS September 30, 2016

Ref.No. Contract Description Project Cost (US$) Procurement

Method

Review byBank

(Prior/Post)Schedule

Preparationof Draft

REOI

EOIadvertised in

MPWWebsite

Dateline ofEOI

Submission

SubmissionRFP to WB WB NOL to RFP

Opening ofFinancialProposal

FinalEvaluation

Report

ContractSign

Service Startdate Consultant Remarks

Allocated Original Addendum Actual Submission WB NOL Submission WB NOL Submission Submission WB NOL Original Addendum

2 Implementation Support

Schedule 14-Nov-10 05-Dec-10 23-Jan-11 12-Feb-11 12-Mar-11 02-Apr-11 23-Apr-12 04-Jun-12 22-Jul-12 05-Aug-12 12-Aug-12 15-Sep-12 29-Sep-12 22-Okt-12 12-Nov-12

Actual 26-Nop-10 07-Jun-11 07-Jul-11 30-Jan-12 07-Mar-12 09-Des-11 06-Mar-12 20-Mar-14 30-Apr-12 14-Jun-12 29-Jun-12 27-Agust-12 03-Sep-12 21-Sep-12 12-Okt-12 05-Nop-12 16-Nop-12

Schedule 11-Dec-11 08-Jan-12 27-Feb-12 26-Mar-12 07-May-12 28-May-12 08-Oct-12 22-Oct-12 05-Nov-12 12-Nov-12 19-Nov-12 26-Nov-12 01-Apr-13 18-Apr-13 02-May-13

Actual 26-Nop-10 07-Jun-11 07-Jul-11 02/04/2012 10-Agust-12 20-Jan-12 23-Mei-12 31-Agust-14 23-Okt-12 20-Des-12 21-Feb-13 05-Mar-13 13-Mar-13 25-Mar-13 19-Apr-13 11-Jun-13 25-Jun-13

Schedule 15-Dec-15 22-Dec-15 19-Jan-16 29-Jan-16 12-Feb-16 05-Feb-16 19-Feb-16 26-Feb-16 08-Apr-16 06-May-16 20-May-16 03-Jun-16 17-Jun-16 15-Jul-16 29-Jul-16 12-Aug-16 26-Aug-16 12

Revised 24-Jun-16 15-Jul-15 04-Aug-16 01-Aug-16 08-Aug-16 18-Aug-16 26-Aug-16 29-Aug-16 28-Sep-16 21-Oct-16 04-Nov-16 21-Nov-16 25-Nov-16 05-Dec-16 16-Dec-16 13-Jan-17 23-Jan-17 11

Actual 24-Jun-16 15-Jul-15 04-Agust-16 18-Agust-16 23-Sep-16 02-Sep-16

61,83

55

1.000.000 QCBS Prior

Period (Month)

40

42

Loanreallocation

Date ofReceipt ofProposals

Prior

Evaluation and Short List Technical EvaluationReport Negotiation & Draft Contract

Prior

Theissuance

RFP to theshortlisted

firms

QCBS

QCBS

PT. Perentjana Djaja,Yongma Eng. Co. Ltdand PT. Epadascon

Permata EngineeringConsultant

Renardet S.A., PT.Cipta Strada, PT. DayaCreasi Mitrayasa, PT.Seecons, PT. Yodya

Karya (Persero)

Technical Assistance for Development of SlopeStabilization, Design and Management, Western

Indonesia Roadsc

Contract(US$)

(excl. VAT)

USD1,743,780 +

IDR37,161,972,29

9

USD1,042,900 +

IDR55,037,399,40

6

aCore Team Consultant (Project Management,Technical Assistant, Enviromental & Social Aspectand Road safety Audit)

5.000.000

USD1,276,700 +

IDR21,415,400,00

0

bDesign and Supervision Consultant (Design AWP-2 & 3 and Construction Supervision of Civil WorksProject)

10.000.000

USD 820,600+

IDR51,818,705,00

0

T O T A L

C:\Users\Tediero\AppData\Local\Temp\Appendix F Procurement Management for Consultants Sep 2016 edf_C28B90

Page 119: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

Appendix G

WINRIP Website & Application Progress

Page 120: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

APPENDIX GManagement Information System (MIS) Status on September, 2016

NO. TASK DESCRIPTION STATUS WORK PLAN1 File Storage

storage.winrip-ibrd.comThe storage server to stored all ofsoft files of reports and documents.

The new version of application has beencompleted on February 2015.

2 DMS (DocumentManagement System)dms.winrip-ibrd.com

The application to record allinformation of letter and documentfiles.

The DMS applications is already finals developedwith the addition of features such as parent-childmechanism, letter comments, and directnotification. The data that has been inputted inthe DMS database until the end of May 2016 are796 records of letters and 402 records ofdocuments.

3 Websitewww.winrip-ibrd.com

The WINRIP official website. The website has been developed on August 2013.

4 WebGISwebgis.winrip-ibrd.com

The spatial data and roadsinformation that overlay intoGoogle Maps.

The application has been developed on October2013.

5 FMIS (FinancialManagement InformationSystem)fmis.winrip-ibrd.com

The application to monitoring afinancial and physical progressreport.

The programming modules that have beenfinished are as follows: Project Data Financial and Physical Progress Progress Summary History of Financial and Physical Progress User

The programming modules that notyet finished are as follows: Consultant Services Reports

6 CHS (Complaint HandlingSystem)chs.winrip-ibrd.com

The application to accommodatecomplaints from the public.

The application has been developed on January2014.

Page 121: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

CHECKLIST OF DOCUMENTS IN THE DMS DATABASELast Updated at The End of September 2016

NO PACKAGEACAP ENVIRONMENT FINANCIAL HIGHWAY PROCUREMENT QA RSA SOCIAL TRAINING

PROJECTPMU CTC

CRO CHU TPM AMDAL HIV/AIDS RKPPL SPPL UKL/

UPL IFR AUDIT DED EE RTA BD BEPR CON-TRACT PRAR COW PCM PMER PHO RSTMMR RSA LARAP STUDY

LARAP TIR WIR PMM IR MPR QPR DPCR PCR

1 Krui - Biha #01#02#03#04#05#06#07#08#09#10#11#12#13#14

#2013#2014

Loan Agr.PIPPADMTR

#01#02#03#04#05#06#07#08#09#10#11#12#13#14#15#16#17#18#19#20#21#22#23#24#25#26#27#28#29#30#31#32#33#34#35#36#37#38#39#40#41#42#43

#01#02#03#04#05#06#07#08#09#10

2 Pd Sawah - SpEmpat

3 Manggopoh - PdSawah

4 Ipuh - Bantal

5 Sp Rampa -Poriaha

6 Ps Pedati -Kerkap

7 Indrapura - Tapan

8Bts KotaPariaman -Manggopoh

9 Rantau Tijang -Kota Agung

10 Sp Empat - Sp AirBalam

11 Bantal -Mukomuko

12 Kambang -Indrapura

13 Sp Rukis - TjKemuning

14 Painan -Kambang

15 Sibolga - BtsTapsel

16 Seblat - Ipuh

17 Sp Gn Kemala -Pugung Tampak

18 Mukomuko - BtsSumbar

19 Lais - Bintunan

20 Lubuk Alung -Sicincin

21 Lubuk Alung -Kuraitaji

*(Read the list of glossary on the next page).

Page 122: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

Glossary of the Document Types in the DMS database.

NO DOCUMENT TYPE ABBREVIATION

1 Addendum ADD2 Aide Memoire AM3 Amendment AMD4 Analisis Mengenai Dampak Lingkungan AMDAL5 Audit AUDIT6 Bid Document BD7 Bid Evaluation Procurement Report BEPR8 Commencement of Work COW9 Complaint Report CR

10 Contract CONTRACT11 Detail Engineering Design DED12 Draft Project Completion Report DPCR13 Engineer Estimate EE14 HIV AIDS Report AIDS15 Inception Report IR16 Interim Financial Report IFR17 Invoice INV18 Land Acquisition Resettlement Action Plan LARAP19 Loan Agreement LA20 Mid Term Review MTR21 Minute of Meeting MOM22 Monthly Progress Report MPR23 Photo PHOTO24 Pre-Construction Meeting PCM25 Procurement Plan PP26 Procurement Readines Assessment Report PRAR27 Project Appraisal Document PAD28 Project Completion Report PCR29 Project Implementation Plan PIP30 Project Management Manual PMM31 Project Monitoring and Evaluation Report PMER32 Provisional Hand Over PHO33 Quarterly Progress Report QPR34 Rencana Kerja Pengelolaan dan Pemantauan Lingkungan RKPPL35 Report RPT36 Road Safety and Traffic Management Monitoring Report RSTMMR37 Road Safety Audit RSA38 Road Technical Analysis RTA39 Surat Pernyataan Pengelolaan Lingkungan SPPL40 Term of Reference TOR41 Third Party Monitoring TPM42 Training Implementation Report TIR

Page 123: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

NO DOCUMENT TYPE ABBREVIATION

43 Upaya Kelola/Pemantauan Lingkungan UKL-UPL44 Video VIDEO45 Wakil Pengamat Masyarakat WPM46 Workshop Implementation Report WIR

Page 124: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

Appendix H

ACAP Training /Dissemination Progress

Page 125: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

Appendix H ACAP Activity ProgressAppendix H1

Activities Progress of Community Representative Observers (CROs) and the Works PlanJanuary 2013 – September 2016

No Subject of Activities Date of Finish/completed

1. Orientation and studied of WINRIP documents and Development of Works Plan January 2013

2 Prepared of Workshop of Procurement Document Evaluation. February 2013

3. Conducted Workshop of Procurement Document Evaluation for POKJA, Satker/PPK, BalaiBBPJN and PMU.

Febr. 28, 2013 –March 01, 2013

4. Provided of Term of Reference (TOR) of the CRO's Selection and Guidelines for CRO’sSelection

March 1, 2013

5. Provided the Materials (Slide Presentation/Power-point) of General Explanations aboutWINRIP and the CRO’s selection and

March 8, 2013

6. Provided Training Materials for CROs. March 8, 2013

7. Sending an official letter No. Hm.0603/Bp-11/0175/2013, from the Director of Planning asChairman of PMU to Head of BBPJN II & III, about the Selection of CROs/WPM, + TOR andGuidelines Document

March 11, 2013

8 Preparation of Socialization on CROs selection in BBPJN II Padang for package 02 PadangSawah – Simpang Empat and package 03 Manggopoh - Padang Sawah, and Socialization onCROs selection in BBPJN III Palembang for package 01 Krui – Biha and package 04 Ipuh –Bantal.

March 31, 2013

9. Socialization on CROs selection in BBPJN II Padang for package 02 Padang Sawah – SimpangEmpat and package 03 Manggopoh - Padang Sawah

April 9, 2013

10 Socialization on CROs selection in BBPJN III Palembang for package 01 Krui – Biha andpackage 04 Ipuh – Bantal.

April 11, 2013

11. Sent the Invitation letter from Head of BBPJN III to Rector of Universities /Head of Colleges inPalembang, about selection of the CROs for package 01. Krui – Biha (Prov. Lampung) andpackage 04. Ipuh – Bantal (Prov. Bengkulu).

May 17, 2013

12. Sent the Invitation letter from Head of BBPJN II to Rector of Universities /Head of Colleges inPadang, about selection of the CROs for package 02. Padang Sawah – Simpang Empat andpackage 03. Manggopoh - Padang Sawah (Prov. Sumatera Barat).

