Name of PROJECT Agency Ms Larsen & Toubro Limited Delhi. SL.NO Description of Item UOM Executed Qt . Coefficient Ba Qty. of Cement Ba s 1 RCCM25(M3) cum 321.18 7.200 2312 2 PCCM15(M3) cum 52.84 5.800 306 3 SCREEDM20(M3) cum 46.32 6.480 300 4 Brick Work/M3(1:4) cum 86.50 1.900 164 5 Slurry for Roof water proofing slurry sqm 1000 0.039 39 6 Ancillary Work 410  7 work in ro ress 150 Total cement consumption as per theoretical Bags 3,532  Total cement consumed as per actual Bags 3,740  Total extra cement consumed more than theoretical Bags 58  Balance quantity of cement available Bags 2,420  Total cement received till 31.08.2012 Bags 6,160  Cement wastage in % 1.629% CEMENT CONSUMPTION STATEMENT 8/17/2013 Name of Work “Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maintenance for 10 years of SCADA system at Bhagirathi WTP & Distribution Area.” Agency M/s Larsen & Toubro Ltd R/A Bill No./CEMENT CONSUMPTION STATEMENT-01 SL.NO Descriptionof Item Unit Unit CC/Cum or Sqm Executed Qty. Qty. of Cement Ba s Executed t . Qty. of Cement (Bags) Executed t . Qty. of Cement Executed t . Qty. of Cement Executed t . Qty. of Cement Executed t . Qty. of Cement Executed t . Qty. of Cement Executed t . Qty. of Cement Executed t . Qty. of Cement Executed t . Qty. of Cement Executed t . Qty. of Cement Executed t . Qty. of Cement 1 RCC M25 (M3) cum 360Kg/M3 7.20 321.18 2312.50 571.90 4117.69 596.84 4297.26 724.72 5217.97 858.13 6178.51 1013.45 7296.82 1087.45 7829.62 1163.57 8377.68 1300.45 9363.22 1425 10262.53 1514.99 10907.95 1615.00 11628.02 2 RCCM30(M3) cum 360Kg/M3 7.20 0.00 0.00 0.00 0.00 0.00 0.00 59.30 426.92 241.85 1741.28 350.50 2523.56 433.12 3118.46 458 3298.46 510.73 3677.27 534.00 3844.81 3 PCC M15 (M3) cum 290Kg/cum 5.80 52.84 306.47 57.84 335.47 62.84 364.47 67.84 393.47 107.84 625.47 155.49 901.84 224.92 1304.56 246.95 1432.33 253.57 1470.73 268 1555.76 306.04 1775.04 395.00 2291.01 4 SCREED M20 (M3) cum 324Kg/M3 6.48 46.32 300.12 109.41 709.00 257.61 1669.34 282.59 1831.21 322.59 2090.41 379.83 2461.32 415.12 2690.00 553.25 3585.06 565.25 3662.85 571 3701.73 584.00 3784.35 590.64 3827.37 5 Guniting/M3(1:2:2) cum 600Kg/M3 12.00 0.00 0.00 13.20 158.40 83.20 998.40 93.20 1118.40 138.20 1658.40 154.20 1850.40 161.20 1934.40 190.60 2287.20 190.60 2287.20 191 2287.20 190.60 2287.20 201.60 2419.20 6 Brick Work/M3(1:4) cum 95Kg/M3 1.90 86.50 164.35 161.50 306.85 176.50 335.35 186.50 354.35 236.50 449.35 344.50 654.55 437.50 831.25 457.50 869.25 487.50 926.25 518 983.25 542.50 1030.75 568.00 1079.20 7 Plastering/M2(1:4) sqm 8.51Kg/M2 0.17 4000.00 680.80 4300.00 731.86 4500.00 765.90 5500.00 936.10 6260.00 1065.45 7760.00 1320.75 8460.00 1439.89 10460.00 1780.29 11960 2035.59 13460.00 2290.89 16080.00 2736.82 8 Dholpur Stone/M2 sqm 9.18Kg/M2 0.31 100.00 30.60 110.00 33.66 1110.00 339.66 1730.00 529.38 1870.00 572.22 2270.00 694.62 2770.00 847.62 3270 1000.62 3792.00 1160.35 4242.00 1298.05 9 GRANITEFLOORING(1:4) sqm 12.42Kg/M2 0.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 125.00 31.05 250.00 62.10 10 VITRIFIEDFLOORING(1:4) sqm 12.42Kg/M2 0.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 250.00 62.10 500.00 124.20 11 Tapecrete/M2 sqm 0.65Kg/M2 0.01 400.00 5.20 4900.00 63.70 5900.00 76.70 6100.00 79.30 6100.00 79.30 6100.00 79.30 6100 79.30 6100.00 79.30 6200.00 80.60 12 AncillaryWork 410.00 Slurry for Roof water proofing slurry sqm workinprogress 179.00 71.00 518.00 437.00 520.00 166.00 173.00 524.00 560.00 439.00 521.00 442.00 Total cementconsumptionas per theoretical 3493.44 6308.22 8427.28 9720.16 12341.60 15263.39 18303.38 21288.90 23535.92 25204.44 27086.25 29391.38 Total cementconsumedas per actual 3561.22 6421.77 8582.35 9895.12 12576.09 15553.39 18623.69 21693.39 23968.98 25658.12 27573.80 29941.00 Total cementreceivedtill 31.08.2012 6160.00 8360.00 10640.00 12920.00 14296.00 16636.00 19676.00 23066.00 26106.00 27626.00 27626.00 31426.00 Balancequantityof cementavailable 2419.78 1867.23 1539.65 2587.88 1199.91 916.61 879.31 848.61 1577.02 1528.88 -468.80 1043.00 %of Extrathantheoretical 1.94 1.8 1.84 1.8 1.9 1.9 1.75 0.019 0.0184 0.018 0.018 0.018 Jun'13 Jul'13 Feb'13 Mar'13 Apr'13 Nov'12 Dec'12 Jan'13 Oct'12 May'13 CEMENT RECONCILATION STATEMENT (Up to 31.08.2012) “Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maintenance for 10 years of SCADA system at Bhagirathi WTP & Distribution Area.” Delhi. Aug'12 Sep'12

Upload: rambinodsharma

Post on 02-Jun-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 1/54

Name of

PROJECT

Agency M s Larsen & Toubro Limited Delhi.

SL.NO Description of Item UOMExecuted

Qt .

