STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of work Mode of tender Dt. of publication of NIT Types of bidding ( single /two bid system ) Last date of receipt of tender Nos. of tenders received Nos. and name of parties qualified after technical evaluation Nos. & names of parties not qualified after technical evaluation Whether contract awarded to lowest tenderer evaluated L1 Contract No. & date. Name of contractor. Value of contract (In Crores /Lakhs) Scheduled date of completion of supplies. Actual date of start of work Actual date of completion Remarks/ Reason for delay if any, 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 CE/C/I-JP Dy. CE/C/I-JP 1 NWR/SC/JP -RGS- CHURU/CIV IL- 101140502 Dismantling of existing MG track, Laying and linking of Broad gauge main line, looplines / Sidings including points and crossings in yards, spreading of ballast, tamping of track, transportation of P. Way materials and other ancillary works in Zone-I (Km. 0.00 to Km. 48.70), including Sikar, Laxmangarh Sikar & Fatehpur shekhawati yards in Sikar - Churu section in connection with Jaipur-Sikar- Loharu & Sikar - Churu Gauge conversion project. Open tender 28.8.15 Single Packet system 30.9.15 05 - - - 42/ NWR/Dy. CE/C-GC/JP /2014-15/JP- SIKR-CUR & SIKR- LHU dt. 26.12.15. M/s ISC Project Pvt. Ltd., “S-2,” The Meropole, Adjacent to INOX, Bund Garden Road, Pune – 411 001 948.07 Lakhs 08.5.2017 Ext. 31.10.17 12.11.15 31.10.17 Final bill submitted in Accounts office on 28.1.19 & 12.3.19 for payment 2 NWR/SC/JP -RGS- CHURU/CIV IL- 101140505 Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines / Sidings including points and crossings in yards, spreading of ballast, tamping of track, transportation of P. Way materials and other ancillary works in Zone-II (Km. 48.70 to Km. 90.46), including Ramgarh shekhawati, Bissau & Churu yards in Sikar -Churu section in connection with Jaipur- Sikar- Loharu & Sikar - Churu Gauge conversion project. Open tender 15.9.15 Single Packet system 19.10.15 02 - - - 45/ NWR/Dy. CE/C-GC/JP /2015-16/JP- SIKR-CUR & SIKR- LHU dt. 22.02.16. M/s Bhanwar Lal Bijarnia, Village -Rajpura, Post- Prewari, Teh- Nawa, Distt.- Nagaur 808.49 Lakhs 11.5.2017 31.12.17 20.11.15 28.12.17 Final measurement under process. 3. NWR/SC/JP -SIKR- CHURU/Civi l/10130001 003 Construction of Road under Bridge / Limited Height Sub- Way in lieu of 24 Nos. level crossing in Sikar-Dundlod Mukandgarh Section & 16 Nos. level crossing and 4 Nos. Balancing culverts in Sikar – Laxmangarh Sikar Section. Open tender 21.11.15 Two bid system 23.12.15 06 01 M/s Gurukrupa Kalyan JV 2A,2nd Floor,Navnath Soc-2, B/H, Shradhadeep Soc, Nr. Sharda School, Singanpor- Causway Road, Surat- 395004. Yes NWR/S&C/ CA/153, Dt. 15.6.2016 M/s AE-MHK (JV) First Floor, Divine India Building, Near R.T.O Office, By Pass Road, Post-Savgadh (Panpur), Himmatnagar- 383001 Dist. S.K. (Gujarat). 6363.98 Lakhs 22.3.2018 Ext 20.8.2018 1.5.2016 30.11.2018 Final measurement under process.

Upload: others

Post on 20-May-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

1

CE/C/I-JP

Dy. CE/C/I-JP

1 NWR/SC/JP

-RGS-

CHURU/CIV

IL-

101140502

Dismantling of existing MG

track, Laying and linking of

Broad gauge main line,

looplines / Sidings including

points and crossings in

yards, spreading of ballast,

tamping of track,

transportation of P. Way

materials and other

ancillary works in Zone-I

(Km. 0.00 to Km. 48.70),

including Sikar, Laxmangarh

Sikar & Fatehpur

shekhawati yards in Sikar -

Churu section in connection

with Jaipur-Sikar- Loharu &

Sikar - Churu Gauge

conversion project.

Open

tender

28.8.15 Single Packet

system

30.9.15 05 - - - 42/ NWR/Dy.

CE/C-GC/JP

/2014-15/JP-

SIKR-CUR & SIKR-

LHU dt. 26.12.15.

M/s ISC Project Pvt. Ltd.,

“S-2,” The Meropole,

Adjacent to INOX, Bund

Garden Road, Pune – 411

001

948.07 Lakhs 08.5.2017

Ext. 31.10.17

12.11.15 31.10.17 Final bill

submitted in

Accounts office

on 28.1.19 &

12.3.19 for

payment

2 NWR/SC/JP

-RGS-

CHURU/CIV

IL-

101140505

Dismantling of existing MG

track, Laying and linking of

Broad gauge main line, loop

lines / Sidings including

points and crossings in

yards, spreading of ballast,

tamping of track,

transportation of P. Way

materials and other

ancillary works in Zone-II

(Km. 48.70 to Km. 90.46),

including Ramgarh

shekhawati, Bissau & Churu

yards in Sikar -Churu section

in connection with Jaipur-

Sikar- Loharu & Sikar -

Churu Gauge conversion

project.

Open

tender

15.9.15 Single Packet

system

19.10.15 02 - - - 45/ NWR/Dy.

CE/C-GC/JP

/2015-16/JP-

SIKR-CUR & SIKR-

LHU dt. 22.02.16.

M/s Bhanwar Lal Bijarnia,

Village -Rajpura, Post-

Prewari, Teh- Nawa, Distt.-

Nagaur

808.49 Lakhs 11.5.2017

31.12.17

20.11.15 28.12.17 Final

measurement

under process.

3. NWR/SC/JP

-SIKR-

CHURU/Civi

l/10130001

003

Construction of Road under

Bridge / Limited Height Sub-

Way in lieu of 24 Nos. level

crossing in Sikar-Dundlod

Mukandgarh Section & 16

Nos. level crossing and 4

Nos. Balancing culverts in

Sikar – Laxmangarh Sikar

Section.

Open

tender

21.11.15 Two bid

system

23.12.15 06 01 M/s

Gurukrupa

Kalyan JV

2A,2nd

Floor,Navnath

Soc-2, B/H,

Shradhadeep

Soc, Nr.

Sharda

School,

Singanpor-

Causway

Road, Surat-

395004.

Yes NWR/S&C/

CA/153, Dt.

15.6.2016

M/s AE-MHK (JV)

First Floor, Divine India

Building, Near R.T.O Office,

By Pass Road, Post-Savgadh

(Panpur), Himmatnagar-

383001

Dist. S.K. (Gujarat).

6363.98 Lakhs 22.3.2018

Ext

20.8.2018

1.5.2016 30.11.2018 Final

measurement

under process.

Page 2: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

2

4. NWR/SC/JP

-SIKR-

CHURU/Civi

l/10130001

004

Construction of Road under

Bridge / Limited Height Sub-

Way in lieu of 33 Nos. level

crossing and 4 Nos. of

Bridges along with 7 Nos

Balancing culverts in

Laxmangarh Sikar - Churu

Section.

Open

tender

21.11.15 Two bid

system

23.12.15 03 - - Yes NWR/S&C/

CA/154, Dt.

23.6.2016

M/s Supreme - Modi (JV) 9,

Leela Mansion,

Raj Bhawan Road,

Civil Line - Jaipur 302006

5876.06 Lakhs 22.3.2018 24.3.16 17.02.18 Final bill

submitted on

19.3.2019 in

accounts office.

5. NWR/SC/JP

-RGS-

Churu/Civil

-

101141806

Construction of 60 nos staff

quarters in Sikar-Churu

section, Construction of

running room at CUR,

construction of PF & PF

shelters & extension of

FOB, RCC OH tank and other

miscellaneous Civil work at

Sikar, Civil works related to

L-xings and related Electric

works in Sikar-Churu section

and other ancillary works in

connection with SIKR-CUR

Gauge Conversion project.

Open

tender

26.2.16 Two bid

system

30.3.16 04 01 M/s Rajendra

Singh

Bhamboo

Infra Pvt. Ltd.

108, First

Floor, Neel

kanth,

Neelkanth

Building ,

Gandhipath,

Vaishali

Nagar, Jaipur

yes NWR/S&C/

CA/159, Dt.

28.9.2016

M/s Gurukrupa Enterprises,

2A,2nd Floor,Navnath Soc-2

B/H, Shradhadeep Soc,

Nr. Sharda School,

Singanpor-Causway Road,

Surat

1948.67 Lakhs 15.9.2017

18.7.16 Work

terminated on

6.6.17

Final bill under

process. Case is

under

arbitration.

6. NWR/SC/JP

-RGS-

Churu/Civil

-

101141612

Balance / left over works of

Construction of 60 nos staff

quarters in Jaipur-Sikar-

Churu section, Construction

of running room at Churu,

construction of PF & PF

shelters & extension of FOB,

RCC OH tank and other

miscellaneous Civil work at

Sikar, Civil works related to

L-xings works in Sikar-

Churu section and other

ancillary works in

connection with Jaipur-

SIKR-CUR Gauge Conversion

project.

Open

tender

25.7.17 Two Packet

system

28.817 02 01 M/s AIEN

MEREN

ENTERPRISES-

DIMAPUR, N.

S.T. Colony,

Circular Road,

Dimapur

Yes NWR/S&C/

CA/171, Dt.

08.12.2017.

M/S V. K.

CONSTRUCTION

COMPANY-

SRIGANGANAGAR, 2-

D-37, Jawahar Nagar,

Sriganganagar

2185.03 Lakhs 31.12.18

Extended

upto

30.04.2019

15.10.17 - Work in

progress.

7. NWR/SC/JP

-RGS-

Churu/

Civil-

10114110R

Residual civil works of Sikar

–Churu section including

construction of PWI Office

& store, trolley huts,

boundary wall, toe walls &

pitching, tool box for gangs

etc temporary diversion for

level crossings, Road Work

and Earth Work etc. in

connection with

Commissioning of Sikar

Churu section.

Open

tender

4.8.2017 Two Packet

system

8.9.2017 02 NIL - Yes 52/ NWR/Dy.

CE/C-I/JP /2018-

19/JP-SIKR-CUR

& SIKR-LHU dt.

26.04.2018

M/S K. B. Enterprises,

Plot No. 2, Mantra

Chaya, Opp. Chambal

Power House, Hawa

Sadak, Jaipur.

1182.01 Lakhs

1685.00 Lakhs

14.1.19

Extended

upto

30.05.2019

25.02.18 Work in

progress.

Page 3: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

3

DY. CE/C/II-JP

1 NWR/S&

C/JP-

SIKR/T/7

Supplying & stacking 65

mm gauge stone

ballast…. JP-SIKR section.

Open

tender

2.9

.20

15

Two packet

system

14

.10

.20

15

7 4 3 Yes Dy

CE/C/II/CA/N

WR/S&C/JP-

SIKR/T/7/01

Dated

17.3.2016

M/s MFL-Sidharth-

Parikshit Chandra Das

(JV) Gurgaon.

09.84 Cr.

12.20 Cr.

01.12.15

31.03.19

1.1.2016 - Work

completed.

2 NWR/S&

C/JP-

SIKR/T

/10

Construction of major &

Minor Bridges in C/w GC

of JP-SIKR section.

Open

tender

-

Two packet

system

18

.8.2

01

5 13 7 6 Yes, NWR/S&C/CA/

152 dated

25.2.2016

M/s Sona Builders,

Unjha (Guj.)

37.14 Cr.

50.29 Cr.

17.11.15

30.04.19

1.12.15 - Work

completed.

3 NWR/S&

C/JP-

SIKR/T

/11

Earth work inembankment

cutting etc. and

construction /alteration of

service building JP-SIKR

section.

Open tender

Two packet

system

25

.8.2

01

5 14 7 7 Yes NWR/S&C/CA/

150 dated

29.1.2016-

M/s Jandu Construction

Company, Hisar.

34.18 Cr.

38.96 Cr.

17.11.15

31.05.19

25.11.15 - Work in

progress .

4 NWR/SC

/JP-RGS-

Churu/

Civil-

1021410

01

Construction of LHS Sub

way(LHS)/RUB---LC(52

nos) between JP-SIKR

section.

Open

tender

Two packet

system

9.1

2.1

5 9 6 3 Yes NWR/S&C/CA/

151 dated

01.7.2016

M/s SGCCL-MMPL (JV)

Jaipur.

68.65 Cr.

84.62 Cr.

23.03.16

30.11.19

1.4.16 - Work in

progress .

5 NWR/SC

/JP-RGS-

Churu/

Civil-

1021408

01

Dismantling of existing of

MG track, Laying and

Linking of BG main line-----

-Jaipur to Sikar GC work

Open

tender

Two packet

system

- 8 5 3 Yes NWR/S&C/CA/

161 dated

19.10.2016

M/s KIEL-BLB (JV), Jaipur 26.21 Cr 08.08.2016

30.05.2019

8.8.2016 - Work in

progress .

6 NWR/SC

/JP

/Civil-

1021606

01R

Construction of PF, FOB PF

shelter ----JP Yard

remodeling & JP-SIKR GC.

Open

tender

Two packet

system

-26

.7.2

01

6 6 5 4 Yes NWR/SC/JP

/Civil-

102160601R/0

1 date

11.11.2016

M/s Sanjeev Brothers

Jaipur

18.48 Cr

24.97 Cr.

30.09.16

31.05.19

30.9.16 - Work in

progress

7. DY.

CE/C/GC/N

WR/2015/T

-55

Flash Butt Welding of

52Kg. / 60Kg. New/SH rails

at depot / site using

Mobile Flash Butt Welding

Plant in Jaipur –Sikar -

Churu section in

connection with Jaipur –

Sikar – Loharu & Sikar –

Churu GC project.

Open tender 29.6.15 Single Packet

system

20.08.15 03 - - - 46/ NWR/Dy.

CE/C-GC/JP

/2016-17/JP-

SIKR-CUR & SIKR-

LHU dt.

22.09.2016.

M/s Navketan Pvt. Ltd.,

1 A. J. C. Bose Road, Kolkata

– 700 020.

8.15 Cr. 22.12.17

30.06.19

25.5.2016 Work in

progress.

Page 4: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

4

8. NWR/SC/JP

-RGS-

Churu/Civil

-

101140507

Providing in situ Glued

joints of G-3 (L) type as per

RDSO drawings for 60 kg &

52 kg rails with all fittings

etc complete in Jaipur -

Sikar - Churu section in

connection with Jaipur -

Sikar - Loharu & Sikar -

Churu Gauge Conversion

project.