May 20, 2013

13. Selection of CROs for Packages Krui – Biha Province Lampung and Ipuh – Bantal ProvinceBengkulu, and training for selected CROs in BBPJN III Palembang

May 23, 2013

14. Selection of WPM/CROs for Packages Manggopoh – Padang Sawah and Padang Sawah –Simpang Empat, and training for selected CROs in BBPJN II Padang

May 27, 2013

15. Sending an official letter No. Hm.0603/Bp-11/0175/2013, from the Director of Planning asChairman of PMU to Head of BBPJN II & III, about the Selection of CROs/WPM, + TOR andGuidelines Document

May 28, 2013

16. Guiding the Balai Besar Pelaksanaan Jalan Nasional (Balai) II Padang to compose theApplication Letter for Approval of selected CROs for Package 03. Manggopoh – PadangSawah, package 02. Padang Sawah – Simpang Empat, and Balai III Palembang for Package 01.Krui – Biha Province Lampung and Package 04. Ipuh – Bantal Province Bengkulu.

May 29, 2013

Page 126: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

No Subject of Activities Date of Finish/completed

17. Compiling summary of the results of Selection the Community Representative Observers(CROs)/ Wakil Pengamat dari Masyarakat (WPM) and the Training activities for selectedCROs for four Packages AWP-1

June 1 - 9, 2013

18. Assist PMU to prepare the Approval letter of selected CROs for four AWP-1 Packages, andprepare of the Decree on Establishment the CROs of AWP-1 WINRIP from Director ofPlanning DGH, as the Chairman of PMU.

June 1 - 9, 2013

19. Monitor and observation the Pre-Bid Meeting and Site Visit activities of Procurement Processthat held by the Procurement Committee, in BBPJN II and III, on 10 June 2013 by CROs inimplementing their tasks on the

June 10 - 16,2013

20. Evaluate of the CROs observation on Pre-Bid Meeting and Site Visit activities Jun.17 - 23, 2013

21. Examine the report of CROs on the monitoring and observation of Pre-Bid Meeting and SiteVisit at the packages of Annual Works Program - 1 (AWP-1) WINRIP.

Modify the template of monitoring the report of the CROs, to be more focused and moresystematically

June 24 - 30,2013

22. Monitor /Observe of Bids Submission and Bids Opening for four packages AWP-1 byCommunity Representative Observers (CROs) for Package 01, 02, 03, and 04

July 18, 2013

23. Monitoring and examined of the CRO’s Report on the monitoring and observation of BidSubmission and Bid Opening activities for four packages of Annual Works Program - 1 (AWP-1) WINRIP, which have been carried out on July 18, 2013

August, 2013

24 Preparation on the Socialization of CROs selection to the Procurement Committee (POKJA) ofSumatera Utara province, for package Simpang Rampa – Poriaha and package Sibolga – BatasTapanuli Selatan

October 2013

25 Monitored /Observed of Procurement progress on Commencement of Bid Winners for fourpackages AWP-1 (Package 01, 02, 03, and 04) and informed to related CommunityRepresentative Observers (CROs).

November 2013

26 Carried out the dissemination of CROs selection to the Procurement Committee (POKJA) ofSumatera Utara province, for package Simpang Rampa – Poriaha. in Balai (BBPJN) I Medanand in Project Management (Satker) Office.

November 19 –20, 2013

27 Carried out the CROs selection for package 17: Simpang Gunung Kemala – Pugung Tampak inLampung..

July 17, 2014

28 Carried out the CROs selection for package 05: Simpang Rampa – Poriaha in North Sumateraprovince.

August 20, 2014

29 Carried out the CROs selection for package 11: Bantal – Mukomuko, and package 13:Simpang Rukis – Tanjung Kemuning in Bengkulu province.

Sept. 1, 2014

30 Ms. Hesti Aulia Sari, ST, CRO for Package 11: Bantal - Mukomuko, meet the invitation of theProcurement Committee (Pokja of Procurement Unit/Unit Layanan Pengadaan BBPJN III,PIU/Satker PJN Region I Bengkulu Province).

Oct. 03, 2014

31 Ms. Hot Maria Angelina, ST, CRO for Package 13: Simpang Rukis - Tanjung Kemuning wasattended Bid-Opening meeting meet the invitation by the Procurement Committee (Pokja ofProcurement Unit/Unit Layanan Pengadaan BBPJN III, PIU/Satker PJN Region II BengkuluProvince).

Oct. 03, 2014

32 Carried out the CROs selection for package 06: pasar Pedati –Kerkap and package 19: Lais -Bintunan in Bengkulu province.

Nov. 27, 2014

33 The elected CROs (Ms. Hot Maria Angelina, ST and Ms. Hesti Aulia Sari, ST) attanded Pre-BidMeeting and site visit for package 06 (Pasar Pedati – Kerkap) and package 19 (Lais –Bintunan), Bengkulu Province

Dec. 05, 2014

34 The Community Development team CTC WINRIP has carried out the selection of CROs forPackage 15: Sibolga – Batas Tapanuli Selatan. The Elected CRO is Ernie Shinta Y. Sitanggang,ST, MT, and Ir. M. Koster Silaen, MT as the substitute CRO (both from Politeknik NegeriMedan / State Polytechnic of Medan)

Dec. 16, 2014,

Page 127: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

No Subject of Activities Date of Finish/completed

35 The elected CROs for package 06 (Pasar Pedati – Kerkap) and package 19 (Lais – Bintunan)Bengkulu Province was attanded the Bid-Opening Meeting.

Dec. 29, 2014

36 Ir. M. Koster Silaen, MT as the substitute CRO of Package 15: Sibolga – Batas Tapanuli Selatanwas attended the Pre-Bid Meeting.

Jan. 26, 2015

37 Ir. M. Koster Silaen, MT as the substitute CRO of Package 15: Sibolga – Batas Tapanuli Selatanwas attended the Bid Opening Meeting

Feb. 23, 2015

38 The Community Development team CTC WINRIP has carried out the selection of CROs forfour packages WINRIP in West Sumatera province, as follow; The appointed CRO for Package 07: Indrapura – Tapan, is Ir. Riswandi, M.Si, and

Apwiddhal, ST, MT as the substitute CRO, both from State Polytechnic of Padang(Politeknik Negeri Padang).

The appointed CRO for Package 08: Batas Pariaman – Manggopoh, is M. Nursyaifi Yulius,MT (Mgt), and Ir. Alzahri, MT as the substitute CRO, both from Bung Hatta University ofPadang (Universitas Bung Hatta Padang).

The appointed CRO for Package 10: Simpang Empat – Simpang Air Balam, is Ir. Drs. Heldi,M.Si, and Ir. Afrizal Naumar, MT as the substitute CRO, both from Bung Hatta University ofPadang (Universitas Bung Hatta Padang).

The appointed CRO for Package 12: Kambang – Indrapura, is Syaiful Amri, SST, MT, and B.Army, ST, MT as the substitute CRO, both from State Polytechnic of Padang (PoliteknikNegeri Padang)

June 12, 2015

39 The appointed CRO Ir. Riswandi, M.Si for Package 07: Indrapura – Tapan, and the appointedCRO Syaiful Amri, SST, MT for Package 12: Kambang – Indrapura were attended the Pre-BidMeeting and Site Visit as invited by the Procurement Committee (Pokja) of PIU/Satker PJNRegion II of West Sumatera ProvinceThe appointed CRO M. Nursyaifi Yulius, MT (Mgt) for Package for Package 08: Batas Pariaman– Manggopoh, , and the appointed CRO Ir. Drs. Heldi, M.Si for Package 10: Simpang Empat –Simpang Air Balam were attended the Pre-Bid Meeting and Site Visit as invited by theProcurement Committee (Pokja) of PIU/Satker PJN Region I of West Sumatera Province.

June. 15-16, 2015

40 The appointed CRO Ir. Riswandi, M.Si for Package 07: Indrapura – Tapan, and the appointedCRO Syaiful Amri, SST, MT for Package 12: Kambang – Indrapura were sent the ObservationReport on Pre-Bid Meeting and Site Visit.

July. 02, 2015

41 The appointed CRO M. Nursyaifi Yulius, MT (Mgt) for Package for Package 08: Batas Pariaman– Manggopoh, , and the appointed CRO Ir. Drs. Heldi, M.Si for Package 10: Simpang Empat –Simpang Air Balam were sent the Observation Report on Pre-Bid Meeting and Site Visit.

July. 10, 2015

42 The CRO for Package 07: Indrapura – Tapan (Ir. Riswandi, M.Si), and the CRO for Package 12:Kambang – Indrapura (Syaiful Amri, SST, MT) were attended the Bid Opening Meeting.

August 13, 2015

43 The CRO for Package for Package 08: Batas Pariaman – Manggopoh (M. Nursyaifi Yulius, MT(Mgt), and the CRO for Package 10: Simpang Empat – Simpang Air Balam (Ir. Drs. Heldi, M.Si)were attended the Bid Opening Meeting.

August 13, 2015

44 Selection of CROs for packages 16 (Sebelat – Ipuh) in Bengkulu province, as follow; The appointed CRO for Package 16 is Mr. Besperi, ST, MT, and and Ms. Anggi Nidya Sari,

ST., MT as the substitute CRO. Both of them were from Bengkulu University.

Nov,.4-5, 2015

45 Selection of CROs for packages 14, 20, and 21 in West Sumatera province, as follow; The Elected CRO for Package 14 (Painan - Kambang) were Mr. M. Nursyaifi Yulius, MT

(Mgt), and Mr. Ir. Alzahri, MT, as the substitute CRO, both of them were from Bung HattaUniversity.

The Elected CRO for Package 20 (Lubuk Alung - Sicincin), were Mr. Ir. Riswandi, M.Si andMr. Syaiful Amri, SST., MT, as the substitute CRO, both of them were from StatePolitechnic of Padang (Politeknik Negeri Padang).

The Elected CRO for Package 21 (Lubuk Alung - Kuraitaji) were Mr. Jafril Tanjung, DR. Engand Mr. Ophiyandri, Ph.D as the substitute CRO, both of them were from AndalasUniversity

Nov,.16-17, 2015

Page 128: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

No Subject of Activities Date of Finish/completed

46 The substitute CRO for Package 16: Sebelat – Ipuh, Ms. Anggi Nidya Sari, ST., MT wasattended the Pre-Bid Meeting and Site Visit as invited by the Procurement Committee (Pokja)of PIU/Satker PJN Region I of Bengkulu Province.

Nov. 05, 2015

47 The substitute CRO for Package 14: Painan - Kambang, Mr. Ir. Alzahri, MT was attended thePre-Bid Meeting and Site Visit as invited by the Procurement Committee (Pokja) ofPIU/Satker PJN Region II of West Province.

Nov. 18, 2015

48 The Elected CRO for Package 20 (Lubuk Alung - Sicincin), Mr. Ir. Riswandi, M.Si, was attendedthe Pre-Bid Meeting and Site Visit as invited by the Procurement Committee (Pokja) ofPIU/Satker PJN Region I of West Sumatera Province.

Nov. 18, 2015

49 The Elected CRO for Package 21 (Lubuk Alung - Kuraitaji), Mr. Jafril Tanjung, DR. Eng, wasattended the Pre-Bid Meeting and Site Visit as invited by the Procurement Committee (Pokja)of PIU/Satker PJN Region I of West Sumatera Province.

Nov. 18, 2015

50 The substitute CRO for Package 16: Sebelat – Ipuh, Ms. Anggi Nidya Sari, ST., MT wasattended the Bid Opening Meeting, invited by the Procurement Committee (Pokja) ofPIU/Satker PJN Region I of Bengkulu Province.

Nov. 19, 2015

51 The CRO for Package 14: Painan - Kambang, Mr. Ir. Alzahri, MT was attended the Bid OpeningMeeting as invited by the Procurement Committee (Pokja) of PIU/Satker PJN Region II ofWest Province.