Coefficient

Ba

Qty. of Cement

Ba s

1 RCC M25 (M3) cum 321.18 7.200 2312

2 PCC M15 (M3) cum 52.84 5.800 306

3 SCREED M20 (M3) cum 46.32 6.480 300

4 Brick Work/M3(1:4) cum 86.50 1.900 164

5 Slurry for Roof water proofing slurry sqm 1000 0.039 39

6 Ancillary Work 410 7 work in ro ress 150

Total cement consumption as per theoretical Bags 3,532 Total cement consumed as per actual Bags 3,740 Total extra cement consumed more than theoretical Bags 58 Balance quantity of cement available Bags 2,420 Total cement received till 31.08.2012 Bags 6,160 Cement wastage in % 1.629%

CEMENT CONSUMPTION STATEMENT 8/17/2013

Name of Work “Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maintenance for 10 years of SCADA sys tem at Bhagirathi WTP & Distribu

Agency M/s Larsen & Toubro Ltd

R/A Bill No./CEMENT CONSUMPTION STATEMENT-01

SL.NO Description of Item Unit Unit CC/Cum or Sqm Executed Qty.Qty. of Cement

Ba s

Executed

t .

1 RCC M25 (M3) cum 360Kg/M3 7.20 321.18 2312.50 571.90

2 RCC M30 (M3) cum 360Kg/M3 7.20 0.00 0.003 PCC M15 (M3) cum 290Kg/cum 5.80 52.84 306.47 57.84

4 SCREED M20 (M3) cum 324Kg/M3 6.48 46.32 300.12 109.41

5 Guniting/M3(1:2:2) cum 600Kg/M3 12.00 0.00 0.00 13.20

6 Brick Work/M3(1:4) cum 95Kg/M3 1.90 86.50 164.35 161.50

7 Plasterin /M2(1 4) sqm 8 51K /M2 0 17 4000 00

CEMENT RECONCILATION STATEMENT

(Up to 31.08.2012)

“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maintenance for 10 years of SCADA system

at Bhagirathi WTP & Distribution Area.” Delhi.

Aug'12

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 2/54

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 3/54

Name of

PROJECT

Agency

SL.NO Descri tion of Item UOM Executed Coefficient t . of Cement

1 RCC M25 (M3) cum 596.84 7.200 4297

2 PCC M15 (M3) cum 62.84 5.800 364

3 SCREED M20 (M3) cum 257.61 6.480 1669

4 Guniting/M3(1:2:2) cum 83.20 12.000 998

5Brick Work/M3(1:4) cum

176.501.900 335

6 Plastering/M2(1:4) cum 4300.00 0.170 732

7 Dholpur Stone/M2 sqm 100.00 0.306 31

8 Slurry for Roof water proofing slurry sqm 1900 0.039 74

9 work in ro ress 425

Total cement consumption as per theoretical Bags 8,501 

Total cement consumed as per actual Bags 9,088 

Total extra cement consumed more than theoretical Bags 162 

Balance quantity of cement available Bags 1,552 

Total cement received till 31.10.2012 Bags 10,640 

Cement wastage in % 1.901%

CEMENT CONSUMPTION STATEMENT8/17/2013

CEMENT RECONCILATION STATEMENT

(Up to 31.10.2012)

“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maintenance for 10 years of SCADA

system at Bhagirathi WTP & Distribution Area.” Delhi.

M/s Larsen & Toubro Limited, Delhi.

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 4/54

Name of

PROJECT

“Design, Construction, Supply, Testing,

Commissionin Trial run O eration and

Agency M s Larsen & Toubro Limited Delhi.

SL.NO Descri tion of Item UOM Executed Coefficient Qt . of Cement

1 RCC M25 (M3) cum 724.72 7.200 5218

2 PCC M15 (M3) cum 67.84 5.800 393

3 SCREED M20 (M3) cum 282.59 6.480 1831

4 Guniting/M3(1:2:2) cum 83.20 12.000 998

5 Brick Work/M3(1:4) cum 186.50 1.900 354

6 Plastering/M2(1:4) cum 4500.00 0.170 766

7 Dholpur Stone/M2 sqm 110.00 0.306 34

8 Tapecrete/M2 sqm 400.00 0.013 5

9 Slurry for Roof water proofing slurry sqm 2200 0.039 86

11 work in ro ress 450

Total cement consumption as per theoretical Bags 9,686 

Total cement consumed as per actual Bags 10,318 

Total extra cement consumed more than theoretical Bags 182 

Balance quantity of cement available Bags 2,602 Total cement received till 30.11.2012 Bags 12,920 

Cement wastage in % 1.879%

CEMENT CONSUMPTION STATEMENT

CEMENT RECONCILATION STATEMENT

(Up to 30.11.2012)

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 5/54

Name ofPROJECT

“Design, Construction, Supply, Testing,

Commissionin Trial run O eration and

Agency M s Larsen & Toubro Limited Delhi.

SL.NO Descri tion of Item UOM Executed Coefficient Qt . of Cement

1 RCC M25 (M3) cum 858.13 7.200 6179

2 PCC M15 (M3) cum 107.84 5.800 625

3 SCREED M20 (M3) cum 322.59 6.480 2090

4 Guniting/M3(1:2:2) cum 120.00 12.000 1440

5 Brick Work/M3(1:4) cum 236.50 1.900 449

6 Plastering/M2(1:4) cum 5500.00 0.170 936

7 Dholpur Stone/M2 sqm 1110.00 0.306 340

8 Tapecrete/M2 sqm 4900.00 0.013 64

9 Slurry for Roof water proofing slurry sqm 2600 0.039 101

11 work in ro ress 520

Total cement consumption as per theoretical Bags 12,225 

Total cement consumed as per actual Bags 12,958 

Total extra cement consumed more than theoretical Bags 213 

Balance quantity of cement available Bags 1,338 Total cement received till 31.12.2012 Bags 14,296 

Cement wastage in % 1.746%

CEMENT CONSUMPTION STATEMENT

CEMENT RECONCILATION STATEMENT

(Up to 31.12.2012)

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 6/54

Name of “Design, Construction, Supply, Testing,

A enc M s Larsen & Toubro Limited Delhi.

SL.NO Description of Item UOMExecuted Coefficient Qty. of Cement

RCC M25 (M3) cum 7.200 7297

RCC M30 (M3) cum 7.200 427

3 PCC M15 (M3) cum 155.49 5.800 9024 SCREED M20 (M3) cum 379.83 6.480 2461

5 Guniting/M3(1:2:2) cum 120.00 12.000 1440

6 Brick Work/M3(1:4) cum 344.50 1.900 655

7 Plastering/M2(1:4) sqm 6260.00 0.170 1065

Dholpur Stone/M2 sqm 0.306 529

Tapecrete sqm 0.013 77

10 Slurry for Roof water proofing slurry sqm 3200.00 0.039 125

11 work in ro ress 250

Total cement consumption as per theoretical Bags 14,978 

Total cement consumed as per actual Bags 15,504 Total extra cement consumed more than theoretical Bags 276 

Balance quantity of cement available Bags 1,132 

Total cement received till 31.01.2013 Bags 16,636 

Cement wastage in % 1 844%

CEMENT RECONCILATION STATEMENT

(Up to 31.01.2013)

