STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1
CE/C/I-JP
Dy. CE/C/I-JP
1 NWR/SC/JP
-RGS-
CHURU/CIV
IL-
101140502
Dismantling of existing MG
track, Laying and linking of
Broad gauge main line,
looplines / Sidings including
points and crossings in
yards, spreading of ballast,
tamping of track,
transportation of P. Way
materials and other
ancillary works in Zone-I
(Km. 0.00 to Km. 48.70),
including Sikar, Laxmangarh
Sikar & Fatehpur
shekhawati yards in Sikar -
Churu section in connection
with Jaipur-Sikar- Loharu &
Sikar - Churu Gauge
conversion project.
Open
tender
28.8.15 Single Packet
system
30.9.15 05 - - - 42/ NWR/Dy.
CE/C-GC/JP
/2014-15/JP-
SIKR-CUR & SIKR-
LHU dt. 26.12.15.
M/s ISC Project Pvt. Ltd.,
“S-2,” The Meropole,
Adjacent to INOX, Bund
Garden Road, Pune – 411
001
948.07 Lakhs 08.5.2017
Ext. 31.10.17
12.11.15 31.10.17 Final bill
submitted in
Accounts office
on 28.1.19 &
12.3.19 for
payment
2 NWR/SC/JP
-RGS-
CHURU/CIV
IL-
101140505
Dismantling of existing MG
track, Laying and linking of
Broad gauge main line, loop
lines / Sidings including
points and crossings in
yards, spreading of ballast,
tamping of track,
transportation of P. Way
materials and other
ancillary works in Zone-II
(Km. 48.70 to Km. 90.46),
including Ramgarh
shekhawati, Bissau & Churu
yards in Sikar -Churu section
in connection with Jaipur-
Sikar- Loharu & Sikar -
Churu Gauge conversion
project.
Open
tender
15.9.15 Single Packet
system
19.10.15 02 - - - 45/ NWR/Dy.
CE/C-GC/JP
/2015-16/JP-
SIKR-CUR & SIKR-
LHU dt. 22.02.16.
M/s Bhanwar Lal Bijarnia,
Village -Rajpura, Post-
Prewari, Teh- Nawa, Distt.-
Nagaur
808.49 Lakhs 11.5.2017
31.12.17
20.11.15 28.12.17 Final
measurement
under process.
3. NWR/SC/JP
-SIKR-
CHURU/Civi
l/10130001
003
Construction of Road under
Bridge / Limited Height Sub-
Way in lieu of 24 Nos. level
crossing in Sikar-Dundlod
Mukandgarh Section & 16
Nos. level crossing and 4
Nos. Balancing culverts in
Sikar – Laxmangarh Sikar
Section.
Open
tender
21.11.15 Two bid
system
23.12.15 06 01 M/s
Gurukrupa
Kalyan JV
2A,2nd
Floor,Navnath
Soc-2, B/H,
Shradhadeep
Soc, Nr.
Sharda
School,
Singanpor-
Causway
Road, Surat-
395004.
Yes NWR/S&C/
CA/153, Dt.
15.6.2016
M/s AE-MHK (JV)
First Floor, Divine India
Building, Near R.T.O Office,
By Pass Road, Post-Savgadh
(Panpur), Himmatnagar-
383001
Dist. S.K. (Gujarat).
6363.98 Lakhs 22.3.2018
Ext
20.8.2018
1.5.2016 30.11.2018 Final
measurement
under process.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
2
4. NWR/SC/JP
-SIKR-
CHURU/Civi
l/10130001
004
Construction of Road under
Bridge / Limited Height Sub-
Way in lieu of 33 Nos. level
crossing and 4 Nos. of
Bridges along with 7 Nos
Balancing culverts in
Laxmangarh Sikar - Churu
Section.
Open
tender
21.11.15 Two bid
system
23.12.15 03 - - Yes NWR/S&C/
CA/154, Dt.
23.6.2016
M/s Supreme - Modi (JV) 9,
Leela Mansion,
Raj Bhawan Road,
Civil Line - Jaipur 302006
5876.06 Lakhs 22.3.2018 24.3.16 17.02.18 Final bill
submitted on
19.3.2019 in
accounts office.
5. NWR/SC/JP
-RGS-
Churu/Civil
-
101141806
Construction of 60 nos staff
quarters in Sikar-Churu
section, Construction of
running room at CUR,
construction of PF & PF
shelters & extension of
FOB, RCC OH tank and other
miscellaneous Civil work at
Sikar, Civil works related to
L-xings and related Electric
works in Sikar-Churu section
and other ancillary works in
connection with SIKR-CUR
Gauge Conversion project.
Open
tender
26.2.16 Two bid
system
30.3.16 04 01 M/s Rajendra
Singh
Bhamboo
Infra Pvt. Ltd.
108, First
Floor, Neel
kanth,
Neelkanth
Building ,
Gandhipath,
Vaishali
Nagar, Jaipur
yes NWR/S&C/
CA/159, Dt.
28.9.2016
M/s Gurukrupa Enterprises,
2A,2nd Floor,Navnath Soc-2
B/H, Shradhadeep Soc,
Nr. Sharda School,
Singanpor-Causway Road,
Surat
1948.67 Lakhs 15.9.2017
18.7.16 Work
terminated on
6.6.17
Final bill under
process. Case is
under
arbitration.
6. NWR/SC/JP
-RGS-
Churu/Civil
-
101141612
Balance / left over works of
Construction of 60 nos staff
quarters in Jaipur-Sikar-
Churu section, Construction
of running room at Churu,
construction of PF & PF
shelters & extension of FOB,
RCC OH tank and other
miscellaneous Civil work at
Sikar, Civil works related to
L-xings works in Sikar-
Churu section and other
ancillary works in
connection with Jaipur-
SIKR-CUR Gauge Conversion
project.
Open
tender
25.7.17 Two Packet
system
28.817 02 01 M/s AIEN
MEREN
ENTERPRISES-
DIMAPUR, N.
S.T. Colony,
Circular Road,
Dimapur
Yes NWR/S&C/
CA/171, Dt.
08.12.2017.
M/S V. K.
CONSTRUCTION
COMPANY-
SRIGANGANAGAR, 2-
D-37, Jawahar Nagar,
Sriganganagar
2185.03 Lakhs 31.12.18
Extended
upto
30.04.2019
15.10.17 - Work in
progress.
7. NWR/SC/JP
-RGS-
Churu/
Civil-
10114110R
Residual civil works of Sikar
–Churu section including
construction of PWI Office
& store, trolley huts,
boundary wall, toe walls &
pitching, tool box for gangs
etc temporary diversion for
level crossings, Road Work
and Earth Work etc. in
connection with
Commissioning of Sikar
Churu section.
Open
tender
4.8.2017 Two Packet
system
8.9.2017 02 NIL - Yes 52/ NWR/Dy.
CE/C-I/JP /2018-
19/JP-SIKR-CUR
& SIKR-LHU dt.
26.04.2018
M/S K. B. Enterprises,
Plot No. 2, Mantra
Chaya, Opp. Chambal
Power House, Hawa
Sadak, Jaipur.
1182.01 Lakhs
1685.00 Lakhs
14.1.19
Extended
upto
30.05.2019
25.02.18 Work in
progress.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
3
DY. CE/C/II-JP
1 NWR/S&
C/JP-
SIKR/T/7
Supplying & stacking 65
mm gauge stone
ballast…. JP-SIKR section.
Open
tender
2.9
.20
15
Two packet
system
14
.10
.20
15
7 4 3 Yes Dy
CE/C/II/CA/N
WR/S&C/JP-
SIKR/T/7/01
Dated
17.3.2016
M/s MFL-Sidharth-
Parikshit Chandra Das
(JV) Gurgaon.
09.84 Cr.
12.20 Cr.
01.12.15
31.03.19
1.1.2016 - Work
completed.
2 NWR/S&
C/JP-
SIKR/T
/10
Construction of major &
Minor Bridges in C/w GC
of JP-SIKR section.
Open
tender
-
Two packet
system
18
.8.2
01
5 13 7 6 Yes, NWR/S&C/CA/
152 dated
25.2.2016
M/s Sona Builders,
Unjha (Guj.)
37.14 Cr.
50.29 Cr.
17.11.15
30.04.19
1.12.15 - Work
completed.
3 NWR/S&
C/JP-
SIKR/T
/11
Earth work inembankment
cutting etc. and
construction /alteration of
service building JP-SIKR
section.
Open tender
Two packet
system
25
.8.2
01
5 14 7 7 Yes NWR/S&C/CA/
150 dated
29.1.2016-
M/s Jandu Construction
Company, Hisar.
34.18 Cr.
38.96 Cr.
17.11.15
31.05.19
25.11.15 - Work in
progress .
4 NWR/SC
/JP-RGS-
Churu/
Civil-
1021410
01
Construction of LHS Sub
way(LHS)/RUB---LC(52
nos) between JP-SIKR
section.
Open
tender
Two packet
system
9.1
2.1
5 9 6 3 Yes NWR/S&C/CA/
151 dated
01.7.2016
M/s SGCCL-MMPL (JV)
Jaipur.
68.65 Cr.
84.62 Cr.
23.03.16
30.11.19
1.4.16 - Work in
progress .
5 NWR/SC
/JP-RGS-
Churu/
Civil-
1021408
01
Dismantling of existing of
MG track, Laying and
Linking of BG main line-----
-Jaipur to Sikar GC work
Open
tender
Two packet
system
- 8 5 3 Yes NWR/S&C/CA/
161 dated
19.10.2016
M/s KIEL-BLB (JV), Jaipur 26.21 Cr 08.08.2016
30.05.2019
8.8.2016 - Work in
progress .
6 NWR/SC
/JP
/Civil-
1021606
01R
Construction of PF, FOB PF
shelter ----JP Yard
remodeling & JP-SIKR GC.
Open
tender
Two packet
system
-26
.7.2
01
6 6 5 4 Yes NWR/SC/JP
/Civil-
102160601R/0
1 date
11.11.2016
M/s Sanjeev Brothers
Jaipur
18.48 Cr
24.97 Cr.
30.09.16
31.05.19
30.9.16 - Work in
progress
7. DY.
CE/C/GC/N
WR/2015/T
-55
Flash Butt Welding of
52Kg. / 60Kg. New/SH rails
at depot / site using
Mobile Flash Butt Welding
Plant in Jaipur –Sikar -
Churu section in
connection with Jaipur –
Sikar – Loharu & Sikar –
Churu GC project.
Open tender 29.6.15 Single Packet
system
20.08.15 03 - - - 46/ NWR/Dy.
CE/C-GC/JP
/2016-17/JP-
SIKR-CUR & SIKR-
LHU dt.
22.09.2016.
M/s Navketan Pvt. Ltd.,
1 A. J. C. Bose Road, Kolkata
– 700 020.
8.15 Cr. 22.12.17
30.06.19
25.5.2016 Work in
progress.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
4
8. NWR/SC/JP
-RGS-
Churu/Civil
-
101140507
Providing in situ Glued
joints of G-3 (L) type as per
RDSO drawings for 60 kg &
52 kg rails with all fittings
etc complete in Jaipur -
Sikar - Churu section in
connection with Jaipur -
Sikar - Loharu & Sikar -
Churu Gauge Conversion
project.
Open tender 18.5.16 Single Packet
system
22.06.16 05 01 M/s Diamond
Steel
Industries, Plot
No. 879,
Sector-16,
Faridabad
Yes 48/ NWR/Dy.
CE/C-GC/JP
/2016-17/JP-
SIKR-CUR & SIKR-
LHU dt.
11.01.2017.
M/s Creative Engineers,
F/189, Road No. 5,
Indraprastha Industrial
Area,
Kota
160.21 Lack
14.03.2019
18.10.16 Work in
progress.
9. NWR/SC/JP
-RGS-
Churu/Civil
-
101140508
Welding of Rail Joints by
SKV process in Jaipur-
Sikar & Sikar-Churu section
in connection with Jaipur-
Sikar-Loharu and Sikar-
Churu Gauge Conversion
project.
Open tender 10.6.16 Single Packet
system
14.07.16 02 - - Yes 49/ NWR/Dy.
CE/C-GC/JP
/2016-17/JP-
SIKR-CUR & SIKR-
LHU dt.
11.01.2017.
M/s Oberoi Thermit
Pvt., Ltd. Plot No.3,
Sector 8B, IIE, Sidcul,
Haridwar -249403
349.73 Lacks 18.10.18
31.08.19
26.12.16 Work in
progress.
10. Construction of
LHS/RUB (52 Nos.)
between Jaipur-Sikar.
Open
Tender
Two packed
system
M/s DRAIPL-MMK (JV) ,
Gandhidham (Guj.)
44.87 Cr. 31.07.2019 Work in
progress.
11 Providing in situ Glued
joints of G-3(L) type
(including JP Yard) in
c/w JP-SIKR-LHU &
SIKR-CUR GC Project
and ROH Phulera &
Rewari-Sadulpur bypass
line.
Open
tender
Single Packed M/s Creative Engineers,
F/189, Road No. 5,
Indraprastha Industrial
Area,
Kota
1.34 Cr. 31.10.2019 Work in
progress.
12 Residual Civil works of
Jaipur-Sikar Section.
Open
Tender
Two packed
system
M/s JMDES-BCS (JV)
Bikaner.
22.00 Cr. 13.09.2019 Work in
progress.
13 Supplying and stacking
65mm gauge stone
ballast in c/with Jaipur-
Sikar.
Open
Tender
Single
Packed.
M/s Deepak Choudhary
& Co. Jodhpur
5.35 Cr. 30.04.2019 Work
completed.
14 FlashButt Welding of 52
Kg./ 60 Kg. New/SH
Rails at Depot/ site in
Jaipur-Ringus section in
c/with JP-SIKR-LHU &
SIKR-CUR GC Project.
Open
tender
Single Packet M/s Railtech
Infraventure Pvt. Ltd.,
Allahabad
1.79 Cr. 04.06.2019 Work in
progress.
15 Residual civil works of
Jaipur Yard in c/with
commissioning of JP-
RGS section.
Open
Tender
Single M/s M.H. Khanusiya,
Himmat Nagar
6.81 Cr. 31.05.2019 Work in
progress.
