Page 1: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 2: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

Monitoring the Implementation of Environmental SafeguardsMinistry of Environment, Forest & Climate Change

Regional Office (West Central Zone), NagpurMonitoring Report

Part – IDATA SHEET1. Project Type: River-valley / Mining / Industry/Thermal / Nuclear / Other (Specify) Construction project – Residential development2. Name of the Project Residential Development3. Clearance Letter (s) / OM No. and date EC No. –SEAC-III- 2015/CR.132/TC-3/ADated -18th July, 20164. Location S. No. 17/7, 22/2A, 17/6/1(1+2+3), 17/6/2 at Kharadia. District (s) Puneb. State (s) Maharashtrac. Latituded. Longitude Latitude: 18°32’28.73” NLongitude: 73°56’21.35” E5 Address for correspondencea. Address of concerned Project ChiefEngineer (with Pin Code & Telephone/Telex/ Fax Numbers) : Dr. J.Y.HoteExecutive Director & CEOM/s. Nyati Housing.“Nyati Unitree”,Nagar Road, Yerawada Pune- 411006b. Address of Executive Project Engineer /Manager (with pin code/fax numbers) Mr. N.H.MohiteM/s. Nyati Housing.“Nyati Unitree”,Nagar Road, Yerawada Pune- 411006Tel No. 020- 668633336. Salient featuresa. Of the Project It is Residential Developmentb. Of the Environmental ManagementPlan 1. Sewage Treatment Plant-

We have planned to provide 2 STP’s ofcapacity 420 kld & 105 kld for the treating thewaste water.Recycled waste water will be used forflushing and gardening purpose at projectsite.

2. Solid waste management- Top soil shall be preserved and reused withinthe project site for the landscaping. Biodegradable waste will be treated byOrganic waste converter. Dry waste will be handed over to theauthorized vendor. STP Sludge will be used as manure.

Page 3: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

3. Rain water Harvesting:Rain water harvesting pits shall be provided toraise the ground water table.4. Solar Energy- Solar lights will be provided for the commonamenities like street lighting & gardenlighting. Solar water heating system will be done.7. Breakup of the Project areaa. Submergence Area: Forest & NonForest Non Forestb. Others a. Total Plot Area – 27424.31 sq.mt.b. FSI area- 47399.45 sq.mtc. NON FSI area- 64692.99 sq.mt.d. Construction Built - Up Area – 112092.44 sq.mt.

All area as per EC received vide no SEAC-III-2015/CR.132/TC-3/A Dated : 18th July 20168. Breakup of the Project affected populationwith enumeration of those losinghouses/dwelling units only, agricultural landonly, both dwelling units & both dwellingunits & agricultural land & landlesslaborers/artisan

Land was barren land.We developed as Residential Development.

a. SC, ST/Adivasis --b. Others(Please indicate whether these figures arebased on any scientific and systematic surveycarried out or only provisional figures, if asurvey carried out gives details and years ofsurvey).--

9. Financial Details;a. Project costs as originally planned &subsequent revised estimates and the yearof price reference. Total cost of project- Rs. 141.6/-cr. only.b. Allocations made for EnvironmentalManagement Plan with item wise & yearwise breakup. EMP Cost- ( In Lakhs)Sewage Treatment plant- Rs. 115.50/- LacsRain water Harvesting – Rs. 26.00/- LacsSolar Energy- Rs. 84.98/- LacsGardening- Rs. 29.04/- lacsSolid waste management- Rs. 33.95/ Lacsc. Benefit Cost Ratio / Internal rate of Returnand the year of assessment.d. Whether (c) includes the cost ofEnvironmental Management as shown inthe above.e. Whether (c) includes the cost ofEnvironmental Management as shown inthe above.f. Actual expenditure incurred on theEnvironmental Management Plan so far10. Forest land requirementa. The status of approval for diversion of The land is non forest type hence not applicable.

Page 4: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

Forestland for non-forestry useb. The Status of clearing felling Not Applicablec. The status of compensatoryAfforestation programme in the lightof actual field experience Not Applicabled. Comments on the viability andsustainability of compensatoryafforestation program in the light ofactual field experience so far.

Not Applicable11. The status of clear felling in non-forest areas(such as submergence area of reservoir,Approach roads), if any with quantitativeinformation

Not Applicable12. Status of constructiona. Date of commencement (Actualand/or Planned) 2 December 2016b. Date of completion (Actual and/orPlanned) May 202013. Reasons for the delay if the project is yet tostart Work in progress.14. Dates of site visitsa. The dates on which the Project wasmonitored by Regional Office onprevious occasions, if any Yet Not Visited.

b. Date of site visit for this monitoringReport 8th May 201715. Details of correspondence with projectauthorities for obtaining action plan /information on status of compliance tosafeguards other than the routine letters forlogistic support for site visit.(The monitoring report may obtain the detailsof all the letters issued so far but the laterreports may cover only the letters issuedsubsequently)

Dr. J.Y.HoteExecutive Director & CEOM/s. Nyati Housing.“Nyati Unitree”,Nagar Road, Yerawada Pune- 411006Email- designdept.nyatigroup.comTel- 020-66863333

Page 5: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

M/s. Nyati Housing “Residential Development”, At Kharadi, Pune.

: PART A:

CURRENT STATUS OF WORK

The current status of the project:

S. No. RevisedNomenclature

Revised No. ofFloors

Status of construction Total area constructedsq.mt.1 A2 4P+29 2nd slab – work in progress 1159.75 sq.mt2 B1 4P+29 1st slab completed 428.933 B2 4P+29 1st slab completed 428.934 C3 4P+29 1st slab completed 402.66

Page 6: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

M/s. Nyati Housing “Residential Development”, At Kharadi, Pune.