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 7/54

Name of

PROJECT

A enc

1 RCC M25 (M3) cum 1087.45 7.200 7830

2 RCC M30 (M3) cum 241.85 7.200 1741

3 PCC M15 (M3) cum 224.92 5.800 1305

4 SCREED M20 (M3) cum 415.12 6.480 2690Guniting/M3(1:2:2) cum 12.000 1440

Brick Work/M3(1:4) cum 1.900 831

Plastering/M2(1:4) sqm 0.170 1321

8 Dholpur Stone/M2 sqm 1870.00 0.306 572

9 Tapecrete sqm 6100.00 0.013 79

10 Slurry for Roof water proofing slurry sqm 4000.00 0.039 156

11 work in ro ress 300

Total cement consumption as per theoretical Bags 17,965 

Total cement consumed as per actual Bags 18,564 

Total extra cement consumed more than theoretical Bags 299 

Balance quantity of cement available Bags 1,112 

Total cement received till 28.02.2013 Bags 19,676 

Cement wastage in % 1.664%

CEMENT RECONCILATION STATEMENT

(Up to 28.02.2013)“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maintenance for 10 years of SCADA system

at Bhagirathi WTP & Distribution Area.” Delhi.

M/s Larsen & Toubro Limited, Delhi.

SL.NO Description of Item UOMExecuted

Qty.

Coefficient

(Bag)

Qty. of Cement

(Bags)

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 8/54

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 9/54

Name of

PROJECT

A enc

1 RCC M25 (M3) cum 1300.45 7.200 9363

2 RCC M30 (M3) cum 433.12 7.200 3118

3 PCC M15 (M3) cum 253.57 5.800 1471

SCREED M20 (M3) cum 6.480 3663Guniting/M3(1:2:2) cum 12.000 1800

6 Brick Work/M3(1:4) cum 487.50 1.900 926

7 Plastering/M2(1:4) sqm 10460.00 0.170 1780

8 Dholpur Stone/M2 sqm 2770.00 0.306 848

9 Tapecrete sqm 6100.00 0.013 79

10 Slurry for Roof water proofing slurry sqm 5200.00 0.039 203

work in ro ress 500

Total cement consumption as per theoretical Bags 23,252 

Total cement consumed as per actual Bags 24,184 

Total extra cement consumed more than theoretical Bags 432 Balance quantity of cement available Bags 1,922 

Total cement received till 30.04.2013 Bags 26,106 

Cement wastage in % 1.860%

CEMENT RECONCILATION STATEMENT

(Up to 30.04.2013)“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maintenance for 10 years of SCADA system at

Bhagirathi WTP & Distribution Area.” Delhi.

M/s Larsen & Toubro Limited, Delhi.

SL.NO Description of Item UOMExecuted

Qty.

Coefficient

(Bag)

Qty. of Cement

(Bags)

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 10/54

Name of

PROJECT

A enc

1 RCC M25 (M3) cum 1425.35 7.200 10263

2 RCC M30 (M3) cum 458.12 7.200 3298

3 PCC M15 (M3) cum 268.23 5.800 1556

SCREED M20 (M3) cum 6.480 3702Guniting/M3(1:2:2) cum 12.000 1860

6 Brick Work/M3(1:4) cum 517.50 1.900 983

7 Plastering/M2(1:4) sqm 11960.00 0.170 2036

8 Dholpur Stone/M2 sqm 3270.00 0.306 1001

9 Tapecrete sqm 6100.00 0.013 79

10 Slurry for Roof water proofing slurry sqm 5500.00 0.039 215

work in ro ress 325

Total cement consumption as per theoretical Bags 24,992 

Total cement consumed as per actual Bags 25,690 

Total extra cement consumed more than theoretical Bags 373 Balance quantity of cement available Bags 1,936 

Total cement received till 31.05.2013 Bags 27,626 

Cement wastage in % 1.494%

CEMENT RECONCILATION STATEMENT

(Up to 31.05.2013)“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maintenance for 10 years of SCADA system at

Bhagirathi WTP & Distribut ion Area.” Delhi.

M/s Larsen & Toubro Limited, Delhi.

SL.NO Description of Item UOMExecuted

Qty.

Coefficient

(Bag)

Qty. of Cement

(Bags)

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 11/54

Name of

Agency

RCC M25 (M3) cum 7.200 10908

2 RCC M30 (M3) cum 510.73 7.200 3677

3 PCC M15 (M3) cum 306.04 5.800 1775

SCREED M20 (M3) cum 6.480 37845 Guniting/M3(1:2:2) cum 160.00 12.000 1920

6 Brick Work/M3(1:4) cum 542.50 1.900 1031

7 Plastering/M2(1:4) sqm 13460.00 0.170 2291

Dholpur Stone/M2 sqm 0.306 1160

9 GRANITE FLOORING(1:4) sqm 125.00 0.248 31

10 VITRIFIED FLOORING(1:4) sqm 250.00 0.248 62

Tapecrete sqm 0.013 79

12 Slurry for Roof water proofing slurry sqm 6300.00 0.039 246

13 work in ro ress 200

Total cement consumption as per theoretical Bags 26,965 Total cement consumed as per actual Bags 27,622 

Total extra cement consumed more than theoretical Bags 457 

Balance quantity of cement available Bags 4 

Total cement received till 30.06.2013 Bags 27,626 

CEMENT RECONCILATION STATEMENT

(Up to 30.06.2013)“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maintenance for 10 years of SCADA system at B

WTP & Distribution Area.” Delhi.

M/s Larsen & Toubro Limited, Delhi.

SL.NO Description of Item UOMExecuted

Qty.

Coefficient

(Bag)

Qty. of Cement

(Bags)

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 12/54

Name of

Agency

RCC M25 (M3) cum 7.200 11628

RCC M30 (M3) cum 7.200 3845

PCC M15 (M3) cum 5.800 2291

4 SCREED M20 (M3) cum 585.00 6.480 3791

5 Guniting/M3(1:2:2) cum 172.60 12.000 2071

6 Brick Work/M3(1:4) cum 558.00 1.900 1060

7 Plastering/M2(1:4) sqm 16080.00 0.170 2737

8 Dholpur Stone/M2 sqm 4242.60 0.306 1298

9 GRANITE FLOORING(1:4) sqm 250.00 0.248 62

10 VITRIFIED FLOORING(1:4) sqm 500.00 0.248 124

11 Tapecrete sqm 6200.00 0.013 81

Slurry for Roof water proofing slurry sqm 0.039 265

  86

Total cement consumption as per theoretical Bags 29,253 

Total cement consumed as per actual Bags 29,854 Total extra cement consumed more than theoretical Bags 515 

Balance quantity of cement available Bags 1,572 

Total cement received till 31.07.2013 Bags 31,426 

Cement wastage in % 1.761%

CEMENT CONSUMPTION STATEMENT8/17/2013

Name of Work “Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maintenance for 10 years of SCADA system at Bhagirathi WT

Agency M/s Larsen & Toubro Ltd

R/A Bill No./CEMENT CONSUMPTION STATEMENT-01

Q f

 

(Up to 31.07.2013)

“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maintenance for 10 years of SCADA syst

Bhagirathi WTP & Distribution Area.” Delhi.M/s Larsen & Toubro Limited, Delhi.