16 Provision of stabling
line in c/with
Baisgodam/Sanganer
Open Single M/s Chintpurni
Construction Co. Sonipat
(Haryana)
7.08 Cr. 20.01.2020
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
5
Dy. CE/C/III-JP
1 NWR/S&C
/LHS/RE-
FL-
Madar/T/1
Construction of road
under bridges / limited
height subways (35
Nos) in Rewari–
Phulera( RPC) section
Open
tender
Two packet
system
- Yes NWR/S&C/C
A/143 dated
08.7.2015
M/s S.B. Poonia
Const. Co. (JV),
Hissar.
51.06 Crore. 28.4.17
30.06.18
5.5.2015 30.6.2018 Work
completed.
2 NWR/S&C
/LHS/RE-
FL-
Madar/T/2
Construction of road
under bridges / limited
height subways (32
Nos) in Rewari –
Phulera( RPC) section
Open
tender
Two packet
system
- Yes NWR/S&C/C
A/144 dated
16.7.2015
M/s S.B. Poonia
Const. Co. (JV),
Hissar.
43.74 Crore. 28.04.17
30.06.18
10.5.15 30.6.2018 Work
completed.
3 NWR/SC/
MD-FL-
RGS/Civil-
10399801
Residual composite
work for Construction of
118 Nos Staff quarters
between RE-RGS-FL
section.
Open
tender
Two packet
system
- Yes NWR/SC/M
D-FL-
RGS/Civil-
10399801/C
A/03 dated
21.11.2016
M/s Sammer Const.
Co. 15/65 West
Punjabi Bagh New
Delhi
11.41 Cr.
16.08 Cr.
21.6.2017 28.06.16
31.05.19
- Work in
progress
4 Construction of Club
House at Jagatpura
jaipur
Open
tender
Two packet
system
- Yes NWR/S&C/C
A/168 dated
8.5.2017
M/s P.K.Jain , Jaipur 16.53 Cr.
23.22 Cr.
16.02.18
30.06.19
01.03.17
Work in
progress
5 Fabrication & erection
of structural steel
covering etc. in c/with
RE-SDLP Bypass line.
Open
tender
Two
packed
system
M/s Sanjeev
Brothers, C-10,
Vaishali Nagar, Jaipur
12.78 Cr.
13.32 Cr.
31.12.2018
30.06.2019
Work in
progress.
6 Earthwork in formation,
LHS, other works in
c/with RE-SDLP
Byepass Line.
Open
tender
Two
system
M/s Mohala
Construction Co.
Hisar
15.66 Cr. 21.11.2019 Work in
progress.
7 Construction of two lane
ROB in lieu of LC No.
206 of 1x33
Open
tender
Two
packed
M/s Modi
Construction Co.
Jaipur
15.93 Cr. 15.12.2019 Work in
progress.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
6
Dy. CE/C/IV-JP
CE/C/II-JP
Dy. CE/C/I-UDZ
1. Tender No.NWR/SC/JP/ Civil-102990301
RGS Detour in
connection with DFCCIL
work- Construction of
Viaduct (157x18.30m),
Major (5x18.30m &
3x18.30) and Minor
Bridges, earth work in
bank/cutting including
Blanketing material,
Track works for Broad
Gauge line, Supplying &
putting ballast in track,
Transportation of P.
Way materials and
other ancillary works in
Ringus- in connection
with RGS Detour.
Open
tender
6.3.2016 Two bid
system
12.4.2016 9 7 - Yes NWR/S&C/
CA/158
Dated
9.9.2016
M/s AT PLT MHK (JV)
First Floor, Divine
India Building, Nr.
RTO Office, By Pass
Road, Himatnagar-
383001, Dist- S.K.
(Gujrat)
108.92 Cr
143.48 Cr.
23.06.18
30.06.19
20.7.16 - Work in
progress.
1 UDZ-
HMT/
GC/EW/T/
4
Construction of Minor
bridges & earthwork
form Km. 207/0 to 250/0
in connection with UDZ-
HMT section GC Project .
Open 02.01.11 Single 04.02.11 7 Yes NWR/S&C/
CA/113 dtd.
21.10.11
M/s Rahee-Triveni
(J/V), Kolkatta
2286.41 Lakhs
07.02.13
31.07.14
31.03.15
31.12.15
30.06.16
30.12.16
31.07.17
31.01.18
31.10.18
23.08.11 31.10.18 Work
completed.
2 UDZ-HMT/
GC/MB/T-
13-R-1
Substructures of major
bridges from Udaipur to
Dungarpur.
Open 13.11.14 Two bid
system
17.12.14 05 02 Yes NWR/S&C/
CA/ 142 dtd.
30.06.15
M/s Murali Krishna
Const. Co, Hyderabad
6814.86 Lakhs 23.04.17
31.12.17
31.10.18
09.05.15 31.10.18 Work
completed.
Final variation
with HQ for
sanction.
3 UDZ-HMT/
GC/EW/T-
20
Construction of Minor
bridges & earthwork
from Km. 121/0 to160/0
in c/w UDZ-HMT section
GC Project
Open 08.05.15 Two bid
system
12.06.15 03 02 Yes NWR/S&C/
CA/ 145 dtd.
23.11.2015
M/S M.G. Contractors, Pvt., Ltd., Panchkula
6402.75 lakhs
9571.00 Lakhs
13.03.17
31.03.19
31.07.19
28.09.15 89% Work in
progress.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
7
4 NWR/SC/
UDZ-HMT
(GC)/Civil-
204140627
Construction of station
buildings, S&T structures,
and ancillary works in
connection with UDZ-
HMT GC project
Open 05.04.16 Two bid
system
11.05.16 01 01 Yes NWR/S&C/
CA/ 162 dtd.
24.10.16
M/s Jainsons
Construction Co. JV,
Jodhpur
4979.00 Lakhs
5495.00 Lakhs
31.08.18
30.11.18
31.03.19
30.06.19
14.09.16 62% Work in
progress.
5 NWR/SC/
UDZ-HMT
(GC)/Civil-
204140426
Supply & stacking 50 mm
stone track ballast in UDZ-
HMT section
Open 06.0216 Two bid
system
16.03.16 04 02 Yes Dy.
CE/C/UDZ/CA
/34 dated
20.10.17
M/s Choyash Infra
Solution Joint Venture
Pvt. Ltd, Dungarpur
1345.41 Lakhs 30.06.18
31.01.19
31.10.19
10.09.16 79% Work in
progress.
6 NWR/SC/
UDZ-HMT
(GC)/Civil-
204141129
Transportation of PSC
sleepers from sleeper
factory to site in UDZ-
HMT section
Open 05.06.16 Single
packet
19.07.16 04 04 No Dy.
CE/C/UDZ/CA
/35 dated
24.12.2016
M/s J.K Construction
Co., New Market
Nokha
267.84 Lakhs 24.04.17
25.12.17
31.08.18
31.10.18
31.12.18
19.04.17 31.12.18 Work
completed.
Final Bill
passed. SD &
PG released.
7 NWR/SC
/
UDZ-
HMT
(GC)/Civi
l-
20414012
8
Balance work of
construction, minor
bridges and earth work in
UDZ-HMT section.
Open 30.05.16 Two bid
system
05.07.16 02 02 Yes NWR/S&C/
CA/ 163 dtd.
08.12.1016
M/s Ravi Infrabuild
Projects Pvt. Ltd, ,
Udaipur
3701.00 Lakhs
5419.00 Lakhs
30.08.18
30.04.19
31.10.19
15.09.16 73% Work in
progress.
8 NWR/SC/
UDZ-HMT
(GC)/Civil-
204140124
Construction of minor
bridges and earth work in
cutting and filling
between Umra and Zawar
stations in connection
with UDZ-HMT GC Project
Open 02.06.16 Two bid
system
12.07.16 05 02 Yes NWR/S&C/
CA/ 164 dtd.
08.12.2016
M/s Ravi Infrabuild
Projects Pvt. Ltd, ,
Udaipur
6980.98 Lakhs
8626.00 Lakhs
11.09.2018
31.08.2019
01.10.16 68% Work in
progress.
9 NWR/SC/
Constructio
n/Civil-
204300010
30
Construction of 49 Nos.
Road Under Bridges and 8
Nos. Road Over Bridges in
UDZ-HMT section
Open 14.09.16 Two bid
system
18.10.16 04 03 Yes NWR/S&C/
CA/ 166 dtd.
14.03.2017
M/s Rachana - MI (JV),
Ahmedabad-(Gujarat).
6623.00 Lakhs
8632.00 Lakhs
22.12.18
22.06.19
01.01.17 78% Work in
progress.
10 NWR/SC/
UDZ-HMT
(GC)/Civil-
204140334
Constriction of Super
structure of 32 Nos Major
bridge in UDZ-HMT
section
Open 04.12.16 Two bid
system
11.01.17 04 04 Yes NWR/S&C/
CA/ 1697 dtd.
09.04.17
M/s Rachana - MI (JV),
Ahmedabad-(Gujarat).
5674.62 Lakhs
5979.00 Lakhs
26.02.19
30.06.19
08.03.17 73% Work in
progress.
11 NWR/SC/
UDZ-HMT
(GC)/Civil-
204140533
Providing in situ Glued
joints of G-3 (L) type in
UDZ-HMT section
Open 20.10.16 Single
Packet
07.12.16 05 05 Yes Dy. CE/C/
UDZ/CA/41
dated
16.05.2017
M/s. Tirupati Metal
Fabricators, Faridabad
148.97 Lakhs 15.02.19
30.04.19
Work yet to
start
12 NWR/SC/
UDZ-HMT
(GC)/Civil-
204140535
Supply of stone Ballast in
UDZ-HMT section
Open 21.12.20 Single
Packet
25.01.17 06 06 Yes Dy. CE/C/
UDZ/CA/26
dated
26.05.2017
M/s. B. B. Construction,
Khurja-Distt.
Bulandshahr
801.13 Lakhs 02.09.2018
02.04.2019
02.10.2019
24.03.17 68% Work in
progress.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
8
13 NWR/SC/
UDZ-
HMT(GC)/
Civil -
204141137
Carrying out Geotechnical
investigation in UDZ-HMT
section
Open 29.12.16 Single
Packet
08.02.17 03 03 Yes NWR/S&C/
CA/ 169 dtd.
112.05.17
M/s JP Surveys &
Consultants,Chennai-40
41.05 Lakhs 13.07.17
12.03.18
12.10.18
13.07.17 12.10.18 Work
completed.
14 NWR/SC/U
DZ-
HMT(GC)/
Civil-
204140538
Flash butt welding of Rails
in UDZ-HMT section
Open 31.12.16 Single
Packet
08.03.17 02 02 Yes Dy. CE/C/
UDZ/CA/49
dated
28.10.17
M/s ITC, Kanpur 648.34 Lakhs 30.11.18
30.11.19
--- Work yet to
start
15 NWR/SC/
UDZ-HMT
(GC)/Civil-
205140539
Laying and linking of track
in UDZ-HMT section.
Open 31.12.16 Single
Packet
10.02.17 02 02 Yes Dy. CE/C/
UDZ/CA/40
dated 17.04.17
M/s Ravi Infrabuild
Projects Pvt. Ltd,
Udaipur
861.39 Lakhs 31.12.18
30.09.19
28.03.17 27% Work in
progress.
16 NWR/SC/
UDZ-HMT
(GC)/Civil-
204140839
Laying and linking of track
in UDZ-HMT section. from
Km 160 to Km 225 In UDZ-
HMT section
Open 29.12.16 Two packet 02.02.17 04 04 Yes Dy. CE/C/
UDZ/CA/45
dated 26.09.17
M/s BLB--SNCC JV,
Jodhpur (Raj)-342001
1128.55 Lakhs
1134.00 Lakhs
02.04.19
30.09.19
16.05.17 1% Work in
progress.
17 T.NO.UDZ
-HMT-GC-
MB-T-43-R
Fabrication, transporting
assembling and erection of
superstructures
Open 19.07.17 Two packet 24.08.17 03 02 Yes Dy. CE/C/
UDZ/CA/53
dated 15.02.18
M/s Dynamic Engineers
Infratrack Pvt.,Ltd.,
Kota
1510.59 Lakhs
1672.00 Lakhs
15.01.19
15.09.19
15.12.2017 46% Work in
progress.
18 T.NO.UDZ
-HMT-GC-
BLDG/T-
44
Construction of staff
Quarters & SSE/C/P.Way
office in UDZ-HMT section
Open 09.06.17 Single 12.07.17 03 03 Yes Dy. CE/C/
UDZ/CA/46
dated 20.09.17
M/s Ravi Infrabuild
Projects Pvt. Ltd, ,
Udaipur
374.00 Lakhs
458.00 Lakhs
31.01.18
30.06.18
30.11.18
31.08.19
24.08.17 78% Work in
progress.
19 T.NO.UDZ
-HMT-GC-
Civil/T-47
Earth work and minor
bridges between UDZ-
Umra in UDZ-HMT section
Open 18.08.17 Single packet 20.09.17 02 02 Yes Dy.CE/C/
UDZ/CA/51
dated 20.01.18
M/s Ravi Infrabuild
Projects Pvt. Ltd,
Udaipur
890.55 Lakhs
1327.00 Lakhs
10.06.18
10.11.18
10.06.19
01.11.17 90% Work in
progress.
20 T. No.
UDZ-
HMT-GC-
P.way-T-
46-R
Laying and linking of track
in UDZ-HMT section. from
Km 111 to Km 160 In UDZ-
HMT section
Open 11.11.17 Two packet 18.12.17 03 03 Yes Dy.CE/C/
UDZ/CA/60
Dt. 21.06.18
M/s B.S. Sangwan,
Sonepat
1466.98 Lakhs 19.09.19 26.02.18 39% Work in
progress
21 T. No.
UDZ-
HMT-GC-
Miscl-T-49
Const. of toe walls,
retaining walls, trolley
refuges, etc. b/w KRCD &
DNRP stations
Open 23.05.18 Two packet 28.06.18 07 06 Yes NWR/S&C/CA
/ 179 Dt.
17.10.2018
M/s S.K. Builders,
Gautam Buddha Nagar,
U.P.
3507.92 Lakhs
4283.00 Lakhs
12.02.20 13.8.18 14% Work in
progress.