Jan. 05, 2016

52 The Elected CRO for Package 20 (Lubuk Alung - Sicincin), Mr. Ir. Riswandi, M.Si, was attendedthe Bid Opening Meeting as invited by the Procurement Committee (Pokja) of PIU/Satker PJNRegion I of West Sumatera Province.

Jan. 05, 2016

53 The Elected CRO for Package 21 (Lubuk Alung - Kuraitaji), Mr. Jafril Tanjung, DR. Eng, wasattended the Bid Opening Meeting as invited by the Procurement Committee (Pokja) ofPIU/Satker PJN Region I of West Sumatera Province.

Jan. 05, 2016

54 The appointed CRO Ir. Riswandi, M.Si for Package 07: Indrapura – Tapan, was sent theObservation Report on Bid Opening and Bid Winner Announcement.

April, 20, 2016

55 The appointed CRO Ir. Drs. Heldi, M.Si for Package 10: Simpang Empat – Simpang Air Balamhas sent the Observation Report on Bid Opening and Bid Winner Announcement.

April, 20, 2016

Page 129: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

Appendix H.2The Progress of Third Party Monitoring (TPM) Activities and Works Plan for Next Steps

January 2013 – September 2016

No Subject of Activities Target Completed

1. Preparation the initial draft of ToR of selection the TPM Dec, 2013 Dec, 2013

2. Providing the TPM selection guidelines. Dec, 2013 Dec, 2013

3. Providing the Training Materials for the TPM Dec, 2013 Dec, 2013

4. Preparing the official letter from the Director of Planning as Chairman ofPMU to Head of BBPJN II & III, about the Selection of TPM. Jan, 2014 Jan. 24, 2014

5. Preparing the official letter from the Director of Planning as Chairman ofPMU to Universities, about the Selection of TPM. Jan., 2014 Jan 29, 2014

Preparing the official letter from the Official in Charge/Ketua PelaksanaHarian PMU to Satker/PPK, about the Selection of TPM Jan, 2014 Jan 13, 2014

5.Preparing the official letter from the Official in Charge/Ketua PelaksanaHarian PMU to Universities and Satker/PPK, about the Socialization ofTPM Selection for Package 01, 02, & 03

Feb. 2014 Feb. 07, 2014Feb. 13, 2014

6. Socialization of the TPM selection for package 01: Krui - Biha. Feb. 2014 Febr. 14, 2014

7. Socialization of the TPM selection for package 02: Padang Sawah –Simpang Empat and package 03: Manggopoh – Simpang Empat Feb. 2014 Febr. 18, 2014

8.Preparing the official letter from the Director of Planning as Chairman ofPMU to University of Bengkulu, about the Selection of TPM for package04: Ipuh - Bantal.

Jan, 2014 Febr. 19, 2014

9. Help the PMU on formulating the TPM Evaluation Team March 2014 Febr. 25, 2014

10. Implementation of selection of the TPM for four AWP-1 packages by TPMEvaluation Team March 2014 March 10, 2014

11. Delivery of the Preparatory Training for elected TPM for package 01: Krui– Biha in Lampung June 2014 June 5 - 6, 2014

12.Delivery of the Preparatory Training for elected TPM for package 02:Padang Sawah – Simpang Empat, and package 03: Mangopoh – PadangSawah in West Sumatera

June 2014 June 17-18, 2014

13. Delivery of the Preparatory Training for elected TPM for package 04: Ipuh– Bantal in Bengkulu July 2014 July 7 – 8, 2014

14 Approval process of elected TPM July 2014 July 7 – 8, 2014

15 Assist PMU to prepare the Decree on Establishment the TPM of AWP-1WINRIP from Director of Planning DGH, as the Chairman of PMU.

August 2014 Sept. 1, 2014

16

Sending the Coordination Letter from Director of Planning, DirectorateGeneral of Highways to the Head of BBPJN Region I Medan, aboutSelection of the Third Party Monitoring (TPM) for package 05 (SimpangRampa – Poriaha, and package 15 (Sibolga – Tapanuli Selatan border) inNorth Sumatera.

October 2014 Oct, 07, 2014

17

Sent the Information Letter about participation of Third Party Monitoring(TPM) on WINRIP, from Director of Planning, Directorate General ofHighways to the University of Lampung (UNILA) for package 17 (SimpangGunung Kemala – Pugung Tampak) in Lampung Province.

October 2014 Oct, 03, 2014

18

Sent the Information Letter about participation of Third Party Monitoring(TPM) on WINRIP, from Director of Planning, Directorate General ofHighways to the University of Sumatera Utara (USU) for package 05(Simpang Rampa – Poriaha) in North Sumatera Province

October 2014 Oct, 03, 2014

19

Sent the Information Letter about participation of Third Party Monitoring(TPM) on WINRIP, from Director of Planning, Directorate General ofHighways to the University of Bengkulu (UNIB) for package 11 (Bantal –Mukomuko) and package 13 (Simpang Rukis - Tanjung Kemuning) in

October 2014 Oct, 20, 2014

Page 130: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

No Subject of Activities Target Completed

Bengkulu Province.

20Selection of the Third Party Monitoring (TPM) for packages 17 (SimpangGunung Kemala – Pugung Tampak) Lampung Province November 2014 Dec. 4, 2014

21 Selection of the Third Party Monitoring (TPM) for packages 11, and 13,Bengkulu Province

December 2014 Dec. 22, 2014

22 Socialization and Explaination of the Third Party Monitoring (TPM) forpackages 05, and 15 in Universitas Graha Nusantara Padang-sidempuan

January 2015 Jan, 28, 2015

23 Socialization and Explaination of the Third Party Monitoring (TPM) forpackages 05, and 15 in Universitas Sumatera Utara Medan

January 2015 Jan, 30, 2015

24The Employment Agreement or Memorandum of Understanding betweenTPM (packages 01, 02, 03, and 04) with the CTC WINRIP (PT. PlannersDjaja) has been signed.

November 2014 Feb. 26, 2015

25Delivery of the Preparatory Training for elected TPM for package 11:Bantal – Mukomuko and package 13: Simp. Rukis – Tj. Kemuning, inBengkulu

January 2015 March 11-12,2015

26 Selection of the Third Party Monitoring (TPM) for packages 05, and 15,Northern Sumatera Province March 2015 April 9, 2015

27 Selection of the Third Party Monitoring (TPM) for packages 06, and 19, inBengkulu Province May 2015 May 5, 2015

28Delivery of the Preparatory Training for elected TPM for package 06:Pasar Pedati – Kerkap and package 19: Lais – Bintunan, in BengkuluProvince

June 2015 June 4-5, 2015

29 The TPM of package 01 (Krui - Biha) has been doing site observations (fieldvisit) for the first phase July 2015

30 TPM package 02 (Padang Sawah - Simpang Empat) and package 03(Mangopoh - Padang Sawah), had conducted a field visit for first phase July 2015

31 The TPM of package 01 (Krui - Biha) has been done site observations (fieldvisit) for the second phase

3rd week ofAugust 2015

32 The TPM of package 04 (Ipuh - Bantal) has been done site observations(field visit) for the first phase

4th of August2015

33 The Community Development Team of CTC WINRIP has monitored theTPM’s Activity on TPM Package 01 Krui - Biha Agt. 19 -21, 2015

34 The Community Development Team of CTC WINRIP has monitored theTPM’s Activity on TPM Package 04 Ipuh - Bantal Agt. 27 -28, 2015

35The Community Development Team of CTC WINRIP has monitored theTPM’s Activity on TPM Package 02 (Padang Sawah – Simpang Empat)package 03 (Manggopoh Padang Sawah)

Sept. 10 - 11,2015

36The TPM of Package 02 (Padang Sawah – Simpang Empat) an package 03(Manggopoh Padang Sawah) had been done site observations (field visit)for the first phase

Sept, 2015

37Delivery of the Preparatory Training for appointed TPM for package 05:Sp. Rampa – Poriaha and package 15: Sibolga – Batas Tapsel in NorthSumatera Province

October 9, 2015

38 Delivery of the Preparatory Training for appointed TPM for package 17:Sp. Gunung Kemala – Pugung Tampak in Lampung Province Oct. 22, 2015

39 TPM package 04 Ipuh – Bantal has submitted their Field Visit MonitoringReport to PMU WINRIP Oct. 27, 2015

40 TPM package 03 Maggopoh – Padang Sawah has submitted their FieldVisit Monitoring Report to PMU WINRIP Nov. 11, 2015

41 TPM package 01 Krui – Biha has submitted their Field Visit MonitoringReport to PMU WINRIP Nov. 26, 2015

42The Community Development Team of CTC WINRIP has monitored theTPM’s Activity on TPM Package 11 (Bantal – Mukomuko) package 13(Simpang Rukis – Tanjung Kemuning) in Bengkulu Province

Dec. 03-04, 2015

Page 131: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

No Subject of Activities Target Completed

43 Selection of the Third Party Monitoring (TPM) for packages 07 and 12 inWest Sumatera Province Dec. 22, 2015

44 Selection of the Third Party Monitoring (TPM) for package 16 in BengkuluProvince Dec. 29, 2015

45 Selection of the Third Party Monitoring (TPM) for packages 08 and 10 inWest Sumatera Province Jan. 14, 2016

46The Community Development Team of CTC WINRIP has monitored theTPM’s Activity on TPM Package 04 (Ipuh – Bantal) and package 11 (Bantal– Mukomuko) in Bengkulu Province

Apr. 6-8, 2016

47The Community Development Team of CTC WINRIP has monitored theTPM’s Activity on TPM Package 02 (Padang Sawah – Simpang Empat) andpackage 03 (Manggopoh – Padang Sawah) in West Sumatra Province

Apr. 20-22, 2016

48The Community Development Team of CTC WINRIP has carry out ofSocialization of the TPM for package 14, 20, 21 to Andalas University ofpadang in BBPJN II Padang.

Apr. 27, 2016

49Community Development team has monitored the TPM activity onpackage 06 (Pasar Pedati – Kerkap) and package 19 (Lais – Bintunan) inBengkulu Province.

May 18–20, 2016

50Community Development team has carry out of TPM selection for package20 (Lubuk Alung - Sicincin) and package 21 (Lubuk Alung – Kuraitaji) inWest Sumatera Province

May 26, 2016

51Community Development team has delivered of the Preparatory Trainingfor appointed TPM for package 07and package 08 in West SumateraProvince

June 9, 2016

52Community Development team has monitored the TPM activity onpackage 05 (Simpang Rampa – Poriaha) and package 15 (Sibolga – BatasTapsel) in North Sumatera Province.

June 20–22, 2016

53 Community Development team has monitored the TPM activity onpackage 17 (Simpang Gn. Kemala – Pugung Tampak) in Lampung Province. July 27–29, 2016

54 Community Development team has carry out of TPM selection for package14 (Painan – Kambang) in West Sumatera Province Agt. 11–13, 2016

55 Community Development team has monitored the TPM activity onpackage 06 (Pasar Pedati – Kerkap) in Bengkulu. Agt. 24–26, 2016

56Community Development team has delivered of the Preparatory Trainingfor appointed TPM for package 12 and package 14 in West SumateraProvince

Sept. 27, 2016

Page 132: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

Appendix H.3Works Activities on Complaints Handling Mechanism System (CHS)

March 2013 – September 2016

No Subject of Activities / Item of Tasks Completion Plan/Progress Condition

1 Review of Minister Decree of Public Works No. 323/2005 concerning the procedures ofHandling input from communities on the environment of the Ministry of Public Works April 18, 2013

2 Preparation of Complaints Register and the complaints address (developing of web site ofWINRIP) and provided ACAP to inputting data in the web site.