: PART B:

2. Point wise compliance status to various stipulations laid down by the Ministry in its clearanceletter No. SEAC-III -2015/CR.132/TC.3/A are as follows:Condition Status1. This environmental clearance is issued subject to land useverification. Local authority/ planning authority shouldensure this with request to Rules, Regulations,Notifications, Government Resolution, Circulars, etc.issued if any Judgments/ orders issued by Hon’ble HighCourt, Hon’ble NGT, Hon’ble Supreme Court regardingDCR provisions, Environmental issues applicable in thismatter should be verified. PP should submit exactly thesame plans appraised by concerned SEAC and SEIAA. Ifany discrepancy found in the plans submitted or detailsprovided in the above para may be reported toEnvironmental Department. The EnvironmentalClearance issued with respect to the environmentalconsideration and it does not mean that State LevelImpact Assessment Authority (SEIAA) approved theproposed land use.

The plot under considerationfalls under residential zone asper development plan.Copy of the Commencementcertificate is attached for yourreference. Please referEnclosure 5

2. E- Waste shall be disposed through Authorized Vender asper E- waste ( Management and Handling) Rules, 2011 E-Waste to be generated fromproject site will hand over toauthorized vender as per the E-waste ( Management andHandling) Rules, 20113. Occupancy certificate should be issued to the project byLocal Planning Authority only after ensuring availabilityof drinking water and connectivity of the sewer line to theproject site.We will issued Occupancycertificate after ensuringavailability of drinking waterand connectivity of the sewerline to the project site by Localplanning authority.4. This Environmental Clearance is issued subject toobtaining NOC from Forestry & Wild Life angle includingclearance from the standing committee of the NationalBoard for Wild Life as if applicable & this EnvironmentalClearance does not necessarily implies that Forestry &Wild Life clearance granted to the project which will beconsidered separately on merit.

Agreed to comply.

5. PP has to abide by the conditions stipulated by SEAC &SEIAA. We abide by the conditionsstipulated by SEAC & SEIAA6. The height, Construction built up area of proposedconstruction shall be in accordance with the existing We have constructed thebuildings on site as per the

Page 7: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

M/s. Nyati Housing “Residential Development”, At Kharadi, Pune.

Condition StatusFSI/FAR norms of the urban local body & it should ensurethe same along with survey number before approvinglayout plan & before according commencement certificateto proposed work. Plan approving authority should alsoensure the zoning permissibility for the proposed projectas per the approved development plan of the areasanction vide CC/1841/15dated 14.09.2015 obtainedfrom local authority.For proposed expansion alsowe have already obtained thesanction vide CC/2033/16dated 13.10.2016. Copy of thesanction attached as theannexure 5, for yourreference. In accordance withthe same we shall constructfurther phases.7. “Consent for establishment” shall be obtained fromMaharashtra Pollution Control Board under air Water Actand a copy shall be submitted to the Environmentdepartment before start of any construction work at thesite.We have obtained Consent toEstablish vid No.1.0/BO/ROHQ/PN-26885-15/CE/CC-3132Date- 02nd March 2016Please refer Enclosure 28. All required sanitary and hygienic measures should be inplace before starting construction activities and to bemaintained throughout the construction phase. We have provide the toilets forworkers and generated sludgecollected by authorized vender.Solid waste generated shall behanded over to PMC1. Provision shall be made for the housing of constructionlabour within the site with all necessary infrastructureand facilities such as fuel for cooking, mobile toilets,mobile STP, safe drinking water, medical health care,crèche etc.All necessary infrastructure andfacilities like kerosene forcooking, toilets, safe drinkingwater, medical health carefacility, crèche for children etc.are provided at site for workers.2. Adequate drinking water and sanitary facilities should beprovided for construction workers at the site. Provisionshould be made for mobile toilets. The safe disposal ofwastewater and solid wastes generated during theconstruction phase should be ensured.We are providing drinkingwater through potable Watertanker from water suppliersand toilets provided on site forworkers.Sewage collected anddisposed by authorizedvender.We have provided separategarbage bins, for collection ofsolid waste, after collection ithanded over to Authorizedvender.

Page 8: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

M/s. Nyati Housing “Residential Development”, At Kharadi, Pune.

Condition Status3. The solid waste generated should be properly collectedand segregated. Dry/inert solid waste should be disposedoff to the approved sites for land filling after recoveringrecyclable material.For construction phase wehave provided separategarbage bins, for collection ofsolid waste, after collectionhanded over to Authorizedvender.During operation phase thesolid waste has been segregatedin to bio degradable waste andnon-bio-degradable waste.Non-biodegradable wasteshould be collected and handedover to authorized agency andbiodegradable waste will betreated by organic wasteconverter at site and used asmanure for gardening purpose.4. Disposal of muck during construction phase should notcreate any adverse effect on neighboring communitiesand be disposed taking the necessary precautions forgeneral safety and health aspects of people, only inapproved sites with the approval of competent authority.All the excavated material isused for land leveling. Top Soilwas used for landscaping atproject site.5. Arrangement shall be made that waste water and stormwater do not get mixed. Separate network for stormwater and sewage are provided.6. All the topsoil excavated during construction activitiesshould be stored for use in horticulture / landscapedevelopment within the project site. All the topsoil excavatedmaterial is used for landleveling. Top Soil was used forlandscaping & stores the projectpremises area.7. Additional soil for leveling of the proposed site shall begenerated within the sites (to the extent possible) so thatnatural drainage system of the area is protected andimproved.Excess excavated material andconstruction waste is used forleveling.8. Green Belt Development shall be carried out consideringCPCB guidelines including selection of plant species andin consultation with the local DFO/ Agriculture Dept. Green Belt Development will becarried out considering CPCBGuidelines.2652.43 sq.mt area shall bedeveloped as green belt.There will be tree plantation ofabout 294 nos.9. Soil and ground water sample will be tested to ascertainthat there is no threat to ground water quality by leachingof heavy metals and other toxic contaminants. Soil analysis report enclosed.Please refer the Enclosure 13

Page 9: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

M/s. Nyati Housing “Residential Development”, At Kharadi, Pune.