22 T. No.
UDZ-
HMT-GC-
Tunnel-T-
50
Const. of BG tunnel b/w
KRCD and Zawar stations
Open 23.05.18 Two packet 28.06.18 08 04 Yes NWR/S&C/CA
/182 Dt.
01.03.2019
M/s ABCI Infrastructure
Pvt. Ltd, Kolkata
4180.85 Lakhs 19.05.20 15.09.18 0.25% Work in
progress
23 T. No.
UDZ-
HMT-GC-
Stn-T-51
Const. of stn bldgs, PF,
FOBs at Zawar, Semari,
KDLG, RDD, Kotana and
JYM stns.
Open 30.05.18 Two packet 04.07.18 06 05 Yes NWR/S&C/CA
/180 Dt.
4.12.2018
M/s Prem Fabricators,
Ahmedabad
2157.37 Lakhs 12.08.19 02.10.18 17% Work in
progress
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
9
Dy. CE/C/II-UDZ
1. T.No. NWR/SC/AII-COR-UDZ/Civil-204141902
Tender No. NWR/SC/AII-COR-UDZ/Civil-204141902 – Earth work in bank/ cutting including blanketing material, construction strengthening, rebuilding, extension of Major bridges, Minor bridges ……..and other ancillary works, in Mavli (incl)- Barisadri (incl) section in connection with Mavli Junction to Barisadri to Barisadri GC Project.
Open 19.02.16 Two Packet
20.04.16 13 Nos. 5 NIL YES Contract agreement No. NWR/S&C/CA/160 dated 30.09.16
M/s Gurukrupa Kalyan JV 2A, 2nd Floor, Navnath Sec-2, B/H, Shradhadeep Society, Nr. Sharda School, Singanpore-Causway Road
Rs. 137.40 Cr 15.06.18 01.07.16 Work terminated on 25.09.17
Due to slow progress and work stopped by agency work terminated.
2 T. No. NWR/SC/AII-COR-UDZ/Civil-304140803-R
Flash Butt Welding of 60Kg / 52Kg New / SH Rails at Depot / Site using Mobile Flash Butt Welding Plant in Mavli – Bari Sadri section in connection with Mavli–Badi Sadri gauge conversion project
Open 10.10.16 Single Packet
25.11.16 2 Nos. 01 No 01 No Yes Acceptance letter No.UDZ/ MVJ-BI/GC /Welding/T-3R Dated 20.02.17
M/s Railtech Infraventure Pvt.Ltd., 147/91-A Old Bairahana, Allahabad-211003 (UP)
Rs.03.93 Cr 19.08.18 31.03.19 17.11.19
yet to start
24 T. No.
UDZ-
HMT- GC-
Misc. T.52
Const. of toe walls,
retaining walls, trolley
refuges, etc. bet. KRCD &
DNRP station.
Open 05.09.18 Single
Packet
05.09.18 01 01 - Yes Dy.CE/C/UDZ/
CA/64 Dt.
20.12.18
M/s S.K. Builders,
Gautam Budha Nagar,
(UP)
0899.90 Lakhs
1095.00 Lakhs
18.06.19 18.06.19 14% Work in
progress
25 T. No.
UDZ-
HMT/GC
/T-55 –
Rock fall protection,
between station Umra-
Kharwa Chanda
Open - Single
Packet
M/s Garware Wall
Ropes Limited , Pune
732.00 Lakhs 07.11.2019
26 T. No
UDZ-HMT/
GC/T/56
Provision of Erosion
control pitching and other
work between Udaipur to
Kharwa Chanda
Open - Single
Packet
M/s Backbone
Construction Pvt. Ltd.,
Rajkot
447.00 Lakhs 07.03.2020
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
10
3 T.No.UDZ-MVJ-BI-GC- Ballast-
T-5
T.No.UDZ-MVJ-BI-GC-Ballast-T-5- Supply & stacking 65 mm machine crushed, stone
track ballast conforming to Railway specifications in stacks on cess along the track & in yards at stations between Mavli (including) & Bhinder (including) stations from Ch. 0.000 to Ch 41000 and at temporary ballast depot at Bhinder or any station between MVJ-BNNR station in connection with Mavli-Barisadri Gauge Conversion project
Open E -Tender
25.10.17 Two Packet
30.11.17 2 Nos. 2 NIL YES Dy.
CE/C/UDZ/
CA/54
dated
05.03.2018
M/s J.K. Construction Co., Naya Bazar, Nokha (Bikaner)-334803
Rs. 6.94 Cr 27.12.18 30.06.19
29.12.17 52% Work in progress.
4 T.No.UDZ-MVJ-BI-GC- Ballast-T-6
T.No.UDZ-MVJ-BI-GC-Ballast-T-6- Supply & stacking 65 mm machine crushed, stone track ballast conforming to Railway specifications in stacks on cess along the track & in yards at stations between Bhinder (excluding) & Barisadri (including) stations from Ch.41000 to Ch 82405 and at temporary ballast depot at Barisadri or any station between Bhinder-Barisadri stations in connection with Mavli-Barisadri
Gauge Conversion project.
Open E -Tender
25.10.17 Two bid 01.12.17 2 Nos. 4 NIL YES Dy.
CE/C/UDZ/
CA/55
dated
07.03.2018
M/s J.K. Construction Co., Naya Bazar, Nokha (Bikaner)-334803
Rs. 6.82 Cr 08.01.19 30.06.19
13.01.18 64% Work in progress.
5 T. No. UDZ-MVJ-BI-GC-LHS-T-7
T. No. UDZ-MVJ-BI-GC-LHS-T-7- Balance work of construction of 42 Nos. Road Under Bridges (RUB/LHS) in lieu of level crossings and all other ancillary works like approach road works, retaining walls, drainage works, height gauges, etc. between Mavli - Bhinder stations (from Ch 0 to 41000) in connection with Mavli- Bari Sadri GC Project.
Open
E-
tender
25.10.17 Two
Packet
27.11.17 4 Nos. NIL NIL Yes NWR/S&C/
CA/175
dated
28.05.18
M/s Ravi Infrabuid
Projects Pvt. Ltd, 95
Hiran magri- Sector-
11 Udaipur-313002
Rs. 33.37 Cr. 11.09.2019 25.03.18 57% Work in progress.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
11
6 T. No. UDZ-MVJ-BI-GC-LHS-T-8
T. No. UDZ-MVJ-BI-GC-LHS-T-8 -Balance work of construction of 47 Nos. Road Under Bridges (RUB/LHS) in lieu of level crossings and all other ancillary works like approach road works, retaining walls, drainage works, height gauges, etc. between Bhinder-Bari Sadri stations (from Ch 41000 to 82610) in connection with Mavli- Bari Sadri GC Project.
Open E
tender
25.10.17 Two
Packet
28.11.17 5 Nos. 01 No.
( D.K.
CONSTRUC
TIONS-
MOHALI)
Nil YES NWR/S&C/
CA/176
dated
28.05.18
M/s Rachana- MCPL-
JV Bikaner Road,
NOKHA 334803 Distt
Bikaner Raj.
39.57 Cr.
40.48 Cr.
11.09.2019 25.03.2018 46% Work in
progress.
7 T.No.UDZ-MVJ-BI-GC-T-
9
T.No.UDZ-MVJ-BI-GC-T-9 - Balance work of “Construction,
extension, strengthening, rebuilding of existing major & minor bridges, Earthwork in cuttings and filling including blanketing material for widening of existing MG formation for making formation width as per BG standard profile ,construction of station building, S&T structures, platform wall, PF shelters, FOB, circulating area, retaining wall, boundary wall, approach road, etc.& all other ancillary works from Ch.0 to Ch.41000 between Mavli Jn. and Bhinder stations in connection with Mavli Jn.-Barisadri Gauge Conversion Project”.
Open E
tender
25.10.17 Two
Packet
27.11.18 3 Nos. NIL NIL YES No.
NWR/S&C/
CA/177
dated
28.05.18
M/s Ravi Infrabuid
Projects Pvt. Ltd, 95
Hiran magri- Sector-
11 Udaipur-313002
54.32 Cr. 11.09.2019 25.03.18 50% Work in
progress.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
12
8 T.No.UDZ-MVJ-BI-GC-T-10
T.No.UDZ-MVJ-BI-GC-T-10- Balance work for “Construction, extension, strengthening, rebuilding of existing minor bridges, Earthwork in cuttings and filling including blanketing material for widening of existing MG formation for making formation width as per BG standard profile, construction of station building, S&T structures, platform wall, PF shelters, FOB, circulating area, retaining wall, boundary wall, approach road, etc.& all other ancillary works from Ch.41000 to Ch.82610 between Bhinder and Bari Sadri stations in connection with Mavli Jn.- Barisadri Gauge Conversion Project”
Open E
tender
25.10.17 Two
Packet
28.11.17 3 Nos. NIL NIL YES NWR/S&C/
CA/178
dated
28.05.18
M/s Ravi Infrabuid
Projects Pvt. Ltd, 95
Hiran magri- Sector-
11 Udaipur-313002
60.84 Cr.
62.05 Cr.
11.09.2019 25.03.18 48% Work in
progress.
9 Tender No. UDZ-MVJ-BI-GC-T-11
Tender No. UDZ-MVJ-BI-GC-T-11:- Dismantling of balance existing MG track,
laying and linking of Broad gauge main line, loop lines / sidings including points and crossings, SEJs, etc. in yards, spreading of ballast, tamping of track, Pre NI/NI works in Mavli station yard and other ancillary works from Mavli (including) - Bhinder (Including)- Ch. 0.000 to Ch.41000.00 and transportation of P. Way materials in connection with Mavli -Barisadri Gauge conversion project.
Open E
tender
24.10.17 Single
Packet
5.12.17 2 Nos. NIl NIL Yes Acceptance
letter No.
NWR/S&C/
UDZ-
474461463
dated
13.03.18
M/s Jhawar Sales
Corporation, Rani
Bazar, Bikaner-
334001(Raj)
7.23 Cr. 12.06.2019 1% Work in
progress.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
13
10 Tender No. UDZ-MVJ-BI-GC-T-12
Tender No. UDZ-MVJ-BI-GC-T-12 Dismantling of balance existing MG track,
laying and linking of Broad gauge main line, loop lines / sidings including points and crossings, SEJs, etc. in yards, spreading of ballast, tamping of track, and other ancillary works from Bhinder (excluding) - Bari Sadri (Including)- Ch. 41.000 to Ch.82610.00 and transportation of P. Way materials in connection with Mavli -Barisadri Gauge conversion project.
Open E
tender
24.10.17 Single
Packet
6.12.17 2 Nos. NIl NIL Yes Acceptance
letter No.
NWR/S&C/
UDZ-
474461464
dated
13.03.18
M/s B.S.Sangwan
4GF, Harry Plaza,
Subash Chowk,
Sonipat - 131001
Haryana
7.56 Cr. 12.06.2019 3% Work in
progress.
11 Dy. CE-C-BNSW-T-12R
Tender No. Dy. CE-C-BNSW-T-12R -Carrying out final location survey, geotechnical studies, design, preparation drawings & other preliminary activities and work out actual realistic cost & ROR estimated in connection with Gauge conversion project between Marwar-Mavli (152KM)
Open E- tender
07.11.2017 Single Packet
12.12.17 5 Nos. NIl NIL Yes Acceptance letter No. NWR /BNSW/S&C/484266032 Vol-0 dated 19.05.18
M/s PIONEER SURVEYORS KOLKATA
2.91 Cr. 18.05.2019 10% Work in progress.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
14
Dy. CE/C/Dungarpur
1. Dy.CE/C/
UDZ/
DNRP-
RTM/FLS/
2011/T/1
Carrying out final
location of survey &
….other preliminary
activities in connection
with new BG line
between DNRP-RTM via
Banswara
Open 1/6/11 &
30/6/11
(NIT & First
corrig.)
Single 15-07-
2011
10 NA NA Yes NWR/S&C/
CA/114 Dt.
27-02-12
M/s S.M. Consultants,
Bhubneswar
4.99 Cr
5.60 Cr.
13/11/12
31/12/19
14/11/2011 98%
Work in
progress
2. Dy.
CE/C/DN
RP/ RTM-
DNRP/EW
/ NL/T-8
E/W in cutting and
filling for formation &
all other ancillary works
etc. from Km. 0.00 to
Km. 17.00 between
Dungarpur-Nawa Gaon
station in c/with DNRP-
RTM New BG Rail Line
Project.
Open 23-01-2013 Two
Packet
06-03-
2013
15 5 10 Yes NWR/S&C/
CA/129
Dt. 31-10-
13
M/s Nayak
Infrastructure Pvt.
Ltd., Guwahati
56.74 Cr.
Ex.SCA
8.05 Cr.
09-07-2015
09.07.2017
Work closed
as on is
basis.
06-11-2013 - Project
freeze.
Final bill
passed &
submitted
to finance.
3. T. No.
Dy. CE/C/
DNRP/
RTM-
DNRP/MB
/NL/T/ 10
– Const. of minor
bridges, RUB & other
ancillary works etc.
from Km. 0.00 to 17.00
bet. Dungarpur to
Nawa Gaon stations in
c/with DNRP-RTM New
BG Rail Line Project.
Open 10-09-2013 Two
Packet
23-10-
2013
8 6 2 Yes NWR/S&C/
CA/137 Dt.
30-06-
2014
M/s Gannon Dunkerley & Co. Ltd., Ahmedabad
38.06 Crore 38.48 Crore
03-04-2016
Extended
upto
31.12.2019
14.11.2014 50% Work in
progress.
4 T. No.
UDZ-
HMT/GC/E
W/T-3R
UDZ-HMT GC PROJ.
Construction of Minor
bridges & earthwork
from Km. 270/0 to
320/0 in connection
with UDZ-HMT section
GC Project
Open 08.05.15 Two bid
system
12.06.15 06 01 05 Yes NWR/S&C/
CA/148
dated
12.01.2016
M/s Royal Infra
Engineering Pvt. Ltd., Surat
29.15 Cr.
30.90 Cr.
19.04.17
Extended
upto
30.06.2019
27.11.15 89% Work in
Progress
5 NWR/SC/
UDZ-
HMT/GC/Ci
vil/204140
532
Flash Butt welding of
60 Kg/52 Kg. New / SH
Rails at Depot/ Site
using Mobile Flash Butt
Welding Plant in DNRP-
HMT Section.
