monitoring bridges by gnss - fig · monitoring bridges by gnss • 7 bridges, case studies •...

12
FIG Congress 2010 Facing the Challenges – Building the Capacity Sydney, Australia, 1116 April 2010 1 Dr Gethin Wyn Roberts, Chris Brown, Dr Oluropo Ogundipe Monitoring Bridges by GNSS 7 Bridges, case studies Large and small suspension bridges, one viaduct, one cable stayed bridge New tests on the Severn Suspension Bridge, antennas on cables and towers

Upload: others

Post on 21-Mar-2020

12 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Monitoring Bridges by GNSS - FIG · Monitoring Bridges by GNSS • 7 Bridges, case studies • Large and small suspension bridges, one viaduct, one cable stayed bridge • New tests

FIG Congress 2010 Facing the Challenges – Building the Capacity Sydney, Australia, 11‐16 April 2010  1

Dr Gethin Wyn Roberts, Chris Brown, Dr Oluropo Ogundipe

Monitoring Bridges by GNSS

• 7 Bridges, case studies

• Large and small suspension bridges, one viaduct, one cable stayed bridge

• New tests on the Severn Suspension Bridge, antennas on cables and towers

Page 2: Monitoring Bridges by GNSS - FIG · Monitoring Bridges by GNSS • 7 Bridges, case studies • Large and small suspension bridges, one viaduct, one cable stayed bridge • New tests

FIG Congress 2010 Facing the Challenges – Building the Capacity Sydney, Australia, 11‐16 April 2010  2

Nottingham Wilford Suspension Bridge

London Millennium Suspension Bridge

Page 3: Monitoring Bridges by GNSS - FIG · Monitoring Bridges by GNSS • 7 Bridges, case studies • Large and small suspension bridges, one viaduct, one cable stayed bridge • New tests

FIG Congress 2010 Facing the Challenges – Building the Capacity Sydney, Australia, 11‐16 April 2010  3

Humber Bridge

Page 4: Monitoring Bridges by GNSS - FIG · Monitoring Bridges by GNSS • 7 Bridges, case studies • Large and small suspension bridges, one viaduct, one cable stayed bridge • New tests

FIG Congress 2010 Facing the Challenges – Building the Capacity Sydney, Australia, 11‐16 April 2010  4

Forth Road Bridge

Avonmouth Viaduct

Page 5: Monitoring Bridges by GNSS - FIG · Monitoring Bridges by GNSS • 7 Bridges, case studies • Large and small suspension bridges, one viaduct, one cable stayed bridge • New tests

FIG Congress 2010 Facing the Challenges – Building the Capacity Sydney, Australia, 11‐16 April 2010  5

Height Results

Seohae Grand Bridge, Korea Location: From Kyeonggi-do Pyeongtaek-si Poseoung-myun Naegi-ri To Choongcheongnam-do Dangjin-gun Songak-myun Bokwoo

Page 6: Monitoring Bridges by GNSS - FIG · Monitoring Bridges by GNSS • 7 Bridges, case studies • Large and small suspension bridges, one viaduct, one cable stayed bridge • New tests

FIG Congress 2010 Facing the Challenges – Building the Capacity Sydney, Australia, 11‐16 April 2010  6

Severn Suspension Bridge

9 GNSS receivers

2 reference stations

Reference station and backup

Post Processed OTF

Page 7: Monitoring Bridges by GNSS - FIG · Monitoring Bridges by GNSS • 7 Bridges, case studies • Large and small suspension bridges, one viaduct, one cable stayed bridge • New tests

FIG Congress 2010 Facing the Challenges – Building the Capacity Sydney, Australia, 11‐16 April 2010  7

Antenna locations, tower and cable

Movements location A, 40 min period

Page 8: Monitoring Bridges by GNSS - FIG · Monitoring Bridges by GNSS • 7 Bridges, case studies • Large and small suspension bridges, one viaduct, one cable stayed bridge • New tests

FIG Congress 2010 Facing the Challenges – Building the Capacity Sydney, Australia, 11‐16 April 2010  8

Location B 10 mins

Location B 1 min

Page 9: Monitoring Bridges by GNSS - FIG · Monitoring Bridges by GNSS • 7 Bridges, case studies • Large and small suspension bridges, one viaduct, one cable stayed bridge • New tests

FIG Congress 2010 Facing the Challenges – Building the Capacity Sydney, Australia, 11‐16 April 2010  9

Tower Longitudinal movements, 10 mins

Location A spectral analysis

Page 10: Monitoring Bridges by GNSS - FIG · Monitoring Bridges by GNSS • 7 Bridges, case studies • Large and small suspension bridges, one viaduct, one cable stayed bridge • New tests

FIG Congress 2010 Facing the Challenges – Building the Capacity Sydney, Australia, 11‐16 April 2010  10

Location B spectral analysis

Tower T1 spectral analysis

Page 11: Monitoring Bridges by GNSS - FIG · Monitoring Bridges by GNSS • 7 Bridges, case studies • Large and small suspension bridges, one viaduct, one cable stayed bridge • New tests

FIG Congress 2010 Facing the Challenges – Building the Capacity Sydney, Australia, 11‐16 April 2010  11

Height 4 locations 10 mins

Conclusions

• Valuable monitoring tool and technique

• Forth and Severn suffer wire breaks

• Long term monitoring?

Page 12: Monitoring Bridges by GNSS - FIG · Monitoring Bridges by GNSS • 7 Bridges, case studies • Large and small suspension bridges, one viaduct, one cable stayed bridge • New tests

FIG Congress 2010 Facing the Challenges – Building the Capacity Sydney, Australia, 11‐16 April 2010  12