Open tender 18.5.16 Single Packet

system

22.06.16 05 01 M/s Diamond

Steel

Industries, Plot

No. 879,

Sector-16,

Faridabad

Yes 48/ NWR/Dy.

CE/C-GC/JP

/2016-17/JP-

SIKR-CUR & SIKR-

LHU dt.

11.01.2017.

M/s Creative Engineers,

F/189, Road No. 5,

Indraprastha Industrial

Area,

Kota

160.21 Lack

14.03.2019

18.10.16 Work in

progress.

9. NWR/SC/JP

-RGS-

Churu/Civil

-

101140508

Welding of Rail Joints by

SKV process in Jaipur-

Sikar & Sikar-Churu section

in connection with Jaipur-

Sikar-Loharu and Sikar-

Churu Gauge Conversion

project.

Open tender 10.6.16 Single Packet

system

14.07.16 02 - - Yes 49/ NWR/Dy.

CE/C-GC/JP

/2016-17/JP-

SIKR-CUR & SIKR-

LHU dt.

11.01.2017.

M/s Oberoi Thermit

Pvt., Ltd. Plot No.3,

Sector 8B, IIE, Sidcul,

Haridwar -249403

349.73 Lacks 18.10.18

31.08.19

26.12.16 Work in

progress.

10. Construction of

LHS/RUB (52 Nos.)

between Jaipur-Sikar.

Open

Tender

Two packed

system

M/s DRAIPL-MMK (JV) ,

Gandhidham (Guj.)

44.87 Cr. 31.07.2019 Work in

progress.

11 Providing in situ Glued

joints of G-3(L) type

(including JP Yard) in

c/w JP-SIKR-LHU &

SIKR-CUR GC Project

and ROH Phulera &

Rewari-Sadulpur bypass

line.

Open

tender

Single Packed M/s Creative Engineers,

F/189, Road No. 5,

Indraprastha Industrial

Area,

Kota

1.34 Cr. 31.10.2019 Work in

progress.

12 Residual Civil works of

Jaipur-Sikar Section.

Open

Tender

Two packed

system

M/s JMDES-BCS (JV)

Bikaner.

22.00 Cr. 13.09.2019 Work in

progress.

13 Supplying and stacking

65mm gauge stone

ballast in c/with Jaipur-

Sikar.

Open

Tender

Single

Packed.

M/s Deepak Choudhary

& Co. Jodhpur

5.35 Cr. 30.04.2019 Work

completed.

14 FlashButt Welding of 52

Kg./ 60 Kg. New/SH

Rails at Depot/ site in

Jaipur-Ringus section in

c/with JP-SIKR-LHU &

SIKR-CUR GC Project.

Open

tender

Single Packet M/s Railtech

Infraventure Pvt. Ltd.,

Allahabad

1.79 Cr. 04.06.2019 Work in

progress.

15 Residual civil works of

Jaipur Yard in c/with

commissioning of JP-

RGS section.

Open

Tender

Single M/s M.H. Khanusiya,

Himmat Nagar

6.81 Cr. 31.05.2019 Work in

progress.

16 Provision of stabling

line in c/with

Baisgodam/Sanganer

Open Single M/s Chintpurni

Construction Co. Sonipat

(Haryana)

7.08 Cr. 20.01.2020

Page 5: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

5

Dy. CE/C/III-JP

1 NWR/S&C

/LHS/RE-

FL-

Madar/T/1

Construction of road

under bridges / limited

height subways (35

Nos) in Rewari–

Phulera( RPC) section

Open

tender

Two packet

system

- Yes NWR/S&C/C

A/143 dated

08.7.2015

M/s S.B. Poonia

Const. Co. (JV),

Hissar.

51.06 Crore. 28.4.17

30.06.18

5.5.2015 30.6.2018 Work

completed.

2 NWR/S&C

/LHS/RE-

FL-

Madar/T/2

Construction of road

under bridges / limited

height subways (32

Nos) in Rewari –

Phulera( RPC) section

Open

tender

Two packet

system

- Yes NWR/S&C/C

A/144 dated

16.7.2015

M/s S.B. Poonia

Const. Co. (JV),

Hissar.

43.74 Crore. 28.04.17

30.06.18

10.5.15 30.6.2018 Work

completed.

3 NWR/SC/

MD-FL-

RGS/Civil-

10399801

Residual composite

work for Construction of

118 Nos Staff quarters

between RE-RGS-FL

section.

Open

tender

Two packet

system

- Yes NWR/SC/M

D-FL-

RGS/Civil-

10399801/C

A/03 dated

21.11.2016

M/s Sammer Const.

Co. 15/65 West

Punjabi Bagh New

Delhi

11.41 Cr.

16.08 Cr.

21.6.2017 28.06.16

31.05.19

- Work in

progress

4 Construction of Club

House at Jagatpura

jaipur

Open

tender

Two packet

system

- Yes NWR/S&C/C

A/168 dated

8.5.2017

M/s P.K.Jain , Jaipur 16.53 Cr.

23.22 Cr.

16.02.18

30.06.19

01.03.17

Work in

progress

5 Fabrication & erection

of structural steel

covering etc. in c/with

RE-SDLP Bypass line.

Open

tender

Two

packed

system

M/s Sanjeev

Brothers, C-10,

Vaishali Nagar, Jaipur

12.78 Cr.

13.32 Cr.

31.12.2018

30.06.2019

Work in

progress.

6 Earthwork in formation,

LHS, other works in

c/with RE-SDLP

Byepass Line.

Open

tender

Two

system

M/s Mohala

Construction Co.

Hisar

15.66 Cr. 21.11.2019 Work in

progress.

7 Construction of two lane

ROB in lieu of LC No.

206 of 1x33

Open

tender

Two

packed

M/s Modi

Construction Co.

Jaipur

15.93 Cr. 15.12.2019 Work in

progress.

Page 6: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

6

Dy. CE/C/IV-JP

CE/C/II-JP

Dy. CE/C/I-UDZ

1. Tender No.NWR/SC/JP/ Civil-102990301

RGS Detour in

connection with DFCCIL

work- Construction of

Viaduct (157x18.30m),

Major (5x18.30m &

3x18.30) and Minor

Bridges, earth work in

bank/cutting including

Blanketing material,

Track works for Broad

Gauge line, Supplying &

putting ballast in track,

Transportation of P.

Way materials and

other ancillary works in

Ringus- in connection

with RGS Detour.

Open

tender

6.3.2016 Two bid

system

12.4.2016 9 7 - Yes NWR/S&C/

CA/158

Dated

9.9.2016

M/s AT PLT MHK (JV)

First Floor, Divine

India Building, Nr.

RTO Office, By Pass

Road, Himatnagar-

383001, Dist- S.K.

(Gujrat)

108.92 Cr

143.48 Cr.

23.06.18

30.06.19

20.7.16 - Work in

progress.

1 UDZ-

HMT/

GC/EW/T/

4

Construction of Minor

bridges & earthwork

form Km. 207/0 to 250/0

in connection with UDZ-

HMT section GC Project .

Open 02.01.11 Single 04.02.11 7 Yes NWR/S&C/

CA/113 dtd.

21.10.11

M/s Rahee-Triveni

(J/V), Kolkatta

2286.41 Lakhs

07.02.13

31.07.14

31.03.15

31.12.15

30.06.16

30.12.16

31.07.17

31.01.18

31.10.18

23.08.11 31.10.18 Work

completed.

2 UDZ-HMT/

GC/MB/T-

13-R-1

Substructures of major

bridges from Udaipur to

Dungarpur.

Open 13.11.14 Two bid

system

17.12.14 05 02 Yes NWR/S&C/

CA/ 142 dtd.

30.06.15

M/s Murali Krishna

Const. Co, Hyderabad

6814.86 Lakhs 23.04.17

31.12.17

31.10.18

09.05.15 31.10.18 Work

completed.

Final variation

with HQ for

sanction.

3 UDZ-HMT/

GC/EW/T-

20

Construction of Minor

bridges & earthwork

from Km. 121/0 to160/0

in c/w UDZ-HMT section

GC Project

Open 08.05.15 Two bid

system

12.06.15 03 02 Yes NWR/S&C/

CA/ 145 dtd.

23.11.2015

M/S M.G. Contractors, Pvt., Ltd., Panchkula

6402.75 lakhs

9571.00 Lakhs

13.03.17

31.03.19

31.07.19

28.09.15 89% Work in

progress.

Page 7: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

7

4 NWR/SC/

UDZ-HMT

(GC)/Civil-

204140627

Construction of station

buildings, S&T structures,

and ancillary works in

connection with UDZ-

HMT GC project

Open 05.04.16 Two bid

system

11.05.16 01 01 Yes NWR/S&C/

CA/ 162 dtd.

24.10.16

M/s Jainsons

Construction Co. JV,

Jodhpur

4979.00 Lakhs

5495.00 Lakhs

31.08.18

30.11.18

31.03.19

30.06.19

14.09.16 62% Work in

progress.

5 NWR/SC/

UDZ-HMT

(GC)/Civil-

204140426

Supply & stacking 50 mm

stone track ballast in UDZ-

HMT section

Open 06.0216 Two bid

system

16.03.16 04 02 Yes Dy.

CE/C/UDZ/CA

/34 dated

20.10.17

M/s Choyash Infra

Solution Joint Venture

Pvt. Ltd, Dungarpur

1345.41 Lakhs 30.06.18

31.01.19

31.10.19

10.09.16 79% Work in

progress.

6 NWR/SC/

UDZ-HMT

(GC)/Civil-

204141129

Transportation of PSC

sleepers from sleeper

factory to site in UDZ-

HMT section

Open 05.06.16 Single

packet

19.07.16 04 04 No Dy.

CE/C/UDZ/CA

/35 dated

24.12.2016

M/s J.K Construction

Co., New Market

Nokha

267.84 Lakhs 24.04.17

25.12.17

31.08.18

31.10.18

31.12.18

19.04.17 31.12.18 Work

completed.

Final Bill

passed. SD &

PG released.

7 NWR/SC

/

UDZ-

HMT

(GC)/Civi

l-

20414012

8

Balance work of

construction, minor

bridges and earth work in

UDZ-HMT section.

Open 30.05.16 Two bid

system

05.07.16 02 02 Yes NWR/S&C/

CA/ 163 dtd.

08.12.1016

M/s Ravi Infrabuild

Projects Pvt. Ltd, ,

Udaipur

3701.00 Lakhs

5419.00 Lakhs

30.08.18

30.04.19

31.10.19

15.09.16 73% Work in

progress.

8 NWR/SC/

UDZ-HMT

(GC)/Civil-

204140124

Construction of minor

bridges and earth work in

cutting and filling

between Umra and Zawar

stations in connection

with UDZ-HMT GC Project

Open 02.06.16 Two bid

system

12.07.16 05 02 Yes NWR/S&C/

CA/ 164 dtd.

08.12.2016

M/s Ravi Infrabuild

Projects Pvt. Ltd, ,

Udaipur

6980.98 Lakhs

8626.00 Lakhs

11.09.2018

31.08.2019

01.10.16 68% Work in

progress.

9 NWR/SC/

Constructio

n/Civil-

204300010

30

Construction of 49 Nos.

Road Under Bridges and 8

Nos. Road Over Bridges in

UDZ-HMT section

Open 14.09.16 Two bid

system

18.10.16 04 03 Yes NWR/S&C/

CA/ 166 dtd.

14.03.2017

M/s Rachana - MI (JV),

Ahmedabad-(Gujarat).

6623.00 Lakhs

8632.00 Lakhs

22.12.18

22.06.19

01.01.17 78% Work in

progress.

10 NWR/SC/

UDZ-HMT

(GC)/Civil-

204140334

Constriction of Super

structure of 32 Nos Major

bridge in UDZ-HMT

section

Open 04.12.16 Two bid

system

11.01.17 04 04 Yes NWR/S&C/

CA/ 1697 dtd.

09.04.17

M/s Rachana - MI (JV),

Ahmedabad-(Gujarat).

5674.62 Lakhs

5979.00 Lakhs

26.02.19

30.06.19

08.03.17 73% Work in

progress.

11 NWR/SC/

UDZ-HMT

(GC)/Civil-

204140533

Providing in situ Glued

joints of G-3 (L) type in

UDZ-HMT section

Open 20.10.16 Single

Packet

07.12.16 05 05 Yes Dy. CE/C/

UDZ/CA/41

dated

16.05.2017

M/s. Tirupati Metal

Fabricators, Faridabad

148.97 Lakhs 15.02.19

30.04.19

Work yet to

start

12 NWR/SC/

UDZ-HMT

(GC)/Civil-

204140535

Supply of stone Ballast in

UDZ-HMT section

Open 21.12.20 Single

Packet

25.01.17 06 06 Yes Dy. CE/C/

UDZ/CA/26

dated

26.05.2017

M/s. B. B. Construction,

Khurja-Distt.

Bulandshahr

801.13 Lakhs 02.09.2018

02.04.2019

02.10.2019

24.03.17 68% Work in

progress.

Page 8: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

8

13 NWR/SC/

UDZ-

HMT(GC)/

Civil -

204141137

Carrying out Geotechnical

investigation in UDZ-HMT

section

Open 29.12.16 Single

Packet

08.02.17 03 03 Yes NWR/S&C/

CA/ 169 dtd.

112.05.17

M/s JP Surveys &

Consultants,Chennai-40

41.05 Lakhs 13.07.17

12.03.18

12.10.18

13.07.17 12.10.18 Work

completed.

14 NWR/SC/U

DZ-

HMT(GC)/

Civil-

204140538

Flash butt welding of Rails

in UDZ-HMT section

Open 31.12.16 Single

Packet

08.03.17 02 02 Yes Dy. CE/C/

UDZ/CA/49

dated

28.10.17

M/s ITC, Kanpur 648.34 Lakhs 30.11.18

30.11.19

--- Work yet to

start

15 NWR/SC/

UDZ-HMT

(GC)/Civil-

205140539

Laying and linking of track

in UDZ-HMT section.

Open 31.12.16 Single

Packet

10.02.17 02 02 Yes Dy. CE/C/

UDZ/CA/40

dated 17.04.17

M/s Ravi Infrabuild

Projects Pvt. Ltd,

Udaipur

861.39 Lakhs 31.12.18

30.09.19

28.03.17 27% Work in

progress.

16 NWR/SC/

UDZ-HMT

(GC)/Civil-

204140839

Laying and linking of track

in UDZ-HMT section. from

Km 160 to Km 225 In UDZ-

HMT section

Open 29.12.16 Two packet 02.02.17 04 04 Yes Dy. CE/C/

UDZ/CA/45

dated 26.09.17

M/s BLB--SNCC JV,

Jodhpur (Raj)-342001

1128.55 Lakhs

1134.00 Lakhs

02.04.19

30.09.19

16.05.17 1% Work in

progress.