Open Single
Packet
23.11.16 02 01 01 Yes Dy.
CE/C/DNRP
/CA/26 Dt.
20.01.2019
M/s Railtech
Infraventure Pvt. Ltd. 147/91-A, Old Bairahana Allahabad – 211003 (UP)
531.70 Lakhs 21.08.2018
20.11.2019
25% Work in
progress.
6 NWR/SC/
UDZ-
HMT/GC/Ci
vil/205140
541
Dismantling of existing
MG track, laying and
linking of BG ML, LL
etc. bet. Km. 270.00 to
Km. 320.00 in c/with
DNRP-HMT Section.
Open - Single 01.02.2017 04 Nos. 1 1 Yes Dy.
CE/C/DNRP
/CA/17 Dt.
27.06.2017
M/s Bhanwar Lal Bijarnia, Vill. Rajpura, Post Prewari, Tehsil Nawa, Distt. Nagaur (Raj.)
890.85 Lakhs
803.00 Lakhs
27.02.2018
Extended upto
30.06.19
05.04.2017 65% Work in
progress.
7. UDZ-HMT/
GC/
205140838
-R1
Transportation of all
types of free rails, P&C
etc. between DNRP-
HMT Section in c/w
UDZ-HMT GC Project.
Open
tender
01.05.2017 Single
Packet
12.06.2017 2 Nos. NA NA Yes Dy. CE/ C/
DNRP/CA/1
9 Dt.
15.10.2017
M/s Shree Nahar Construction Co., A-328, Shastri Nagar, Jodhpur (Rajasthan)
6.28 Crores 17.08.2018
Extended
upto
31.12.2019
31.08.2017 59% Work in
progress.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
15
DY. CE/C/RTM
1. Dy.CE/C/RTM/ DNRP-RTM/NL/T-2
Construction of minor bridges ,Road under bridges (RUB) & other ancillary works from 142.85 to 163.00 km between Chotti Sarvan -Shivgarh stations in c/w Construction of DNRP-RTM via Banswara.New BG Rail line project
Open 15.06.2014 Two bid 23.07.14 5 Nos. 01No 04(four) Yes NWR/S&C/CA/141 dated 16.03.2015 & 31.05.18
M/S Gannon Dunkerley & Co.Ltd. 301-303,Prema Acrcade,3rd Floor, Opp Doctor House, Near Parimal Crossing,C.G.Road,Ahemdabad-380006
Rs.4288.78 Lakhs
17.12.2016 31.03.2018 30.11.2018 30.06.2019
10.08.2015 28% The work in progress.
CE/C/III-JP
Dy. CE/C/I-Ajmer
1
AII
/Const.
/DFCCIL
/T/3
-R2
Shifting of track between Madar & Durai stations & shifting MG yard at Marwar Jn. i.c.w. DFC.
Open 17.04.13 Two Bid 02.04.13 4 Nos. 1 No. 1 No. Yes NWR/S&C/CA/60 dated 26/12/2013
M/s. Ravi Infra build Pvt. Ltd., 95, Hiran Magri, Sector-11, Udaipur
3216.99 Lakhs
4342.00 Lakhs
04/02/2015, 30/04/2016, 31/12/2016, 30/06/2018 31/12/2018 30/08/2019
14/12/13 75% Work in progress.
8. UDZ-HMT/
GC/
205141142
Const. of duty huts,
road works at level
crossing, etc. in the
section of Dy.
CE/C/DNRP in c/with
UDZ-HMT GC Project.
Open
tender
14.08.2017 Single
Packet
18.09.2017 1 NA NA Yes Dy. CE/C/
DNRP/CA/
22 Dt.
24.01.2018
M/s R.K. Constructions, Village –Nawada, Sector-20, Greater Noida, Distt . Gautam Budh Nagar.
7.63 Crores
7.83 Crores
17.10.2018.
Further
extended upto
31.08.2019
02.11.2017 35% Work in
progress.
9. NWR/SC/
UDZ-HMT/
GC/ Civil –
205140436
Supply & stacking of
stone track ballast etc.
bet. Km. 260 to Km.
320 etc. in c/with UDZ-
HMT GC Project.
Open
tender
08.12.2016 Two
packet
18.01.2017 4 4 - Yes Dy. CE/C/
DNRP/CA/
18 dated
15.07.2017
M/s YSCC-YKS-HID
(JV), Vill. Mothala, Abu Road, Distt. Sirohi
10.87 Crores
12.58 Crores
17.10.2018
Ext. upto
30.09.2019
08.05.2017 68% Work in
progress.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
16
2
AII
/Const.
/DFCCIL
/T/6
Construction of station building & staff quarters in c/w shifting of utilities for DFCCIL.
Open 10.01.13 Two Bid 15.02.13 9 Nos. 5 Nos. 5 Nos. Yes NWR/S&C/CA/61 dated 27/12/2013
M/s. Rama Construction company, H-240, Ashok Vihar Phase-I New Delhi
4117.03 Lakhs
05/03/2015, 31/12/2015, 30/06/2016, 31/12/2016, 30/06/2017, 31/12/2017, 31/03/2018, 30/06/2018
& 31/07/2018
15/09/13 - Work completed.
3
AII
/Const.
/LH
S/T
/3 Providing Limited Height
Subways in lieu of existing Level Crossings between Madar & Haripur stations of Madar - Marwar Section in connection with elimination of existing level crossing gates.
Open 10.06.13 Two Bid 17.07.13 01 Nos. - - Yes NWR/S&C/CA/64 dated 20/02/2014
M/s. Lall Construction Co. AA-105, Shalimar Bagh, Delhi-110088
4577.17 Lakhs
6839.00 Lakhs
15/12/2015, 31/03/2017, 31/10/2017, 30/06/2018
&
30/06/2019
18/02/14 90% Work under progress.
4
AII
/Const.
/C&
W/M
od./
T/6
Improvement to drainage system in C&W Workshop by the construction of drain using mostly pre-cast RCC units including launching. Work also includes construction of traverser path and other ancillary works in connection with Modernisation of C&W Workshop, Ajmer
Open 23/10/14 Two Bid 26/11/14 06 (Six) 04 (Four)
1.0 Varaha Infra Limited, Umesh Smriti-6, Jalam Vilas Scheme, Poata B. Road, Jodhpur (Raj.)-342006. 2.0 Bharat Spun Pipe & Construction Company, 43, Industrial Area, Jhotwara, Jaipur-302012. 3.0 JCC Infra
Projects Pvt. Ltd., 761/30, Aklank House, Tikam Ganj, Ajmer (Raj.) 4.0 M/s. Raj Kumar Gupta
Yes
Dy. CE(C)/AII/CA/91 dated 30/07/2015
Prem Fabricator's, 426, Near Jyoti Power, Behind Steel Town, Moriya, Chandgodar, Ahmedabad-382110
948.74 Lakhs
21/01/2016, 31/12/2016, 30/06/2017, 31/10/2017, 15/01/2018, 15/03/2018
& 31/07/2018
04/02/15 - Work completed.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
17
Contractors, III-J/59, Nehru Nagar,
Ghaziabad-201001.
5
NW
R/S
C/A
II-B
NG
M/C
ivil -
308151801
Earth work in
bank/cutting including Blanketing material, Construction of Major/Minor Bridges, Construction of Quarters, S&T structures & Miscellaneous structures, Dismantling of existing Buildings, Platforms & Steel structures etc., .... in connection with Ajmer-Bangurgram BG Doubling project.
Open 02/03/16 Double packet
12/04/2016
06 (Six) 02 (Two)
M/s. Rajendra Singh Bhamboo Infra Pvt. Ltd. 108, First Floor, Neel Kanth
Building, Gandhi Path, Vaishali Nagar, Jaipur – 302021 and M/s. Balajee-Modi (JV), 9, Leela Mension, Raj Bhawan Road, Civil Lines, Jaipur-302006 Jaipur-302006
Yes NWR/S&C/CA/74 dated 30/08/2016
M/s. Shivakriti-Shri Mohangarh (JV), 7th Floor, Ajmer Puliya, Jaipur-302006
11337.76 Lakh 13020.00 Lakhs
23/06/2018 &
28/02/2019 30/11/2019
20/07/16 85% Work in progress.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
18
6
NW
R/S
C/B
angurg
ram
-Guriya-P
atc
h/C
ivil-3
08151801
Earth work in bank/cutting including Blanketing materials, Construction of Major/Minor Bridges, Construction of
Quarters, S&T structures & Miscellaneous structures, dismantling of existing buildings, platforms & steel structures etc., ... in connection with Bangurgram - Guriya BG Doubling project.
Open 28/06/16 Double packet
10/08/2016
05 (Five) 01 (One)
VPRPL-RBIPL "Guriya" (JV) H-1, First Floor
Shivalik Complex, Near Gol Building, Sardarpura, Jodhpur (Rajasthan) 342001
Yes NWR/S&C/CA/76 dated 24/01/2017
M/s. H.S. Mehta Infra
– JCC Infra Projects (JV), 761/30, Aklank House, Tikam Ganj Ajmer – 305001
16161.54 Lakh 19471.00 Lakhs
10/11/2018
Extended upto
31.07.2019
20/11/16 60% Work in progress.
7
NW
R/S
C/M
D-/
Civ
il-3
08421801
Providing pit line with or without catwalk, washing apron, overhead water tank, extension of existing bridges, extension of existing shed, construction of service buildings and dismantling of existing
track, laying & linking of new track & turnouts etc. in Madar yard in connection with shifting of coach maintenance facility from Ajmer to Madar project
Open 29/04/16 Double packet
28/06/16 7 (Seven) 2 (One)
M/s. Ali Mohd. Abdul Mazid, Near Jama Masjid, Mohalla Vyaparian, Bikaner-334001 (Raj.) Varindera
Constructions Limited, 408-409, Suneja Tower-I, District Cenre, Janakpuri, New Delhi.
Yes NWR/S&C/CA/75 dated 29/09/2016
M/s. M. H. Khanusiya, First Floor, Divine India Building, Near RTO office, By Pass Road, Post-Savgadh, (Panpur) Himmatnagar-383001 Dist.-S.K. (Gajarat)
2643.75 Lakh
06/09/2017, 31/01/2018, 31/05/2018
&
31/07/2018
15/09/16 - Work in completed.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
19
Dy. CE/C/II-Ajmer
1 AII/Const.
/LHS/T/2
Construction of
Limited Height
Subway in lieu of
existing LC No. 58,
60, 61, 62, 64, 65,
66, 67, 68, 69, 71, 72
& 73(13 Nos)
between stations
Marwar to Rani of
Marwar-Palanpur
Section in connection
with elimination of
level crossing gates.
Open 21.02.2013 Single 28.03.2013 01 Nos.
1st Lowest
M/s. Ravi
Infrabuild
Projects Pvt.
Ltd. Office
95, Hiran
Magri Sector-
11, Udaipur-
313002
(Raj.).
NIL Yes
NWR/S&C/CA/5
8 dated
18/11/2013
M/s. Ravi Infrabuild
Projects Pvt. Ltd.
Office 95, Hiran Magri
Sector-11, Udaipur-
313002 (Raj.).
1790.49 Lakhs
31/12/2014,
30/09/2015,
30/09/2016,
30/09/2016,
31/12/2016,
31/05/2017 &
30/11/2017
14/09/2013 - Work
Completed.
2
AII/GRI-
MJ/BGD/T
/1
Earthwork in
embankment for
cutting & filling,
Blanketing for bank,
Addition, alteration
and construction of
S&T structures, Pass.
Platform, Platform
Shelters, station
Building, staff
Quarters, water Huts,
toilets, Hand Pumps,
FOBs, TMC Rest
house etc. between
Guriya–Marwar Jn.
stations (both excl.)
and Officer Rest
House at Mawar Jn.
Station in connection
with Guriya-Marwar
Jn. BG Patch Doubling
Project.
Open 30.08.12 Single 16.10.12 07 Nos.
1st Lowest
M/s. Braham
Prakash Modi,
74
Sudarshanpur
a, Industrial
Area,
Baisgodam,
Jaipur-06
NIL Yes
NWR/S&C/CA/5
1 dated
14/03/2013
M/s. Braham Prakash
Modi, 74
Sudarshanpura,
Industrial Area,
Baisgodam, Jaipur-06
3541.71 Lacs.
30/09/2014,
30/04/2015,
31/07/2015,
30/10/2015,
31/12/2015,
30/04/2016,
30/06/2016,
31/12/2016,
31/03/2017 &
30/06/2017
31/12/2012 30/06/17 Work
completed.
3
AII/GRI-
MJ/BGD/T
/2
Construction of
Important/Major
Bridges including
earthwork, blanketing
on the approaches
between stations
Guriya to Marwar
Junction with
Railway’s/Contractor’s
design & drawing in
connection with
Guriya-Marwar
Junction BG Patch
Doubling Project.
Open 21.01.2013 Single 26.02.2013 06 Nos.
1st Lowest
M/s.PNC
Infratech
Ltd.-Jain
Construction
Company
(JV) 761/30,
Aklank
House, Near
Mal Godown,
Tikam Ganj,
Ajmer
NIL Yes
NWR/S&C/CA/6
2 dated
06/01/2014
M/s. PNC Infratech
Ltd.-Jain Construction
Company (JV) 761/30,
Aklank House, Near
Mal Godown, Tikam
Ganj, Ajmer
3240.43 Lakhs
28/01/2015,
31/12/2015,
30/09/2016,
31/12/2016,
15/02/2017 &
31/07/2017
06/12/2013 -
Work
completed,
final bill
passed.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
20
4 AII/Const.
/FLS/T/1
Marking out of center
line, taking levels
including all details,
Carrying out Geotech
investigation,
designing of
foundation and sub –
structures / super
structure of Minor /
Major bridges/LHS,
preparation of land
plans & proposal,
Preparation of L-
section & yard plans
etc. & submitting
detailed working
drawings in
connection with
Bangurgram to Guriya
& Marwar to Rani
Doubling projects and
Various shifting of
utility works of
DFCCIL & LHS works
between Kishangarh
& Palanpur stations.
Open 17.09.2012 Single 09.11.2012 03 Nos.
2nd Lowest
M/s. S. M.