Completed on themiddle of Feb. 2014.

3 Preparation of Complaint Handling Procedure (already available on the websiteapplication http://www.winrip-ibrd.com) April 2014

4The completion of the Initial investigation of a complaint Procedure, and the procedurefor the investigation of Complaints, as well as the conclusion of investigation (alreadyavailable on the website application http://www.winrip-ibrd.com)

April 2014

5 Monitored and noted the public complaints via SiPP website and WINRIP website, butuntil December 2014 have no complaint about the WINRIP programs December 2014

6

Clarification of Community complaint for package 02 & 03 by Jejak Media Group (JMG) byMr. Buyung on gravel aggregate materials, routine maintenance, and watering work site(dust pollution). It has been followed up by PPK 09 and PPK 10 to hold a clarificationmeeting, followed by the elements PPK, Supervision Consultant (DSC), and Jejak MediaGroup (JMG).

March 23, 2015

7

Clarification of information of work implementation on package 04: Ipuh - Bantal wasunfavorable, by TPM member (Mr. Hardiansyah, ST, MT). The information obtained fromthe local mass media. The problem is that the people around the location of the packageIpuh - Bantal especially road users complained about the excavation of road widening isleft open for an extended period of time without equipped with signs and safety fence,felt very dangerous, especially when driving at night, and according to the informationsome of the riders had been an accident which the vehicle plunged into the hole dug.This information has been followed up by PPK 01 Bengkulu together with the SupervisionConsultant (DSC Field Team) to instruct the Contractor to install traffic signs and safetyfences in places that endanger of road user

March 26, 2015

8

On May 11, 2015, Mr. Dr. M. Fauzi, ST, MT,, the main observer of the Third PartyMonitoring for Package 11 (Bantal - Mukomuko) Bengkulu Province, conveyinginformation from local newspaper clippings (Koran Rakyat Bengkulu) containing news thata 1.5-year-old toddler fell and nearly drowned in the excavation of the road wideningPackage 11 (Bantal - Mukomuko) which flooded about 80 cm deep. That is because theexcavation is situated in the location residential and not immediately undertaken, andwere not given the signs and safety fence.The complaint was submitted to the PMU and forwarded to the related PIU / PPK to beclarified.Until the end of May there has been no follow-up report to the complaint from the PIU /PPK 01 linked.

May 11, 2015

9

The CHS team has been received the copy of complaints letter from Tender Participantson package 08 to the Procurement Committee. Disclaimer of submitted by the tenderparticipants of package 08 (Batas Kot Pariaman – Manggopoh) PT. Adhi Karya (Persero)Tbk – PT. Yasa Patria Perkasa, JO by letter No: ADHI-YASA/12/I/2016 dated January 12,2016, to the Procurement Committee concerning to the results of Bid Evaluation Report(BER) section III, clause 4, point 4.2 (b): Specific Construction Experience in Key Activitiesspecifically on the experience of aggregate base production.

Jan. 15, 2016

10

CHS team has been received the other similar complaint to the Procurement Committeewas submitted by the same tender participant of package 12: Painan – Kambang (PT. AdhiKarya (Persero) Tbk – PT. Yasa Patria Perkasa, JO) by letter No: ADHI-YASA/11/I/2016dated January 4, 2016. The content of complaint was the similar subject i.e. the results ofBid Evaluation Report (BER) section III, clause 4, point 4.2 (b): Specific ConstructionExperience in Key Activities specifically on the experience of aggregate base production

Jan. 15, 2016

Page 133: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

No Subject of Activities / Item of Tasks Completion Plan/Progress Condition

11

CHS team has been received the complaints from Riki Susanato (Konsorsium Nasional LSMProvinsi Bengkulu) dated February 02, 2016. Riki Susanato and Edy Novriansyah had sent aletter No: 06/Khusus/XII/2015 dated December 11, 2015 on a request for publicinformation related to the documents of WINRIP project in Bengkulu province. But thisrequest was unable to fulfill by Satker PJN Wil. I of Bengkulu Province, especially inrelation to Contract Document / Letter of Agreement between the ProjectImplementation Unit of WINRIP for Bengkulu Province with the Contractors.By not granting of the request of the documents, then Riki Susanto delivered thecomplaint through the Complaint Handling System (CHS) of WINRIP website (www.winrip-ibrd.com). The complaint was submitted to the PMU WINRIP and the relevantstakeholders to immediately follow-up.

Feb. 02, 2016

12

On January 20, 2016, there was a World Bank letter No. 281 on reviewing Bid EvaluationReport (BER) for Package 16: Seblat – Ipuh in Bengkulu Province. World Bank has and havecomments on the Bina Marga proposed rejection of the five lower priced bidders.As a follow up of these comments, on February 10, 2016 has been held DiscussionMeeting to respond to the letter. Meeting followed by elements from the WB, PMU, PokjaPJN Reg. 1 of Bengkulu Province. Clarification should be explained in the revision of BERand sent to World Bank.

January 20, 2016February 10, 2016

13

The Complaint from Civil Society of villages in around the project STA 28+900 (DesaPondok Kandang, Desa Pondok Suguh, dan Desa Karya Mulya) was submitted through aletter of district head (Surat Camat) of Pondok Suguh, No. 620.52/56/K.05/IV/2016 datedApril 11, 2016, sent to the Supervision Consultants (Field Team DSC of Package 04) on therequest of one extra culvert / box culvert again, because the existing culvert in small sizeand its surface less downward, which is predicted when it rains the water could not floweasily or drained from the settlement and the Villages will be flooded

April 11, 2016

14

Complaint by Buyung Fajri from Jejak Community sent to PMU WINRIP" via [email protected] on subject of performance audit of PT, JAYA KONTRUKSI MP.Tbkthat was Addendum until April 19, 2016 but the work is still ongoing until April 23 2016,how it could happen, we ask for explanation

May 11, 2016,

15

Complaint by Buyung Fajri from Jejak Community sent to PMU WINRIP" via [email protected] on subject evaluation of stone masonry works on bridgeapproach of Air Gadang Bridge in package 02 (Padang Sawah – Simpang Empat) WestSumatera Province. The stone masonry works by contractor PT. JAYA KONTRUKSI MP.Tbkis bed quality, did not match to the specification

May 14, 2016

16

Complaint by Buyung Fajri from Jejak Community sent to PMU WINRIP" via [email protected] and to Menteri PUPERA by e-mail minister of Public Works and onsubject of the National Road in Pasaman Barat - West Sumatra province, many of themwere which seriously damaged.

May 17, 2016

17Complaint by Buyung Fajri from Jejak Community sent to PMU WINRIP" via [email protected] on subject that Air Gadang Bridge until May 31, 2016 is not yet befinished.

May 31, 2016

18

The Community Development Officer and Information Management Specialist wasmeeting with World Bank (Mr. Andri Wibisono) on topic of completeness the WINRIPwebsite included Complaint Handling System (CHS). The main subject is the completenessof the website application program, the completeness data sources, and the applicableand accessible of this website, so everyone can access or find the data that they needs.

August 2, 2016

19 The establishment of the settlement Commission Handling the Complaint under theInspectorate General of the Ministry of Public Works (Executing Agency) if it necessary

Will establish if there is acase that needs specialhandling

20Preparation of the device for Executing Agency such as: Procedures announcement ofpenalties, procedures for the annual Survey, Procedure Annual Independent Review, theprocess of Auctions

Done by ProcurementSpecialist and theContract ExaminerCommittee

21 The development of a code of conduct and actions for Implementing Institutions/Implementing Agency (Bidders, Suppliers, contractors and Consultants)

Done by PMU of DGH

Page 134: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

No Subject of Activities / Item of Tasks Completion Plan/Progress Condition

22 Support the PMU in the Management and Monitoring of the implementation policy inhandling public complaints

Have been carried outthroughout projectimplementation period

Page 135: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

Appendix H.4Works Activities on Publication / Disclosure Activities

January 2013 – September 2016

No Subject of Activities / Item of Tasks Completion Plan/Progress Condition

1 Conducted Workshop of Procurement Document Evaluation for POKJA,Satker/PPK, Balai BBPJN and PMU

February 28, 2013– March 01, 2013

2 Conducted Workshop of World Bank Guidelines of Procurement for WINRIP tothe POKJA, Satker/PPK, Balai BBPJN and PMU

April 24 – 25, 2013

3 Review training materials on Project Management Manual (PMM), especiallyCHAPTER XI of the anti-Corruption Action Plan (ACAP)

First updating April 29, 2013

4 The second Review of training materials on Project Management Manual(PMM), Chapter I - XII

Second updating onDecember 18, 2013

5 The third Review of training materials on Project Management Manual (PMM),Chapter I - XII

third updating onApril, 2014

6. Preparing Method Transparency to the Public, and Improvement the proceduresto the Public Disclosure through information media (website).

Establishment of InformationSystem (MIS) was finish on

March 2014

7. The updating of Project Management Manual (PMM), Chapter 3, 9, 11, and 13,has been held in Bogor June 2014

8 Delivery of the Preparatory Training for elected TPM for AWP-a packages: 01,02, and 03 June 2014

9 Delivery of the Preparatory Training for elected TPM for AWP-a packages: 04 July 2014

10 The implementation of Dissemination/training of the PMM to Stakeholders forPackages 01, 02, 03, and 04

September 10 - 11 2014

11Inputting / upload / update of data/documents/reports of the CommunityRepresentative Observers (CROs) activities for packages 01, 02, 03, 04, 17, 11,13, 05, 06, 19, and 15 into the WINRIP’s website.

From Augt 2013 – April, 2015

12Inputting / upload / update of data/documents/reports of the Third PartyMonitoring (TPM) activities for packages 01, 02, 03, 04, 17, 11, and 13 into theWINRIP’s website.

From Augt 2013 – April, 2015

13Inputting / upload / update of data/documents/reports of Procurement ofContractors for packages 01, 02, 03, 04, 17, 11, 13, 05, 06, and 19 into theWINRIP’s website.

From Augt 2013 – April, 2015

14Inputting / upload / update of data/documents/reports of Environmentalactivities for packages 01, 02, 03, 04, 17, 11, 13, 05, 06, and 19 into the WINRIP’swebsite.

From Augt 2013 – April, 2015

15Inputting / upload / update of data/documents/reports of Social Safeguard /LARAP for packages 01, 02, 03, 04, 17, 11, 13, 05, 06, and 19 into the WINRIP’swebsite.

From Augt 2013 – April, 2015

16Inputting / upload / update of Progress Report/ Actual Status (fisichal worksand financial) of each package that has been contracted (packages 01, 02, 03,and 04) into the WINRIP’s website.

From Augt 2013 – April, 2015

17 Inputting / upload of Monthly Progress Report (MPR December 2012 – December2014) into the WINRIP’s website.

Every Month

Page 136: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

No Subject of Activities / Item of Tasks Completion Plan/Progress Condition

18 Inputting / upload of Quarterly Progress Report (QPR December 2012 –December 2014) into the WINRIP’s website.

Every Three Months

19 Delivery the IFM Training for Stakeholders (Official and staff of Satker, Officialand staff of PPK) packages 01, 02, 03, and 04.

26 – 27 November 2014

20 Publish the Quarterly Newsletter on official website of MPW and WINRIP’swebsite

Every three months forQuarterly Newsletter October –

December 2015

21 Delivery the IFM Training for Stakeholders (Official and staff of Satker, Officialand staff of PPK) packages 05, 11, 13, and 17.