Condition Status10. Construction spoils, including bituminous material andother hazardous material must not be allowed tocontaminate water courses and the dumpsites for suchmaterial must be secured so that they should not leachinto the ground water.Adequate measures areprovided.Dump site is in the corner of thesite.We are not using anybituminous material/ hazardousmaterial of any type at the site.11. Any hazardous waste generated during constructionphase should be disposed off as per applicable rules andnorms with necessary approvals of the MaharashtraPollution Control Board.DG sets to be used duringconstruction phase has lowSulphur diesel type and havingacoustic enclosure.No any hazardous waste wasgenerated during constructionphase.12. The diesel generator sets to be used during constructionphase should be low Sulphur diesel type and shouldconform to Environment (Protection) Rules prescribedfor air and noise emission standards.DG set are with acoustic canopy& confirming the rules madeunder the Environment(Protection) Act 1986.13. The diesel required for operating DG sets shall be storedin underground tanks and if required, clearance fromconcern authority shall be taken. The DG sets are purchased withinbuilt storage tank, so there isno need to stored diesel inunderground tank on site.14. Vehicles hired for bringing construction material to thesites should be in good condition and should havepollution check certificate and should conform toapplicable air and noise emission standards and shouldbe operated only during non-peak hours.Daily checking of PUC forevery vehicle before entry atproject site.Vehicles operated only duringnon-peak hours at project site.Copy of PUC is attached asEnclosure 715. Ambient noise levels should conform to residentialstandards both during day and night. Incrementalpollution loads on the ambient air and noise qualityshould be closely monitored during construction phase.Adequate measures should be made to reduce ambient airand noise level during construction phase, so as toconform to the stipulated standards by CPCB/MPCB.Ambient Noise level qualityshould measure regularly.Please refer Enclosure 6.

16. Fly ash should be used as building material in theconstruction as per the provision of Fly Ash Notificationof September 1999 and amended as on 27th August, 2003.(The above condition is applicable only if the project sitelocated within the 100 km of Thermal Power Station).We are using fly ash inconstruction work. (No anythermal power station within100 km)17. Ready mixed concrete must be used in buildingconstruction. We are using ready mixconcrete in for construction.

Page 10: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

M/s. Nyati Housing “Residential Development”, At Kharadi, Pune.

Condition Status18. The approval of competent authority shall be obtained forstructural safety of the building any possible earthquake,adequacy of firefighting equipment etc. as per NationalBuilding Code including measures from lighting.Copy of structural safetyCertificate is attached asannexure 12, for yourreference.Fire NOC is attached. Pleaserefer Enclosure 4 for yourreference.19. Strom water control and its re-use as per CGWB and BSIStandards for various applications. We have recharge the groundwater through providing 14nos.of recharge pits as per CGWBand BSI Standards.20. Water demand during construction should be reduce byuse of pre-mixed concrete, curing agents and other bestpractices referred. We are using pre-mixedconcrete, curing agents inconstruction.21. The ground water level and its quality should bemonitored regularly in consultation with Ground waterAuthority. Agreed to comply.22. The installation of the Sewage Treatment Plant (STP)should be certified by an independent expert and a reportin this regard should be submitted to the EnvironmentDepartment before the project is commissioned foroperation. Treated effluent emanating from STP shall berecycled/ refused to the maximum extent possible.Treatment of 100% gray water by decentralizedtreatment should be done. Discharge of unused treatedeffluent shall conform to the norms and standards of theMaharashtra Pollution Control Board. Necessarymeasures should be made to mitigate the odor problemfrom STP.

Noted and As per the standardspresently STP of capacity 420CMD, 105 CMD will be provide.Treated water generated fromSTP shall be reused for flushingand gardening purposed atproject site.Excess treated water shall bedisposed at municipal sewerline.23. Permission to draw ground water shall be obtained fromthe competent authority prior to construction / operationof the project. Agreed to comply.24. Separation of gray and black water should be done by theuse of dual plumbing line for separation of gray and blackwater. We will be provide dualplumbing system for separationof gray and black water.25. Fixtures for showers, toilet flushing and drinking shouldbe of low flow either by use of aerators or pressureduring devices or sensor based control. We will be provided low flowfixtures for showers, toiletflushing and drinking by usingof pressure regulator valve.26. Use of glass may be reduced up to 40% to reducedelectricity consumption and load on air conditioning. Ifnecessary, use high quality double glass with special The project is Residential, so useof glass is very less.

Page 11: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

M/s. Nyati Housing “Residential Development”, At Kharadi, Pune.

Condition Statusreflective coating in windows.27. Roof should meet prescriptive requirement as per EnergyConservation Building Code by using appropriate thermalinsulation material to fulfill requirement. We have used brick bat asthermal insulation material tofulfill requirement.28. Energy conservation measures like installation of CFLs/TFLS for the lighting areas outside the building shouldbe integral part of project design and should be in placebefore project commissioning. Use CFLs and TFLs shouldbe properly collected and disposed off/ sent for recyclingas per the prevailing guidelines/ rules of regulatoryauthority to avoid mercury contamination. Use of solarpanels may be done to the extent possible like installingsolar street lights. Project proponents should install, afterchecking feasibility, solar plus hybrid non-conventionalenergy sources as sources of energy.