Consultants,
Plot No.-130,
S.M. Tower,
Mancheswar
Industrial
Estate,
Rasulgarh,
Bhubneshwar
(Odisha)
M/s. BPC
India, Nataraj
Bhawan,
P.O.Khamarch
andi, P.S.
Haripal, Dist.-
Hooghly, West
Bengal
Yes
NWR/S&C/CA/
57 dated
07/11/2013
M/s. S. M.
Consultants, Plot No.-
130, S.M. Tower,
Mancheswar Industrial
Estate, Rasulgarh,
Bhubneshwar (Odisha)
183.38 Lakhs
06/07/2013,
30/11/2013,
31/03/2014,
31/10/2014,30/0
4/2015,
31/08/2015,
31/12/2015,
30/04/2016,
31/08/2016 &
30/04/2017
02/02/2013 - Work
completed.
5 AII/Const/
FBW/T/1
Flash butt Welding of
60/52 Kg.
New/SH,(72/90 UTS )
Rail joints by using
mobile flash butt
welding plant in
connection with
various sanctioned
works of Ajmer unit of
construction
organization.
Open 11.10.2012 Single 19.11.2012 01 No.
1st Lowest
M/s. The
India Thermit
Corpn. Ltd.,
84/22, Fazal
Ganj,
Kanpur-
208012.
NIL Yes
Dy.
CE(C)/AII/FBW/
CA/85 dated
21/10/2013
M/s. The India Thermit
Corpn. Ltd., 84/22,
Fazal Ganj, Kanpur-
208012
699.04 Lakhs
18/03/2015,
18/03/2016,
18/03/2017 &
18/03/2019
13/11/2013 95% Work in
progress
6 AII/Const.
/LHS/T/4
Providing Limited
Height Subway (17
Nos.) in lieu of
existing level
crossings between
Haripur & Marwar Jn.
stations of Ajmer -
Marwar Jn. section in
connection with
elimination of existing
level crossing gates.
Open 11.07.14 Two packet
system 13.08.2014 07 Nos.
1st Lowest
M/s. PNC
Infratech
Ltd.-JCC
Infraprojects
Pvt. Ltd. (JV)
761/30,
Aklank
House, Near
Mal Godown,
Tikam Ganj,
Ajmer
04 (Four) Yes
NWR/S&C/CA
/68 Dt. 09-03-
2015
M/s. PNC Infratech
Ltd.-JCC Infraprojects
Pvt. Ltd. (JV) 761/30,
Aklank House, Near
Mal Godown, Tikam
Ganj, Ajmer
3529.60
Lakhs
2916.00
Lakhs
18/05/2016
30/06/2017
31/10/2018
11/09/2015 100% Work
completed.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
21
7 AII/Const.
/LHS/T/5
Providing Limited
Height Subways (19
Nos.) in lieu of
existing level
crossings between
Rani & Keshavganj
stations of Marwar Jn.
– Palanpur section in
connection with
elimination of existing
level crossing gates.
Open 21.02.2013 Two packet
system 13.08.2014 04Nos.
1st Lowest
M/s. Ravi
Infrabuild
Projects Pvt.
Ltd. Office
95, Hiran
Magri Sector-
11, Udaipur-
313002
(Raj.).
03 (Three) Yes
NWR/S&C/CA/6
6 Dt. 27-02-
2015
M/s. Ravi Infrabuild
Projects Pvt. Ltd.
Office 95, Hiran Magri
Sector-11, Udaipur-
313002 (Raj.).
Rs.3908.17
Lacs
3840.00 Lakhs
18/05/2016,
13/03/2017
31/12/2017
31/10/2018
30/06/2019
03/12/2014 95% Work under
progress
8 AII/Const.
/LHS/T/6
Providing Limited
Height Subways in
lieu of existing level
crossings between
Swaroopganj &
Palanpur stations of
Marwar Jn. - Palanpur
section in connection
with elimination of
existing level crossing
gates.
Open 21.02.2013 Two packet
system 13.08.2014 04 Nos.
1st Lowest
M/s. Ravi
Infrabuild
Projects Pvt.
Ltd. Office
95, Hiran
Magri Sector-
11, Udaipur-
313002
(Raj.).
03 (Three) Yes
NWR/S&C/CA
/67 dated
27/02/2015
M/s. Ravi Infrabuild
Projects Pvt. Ltd.
Office 95, Hiran Magri
Sector-11, Udaipur-
313002 (Raj.).
Rs.3873.36
Lacs
4636.00 Lakhs
18/05/2016,
31/03/2017
31/03/2018
31/12/2019
18/12/2014 50% Work under
progress
9
AII/GRI-
MJ/BGD/T
/6
Construction of Minor
Bridges including
other ancillary work
between station
Guriya (excluding) -
Marwar Jn.
(excluding) in
connection with
Guriya - Marwar
Junction BG patch
doubling project.
Open 07/07/2014 Two packet
system 13/08/2014 04 Nos. 1.0 (One)
1.0 M/s.
Ashish
Construction
Co.- SP
Infracon (JV)
211, Shivam
Complex, Opp.
Hetarth Party
Plot, Science
City Road,
Sola,
Ahmedabad -
380061.
Yes
NWR/S&C/CA
/69 dated
09/03/2015.
M/s. JCC InfraProjects
Pvt. Ltd., 761/30,
"Aklank House", Tikam
Ganj, Ajmer (Raj.).
2169.63 Lakhs
29/02/2016,
30/06/2016,
31/12/2016,
31/07/2017 &
31/12/2017
01/03/2015 31/12/2017 Work
completed.
10
AII/GRI-
MJ/BGD/T
/8-R
Dismantling of
existing BG track,
laying and linking of
Broad gauge main
line, loop lines
including points and
crossings at various
yards, spreading of
ballast, tamping of
track, transportation
of P-Way materials
and other ancillary
works between Guriya
– Marwar Jn. Section
in connection with
Guriya - Marwar Jn.
BG Patch Doubling
Project.
Open 28/07/2015 Single packet
system 31/08/2015 5 Nos. 1.0 (One)
1.0 JCC Infra
Projects Pvt.
Ltd., 761/30,
Aklank House,
Tikam Ganj,
Ajmer
No -
M/s. Jhawar Sales
Corporation, Rani
Bazar, Bikaner-
334001 (Raj.)
Rs. 976.32
Lakhs
28/05/2017 &
31/07/2017 - 30/06/17
Work
completed.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
22
11
AII/MJ-
RN/BGD/T
/1
Earth work in
bank/cutting including
Blanketing material,
Construction of
Important/Major/Mino
r Bridges,
Construction of
Quarters, S&T
structures &
Miscellaneous
structures on stations
and in section,
Dismantling of
various Buildings,
Platforms & Steel
structures etc, Track
works for Broad
Gauge line, Supplying
& putting ballast in
track, Transportation
of P. Way materials
and other ancillary
works in Marwar
Junction to Rani
section in connection
with Marwar Jn.-Rani
(both including) BG
Patch Doubling
project.
Open 09/08/2015 Two packet
system 06/10/2015 13 Nos. 7.0 (Seven)
1.0 M/s.
Gawar –
Lakhlan (JV)
402, Diamond
Tower, Purani
Chungi, Ajmer
Road,
Jaipur2.0 M/s.
Kalindee –
Paras JV, 2nd
Floor Building
No. 9 A, Cyber
City, DLF
Phase – III,
Gurgaon –
1220023.0
M/s. Ravi - HG
(JV) 95, Hiran
Magri, Sector-
11, Udaipur –
3130024.0
M/s. Gannon
Dunkerley &
Co. Ltd. 301-
303, Prerna
Arcade, Opp.
Doctor House,
Near parimal
Crossing, C.G.
Road,
Ahmedabad-
3800065.0
M/s. VRC – SIL
(JV), 16, Opp.
Metro Pillar
No. 190,
Paschim Vihar
Extension,
Rohtak Road,
Delhi
1100636.0
M/s. BPL-BCPL
(JV) Ekta
House, Nr.
Shripath
Apartment,
Jalaram-II,
University
Road, Rajkot –
360007
Yes
NWR/S&C/CA
/71 dated
22/02/2016
M/s. VPRPL – RBIPL
(JV) H-1, first Floor
Shivalik Complex,
Near Gol Building,
Sardarpura, Jodhpur
(Raj.) – 342001
15262.94
Lakh
15191.00
Lakhs
29/12/2017
31/12/2018
30/06/2019
25/02/2016 98% Work under
progress.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
23
12
NWR/SC/
Guriya-
Marwar/Ci
vil-
30915110
9
Miscellaneous works
between Guriya to
Marwar Jn. doubling
project.
Open 20/09/2016 Single packet
system 24/10/2016 04 Nos. 04 (Four) NIL Yes
Dy.CE(C)/AII/C
onst./GRI-
MJ/CA/4 dated
30/03/2017
M/s K.B. Enterprises,
2, Matra Chhaya,
Opp. Chambal Power
House, Hawa Sarak,
Jaipur-302006
Rs.814.54
Lakhs
20/05/2017 &
19/08/2017 03/12/2016 100%
Work
completed.
13 AII/Const./
LHS/T/9
Providing leftover Limited
height subway in lieu of
existing level crossings
in Marwar Jn.-Palanpur
section in connection
with elimination of
existing level crossing
gates.
Open 08/09/2016 Two Packet
System 14/10/2016 03 Nos. 03 (Three) NIL Yes
Dy.CE(C)/AII/
Const./LHS/CA
/06
Dated
06/09/2017
M/s Radhe Associate,
137-1st Floor Kensvilla
Complex, Nr.
Ramosana Circle,
Mehsana-Unjha
Highway Road-384002
895.23
Lakhs
26/01/2018,
30/06/2018
28/02/2019
31/12/2019
09/02/2017 35% Work in
progress
14
NWR/SC/
Rani-
Marwar/
Civil-
309150802
-R
Flash butt welding of
60/52 Kg. New/SH
(72/90 UTS) Rail joints
by using Mobile flash
butt welding plant in
connection with Marwar
Jn.-Rani BG patch
doubling and Thaiyat-
Hamira-Sanu new BG
line project.
Open 15/07/2016 Single packet
system 22/08/2016 01 No. 01 (One) NIL Yes
Dy.CE(C)-
II/AII/CA/7 dated
25/11/2017
M/s Railtech
Infraventure Pvt. Ltd.,
147/91-A, Old
Bairahana, Allahabad-
211003
660.66
Lakhs
16/03/2018,
15/09/2018 &
31/12/2018
31/07/2019
25/12/2017 50% Work in
progress
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
24
CE/C/IV-JP
Dy. CE/C/I-Jodhpur
1 T.No.JU/CONST./T-08 /2012-13/GAD-
Preparation of GAD
and Soil Testing for
RUBs in various
sections of JU division
Open
tender
07.12.12 Single 10.01.13 03 M/s Theme
Engineering
Services Pvt.
Ltd., B-24,
Jaipur
1. M/s M.K. Soil Testing Laboratory, Ahmedabad
2. M/s Engineer's Associates, Ratanada, ,JU
L-1 Dy.CE/C/
JU/10/2013
-14/GAD,
dtd.
19.10.13.
M/s Theme Engineering Services Pvt. Ltd., Jaipur
20.19 Lakhs 06.07.13
Extended
upto
30.06.17
15.04.13 100% Work
delayed due
to NOC of
various LCs
were not
received
from Divn.
2 JU/Const./
T-22/14-
15/Std.IIR
/MTD-BKN
All Civil & P.Way work
c/with Std-II work in
MTD-BKN & RKB-PLC
sec
Open
Tender
21.11.14 Single
Tender
23.12.14 02 Nos. M/s
Bhanwar Lal
Bijarnia,
Village-
Rajpura,
Post-
Prewari,
Tehsil-
Nawa, Distt.
Nagour
(Rajasthan)
M/s Jai Mata De Energy System,
Laxmangarh sikar
L-1 Dy.CE/C/
JU/14/2015
-16/Std-
IIR, dtd.
11.06.15.
M/s Bhanwar Lal
Bijarnia,
Village-Rajpura, Post-
Prewari,
Tehsil- Nawa, Distt.
Nagour
(Rajasthan)
715.80 lacs. 03.10.16
31.03.17
31.08.17
31.03.18
30.08.18
15.10.18
10.04.15 100% Final SCA is
under
process.
3 JU/Const./
74-W-
26/2015-
16/Std.IIR
/ RKB-PLC
Supplying and
stacking of 20800 cum
Stone ballast for
Std.IIR work in RKB-
PLC section
Open
Tender
05.06.15 Single
Tender
10.07.15 04 Nos. M/s J.K.
Const.Co.
Nokha,
A.K. Gupta & Co., , DELHI
M/s Hanuman Const. Co., Nokha
M/s Shree Shyam Engineering Co, Churu
L-1 Dy.CE/C/
JU/19/
2015-
16/Std.IIR/
RKB-PLC,
dtd.
30.01.16
M/s J.K. Construction
Co.,
New Market, Nokha,
District – Bikaner
142.84 lacs. 10.05.16
31.07.16
15.11.16
.09.2015 100% Work
completed &
final bill
awaited due
to non
deposition of
mining NOC.
4 JU/Const./
T-
27/2015-
16/Std.IIR
/ RKB-PLC
All Civil & P.Way work
c/with Std-II work in
RKB-PLC sec
Open
Tender
11.06.15 Single 15.07.15 01 No. M/s
Bhanwar Lal
Bijarnia,
Village-
Rajpura,
Post-
Prewari,
Tehsil-
Nawa, Distt.
Nagour
(Rajasthan)
- L-1 Dy.CE/C/
JU/18/
2015-
16/Std.IIR,
dtd.
06.01.16
M/s Bhanwar Lal
Bijarnia,
Village-Rajpura, Post-
Prewari,
Tehsil- Nawa, Distt.
Nagour
(Rajasthan)
679.84 lacs. 15.03.17
08/2017
31.03.18
31.08.18
15.10.18
18.09.15 100% Work
completed &
final C&A
under
process.-
5 JU/Const./
T-
25/2015-
16/Std IIR
Providing “IN SITU”
Glued Insulated Joints
of G-3 (L) type for 52
kg/60 kg rails in c/w
StdIIR work in MTD-
BKN & RKB-PLC
section.
Open
Tender
05.06.15 Single 10.07.15 03 M/s Tirupati
Metal
Fabricators,
1433 Sector
16,
Faridabad-
121002
(Haryana)
Dynamic Engineers Kota.