17 T.NO.UDZ

-HMT-GC-

MB-T-43-R

Fabrication, transporting

assembling and erection of

superstructures

Open 19.07.17 Two packet 24.08.17 03 02 Yes Dy. CE/C/

UDZ/CA/53

dated 15.02.18

M/s Dynamic Engineers

Infratrack Pvt.,Ltd.,

Kota

1510.59 Lakhs

1672.00 Lakhs

15.01.19

15.09.19

15.12.2017 46% Work in

progress.

18 T.NO.UDZ

-HMT-GC-

BLDG/T-

44

Construction of staff

Quarters & SSE/C/P.Way

office in UDZ-HMT section

Open 09.06.17 Single 12.07.17 03 03 Yes Dy. CE/C/

UDZ/CA/46

dated 20.09.17

M/s Ravi Infrabuild

Projects Pvt. Ltd, ,

Udaipur

374.00 Lakhs

458.00 Lakhs

31.01.18

30.06.18

30.11.18

31.08.19

24.08.17 78% Work in

progress.

19 T.NO.UDZ

-HMT-GC-

Civil/T-47

Earth work and minor

bridges between UDZ-

Umra in UDZ-HMT section

Open 18.08.17 Single packet 20.09.17 02 02 Yes Dy.CE/C/

UDZ/CA/51

dated 20.01.18

M/s Ravi Infrabuild

Projects Pvt. Ltd,

Udaipur

890.55 Lakhs

1327.00 Lakhs

10.06.18

10.11.18

10.06.19

01.11.17 90% Work in

progress.

20 T. No.

UDZ-

HMT-GC-

P.way-T-

46-R

Laying and linking of track

in UDZ-HMT section. from

Km 111 to Km 160 In UDZ-

HMT section

Open 11.11.17 Two packet 18.12.17 03 03 Yes Dy.CE/C/

UDZ/CA/60

Dt. 21.06.18

M/s B.S. Sangwan,

Sonepat

1466.98 Lakhs 19.09.19 26.02.18 39% Work in

progress

21 T. No.

UDZ-

HMT-GC-

Miscl-T-49

Const. of toe walls,

retaining walls, trolley

refuges, etc. b/w KRCD &

DNRP stations

Open 23.05.18 Two packet 28.06.18 07 06 Yes NWR/S&C/CA

/ 179 Dt.

17.10.2018

M/s S.K. Builders,

Gautam Buddha Nagar,

U.P.

3507.92 Lakhs

4283.00 Lakhs

12.02.20 13.8.18 14% Work in

progress.

22 T. No.

UDZ-

HMT-GC-

Tunnel-T-

50

Const. of BG tunnel b/w

KRCD and Zawar stations

Open 23.05.18 Two packet 28.06.18 08 04 Yes NWR/S&C/CA

/182 Dt.

01.03.2019

M/s ABCI Infrastructure

Pvt. Ltd, Kolkata

4180.85 Lakhs 19.05.20 15.09.18 0.25% Work in

progress

23 T. No.

UDZ-

HMT-GC-

Stn-T-51

Const. of stn bldgs, PF,

FOBs at Zawar, Semari,

KDLG, RDD, Kotana and

JYM stns.

Open 30.05.18 Two packet 04.07.18 06 05 Yes NWR/S&C/CA

/180 Dt.

4.12.2018

M/s Prem Fabricators,

Ahmedabad

2157.37 Lakhs 12.08.19 02.10.18 17% Work in

progress

Page 9: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

9

Dy. CE/C/II-UDZ

1. T.No. NWR/SC/AII-COR-UDZ/Civil-204141902

Tender No. NWR/SC/AII-COR-UDZ/Civil-204141902 – Earth work in bank/ cutting including blanketing material, construction strengthening, rebuilding, extension of Major bridges, Minor bridges ……..and other ancillary works, in Mavli (incl)- Barisadri (incl) section in connection with Mavli Junction to Barisadri to Barisadri GC Project.

Open 19.02.16 Two Packet

20.04.16 13 Nos. 5 NIL YES Contract agreement No. NWR/S&C/CA/160 dated 30.09.16

M/s Gurukrupa Kalyan JV 2A, 2nd Floor, Navnath Sec-2, B/H, Shradhadeep Society, Nr. Sharda School, Singanpore-Causway Road

Rs. 137.40 Cr 15.06.18 01.07.16 Work terminated on 25.09.17

Due to slow progress and work stopped by agency work terminated.

2 T. No. NWR/SC/AII-COR-UDZ/Civil-304140803-R

Flash Butt Welding of 60Kg / 52Kg New / SH Rails at Depot / Site using Mobile Flash Butt Welding Plant in Mavli – Bari Sadri section in connection with Mavli–Badi Sadri gauge conversion project

Open 10.10.16 Single Packet

25.11.16 2 Nos. 01 No 01 No Yes Acceptance letter No.UDZ/ MVJ-BI/GC /Welding/T-3R Dated 20.02.17

M/s Railtech Infraventure Pvt.Ltd., 147/91-A Old Bairahana, Allahabad-211003 (UP)

Rs.03.93 Cr 19.08.18 31.03.19 17.11.19

yet to start

24 T. No.

UDZ-

HMT- GC-

Misc. T.52

Const. of toe walls,

retaining walls, trolley

refuges, etc. bet. KRCD &

DNRP station.

Open 05.09.18 Single

Packet

05.09.18 01 01 - Yes Dy.CE/C/UDZ/

CA/64 Dt.

20.12.18

M/s S.K. Builders,

Gautam Budha Nagar,

(UP)

0899.90 Lakhs

1095.00 Lakhs

18.06.19 18.06.19 14% Work in

progress

25 T. No.

UDZ-

HMT/GC

/T-55 –

Rock fall protection,

between station Umra-

Kharwa Chanda

Open - Single

Packet

M/s Garware Wall

Ropes Limited , Pune

732.00 Lakhs 07.11.2019

26 T. No

UDZ-HMT/

GC/T/56

Provision of Erosion

control pitching and other

work between Udaipur to

Kharwa Chanda

Open - Single

Packet

M/s Backbone

Construction Pvt. Ltd.,

Rajkot

447.00 Lakhs 07.03.2020

Page 10: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

10

3 T.No.UDZ-MVJ-BI-GC- Ballast-

T-5

T.No.UDZ-MVJ-BI-GC-Ballast-T-5- Supply & stacking 65 mm machine crushed, stone

track ballast conforming to Railway specifications in stacks on cess along the track & in yards at stations between Mavli (including) & Bhinder (including) stations from Ch. 0.000 to Ch 41000 and at temporary ballast depot at Bhinder or any station between MVJ-BNNR station in connection with Mavli-Barisadri Gauge Conversion project

Open E -Tender

25.10.17 Two Packet

30.11.17 2 Nos. 2 NIL YES Dy.

CE/C/UDZ/

CA/54

dated

05.03.2018

M/s J.K. Construction Co., Naya Bazar, Nokha (Bikaner)-334803

Rs. 6.94 Cr 27.12.18 30.06.19

29.12.17 52% Work in progress.

4 T.No.UDZ-MVJ-BI-GC- Ballast-T-6

T.No.UDZ-MVJ-BI-GC-Ballast-T-6- Supply & stacking 65 mm machine crushed, stone track ballast conforming to Railway specifications in stacks on cess along the track & in yards at stations between Bhinder (excluding) & Barisadri (including) stations from Ch.41000 to Ch 82405 and at temporary ballast depot at Barisadri or any station between Bhinder-Barisadri stations in connection with Mavli-Barisadri

Gauge Conversion project.

Open E -Tender

25.10.17 Two bid 01.12.17 2 Nos. 4 NIL YES Dy.

CE/C/UDZ/

CA/55

dated

07.03.2018

M/s J.K. Construction Co., Naya Bazar, Nokha (Bikaner)-334803

Rs. 6.82 Cr 08.01.19 30.06.19

13.01.18 64% Work in progress.

5 T. No. UDZ-MVJ-BI-GC-LHS-T-7

T. No. UDZ-MVJ-BI-GC-LHS-T-7- Balance work of construction of 42 Nos. Road Under Bridges (RUB/LHS) in lieu of level crossings and all other ancillary works like approach road works, retaining walls, drainage works, height gauges, etc. between Mavli - Bhinder stations (from Ch 0 to 41000) in connection with Mavli- Bari Sadri GC Project.

Open

E-

tender

25.10.17 Two

Packet

27.11.17 4 Nos. NIL NIL Yes NWR/S&C/

CA/175

dated

28.05.18

M/s Ravi Infrabuid

Projects Pvt. Ltd, 95

Hiran magri- Sector-

11 Udaipur-313002

Rs. 33.37 Cr. 11.09.2019 25.03.18 57% Work in progress.

Page 11: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

11

6 T. No. UDZ-MVJ-BI-GC-LHS-T-8

T. No. UDZ-MVJ-BI-GC-LHS-T-8 -Balance work of construction of 47 Nos. Road Under Bridges (RUB/LHS) in lieu of level crossings and all other ancillary works like approach road works, retaining walls, drainage works, height gauges, etc. between Bhinder-Bari Sadri stations (from Ch 41000 to 82610) in connection with Mavli- Bari Sadri GC Project.

Open E

tender

25.10.17 Two

Packet

28.11.17 5 Nos. 01 No.

( D.K.

CONSTRUC

TIONS-

MOHALI)

Nil YES NWR/S&C/

CA/176

dated

28.05.18

M/s Rachana- MCPL-

JV Bikaner Road,

NOKHA 334803 Distt

Bikaner Raj.

39.57 Cr.

40.48 Cr.

11.09.2019 25.03.2018 46% Work in

progress.

7 T.No.UDZ-MVJ-BI-GC-T-

9

T.No.UDZ-MVJ-BI-GC-T-9 - Balance work of “Construction,

extension, strengthening, rebuilding of existing major & minor bridges, Earthwork in cuttings and filling including blanketing material for widening of existing MG formation for making formation width as per BG standard profile ,construction of station building, S&T structures, platform wall, PF shelters, FOB, circulating area, retaining wall, boundary wall, approach road, etc.& all other ancillary works from Ch.0 to Ch.41000 between Mavli Jn. and Bhinder stations in connection with Mavli Jn.-Barisadri Gauge Conversion Project”.

Open E

tender

25.10.17 Two

Packet

27.11.18 3 Nos. NIL NIL YES No.

NWR/S&C/

CA/177

dated

28.05.18

M/s Ravi Infrabuid

Projects Pvt. Ltd, 95

Hiran magri- Sector-

11 Udaipur-313002

54.32 Cr. 11.09.2019 25.03.18 50% Work in

progress.

Page 12: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

12

8 T.No.UDZ-MVJ-BI-GC-T-10

T.No.UDZ-MVJ-BI-GC-T-10- Balance work for “Construction, extension, strengthening, rebuilding of existing minor bridges, Earthwork in cuttings and filling including blanketing material for widening of existing MG formation for making formation width as per BG standard profile, construction of station building, S&T structures, platform wall, PF shelters, FOB, circulating area, retaining wall, boundary wall, approach road, etc.& all other ancillary works from Ch.41000 to Ch.82610 between Bhinder and Bari Sadri stations in connection with Mavli Jn.- Barisadri Gauge Conversion Project”

Open E

tender

25.10.17 Two

Packet

28.11.17 3 Nos. NIL NIL YES NWR/S&C/

CA/178

dated

28.05.18

M/s Ravi Infrabuid

Projects Pvt. Ltd, 95

Hiran magri- Sector-

11 Udaipur-313002

60.84 Cr.

62.05 Cr.

11.09.2019 25.03.18 48% Work in

progress.

9 Tender No. UDZ-MVJ-BI-GC-T-11

Tender No. UDZ-MVJ-BI-GC-T-11:- Dismantling of balance existing MG track,

laying and linking of Broad gauge main line, loop lines / sidings including points and crossings, SEJs, etc. in yards, spreading of ballast, tamping of track, Pre NI/NI works in Mavli station yard and other ancillary works from Mavli (including) - Bhinder (Including)- Ch. 0.000 to Ch.41000.00 and transportation of P. Way materials in connection with Mavli -Barisadri Gauge conversion project.

Open E

tender

24.10.17 Single

Packet

5.12.17 2 Nos. NIl NIL Yes Acceptance

letter No.

NWR/S&C/

UDZ-

474461463

dated

13.03.18

M/s Jhawar Sales

Corporation, Rani

Bazar, Bikaner-

334001(Raj)

7.23 Cr. 12.06.2019 1% Work in

progress.

Page 13: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

13

10 Tender No. UDZ-MVJ-BI-GC-T-12

Tender No. UDZ-MVJ-BI-GC-T-12 Dismantling of balance existing MG track,

laying and linking of Broad gauge main line, loop lines / sidings including points and crossings, SEJs, etc. in yards, spreading of ballast, tamping of track, and other ancillary works from Bhinder (excluding) - Bari Sadri (Including)- Ch. 41.000 to Ch.82610.00 and transportation of P. Way materials in connection with Mavli -Barisadri Gauge conversion project.

Open E

tender

24.10.17 Single

Packet

6.12.17 2 Nos. NIl NIL Yes Acceptance

letter No.

NWR/S&C/

UDZ-

474461464

dated

13.03.18

M/s B.S.Sangwan

4GF, Harry Plaza,

Subash Chowk,

Sonipat - 131001

Haryana

7.56 Cr. 12.06.2019 3% Work in

progress.

11 Dy. CE-C-BNSW-T-12R

Tender No. Dy. CE-C-BNSW-T-12R -Carrying out final location survey, geotechnical studies, design, preparation drawings & other preliminary activities and work out actual realistic cost & ROR estimated in connection with Gauge conversion project between Marwar-Mavli (152KM)

Open E- tender

07.11.2017 Single Packet

12.12.17 5 Nos. NIl NIL Yes Acceptance letter No. NWR /BNSW/S&C/484266032 Vol-0 dated 19.05.18

M/s PIONEER SURVEYORS KOLKATA

2.91 Cr. 18.05.2019 10% Work in progress.

Page 14: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

14

Dy. CE/C/Dungarpur

1. Dy.CE/C/

UDZ/

DNRP-

RTM/FLS/

2011/T/1

Carrying out final

location of survey &

….other preliminary

activities in connection

with new BG line

between DNRP-RTM via

Banswara

Open 1/6/11 &

30/6/11

(NIT & First

corrig.)

Single 15-07-

2011

10 NA NA Yes NWR/S&C/

CA/114 Dt.

27-02-12

M/s S.M. Consultants,

Bhubneswar

4.99 Cr

5.60 Cr.

13/11/12

31/12/19

14/11/2011 98%

Work in

progress

2. Dy.

CE/C/DN

RP/ RTM-

DNRP/EW

/ NL/T-8

E/W in cutting and

filling for formation &

all other ancillary works

etc. from Km. 0.00 to

Km. 17.00 between

Dungarpur-Nawa Gaon

station in c/with DNRP-

RTM New BG Rail Line

Project.