Solar Water HeatingSystems Will Be Done ForBathrooms. Solar lights will beprovided for commonamenities like Streetlighting & Gardenlighting. CFL & LED based lightingwill be done in thecommon areas, landscapeareas, signage’s, Entrygates and boundarycompound walls etc. Auto Timer Switches willbe provided for Streetlights, Garden lights,Parking & staircase Lights& Other Common AreaLights, for savingelectrical energy. Water Level Controllerswith Timers will be usedfor Water Pumps.To create awareness to endconsumer or flat owner, forusing energy efficient lightfittings like CFL, T5 Lamps &LED Lights29. Diesel power generating sets proposed as sources ofbackup power for elevators and common areaillumination during operation phase should be ofenclosed type and conform to rules made under theEnvironment (Protection) Act, 1986. The height of stackof DG sets should be equal to the height needed for thecombined capacity of all proposed DG sets. Use lowsulphur diesels. The location of the DG sets may bedecided with in consultation with Maharashtra PollutionControl Board.

DG set are with acoustic canopy& confirming the rules madeunder the Environment(Protection) Act 1986.30. Noise should be controlled to ensure that it does notexceed the prescribed standards. During nighttime the The noise levels measured arewithin the prescribed standards

Page 12: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

M/s. Nyati Housing “Residential Development”, At Kharadi, Pune.

Condition Statusnoise levels measured at the boundary of the buildingshall be restricted to the permissible level to comply withthe prevalent regulation. for day and night time.Monitoring report is attached asEnclosure- 631. Traffic congestion near the entry and exit points from theroads adjoining the proposed project site must beavoided. Parking should be fully internalized and nopublic space should be utilized. Agreed to comply

32. Opaque wall should meet prescriptive requirement as perEnergy Conservation Building Code, which is proposed tobe mandatory for all air-conditioned spaces while it is asprational for non-air–conditioned spaces by use ofappropriate thermal insulation material to fulfillrequirement.Agreed to comply

33. The building should have adequate distance betweenthem to allow movement of fresh air and passage ofnatural light, air and ventilation. Adequate distance betweenbuildings is mini.14 mt providedto allow movement of fresh airand passage of natural light, airand ventilation.34. Regular supervision of the above and other measures formonitoring should be in place all through theconstruction phase, so as to avoid disturbance to thesurrounding.Construction work is beingsupervised by Project Engineerand qualified supervisors35. Under the provision of Environment (Protection) Act,1986, legal action shall be initiated against the projectproponent if it was found that construction of the projecthas been started without obtaining environmentclearance.Environmental clearanceobtained vide letter No.SEAC-III- 2015/CR.132/TC.3/ADated 18th July, 2016.Please refers Enclosure-1.36. Six monthly monitoring reports should be submitted tothe Department and MPCB. Six monthly reports issubmitted.1. Project proponent shall ensure completion of STP, MSWdisposal facility, green belt development, prior tooccupation of the buildings. No physical occupation orallotment will be given unless all above saidenvironmental infrastructure is installed and madefunctional including water requirement in Para.2.Prior certification from appropriate authority shall beobtained.

Agreed to comply

2. Wet garbage should be treated by organic wasteconvertor and treated waste (manure) should be utilizedin the existing premises for gardening. And no wetgarbage will be disposed outside the premises. Localauthority should ensure this. Agreed to comply3. Local body should ensure that no occupation certification Agreed to comply

Page 13: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

M/s. Nyati Housing “Residential Development”, At Kharadi, Pune.

Condition Statusis issued prior to operation of STP/ MSW site etc. withdue permission of MPCB.4. A complete set of all documents submitted to thedepartment should be forwarded to the MPCB. We are submitting six monthlyreports regularly along withnecessary documents.5. In the case of any change(s) in the scope of the project,the project would require a fresh appraisal by thisDepartment. We have applied for the revisedappraisal to EnvironmentalDepartment.Acknowledgement copy ofEnvironmental Clearanceapplication attached. Pleaserefer Enclosure - 106. A separate environment management cell with qualifiedstaff shall be set up for implementation of the stipulatedenvironmental safeguards. Environmental ManagementCell is being supervised byProject Engineer and qualifiedsupervisors.7. Separate funds shall be allocated for implementation ofenvironmental protection measures/EMP along withitem-wise breaks-up. These cost shall be included as partof the project cost. The funds earmarked for theenvironment protection measures shall not be divertedfor other purposes and year-wise expenditure shouldreported to the MPCB & this department.Year wise expenditure has beensubmitted to MPCB andEnvironmental Department in 6monthly compliance report.

8. The project management shall advertise at least in twolocal newspapers widely circulated in the region aroundthe project, one of which shall be in the Marathi languageof the local concerned within seven days of issue of thisletter, informing that the project has been accordedenvironmental clearance and copies of clearance letterare available with the Maharashtra Pollution ControlBoard and may also be seen at Website athttp://envis.maharashtra.gov.in.

We have publishedadvertisement on 09.08.2016in Sakal Times and Prabhat.Copy of the newspaperadvertisement is attached asannexure 3, for yourreference.9. Project management should submit half yearlycompliance reports in respect of the stipulated priorenvironment clearance terms and conditions in hard &soft copies to the MPCB & this department, on 1SI June &1st December of each calendar year.Half yearly post monitoringcompliance report to Nagpurand MPCB has been submitted.Acknowledgment copy isattached as 1310. A copy of the clearance letter shall be sent by proponentto the concerned Municipal Corporation and the localNGO, if any, from whom suggestions/representations, ifany, were received while processing the proposal. Theclearance letter shall also be put on the website of thecompany by the proponent.A copy of the clearance letterhad sent to VANASHREE localNGO on 10th August 2016. Theletter is attached as Enclosure-8

Page 14: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

M/s. Nyati Housing “Residential Development”, At Kharadi, Pune.