Creative Engineers Kota -
L-1 Dy.CE/C/
JU/17/
2015-
16/Std.IIR,
dtd. 06.01-
2016
M/s Tirupati Metal
Fabricators,
1433 Sector 16,
Faridabad-121002
(Haryana)
320.01 lacs. 31.03.18
30.06.18
30.08.18
17.12.15 100% Work
completed &
final C&A
under
process.-
6 NWR/SC/ LN-MJ sec. -RUBs in Open 09.12.15 Single 12.01.16 07 • M/s Rachana-
• M/s Rachana-SNCC JV
L-1 Dy.CE/C/ M/s M.H.Khanusiya, 12.71 Cr. 01.11.17 12.05.16 100% Work
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
25
RKB-
JSM/Civil-
31030001
004
lieu of LCs (12 Nos
LCs under Pink Book
item No. 93 of 2015-
16)
tender (Seven) SNCC JV • M/s Jay Jawan Const. Co
• M/s Satish Kera Ram Amit
• M/s Mohanlal Managanlal Kakrecha
• M/s JCC Infra
• M/s M.H. Khanusiya
• M/s Rama Kishan
• M/s Jay Jawan Const. Co
• M/s Satish Kera Ram Amit
• M/s Mohanlal Managanlal Kakrecha
• M/s JCC Infra • M/s Rama
Kishan
JU/23/
2016-
17/LHS/
LN-MJ, dtd.
12.07.16
Himantnagar-383001
Dist- S.K.(Gujrat)
31.03.18
31.10.18
31.03.19
30.06.19
completed.
Final SCA
under
process.
7 NWR/SC/
MTD-
BKN/CIVIL
-
31030001
002-R
MTD-BKN section-
RUB in lieu of LCs, (16
Nos. of LCs under Pink
Book item No. 97 &
104 of 2016-17)
Open
tender
17.07.16 Two
packet
system
19.08.16 04 (Four) • M/s Shree Karni Traders, Bikaner
• M/s M.H. Khanusiya, Himatnagar
• M/s JMES – MGC (JV) V.P.O. – Narodara
• M/s PCC – Harita Construction Co. (JV), Hisar
M/s Shree Karni Traders, Bikaner
M/s JMES – MGC (JV) V.P.O. – Narodara
M/s PCC – Harita Construction Co. (JV), Hisar
L-1 NWR/S&C/
CA/ 77
dated
15.02.2017
M/s M.H. Khanusiya,
Himatnagar
1823.45
Lakhs
05.11.18
31.03.19
30.06.19
10.01.17 100% Work
completed.
Final SCA
under
process.
8 NWR/SC/
RKB-
JSM/Civil-
31030001
003-R
RKB-JSM section- RUB
in lieu of LCs, (20 Nos.
LCs under Pink Book
item No. 98 & 108 of
2016-17).
Open
tender
03.08.16 Two
packet
system
06.09.16 04 (Four) • M/s Rachana – SNCC JV, Jodhpur.
• M/s Shree Karni Traders, Bikaner
• M/s M.H. Khanusiya, Sunshine Infrastucther (JV), Himatnagar
• M/s SB – Jagtaji (JV), New Delhi – 110018
• M/s Shree Karni Traders, Bikaner
• M/s M.H. Khanusiya, Sunshine Infrastucther (JV), Himatnagar
• M/s SB – Jagtaji (JV), New Delhi – 110018
L-1 NWR/S&C/
CA/ 78
dated
05.06.2017
M/s Rachana – SNCC
JV, Jodhpur
2162.34
Lakhs
13.06.18
31.03.19
30.06.19
15.01.17 100% Work
completed.
Final bill
under
process.
9 NWR/SC/
RUB/Civil-
41030001
007
NWR/SC/RUB/Civil-
41030001007
Samdari-Barmer
section - Road under
bridges in lieu of Level
Crossings (13 No. LCs
under PB item No. 73
of 2016-17 & 04 No.
LCs under PB item No.
100 of 2016-17)
Open
tender
06.11.2016 Two
packet
system
08.12.16 04 • M/s M.H. Khanusiya, Himatnagar
• M/s Shree Karni Traders, Bikaner
• M/s JMES – MGC (JV) V.P.O. – Narodara
• M/s Rama kishan
M/s Shree Karni Traders, Bikaner
L-1 NWR/S&C/
CA/ 79
dated
19.07.2017
M/S Rama kishan
Ashok kumar (JV)
205, Sardarpura JU.
2241.33
2246.65
(Revised)
06.10.18
31.03.19
15.07.19
10/2017 80% Work in
progress.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
26
Ashok kumar (JV) JU.
10 NWR/SC/
ROB/Civil-
41030000
9086
NWR/SC/ROB/Civil-
410300009086
construction of
complete ROB
including Approaches
in lieu of existing LC
No. C- 56 at JM: 77/2-
3 and C- 109 at KM:
145/9 – 146/0 on
SMR-BLDI section
Open
tender
Two
packet
system
10.03.17 08 M/s M.H. Khanusiya, Himatnagar
M/s Rachana Ankleshwar
M/s Shree Karni Traders, Bikaner
Lal Const. Company
M/S Sona Builders- RC Patel JV Mehsana
Ravi infra build projects Pvt. Ltd. Udaipur
Radhe associates Mehsana
VPRPL- RBIPL Samdari JV
M/s Shree Karni Traders, Bikaner
M/s Rachana Ankleshwar
VPRPL- RBIPL Samdari JV
Radhe associates Mehsana
L-1 NWR/S&C/
CA/81
dated
19.12.17
M/S Sona Builders- RC Patel JV Mehsana
3699.14
Lakhs
04.07.19 26.09.17 35% Work in
progress.
11 NWR/SC/
RUB/Civil-
41030001
009
Merta Road - Bikaner
section - Road under
bridges in lieu of LC
(21 Nos. LCs under
Pink Book item No.
106 of 2017-18 & 02
Nos LCs under Pink
book item No.113 of
2017-18 )
Open
tender
04.08.17 Two
packet
system
11.09.17 03 M/s Rachana Construction Company, AT & PO Maktupur, Ta. Unjha, Mehsana (Gujrat).
M/s Shree Karni Traders, Bikaner
M/s Pragat Const. Co. New Delhi
L-1 NWR/S&C/
CA/83,
dated
10.04.2018
M/s Rachana Construction Company, AT & PO Maktupur, Ta. Unjha, Mehsana (Gujrat).
5225.26 Lakhs
10.11.19 11.01.18 40% Work in
progress.
12 NWR/SC/
RUB/Civil-
41030001
011
DNA-MTD & RTGH-
DNA section - Road
under bridges in lieu
of LC (20 Nos. LCs
under Pink Book item
No. 122 of 2017-18,
01 No LC under Pink
book item No. 112 of
2017-18 )
Open
tender
04.08.17 Two
packet
system
11.09.17 03 M/s Rachana Construction Company, AT & PO Maktupur, Ta. Unjha, Mehsana (Gujrat).
Mehta Const. Co Karnal
M/s Pragat Const. Co. New Delhi
L-1 NWR/S&C/
CA/84,
dated
10.04.2018
M/s Rachana Construction Company, AT & PO Maktupur, Ta. Unjha, Mehsana (Gujrat).
5306.07 Lakhs
10.11.19 09.03.18 60% Work in
progress
13 NWR/SC/
RUB/Civil-
41030001
010
MTD-JU, PPR-BARA
section - RUB in lieu of
LC (19 Nos. LCs under
P B item No. 112 of
2017-18, 01 No LC
under Pb item No. 117
of 2017-18 )
Open
tender
04.08.17 Two
packet
system
11.09.17 02 M/s Shree Karni Traders, Bikaner
M/s Pragat Const. Co. New Delhi
L-1 NWR/S&C/
CA/82
dated
09.04.2018
M/s Shree Karni
Traders, Bikaner.
4939.74 Lakhs
02.01.20 01.04.18 100% Work
completed.
Final bill
under
process.
14 Extension of existing
RUB (8 Nos.) and
const. of RUB in lieu of
manned LCs (08 Nos.)
FL-DNA doubling
project.
Open
tender
Two
packet
system.
L-1 NWR/S&C/
CA/
M/s HJKIPL DRAIPL JV, Deesa
3207.00 Lakhs
25.08.20
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
27
15 Special repair of office
premises of Dy.
CE/C?JU
Open
Tender
Single
Packet
System
Shree Ram Const. Co. Jodhpur
39.00 Lakhs 03.10.19 15.06.19
100% Work
completed.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
28
Dy. CE/C/II-JU
1 NWR/SC/Tha
iyat/Civil-
310111802
Construction of all Civil
work & all other misc.
works between THM–
Sanu new BG line
project (56.250 kms.).
Open
tender
11.09.15 Two packet
17.11.15 07 M/s SCC JV PMP
Infratech, A-Block, A-
104, Ganesh Meridian,
Ahmedabad
M/s DRD MI JV
M/s Bhaniyana Const.
JV
M/S Apex Termic PVT
(JV)
M/S Ravi-HG (JV)
L-1 NWR/SC
/CA/73 dt.
17.08.16
M/s SCC JV
PMP Infratech,
A-Block, A-104,
Ganesh
Meridian,
Ahmedabad
11733.94 22.03.18
30.09.18
31.01.19
31.03.19
30.09.19
27.04.16 78% Work in
progress.
2 NWR/SC/Thi
yat/Civil-
319110507-R
Providing “IN SITU”
Glued Insulated Joint
in c/w. Thaiyat
Hamira–Sanu new BG
line project & MJ-Rani
BG Patch Doubling
project
Open
tender
27.12.16 Singal 02.02.17 5 M/s Creative
Engineers, F-189, Road
No. 5, Indraprasth lnd
Area, Kota (Raj.)
324005
1.M/sDynamic
Engineers
2 M/s Kushal
Engineering
3 .M/s Tirupati Metal
Fabricators
4. M/s Diamond Steel
Ind.
L-1 Dy.CE/C/
JU/CA04/
dtd. 18.08.17
M/s Creative
Engineers, F-
189, Road No.
5, Indraprasth
lnd Area, Kota
(Raj.) 324005
173.15 30.05.19
30.09.19
22.11.17 82% Work in
progress.
3 NWR/SC/FL-
DNA/Civil-
410152001
Construction of
Doubling work
between Phulera –
Degana (108.75 Kms.)
on Phulera-Degana
Railway line.
EPC 13.12.16 EPC 02.08.17 5 M/s Punj Lloyd
Limited,
Plot No.78,
Institutional Area,
Sector-32, Gurgaon
PIN-122003 Haryana
1.M/s IRCON
International Ltd,
2.Jaiprakash Associates
Ltd,
NOIDA
3. Larsen & Toubro
Limited
MUMBAI
4. AFCONS Infra. Ltd,
Mumbai
L-1 NWR/S7C/CA/8
0
dt.28.8.17
M/s Punj Lloyd
Limited,
Plot No.78,
Institutional
Area,
Sector-32,
Gurgaon
Haryana
477.50
Cr.
13.03.20 26.9.17
( Appointed
date)
Work
awarded on
09.08.17.
Termination
issued on
24.09.18
4 NWR/SC/Thiy
at/Civil-
402111110-R
Housekeeping &
upkeep. under Dy.CE
(Const.)-II,JU
Open
tender
26.08.17 Singal 04.10.17 3 M/s Rajendra Singh,
Jaisalmer,
1.M/s Ratan
Construction co.,
Jodhpur
2.M/s B.S. Const. Delhi
L-1 Dy.CE/C/
JU/CA-.07./
dtd. 20.02..18
M/s Rajendra
Singh,
Jaisalmer,
28.20
Lakh
06.11.18
06.02.19
06.04.19
06.05.19
15.05.19
16.11.17 100% Work
completed.
5 T.No.
NWR/SC/FL-
DNA/Civil-
419150703
Hiring of 03 (Three)
Nos. (MUV) under
Dy.CE/C-II,JU in FL-
DNA doubling project
Open
tender
06.01.18 Singal 13.02.18 3 M/s ALRIA
Construction,
Goredi Karna, Degana
Nagaur, Rajasthan
1. M/s Subhash
Traders, Nagaur
2. M/s Shri Vinayak,
Phulera
L-1 Dy.CE/C/
JU/CA-.09./
dtd. 10.5.18
M/s ALRIA
Construction,
Goredi Karna,
Degana
Nagaur,
Rajasthan
33.95
Lakh
20.08.20 22.02.18 Work in
progress
6 NWR/SC/FL-
DNA/Civil-
41910704
Hiring of 03
Nos.vehicle i.e. etc. in
connection with FL—
DNA doubling project.
Open
tender
19.05.18 Singal
25.06.18 5 M/s Shera Di Com C,
Phulera,
2. M/s P C Const. C, C
Road, Jodhpur
3. M/s ALRIA Const.,
Degana
4. M/s Meera Tour &
Travels, Jaisalmer
M/s P C Const. co., P-
11, Saran Nagar, C
Road, Jodhpur
L-1 Dy.CE/C/
JU/CA-11/
dtd 24.10.18
M/s P. C. Const.
co., P-11, Saran
Nagar, C Road,
Jodhpur
33..14 13.08.20 20.09.18 Work in
progress
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
29
7 Tender No:
NWR/SC/FL-
DNA/Civil-
419150108
Phase-I - Earthwork in
bank / cutting
including blanketing
material, Construction
of minor Bridges
including in
connection with
Phulera - Degana
Doubling Project of
Jodhpur Division.
Open E-
Tender
31/10/18 Two
Packet
26/11/18 03 1. 1. NGPL-SCC JV, Jaipur
2. M/s Vishnu Prakash R
PungliaLTd, Mumbai
3. M/s Rachna Shri
Mohangarh JVS-8,
First Floor, Transport
Nagar, Jaisalmer
NA L-1 NWR/S&C
/CA/92 dt.
20.05.2019
M/s Rachna
Shri Mohangarh
JVS-8, First
Floor, Transport
Nagar,
Jaisalmer
4094.26 09.01.20 25.02.19 1.00% Work in
progress.