SL.NO Description of Item UOM Executed Qty. Coefficient (Bag)Qty. of Cement

(Bags)

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 13/54

Name of

PROJECTAgency

1 RCC M25 (M3) cum 1615.00

2 RCC M30 (M3) cum 534.003 PCC M15 (M3) cum 395.00

4 SCREED M20 (M3) cum 585.00

5 Guniting/M3(1:2:2) cum 172.60

6 Brick Work/M3(1:4) cum 558.00

7 Plastering/M2(1:4) sqm 16080.00

8 Slurry for Roof water proofing slurry sqm 12616.00

9 Pre Cast slab cum 22.50

10 Dholpur Stone/M2 sqm 4242.60

11 GRANITE FLOORING(1:4) sqm 250.00

12 VITRIFIED FLOORING(1:4) sqm 500.00

13 Tapecrete sqm 6200.00

14 WIP to be measured

Total cement consumption as per theoretical Bags

Total cement consumed as per actual Bags

Cement consumed for ancilary work 31.07.2013 BagsTotal Cement consumed as on 31.07.2013 Bags

Balance quantity of cement available Bags

Total cement received till 31.07.2013 Bags

CEMENT RECONCILATION STATEMENT

(Up to 31.07.2013)

“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Mai

system at Bhagirathi WTP & Distribution Area.” Delhi.M/s Larsen & Toubro Limited, Delhi.

SL.NO Description of Item UOM Executed Qty.

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 14/54

3 PCC M15 (M3) cum 306

4 SCREED M20 (M3) cum 584

5 Guniting/M3(1:2:2) cum 160

6 Brick Work/M3(1:4) cum 543

7 Plastering/M2(1:4) sqm 13460

8 Slurry for Roof water proofing slurry sqm 11000.00

9 Pre Cast slab cum

10 Dholpur Stone/M2 sqm 3792.00

11 GRANITE FLOORING(1:4) sqm

12 VITRIFIED FLOORING(1:4) sqm

13 Tapecrete sqm 6100.00

14 WIP to be measuredTotal cement consumption as per theoretical Bags

Total cement consumed as per actual Bags

Cement consumed for ancilary work 30.06.2013 Bags

Total Cement consumed as on 30.06.2013 Bags

Balance quantity of cement available Bags

Total cement received till 30.06.2013 Bags

Bags

Cement wastage in %

Name of

PROJECT

Cement wastage in bags

CEMENT RECONCILATION STATEMENT

(Up to 31.05.2013)“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Mai

system at Bhagirathi WTP & Distribution Area.” Delhi.

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 15/54

12 VITRIFIED FLOORING(1:4) sqm

13 Tapecrete sqm 6100.00

14 WIP to be measured

Total cement consumption as per theoretical Bags

Total cement consumed as per actual Bags

Cement consumed for ancilary work 31.05.2013 Bags

Total Cement consumed as on 31.05.2013 Bags

Balance quantity of cement available Bags

Total cement received till 31.05.2013 Bags

Bags

Cement wastage in %

Name of

PROJECT

Agency

1 RCC M25 (M3) cum 1300

2 RCC M30 (M3) cum 433

3 PCC M15 (M3) cum 254

SL.NO Description of Item UOM Executed Qty.

Cement wastage in bags

CEMENT RECONCILATION STATEMENT

(Up to 30.04.2013)

“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Mai

system at Bhagirathi WTP & Distribution Area.” Delhi.

M/s Larsen & Toubro Limited, Delhi.

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 16/54

Bags

Cement wastage in %

Name ofPROJECT

Agency

1 RCC M25 (M3) cum 1164

2 RCC M30 (M3) cum 350

3 PCC M15 (M3) cum 247

4 SCREED M20 (M3) cum 553

5 Guniting/M3(1:2:2) cum 148

6 Brick Work/M3(1:4) cum 458

7 Plastering/M2(1:4) sqm 84608 Slurry for Roof water proofing slurry sqm 5000.00

9 Pre Cast slab cum

10 Dholpur Stone/M2 sqm 2270.00

Cement wastage in bags

CEMENT RECONCILATION STATEMENT

(Up to 31.07.2013)

“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maisystem at Bhagirathi WTP & Distribution Area.” Delhi.

M/s Larsen & Toubro Limited, Delhi.

SL.NO Description of Item UOM Executed Qty.

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 17/54

Name of

PROJECT

Agency

1 RCC M25 (M3) cum 10872 RCC M30 (M3) cum 242

3 PCC M15 (M3) cum 225

4 SCREED M20 (M3) cum 415

5 Guniting/M3(1:2:2) cum 120

6 Brick Work/M3(1:4) cum 438

7 Plastering/M2(1:4) sqm 7760

8 Slurry for Roof water proofing slurry sqm 4000.00

9 Pre Cast slab cum

10 Dholpur Stone/M2 sqm 1870.00

11 GRANITE FLOORING(1:4) sqm

12 VITRIFIED FLOORING(1:4) sqm

13 Tapecrete sqm 6100.00

14 WIP to be measured

Total cement consumption as per theoretical Bags

Total cement consumed as per actual BagsCement consumed for ancilary work 28.02.2013 Bags

Total Cement consumed as on 28.02.2013 Bags

Balance quantity of cement available Bags

SL.NO Description of Item UOM Executed Qty.

CEMENT RECONCILATION STATEMENT

(Up to 28.02.2013)

“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Mai

system at Bhagirathi WTP & Distribution Area.” Delhi.

M/s Larsen & Toubro Limited, Delhi.

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 18/54

1 RCC M25 (M3) cum 1013.00

2 RCC M30 (M3) cum 59.00

3 PCC M15 (M3) cum 155.00

4 SCREED M20 (M3) cum 380.00

5 Guniting/M3(1:2:2) cum 120.00

6 Brick Work/M3(1:4) cum 345.00

7 Plastering/M2(1:4) sqm 6260.00

8 Slurry for Roof water proofing slurry sqm 3200.00

9 Pre Cast slab cum

10 Dholpur Stone/M2 sqm 1730.0011 GRANITE FLOORING(1:4) sqm

12 VITRIFIED FLOORING(1:4) sqm

13 Tapecrete sqm 5900.00

14 WIP to be measured

Total cement consumption as per theoretical Bags

Total cement consumed as per actual Bags

Cement consumed for ancilary work 31.01.2013 Bags

Total Cement consumed as on 31.01.2013 BagsBalance quantity of cement available Bags

Total cement received till 31.01.2013 Bags

Bags

Cement wastage in %

Cement wastage in bags

CEMENT RECONCILATION STATEMENT

SL.NO Description of Item UOM Executed Qty.