Feb. 11 - 12, 2015

22 Report of Technical and Financial Audit Consultants (TFAC) for Packages 02 and03 has been received from TFAC Team

Feb. 27, 2015

23

Delivery of the Preparatory Training for elected TPM for package 11: Bantal –Mukomuko and package 13: Simp. Rukis – Tj. Kemuning, in Bengkulu. Thistraining followed the elements of TPM, Satker/PPK, Contractors, SupervisionConsultants, and Balai BBPJN III Palembang.This training is intended to provide an explanation of the scope of duties of TPMand provide information to all elements involved in the implementation of theproject that the community be involved in monitoring the implementation ofthe project which is represented by the TPM, in accordance with the LoanAgreement.

March 11 – 12, 2015

24 Publish the Quarterly Newsletter on official website of MPW and WINRIP’swebsite

Every three months forQuarterly Newsletter January –

March 2015

25Delivery of PMM Socialization to Stakeholders (Balai BBPJN III, PIU/PPK,contractors and Supervision Consultants ‘DSC’) for four Packages (06, 11, 13,and 19) in Bengkulu Province

May 6 – 7, 2015

26

Delivery of the Preparatory Training for elected TPM and Work Plan for manageand monitor the Environment / Rencana Kerja Pengelolaan dan PemantauanLingkungan (RKPPL) for package 06: Ps. Pedati – Kerkap and package 19: Lais –Bintunan, in Bengkulu. This training followed the elements of TPM, Satker/PPK,Contractors, Supervision Consultants, and Balai BBPJN III Palembang.

June 4 – 5, 2015

27 Publish the Quarterly Newsletter on official website of MPW and WINRIP’swebsite

Every three months forQuarterly Newsletter April –

June 2015

28 The Mid-Term Report of the first semester 2015 has been written by the early ofJuly 2015

July, 2015

29 Delivery of PMM Training for Stakeholders (PPK, contractors and SupervisionConsultants ‘DSC’) for Packages 17, 05, and 15

November 23 – 24, 2015

30Inputting / upload / update of data/documents/reports of the CommunityRepresentative Observers (CROs) activities for packages 07, 08, 10, 12, 14, 16,20 and 21 into the WINRIP’s website.

From May – Dec, 2015

31Inputting / upload / update of data/documents/reports of the Third PartyMonitoring (TPM) activities for packages 05, 06, 07, 12, 15, 19 and 16 into theWINRIP’s website.

December, 2015

32Inputting / upload / update of data/documents/reports of Procurement ofContractors for packages 07, 08, 10, 12, 14, 16, 20 and 21 into the WINRIP’swebsite.

From June – Dec, 2015

33 Inputting / upload / update of data/documents/reports of Environmentalactivities for 07, 08, 10, 12, 14, 16, 20 and 21 into the WINRIP’s website.

From May – Dec, 2015

34Inputting / upload / update of data/documents/reports of Social Safeguard /LARAP for packages for 07, 08, 10, 12, 14, 16, 20 and 21 into the WINRIP’swebsite.

From May – Dec, 2015

Page 137: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

No Subject of Activities / Item of Tasks Completion Plan/Progress Condition

35Inputting / upload / update of Progress Report/ Actual Status (physically works,financial and audits) of each package that has been contracted (packages 05, 06,07, 11, 13, 15, 17 and 19) into the WINRIP’s website.

From May – Dec, 2015

36Inputting / upload / update of data/documents/reports of the CommunityRepresentative Observers (CROs) activities for packages 14, 20 and 21 into theWINRIP’s website.

January, 2016

37Inputting / upload / update of data/documents/reports of the Third PartyMonitoring (TPM) activities for packages 14, 20, and 21 into the WINRIP’swebsite.

December, 2015

38 Updated the Project Management Manual (PMM) Chapter III : Planning andProgramming

January, 2016

39 Review and Updated of the Project Management Manual (PMM) Chapter IX :Performance Monitoring and Evaluation,

March, 2016

40 Review and Updated of the Project Management Manual (PMM) Chapter XI:Anti-Corruption Action Plan (ACAP)

April, 2016

41Review and Updated of Power-point presentation of the Project ManagementManual (PMM) Chapter IX : Performance Monitoring and Evaluation, Chapter XI:Anti-Corruption Action Plan (ACAP)

June, 2016

42

The Information Management Specialist and Community Development Officerimmediately follow up the results of the meeting with World Bank to becompleted and perfected. The results of that meeting be used as an ingredientof Kick-off and Wrap-up Meeting, which would then be inserted in the Final AdieMemoire of August 11, 2016

August 11, 2016

43

Delivery of PMM Socialization to Stakeholders (Balai BPJN III, PIU/Satker Region Iand II of West Sumatera, PPK 06 (pack. 20), PPK 10 (Pack. 08 & 21), PPK 14(Pack. 14), PPK 15 (Pack. 07), contractors and Supervision Consultants ‘DSC’) forfour Packages (07, 08, 14, 20, and 21) in West Sumatera Province

Augt. 29 –31, 2016

44 Delivery of TPM Preparatory Training for packages 12 and 14 in Padang, WestSumatera

Sept. 26 – 28, 2016

Activities Plan for Next Step

1 Delivering the other training programs of WINRIP shall inline of projectimplementation progress.

Depend on projectimplementation progress

2 Public Expose on ACAP to the civil society forum in each project location (eachpackage)

Before the construction worksstarted

3 Monitoring of the implementation of disclosure and transparency of informationto each package during contraction period.

Plan for three time monitoringto field for each package during

contraction period

Page 138: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

Appendix H.5Status of WINRIP’s Anti-Corruption Action Plan Activity

Edition: September, 2016

RISKAREA NoACTIONS STATUS (as of September, 2016)

Enha

nced

Dis

clos

ure

and

Tran

spar

ency

1 MPW will provide the Contact information forcomplaints related to WINRIP in the PIP, PMM, MPWwebsite and in bidding documents.

Complaint Handling System has been established, written in PMM(Chapter 11.4), and published on DGH websitehttp://binamarga.pu.go.id linked to WINRIP website(http://www.winrip-ibrd.com)

Contact information is provided in Bidding Documents Chapter 2:Instruction to Bidders (Instruksi Kepada Peserta Lelang - IKP 34).

2 Work programs and Procurement Plan published onthe official website of MPW and made available to thepublic.

Work Programs and Procurement Plan available in the MPW website(http://eproc.pu.go.id) and (http://www.winrip-ibrd.com) Open http://www.winrip-ibrd.com, click Pengadaan there are

available data on Procurement Plan, Procurement Information,and List of Contract awarded.

3 Procurement Plan updated annually. Done. Officially sent to World Bank.4 Quarterly newsletter published on the official website

of MPW, including information concerning the list ofcontracts, implementation progress, project-relatedworkshops and the number, typology and status ofcomplaints.

Quarterly newsletter is updated every three months (quarterly) foryear 2015 has developed 3 newsletters (the first Newsletter is ofDecember – March 2015),. The previous quarterly Newsletters waspublished on WINRIP website (http://www.winrip-ibrd.com) linkedto DGH website (http://binamarga.pu.go.id), and the most recent isof April – June 2016 have been developed but did not beenpublished. Quarterly Newsletter is attached with: Summary Physical Works

Implementation Progress, List Implementation of Training /Workshop, and the List of packages that have been contracted.Such information has been inputted or uploaded on the websiteWINRIP (http://www.winrip-ibrd.com) linked to the website ofD.G. of Highways http://binamarga.pu.go.id.

5 Quarterly newsletter sent by MPW to the civil societyforum in each project province in hard copy orthrough an electric mailing system.

Quarterly newsletter published on the website WINRIP developed inthe form of tables and descriptions of activities (see point 4 above). The Quarterly Newsletter is always sent to the civil society forum:

i.e. Indonesian Road Development Association / HimpunanPengembangan Jalan Indonesia (HPJI) and IndonesianTransportation Society / Masyarakat Transportasi Indonesia (MTI)in central level and to the provincial level where the WINRIPproject are developed, by e-mail.

6 Bidding documents, short-list of consultants andrequests for proposals (this provision does not includeactual bids and proposals) issued in accordance withthe procurement provisions of the loan agreementavailable to any member of public promptly uponrequest, subject to payment of a reasonable fee forproducing bidding documents and request forproposals. Documents available until a year aftercompletion of the contract entered into for the goods,works or services in question.

The Bidding Documents such as: Standard Bidding Document, BidInvitations, Instruction to Bidders, General Specifications, DetailedEngineering Design/Drawing, General Condition of Contracts,Special Condition, Bill of Quantity, Owner Estimate, etc, areavailable on MPW website (http://eproc.pu.go.id) and some ofthem were uploaded in WINRIP website (http://www.winrip-ibrd.com), and continuously added for which are available data.

Contract Packages #01, 02, 03, 04, 05, 06, 07, 08, 11, 13, 12, 14,15, 16, 17, 19, 20, and 21 have been awarded.

Packages # 01, 02, 03, 04, 05, 06, 07, 08, 11, 13, 12, 15, 17, 19were under construction.

Packages #10 and 16 are under procurement process. Packages # 09 and 18 proposed to delete from project list,

because the available funds are insufficient7 Information as follows published in UNDB on-line, and

on MPW website within two weeks of contract award(after Bank’s no objection): (a) name of each bidderwho submitted a bid; (b) bid prices as read out at thebid opening; (c) name and evaluated prices of eachbid; (d) name of bidders whose bids were rejectedand the reasons for rejection; and (e) name of thewinning bidders and the prices, as well as the

ICB Contract Award Notice for Packages #01, 02, 03, 04, 05, 08, 11,12, 13, 15, and 17 were published. Package #10 is under procurement process.

Page 139: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

RISKAREA NoACTIONS STATUS (as of September, 2016)

duration and summary scope of the contractawarded.

8 List of all contracts awarded in the three monthspreceding the date of the request by any person orcompany request available, including the name of thecontractor/ supplier/ consultant, the contractamount, the number of bidders/proposals, theprocurement method and the purpose of thecontract.

The information is available, but there has been no request by anyperson or company. The Data of Physical progress of packages that are under

constructions had been completed with any changes of thecontact like: review design, CCO, technical justification,memorandum, amendment, addendum, etc.

9 Final audit reports (financial or otherwise, includingqualified audit reports) and all formal responses ofthe government in relation to such reports publiclyavailable. The audit reports and all formal responseswill be published on the MPW official website withinone month after the report is accepted as final.

MPW has sent report as a response to the Bank regarding thefindings of the audit report.o The Final Audit for 2012, 2013 and 2014 have been completed,

and uploaded to website (http://www.winrip-ibrd.com) linked tohttp://binamarga.pu.go.id

o The Final Audit for 2015 had been held by BPK, and the auditresults are being responding and follow up by DGH and the relatedparties.

10 Financial, technical and physical progress of theproject monitored by an IT system (integrated SiPP) aspublicly accessible project monitoring system.

Those reports are available on WINRIP website (http://fmis.winrip-ibrd.com) linked to Bina Marga website(http://binamarga.pu.go.id/bm/sipp.html).o The financial, technical and physical progress was already

uploaded in the website. It’s have been completed withinformation of name of contractors, number of contract, date ofcontract, contract Price, duration of contract, etc.

o The tutorial guidance has been developed and already been sentby MIS specialist.

o The financial progress report is updated every three months asthe IFR quarterly report.

The technical and physical progress is updated every month as theMonthly Progress Report, and every three months as the QuarterlyProgress Report

Enha

nced

Civ

il So

ciet

y O

vers

ight

11 Representatives of civil society groups invited toattend the public bid openings and other keyprocurement steps. Community RepresentativeObservers (CROs) invited from local universities orother selected independent institutions. Attendancelist for the procurement/selection process signed.

CROs for 19 packages (#01, 02, 03, 04, 05, 06, 07, 08, 10, 11, 12, 13,14, 15, 16, 17, 19, 20, 21) have been selected, and have attended therequired meeting (Pre-Bid Meeting and Bid Opening Meeting).Attendances list are available.