Condition Status

11. The proponent shall upload the status of compliance ofthe stipulated EC conditions, including results ofmonitored data on their website and shall update thesame periodically. It shall simultaneously be sent to theRegional Office of MoEF, the respective Zonal Office ofCPCB and the SPCB. The criteria pollutant levels namely;SPM, RSPM, SO2, NOx (ambient levels as well as stackemissions) or critical sectoral parameters, indicated forthe project shall be monitored and displayed at aconvenient location near the main gate of the company inthe public domain.

Agreed to comply.

12. The project proponent shall also submit six monthlyreports on the status of compliance of the stipulated ECconditions including results of monitored data (both inhard copies as well as by e-mail) to the respectiveRegional office of MoEF, the respective Zonal Office ofCPCB and the SPCB.Half yearly post monitoringcompliance report to Nagpurand MPCB has been submitted.Acknowledgment copy isattached as Enclosure 1313. The environmental statement for each financial yearending 31st March in Form-V as is mandated to besubmitted by the project proponent to the concernedState Pollution Control Board as prescribed under theEnvironment (Protection) Rules, 1986, as amendedsubsequently, shall also be put on the website of thecompany along with the status of compliance of ECconditions and shall also be sent to the respectiveRegional Offices of MoEF by e-mail.Condition is noted and willsubmit each financial yearending 31st March.

14. This environmental clearance is being issued withoutprejudice to the action initiated under EP Act or any courtcase pending in the court of law & it does not mean thatproject proponent has not violated in any environmentallaws in the past & whatever decision under EP Act or ofthe Hon’ble court will be binding on the projectproponent. Hence this clearance does not give immunityto the project proponent in the case filed against him, ifany or action initiated under EP Act.Agreed to comply

15. In case of submission of false document andnoncompliance of stipulated conditions,Authority/Environment department will revoke orsuspend the Environmental clearance without anyintimation and initiate appropriate legal action underEnvironmental protection Act, 1986.Agreed to comply

16. The Environment department reserves the right to add Agreed to comply

Page 15: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

M/s. Nyati Housing “Residential Development”, At Kharadi, Pune.

Condition Statusany stringent condition or to revoke the clearance ifcondition stipulated is not implemented to thesatisfaction of the department or for that matter, for otheradministration reason.17. Validity of Environment Clearance: The environmentClearance accorded shall be valid for a period of 5 years. Agreed to comply18. In case any deviation or alteration in the proposed fromthose submitted to this department for clearance, freshreference should be made to the department to assess theadequacy of the condition(s) imposed and to incorporateadditional environmental protection measures required,if any.Agreed to comply

19. The above stipulation would be enforced among othersunder the Water(prevention and control of pollution)act1974, The air(prevention and control of pollution) act,1981, The Environment (protection) act,1986 and rulestheir under, Hazardous waste(management and handling)rules,1989 and it’s amendment, the public liabilityinsurance act,1981 and it’s amendment

Agreed to comply

20. Any appeal against this environmental clearance shall liewith the National Environmental Appellate Authority, ifpreferred within 30 days as prescribed under section 11of the National Environmental Appellate Act.1997.Agreed to comply

Page 16: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

INDEX

Sr. No. Details1 Environmental Clearance letter2 Consent to Establish3 Public Notice4 Fire NoC5 Commencement Certificate6 Monitoring Report7 PUC certificate8 NGO Letter9 Name change letter10 Revised EC application11 EC correction letter12 Structural safety Certificate13 Acknowledgement copy of Half yearly post monitoringcompliance report

Page 17: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

Enclosure 1Environmental Clearance

letter

Page 18: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 19: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 20: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 21: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 22: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 23: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 24: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 25: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 26: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 27: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 28: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 29: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 30: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 31: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 32: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 33: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 34: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 35: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

Enclosure 2Consent to Establishment

Page 36: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 37: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 38: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 39: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 40: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 41: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 42: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

Enclosure 3Public Notice

Page 43: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 44: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

Enclosure 4Fire NOC

Page 45: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 46: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 47: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 48: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 49: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 50: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 51: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 52: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 53: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 54: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 55: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 56: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 57: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 58: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 59: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 60: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

Enclosure 5Commencement Certificate

Page 61: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 62: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

Enclosure 6Monitoring Report

Page 63: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

POLLUTION MONITORING REPORT

OF

M/s. NYATI HOUSING

FOR YOUR SITE

RESIDENTIAL DEVELOPMENT S/No. 17/7, 22/2A, 17/6/1/(1+2+3), 17/6/2

Behind Columbia Asia Hospital, Kharadi, Pune.

SURVEY CARRIED ON:

APRIL 08, 2017

PREPARED BY:

M/s. ULTRA – TECH AIR & WATER POLLUTION CONSULTANTS

OFFICE NO. 201,202,203,204, SAUDAMINI COMMERCIALCOMPLEX, BUILDING C3,

2ND FLOOR, RIGHT BHUSARI COLONY, PAUD ROAD,

KOTHRUD, PUNE-411038 Tel. No. 2528 6109 , 2528 6106 Fax No. 5380148

Tel. No. 2528 6109 , 2528 6106 Fax No. 5380148

E-mail : [email protected]

Visit @: www.ultratech.in

Page 64: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

POLLUTION MONITORING REPORT

SURVEY CARRIED ON APRIL 08, 2017

CONTENT

Sr.

No. Particulars Page No.

