QA/QC MINUTES OF MEETING 002
PROJECT : HALON REPLACEMENT PROJECT AT UPPER ZAKUM
LOCATION : ACPT -2DATE: 03-09-2014
SUBJECT : QA/QC Weekly Meeting
PARTICIPANTS :
ZADCO / PMC :
1. Paramasivan
2. Umar Yudi Hartono
TYCO :
1. Moazam Ali
2. Senthil
DISTRIBUTION :
Attendees
For Tyco
Prepared By: Moazam Ali
Signature:
Date: 03.09.2014
For ZADCO / PMC
Verified By: Paramasivan
Signature:
Date: 03.09.2014
Sr. No.ContentsAction ByStatus
1General
1.1ZADCO PMC highlighted the as built issue concerning the dimensional and support issues. It was sent to ZADCO for further advice.ZADCO
1.2Nozzle Part Number acceptance to be received from ZADCO.ZADCO
1.3ZADCO PMC requested to get As built Status for ACPT 2 as completion date is on 30Th September 2014. TYCO
1.4Tapping sets 1, 2 were agreed by Tyco to be sent to site for cleaning of threads. It is to be sent.TYCO
2Inspection, Measuring and Testing Equipment
2.1List and calibration certificates of all inspection, measuring and testing equipment shall be submitted on a monthly basis.TYCO
3Request for Inspection (RFI)
3.1RFI to be submitted 24 hours in advance.TYCO
3.2RFI log to be maintained and a copy shall be submitted to ZADCO PMC on a weekly basis.TYCO
4Materials
4.1Material Certificates to be submitted for review before delivery of material to site.TYCO
5Documentation
5.1Latest revision documents to be made available at site.TYCO
5.1Next meeting to be on Wednesday 10-09-2014, 11:00 AM.Info