12 Guidelines on appropriate procedures for the aboveprovided in the PMM.

The Appropriate procedures are written in PMM Chapter 11.2,and in the TOR of CROs Selection.

13 Third Party Monitoring (TPM) mechanism established.This mechanism includes regular sharing ofinformation with the media.

TPM for all 19 Packages #01, 02, 03, 04, 05, 06, 07, 08, 10, 11, 12,13, 15, 16, 17, 19, 20, 21, and 14# had been selected.

TPM Letter of Agreement for Packages #01, 02, 03, 04, 05, 06, 07,08, 11, 13, 15, 17, and 19 had been signed.

For Packages 12 and 14 are under process Packages 16, 20, and 21 are waiting for preparatory training. For Package, 10 is under procurement process.

14 Annual Accountability Meetings held. First meetingheld at the province level before procurement ofcontractors or service providers.

The Annual Accountability Meetings were held through the followingactivities: Coordination meeting at the Regional level (Balai- BBPJN) and in

each province Public Expose of LARAP to the community around the project area Socialization of projects during selection of CROs and TPM at local

universities near project sites and in the same province. (Detaildates of Socialization meeting and training of the CROs and TPMcan be found in the Monthly or Quarterly Report of WINRIP in the

Page 140: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

RISKAREA NoACTIONS STATUS (as of September, 2016)

WINRIP’s website) Public expose and dissemination of information to inhabitants

around the project is delivered through Project InformationBoard.

PMM workshop has been carried out in:­ Padang on September 12, 2014 for four AWP-1 packages # 01,

02, 03, and 04.­ Bengkulu on May 6 – 7, 2015, delivery of PMM Socialization to

Stakeholders (Balai BBPJN III, PPK, contractors and SupervisionConsultants) for four Packages # 06, 11, 13, and 19.

­ Bogor on November 24 – 25, 2015, delivery of PMMSocialization to Stakeholders (BBPJN I, BBPJN III, PPK 08, PPK12, contractors and Supervision Consultants) for threePackages (05, 15, 17).

­ The PMM Socialization has been held in Padang on August 29 –30, 2016 for project stakeholders of six packages in WestSumatera Province # 07, 08, 12, 14, 20, and 21.Target group of this socialization as follows: BBPJN II, PIU/Satker PJN Region I and II of West Sumatera Province, PPKswho are handling the projects (PPK 06, PPK 10, PPK 14, and PPK15), Design and Supervision Consultant (DSC), Field SupervisionConsultants, and Contractors.

Enha

nced

Com

plai

nts H

andl

ing

Mec

hani

sm

15 Enhanced complaints handling mechanism, whichincludes maintaining project complaint log and filingto monitor status of follow-up of each complaint,established by the MPW.

A Complaint Handling System has been established, written in PMM(Chapter 11.4), and published on WINRIP website (http://chs.winrip-ibrd.com).

16 Complaints received acknowledged to thecomplainant by the Project Implementation Unit (PIU)within seven (7) days of receipt with a copy to PMU,DGH and then World Bank. Bid-related complaintsreceived during bid evaluation period responded afterthe contract award. All complaints handlingcomponent included in the MPW website, andupdated on a monthly basis.

Up to present as recorded 10 complaints have been followed up. Complaint procedures and handling mechanism are written in

PMM (Chapter 11.4) and uploaded to website (http://chs.winrip-ibrd.com)

Complaints are handled by the Secretariat of Complaint HandlingUnit (CHU) under PMU WINRIP, and CHU will update thecomplaint status.

Dispute resolution of complaints will be handled by differentinstitutions (PPK, Satker, Inspectorate General, KomisiPenyelesaian Pengaduan), depending on the type of complaints(i.e. general matters, technical matters, or specific matters).

17 Information concerning the alternative conduits forcomplaints (telephone hotline, dedicated emailaddress and PO Box) widely disseminated.

The information of Complaint procedures has been disseminatedto the different institutions related to project implementation(PPK, Satker, Contractors, Engineer/ Supervision Consultants)during PMM workshop and to the CROs & TPM duringintroductory training.

PPK will put the information of complaint procedures and otherproject information to the public through Project InformationBoard.

18 Strict procedures to ensure anonymity of informants. The procedures ensure anonymity of informants

19 Recording and appropriate referral of all incomingcomplaints undertaken by MPW with each casegenerating an automatic, standard format report tothe Bank.

It has been established in the WINRIP website (http://chs.winrip-ibrd.com)

Miti

gatin

g Co

llusi

on,

Forg

ery

and

Frau

dRi

sks

20 “Semi E-Tendering” on the MPW official publicwebsite used by MPW for both works and consultantservices. Key information (see list) published on theofficial website (www.pu.go.id): (a) invitation for bids;(b) download of bidding documents; (c) bidclarifications; (d) minutes of bid opening; (e)information of contract award.

Semi e-procurement was applied before November 2014 and full e-procurement was applied afterward.

Page 141: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

RISKAREA NoACTIONS STATUS (as of September, 2016)

21 All specifications defined in the bidding documents,and all clarifications sought through writtencorrespondence and replies sent to all bidders.

Done.

22 Key indicators of submitted bids analyzed by MPW,through CTC. Short technical report for each group ofbidding (the bidding packages simultaneously invited)prepared and shared with the Bank.

Applicable only to AWP-1 (Packages #01, 02, 03, and 04).

23 Contracts awarded within original bid validity period. The last information from the Procurement Specialist, there aresix (6) contracts awarded within original bid validity period(Package # 04, 06, 11, 13, 17, and 19).

Twelve (12) contracts awarded after original bid validity period(Packages # 01, 02, 03, 05, 07, 08, 12, 14, 15, 16, 20, and 21).

One packages are under process procurement (# 10).24 Guidelines for preparation of specifications/ selection

criteria in the bidding documents and request forproposals prepared to ensure compliance with theBank Guidelines.

Done

25 FIDIC arrangements used by MPW with theindependent supervision consultant havingresponsibility as the “Engineer” in the workscontracts.

Done

26 Criteria for nominating procurement committeesestablished by MPW. Each Project ImplementationUnit includes a specified procurement officer andfinancial management officer.

Done

27 Procedures to maintain proper project andprocurement filing established by MPW, includingfiling of advertisements, bidding documents/requestfor proposals, clarifications/addenda to biddingdocument/request for proposals, minutes of bidopening, evaluation reports, contract award and finalcontract documents, and also for regular review ofaccounting reports, including all supportingdocuments (i.e. travel report, receipts, etc.).

Done

28 Regular interim audits conducted by third parties,which include review of procurement process andresults.

Done.

Sanc

tions

and

Rem

edie

s

29 Remedial actions and sanctions for cases of fraud andcorruption that are reported and for which evidenceis found established by MPW.

No cases of fraud and corruption have been encountered so far. Ifsuch case happened MPW will use remedial actions and sanctionsbased on GOI and Bank regulations.

30 Information regarding fraud, corruption, collusionand/or coercive practice cases (resulting in thetermination of the contract and possibly otherpenalties), where lessons are learned and funds areretrieved, widely disseminated.

It will be done if there are such cases.

31 Disbursement to any given contract/locationsuspended or stopped completely if cases ofcorruption not dealt with effectively.

It will be done if there are such cases.

Page 142: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

Appendix I

Performance Indicator

Page 143: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

Appendix I: WINRIP Performance Indicators

Project Development Objective Indicators

Indicator Name CoreUnit ofMeasure

Baseline(2010)

FY1(2013)target

FY1(2013)actual

FY2(2014)target

FY2(2014)actual

FY3(2015)target

FY3(2015)actual

FY4(2016)target

FY4(2016)actual

FY5 (2017)end target

FY5 (2017)end actual

Increase of AADTon project roadsections (allvehicle types)

Number Value 8,241 10,880 11,936 4,140 13,094 12,696 13,990 N.A. 14,947

Date 31-Dec-2010 31-Dec-14

March2015

9-Aug-16

31-Dec-2017

Comments 2010 baseline isthe simpleaverage of theAADT of the 19WINRIP sections(page 41 ofPAD).

Resultsfrom IRMS

Resultsfromstatictrafficcounts on6 links in 4provinces

2015IRMSdata notyetavailable

2017 target calculated using the growthforecasts for four vehicle types on page 39of the PAD, weighing them by the typicaltraffic composition from the 2010 MasterPlan for Arterial Road Network in SumatraIsland (motorcycles 54.9%, cars 24.6%,buses 2.7% and trucks 17.8%)

Indicator Name CoreUnit ofMeasure

Baseline(2010)

FY1(2013)target

FY1(2013)actual

FY2(2014)target

FY2(2014)actual

FY3(2015)target

FY3(2015)actual

FY4(2016)target

FY4(2016)actual

FY5 (2017)end target

FY5 (2017)end actual

Average vehicleoperating costfor a typical carreduced by atleast 5% onproject roads(base yearoperating cost:US$0.19/veh-km)

Percentage Value 0.00 n.a. 3.00 n.a. n.a. 5.00

Date 31-Dec-2010 31-Dec-14

10-Nov-15

9-Aug-16

31-Dec-2017

CommentsTarget notassessedbecauseno workscompleted

Target notassessedbecauseno workscompleted

Vehicleoperatingcosts willbeassessedat projectend

Indicator Name CoreUnit ofMeasure

Baseline(2010)

FY1(2013)target

FY1(2013)actual

FY2(2014)target

FY2(2014)actual

FY3(2015)target

FY3(2015)actual

FY4(2016)target

FY4(2016)actual

FY5 (2017)end target

FY5 (2017)end actual

Average vehicle Percentage Value 0.00 n.a. 5.00 n.a. N.A. 8.00

Page 144: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

operating costfor a typical busreduced by atleast 8% onproject roads(base yearoperating cost:US$0.35/veh-km)

Date 31-Dec-2010 31-Dec-14

10-Nov-15

9-Aug-16

31-Dec-2017

CommentsTarget notassessedbecauseno workscompleted

Target notassessedbecauseno workscompleted

Vehicleoperatingcosts willbeassessedat projectend

Indicator Name CoreUnit ofMeasure

Baseline(2010)

FY1(2013)target

FY1(2013)actual

FY2(2014)target

FY2(2014)actual

FY3(2015)target

FY3(2015)actual

FY4(2016)target

FY4(2016)actual

FY5 (2017)end target

FY5 (2017)end actual

Average vehicleoperating costfor a typicalheavy truckreduced by 10%on project roads(base yearoperating cost:US$0.65 veh-km)

Percentage Value 0.00 n.a. 7.00 n.a. N.A. 10.00

Date 31-Dec-2010 31-Dec-14

10-Nov-15

9-Aug-16

31-Dec-2017

CommentsTarget notassessedbecauseno workscompleted

Target notassessedbecauseno workscompleted

Vehicleoperatingcosts willbeassessedat projectend

Indicator Name CoreUnit ofMeasure

Baseline(2010)

FY1(2013)target

FY1(2013)actual

FY2(2014)target

FY2(2014)actual

FY3(2015)target

FY3(2015)actual

FY4(2016)target

FY4(2016)actual

FY5 (2017)end target

FY5 (2017)end actual

Averagepassenger traveltime for lightvehicles reducedby at least 20%on project roads(base year speed:51 km/h)

Percentage Value 0.00 0.00 -15.29 5.00 3.7 7.84 20.00

Date 31-Dec-2010 31-Dec-13

31-Dec-14

10-Nov-15

9-Aug-16

31-Dec-2017

CommentsFor 4ongoingworksonly

For 9ongoingworksonly

For 12ongoingworksonly

Indicator Name CoreUnit ofMeasure

Baseline(2010)

FY1(2013)

FY1(2013)

FY2(2014)

FY2(2014)

FY3(2015)

FY3(2015)

FY4(2016)

FY4(2016)

FY5 (2017)end target

FY5 (2017)end actual

Page 145: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

target actual target actual target actual target actual

Averagepassenger traveltime for largebuses reduced byat least 20% onproject roads(base year speed:46 km/h)

Percentage Value 0.00 0.00 -19.57 5.00 -2.17 1.27 20.00

Date 31-Dec-2010 31-Dec-13

31-Dec-14

10-Nov-15

9-Aug-16

31-Dec-2017

CommentsNoavailable

For 4ongoingworksonly

For 9ongoingworksonly

For 12ongoingworksonly

Indicator Name CoreUnit ofMeasure

Baseline(2010)

FY1(2013)target

FY1(2013)actual

FY2(2014)target

FY2(2014)actual

FY3(2015)target

FY3(2015)actual

FY4(2016)target

FY4(2016)actual

FY5 (2017)end target

FY5 (2017)end actual

Averagepassenger traveltime for heavytrucks reducedby at least 20%on project roads(base year speed:40 km/h)

Percentage Value 0.00 0.00 -17.50 5.00 -6.53 -1.25 20.00

Date 31-Dec-2010 31-Dec-13

31-Dec-14

10-Nov-15

9-Aug-16

31-Dec-2017

Comments For 4ongoingworksonly

For 9ongoingworksonly

For 12ongoingworksonly

.