Open 23-01-2013 Two

Packet

06-03-

2013

15 5 10 Yes NWR/S&C/

CA/129

Dt. 31-10-

13

M/s Nayak

Infrastructure Pvt.

Ltd., Guwahati

56.74 Cr.

Ex.SCA

8.05 Cr.

09-07-2015

09.07.2017

Work closed

as on is

basis.

06-11-2013 - Project

freeze.

Final bill

passed &

submitted

to finance.

3. T. No.

Dy. CE/C/

DNRP/

RTM-

DNRP/MB

/NL/T/ 10

– Const. of minor

bridges, RUB & other

ancillary works etc.

from Km. 0.00 to 17.00

bet. Dungarpur to

Nawa Gaon stations in

c/with DNRP-RTM New

BG Rail Line Project.

Open 10-09-2013 Two

Packet

23-10-

2013

8 6 2 Yes NWR/S&C/

CA/137 Dt.

30-06-

2014

M/s Gannon Dunkerley & Co. Ltd., Ahmedabad

38.06 Crore 38.48 Crore

03-04-2016

Extended

upto

31.12.2019

14.11.2014 50% Work in

progress.

4 T. No.

UDZ-

HMT/GC/E

W/T-3R

UDZ-HMT GC PROJ.

Construction of Minor

bridges & earthwork

from Km. 270/0 to

320/0 in connection

with UDZ-HMT section

GC Project

Open 08.05.15 Two bid

system

12.06.15 06 01 05 Yes NWR/S&C/

CA/148

dated

12.01.2016

M/s Royal Infra

Engineering Pvt. Ltd., Surat

29.15 Cr.

30.90 Cr.

19.04.17

Extended

upto

30.06.2019

27.11.15 89% Work in

Progress

5 NWR/SC/

UDZ-

HMT/GC/Ci

vil/204140

532

Flash Butt welding of

60 Kg/52 Kg. New / SH

Rails at Depot/ Site

using Mobile Flash Butt

Welding Plant in DNRP-

HMT Section.

Open Single

Packet

23.11.16 02 01 01 Yes Dy.

CE/C/DNRP

/CA/26 Dt.

20.01.2019

M/s Railtech

Infraventure Pvt. Ltd. 147/91-A, Old Bairahana Allahabad – 211003 (UP)

531.70 Lakhs 21.08.2018

20.11.2019

25% Work in

progress.

6 NWR/SC/

UDZ-

HMT/GC/Ci

vil/205140

541

Dismantling of existing

MG track, laying and

linking of BG ML, LL

etc. bet. Km. 270.00 to

Km. 320.00 in c/with

DNRP-HMT Section.

Open - Single 01.02.2017 04 Nos. 1 1 Yes Dy.

CE/C/DNRP

/CA/17 Dt.

27.06.2017

M/s Bhanwar Lal Bijarnia, Vill. Rajpura, Post Prewari, Tehsil Nawa, Distt. Nagaur (Raj.)

890.85 Lakhs

803.00 Lakhs

27.02.2018

Extended upto

30.06.19

05.04.2017 65% Work in

progress.

7. UDZ-HMT/

GC/

205140838

-R1

Transportation of all

types of free rails, P&C

etc. between DNRP-

HMT Section in c/w

UDZ-HMT GC Project.

Open

tender

01.05.2017 Single

Packet

12.06.2017 2 Nos. NA NA Yes Dy. CE/ C/

DNRP/CA/1

9 Dt.

15.10.2017

M/s Shree Nahar Construction Co., A-328, Shastri Nagar, Jodhpur (Rajasthan)

6.28 Crores 17.08.2018

Extended

upto

31.12.2019

31.08.2017 59% Work in

progress.

Page 15: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

15

DY. CE/C/RTM

1. Dy.CE/C/RTM/ DNRP-RTM/NL/T-2

Construction of minor bridges ,Road under bridges (RUB) & other ancillary works from 142.85 to 163.00 km between Chotti Sarvan -Shivgarh stations in c/w Construction of DNRP-RTM via Banswara.New BG Rail line project

Open 15.06.2014 Two bid 23.07.14 5 Nos. 01No 04(four) Yes NWR/S&C/CA/141 dated 16.03.2015 & 31.05.18

M/S Gannon Dunkerley & Co.Ltd. 301-303,Prema Acrcade,3rd Floor, Opp Doctor House, Near Parimal Crossing,C.G.Road,Ahemdabad-380006

Rs.4288.78 Lakhs

17.12.2016 31.03.2018 30.11.2018 30.06.2019

10.08.2015 28% The work in progress.

CE/C/III-JP

Dy. CE/C/I-Ajmer

1

AII

/Const.

/DFCCIL

/T/3

-R2

Shifting of track between Madar & Durai stations & shifting MG yard at Marwar Jn. i.c.w. DFC.

Open 17.04.13 Two Bid 02.04.13 4 Nos. 1 No. 1 No. Yes NWR/S&C/CA/60 dated 26/12/2013

M/s. Ravi Infra build Pvt. Ltd., 95, Hiran Magri, Sector-11, Udaipur

3216.99 Lakhs

4342.00 Lakhs

04/02/2015, 30/04/2016, 31/12/2016, 30/06/2018 31/12/2018 30/08/2019

14/12/13 75% Work in progress.

8. UDZ-HMT/

GC/

205141142

Const. of duty huts,

road works at level

crossing, etc. in the

section of Dy.

CE/C/DNRP in c/with

UDZ-HMT GC Project.

Open

tender

14.08.2017 Single

Packet

18.09.2017 1 NA NA Yes Dy. CE/C/

DNRP/CA/

22 Dt.

24.01.2018

M/s R.K. Constructions, Village –Nawada, Sector-20, Greater Noida, Distt . Gautam Budh Nagar.

7.63 Crores

7.83 Crores

17.10.2018.

Further

extended upto

31.08.2019

02.11.2017 35% Work in

progress.

9. NWR/SC/

UDZ-HMT/

GC/ Civil –

205140436

Supply & stacking of

stone track ballast etc.

bet. Km. 260 to Km.

320 etc. in c/with UDZ-

HMT GC Project.

Open

tender

08.12.2016 Two

packet

18.01.2017 4 4 - Yes Dy. CE/C/

DNRP/CA/

18 dated

15.07.2017

M/s YSCC-YKS-HID

(JV), Vill. Mothala, Abu Road, Distt. Sirohi

10.87 Crores

12.58 Crores

17.10.2018

Ext. upto

30.09.2019

08.05.2017 68% Work in

progress.

Page 16: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

16

2

AII

/Const.

/DFCCIL

/T/6

Construction of station building & staff quarters in c/w shifting of utilities for DFCCIL.

Open 10.01.13 Two Bid 15.02.13 9 Nos. 5 Nos. 5 Nos. Yes NWR/S&C/CA/61 dated 27/12/2013

M/s. Rama Construction company, H-240, Ashok Vihar Phase-I New Delhi

4117.03 Lakhs

05/03/2015, 31/12/2015, 30/06/2016, 31/12/2016, 30/06/2017, 31/12/2017, 31/03/2018, 30/06/2018

& 31/07/2018

15/09/13 - Work completed.

3

AII

/Const.

/LH

S/T

/3 Providing Limited Height

Subways in lieu of existing Level Crossings between Madar & Haripur stations of Madar - Marwar Section in connection with elimination of existing level crossing gates.

Open 10.06.13 Two Bid 17.07.13 01 Nos. - - Yes NWR/S&C/CA/64 dated 20/02/2014

M/s. Lall Construction Co. AA-105, Shalimar Bagh, Delhi-110088

4577.17 Lakhs

6839.00 Lakhs

15/12/2015, 31/03/2017, 31/10/2017, 30/06/2018

&

30/06/2019

18/02/14 90% Work under progress.

4

AII

/Const.

/C&

W/M

od./

T/6

Improvement to drainage system in C&W Workshop by the construction of drain using mostly pre-cast RCC units including launching. Work also includes construction of traverser path and other ancillary works in connection with Modernisation of C&W Workshop, Ajmer

Open 23/10/14 Two Bid 26/11/14 06 (Six) 04 (Four)

1.0 Varaha Infra Limited, Umesh Smriti-6, Jalam Vilas Scheme, Poata B. Road, Jodhpur (Raj.)-342006. 2.0 Bharat Spun Pipe & Construction Company, 43, Industrial Area, Jhotwara, Jaipur-302012. 3.0 JCC Infra

Projects Pvt. Ltd., 761/30, Aklank House, Tikam Ganj, Ajmer (Raj.) 4.0 M/s. Raj Kumar Gupta

Yes

Dy. CE(C)/AII/CA/91 dated 30/07/2015

Prem Fabricator's, 426, Near Jyoti Power, Behind Steel Town, Moriya, Chandgodar, Ahmedabad-382110

948.74 Lakhs

21/01/2016, 31/12/2016, 30/06/2017, 31/10/2017, 15/01/2018, 15/03/2018

& 31/07/2018

04/02/15 - Work completed.

Page 17: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

17

Contractors, III-J/59, Nehru Nagar,

Ghaziabad-201001.

5

NW

R/S

C/A

II-B

NG

M/C

ivil -

308151801

Earth work in

bank/cutting including Blanketing material, Construction of Major/Minor Bridges, Construction of Quarters, S&T structures & Miscellaneous structures, Dismantling of existing Buildings, Platforms & Steel structures etc., .... in connection with Ajmer-Bangurgram BG Doubling project.

Open 02/03/16 Double packet

12/04/2016

06 (Six) 02 (Two)

M/s. Rajendra Singh Bhamboo Infra Pvt. Ltd. 108, First Floor, Neel Kanth

Building, Gandhi Path, Vaishali Nagar, Jaipur – 302021 and M/s. Balajee-Modi (JV), 9, Leela Mension, Raj Bhawan Road, Civil Lines, Jaipur-302006 Jaipur-302006

Yes NWR/S&C/CA/74 dated 30/08/2016

M/s. Shivakriti-Shri Mohangarh (JV), 7th Floor, Ajmer Puliya, Jaipur-302006

11337.76 Lakh 13020.00 Lakhs

23/06/2018 &

28/02/2019 30/11/2019

20/07/16 85% Work in progress.

Page 18: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

18

6

NW

R/S

C/B

angurg

ram

-Guriya-P

atc

h/C

ivil-3

08151801

Earth work in bank/cutting including Blanketing materials, Construction of Major/Minor Bridges, Construction of

Quarters, S&T structures & Miscellaneous structures, dismantling of existing buildings, platforms & steel structures etc., ... in connection with Bangurgram - Guriya BG Doubling project.

Open 28/06/16 Double packet

10/08/2016

05 (Five) 01 (One)

VPRPL-RBIPL "Guriya" (JV) H-1, First Floor

Shivalik Complex, Near Gol Building, Sardarpura, Jodhpur (Rajasthan) 342001

Yes NWR/S&C/CA/76 dated 24/01/2017

M/s. H.S. Mehta Infra

– JCC Infra Projects (JV), 761/30, Aklank House, Tikam Ganj Ajmer – 305001

16161.54 Lakh 19471.00 Lakhs

10/11/2018

Extended upto

31.07.2019

20/11/16 60% Work in progress.

7

NW

R/S

C/M

D-/

Civ

il-3

08421801

Providing pit line with or without catwalk, washing apron, overhead water tank, extension of existing bridges, extension of existing shed, construction of service buildings and dismantling of existing

track, laying & linking of new track & turnouts etc. in Madar yard in connection with shifting of coach maintenance facility from Ajmer to Madar project

Open 29/04/16 Double packet

28/06/16 7 (Seven) 2 (One)

M/s. Ali Mohd. Abdul Mazid, Near Jama Masjid, Mohalla Vyaparian, Bikaner-334001 (Raj.) Varindera

Constructions Limited, 408-409, Suneja Tower-I, District Cenre, Janakpuri, New Delhi.

Yes NWR/S&C/CA/75 dated 29/09/2016

M/s. M. H. Khanusiya, First Floor, Divine India Building, Near RTO office, By Pass Road, Post-Savgadh, (Panpur) Himmatnagar-383001 Dist.-S.K. (Gajarat)

2643.75 Lakh

06/09/2017, 31/01/2018, 31/05/2018

&

31/07/2018

15/09/16 - Work in completed.

Page 19: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

19

Dy. CE/C/II-Ajmer

1 AII/Const.

/LHS/T/2

Construction of

Limited Height

Subway in lieu of

existing LC No. 58,

60, 61, 62, 64, 65,

66, 67, 68, 69, 71, 72

& 73(13 Nos)

between stations

Marwar to Rani of

Marwar-Palanpur

Section in connection

with elimination of

level crossing gates.

Open 21.02.2013 Single 28.03.2013 01 Nos.

1st Lowest

M/s. Ravi

Infrabuild

Projects Pvt.

Ltd. Office

95, Hiran

Magri Sector-

11, Udaipur-

313002

(Raj.).

NIL Yes

NWR/S&C/CA/5

8 dated

18/11/2013

M/s. Ravi Infrabuild

Projects Pvt. Ltd.

Office 95, Hiran Magri

Sector-11, Udaipur-

313002 (Raj.).

1790.49 Lakhs

31/12/2014,

30/09/2015,

30/09/2016,

30/09/2016,

31/12/2016,

31/05/2017 &

30/11/2017

14/09/2013 - Work

Completed.

2

AII/GRI-

MJ/BGD/T

/1

Earthwork in

embankment for

cutting & filling,

Blanketing for bank,

Addition, alteration

and construction of

S&T structures, Pass.

Platform, Platform

Shelters, station

Building, staff

Quarters, water Huts,

toilets, Hand Pumps,

FOBs, TMC Rest

house etc. between

Guriya–Marwar Jn.

stations (both excl.)

and Officer Rest

House at Mawar Jn.

Station in connection

with Guriya-Marwar

Jn. BG Patch Doubling

Project.

Open 30.08.12 Single 16.10.12 07 Nos.

1st Lowest

M/s. Braham

Prakash Modi,

74

Sudarshanpur

a, Industrial

Area,

Baisgodam,

Jaipur-06

NIL Yes

NWR/S&C/CA/5

1 dated

14/03/2013

M/s. Braham Prakash

Modi, 74

Sudarshanpura,

Industrial Area,

Baisgodam, Jaipur-06

3541.71 Lacs.

30/09/2014,

30/04/2015,

31/07/2015,

30/10/2015,

31/12/2015,

30/04/2016,

30/06/2016,

31/12/2016,

31/03/2017 &

30/06/2017

31/12/2012 30/06/17 Work

completed.