1. AMBIENT AIR QUALITY MONITORING REPORT 1-3

2. STACK EMISSION MONITORING REPORT 4

3. NOISE LEVEL MONITORING REPORT 5

4. DRINKING WATER ANALYSIS REPORT 6

5. SOIL ANALYSIS REPORT 7

6. GROUND WATER ANALYSIS REPORT 8

Page 65: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

M/s. NYATI HOUSING

“RESIDENTIAL DEVELOPMENT”

S/No. 17/7, 22/2A, 17/6/1/(1+2+3), 17/6/2

Behind Columbia Asia Hospital, Kharadi, Pune.

AMBIENT AIR MONITORING

Ref No: UT/P/ELS/R/136A/2017 Date: 15.05.2017

Lab Code: UT/L/A/135A

SR.NO. DETAILS LOCATION NO.1 UNITS

1 Date of Sampling 08.05.2017

2 Location of the Sampling Near Main Gate

3 Ambient Air Temp. - - (Max.)

-(Min.) 37.8

25.9

0c 0c

4 Relative Humidity - - (Max.)

- (Min.) 62.0

38.0

%

%

5 POLLUTANTS

a) Particulate Matter (PM10) 64.9 µg/m3

b) Particulate Matter (PM2.5) 25.1 µg/m3

c) Sulphur Di-Oxide (SO2 ) 13.7 µg/m3

d) Oxides Of Nitrogen (NOX) 22.1 µg/m3

NATIONAL AMBIENT AIR QUALITY STANDARDS, SCHEDULE-VII Rule-3(3B)

The Gazette of India with Effect from Monday, November 16, 2009/KARTIKA 25, 1931

Sr.

No. Pollutants

Time

Weighted

Average

National Ambient Air Quality Standards

Industrial, Residential,

Rural and Other Area

Ecological Sensitive area

(Notified by Central

Government)

1. SO2 24 hours 80 80

2. NOx 24 hours 80 80

3. (PM10) 24 hours 100 100

4. (PM2.5) 24 hours 60 60

-END OF REPORT-

For, ULTRA TECH

KISHOR SAWANT

AUTHORIZED SIGNATORY

Page 66: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

M/s. NYATI HOUSING

“RESIDENTIAL DEVELOPMENT”

S/No. 17/7, 22/2A, 17/6/1/(1+2+3), 17/6/2

Behind Columbia Asia Hospital, Kharadi, Pune.

AMBIENT AIR MONITORING

Ref No: UT/P/ELS/R/136B/2017 Date: 15.05.2017

Lab Code: UT/L/A/135B

SR.NO. DETAILS LOCATION NO.2 UNITS

1 Date of Sampling 08.05.2017 --

2 Location of the Sampling On Construction Site --

3 Ambient Air Temp. - - (Max.)

- (Min.) 37.8

25.9

0c 0c

4 Relative Humidity - - (Max.)

- (Min.) 62.0

38.0

%

%

5 POLLUTANTS

a) Particulate Matter (PM10) 65.1 µg/m3

b) Particulate Matter (PM2.5) 21.8 µg/m3

c) Sulphur Di-Oxide (SO2 ) 12.2 µg/m3

d) Oxides Of Nitrogen (NOX) 22.5 µg/m3

NATIONAL AMBIENT AIR QUALITY STANDARDS, SCHEDULE-VII Rule-3(3B)

The Gazette of India with Effect from Monday, November 16, 2009/KARTIKA 25, 1931

Sr.

No. Pollutants

Time

Weighted

Average

National Ambient Air Quality Standards

Industrial, Residential,

Rural and Other Area

Ecological Sensitive area

(Notified by Central

Government)

1. SO2 24 hours 80 80

2. NOx 24 hours 80 80

3. (PM10) 24 hours 100 100

4. (PM2.5) 24 hours 60 60

-END OF REPORT-

For, ULTRA TECH

KISHOR SAWANT

AUTHORIZED SIGNATORY

Page 67: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

M/s. NYATI HOUSING

“RESIDENTIAL DEVELOPMENT”

S/No. 17/7, 22/2A, 17/6/1/(1+2+3), 17/6/2

Behind Columbia Asia Hospital, Kharadi, Pune.

AMBIENT AIR MONITORING

Ref No: UT/P/ELS/R/136C/2017 Date: 15.05.2017

Lab Code: UT/L/A/135C

Sr.

No. DETAILS LOCATION NO. - 03 UNITS

1. Date of Sampling 08.05.2017 --

2. Location of the Sampling Near Store Room --

3. Ambient Air Temp. - - (Max.)

- (Min.)

37.8

25.9 °C

4. Relative Humidity - -(Max)

- (Min.)

62.0

38.0 %

5. POLLUTANTS

a) Particulate Matter (PM10) 59.3 µg/m3

b) Particulate Matter (PM2.5) 20.8 µg/m3

c) Sulphur Di-Oxide (SO2 ) 12.4 µg/m3

d) Oxides Of Nitrogen (NOX) 22.8 µg/m3

NATIONAL AMBIENT AIR QUALITY STANDARDS, SCHEDULE-VII Rule-3(3B)

The Gazette of India with Effect from Monday, November 16, 2009/KARTIKA 25, 1931

Sr.

No. Pollutants

Time

Weighted

Average

National Ambient Air Quality Standards

Industrial, Residential,

Rural and Other Area

Ecological Sensitive area

(Notified by Central

Government)

1. SO2 24 hours 80 80

2. NOx 24 hours 80 80

3. (PM10) 24 hours 100 100

4. (PM2.5) 24 hours 60 60

-END OF REPORT-

For, ULTRA TECH

KISHOR SAWANT

AUTHORIZED SIGNATORY

Page 68: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

M/s. NYATI HOUSING

“RESIDENTIAL DEVELOPMENT”

S/No. 17/7, 22/2A, 17/6/1/(1+2+3), 17/6/2

Behind Columbia Asia Hospital, Kharadi, Pune.