8 Tender No:
NWR/SC/FL-
DNA/Civil-
419151809
Phase-II - Earthwork in
bank / cutting
including blanketing
material, Construction
of minor Bridges in
connection with
Phulera -Degana
Doubling Project of
Jodhpur
Open E-
Tender
06/11/18 Two
Packet
29/11/18 04 1. M/s K.K. Sorathia
MMC Projects JV
2. M/s NGPL-BLB-SCC JV,
Jaipur
3. M/s Rachna-BLB-
NEPLJV 266-A, Jaipur
M/s BPMODI-MCC JV,
Jaipur
L-1 - M/s K.K.
Sorathia MMC
Projects JV,
Tagore Road,
Gandhidham-
370201
3675.01 09.07.20 03.03.19 1.00% Work in
progress.
9 NWR/SC/FL-
DNA/Civil-
419151810
Phase-III - Earthwork
in bank / cutting
including
blanketingetc. in
connection with
Phulera -Degana
Doubling Project of
Jodhpur Division.
Open E-
Tender
06/11/18 Two
Packet
04/12/18 03 1. M/s K.K. Sorathia
MMC Projects JV,
Gandhidham-370201
2. M/s Rachna Shri
Mohangarh JVS-8,
First Floor, Transport
Nagar, Jaisalmer
M/s BPMODI-MCC
(JV), Jaipur
L-1 M/s Rachna
Shri Mohangarh
JVS-8, First
Floor, Transport
Nagar,
Jaisalmer
4788.27 09.07.20 21.02.19 1.00% Work in
progress.
10 NWR/SC/FL-
DNA/Civil-
419150307-R
419150307-R -
Construction of Major
Bridges (12 Nos.) and
Minor Bridges (PSC
Slab) from Km.0.00 to
Km. 108.75 in c/w
doubling of Phulera -
Degana section of Ju.
Division.
Open E-
Tender
22.11.18 Two
Packet
12.12.18 08 1 M/s.Nelakuduru Infra
Sriganesh Jv-Bangalore
2. M/s Shree Karni
Traders, Bikaner
3. M/s Radhe Guru JV-
Mehsana
4. M/s Vishnu Prakash R
Pungalia Ltd., Mumbai
5. M/s V k Infra. JV-
Sriganganagar
6. M/s JCC Infra Projects
Private Limited, Ajmer
7. M/s Jmes Yes JV-
Jodhpur.
MMC PROJECTS INDIA
PRIVATE LIMITED,
Gandhidam
L-1 - M/s
Nelakuduru
Infra Sriganesh
JV, Plot No. 56,
8th Cross,
Bhuvaneshwari
Nagar, Hebbal
post, Bengaluru
2970.55 24.08.20 24.03.19 0% Yet to start.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
30
11 NWR/SC/FL-
DNA/Civil -
419150311
Construction of Major
Bridge No. 22 (10 X
24.40m Composite
Welded Girder) at Ch.:
24326.45 between
Gudha - Govindi
Marwar Block section
in connection with
doubling of Phulera -
Degana section of
Jodhpur Division.
Open E-
Tender
11.01.19 Two Packet 05.02.19 10 1 .M/s A B Lodha-
Nashik
2. M/s H J Kakrecha
Infracon Pvt. Ltd.,
Banaskantha
3. M/s M S SHREE
KARNI TRADERS,
Bikaner
4. M/s MODI
CONSTRUCTION CO.,
JAIPUR
5. . M/s PMP Infratech
Pvt Ltd, Ahmedabad
6.. M/s Radhe Guru JV-
Mehsana
7.M/s SMB Siddhnath
JV, Ankleshwar
8. M/s SUGAN
CONSTRUCTION
COMPANY- JAIPUR
9. M/s V K
Infrastructure JV-
Sriganganagar
10. M/s Vishnu Prakash
R Punglia Ltd, Mumbai
1. . M/s PMP Infratech
Pvt Ltd, Ahmedabad
L-1 M/s RADHE-
GURU JV-
MEHSANA, 137
Kensvilla
Complex Nr,
Ramosana
Circle,
Mehsana,
Unjha Highway,
384002
2068.46 30.09.20 10.05.19 0% Yet to start.
Dy.CE/C/III-JU
1. Phase-I Earthwork in
bank/ cutting including
blanketing material etc. in
c/with Degana-Raika Bagh
Doubling Project.
Open E-
Tender
Two Packet
L-1 M/s K.K. Sorathia MMC
Project JV,Gandhidham
4898.00 Lakhs 07.08.20 1% Work in
progress.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
31
2. Phase-II Earthwork in
bank/cutting including
blanketing material etc. in
c/with Degana-Raika Bagh
Doubling.
Open
Tender
Two packet
system
L-1 NWR/S&C/CA
/……. Dt….
M/s NGPL-NEPL BLB (JV)
Road Jaipur
5167.00 Lakhs 04.08.20 0%
3 Phase-III Earthwork in
bank/cutting including
blanketing etc. in
connection with Degana-
Raika Bagh Doubing
Project.
Open
Tender
Two Packet L-1 NWR/S&C/CA
/….. dt.
M/s Vishnu Prakash
R.Punglia Ltd., Jodhpur
3431.00 Lakhs 26.06.20 1% Work in
progress.
Dy. CE/C/Test Track/ JU
1. Construction of Major
Bridges * Minor bridges
(PSC Slab in connection
with Test Track for RDSO
(Km. 0.00 to 25.00) to
Jodhpur division.
Open
Tender
Two packet L-1 NWR/S&C/CA
/
M/s Modi Construction
Co. Civil Lines, Jaipur
3968.00 Lakhs 20.03.20 1% Work in
progress.
2. Const. of embankment by
cutting and raising of
existing bank, minor and
road under bridge from
Km. 12.00 to Km. 25.0
Open
Tender
Two Packet L-1 NWR/S&C/CA
/
M/s BGCC-MODI (JV),
Civil Lines, Jaipur
3534.00 Lakhs 20.12.19 1% Work in
progress.
3 Construction of
embankment by cutting
and raising of Existing
bank, Minor and Road
under Bridge from Km.
0.00 to Km. 12.00
Open
Tender
Two Packet l-1 NWR/S&C/CA
/
M/s BGCC-MODI (JV),
Civil Lines, Jaipur
3063.00 Lakhs 20.12.19 1% Work in
progress.
4 Hiring of 02 Nos. vehicles
i.e. and 01 Nos. Multi
Utility Vehicle.
Open
Tender
One Packet L1 M/s P.C. Construction
Co. C. Road, Jodhpur
35.00 Lakhs 06.03.20 12% Work in
progress.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
32
Dy. CE/C/BKN
1 Tender No. NWR-SC-BKN-13-2017-18 Dated 30.09.2017
Construction of Limited height subway ( 1x 4.0m x3.60m) with covering in lieu of existing level crossing No C-4 at km 6/7-8 between Rewari- Kishangarh Balawas station on Rewari- Hisar section of Bikaner division in connection with elimination of level crossing gate.
Open tender
30.09.17 Single Bid 06.11.17 02 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes 39-NWR/Dy.CE/C/BKN/2017-18 Dated: 13.04.2018
M/S Punia Construction Co. 30,Sector-13, Part-2 Hisar-125001( Haryana)
Rs178.67 lakhs
15.06.2018 16.12.2017 08.04.2019 Work physically completed. Final bill is under preparation.
2 Tender No. NWR/SC/ROB/Civil-41230000305/2017-18 Dated 01.08.2017
Construction of 02 lane Road Over Bridge ( single span over Railway tracks) with RCC deck slab on composite girder super structure & pile foundation in lieu of level crossing no. 80 at Km 119/6-7 on Rewari – Hisar section at Hansi – Nalwa – Umra Road in Hisar District
Open tender
01.08.17 Single Bid 08.09.17 05 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes 46-NWR/Dy.CE/C/BKN/2018-19 Dated: 10.08.18
M/S Mohla Construction Co.,476, Sector-15-A Hisar-125001
Rs 448.58 lakhs
15.12.2018 30.06.2019
23.07.2018 95% Work in progress
3 Tender No. NWR-SC-BKN-03(R)-2017-18dated 14.08.2017
Construction of Road Under Bridges in lieu of 14 No existing Level Crossings on Lalgarh- Phalodi, Sadulpur-Bikaner , Suratgarh-Bikaner, Suratgarh Anupgarh and Suratgarh Bye pass sections of Bikaner division in connection with elimination of level crossing gate
Open tender
22.08.2017 Single Bid 20.09.2017 01 no Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes NWR/S&C/CA/85 dated 31.05.2018
M/s Shree Karni Traders, C-171, Kanta Khaturia Colony, Bikaner -334001 ( Rajasthan)
Rs 2696.94 lakhs
15.07.2019 16.01.2018 60% Work in progress
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
33
4 Tender No. NWR-SC-BKN-16-2017-18 dated 13.12.2017
Construction of 02 lane Road Over Bridge (single span over Railway track – 1 x 36m steel composite girder and three span on viaduct 3x18 m PSC girder ) with RCC substructure & pile foundation in lieu of level crossing no C-105 at km 159.500 near Birdhwal station on Suratgarh-Lalgarh section on approach Road connecting NH-15 to Suratgarh Thermal Power Station on Deposit terms
Open tender
13.12.2017 Single Bid 19.01.2018 09 Nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes 45-NWR/Dy.CE/C/BKN/2018-19 Dated: 06.08.2018
M/S Pawansut Infra Projects Private Limited, 4/12, RHB Colony, Hanumangarh-335512 (Rajasthan)
Rs 850.97 Lakhs
09.04.2019 30.09.2019
13.04.2018 45% Work in progress
5 Tender No. NWR-SC-BKN-17-2017-18 dated 03.01.2018
Construction of 04 nos Road Over Bridge (7x36 m + 2x30 m+ 1x18 m + 1x24 m span over Railway tracks) with RCC deck slab on composite girder super structure / PSC girder with RCC substructure & pile foundation along with Limited Height Subway in lieu of level crossing No. 54-A at km 85/2-3, 76 A at km 115/3-4, 123 at km 189/3-4 on Rewari - Hisar - Bathinda section and level crossing No. C-4-A at km 3/7-8 on Hisar - Sadulpur section of Bikaner division.
Open tender
03.01.2018 Two Bid 09.02.2018 03 Nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes NWR/S&C/CA/86 dated 12.06.2018
M/S Vishnu Prakash R Punglia Ltd., H-1, First Floor, Shivalik Complex, Near Gol Building , Sardarpura, Jodhpur-342003
Rs 4291.59 Lakhs
05.10.2019 30% Work in progress
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
34
6 NWR-SC-BKN-10 (R)-2017-18 dated 11.01.2018
Earth work in bank / cutting including Blanketing materials, toe wall with pitching, buildings for Station Master, Commercial staff, yard master, Loco shed, end loading ramp, connecting roads / pathways and other ancillary works at Birdhwal station and from takeoff point chainage 0.00 to Implant yard in connection with providing Railway Track link to Unit No. 7 & 8 (2 x 660 MW) at Suratgarh Supercritical Thermal Power station
Open tender
11.01.2018 Two Bid 16.02.2018 09 Nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes 44-NWR/Dy.CE/C/BKN/2018-19 Dated: 13.08.2018
M/S JMES JMDE (JV),VPO- Narodara, Tehsil- Laxmangarh, Sikar- 332311 (Rajasthan)
Rs 1690.65 lakhs
16.04.2019 31.12.2019
10.05.2018 60% Work in progress
7 Tender No. NWR-SC-BKN -18-2017-18 dated 03.02.2018
Construction of 09 Nos Road Under Bridge in lieu of existing Level Crossing no 79,84,86,90,93,96,108,109-A and 139 on Rewari- Sadulpur sections of Bikaner division in connection with elimination of level crossing gate
Open tender
03.02.2018 Two Bid 12.03.2018 03 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes NWR/S&C/CA/87 dated 18.09.18
M/S Mohla Construction Co.,476, Sector-15-A Hisar-125001
Rs 2668.75 lakhs
05.01.2020 23.07.2018 35% Work in progress
8 Tender No. NWR/SC/SURP-HMH-SGNR/Civil-412140106 (R-1)/2017-18 dated 03.02.2018
Earthwork in cutting and filling, toe wall, pitching , Construction of Road Under Bridges, S&T Structure at takeoff point, Suratpura station and other ancillary works for Sadulpur Bye Pass line in connection with Suratpura – Hanumangarh- Sri Ganganagar gauge conversion project
Open tender
03.02.2018 Single Bid 12.03.2018 02 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes 48-NWR/Dy.CE/C/BKN/2018-19 Dated: 18.12.2018
M/S Jai Mata Di Energy System, Narodara, Laxmangarh, Sikar- 332311 (Rajasthan)
Rs 991.52 lakhs
01.07.2019 10% Work in progress
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
35
9 Tender No NWR-SC-BKN-01-2018-19 Dated 09.05.2018
Dismantling of existing BG track, laying and linking of Broad Gauge main line , loop lines including points and crossings in yards, spreading of ballast , tamping of track , transportation of p.way materials and other ancillary works from takeoff point chainage 0.00 to implant yard (including Birdhwal station yard) in connection with providing Railway track link to Unit no 7 & 8 ( 2 x 660 MW) at Suratgarh Supercritical Thermal Power station.
Open tender
09.05.2018 Single Bid 14.06.2018 04 Nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes 47-NWR/ Dy CE/C/BKN/2018-19 dated 05.10.2018
M/S Jhawar Sales Corporation, Rani Bazar, Bikaner -334001 (Raj)
Rs 750.91 lakhs
30.07.2019 16.08.2018 16% Work is in progress
10 Tender No. NWR-SC-BKN -03-2018-19 dated 15.05.2018
Construction of 11 Nos Road Under Bridge in lieu of existing Level Crossing no 5,7,15,16,21,23,30,47,71,74 and 77 on Rewari- Hisar sections of Bikaner division in connection with elimination of level crossing gate
Open tender
15.05.2018 Two Bid 21.06.2018 02 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes NWR/S&C/CA/88 dated 25.10.2018
M/S JMES-JDC(JV), VPO-Dahar, Near Tata Mobile Tower, Distt Paipat-132103 , Haryana
Rs 3298.60 lakhs
05.02.2020 25.09.2018 30% Work is in progress
11 Tender No. NWR-SC-BKN -02-2018-19 dated 11.05.2018
Construction of 03 lane Road Over Bridge in Railway portion ( Four span of 36m over railway tracks) with RCC deck slab on composite girder super structure with RCC substructure & pile foundation along with Limited height subway ( 1 x 4.50m x 2.50m for 3 track) in lieu of level crossing no 100 at km 151/8-9 on Hisar – Ghursal Road and level crossing No 112-A at km 170/6-7 on Barwala – Agroha- Adampur- Bhadra Road (SH -10) in Hisar District on Hisar- Bathinda section.