3

AII/GRI-

MJ/BGD/T

/2

Construction of

Important/Major

Bridges including

earthwork, blanketing

on the approaches

between stations

Guriya to Marwar

Junction with

Railway’s/Contractor’s

design & drawing in

connection with

Guriya-Marwar

Junction BG Patch

Doubling Project.

Open 21.01.2013 Single 26.02.2013 06 Nos.

1st Lowest

M/s.PNC

Infratech

Ltd.-Jain

Construction

Company

(JV) 761/30,

Aklank

House, Near

Mal Godown,

Tikam Ganj,

Ajmer

NIL Yes

NWR/S&C/CA/6

2 dated

06/01/2014

M/s. PNC Infratech

Ltd.-Jain Construction

Company (JV) 761/30,

Aklank House, Near

Mal Godown, Tikam

Ganj, Ajmer

3240.43 Lakhs

28/01/2015,

31/12/2015,

30/09/2016,

31/12/2016,

15/02/2017 &

31/07/2017

06/12/2013 -

Work

completed,

final bill

passed.

Page 20: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

20

4 AII/Const.

/FLS/T/1

Marking out of center

line, taking levels

including all details,

Carrying out Geotech

investigation,

designing of

foundation and sub –

structures / super

structure of Minor /

Major bridges/LHS,

preparation of land

plans & proposal,

Preparation of L-

section & yard plans

etc. & submitting

detailed working

drawings in

connection with

Bangurgram to Guriya

& Marwar to Rani

Doubling projects and

Various shifting of

utility works of

DFCCIL & LHS works

between Kishangarh

& Palanpur stations.

Open 17.09.2012 Single 09.11.2012 03 Nos.

2nd Lowest

M/s. S. M.

Consultants,

Plot No.-130,

S.M. Tower,

Mancheswar

Industrial

Estate,

Rasulgarh,

Bhubneshwar

(Odisha)

M/s. BPC

India, Nataraj

Bhawan,

P.O.Khamarch

andi, P.S.

Haripal, Dist.-

Hooghly, West

Bengal

Yes

NWR/S&C/CA/

57 dated

07/11/2013

M/s. S. M.

Consultants, Plot No.-

130, S.M. Tower,

Mancheswar Industrial

Estate, Rasulgarh,

Bhubneshwar (Odisha)

183.38 Lakhs

06/07/2013,

30/11/2013,

31/03/2014,

31/10/2014,30/0

4/2015,

31/08/2015,

31/12/2015,

30/04/2016,

31/08/2016 &

30/04/2017

02/02/2013 - Work

completed.

5 AII/Const/

FBW/T/1

Flash butt Welding of

60/52 Kg.

New/SH,(72/90 UTS )

Rail joints by using

mobile flash butt

welding plant in

connection with

various sanctioned

works of Ajmer unit of

construction

organization.

Open 11.10.2012 Single 19.11.2012 01 No.

1st Lowest

M/s. The

India Thermit

Corpn. Ltd.,

84/22, Fazal

Ganj,

Kanpur-

208012.

NIL Yes

Dy.

CE(C)/AII/FBW/

CA/85 dated

21/10/2013

M/s. The India Thermit

Corpn. Ltd., 84/22,

Fazal Ganj, Kanpur-

208012

699.04 Lakhs

18/03/2015,

18/03/2016,

18/03/2017 &

18/03/2019

13/11/2013 95% Work in

progress

6 AII/Const.

/LHS/T/4

Providing Limited

Height Subway (17

Nos.) in lieu of

existing level

crossings between

Haripur & Marwar Jn.

stations of Ajmer -

Marwar Jn. section in

connection with

elimination of existing

level crossing gates.

Open 11.07.14 Two packet

system 13.08.2014 07 Nos.

1st Lowest

M/s. PNC

Infratech

Ltd.-JCC

Infraprojects

Pvt. Ltd. (JV)

761/30,

Aklank

House, Near

Mal Godown,

Tikam Ganj,

Ajmer

04 (Four) Yes

NWR/S&C/CA

/68 Dt. 09-03-

2015

M/s. PNC Infratech

Ltd.-JCC Infraprojects

Pvt. Ltd. (JV) 761/30,

Aklank House, Near

Mal Godown, Tikam

Ganj, Ajmer

3529.60

Lakhs

2916.00

Lakhs

18/05/2016

30/06/2017

31/10/2018

11/09/2015 100% Work

completed.

Page 21: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

21

7 AII/Const.

/LHS/T/5

Providing Limited

Height Subways (19

Nos.) in lieu of

existing level

crossings between

Rani & Keshavganj

stations of Marwar Jn.

– Palanpur section in

connection with

elimination of existing

level crossing gates.

Open 21.02.2013 Two packet

system 13.08.2014 04Nos.

1st Lowest

M/s. Ravi

Infrabuild

Projects Pvt.

Ltd. Office

95, Hiran

Magri Sector-

11, Udaipur-

313002

(Raj.).

03 (Three) Yes

NWR/S&C/CA/6

6 Dt. 27-02-

2015

M/s. Ravi Infrabuild

Projects Pvt. Ltd.

Office 95, Hiran Magri

Sector-11, Udaipur-

313002 (Raj.).

Rs.3908.17

Lacs

3840.00 Lakhs

18/05/2016,

13/03/2017

31/12/2017

31/10/2018

30/06/2019

03/12/2014 95% Work under

progress

8 AII/Const.

/LHS/T/6

Providing Limited

Height Subways in

lieu of existing level

crossings between

Swaroopganj &

Palanpur stations of

Marwar Jn. - Palanpur

section in connection

with elimination of

existing level crossing

gates.

Open 21.02.2013 Two packet

system 13.08.2014 04 Nos.

1st Lowest

M/s. Ravi

Infrabuild

Projects Pvt.

Ltd. Office

95, Hiran

Magri Sector-

11, Udaipur-

313002

(Raj.).

03 (Three) Yes

NWR/S&C/CA

/67 dated

27/02/2015

M/s. Ravi Infrabuild

Projects Pvt. Ltd.

Office 95, Hiran Magri

Sector-11, Udaipur-

313002 (Raj.).

Rs.3873.36

Lacs

4636.00 Lakhs

18/05/2016,

31/03/2017

31/03/2018

31/12/2019

18/12/2014 50% Work under

progress

9

AII/GRI-

MJ/BGD/T

/6

Construction of Minor

Bridges including

other ancillary work

between station

Guriya (excluding) -

Marwar Jn.

(excluding) in

connection with

Guriya - Marwar

Junction BG patch

doubling project.

Open 07/07/2014 Two packet

system 13/08/2014 04 Nos. 1.0 (One)

1.0 M/s.

Ashish

Construction

Co.- SP

Infracon (JV)

211, Shivam

Complex, Opp.

Hetarth Party

Plot, Science

City Road,

Sola,

Ahmedabad -

380061.

Yes

NWR/S&C/CA

/69 dated

09/03/2015.

M/s. JCC InfraProjects

Pvt. Ltd., 761/30,

"Aklank House", Tikam

Ganj, Ajmer (Raj.).

2169.63 Lakhs

29/02/2016,

30/06/2016,

31/12/2016,

31/07/2017 &

31/12/2017

01/03/2015 31/12/2017 Work

completed.

10

AII/GRI-

MJ/BGD/T

/8-R

Dismantling of

existing BG track,

laying and linking of

Broad gauge main

line, loop lines

including points and

crossings at various

yards, spreading of

ballast, tamping of

track, transportation

of P-Way materials

and other ancillary

works between Guriya

– Marwar Jn. Section

in connection with

Guriya - Marwar Jn.

BG Patch Doubling

Project.

Open 28/07/2015 Single packet

system 31/08/2015 5 Nos. 1.0 (One)

1.0 JCC Infra

Projects Pvt.

Ltd., 761/30,

Aklank House,

Tikam Ganj,

Ajmer

No -

M/s. Jhawar Sales

Corporation, Rani

Bazar, Bikaner-

334001 (Raj.)

Rs. 976.32

Lakhs

28/05/2017 &

31/07/2017 - 30/06/17

Work

completed.

Page 22: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

22

11

AII/MJ-

RN/BGD/T

/1

Earth work in

bank/cutting including

Blanketing material,

Construction of

Important/Major/Mino

r Bridges,

Construction of

Quarters, S&T

structures &

Miscellaneous

structures on stations

and in section,

Dismantling of

various Buildings,

Platforms & Steel

structures etc, Track

works for Broad

Gauge line, Supplying

& putting ballast in

track, Transportation

of P. Way materials

and other ancillary

works in Marwar

Junction to Rani

section in connection

with Marwar Jn.-Rani

(both including) BG

Patch Doubling

project.

Open 09/08/2015 Two packet

system 06/10/2015 13 Nos. 7.0 (Seven)

1.0 M/s.

Gawar –

Lakhlan (JV)

402, Diamond

Tower, Purani

Chungi, Ajmer

Road,

Jaipur2.0 M/s.

Kalindee –

Paras JV, 2nd

Floor Building

No. 9 A, Cyber

City, DLF

Phase – III,

Gurgaon –

1220023.0

M/s. Ravi - HG

(JV) 95, Hiran

Magri, Sector-

11, Udaipur –

3130024.0

M/s. Gannon

Dunkerley &

Co. Ltd. 301-

303, Prerna

Arcade, Opp.

Doctor House,

Near parimal

Crossing, C.G.

Road,

Ahmedabad-

3800065.0

M/s. VRC – SIL

(JV), 16, Opp.

Metro Pillar

No. 190,

Paschim Vihar

Extension,

Rohtak Road,

Delhi

1100636.0

M/s. BPL-BCPL

(JV) Ekta

House, Nr.

Shripath

Apartment,

Jalaram-II,

University

Road, Rajkot –

360007

Yes

NWR/S&C/CA

/71 dated

22/02/2016

M/s. VPRPL – RBIPL

(JV) H-1, first Floor

Shivalik Complex,

Near Gol Building,

Sardarpura, Jodhpur

(Raj.) – 342001

15262.94

Lakh

15191.00

Lakhs

29/12/2017

31/12/2018

30/06/2019

25/02/2016 98% Work under

progress.

Page 23: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

23

12

NWR/SC/

Guriya-

Marwar/Ci

vil-

30915110

9

Miscellaneous works

between Guriya to

Marwar Jn. doubling

project.

Open 20/09/2016 Single packet

system 24/10/2016 04 Nos. 04 (Four) NIL Yes

Dy.CE(C)/AII/C

onst./GRI-

MJ/CA/4 dated

30/03/2017

M/s K.B. Enterprises,

2, Matra Chhaya,

Opp. Chambal Power

House, Hawa Sarak,

Jaipur-302006

Rs.814.54

Lakhs

20/05/2017 &

19/08/2017 03/12/2016 100%

Work

completed.

13 AII/Const./

LHS/T/9

Providing leftover Limited

height subway in lieu of

existing level crossings

in Marwar Jn.-Palanpur

section in connection

with elimination of

existing level crossing

gates.

Open 08/09/2016 Two Packet

System 14/10/2016 03 Nos. 03 (Three) NIL Yes

Dy.CE(C)/AII/

Const./LHS/CA

/06

Dated

06/09/2017

M/s Radhe Associate,

137-1st Floor Kensvilla

Complex, Nr.

Ramosana Circle,

Mehsana-Unjha

Highway Road-384002

895.23

Lakhs

26/01/2018,

30/06/2018

28/02/2019

31/12/2019

09/02/2017 35% Work in

progress

14

NWR/SC/

Rani-

Marwar/

Civil-

309150802

-R

Flash butt welding of

60/52 Kg. New/SH

(72/90 UTS) Rail joints

by using Mobile flash

butt welding plant in

connection with Marwar

Jn.-Rani BG patch

doubling and Thaiyat-

Hamira-Sanu new BG

line project.

Open 15/07/2016 Single packet

system 22/08/2016 01 No. 01 (One) NIL Yes

Dy.CE(C)-

II/AII/CA/7 dated

25/11/2017

M/s Railtech

Infraventure Pvt. Ltd.,

147/91-A, Old

Bairahana, Allahabad-

211003

660.66

Lakhs

16/03/2018,

15/09/2018 &

31/12/2018

31/07/2019

25/12/2017 50% Work in

progress

Page 24: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

24

CE/C/IV-JP

Dy. CE/C/I-Jodhpur

1 T.No.JU/CONST./T-08 /2012-13/GAD-

Preparation of GAD

and Soil Testing for

RUBs in various

sections of JU division

Open

tender

07.12.12 Single 10.01.13 03 M/s Theme

Engineering

Services Pvt.

Ltd., B-24,

Jaipur

1. M/s M.K. Soil Testing Laboratory, Ahmedabad

2. M/s Engineer's Associates, Ratanada, ,JU

L-1 Dy.CE/C/

JU/10/2013

-14/GAD,

dtd.

19.10.13.

M/s Theme Engineering Services Pvt. Ltd., Jaipur

20.19 Lakhs 06.07.13

Extended

upto

30.06.17

15.04.13 100% Work

delayed due

to NOC of

various LCs

were not

received

from Divn.

2 JU/Const./

T-22/14-

15/Std.IIR

/MTD-BKN

All Civil & P.Way work

c/with Std-II work in

MTD-BKN & RKB-PLC

sec

Open

Tender

21.11.14 Single

Tender

23.12.14 02 Nos. M/s

Bhanwar Lal

Bijarnia,

Village-

Rajpura,

Post-

Prewari,

Tehsil-

Nawa, Distt.

Nagour

(Rajasthan)

M/s Jai Mata De Energy System,

Laxmangarh sikar

L-1 Dy.CE/C/

JU/14/2015

-16/Std-

IIR, dtd.

11.06.15.

M/s Bhanwar Lal

Bijarnia,

Village-Rajpura, Post-

Prewari,

Tehsil- Nawa, Distt.

Nagour

(Rajasthan)

715.80 lacs. 03.10.16

31.03.17

31.08.17

31.03.18

30.08.18

15.10.18

10.04.15 100% Final SCA is

under

process.

3 JU/Const./

74-W-

26/2015-

16/Std.IIR

/ RKB-PLC

Supplying and

stacking of 20800 cum

Stone ballast for

Std.IIR work in RKB-

PLC section

Open

Tender

05.06.15 Single

Tender

10.07.15 04 Nos. M/s J.K.

Const.Co.

Nokha,

A.K. Gupta & Co., , DELHI

M/s Hanuman Const. Co., Nokha

M/s Shree Shyam Engineering Co, Churu

L-1 Dy.CE/C/

JU/19/

2015-

16/Std.IIR/

RKB-PLC,

dtd.

30.01.16

M/s J.K. Construction

Co.,

New Market, Nokha,

District – Bikaner

142.84 lacs. 10.05.16

31.07.16

15.11.16

.09.2015 100% Work

completed &

final bill

awaited due

to non

deposition of

mining NOC.