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 19/54

8 Slurry for Roof water proofing slurry sqm 2600.00

9 Pre Cast slab cum

10 Dholpur Stone/M2 sqm 1110.00

11 GRANITE FLOORING(1:4) sqm

12 VITRIFIED FLOORING(1:4) sqm

13 Tapecrete sqm 4900.00

14 WIP to be measured

Total cement consumption as per theoretical Bags

Total cement consumed as per actual Bags

Cement consumed for ancilary work 31.12.2012 Bags

Total Cement consumed as on 31.12.2012 Bags

Balance quantity of cement available BagsTotal cement received till 31.12.2012 Bags

Bags

Cement wastage in %

Name of

PROJECT

Agency

Cement wastage in bags

CEMENT RECONCILATION STATEMENT

(Up to 30.11.2012)

“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Mai

system at Bhagirathi WTP & Distribution Area.” Delhi.

M/s Larsen & Toubro Limited, Delhi.

SL NO Description of Item UOM Executed Qty

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 20/54

Cement consumed for ancilary work 30.11.2012 Bags

Total Cement consumed as on 30.11.2012 Bags

Balance quantity of cement available Bags

Total cement received till 30.11.2012 Bags

Bags

Cement wastage in %

Name of

PROJECT

Agency

1 RCC M25 (M3) cum 597

2 RCC M30 (M3) cum

3 PCC M15 (M3) cum 63

4 SCREED M20 (M3) cum 258

5 Guniting/M3(1:2:2) cum 836 Brick Work/M3(1:4) cum 177

7 Plastering/M2(1:4) sqm 4300

8 Slurry for Roof water proofing slurry sqm 1900.00

M/s Larsen & Toubro Limited, Delhi.

SL.NO Description of Item UOM Executed Qty.

CEMENT RECONCILATION STATEMENT(Up to 31.10.2012)

“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Mai

system at Bhagirathi WTP & Distribution Area.” Delhi.

Cement wastage in bags

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 21/54

Name of

PROJECT

Agency

1 RCC M25 (M3) cum 572

2 RCC M30 (M3) cum

3 PCC M15 (M3) cum 58

4 SCREED M20 (M3) cum 109

5 Guniting/M3(1:2:2) cum 13

6 Brick Work/M3(1:4) cum 162

7 Plastering/M2(1:4) sqm 4000

8 Slurry for Roof water proofing slurry sqm 1500

9 Pre Cast slab cum 22.50

10 Dholpur Stone/M2 sqm 4242.60

11 GRANITE FLOORING(1:4) sqm 250.00

12 VITRIFIED FLOORING(1:4) sqm 500.00

13 Tapecrete sqm 6200.00

14 WIP to be measured

Total cement consumption as per theoretical Bags

Total cement consumed as per actual Bags

Cement consumed for ancilary work 30.09.2012 Bags

CEMENT RECONCILATION STATEMENT

(Up to 30.09.2012)

“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Mai

system at Bhagirathi WTP & Distribution Area.” Delhi.

M/s Larsen & Toubro Limited, Delhi.

SL.NO Description of Item UOM Executed Qty.

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 22/54

1 RCC M25 (M3) cum 321

2 RCC M30 (M3) cum

3 PCC M15 (M3) cum 53

4 SCREED M20 (M3) cum 46

5 Guniting/M3(1:2:2) cum

6 Brick Work/M3(1:4) cum 87

7 Plastering/M2(1:4) sqm

8 Slurry for Roof water proofing slurry sqm 1000

9 Pre Cast slab cum

10 Dholpur Stone/M2 sqm11 GRANITE FLOORING(1:4) sqm

12 VITRIFIED FLOORING(1:4) sqm

13 Tapecrete sqm

14 WIP to be measured

Total cement consumption as per theoretical Bags

Total cement consumed as per actual Bags

Cement consumed for ancilary work 31.08.2012 Bags

Total Cement consumed as on 31.08.2012 BagsBalance quantity of cement available Bags

Total cement received till 31.08.2012 Bags

Bags

Cement wastage in %

Cement wastage in bags

SL.NO Description of Item UOM Executed Qty.

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 23/54

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 24/54

5.800 1775 4

6.480 3784 5

12.000 1920 6

1.900 1031 7

0.170 2291 8

0.039 429 9

8.100 0 10

0.306 1160 11

0.248 0 12

0.248 0 13

0.013 79 Total cem

390 Total cem27055 Total extr

29854 Balance q

31426 Total cem

61670 Cement

34,136 

2799

4.539%

Name of

Project

  ntenance for 10 years of SCADA

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 25/54

0.248 0 Total extr

0.013 79 Balance q

390 Total cem

25128 Cement

29854

31426

61670

1,936 

34,136 

4726

7.663%

Name of

Project

Agency

SL.NO

1

2

7.200 9363 3

7.200 3118 4

5.800 1471 5

Coefficient (Bag)Qty. of Cement

(Bags)

  ntenance for 10 years of SCADA

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 26/54

6513

10.561%

Name ofProject

Agency

SL.NO

1

27.200 8378 3

7.200 2524 4

5.800 1432 5

6.480 3585 6

12.000 1776 7

1.900 869 8

0.170 1440 9

0.039 195 10

8.100 0 11

0.306 695 Total cem

 

Qty. of Cement

(Bags)

  ntenance for 10 years of SCADA

Coefficient (Bag)

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 27/54

Name of

Project

Agency

SL.NO

1

2

7.200 7830 37.200 1741 4

5.800 1305 5

6.480 2690 6

12.000 1440 7

1.900 831 8

0.170 1321 9

0.039 156 10

8.100 0 110.306 572 Total cem

0.248 0 Total cem

0.248 0 Total extr

0.013 79 Balance q

390 Total cem

17965 Cement

29854

31426

61670

1,112 

Coefficient (Bag)Qty. of Cement

(Bags)

  ntenance for 10 years of SCADA

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 28/54

1

2

7.200 7294 3

7.200 425 4

5.800 899 5

6.480 2462 6

12.000 1440 7

1.900 656 8

0.170 1065 9

0.039 125 10

8.100 0 11

0.306 529 Total cem

0.248 0 Total cem

0.248 0 Total extr

0.013 77 Balance q

390 Total cem

14972 Cement

29854

31426

616701,132 

34,136 

14882

24.132%

 

Qty. of Cement

(Bags)Coefficient (Bag)

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 29/54

0.039 101 10

8.100 0 Total cem

0.306 340 Total cem

0.248 0 Total extr

0.248 0 Balance q

0.013 64 Total cem

390 Cement

12228

29854

31426

61670

1,338 

34,136 

17626

28.581%

Name of

Project

Agency

SL.NO

1

 

Qty. of Cement

  ntenance for 10 years of SCADA

Coefficient (Bag)

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 30/54

31426

61670

2,602 

34,136 

20164

32.696%

Name of

Project

Agency

SL.NO

1

2

7.200 4297 3

7.200 0 4

5.800 364 5

6.480 1669 6

12.000 998 7

1.900 335 8

0.170 732 9

0.039 74 Total cem

 