Open tender
11.05.2018 Two Bid 18.06.2018 08 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes 49-NWR/Dy.CE/C/BKN/2018-19 Dated: 01.02.2019
M/S Punia Construction Co., 30, Sector-13, Part-2 Hisar-125001 (Haryana)
Rs 1821.24 lakhs
18.09.2019 01.10.2018 3% Work in progress
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
36
CE/C/HQ-JP
Dy. CE/C/I & II-DO
1 DO/GGC/NL
/18
Construction of Broad
Gauge Formation & Minor
Bridges from Chainage
41000.00 to 45000.00
between Dausa and Lalsot
in connection with Dausa-
Gangapur City New Broad
Gauge line project.
Op
en
te
nd
er
Single packet
system
14
/11
/20
07
Yes NWR/S&C/CA/9
7 dated
03/03/2008
M/s Atlanta-
ARSS (JV)
Bhubneshwa
r (Orissa)
17.95 Crore 30/07/09
extended
upto
30/06/2014
14/03/08 - Work short
closed vide
HQ’s letter
dated
18/06/2014
. Final
measureme
nts under
process
2 DO/GGC/NL
/21
Construction of BG
formation and Minor Bridge
from chanaige 45000 to
60000 bet. Lalsot and
Gangapur City in
connection with DO-GGC
New B G line Project
O
pe
n t
en
de
r
24
/09
/20
07
Single Packet
system
02
/11
/20
07
3 Yes NWR/S&C/CA/9
5 dated
18/02/2008
M/s. ARSS
Infrastructur
e Projects
Limited,
Bhubaneshw
ar
8.41
Crores
20/03/09
Extended
upto
30/06/15
15/03/08 - Contract
has been
short
closed. Final
bill under
process
3 DO/GGC/NL/
30
Construction of single line
13 standard straight
alignment tunnel in soil and
rock including cut and cover
portion between chainage
38/720 to 40/840 including
side drain and other
approaches of tunnel
between Didwana- Lalsot
Railway station in
connection with Dausa-
Gangapurcity new BG line
project. Op
en
te
nd
er
Single packet
system
27
/07
/20
09
12 - - Yes NWR/S&C/CA/1
06 dated
29/12/10
M/s Valecha-
Transtonelstr
oey (J/V)
Mumbai
53.02 Crore 27/09/2012.
Extended
upto
31/12/2015
- - Work
terminated
on
07/07/2015
. Final bill is
under
technical
check..
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
37
4 DO/GGC/NL/
40
Laying and linking of BG
track and transportation of
P.Way material, PSC
sleepers etc between
Dausa- Deedwana section in
connection with Dausa-
Gangapurcity new BG line
project. Op
en
te
nd
er
28
/03
/20
11
Single packet
system
18
/05
/20
11
6 - - Yes
Dy.CE/C/DO/CA/
56 dated
18/10/11
M/s Goel
Brothers Rail
Infra Pvt.
Ltd., Bareilly.
5.66 Crore 01/08/2012.
Extended
upto
31/10/2014
13/09/11 Work short
closed. Final
bill under
process
5 DO/GGC/NL/
10(R&C)R
Construction of broad
gauge formation from
chainage 15000 to 28000 in
connection with Dausa
Gangapurcity new line
project(Risk & cost tender).
Op
en
te
nd
er
Single packet
system
11
/01
/20
13
2
- - Yes Dy.CE/C/DO/CA/
68 dated
16/04/13
M/s MCD
Pvt. Ltd., &
Aastha
Construction
Co.(JV),
Jaipur
3.30 Crore 05/07/13
Extended
upto
15/10/2014
08/04/2013 - Completed.
Final
measureme
nts under
process.
6 DO/GGC/NL/
53
Construction of 3 nos Low
Over Pass at LC No. 4, 26 &
27 on Dausa- Gangapurcity
secton
Op
en
te
nd
er
Two packet
system
06
/09
/13
4 - - Yes NWR/S&C/CA/1
36 dated
03/06/2014
M/s Bharat
Spun Pipe &
Construction
Co., Jaipur
Rs.10.44 Crore 08/04/15
extended
upto
31.03.2019
- - Work in
progress.
7 DO/GGC/NL/
57
Construction of Road Over
Bridge at LC No. 24B on
Dausa- Gangapurcity
section
Op
en
te
nd
er
Two packet
system 0
6/0
9/1
3
4 - - Yes NWR/S&C/CA/1
35 dated
19/05/2014
M/s Bharat
Spun Pipe &
Construction
Co., Jaipur
Rs.13.75 Crore 09/07/15
Extended
upto
30/09/18
Further
extension
under
process
- - Contract
under
process for
closure.
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
38
8 AWR-
BKI/Doubling
/T/2
Earthwork in bank/cutting
including blanketing
material, construction of
major/minor bridges
including drop/curtain
walls, LHS, construction
S&T structures, platform
walls, PF shelters, FOB,
water huts, Staff quarters
etc. supply of stone ballast
and dismantling of existing
BG track, laying and linking
of Broad gauge main line,
loop lines including points
and crossings of various
yards spreading of ballast,
tamping of track
transportation of P. Way
material and other
ancillary works between
Alwar-Bandikui section in
connection with AWR-BKI
Doubling project.
Op
en
Two packet
system
21
/03
/20
16
8 6 2 Yes
NWR/S&C/CA/1
57 dated
05/09/2016
M/s NG
Project Ltd.-
M/s. Deem
Construction
Co. Pvt. Ltd
(JV), Jaipur
Rs.118.24
Crore
17/05/18
Extended
upto
31/07/19.
- 75% Work in
progress.
9 NWR/SC/DO-
GGC/CIVIL/51
4110468
Supplying and stacking
machine crushed stone
ballast in stacks as per
Railway’s specifications
between Dausa &
Gangapurcity stations in
connection with Dausa-
Gangapurcity new line
project
op
en
Two packet
system
31
/08
/16
2 - 2 Yes
Dy.
CE/C/DOCA/81
dated
23/12/2016
M/s J.K.
Construction
Co., Nokha,
Distt Bikaner
Rs.14.33
Crore
06/04/18
Extended
upto
31/12/19
- 80% Work in
progress
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
39
10 NWR/SC/DO-
GGC/CIVIL/51
4111804
Construction of balance
work of single line BG
standard straight
alignment tunnel in soil
and rock including cut
& cover portion, side
drains, protection works
on approaches of tunnel
and other ancillary
works from chainage
38600 to 40900 between
Didwana & Lalsot
Railway stations in
connection with Dausa-
Gangapurcity new BG
line project
Op
en
Two Packet
system
20
/06
/20
16
5 3 2 Yes
NWR/S&C/CA.
165 dated
01/02/17
M/s TCL-
UTM JV,
Gurgoan
Rs.54.46 Crore
22/03/18
Extended
upto
30/06/19
- 50% Work in
progress
11 NWR/SC/LHS/
CIVIL/514300
01001
Construction of kimited
Height sub-way (08
nos) in lieu of level
crossings in Dausa-
Gangapurcity new line
section in connection
with elimination of level
crossings
Op
en
Two Packet
system 0
7/0
9/2
01
6
8 5 3 Yes
Dy. CE/
C/DO/CA/86
dated 10/03/17
M/s JMES-
KDC-JPIS(JV),
Beawar,
Ajmer
Rs.10.00 Crore
04/02/18
extended
upto
31.05.2019
- 95% Work in
progress
12 NWR/SC/Alw
ar-Bandikui
/Civil/514150
803-R
Flash butt welding of
60/ 53kg New/SH
(72/90UTS) Rail joints
by using mobile flash
butt welding plant in
connection with Alwar-
Bandikui and Dausa-
Gangapurcity new line
project.
Op
en
te
nd
er
Two packet
system
28
/10
/20
16
1 1 0 Yes
Dy. CE/
C/DO/CA/85
dated 06/03/17
M/s Railtech
Infraventure
Pvt. Ltd.
Allahabad
Rs.11.15 Crore
15/05/18
extended
upto
30/05/19
- 45% Work in
progress
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
40
13 NWR/SC/DO-
GGC/CIVIL/51
4110869-R
Balance work of laying
& linking of Broad
Gauge main line loop
lines including points &
crossings in yards,
spreading of ballast,
tamping of track
transportation of P-Way
material and other
ancillary works between
Dausa- Gangapurcity
new line project O
pe
n
Single packet
system
23
/11
/20
16
- - - Yes
Dy. CE/
C/DO/CA/84
dated 17/02/17
M/s P.C.
Sharma,
Noida.
Rs.3.93 Crore
05/06/17
Extended
upto
31/10/17
- -
Work
completed.
Final
measureme
nts under
process
14 NWR/SC/DO-
GGC/CIVIL/51
4110170
Balance earthwork and
blanketing work
including side drain,
trolley refuges pitching
diversion road etc. from
chainage 67400 to
92670 between Piplai
village and
Gangapurcity in
connection with Dausa-
Gangapurcity new line
project
Op
en
Two packet
system
17
/04
/20
17
2 1 1 Yes
Dy.
CE/C/DO/CA/89
dated
15/11/2017
M/s. KB-Shiv
Om (JV), New
Delhi.
Rs.13.60
Crore
20/06/18
Extended
upto
20/06/19
- 65% Work in
progress
15 NWR/SC/RE-
JP/Civil/5143
00905
Construction of ROB at
LC No. 69 on RE-JP
section
Op
en
Single packet
system
09
/10
/20
17
- - - Yes
M/s Punia
Construction
Co., Hisar.
Rs.8.34 Crore
22/11/18
Extended
upto
30.06.2019
- 25% Work in
progress.
16 NWR/SC/BKI-
AWR/Civil/51
4301004
Construction of Limited
Height Subway in lieu
of existing level
crossing between
Alwar- Bandikui station
of Jaipur- Rewari
section in connection
with elimination of level
crossings (20 nos)
Op
en
Two packet
system
30
/08
/20
17
4 4 0 Yes
NWR/S&C/CA/1
72 dated
02/02/2018
Sanjeev-
Bharat (JV),
Jaipur
Rs.29.84 Crore
29/04/19
Extended
up to
31/10/19
- 21% Work in
progress
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
41
17 NWR/SC/DO-
GGC/Civil/51
4110873
Laying and linking of
Broad gauge main line,
loop lines including
points and crossings in
yard, spreading of
ballast, tamping of track
transportation of P-ay
materials and other
ancillary works between
Didwana &
Gangapurcity stations
and at Baniyana &
Arnya Kala Salempura
stations in connection
with Dausa-
Gangapurcity new line
project.
Op
en
Two Packet
system
11
/10
/20
17
3 1 2 Yes
Dy. CE /C/
DO/CA/96 dated
10/05/2018
M/s Laxyo
Energy
Limited,
Ratlam
Rs.14.67 Crore
27/03/19.
Further
extended
upto
31.12.19
- 28% Work in
progress
18 NWR/SC/DO-
GGC/Civil/51
4110174
Balance earthwork and
blanketing work
including side drains,
trolley refuges, pitching,
toe wall etc. from
chainage 36000 to
45000 between
Didwana and Lalsot
stations in connection
with Dausa-
Gangapurcity new line
project.
Op
en
Two Packet
system
25
/10
/20
17
5 3 2 Yes
NWR/S&C/CA/1
74 dated
26/03/2018
M/s Varaha
Infra Limited,
Jodhpur
Rs.34.03 Crore
26/03/19.
Further
extended
upto
30/06/19
- 55% Work in
progress
19 NWR/SC/DO-
GGC/Civil/51
4110277
Balance work of minor
bridges, Road Under
Bridge, like PSC slabs,
bed blocks, returns, toe
wall, pitching, drop &
curtain wall, height
gauge, road work etc.
and construction of
Limited Height Subway
between Didwana to
Gangapurcity stations in
connection with Dausa-
Gangapurcity new Line
Project
Op
en
Two Packet
System
27
/10
/20
17
2 1 1 Yes
NWR/S&C/CA/1
73 dated
26/03/2018
M/s. Lall
Construction
Co. Delhi
Rs.46.41 Crore 26/06/19 - 55% Work
progress
STATEMENT SHOWING THE DETAILS OF ONGOING WORKS CONTRACT UNDER CAO/C/JP UNIT FOR THE MONTH OF May, 2019
Sr. No
Tender No.
Item /nature of work Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
(In Crores /Lakhs)
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for
delay if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
42
For CAO/C/JP
20 NWR/SC/DO-
GGC/Civil/51
4110175
Balance earthwork and
blanketing work
including side drains,
trolley refuges, pitching,
toe wall etc. from
chainage 45000 to
67400 between Lalsot
and stations
Op
en
Two Packet
system
27
/10
/20
17
3 1 2 Yes
Dy.
CE/c/DO/CA/94
dated
31/03/2018
M/s
Meenesh
Contractor &
Developers
Pvt. Ltd.,
Jaipur
Rs.10.35 Crore
19/12/18
extended
upto
19/06/19
- 40% Work in
progress.
21 NWR/SC/DO-
GGC/Civil/51
4110676
Miscellaneous works
like construction of
station buildings,
providing FOB,
platform covering,
circulating area, balance
work of platforms etc.
from Lalsot to
Gangapurcity in
connection with Dausa-
Gangapurcity New Line
Project.
Op
en
Two Packet
system
27
/10
/20
17
6 3 3 Yes
Dy. CE /C/
DO/CA/93 dated
24/03/2018
M/s MCDPL-
Sunrise Infra
(JV), Jaipur
Rs.17.95 Crore
19/03/19.
Further
extended
upto
30.06.19
- 50% Work in
progress.
22 Construction of 2 lane
Road Over Bridges at
Level CrossingNo. 28 &
29 and construction
ofRUB at Ch. 44949
Op
en
Two packet
system
NWR/S&C/CA/…
.
M/s SKT-Yash
Enterprises
(JV), Jodhpur
45.01 Crores. 09/07/20 - 10% Work in
progress.