4 JU/Const./

T-

27/2015-

16/Std.IIR

/ RKB-PLC

All Civil & P.Way work

c/with Std-II work in

RKB-PLC sec

Open

Tender

11.06.15 Single 15.07.15 01 No. M/s

Bhanwar Lal

Bijarnia,

Village-

Rajpura,

Post-

Prewari,

Tehsil-

Nawa, Distt.

Nagour

(Rajasthan)

- L-1 Dy.CE/C/

JU/18/

2015-

16/Std.IIR,

dtd.

06.01.16

M/s Bhanwar Lal

Bijarnia,

Village-Rajpura, Post-

Prewari,

Tehsil- Nawa, Distt.

Nagour

(Rajasthan)

679.84 lacs. 15.03.17

08/2017

31.03.18

31.08.18

15.10.18

18.09.15 100% Work

completed &

final C&A

under

process.-

5 JU/Const./

T-

25/2015-

16/Std IIR

Providing “IN SITU”

Glued Insulated Joints

of G-3 (L) type for 52

kg/60 kg rails in c/w

StdIIR work in MTD-

BKN & RKB-PLC

section.

Open

Tender

05.06.15 Single 10.07.15 03 M/s Tirupati

Metal

Fabricators,

1433 Sector

16,

Faridabad-

121002

(Haryana)

Dynamic Engineers Kota.

Creative Engineers Kota -

L-1 Dy.CE/C/

JU/17/

2015-

16/Std.IIR,

dtd. 06.01-

2016

M/s Tirupati Metal

Fabricators,

1433 Sector 16,

Faridabad-121002

(Haryana)

320.01 lacs. 31.03.18

30.06.18

30.08.18

17.12.15 100% Work

completed &

final C&A

under

process.-

6 NWR/SC/ LN-MJ sec. -RUBs in Open 09.12.15 Single 12.01.16 07 • M/s Rachana-

• M/s Rachana-SNCC JV

L-1 Dy.CE/C/ M/s M.H.Khanusiya, 12.71 Cr. 01.11.17 12.05.16 100% Work

Page 25: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

25

RKB-

JSM/Civil-

31030001

004

lieu of LCs (12 Nos

LCs under Pink Book

item No. 93 of 2015-

16)

tender (Seven) SNCC JV • M/s Jay Jawan Const. Co

• M/s Satish Kera Ram Amit

• M/s Mohanlal Managanlal Kakrecha

• M/s JCC Infra

• M/s M.H. Khanusiya

• M/s Rama Kishan

• M/s Jay Jawan Const. Co

• M/s Satish Kera Ram Amit

• M/s Mohanlal Managanlal Kakrecha

• M/s JCC Infra • M/s Rama

Kishan

JU/23/

2016-

17/LHS/

LN-MJ, dtd.

12.07.16

Himantnagar-383001

Dist- S.K.(Gujrat)

31.03.18

31.10.18

31.03.19

30.06.19

completed.

Final SCA

under

process.

7 NWR/SC/

MTD-

BKN/CIVIL

-

31030001

002-R

MTD-BKN section-

RUB in lieu of LCs, (16

Nos. of LCs under Pink

Book item No. 97 &

104 of 2016-17)

Open

tender

17.07.16 Two

packet

system

19.08.16 04 (Four) • M/s Shree Karni Traders, Bikaner

• M/s M.H. Khanusiya, Himatnagar

• M/s JMES – MGC (JV) V.P.O. – Narodara

• M/s PCC – Harita Construction Co. (JV), Hisar

M/s Shree Karni Traders, Bikaner

M/s JMES – MGC (JV) V.P.O. – Narodara

M/s PCC – Harita Construction Co. (JV), Hisar

L-1 NWR/S&C/

CA/ 77

dated

15.02.2017

M/s M.H. Khanusiya,

Himatnagar

1823.45

Lakhs

05.11.18

31.03.19

30.06.19

10.01.17 100% Work

completed.

Final SCA

under

process.

8 NWR/SC/

RKB-

JSM/Civil-

31030001

003-R

RKB-JSM section- RUB

in lieu of LCs, (20 Nos.

LCs under Pink Book

item No. 98 & 108 of

2016-17).

Open

tender

03.08.16 Two

packet

system

06.09.16 04 (Four) • M/s Rachana – SNCC JV, Jodhpur.

• M/s Shree Karni Traders, Bikaner

• M/s M.H. Khanusiya, Sunshine Infrastucther (JV), Himatnagar

• M/s SB – Jagtaji (JV), New Delhi – 110018

• M/s Shree Karni Traders, Bikaner

• M/s M.H. Khanusiya, Sunshine Infrastucther (JV), Himatnagar

• M/s SB – Jagtaji (JV), New Delhi – 110018

L-1 NWR/S&C/

CA/ 78

dated

05.06.2017

M/s Rachana – SNCC

JV, Jodhpur

2162.34

Lakhs

13.06.18

31.03.19

30.06.19

15.01.17 100% Work

completed.

Final bill

under

process.

9 NWR/SC/

RUB/Civil-

41030001

007

NWR/SC/RUB/Civil-

41030001007

Samdari-Barmer

section - Road under

bridges in lieu of Level

Crossings (13 No. LCs

under PB item No. 73

of 2016-17 & 04 No.

LCs under PB item No.

100 of 2016-17)

Open

tender

06.11.2016 Two

packet

system

08.12.16 04 • M/s M.H. Khanusiya, Himatnagar

• M/s Shree Karni Traders, Bikaner

• M/s JMES – MGC (JV) V.P.O. – Narodara

• M/s Rama kishan

M/s Shree Karni Traders, Bikaner

L-1 NWR/S&C/

CA/ 79

dated

19.07.2017

M/S Rama kishan

Ashok kumar (JV)

205, Sardarpura JU.

2241.33

2246.65

(Revised)

06.10.18

31.03.19

15.07.19

10/2017 80% Work in

progress.

Page 26: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

26

Ashok kumar (JV) JU.

10 NWR/SC/

ROB/Civil-

41030000

9086

NWR/SC/ROB/Civil-

410300009086

construction of

complete ROB

including Approaches

in lieu of existing LC

No. C- 56 at JM: 77/2-

3 and C- 109 at KM:

145/9 – 146/0 on

SMR-BLDI section

Open

tender

Two

packet

system

10.03.17 08 M/s M.H. Khanusiya, Himatnagar

M/s Rachana Ankleshwar

M/s Shree Karni Traders, Bikaner

Lal Const. Company

M/S Sona Builders- RC Patel JV Mehsana

Ravi infra build projects Pvt. Ltd. Udaipur

Radhe associates Mehsana

VPRPL- RBIPL Samdari JV

M/s Shree Karni Traders, Bikaner

M/s Rachana Ankleshwar

VPRPL- RBIPL Samdari JV

Radhe associates Mehsana

L-1 NWR/S&C/

CA/81

dated

19.12.17

M/S Sona Builders- RC Patel JV Mehsana

3699.14

Lakhs

04.07.19 26.09.17 35% Work in

progress.

11 NWR/SC/

RUB/Civil-

41030001

009

Merta Road - Bikaner

section - Road under

bridges in lieu of LC

(21 Nos. LCs under

Pink Book item No.

106 of 2017-18 & 02

Nos LCs under Pink

book item No.113 of

2017-18 )

Open

tender

04.08.17 Two

packet

system

11.09.17 03 M/s Rachana Construction Company, AT & PO Maktupur, Ta. Unjha, Mehsana (Gujrat).

M/s Shree Karni Traders, Bikaner

M/s Pragat Const. Co. New Delhi

L-1 NWR/S&C/

CA/83,

dated

10.04.2018

M/s Rachana Construction Company, AT & PO Maktupur, Ta. Unjha, Mehsana (Gujrat).

5225.26 Lakhs

10.11.19 11.01.18 40% Work in

progress.

12 NWR/SC/

RUB/Civil-

41030001

011

DNA-MTD & RTGH-

DNA section - Road

under bridges in lieu

of LC (20 Nos. LCs

under Pink Book item

No. 122 of 2017-18,

01 No LC under Pink

book item No. 112 of

2017-18 )

Open

tender

04.08.17 Two

packet

system

11.09.17 03 M/s Rachana Construction Company, AT & PO Maktupur, Ta. Unjha, Mehsana (Gujrat).

Mehta Const. Co Karnal

M/s Pragat Const. Co. New Delhi

L-1 NWR/S&C/

CA/84,

dated

10.04.2018

M/s Rachana Construction Company, AT & PO Maktupur, Ta. Unjha, Mehsana (Gujrat).

5306.07 Lakhs

10.11.19 09.03.18 60% Work in

progress

13 NWR/SC/

RUB/Civil-

41030001

010

MTD-JU, PPR-BARA

section - RUB in lieu of

LC (19 Nos. LCs under

P B item No. 112 of

2017-18, 01 No LC

under Pb item No. 117

of 2017-18 )

Open

tender

04.08.17 Two

packet

system

11.09.17 02 M/s Shree Karni Traders, Bikaner

M/s Pragat Const. Co. New Delhi

L-1 NWR/S&C/

CA/82

dated

09.04.2018

M/s Shree Karni

Traders, Bikaner.

4939.74 Lakhs

02.01.20 01.04.18 100% Work

completed.

Final bill

under

process.

14 Extension of existing

RUB (8 Nos.) and

const. of RUB in lieu of

manned LCs (08 Nos.)

FL-DNA doubling

project.

Open

tender

Two

packet

system.

L-1 NWR/S&C/

CA/

M/s HJKIPL DRAIPL JV, Deesa

3207.00 Lakhs

25.08.20

Page 27: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

27

15 Special repair of office

premises of Dy.

CE/C?JU

Open

Tender

Single

Packet

System

Shree Ram Const. Co. Jodhpur

39.00 Lakhs 03.10.19 15.06.19

100% Work

completed.

Page 28: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

28

Dy. CE/C/II-JU

1 NWR/SC/Tha

iyat/Civil-

310111802

Construction of all Civil

work & all other misc.

works between THM–

Sanu new BG line

project (56.250 kms.).

Open

tender

11.09.15 Two packet

17.11.15 07 M/s SCC JV PMP

Infratech, A-Block, A-

104, Ganesh Meridian,

Ahmedabad

M/s DRD MI JV

M/s Bhaniyana Const.

JV

M/S Apex Termic PVT

(JV)

M/S Ravi-HG (JV)

L-1 NWR/SC

/CA/73 dt.

17.08.16

M/s SCC JV

PMP Infratech,

A-Block, A-104,

Ganesh

Meridian,

Ahmedabad

11733.94 22.03.18

30.09.18

31.01.19

31.03.19

30.09.19

27.04.16 78% Work in

progress.

2 NWR/SC/Thi

yat/Civil-

319110507-R

Providing “IN SITU”

Glued Insulated Joint

in c/w. Thaiyat

Hamira–Sanu new BG

line project & MJ-Rani

BG Patch Doubling

project

Open

tender

27.12.16 Singal 02.02.17 5 M/s Creative

Engineers, F-189, Road

No. 5, Indraprasth lnd

Area, Kota (Raj.)

324005

1.M/sDynamic

Engineers

2 M/s Kushal

Engineering

3 .M/s Tirupati Metal

Fabricators

4. M/s Diamond Steel

Ind.

L-1 Dy.CE/C/

JU/CA04/

dtd. 18.08.17

M/s Creative

Engineers, F-

189, Road No.

5, Indraprasth

lnd Area, Kota

(Raj.) 324005

173.15 30.05.19

30.09.19

22.11.17 82% Work in

progress.

3 NWR/SC/FL-

DNA/Civil-

410152001

Construction of

Doubling work

between Phulera –

Degana (108.75 Kms.)

on Phulera-Degana

Railway line.

EPC 13.12.16 EPC 02.08.17 5 M/s Punj Lloyd

Limited,

Plot No.78,

Institutional Area,

Sector-32, Gurgaon

PIN-122003 Haryana

1.M/s IRCON

International Ltd,

2.Jaiprakash Associates

Ltd,

NOIDA

3. Larsen & Toubro

Limited

MUMBAI

4. AFCONS Infra. Ltd,

Mumbai

L-1 NWR/S7C/CA/8

0

dt.28.8.17

M/s Punj Lloyd

Limited,

Plot No.78,

Institutional

Area,

Sector-32,

Gurgaon

Haryana

477.50

Cr.

13.03.20 26.9.17

( Appointed

date)

Work

awarded on

09.08.17.

Termination

issued on

24.09.18

4 NWR/SC/Thiy

at/Civil-

402111110-R

Housekeeping &

upkeep. under Dy.CE

(Const.)-II,JU

Open

tender

26.08.17 Singal 04.10.17 3 M/s Rajendra Singh,

Jaisalmer,

1.M/s Ratan

Construction co.,

Jodhpur

2.M/s B.S. Const. Delhi

L-1 Dy.CE/C/

JU/CA-.07./

dtd. 20.02..18

M/s Rajendra

Singh,

Jaisalmer,

28.20

Lakh

06.11.18

06.02.19

06.04.19

06.05.19

15.05.19

16.11.17 100% Work

completed.

5 T.No.

NWR/SC/FL-

DNA/Civil-

419150703

Hiring of 03 (Three)

Nos. (MUV) under

Dy.CE/C-II,JU in FL-

DNA doubling project

Open

tender

06.01.18 Singal 13.02.18 3 M/s ALRIA

Construction,

Goredi Karna, Degana

Nagaur, Rajasthan

1. M/s Subhash

Traders, Nagaur

2. M/s Shri Vinayak,

Phulera

L-1 Dy.CE/C/

JU/CA-.09./

dtd. 10.5.18

M/s ALRIA

Construction,

Goredi Karna,

Degana

Nagaur,

Rajasthan

33.95

Lakh

20.08.20 22.02.18 Work in

progress

6 NWR/SC/FL-

DNA/Civil-

41910704

Hiring of 03

Nos.vehicle i.e. etc. in

connection with FL—

DNA doubling project.

Open

tender

19.05.18 Singal

25.06.18 5 M/s Shera Di Com C,

Phulera,

2. M/s P C Const. C, C

Road, Jodhpur

3. M/s ALRIA Const.,

Degana

4. M/s Meera Tour &

Travels, Jaisalmer

M/s P C Const. co., P-

11, Saran Nagar, C

Road, Jodhpur

L-1 Dy.CE/C/

JU/CA-11/

dtd 24.10.18

M/s P. C. Const.

co., P-11, Saran

Nagar, C Road,

Jodhpur

33..14 13.08.20 20.09.18 Work in

progress

Page 29: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

29

7 Tender No:

NWR/SC/FL-

DNA/Civil-

419150108

Phase-I - Earthwork in

bank / cutting

including blanketing

material, Construction

of minor Bridges

including in

connection with

Phulera - Degana

Doubling Project of

Jodhpur Division.

