monica lsp project management of networked i …...2019/05/05 · presentation reflects solely the...
TRANSCRIPT
![Page 1: MONICA LSP Project Management Of Networked I …...2019/05/05 · presentation reflects solely the views of its authors. The European Commission is not liable for any use that may](https://reader033.vdocuments.mx/reader033/viewer/2022042409/5f2501ae13058a47e4330d9f/html5/thumbnails/1.jpg)
Co-funded by the
European Union
MONICA LSP ProjectManagement Of Networked IoT Wearables – Very Large Scale
Demonstration of Cultural Societal Applications
MONICA Project presentation
eXperience for the future
12/4/2019 - Roberto Gavazzi - TIM - Italy
![Page 2: MONICA LSP Project Management Of Networked I …...2019/05/05 · presentation reflects solely the views of its authors. The European Commission is not liable for any use that may](https://reader033.vdocuments.mx/reader033/viewer/2022042409/5f2501ae13058a47e4330d9f/html5/thumbnails/2.jpg)
Introduction and Objectives of MONICA
• MONICA is a large-scale demonstration of multiple existing and new IoT technologies for Smarter Living• Advanced wireless technologies for Sound control, Safety
(Drones, Cam, Wearables, and smartphone apps), and User experience deployed at big, open-air cultural and sport events
![Page 3: MONICA LSP Project Management Of Networked I …...2019/05/05 · presentation reflects solely the views of its authors. The European Commission is not liable for any use that may](https://reader033.vdocuments.mx/reader033/viewer/2022042409/5f2501ae13058a47e4330d9f/html5/thumbnails/3.jpg)
Partners
Fraunhofer FIT, Germany
City of Lyon - Acoucité, France
Atos IT Solutions and Services, Slovakia
Brüel & Kjær Sound & Vibration Measurement A/S, Denmark
City of Bonn, Germany
CERTH Information Technologies Institute, Greece
CNet Svenska AB, Sweden
Dexels BV, Netherlands
DigiSky SRL UAV & Robotics Systems, Italy
Technical University of Denmark
City of Hamburg, Germany
Hamburg University of Applied Science, Germany
HW Communications Ltd, UK
In-JeT ApS, Denmark
ISMB Istituto Superiore Mario Bella, Italy
City of Copenhagen, Denmark
Kingston University, UK
Leeds Beckett University, UK
Movement Entertainment Srl, Italy
Optinvent S.A., France
Praesidio Group ApS, Denmark
Ring Advocacy ApS, Denmark
Telecom Italia S.p.A., Italy
Tivoli A/S, Denmark
City of Torino, Italy
VCA Technology Ltd, UK
Vaeksthus Zealand, Denmark
Yorkshire County Cricket Club Ltd, UK
Leeds Rugby, UK
Italy (5)
Germany (4)
Sweden (1)
France (2) Slovakia (1)
Denmark (8)
Greece (1)
Netherlands (1)UK (6)
29 partners, six cities, more than 16 events
![Page 4: MONICA LSP Project Management Of Networked I …...2019/05/05 · presentation reflects solely the views of its authors. The European Commission is not liable for any use that may](https://reader033.vdocuments.mx/reader033/viewer/2022042409/5f2501ae13058a47e4330d9f/html5/thumbnails/4.jpg)
Challenges
Massive scale operation, demonstrated by 10,000 simultaneous end users
Based on open standards and architecture with only the application layer specific to deployment
Using cost-efficient wearables and legacy smartphones
Data security and trust management framework, ensuring full data protection and privacy
![Page 5: MONICA LSP Project Management Of Networked I …...2019/05/05 · presentation reflects solely the views of its authors. The European Commission is not liable for any use that may](https://reader033.vdocuments.mx/reader033/viewer/2022042409/5f2501ae13058a47e4330d9f/html5/thumbnails/5.jpg)
Achievements: the technical concept
Closed Loop
Control SystemsClosed Loop
Control Systems
MONICA Private Cloud
Active Closed Loop
Control Systems
M2
M C
om
mu
nic
atio
n
Arc
hite
ctu
re
Situational Awareness and
Decision Support
SensingSensing
Sensing
Actuation
Situational
Information
Situational
Information
Control Strategy
Data
Security and
Trust
Control Strategy
Actuation IoT
Infrastructure
Th
e A
ctu
atio
n D
om
ain
Nomadic IoT InfrastructureMovable Sensor Networks
Dynamic IoT InfrastructureWearable Sensor Networks
Open IoT
Architecture
T h e S e n s i n g D o m a i n
Static IoT InfrastructureFixed Sensor Networks
![Page 6: MONICA LSP Project Management Of Networked I …...2019/05/05 · presentation reflects solely the views of its authors. The European Commission is not liable for any use that may](https://reader033.vdocuments.mx/reader033/viewer/2022042409/5f2501ae13058a47e4330d9f/html5/thumbnails/6.jpg)
Achievements: Pilot cities and events 2018-2019
• Copenhagen• Four Friday Rock concerts at TIVOLI
Gardens• 500,000 guests per season