Intermediate Results Indicators

Indicator Name CoreUnit ofMeasure

Baseline(2010)

FY1(2013)target

FY1(2013)actual

FY2(2014)target

FY2(2014)actual

FY3(2015)target

FY3(2015)actual

FY4(2016)target

FY4(2016)actual

FY5 (2017)end target

FY5 (2017)end actual

Satisfactorycompletion ofslope protectiondesigns

Number

Value 0.00 0.00 0 3.00

Date 15-Dec-2015

15-Dec-2015

9-Aug-16

31-Dec-2017

Comments Study incontract-ing phase

Page 146: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

Number of km ofimprovednational roads inthe projectregion asplanned/ Roadsrehabilitated,Rural

Kilometers

Value 0.00 0.00 0 5 5.38 80 134.54 380 217 640.00

Date 31-Dec-2010 31-Dec-13

Dec-1410-Nov-15

9-Aug-16

31-Dec-2017

CommentsRev.Target

Rev.Target

Rev.Target

Rev. Target

Indicator Name CoreUnit ofMeasure

Baseline(2010)

FY1(2013)target

FY1(2013)actual

FY2(2014)target

FY2(2014)actual

FY3(2015)target

FY3(2015)actual

FY4(2016)target

FY4(2016)actual

FY5 (2017)end target

FY5 (2017)end actual

Number ofmeters ofimproved bridges

Meters

Value 0.00 0.00 0.00 0.00 0.00 48.00 0.00 96.00 100 160.00

Date 31-Dec-2010 31-Dec-13

010-Nov-15

9-Aug-16

31-Dec-2017

Comments rehabilitated,Rural"

Rev.Target

Rev.Target

Rev.Target

Rev. Target

Indicator Name CoreUnit ofMeasure

Baseline(2010)

FY1(2013)target

FY1(2013)actual

FY2(2014)target

FY2(2014)actual

FY3(2015)target

FY3(2015)actual

FY4(2016)target

FY4(2016)actual

FY5 (2017)end target

FY5 (2017)end actual

Satisfactorycompletion oftechnical auditsfor all roadprojects ofcomponent 1

Percentage

Value 0.00 0.00 0.00 0.00 0.00 20.00 16.00 60.00 16 100.00

Date 31-Dec-2010 31-Dec-13

09-Aug-16

31-Dec-2017

Comments Rev.Target

0 out of19

Rev.Target

3 out of19

Rev.Target

3 outof 19

Indicator Name CoreUnit ofMeasure

Baseline(2010)

FY1(2013)target

FY1(2013)actual

FY2(2014)target

FY2(2014)actual

FY3(2015)target

FY3(2015)actual

FY4(2016)target

FY4(2016)actual

FY5 (2017)end target

FY5 (2017)end actual

Satisfactory Percentage Value 0.00 0.00 0 40 80 90 100 100 100 100.00

Page 147: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

completion ofroad safetyaudits carriedout by CTC orTLKJ for all roadprojects ofcomponent 1

Date 31-Dec-2010 31-Dec-13

Dec-149-Aug-16

31-Dec-2017

Comments

16 outof 19

Rev.Target

19 outof 19

Rev.Target

19 outof 19

Page 148: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

Appendix J

Correspondence

Page 149: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

Appendix J Correspondence

INCOMING LETTER

Correspondence

Date From To ActivitySeptember 1,

2016DirekturPengembanganJaringan Jalan

CTC WINRIP Undangan Rapat Penutupan MisiTFAC untuk Program WINRIP;Loan WINRIP 8043-ID

September 1,2016

Satker PJN Wilayah IProvinsi Bengkulu

DirekturPembangunan Jalan

Permohonan PerpanjanganMasa Berlaku Surat Penawarandan Jaminan Penawaran untukPaket No. 16: Sebelat – Ipuh diProvinsi Bengkulu WesternIndonesia National RoadsImprovement Project IBRD No.8043-ID

September 1,2016

DirekturPembangunan Jalan

CTC WINRIP Undangan Pembahasan PaketNo. 03 Manggopoh – PadangSawah IBRD Loan No. 8043-ID

September 1,2016

World Bank Director General ofHighways, MPWH

Audited Financial Statements forFiscal Year 2015Acknowledgement of AuditReports

September 5,2016

DirekturPembangunan Jalan

BPJN III Padang Penyampaian Surat Bank Duniaterhadap Laporan MonitoringPelaksanaan LARAP Paket No.21: Lubuk Alung – Kuraitaji diProvinsi Sumatera Barat; WINRIPIBRD Loan No. 8043-ID

September 5,2016

Director of RoadNetworkDevelopment

World Bank Submission Draft Shorlist ofTechnical Assistance forDevelopment of SlopeStabilization, Design andManagement; WINRIP Loan IBRD8043-ID

September 5,2016

KasubditManajemenKonstruksi

Penyampaian Risalah RapatPembahasan Usulan FinalisasiFisik dan Keuangan (AddendumFinal) WINRIP Paket 03Manggopoh – Padang Sawah

September 8,2016

BBPJN II Medan DirekturPembangunan Jalan

Undangan Monitoring Evaluasidan Percepatan PelaksanaanPekerjaan Paket WINRIPRekonstruksi Rampa – Poriaha /Mungkur

September 8,2016

BBPJN II Medan DirekturPembangunan Jalan

Undangan Monitoring Evaluasidan Percepatan PelaksanaanPekerjaan Paket WINRIP

Page 150: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

Date From To ActivityPelebaran Jalan Bts. Kota Sibolga– Bts. Kab Tapsel

September 8,2016

World Bank Director of RoadNetworkDevelopment

Submission Draft Shortlist ofTechnical Assistance forDevelopment of SlopeStabilization, Design andManagement; WINRIP Loan IBRD8043-ID

September 9,2016

Kasatker PJNWilayah I ProvinsiBengkulu

BPJN III Padang Penyampaian Perbaikan LaporanTindak Lanjut Temuan AuditTFAC

September 9,2016

World Bank Director of RoadNetworkDevelopment

Replacement of Team Leaderunder Design SupervisionConsultant (DSC) contract

September 9,2016

DirekturPengembanganJaringan Jalan

DirekturPembangunan Jalan

Penyampaian Surat Bank Duniatentang Draft Shortlist untukTechnical Assistance forDevelopment of SlopeStabilization, Design andManagement; WINRIP Loan IBRD8043-ID

September 13,2016

SSE Package 12 GS Package 12 Keselamatan dan KesehatanKerja (K3)

September 13,2016

SSE Package 12 GS Package 12 Pelaksanaan Pekerjaan Paket 12Kambang – Inderapura (WINRIP)IBRD Loan No. 8043-ID

September 13,2016

DirekturPengembanganJaringan Jalan

DirekturPembangunan Jalan

Penyampaian Surat Bank Duniatentang Updated ProcurementPlan WINRIP Loan IBRD 9043-ID

September 13,2016

DirekturPembangunan Jalan

Pokja DirektoratPembangunan JalanULP Pusat 2

Penyampaian Surat Bank Duniaterkait Perbaikan Request forProposals (RFP) dan SummaryCost Estimate untuk PekerjaanTechnical Assistance forDevelopment of SlopeStabilization, Design andManagement Western IndonesiaNational Road, WINRIP IBRDLoan No. 8043-ID

September 14,2016

World Bank Director of RoadNetworkDevelopment

Request to Speed Up LARAP’sImplementation in the LastWeeks of December 2015

September 15,2016

Kepala ULPSumatera Barat

DirekturPembangunan Jalan

Tindak Lanjut Hasil PelelanganPekerjaan WINRIP Paket 10:Simpang Empat – Simpang AirBalam Provinsi Sumatera Barat

September 15,2016

Kasatker PJNWilayah I ProvinsiSumatera Barat

CTC WINRIP Undangan Rapat Pre-Construction Meeting (PCM)Paket 21

Page 151: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

Date From To ActivitySeptember 16,

2016DirekturPembangunan Jalan

Pokja DirektoratPembangunan JalanULP Pusat 2

Penyampaian Surat Bank Duniaterkait Draft Shortlist untukTechnical Assistance forDevelopment of SlopeStabilization, Design andManagement; WINRIP IBRD LoanNo. 8043-ID

September 16,2016

DirekturPembangunan Jalan

DirekturPengembanganJaringan Jalan

Penyampaian Perbaikan Requestfor Proposals (RFP) danSummary Cost Estimate untukPekerjaan Technical Assistancefor Development of SlopeStabilization, Design andManagement Western IndonesiaNational Road, WINRIP IBRDLoan No. 8043-ID

September 19,2016

DirekturPembangunan Jalan

DirekturPengembanganJaringan Jalan

Penyampaian LaporanMonitoring Pelaksanaan LARAPpada Paket 20: Lubuk Alung –Sicincin di Provinsi SumateraBarat; WINRIP IBRD Loan No.8043-ID

September 19,2016

DirekturPembangunan Jalan

DirekturPengembanganJaringan Jalan

Penyampaian Update DokumenLARAP pada Paket 16: Seblat –Ipuh di Provinsi Bengkulu;WINRIP IBRD Loan No. 8043-ID

September 19,2016

DirekturPembangunan Jalan

BPJN III PadangULP Bengkulu

Penyampaian Persetujuan BankDunia terhadap BiddingEvaluation Report Paket No. 16:Seblat – Ipuh di ProvinsiBengkulu; WINRIP IBRD Loan No.8043-ID

September 19,2016

Ketua PelaksanaHarian PMU WINRIP

Kepala BPJN IIIPadang

Permohonan Ijin MenggunakanRuang Rapat untuk PelatihanPembekalan (Third PartyMonitoring) TPM Paket 12:Kambang – Indrapura dan Paket14: Painan – Kambang di ProvinsiSumatera Barat WINRIP 8043-ID

September 19,2016

Ketua PelaksanaHarian PMU WINRIP

BPJN III Padangetc

Undangan Mengikuti PelatihanPembekalan Third PartyMonitoring (TPM) Paket 12:Kambang – Indrapura dan Paket14: Painan – Kambang di ProvinsiSumatera Barat WINRIP 8043-ID

September 20,2016

Director of RoadNetworkDevelopment

World Bank Submission of Request forProposal (RFP) and Cost Estimateof Technical Assistance forDevelopment of SlopeStabilization, Design and