Open E-

Tender

31/10/18 Two

Packet

26/11/18 03 1. 1. NGPL-SCC JV, Jaipur

2. M/s Vishnu Prakash R

PungliaLTd, Mumbai

3. M/s Rachna Shri

Mohangarh JVS-8,

First Floor, Transport

Nagar, Jaisalmer

NA L-1 NWR/S&C

/CA/92 dt.

20.05.2019

M/s Rachna

Shri Mohangarh

JVS-8, First

Floor, Transport

Nagar,

Jaisalmer

4094.26 09.01.20 25.02.19 1.00% Work in

progress.

8 Tender No:

NWR/SC/FL-

DNA/Civil-

419151809

Phase-II - Earthwork in

bank / cutting

including blanketing

material, Construction

of minor Bridges in

connection with

Phulera -Degana

Doubling Project of

Jodhpur

Open E-

Tender

06/11/18 Two

Packet

29/11/18 04 1. M/s K.K. Sorathia

MMC Projects JV

2. M/s NGPL-BLB-SCC JV,

Jaipur

3. M/s Rachna-BLB-

NEPLJV 266-A, Jaipur

M/s BPMODI-MCC JV,

Jaipur

L-1 - M/s K.K.

Sorathia MMC

Projects JV,

Tagore Road,

Gandhidham-

370201

3675.01 09.07.20 03.03.19 1.00% Work in

progress.

9 NWR/SC/FL-

DNA/Civil-

419151810

Phase-III - Earthwork

in bank / cutting

including

blanketingetc. in

connection with

Phulera -Degana

Doubling Project of

Jodhpur Division.

Open E-

Tender

06/11/18 Two

Packet

04/12/18 03 1. M/s K.K. Sorathia

MMC Projects JV,

Gandhidham-370201

2. M/s Rachna Shri

Mohangarh JVS-8,

First Floor, Transport

Nagar, Jaisalmer

M/s BPMODI-MCC

(JV), Jaipur

L-1 M/s Rachna

Shri Mohangarh

JVS-8, First

Floor, Transport

Nagar,

Jaisalmer

4788.27 09.07.20 21.02.19 1.00% Work in

progress.

10 NWR/SC/FL-

DNA/Civil-

419150307-R

419150307-R -

Construction of Major

Bridges (12 Nos.) and

Minor Bridges (PSC

Slab) from Km.0.00 to

Km. 108.75 in c/w

doubling of Phulera -

Degana section of Ju.

Division.

Open E-

Tender

22.11.18 Two

Packet

12.12.18 08 1 M/s.Nelakuduru Infra

Sriganesh Jv-Bangalore

2. M/s Shree Karni

Traders, Bikaner

3. M/s Radhe Guru JV-

Mehsana

4. M/s Vishnu Prakash R

Pungalia Ltd., Mumbai

5. M/s V k Infra. JV-

Sriganganagar

6. M/s JCC Infra Projects

Private Limited, Ajmer

7. M/s Jmes Yes JV-

Jodhpur.

MMC PROJECTS INDIA

PRIVATE LIMITED,

Gandhidam

L-1 - M/s

Nelakuduru

Infra Sriganesh

JV, Plot No. 56,

8th Cross,

Bhuvaneshwari

Nagar, Hebbal

post, Bengaluru

2970.55 24.08.20 24.03.19 0% Yet to start.

Page 30: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

30

11 NWR/SC/FL-

DNA/Civil -

419150311

Construction of Major

Bridge No. 22 (10 X

24.40m Composite

Welded Girder) at Ch.:

24326.45 between

Gudha - Govindi

Marwar Block section

in connection with

doubling of Phulera -

Degana section of

Jodhpur Division.

Open E-

Tender

11.01.19 Two Packet 05.02.19 10 1 .M/s A B Lodha-

Nashik

2. M/s H J Kakrecha

Infracon Pvt. Ltd.,

Banaskantha

3. M/s M S SHREE

KARNI TRADERS,

Bikaner

4. M/s MODI

CONSTRUCTION CO.,

JAIPUR

5. . M/s PMP Infratech

Pvt Ltd, Ahmedabad

6.. M/s Radhe Guru JV-

Mehsana

7.M/s SMB Siddhnath

JV, Ankleshwar

8. M/s SUGAN

CONSTRUCTION

COMPANY- JAIPUR

9. M/s V K

Infrastructure JV-

Sriganganagar

10. M/s Vishnu Prakash

R Punglia Ltd, Mumbai

1. . M/s PMP Infratech

Pvt Ltd, Ahmedabad

L-1 M/s RADHE-

GURU JV-

MEHSANA, 137

Kensvilla

Complex Nr,

Ramosana

Circle,

Mehsana,

Unjha Highway,

384002

2068.46 30.09.20 10.05.19 0% Yet to start.

Dy.CE/C/III-JU

1. Phase-I Earthwork in

bank/ cutting including

blanketing material etc. in

c/with Degana-Raika Bagh

Doubling Project.

Open E-

Tender

Two Packet

L-1 M/s K.K. Sorathia MMC

Project JV,Gandhidham

4898.00 Lakhs 07.08.20 1% Work in

progress.

Page 31: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

31

2. Phase-II Earthwork in

bank/cutting including

blanketing material etc. in

c/with Degana-Raika Bagh

Doubling.

Open

Tender

Two packet

system

L-1 NWR/S&C/CA

/……. Dt….

M/s NGPL-NEPL BLB (JV)

Road Jaipur

5167.00 Lakhs 04.08.20 0%

3 Phase-III Earthwork in

bank/cutting including

blanketing etc. in

connection with Degana-

Raika Bagh Doubing

Project.

Open

Tender

Two Packet L-1 NWR/S&C/CA

/….. dt.

M/s Vishnu Prakash

R.Punglia Ltd., Jodhpur

3431.00 Lakhs 26.06.20 1% Work in

progress.

Dy. CE/C/Test Track/ JU

1. Construction of Major

Bridges * Minor bridges

(PSC Slab in connection

with Test Track for RDSO

(Km. 0.00 to 25.00) to

Jodhpur division.

Open

Tender

Two packet L-1 NWR/S&C/CA

/

M/s Modi Construction

Co. Civil Lines, Jaipur

3968.00 Lakhs 20.03.20 1% Work in

progress.

2. Const. of embankment by

cutting and raising of

existing bank, minor and

road under bridge from

Km. 12.00 to Km. 25.0

Open

Tender

Two Packet L-1 NWR/S&C/CA

/

M/s BGCC-MODI (JV),

Civil Lines, Jaipur

3534.00 Lakhs 20.12.19 1% Work in

progress.

3 Construction of

embankment by cutting

and raising of Existing

bank, Minor and Road

under Bridge from Km.

0.00 to Km. 12.00

Open

Tender

Two Packet l-1 NWR/S&C/CA

/

M/s BGCC-MODI (JV),

Civil Lines, Jaipur

3063.00 Lakhs 20.12.19 1% Work in

progress.

4 Hiring of 02 Nos. vehicles

i.e. and 01 Nos. Multi

Utility Vehicle.

Open

Tender

One Packet L1 M/s P.C. Construction

Co. C. Road, Jodhpur

35.00 Lakhs 06.03.20 12% Work in

progress.

Page 32: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

32

Dy. CE/C/BKN

1 Tender No. NWR-SC-BKN-13-2017-18 Dated 30.09.2017

Construction of Limited height subway ( 1x 4.0m x3.60m) with covering in lieu of existing level crossing No C-4 at km 6/7-8 between Rewari- Kishangarh Balawas station on Rewari- Hisar section of Bikaner division in connection with elimination of level crossing gate.

Open tender

30.09.17 Single Bid 06.11.17 02 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

Yes 39-NWR/Dy.CE/C/BKN/2017-18 Dated: 13.04.2018

M/S Punia Construction Co. 30,Sector-13, Part-2 Hisar-125001( Haryana)

Rs178.67 lakhs

15.06.2018 16.12.2017 08.04.2019 Work physically completed. Final bill is under preparation.

2 Tender No. NWR/SC/ROB/Civil-41230000305/2017-18 Dated 01.08.2017

Construction of 02 lane Road Over Bridge ( single span over Railway tracks) with RCC deck slab on composite girder super structure & pile foundation in lieu of level crossing no. 80 at Km 119/6-7 on Rewari – Hisar section at Hansi – Nalwa – Umra Road in Hisar District

Open tender

01.08.17 Single Bid 08.09.17 05 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

Yes 46-NWR/Dy.CE/C/BKN/2018-19 Dated: 10.08.18

M/S Mohla Construction Co.,476, Sector-15-A Hisar-125001

Rs 448.58 lakhs

15.12.2018 30.06.2019

23.07.2018 95% Work in progress

3 Tender No. NWR-SC-BKN-03(R)-2017-18dated 14.08.2017

Construction of Road Under Bridges in lieu of 14 No existing Level Crossings on Lalgarh- Phalodi, Sadulpur-Bikaner , Suratgarh-Bikaner, Suratgarh Anupgarh and Suratgarh Bye pass sections of Bikaner division in connection with elimination of level crossing gate

Open tender

22.08.2017 Single Bid 20.09.2017 01 no Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

Yes NWR/S&C/CA/85 dated 31.05.2018

M/s Shree Karni Traders, C-171, Kanta Khaturia Colony, Bikaner -334001 ( Rajasthan)

Rs 2696.94 lakhs

15.07.2019 16.01.2018 60% Work in progress

Page 33: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

33

4 Tender No. NWR-SC-BKN-16-2017-18 dated 13.12.2017

Construction of 02 lane Road Over Bridge (single span over Railway track – 1 x 36m steel composite girder and three span on viaduct 3x18 m PSC girder ) with RCC substructure & pile foundation in lieu of level crossing no C-105 at km 159.500 near Birdhwal station on Suratgarh-Lalgarh section on approach Road connecting NH-15 to Suratgarh Thermal Power Station on Deposit terms

Open tender

13.12.2017 Single Bid 19.01.2018 09 Nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

Yes 45-NWR/Dy.CE/C/BKN/2018-19 Dated: 06.08.2018

M/S Pawansut Infra Projects Private Limited, 4/12, RHB Colony, Hanumangarh-335512 (Rajasthan)

Rs 850.97 Lakhs

09.04.2019 30.09.2019

13.04.2018 45% Work in progress

5 Tender No. NWR-SC-BKN-17-2017-18 dated 03.01.2018

Construction of 04 nos Road Over Bridge (7x36 m + 2x30 m+ 1x18 m + 1x24 m span over Railway tracks) with RCC deck slab on composite girder super structure / PSC girder with RCC substructure & pile foundation along with Limited Height Subway in lieu of level crossing No. 54-A at km 85/2-3, 76 A at km 115/3-4, 123 at km 189/3-4 on Rewari - Hisar - Bathinda section and level crossing No. C-4-A at km 3/7-8 on Hisar - Sadulpur section of Bikaner division.

Open tender

03.01.2018 Two Bid 09.02.2018 03 Nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

Yes NWR/S&C/CA/86 dated 12.06.2018

M/S Vishnu Prakash R Punglia Ltd., H-1, First Floor, Shivalik Complex, Near Gol Building , Sardarpura, Jodhpur-342003

Rs 4291.59 Lakhs

05.10.2019 30% Work in progress

Page 34: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

34

6 NWR-SC-BKN-10 (R)-2017-18 dated 11.01.2018

Earth work in bank / cutting including Blanketing materials, toe wall with pitching, buildings for Station Master, Commercial staff, yard master, Loco shed, end loading ramp, connecting roads / pathways and other ancillary works at Birdhwal station and from takeoff point chainage 0.00 to Implant yard in connection with providing Railway Track link to Unit No. 7 & 8 (2 x 660 MW) at Suratgarh Supercritical Thermal Power station

Open tender

11.01.2018 Two Bid 16.02.2018 09 Nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

Yes 44-NWR/Dy.CE/C/BKN/2018-19 Dated: 13.08.2018

M/S JMES JMDE (JV),VPO- Narodara, Tehsil- Laxmangarh, Sikar- 332311 (Rajasthan)

Rs 1690.65 lakhs

16.04.2019 31.12.2019

10.05.2018 60% Work in progress

7 Tender No. NWR-SC-BKN -18-2017-18 dated 03.02.2018

Construction of 09 Nos Road Under Bridge in lieu of existing Level Crossing no 79,84,86,90,93,96,108,109-A and 139 on Rewari- Sadulpur sections of Bikaner division in connection with elimination of level crossing gate

Open tender

03.02.2018 Two Bid 12.03.2018 03 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

Yes NWR/S&C/CA/87 dated 18.09.18

M/S Mohla Construction Co.,476, Sector-15-A Hisar-125001

Rs 2668.75 lakhs

05.01.2020 23.07.2018 35% Work in progress

8 Tender No. NWR/SC/SURP-HMH-SGNR/Civil-412140106 (R-1)/2017-18 dated 03.02.2018

Earthwork in cutting and filling, toe wall, pitching , Construction of Road Under Bridges, S&T Structure at takeoff point, Suratpura station and other ancillary works for Sadulpur Bye Pass line in connection with Suratpura – Hanumangarh- Sri Ganganagar gauge conversion project

Open tender

03.02.2018 Single Bid 12.03.2018 02 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

Yes 48-NWR/Dy.CE/C/BKN/2018-19 Dated: 18.12.2018

M/S Jai Mata Di Energy System, Narodara, Laxmangarh, Sikar- 332311 (Rajasthan)

Rs 991.52 lakhs

01.07.2019 10% Work in progress

Page 35: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

35

9 Tender No NWR-SC-BKN-01-2018-19 Dated 09.05.2018

Dismantling of existing BG track, laying and linking of Broad Gauge main line , loop lines including points and crossings in yards, spreading of ballast , tamping of track , transportation of p.way materials and other ancillary works from takeoff point chainage 0.00 to implant yard (including Birdhwal station yard) in connection with providing Railway track link to Unit no 7 & 8 ( 2 x 660 MW) at Suratgarh Supercritical Thermal Power station.