• Bonn• Rhine in Flames festival
• up to 90,000 visitors per day
• Pützchens Markt festival, 5 days, • 1 million visitors in total
• Hamburg• Hamburger DOM funfair, 3 x 3 days
• 7-10 million visitors yearly (91 days)
• Port Anniversary, 2 x 3 days• 1 million visitors
City of Bonn/Michael Sondermann
![Page 7: MONICA LSP Project Management Of Networked I …...2019/05/05 · presentation reflects solely the views of its authors. The European Commission is not liable for any use that may](https://reader033.vdocuments.mx/reader033/viewer/2022042409/5f2501ae13058a47e4330d9f/html5/thumbnails/7.jpg)
Achievements: Pilot cities and events 2018-2019
• Lyon• La Fête des Lumières festival, 4 days
• Nuits Sonores, music festival, 5 days
• Turin• KappaFutur Festival, 2 days
• 20,000 people
• The Movida, 2 weekends
• Leeds, Headingly Stadium• Cricket matches, 2 events
• 158,000 visitors (2016)
• Rugby matches, 2 events• 250,000 visitors (2016)
![Page 8: MONICA LSP Project Management Of Networked I …...2019/05/05 · presentation reflects solely the views of its authors. The European Commission is not liable for any use that may](https://reader033.vdocuments.mx/reader033/viewer/2022042409/5f2501ae13058a47e4330d9f/html5/thumbnails/8.jpg)
Achievements: Validation
• 100,000 application users of which 10,000 participate in evaluation and validation activities• Authorities, organisers and citizens
• Technology, impact, user acceptance
![Page 9: MONICA LSP Project Management Of Networked I …...2019/05/05 · presentation reflects solely the views of its authors. The European Commission is not liable for any use that may](https://reader033.vdocuments.mx/reader033/viewer/2022042409/5f2501ae13058a47e4330d9f/html5/thumbnails/9.jpg)
Involving the entire chain of stakeholders
• Security ecosystem • Applications that can be used to
monitor and manage security before, during and after an event
• Acoustics ecosystem• Applications that help monitor
and manage the sound before, during and after a performance
• Innovation ecosystem • Applications for public engagement and innovation based on
open data and development tools
![Page 10: MONICA LSP Project Management Of Networked I …...2019/05/05 · presentation reflects solely the views of its authors. The European Commission is not liable for any use that may](https://reader033.vdocuments.mx/reader033/viewer/2022042409/5f2501ae13058a47e4330d9f/html5/thumbnails/10.jpg)
MONICA Sustainable and Replicable solutions
• Roadmaps to ensure further exploitation of MONICA apps
• Additional Business models and cases to show replicability of IoT platforms
• MONICA Platform Plug-in capability to other Smart City platforms
• Start-up services for entrepreneurs
• Open data repositories and tools for citizens and developers
![Page 11: MONICA LSP Project Management Of Networked I …...2019/05/05 · presentation reflects solely the views of its authors. The European Commission is not liable for any use that may](https://reader033.vdocuments.mx/reader033/viewer/2022042409/5f2501ae13058a47e4330d9f/html5/thumbnails/11.jpg)
A local example in which MONICA solutions can easily be replicated
• Basic Infrastructure: IoT Network coverage and evolution toward 5G
• Safety and Security: MONICA Solutions based on Drones, Cam,Wearables, and smartphone apps
• Fan Experience: MONICA wearables and apps for user experiences (professional and visitor apps)
![Page 12: MONICA LSP Project Management Of Networked I …...2019/05/05 · presentation reflects solely the views of its authors. The European Commission is not liable for any use that may](https://reader033.vdocuments.mx/reader033/viewer/2022042409/5f2501ae13058a47e4330d9f/html5/thumbnails/12.jpg)
Thanks for your attention and time!!!
For any information: Roberto Gavazzi – TIM Italy – Phone: +393357669704 - Email: [email protected]
All rights reserved. All copyright for this presentation are owned in full by the MONICA Project.
Permission is granted to print material published in this presentation for personal use only. Its use for any other purpose, and in particular its commercial use or distribution, is strictly
forbidden in the absence of prior written approval.
MONICA has received funding from the European Union’s Horizon 2020 Framework Programme for Research and Innovation under Grant Agreement No 732350.
Possible inaccuracies of information are under the responsibility of the project. This presentation reflects solely the views of its authors. The European Commission is not liable for
any use that may be made of the information contained therein.
Please see us here: www.monica-project.eu