Coefficient (Bag)Qty. of Cement

(Bags)

  ntenance for 10 years of SCADA

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 31/54

Name of

Project

Agency

SL.NO

12

7.200 4118 3

7.200 0 4

5.800 335 5

6.480 709 6

12.000 158 7

1.900 307 8

0.170 681 Total cem0.039 59 Total cem

8.100 182 Total extr

0.306 1298 Balance q

0.248 62 Total cem

0.248 124 Cement

0.013 81

390

8114

29854

31426

ntenance for 10 years of SCADA

Coefficient (Bag) Qty. of Cement(Bags)

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 32/54

1

2

7.200 2312 3

5.800 0 4

5.800 306 56.480 300 6

12.000 0 7

1.900 164 Total cem

0.170 0 Total cem

0.039 39 Total extr

8.100 0 Balance q

0.306 0 Total cem

0.248 0 Cement

0.248 0

0.013 0

390

3122

29854

31426

616702,420 

34,136 

26732

43.346%

Coefficient (Bag)Qty. of Cement

(Bags)

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 33/54

M/s Larsen & Toubro Limited, Delhi.

Description of Item UOMExecuted

Qty.

Coefficie

nt (Bag)

Qty. of

Cement

(Bags)

RCC M25 (M3) cum 1615 7.200 11628

RCC M30 (M3) cum 534 7.200 3845

PCC M15 (M3) cum 395 5.800 2291

SCREED M20 (M3) cum 585 6.480 3791Guniting/M3(1:2:2) cum 173 12.000 2071

Brick Work/M3(1:4) cum 558 1.900 1060

Plastering/M2(1:4) sqm 16080 0.170 2737

Dholpur Stone/M2 sqm 4243 0.306 1298

GRANITE FLOORING(1:4) sqm 250 0.248 62

VITRIFIED FLOORING(1:4) sqm 500 0.248 124

Tapecrete sqm 6200 0.013 81

Slurry for Roof water proofing slurry sqm 12616 0.039 492work in progress 86

  nt consumption as per theoretical Bags 29480

  nt consumed as per actual Bags 29854

  cement consumed more than theoretical Bags 288

  antity of cement available Bags 1,572 

nt received till 31.07.2013 Bags 31,426 

astage in % 0.978%

CEMENT RECONCILIATION STATEMENT

(Up to 31.07.2013)

“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and

Maintenance for 10 years of SCADA system at Bhagirathi WTP & Distribution Area.”

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 34/54

SCREED M20 (M3) cum 584 6.480 3784

Guniting/M3(1:2:2) cum 160 12.000 1920

Brick Work/M3(1:4) cum 543 1.900 1031

Plastering/M2(1:4) sqm 13460 0.170 2291

Dholpur Stone/M2 sqm 3792 0.306 1160GRANITE FLOORING(1:4) sqm 125 0.248 31

VITRIFIED FLOORING(1:4) sqm 250 0.248 62

Tapecrete sqm 6100 0.013 79

Slurry for Roof water proofing slurry sqm 11000 0.039 429

work in progress 200

  nt consumption as per theoretical Bags 27148

  nt consumed as per actual Bags 27622

  cement consumed more than theoretical Bags 274

  antity of cement available Bags 4 

nt received till 30.06.2013 Bags 27,626 

astage in % 1.010%

CEMENT RECONCILIATION STATEMENT

(Up to 31.05.2013)

“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and

Maintenance for 10 years of SCADA system at Bhagirathi WTP & Distribution Area.”

Delhi.

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 35/54

  cement consumed more than theoretical Bags 237

  antity of cement available Bags 1,936 

nt received till 31.05.2013 Bags 27,626 

astage in % 0.942%

M/s Larsen & Toubro Limited, Delhi.

Description of Item UOMExecuted

Qty.

Coefficie

nt (Bag)

Qty. of

Cement

(Bags)

RCC M25 (M3) cum 1300 7.200 9363

RCC M30 (M3) cum 433 7.200 3118

PCC M15 (M3) cum 254 5.800 1471

SCREED M20 (M3) cum 565 6.480 3663

Guniting/M3(1:2:2) cum 150 12.000 1800

CEMENT RECONCILIATION STATEMENT

(Up to 30.04.2013)

“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and

Maintenance for 10 years of SCADA system at Bhagirathi WTP & Distribution Area.”Delhi.

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 36/54

M/s Larsen & Toubro Limited, Delhi.

Description of Item UOMExecuted

Qty.

Coefficie

nt (Bag)

Qty. of

Cement

(Bags)

RCC M25 (M3) cum 1164 7.200 8378

RCC M30 (M3) cum 350 7.200 2524PCC M15 (M3) cum 247 5.800 1432

SCREED M20 (M3) cum 553 6.480 3585

Guniting/M3(1:2:2) cum 148 12.000 1776

Brick Work/M3(1:4) cum 458 1.900 869

Plastering/M2(1:4) sqm 8460 0.170 1440

Dholpur Stone/M2 sqm 2270 0.306 695

Tapecrete sqm 6100 0.013 79

Slurry for Roof water proofing slurry sqm 5000 0.039 195

work in progress 550

  nt consumption as per theoretical Bags 20973

(Up to 31.03.2013)

“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation andMaintenance for 10 years of SCADA system at Bhagirathi WTP & Distribution Area.”

Delhi.

CEMENT RECONCILIATION STATEMENT

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 37/54

M/s Larsen & Toubro Limited, Delhi.

Description of Item UOMExecuted

Qty.

Coefficie

nt (Bag)

Qty. of

Cement

(Bags)

RCC M25 (M3) cum 1087 7.200 7830

RCC M30 (M3) cum 242 7.200 1741

PCC M15 (M3) cum 225 5.800 1305

SCREED M20 (M3) cum 415 6.480 2690

Guniting/M3(1:2:2) cum 120 12.000 1440

Brick Work/M3(1:4) cum 438 1.900 831

Plastering/M2(1:4) sqm 7760 0.170 1321

Dholpur Stone/M2 sqm 1870 0.306 572

Tapecrete sqm 6100 0.013 79

Slurry for Roof water proofing slurry sqm 4000 0.039 156

work in progress 300  nt consumption as per theoretical Bags 17965

  nt consumed as per actual Bags 18564

  cement consumed more than theoretical Bags 299

  antity of cement available Bags 1,112 

nt received till 28.02.2013 Bags 19,676 

astage in % 1.664%

CEMENT RECONCILIATION STATEMENT

(Up to 28.02.2013)

“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and

Maintenance for 10 years of SCADA system at Bhagirathi WTP & Distribution Area.”

Delhi.