STACK EMISSOIN MONITORING REPORT

Ref No: UT/P/ELS/R/136D/2017 Date: 15.05.2017

Lab Code: UT/L/A/135D

Sr.No. STACK DETAILS & PARAMETERS STACK NO. 1 M.P.C.B.

LIMITS UNITS

1. Date of sampling 08.05.2017 -- --

2. Stack Attached to D. G. Set-

125 KVA -- --

3. Material of construction of Stack M. S. -- --

4. Height of Stack 7 -- Ft

5. Diameter of Stack 5*5 -- Inch

6. Fuel Used Diesel -- --

7. Fuel Consumption 8 -- Liter/Hr.

8. Stack Gas Temperature 127 -- 0C

9. Flue Gas Velocity 5.3 -- m/sec.

10 Flow 678.26 -- Nm3/hr

10. POLLUTANTS

a. Total Particulate Matter (TPM) 56.4 150.0 mg/Nm3

b. Sulphur Dioxide (SO2) 1.3 -- Kg/day

-END OF REPORT-

For, ULTRA TECH

KISHOR SAWANT

AUTHORIZED SIGNATORY

Page 69: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

M/s. NYATI HOUSING

“RESIDENTIAL DEVELOPMENT”

S/No. 17/7, 22/2A, 17/6/1/(1+2+3), 17/6/2

Behind Columbia Asia Hospital, Kharadi, Pune.

AMBIENT NOISE LEVEL MONITORING

Date of Survey: - 08.05.2017

AMBIENT NOISE LEVEL STANDARDS

-END OF REPORT-

For, ULTRA TECH

KISHOR SAWANT

AUTHORIZED SIGNATORY

Ref No: UT/P/ELS/R/136E/2017 Date: 15.05.2017

SR.NO LOCATION NOISE LEVEL IN dB ( A ) Leq

( Day Time ) ( Night Time )

1. Near Main Gate 54.2 43.1

2. Near Engineering Site 52.7 40.5

3. Near Store 53.1 42.9

4. On Construction Site 51.6 41.1

Category Of Area

Limits in dB ( A ) Leq

Day Time

(6 am – 10 pm)

Night Time

(10 pm – 6 am)

Industrial Area 75 70

Commercial Area 65 55

Residential Area 55 45

Silence Zone 50 40

Page 70: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

WATER ANALYSIS REPORT

Ref No: UT/P/ELS/R/136F/2017 Date: 15.05.2017

Lab Code: UT/L/W/116A

Name & Address of the client

M/s. NYATI HOUSING

“RESIDENTIAL DEVELOPMENT”

S/No. 17/7, 22/2A, 17/6/1/(1+2+3), 17/6/2

Behind Columbia Asia Hospital, Kharadi, Pune.

Nature of Sample Drinking Water

Date of Sampling 08.05.2017

Date of Receipt 09.05.2017

Date of Analysis 09.05.2017 To 15.05.2017

PARAMETERS

CONCENTRATION

STANDARD IS:10500:2012 UNIT

PHYSICAL PARAMETERS:-

Turbidity <1 1.0 NTU

Colour <5 5.0 Hazen

Odour Agreeable Agreeable ---

Taste Agreeable Agreeable ---

CHEMICAL PARAMETERS:-

pH 7.62 6.5 – 8.5 ---

Total Dissolved Solids 92 500 mg/l

Chlorides 24 250 mg/l

Sulphate 12 200 mg/l

Total Hardness 52 200 mg/l

Ca-Hardness 36 75 mg/l

Mg-Hardness 16 30 mg/l

Fluoride Not Detected 1 mg/l

Iron Not Detected 0.3 mg/l

Residual Chlorine Nil 0.2 mg/l

Alkalinity 40 200 mg/l

BACTERIOLOGICAL PARAMETERS:

Total Coliform Absent 0 Org/100ml Org/100ml

E. coli Absent Absent --

Note: Sample Collection done by Ultra-tech Environmental consultancy & Laboratory.

-END OF REPORT-

For, ULTRA TECH

KISHOR SAWANT

AUTHORIZED SIGNATORY

Page 71: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

M/s. NYATI HOUSING

“RESIDENTIAL DEVELOPMENT”

S/No. 17/7, 22/2A, 17/6/1/(1+2+3), 17/6/2

Behind Columbia Asia Hospital, Kharadi, Pune.

SOIL ANALYSIS REPORT

Ref No: UT/P/ELS/R/136G/2017 Date: 15.05.2017

Nature of Sample Soil Sample

Lab code UT/L/S/58

Date of Sampling 08.05.2017

Date of Receipt 09.05.2017

Date of Analysis 09.05.2017 To 15.05.2017

PARAMETERS CONCENTRATION

Project Site UNIT

pH 7.41 --

Colour Brownish --

Conductivity 0.258 mS/cm

Moisture Content 3.1 %

Organic Matter 1.9 %

Total Organic Carbon 0.5 %

Calcium as Ca 61 mg/kg

Magnesium as Mg 20 mg/kg

Sodium as Na 269 mg/kg

Available Nitrogen as N 342 mg/kg

Available Phosphorous as P2O5 44 mg/kg

Available Potassium as K2O 163 mg/kg

Cadmium as Cd ≤0.5 mg/kg

Chromium as Cr 52 mg/kg

Copper as Cu 214 mg/kg

Lead as Pb ≤10 mg/kg

Manganese as Mn 647 mg/kg

Zinc as Zn 124 mg/kg

Iron as Fe 69853 mg/kg

-END OF REPORT-

For, ULTRA TECH

KISHOR SAWANT

AUTHORIZED SIGNATORY

Page 72: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

M/s. NYATI HOUSING

“RESIDENTIAL DEVELOPMENT”

S/No. 17/7, 22/2A, 17/6/1/(1+2+3), 17/6/2

Behind Columbia Asia Hospital, Kharadi, Pune.

