ZADCOP.O. BOX 46808, ABU DHABI.TEL: 6050000

QA/QC MINUTES OF MEETING 002

PROJECT : HALON REPLACEMENT PROJECT AT UPPER ZAKUM

LOCATION : ACPT -2DATE: 03-09-2014

SUBJECT : QA/QC Weekly Meeting

PARTICIPANTS :

ZADCO / PMC :

1. Paramasivan

2. Umar Yudi Hartono

TYCO :

1. Moazam Ali

2. Senthil

DISTRIBUTION :

Attendees

For Tyco

Prepared By: Moazam Ali

Signature:

Date: 03.09.2014

For ZADCO / PMC

Verified By: Paramasivan

Signature:

Date: 03.09.2014

Sr. No.ContentsAction ByStatus

1General

1.1ZADCO PMC highlighted the as built issue concerning the dimensional and support issues. It was sent to ZADCO for further advice.ZADCO

1.2Nozzle Part Number acceptance to be received from ZADCO.ZADCO

1.3ZADCO PMC requested to get As built Status for ACPT 2 as completion date is on 30Th September 2014. TYCO

1.4Tapping sets 1, 2 were agreed by Tyco to be sent to site for cleaning of threads. It is to be sent.TYCO

2Inspection, Measuring and Testing Equipment

2.1List and calibration certificates of all inspection, measuring and testing equipment shall be submitted on a monthly basis.TYCO

3Request for Inspection (RFI)

3.1RFI to be submitted 24 hours in advance.TYCO

3.2RFI log to be maintained and a copy shall be submitted to ZADCO PMC on a weekly basis.TYCO

4Materials

4.1Material Certificates to be submitted for review before delivery of material to site.TYCO

5Documentation

5.1Latest revision documents to be made available at site.TYCO

5.1Next meeting to be on Wednesday 10-09-2014, 11:00 AM.Info