Open tender

09.05.2018 Single Bid 14.06.2018 04 Nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

Yes 47-NWR/ Dy CE/C/BKN/2018-19 dated 05.10.2018

M/S Jhawar Sales Corporation, Rani Bazar, Bikaner -334001 (Raj)

Rs 750.91 lakhs

30.07.2019 16.08.2018 16% Work is in progress

10 Tender No. NWR-SC-BKN -03-2018-19 dated 15.05.2018

Construction of 11 Nos Road Under Bridge in lieu of existing Level Crossing no 5,7,15,16,21,23,30,47,71,74 and 77 on Rewari- Hisar sections of Bikaner division in connection with elimination of level crossing gate

Open tender

15.05.2018 Two Bid 21.06.2018 02 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

Yes NWR/S&C/CA/88 dated 25.10.2018

M/S JMES-JDC(JV), VPO-Dahar, Near Tata Mobile Tower, Distt Paipat-132103 , Haryana

Rs 3298.60 lakhs

05.02.2020 25.09.2018 30% Work is in progress

11 Tender No. NWR-SC-BKN -02-2018-19 dated 11.05.2018

Construction of 03 lane Road Over Bridge in Railway portion ( Four span of 36m over railway tracks) with RCC deck slab on composite girder super structure with RCC substructure & pile foundation along with Limited height subway ( 1 x 4.50m x 2.50m for 3 track) in lieu of level crossing no 100 at km 151/8-9 on Hisar – Ghursal Road and level crossing No 112-A at km 170/6-7 on Barwala – Agroha- Adampur- Bhadra Road (SH -10) in Hisar District on Hisar- Bathinda section.

Open tender

11.05.2018 Two Bid 18.06.2018 08 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

Yes 49-NWR/Dy.CE/C/BKN/2018-19 Dated: 01.02.2019

M/S Punia Construction Co., 30, Sector-13, Part-2 Hisar-125001 (Haryana)

Rs 1821.24 lakhs

18.09.2019 01.10.2018 3% Work in progress

Page 36: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

36

CE/C/HQ-JP

Dy. CE/C/I & II-DO

1 DO/GGC/NL

/18

Construction of Broad

Gauge Formation & Minor

Bridges from Chainage

41000.00 to 45000.00

between Dausa and Lalsot

in connection with Dausa-

Gangapur City New Broad

Gauge line project.

Op

en

te

nd

er

Single packet

system

14

/11

/20

07

Yes NWR/S&C/CA/9

7 dated

03/03/2008

M/s Atlanta-

ARSS (JV)

Bhubneshwa

r (Orissa)

17.95 Crore 30/07/09

extended

upto

30/06/2014

14/03/08 - Work short

closed vide

HQ’s letter

dated

18/06/2014

. Final

measureme

nts under

process

2 DO/GGC/NL

/21

Construction of BG

formation and Minor Bridge

from chanaige 45000 to

60000 bet. Lalsot and

Gangapur City in

connection with DO-GGC

New B G line Project

O

pe

n t

en

de

r

24

/09

/20

07

Single Packet

system

02

/11

/20

07

3 Yes NWR/S&C/CA/9

5 dated

18/02/2008

M/s. ARSS

Infrastructur

e Projects

Limited,

Bhubaneshw

ar

8.41

Crores

20/03/09

Extended

upto

30/06/15

15/03/08 - Contract

has been

short

closed. Final

bill under

process

3 DO/GGC/NL/

30

Construction of single line

13 standard straight

alignment tunnel in soil and

rock including cut and cover

portion between chainage

38/720 to 40/840 including

side drain and other

approaches of tunnel

between Didwana- Lalsot

Railway station in

connection with Dausa-

Gangapurcity new BG line

project. Op

en

te

nd

er

Single packet

system

27

/07

/20

09

12 - - Yes NWR/S&C/CA/1

06 dated

29/12/10

M/s Valecha-

Transtonelstr

oey (J/V)

Mumbai

53.02 Crore 27/09/2012.

Extended

upto

31/12/2015

- - Work

terminated

on

07/07/2015

. Final bill is

under

technical

check..

Page 37: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

37

4 DO/GGC/NL/

40

Laying and linking of BG

track and transportation of

P.Way material, PSC

sleepers etc between

Dausa- Deedwana section in

connection with Dausa-

Gangapurcity new BG line

project. Op

en

te

nd

er

28

/03

/20

11

Single packet

system

18

/05

/20

11

6 - - Yes

Dy.CE/C/DO/CA/

56 dated

18/10/11

M/s Goel

Brothers Rail

Infra Pvt.

Ltd., Bareilly.

5.66 Crore 01/08/2012.

Extended

upto

31/10/2014

13/09/11 Work short

closed. Final

bill under

process

5 DO/GGC/NL/

10(R&C)R

Construction of broad

gauge formation from

chainage 15000 to 28000 in

connection with Dausa

Gangapurcity new line

project(Risk & cost tender).

Op

en

te

nd

er

Single packet

system

11

/01

/20

13

2

- - Yes Dy.CE/C/DO/CA/

68 dated

16/04/13

M/s MCD

Pvt. Ltd., &

Aastha

Construction

Co.(JV),

Jaipur

3.30 Crore 05/07/13

Extended

upto

15/10/2014

08/04/2013 - Completed.

Final

measureme

nts under

process.

6 DO/GGC/NL/

53

Construction of 3 nos Low

Over Pass at LC No. 4, 26 &

27 on Dausa- Gangapurcity

secton

Op

en

te

nd

er

Two packet

system

06

/09

/13

4 - - Yes NWR/S&C/CA/1

36 dated

03/06/2014

M/s Bharat

Spun Pipe &

Construction

Co., Jaipur

Rs.10.44 Crore 08/04/15

extended

upto

31.03.2019

- - Work in

progress.

7 DO/GGC/NL/

57

Construction of Road Over

Bridge at LC No. 24B on

Dausa- Gangapurcity

section

Op

en

te

nd

er

Two packet

system 0

6/0

9/1

3

4 - - Yes NWR/S&C/CA/1

35 dated

19/05/2014

M/s Bharat

Spun Pipe &

Construction

Co., Jaipur

Rs.13.75 Crore 09/07/15

Extended

upto

30/09/18

Further

extension

under

process

- - Contract

under

process for

closure.

Page 38: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

38

8 AWR-

BKI/Doubling

/T/2

Earthwork in bank/cutting

including blanketing

material, construction of

major/minor bridges

including drop/curtain

walls, LHS, construction

S&T structures, platform

walls, PF shelters, FOB,

water huts, Staff quarters

etc. supply of stone ballast

and dismantling of existing

BG track, laying and linking

of Broad gauge main line,

loop lines including points

and crossings of various

yards spreading of ballast,

tamping of track

transportation of P. Way

material and other

ancillary works between

Alwar-Bandikui section in

connection with AWR-BKI

Doubling project.

Op

en

Two packet

system

21

/03

/20

16

8 6 2 Yes

NWR/S&C/CA/1

57 dated

05/09/2016

M/s NG

Project Ltd.-

M/s. Deem

Construction

Co. Pvt. Ltd

(JV), Jaipur

Rs.118.24

Crore

17/05/18

Extended

upto

31/07/19.

- 75% Work in

progress.

9 NWR/SC/DO-

GGC/CIVIL/51

4110468

Supplying and stacking

machine crushed stone

ballast in stacks as per

Railway’s specifications

between Dausa &

Gangapurcity stations in

connection with Dausa-

Gangapurcity new line

project

op

en

Two packet

system

31

/08

/16

2 - 2 Yes

Dy.

CE/C/DOCA/81

dated

23/12/2016

M/s J.K.

Construction

Co., Nokha,

Distt Bikaner

Rs.14.33

Crore

06/04/18

Extended

upto

31/12/19

- 80% Work in

progress

Page 39: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

39

10 NWR/SC/DO-

GGC/CIVIL/51

4111804

Construction of balance

work of single line BG

standard straight

alignment tunnel in soil

and rock including cut

& cover portion, side

drains, protection works

on approaches of tunnel

and other ancillary

works from chainage

38600 to 40900 between

Didwana & Lalsot

Railway stations in

connection with Dausa-

Gangapurcity new BG

line project

Op

en

Two Packet

system

20

/06

/20

16

5 3 2 Yes

NWR/S&C/CA.

165 dated

01/02/17

M/s TCL-

UTM JV,

Gurgoan

Rs.54.46 Crore

22/03/18

Extended

upto

30/06/19

- 50% Work in

progress

11 NWR/SC/LHS/

CIVIL/514300

01001

Construction of kimited

Height sub-way (08

nos) in lieu of level

crossings in Dausa-

Gangapurcity new line

section in connection

with elimination of level

crossings

Op

en

Two Packet

system 0

7/0

9/2

01

6

8 5 3 Yes

Dy. CE/

C/DO/CA/86

dated 10/03/17

M/s JMES-

KDC-JPIS(JV),

Beawar,

Ajmer

Rs.10.00 Crore

04/02/18

extended

upto

31.05.2019

- 95% Work in

progress

12 NWR/SC/Alw

ar-Bandikui

/Civil/514150

803-R

Flash butt welding of

60/ 53kg New/SH

(72/90UTS) Rail joints

by using mobile flash

butt welding plant in

connection with Alwar-

Bandikui and Dausa-

Gangapurcity new line

project.

Op

en

te

nd

er

Two packet

system

28

/10

/20

16

1 1 0 Yes

Dy. CE/

C/DO/CA/85

dated 06/03/17

M/s Railtech

Infraventure

Pvt. Ltd.

Allahabad

Rs.11.15 Crore

15/05/18

extended

upto

30/05/19

- 45% Work in

progress

Page 40: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

40

13 NWR/SC/DO-

GGC/CIVIL/51

4110869-R

Balance work of laying

& linking of Broad

Gauge main line loop

lines including points &

crossings in yards,

spreading of ballast,

tamping of track

transportation of P-Way

material and other

ancillary works between

Dausa- Gangapurcity

new line project O

pe

n

Single packet

system

23

/11

/20

16

- - - Yes

Dy. CE/

C/DO/CA/84

dated 17/02/17

M/s P.C.

Sharma,

Noida.

Rs.3.93 Crore

05/06/17

Extended

upto

31/10/17

- -

Work

completed.

Final

measureme

nts under

process

14 NWR/SC/DO-

GGC/CIVIL/51

4110170

Balance earthwork and

blanketing work

including side drain,

trolley refuges pitching

diversion road etc. from

chainage 67400 to

92670 between Piplai

village and

Gangapurcity in

connection with Dausa-

Gangapurcity new line

project

Op

en

Two packet

system

17

/04

/20

17

2 1 1 Yes

Dy.

CE/C/DO/CA/89

dated

15/11/2017

M/s. KB-Shiv

Om (JV), New

Delhi.

Rs.13.60

Crore

20/06/18

Extended

upto

20/06/19

- 65% Work in

progress

15 NWR/SC/RE-

JP/Civil/5143

00905

Construction of ROB at

LC No. 69 on RE-JP

section

Op

en

Single packet

system

09

/10

/20

17

- - - Yes

M/s Punia

Construction

Co., Hisar.

Rs.8.34 Crore

22/11/18

Extended

upto

30.06.2019

- 25% Work in

progress.

16 NWR/SC/BKI-

AWR/Civil/51

4301004

Construction of Limited

Height Subway in lieu

of existing level

crossing between

Alwar- Bandikui station

of Jaipur- Rewari

section in connection

with elimination of level

crossings (20 nos)

Op

en

Two packet

system

30

/08

/20

17

4 4 0 Yes

NWR/S&C/CA/1

72 dated

02/02/2018

Sanjeev-

Bharat (JV),

Jaipur

Rs.29.84 Crore

29/04/19

Extended

up to

31/10/19

- 21% Work in

progress

Page 41: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

41

17 NWR/SC/DO-

GGC/Civil/51

4110873

Laying and linking of

Broad gauge main line,

loop lines including

points and crossings in

yard, spreading of

ballast, tamping of track

transportation of P-ay

materials and other

ancillary works between

Didwana &

Gangapurcity stations

and at Baniyana &

Arnya Kala Salempura

stations in connection

with Dausa-

Gangapurcity new line

project.

Op

en

Two Packet

system

11

/10

/20

17

3 1 2 Yes

Dy. CE /C/

DO/CA/96 dated

10/05/2018

M/s Laxyo

Energy

Limited,

Ratlam

Rs.14.67 Crore

27/03/19.

Further

extended

upto

31.12.19

- 28% Work in

progress

18 NWR/SC/DO-

GGC/Civil/51

4110174

Balance earthwork and

blanketing work

including side drains,

trolley refuges, pitching,

toe wall etc. from

chainage 36000 to

45000 between

Didwana and Lalsot

stations in connection

with Dausa-

Gangapurcity new line

project.

Op

en

Two Packet

system

25

/10

/20

17

5 3 2 Yes

NWR/S&C/CA/1

74 dated

26/03/2018

M/s Varaha

Infra Limited,

Jodhpur

Rs.34.03 Crore

26/03/19.

Further

extended

upto

30/06/19

- 55% Work in

progress

19 NWR/SC/DO-

GGC/Civil/51

4110277

Balance work of minor

bridges, Road Under

Bridge, like PSC slabs,

bed blocks, returns, toe

wall, pitching, drop &

curtain wall, height

gauge, road work etc.

and construction of

Limited Height Subway

between Didwana to

Gangapurcity stations in

connection with Dausa-

Gangapurcity new Line

Project

Op

en

Two Packet

System

27

/10

/20

17

2 1 1 Yes

NWR/S&C/CA/1

73 dated

26/03/2018

M/s. Lall

Construction

Co. Delhi

Rs.46.41 Crore 26/06/19 - 55% Work

progress

Page 42: Monthly CVC May, 2019 on going work€¦ · STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019 Sr. No Tender No. Item /nature of

STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019

Sr. No

Tender No.

Item /nature of work Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

(In Crores /Lakhs)

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for

delay if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

42

For CAO/C/JP

20 NWR/SC/DO-

GGC/Civil/51

4110175

Balance earthwork and

blanketing work

including side drains,

trolley refuges, pitching,

toe wall etc. from

chainage 45000 to

67400 between Lalsot

and stations

Op

en

Two Packet

system

27

/10

/20

17

3 1 2 Yes

Dy.

CE/c/DO/CA/94

dated

31/03/2018

M/s

Meenesh

Contractor &

Developers

Pvt. Ltd.,

Jaipur

Rs.10.35 Crore

19/12/18

extended

upto

19/06/19

- 40% Work in

progress.

21 NWR/SC/DO-

GGC/Civil/51

4110676

Miscellaneous works

like construction of

station buildings,

providing FOB,

platform covering,

circulating area, balance

work of platforms etc.

from Lalsot to

Gangapurcity in

connection with Dausa-

Gangapurcity New Line

Project.

Op

en

Two Packet

system

27

/10

/20

17

6 3 3 Yes

Dy. CE /C/

DO/CA/93 dated

24/03/2018

M/s MCDPL-

Sunrise Infra

(JV), Jaipur

Rs.17.95 Crore

19/03/19.

Further

extended

upto

30.06.19

- 50% Work in

progress.

22 Construction of 2 lane

Road Over Bridges at

Level CrossingNo. 28 &

29 and construction

ofRUB at Ch. 44949

Op

en

Two packet

system

NWR/S&C/CA/…

.

M/s SKT-Yash

Enterprises

(JV), Jodhpur

45.01 Crores. 09/07/20 - 10% Work in