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 38/54

RCC M25 (M3) cum 1013 7.200 7297

RCC M30 (M3) cum 59 7.200 427

PCC M15 (M3) cum 155 5.800 902

SCREED M20 (M3) cum 380 6.480 2461

Guniting/M3(1:2:2) cum 120 12.000 1440Brick Work/M3(1:4) cum 345 1.900 655

Plastering/M2(1:4) sqm 6260 0.170 1065

Dholpur Stone/M2 sqm 1730 0.306 529

Tapecrete sqm 5900 0.013 77

Slurry for Roof water proofing slurry sqm 3200 0.039 125

work in progress 250

  nt consumption as per theoretical Bags 14978

  nt consumed as per actual Bags 15504

  cement consumed more than theoretical Bags 276

  antity of cement available Bags 1132

  nt received till 31.01.2013 Bags 16636

  astage in % 1.844%

CEMENT RECONCILIATION STATEMENT

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 39/54

work in progress 520

  nt consumption as per theoretical Bags 12225

  nt consumed as per actual Bags 12958

  cement consumed more than theoretical Bags 213

  antity of cement available Bags 1338  nt received till 31.12.2012 Bags 14296

  astage in % 1.746%

M/s Larsen & Toubro Limited, Delhi.

Description of Item UOM ExecutedQty.

Coefficient (Bag)

Qty. of

Cement

(Bags)

RCC M25 (M3) cum 725 7.200 5218

CEMENT RECONCILIATION STATEMENT

(Up to 30.11.2012)

“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and

Maintenance for 10 years of SCADA system at Bhagirathi WTP & Distribution Area.”

Delhi.

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 40/54

M/s Larsen & Toubro Limited, Delhi.

Description of Item UOMExecuted

Qty.

Coefficie

nt (Bag)

Qty. of

Cement

(Bags)RCC M25 (M3) cum 597 7.200 4297

PCC M15 (M3) cum 63 5.800 364

SCREED M20 (M3) cum 258 6.480 1669

Guniting/M3(1:2:2) cum 83 12.000 998

Brick Work/M3(1:4) cum 177 1.900 335

Plastering/M2(1:4) cum 4300 0.170 732

Dholpur Stone/M2 sqm 100 0.306 31

Slurry for Roof water proofing slurry sqm 1900 0.039 74

work in progress 425

  nt consumption as per theoretical Bags 8501

CEMENT RECONCILIATION STATEMENT(Up to 31.10.2012)

“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and

Maintenance for 10 years of SCADA system at Bhagirathi WTP & Distribution Area.”

Delhi.

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 41/54

M/s Larsen & Toubro Limited, Delhi.

Description of Item UOMExecuted

Qty.

Coefficie

nt (Bag)

Qty. of

Cement

(Bags)

RCC M25 (M3) cum 572 7.200 4118

PCC M15 (M3) cum 58 5.800 335

SCREED M20 (M3) cum 109 6.480 709

Guniting/M3(1:2:2) cum 13 12.000 158

Brick Work/M3(1:4) cum 162 1.900 307

Plastering/M2(1:4) cum 4000 0.170 681

Slurry for Roof water proofing slurry sqm 1500 0.039 59

work in progress 25

  nt consumption as per theoretical Bags 6367  nt consumed as per actual Bags 6493

  cement consumed more than theoretical Bags 101

  antity of cement available Bags 1867

  nt received till 30.09.2012 Bags 8360

  astage in % 1.591%

“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and

Maintenance for 10 years of SCADA system at Bhagirathi WTP & Distribution Area.”

Delhi.

CEMENT RECONCILIATION STATEMENT

(Up to 30.09.2012)

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 42/54

RCC M25 (M3) cum 321 7.200 2312

PCC M15 (M3) cum 53 5.800 306

SCREED M20 (M3) cum 46 6.480 300

Brick Work/M3(1:4) cum 87 1.900 164

Slurry for Roof water proofing slurry sqm 1000 0.039 39Ancillary Work 410

work in progress 150

  nt consumption as per theoretical Bags 3532

  nt consumed as per actual Bags 3740

  cement consumed more than theoretical Bags 58

  antity of cement available Bags 2420

  nt received till 31.08.2012 Bags 6160

  astage in % 1.629%

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 43/54

Name of

Project

Agency M/s Larsen & Toubro Limited, Delhi.

SL.NO Description of Item UOMExecuted

Qty.

Coefficient

(Bag)

Qty. of Cement

(Bags)

1 RCC M25 (M3) cum 321 7.200 2312

2 PCC M15 (M3) cum 53 5.800 306

3 SCREED M20 (M3) cum 46 6.480 300

4 Brick Work/M3(1:4) cum 87 1.900 164

5 Slurry for Roof water proofing slurry sqm 1000 0.039 39

6 Ancillary Work 410

7 work in progress 150Total cement consumption as per theoretical Bags 3532

Total cement consumed as per actual Bags 3740

Total extra cement consumed more than theoretical Bags 58

Balance quantity of cement available Bags 2420

Total cement received till 31.08.2012 Bags 6160

Cement wastage in % 1.629%

Authorised signatory

Larsen & Toubro Ltd

CEMENT RECONCILIATION STATEMENT

(Up to 31.08.2012)

“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maintenance for 10 years

of SCADA system at Bhagirathi WTP & Distribution Area.” Delhi.

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 44/54

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 45/54

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 46/54

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 47/54

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 48/54

Name of

Project

Agency M/s Larsen & Toubro Limited, Delhi.

SL.NO Description of Item UOMExecuted

Qty.

Coefficient

(Bag)

Qty. of Cement

(Bags)

1 RCC M25 (M3) cum 1013 7.200 7297

2 RCC M30 (M3) cum 59 7.200 427

3 PCC M15 (M3) cum 155 5.800 902

4 SCREED M20 (M3) cum 380 6.480 2461

5 Guniting/M3(1:2:2) cum 120 12.000 1440

6 Brick Work/M3(1:4) cum 345 1.900 655

7 Plastering/M2(1:4) sqm 6260 0.170 1065

8 Dholpur Stone/M2 sqm 1730 0.306 529

9 Tapecrete sqm 5900 0.013 77

10 Slurry for Roof water proofing slurry sqm 3200 0.039 125

11 work in progress 250

Total cement consumption as per theoretical Bags 14978

Total cement consumed as per actual Bags 15504

Total extra cement consumed more than theoretical Bags 276

Balance quantity of cement available Bags 1132

Total cement received till 31.01.2013 Bags 16636

Cement wastage in % 1.844%

Authorised signatory

Larsen & Toubro Ltd

CEMENT RECONCILIATION STATEMENT

(Up to 31.01.2013)

“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maintenance for 10 years

of SCADA system at Bhagirathi WTP & Distribution Area.” Delhi.

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 49/54

Name of

Project

Agency M/s Larsen & Toubro Limited, Delhi.

SL.NO Description of Item UOMExecuted

Qty.