BORE WELL WATER ANALYSIS REPORT Ref No: UT/P/ELS/R/136G/2017 Date: 15.05.2017

Nature of Sample Bore Well Water

Lab Code UT/L/W/116B

Date of Sampling 08.05.2017

Date of Receipt 09.05.2017

Date of Analysis 09.05.2017 To 15.05.2017

PARAMETERS CONCENTRATION STANDARD(IS:10500 -

2012)

UNIT

PHYSICAL PARAMETERS:-

Turbidity <1 1.0 NTU

Colour <5 5.0 Hazen

Odour Agreeable Agreeable ---

Taste Agreeable Agreeable ---

CHEMICAL PARAMETERS:-

pH 7.78 6.5 – 8.5 ---

Total Dissolved Solids 180 500 mg/l

Chlorides 32 250 mg/l

Sulphate 38 150 mg/l

Total Hardness 70 200 mg/l

Ca-Hardness 50 75 mg/l

Mg-Hardness 30 30 mg/l

Fluoride 0.22 1.0 mg/l

Iron Not Detected 0.3 mg/l

Residual Chlorine Nil 0.2 mg/l

Phenolic compounds Not Detected 0.001 mg/l

Nitrate Not Detected 45 mg/l

Cadmium Not Detected 0.01 mg/l

Lead Not Detected 0.05 mg/l

Zinc Not Detected 5.0 mg/l

Chromium Not Detected 0.05 mg/l

Copper 0.02 0.05 mg/l

Manganese 0.064 0.1 mg/l

Alkalinity 34 200 mg/l

BACTERIOLOGICAL PARAMETERS:

Total Coliform 2.0 0 org./100ml Org/100ml

E. coli Absent Absent --

Note: - The Sample Collection has done by ultra tech- Consultancy & laboratory.

-END OF REPORT-

For Ultra Tech

Kishor Sawant

(Authorized Signatory)

Page 73: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

Enclosure 7PUC Certificate

Page 74: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 75: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

Enclosure 8NGO Letter

Page 76: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 77: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

Enclosure 9Name Change Letter

Page 78: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 79: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 80: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 81: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 82: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

Enclosure 10Revised EC application

Page 83: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

10/18/2016 Report Part 1

http://environmentclearance.nic.in/State/ECReport.aspx?pid=SIA/MH/NCP/59785/2016&status=New 1/3

Project Details1.

  

i. Proposal No. : SIA/MH/NCP/59785/2016  

ii. File No. : NIL  

iii.Short narrative of the project: Residential Development at Kharadi Pune  

iv. Project Sector : New Construction Projects and  Industrial  Estates  

v. Subcategory : B2  

vi. Company/Proponent : NYATI HOUSING

vii.Details of State of the project 

Details of State of the project

S.no. State Name District Name Tehsil Name

1. Maharashtra Pune Haveli

 

  

viii.Date of TOR Granted N/A

Important Dates 

Important Dates

Accepted by SEIAA andforwarded to SEAC Accepted by SEAC EC Granted

N/A N/A N/A

Uploaded Documents of EIA/EMP, Risk Assessment, GPS, Toposheet, Form ­ 1,Pre Feasibility Report, Form ­ 1(A)2.

i.EIA/EMP: Annexure­EIA/EMP

ii.Risk Assessment: Annexure­Risk Assessment  

iii.Shape of the project land: Block (Polygon)

iv.GPS file: Annexure­GPS File

v.Toposheet file: Annexure­Toposheet file

EC Report

Page 84: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

10/18/2016 Report Part 1

http://environmentclearance.nic.in/State/ECReport.aspx?pid=SIA/MH/NCP/59785/2016&status=New 2/3

vi. Form ­ 1: Annexure­ Form ­ 1

vii.Pre Feasibility Report / Conceptual Plan : Annexure­Pre Feasibility Report/Conceptual Plan

viii.Form ­ 1(A): Annexure­Form ­ 1(A) 

ix. Uploaded Cover Letter: Annexure­Cover Letter 

x. Uploaded Additional Report/Study/Document as desired by Ministry/EAC: Annexure­Additional Report/Study/Document

 

xi. Remarks: ­

Additional Detail Sought:   NIL3.

Accredited Consultant Details4.

  

i. Accreditation status : Yes  

ii. Accreditation No. : NABET/EIA/1417/RA010  

iii. Name of Consultant: ULTRATECH 

iv. Address : Saudamini commercial complex building C3, 2nd floor right Bhusari colony paud roadKothrud Pune

 

v. Mobile No.: 9765982552 

vi. Landline No.: 02025286106 

vii. Email Id: [email protected]

Undertaking5.

The aforesaid application and documents furnished here with are true to myknowledge

  

i. Name : NYATI HOUSING  

ii. Designation : CEO  

iii. Company : NYATI HOUSING  

iv. Address : M/s. Nyati Housing, Nyati Unitree,

Page 85: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

10/18/2016 Report Part 1

http://environmentclearance.nic.in/State/ECReport.aspx?pid=SIA/MH/NCP/59785/2016&status=New 3/3

Recommendation by SEAC/SEIAA :   NIL6.

Print

Page 86: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

Enclosure 11EC Correction letter

Page 87: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w
Page 88: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w

Enclosure 13Half yearly post

monitoringcompliance report

Page 89: Monitoring the Implementation of ... - Nyati Group...M/s. Nyati Housing. “Nyati Unitree”, Nagar Road, Yerawada Pune- 411006 b. Address of Executive Project Engineer / Manager (w