Page 152: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

Date From To ActivityManagement; WINRIP Loan IBRD8043-ID

September 21,2016

DirekturPembangunan Jalan

CTC WINRIP Undangan Pembahasan LanjutanPermohonan RekomendasiTeknis Perubahan KontrakPekerjaan Pada Paket 5 Sp.Rampa – Poriaha di ProvinsiSumatera Utara (WINRIP IBRDLoan No. 8043-ID)

September 22,2016

Director of RoadNetworkDevelopment

World Bank Submission of LARAPImplementation MonitoringReport for Package No. 20:Lubuk Alung – Sicincin on WestSumatera Province; WINRIP LoanIBRD 8043-ID

September 22,2016

Director of RoadNetworkDevelopment

World Bank Submission of the UpdatedLARAP Report for Package No.16: Seblat – Ipuh on WestSumatera Province; WINRIP LoanIBRD 8043-ID

September 23,2016

Direktur Evaluasi,Akuntansi danSetelmen,Kemenkeu

Kepala ProjectManagement WINRIP

Pemantauan dan EvaluasiKinerja Pinjaman Bank Duniayang Mengalami SlowDisbursement

September 27,2016

KasubditManajemenKonstruksi

CTC WINRIP Penyampaian Risalah RapatPembahasan LanjutanPermohonan RekomendasiTeknis Perubahan KontrakPekerjaan Paket 5 Sp. Rampa –Poriaha WINRIP IBRD Loan No.8043-ID

September 27,2016

Director of RoadNetworkDevelopment

World Bank Submission Responses on Bank’sComment to Draft AddendumContract for Design SupervisionConsultant (DSC) WINRIP;WINRIP Loan IBRD 8043-ID

September 28,2016

DirekturPembangunan Jalan

DirekturPengembanganJaringan Jalan

Penyampaian LaporanMonitoring Pelaksanaan LARAPpada Paket 13: Simpang Rukis –Tj. Kemuning di ProvinsiBengkulu; WINRIP IBRD Loan No.8043-ID

September 28,2016

DirekturPembangunan Jalan

BPJN III Padang Penyampaian Surat Bank Duniatentang Update ProcurementPlan WINRIP Paket No. 16:Seblat – Ipuh di ProvinsiBengkulu

September 28,2016

Menteri PekerjaanUmum danPerumahan Rakyat

Ketua Pokja 6 ULPBengkuluSatker PJN I Bengkulu

Penetapan PemenangPelelangan Western IndonesiaNational Roads Improvement

Page 153: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

Date From To ActivityProject Loan IBRD No. 8043-IDNomor Paket 16: Ipuh – Sebelatpada PPK 01 pada SatkerPelaksanaan Jalan NasionalWilayah I Provinsi Bengkulu,Sumber Dana IBRD Loan No.8043-ID + 30% APBN

September 30,2016

DirekturPembangunan Jalan

DirekturPengembanganJaringan Jalan

Permohonan PersetujuanPenggantian Team Leader DSCWINRIP IBRD Loan No. 8043-ID

Report SubmissionDate From To Activity

September 9,2016

Kasatker PJNWilayah I ProvinsiBengkulu

BPJN III Padang Penyampaian Perbaikan LaporanTindak Lanjut Temuan Audit TFAC

September 19,2016

DirekturPembangunan Jalan

DirekturPengembanganJaringan Jalan

Penyampaian LaporanMonitoring Pelaksanaan LARAPpada Paket 20: Lubuk Alung –Sicincin di Provinsi SumateraBarat; WINRIP IBRD Loan No.8043-ID

September 22,2016

Director of RoadNetworkDevelopment

World Bank Submission of LARAPImplementation MonitoringReport for Package No. 20: LubukAlung – Sicincin on WestSumatera Province; WINRIP LoanIBRD 8043-ID

September 22,2016

Director of RoadNetworkDevelopment

World Bank Submission of the UpdatedLARAP Report for Package No.16: Seblat – Ipuh on WestSumatera Province; WINRIP LoanIBRD 8043-ID

September 28,2016

DirekturPembangunan Jalan

DirekturPengembanganJaringan Jalan

Penyampaian LaporanMonitoring Pelaksanaan LARAPpada Paket 13: Simpang Rukis –Tj. Kemuning di ProvinsiBengkulu; WINRIP IBRD Loan No.8043-ID

MeetingDate From To Activity

September 1,2016

DirekturPengembanganJaringan Jalan

CTC WINRIP Undangan Rapat PenutupanMisi TFAC untuk ProgramWINRIP; Loan WINRIP 8043-ID

September 1,2016

DirekturPembangunan Jalan

CTC WINRIP Undangan Pembahasan PaketNo. 03 Manggopoh – PadangSawah IBRD Loan No. 8043-ID

September 8,2016

BBPJN II Medan DirekturPembangunan Jalan

Undangan Monitoring Evaluasidan Percepatan Pelaksanaan

Page 154: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

Date From To ActivityPekerjaan Paket WINRIPRekonstruksi Rampa – Poriaha /Mungkur

September 8,2016

BBPJN II Medan DirekturPembangunan Jalan

Undangan Monitoring Evaluasidan Percepatan PelaksanaanPekerjaan Paket WINRIPPelebaran Jalan Bts. KotaSibolga – Bts. Kab Tapsel

September 15,2016

Kasatker PJNWilayah I ProvinsiSumatera Barat

CTC WINRIP Undangan Rapat Pre-Construction Meeting (PCM)Paket 21

September 21,2016

DirekturPembangunan Jalan

CTC WINRIP Undangan PembahasanLanjutan PermohonanRekomendasi Teknis PerubahanKontrak Pekerjaan Pada Paket 5Sp. Rampa – Poriaha di ProvinsiSumatera Utara (WINRIP IBRDLoan No. 8043-ID)

Page 155: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

Outgoing Letter

Correspondence

Date From To ActivitySeptember 1,

2016CTC WINRIP OIC PMU WINRIP Submission of Bid

Evaluation/Procurement Reportfor Contract Package No. 20(Lubuk Alung – Sicincin); WINRIPLoan IBRD No.8043-ID

September 5,2016

CTC WINRIP OIC PMU WINRIP Submission of BidEvaluation/Procurement Reportfor Contract Package No. 21(Lubuk Alung – Kuraitaji);WINRIP Loan IBRD No.8043-ID

September 6,2016

CTC WINRIP OIC PMU WINRIP Final Addendum: AdditionalLocations for U-Ditch WorkPackage No. 03:Manggopoh – Padang Sawah;WINRIP IBRD Loan 8043-ID

September 7,2016

CTC WINRIP OIC PMU WINRIP Legal Aspects of ContractSigning for Package No. 16:Seblat – Ipuh; WINRIP

September 8,2016

CTC WINRIP Director of RoadConstruction

Submission of LARAPImplementation MonitoringReport for Package No. 20:Lubuk Alung – Sicincin in WestSumatera Province; WINRIPLoan IBRDNo. 8043-ID

September 9,2016

CTC WINRIP Director of RoadConstruction

Submission of Update LARAPDocument for Package No. 16:Seblat – Ipuh in BengkuluProvince; WINRIP Loan IBRD No.8043-ID

September 14,2016

CTC WINRIP OIC PMU WINRIP Submission of Site Visit (TFACMission) Report for PackagesNo. 05: Sp. Rampa – Poriahaand No. 15: Sibolga – BatasTapsel in North SumateraProvince; WINRIP

September 19,2016

CTC WINRIP OIC PMU WINRIP Submission of Anti-CorruptionAction Plan (ACAP) ReportWINRIP; TPM MonitoringReports

September 19,2016

CTC WINRIP OIC PMU WINRIP Response to the World Bank’se-mail dated September 7, 2016regarding Variation Order forPackage No. 05: SimpangRampa – Poriaha

September 20, CTC WINRIP Director of Road Submission of LARAP

Page 156: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

Date From To Activity2016 Construction Implementation Monitoring

Report for Package No. 13:Simpang Rukis – Tj. Kemuning inBengkulu Province; WINRIPLoan IBRDNo. 8043-ID

September 23,2016

CTC WINRIP OIC PMU WINRIP Submission of PMM ApplicationTraining ImplementationReport; WINRIP

September 29,2016

CTC WINRIP OIC PMU WINRIP Submission of HIV/AIDS and K3Socialization ImplementationReports for Package No. 07:Indrapura – Tapan and No. 12:Kambang – Indrapura; WINRIPIBRD Loan 8043-ID

September 29,2016

CTC WINRIP OIC PMU WINRIP Submission of RKL & RPLImplementation MonitoringReport for Package No. 08: Bts.Kota Pariaman – Manggopoh;WINRIP IBRD Loan 8043-ID

September 30,2016

CTC WINRIP OIC PMU WINRIP Progress of Works for PackageNo. 13 (Sp. Rukis – Tj.Kemuning); WINRIP

September 30,2016

CTC WINRIP OIC PMU WINRIP Progress of Works for PackageNo. 15 (Sibolga – Bts. Tapsel);WINRIP

September 30,2016

CTC WINRIP OIC PMU WINRIP Civil Works Progress EndingSeptember 30, 2016

Report Submission

Date From To ActivitySeptember 1, 2016 CTC WINRIP OIC PMU WINRIP Submission of Bid

Evaluation/Procurement Reportfor Contract Package No. 20(Lubuk Alung – Sicincin); WINRIPLoan IBRD No.8043-ID

September 5, 2016 CTC WINRIP OIC PMU WINRIP Submission of BidEvaluation/Procurement Reportfor Contract Package No. 21(Lubuk Alung – Kuraitaji);WINRIP Loan IBRD No.8043-ID

September 8, 2016 CTC WINRIP Director of RoadConstruction

Submission of LARAPImplementation MonitoringReport for Package No. 20:Lubuk Alung – Sicincin in WestSumatera Province; WINRIPLoan IBRDNo. 8043-ID

Page 157: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering

Monthly Progress Report September 2016

Western Indonesia National Roads Improvement Project

Date From To ActivitySeptember 14,

2016CTC WINRIP OIC PMU WINRIP Submission of Site Visit (TFAC

Mission) Report for PackagesNo. 05: Sp. Rampa – Poriahaand No. 15: Sibolga – BatasTapsel in North SumateraProvince; WINRIP

September 19,2016

CTC WINRIP OIC PMU WINRIP Submission of Anti-CorruptionAction Plan (ACAP) ReportWINRIP; TPM MonitoringReports

September 20,2016

CTC WINRIP Director of RoadConstruction

Submission of LARAPImplementation MonitoringReport for Package No. 13:Simpang Rukis – Tj. Kemuning inBengkulu Province; WINRIPLoan IBRDNo. 8043-ID

September 23,2016

CTC WINRIP OIC PMU WINRIP Submission of PMM ApplicationTraining ImplementationReport; WINRIP

September 29,2016

CTC WINRIP OIC PMU WINRIP Submission of HIV/AIDS and K3Socialization ImplementationReports for Package No. 07:Indrapura – Tapan and No. 12:Kambang – Indrapura; WINRIPIBRD Loan 8043-ID

September 29,2016

CTC WINRIP OIC PMU WINRIP Submission of RKL & RPLImplementation MonitoringReport for Package No. 08: Bts.Kota Pariaman – Manggopoh;WINRIP IBRD Loan 8043-ID

Meeting

Date From To Activity- - - -- - - -

Page 158: Monthly Progress Report No. 45dms.winrip-ibrd.com/data/C2_IS/C2.02_CTC/C2.02.03_RPT/WINRIP_DOC...PT.Perentjana Djaja 17. Yongma Engineering Co, Ltd 18. PT. Epadascon Psrmata Engineering