Coefficient

(Bag)

Qty. of Cement

(Bags)

1 RCC M25 (M3) cum 1087 7.200 7830

2 RCC M30 (M3) cum 242 7.200 1741

3 PCC M15 (M3) cum 225 5.800 1305

4 SCREED M20 (M3) cum 415 6.480 2690

5 Guniting/M3(1:2:2) cum 120 12.000 1440

6 Brick Work/M3(1:4) cum 438 1.900 831

7 Plastering/M2(1:4) sqm 7760 0.170 1321

8 Dholpur Stone/M2 sqm 1870 0.306 572

9 Tapecrete sqm 6100 0.013 79

10 Slurry for Roof water proofing slurry sqm 4000 0.039 156

11 work in progress 300

Total cement consumption as per theoretical Bags 17965

Total cement consumed as per actual Bags 18564

Total extra cement consumed more than theoretical Bags 299

Balance quantity of cement available Bags 1112

Total cement received till 28.02.2013 Bags 19676

Cement wastage in % 1.664%

Authorised signatory

Larsen & Toubro Ltd

“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maintenance for 10 years

of SCADA system at Bhagirathi WTP & Distribution Area.” Delhi.

CEMENT RECONCILIATION STATEMENT

(Up to 28.02.2013)

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 50/54

Name of

Project

Agency M/s Larsen & Toubro Limited, Delhi.

SL.NO Description of Item UOMExecuted

Qty.

Coefficient

(Bag)

Qty. of Cement

(Bags)

1 RCC M25 (M3) cum 1164 7.200 8378

2 RCC M30 (M3) cum 350 7.200 2524

3 PCC M15 (M3) cum 247 5.800 1432

4 SCREED M20 (M3) cum 553 6.480 3585

5 Guniting/M3(1:2:2) cum 148 12.000 1776

6 Brick Work/M3(1:4) cum 458 1.900 869

7 Plastering/M2(1:4) sqm 8460 0.170 1440

8 Dholpur Stone/M2 sqm 2270 0.306 695

9 Tapecrete sqm 6100 0.013 79

10 Slurry for Roof water proofing slurry sqm 5000 0.039 195

11 work in progress 550

Total cement consumption as per theoretical Bags 20973

Total cement consumed as per actual Bags 21934

Total extra cement consumed more than theoretical Bags 411

Balance quantity of cement available Bags 1132

Total cement received till 31.03.2013 Bags 23066

Cement wastage in % 1.961%

Authorised signatory

Larsen & Toubro Ltd

CEMENT RECONCILIATION STATEMENT

(Up to 31.03.2013)

“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maintenance for 10 years

of SCADA system at Bhagirathi WTP & Distribution Area.” Delhi.

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 51/54

Name of

Project

Agency M/s Larsen & Toubro Limited, Delhi.

SL.NO Description of Item UOMExecuted

Qty.

Coefficient

(Bag)

Qty. of Cement

(Bags)

1 RCC M25 (M3) cum 1300 7.200 9363

2 RCC M30 (M3) cum 433 7.200 3118

3 PCC M15 (M3) cum 254 5.800 1471

4 SCREED M20 (M3) cum 565 6.480 3663

5 Guniting/M3(1:2:2) cum 150 12.000 1800

6 Brick Work/M3(1:4) cum 488 1.900 926

7 Plastering/M2(1:4) sqm 10460 0.170 1780

8 Dholpur Stone/M2 sqm 2770 0.306 848

9 Tapecrete sqm 6100 0.013 79

10 Slurry for Roof water proofing slurry sqm 5200 0.039 203

11 work in progress 500

Total cement consumption as per theoretical Bags 23252

Total cement consumed as per actual Bags 24184

Total extra cement consumed more than theoretical Bags 432

Balance quantity of cement available Bags 1922

Total cement received till 30.04.2013 Bags 26106

Cement wastage in % 1.860%

Authorised signatory

Larsen & Toubro Ltd

CEMENT RECONCILIATION STATEMENT

(Up to 30.04.2013)

“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maintenance for 10 years

of SCADA system at Bhagirathi WTP & Distribution Area.” Delhi.

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 52/54

Name of

Project

Agency M/s Larsen & Toubro Limited, Delhi.

SL.NO Description of Item UOMExecuted

Qty.

Coefficient

(Bag)

Qty. of Cement

(Bags)

1 RCC M25 (M3) cum 1425 7.200 10263

2 RCC M30 (M3) cum 458 7.200 3298

3 PCC M15 (M3) cum 268 5.800 1556

4 SCREED M20 (M3) cum 571 6.480 3702

5 Guniting/M3(1:2:2) cum 155 12.000 1860

6 Brick Work/M3(1:4) cum 518 1.900 983

7 Plastering/M2(1:4) sqm 11960 0.170 2036

8 Dholpur Stone/M2 sqm 3270 0.306 1001

9 Tapecrete sqm 6100 0.013 79

10 Slurry for Roof water proofing slurry sqm 5500 0.039 215

11 work in progress 325

Total cement consumption as per theoretical Bags 24992

Total cement consumed as per actual Bags 25690

Total extra cement consumed more than theoretical Bags 373

Balance quantity of cement available Bags 1936

Total cement received till 31.05.2013 Bags 27626

Cement wastage in % 1.494%

Authorised signatory

Larsen & Toubro Ltd

CEMENT RECONCILIATION STATEMENT

(Up to 31.05.2013)

“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maintenance for 10 years

of SCADA system at Bhagirathi WTP & Distribution Area.” Delhi.

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 53/54

Name of

Project

Agency M/s Larsen & Toubro L imited, Delhi.

1 RCC M25 (M3) cum 1515 7.200 10908

2 RCC M30 (M3) cum 511 7.200 3677

3 PCC M15 (M3) cum 306 5.800 1775

4 SCREED M20 (M3) cum 584 6.480 3784

5 Guniting/M3(1:2:2) cum 160 12.000 1920

6 Brick Work/M3(1:4) cum 543 1.900 1031

7 Plastering/M2(1:4) sqm 13460 0.170 2291

8 Dholpur Stone/M2 sqm 3792 0.306 1160

9 GRANITE FLOORING(1:4) sqm 125 0.248 31

10 VITRIFIED FLOORING(1:4) sqm 250 0.248 62

11 Tapecrete sqm 6100 0.013 79

12 Slurry for Roof water proofing slurry sqm 6300 0.039 246

13 work in progress 200

Total cement consumption as per theoretical Bags 26965

Total cement consumed as per actual Bags 27622

Total extra cement consumed more than theoretical Bags 457

Balance quantity of cement available Bags 4Total cement received till 30.06.2013 Bags 27626

Cement wastage in % 1.696%

Authorised signatory

Larsen & Toubro Ltd

CEMENT RECONCILIATION STATEMENT

(Up to 30.06.2013)

“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maintenance for 10 years

of SCADA system at Bhagirathi WTP & Distribution Area.” Delhi.

SL.NO Description of Item UOMExecuted

Qty.

Coefficient

(Bag)

Qty. of Cement

(Bags)

8/10/2019 Monthly Cement 29.10.13

http://slidepdf.com/reader/full/monthly-cement-291013 54/54