Evaluation of Electrical Energy Requirements
For Tehran-Mashad High Speed Rail
Mojtaba Noroozian MENA Rail & Metro Summit 2014
![Page 3: Mojtaba noroozian enermonde](https://reader033.vdocuments.mx/reader033/viewer/2022052218/5584a908d8b42afd5b8b4bee/html5/thumbnails/3.jpg)
CONTENTS
Introduction
Tehran-Mashad Electrical Railway General Information
Electrical Railway Structure
Methodology of Study
TPS numbers, Ratings and locations
Energy Requirements
![Page 4: Mojtaba noroozian enermonde](https://reader033.vdocuments.mx/reader033/viewer/2022052218/5584a908d8b42afd5b8b4bee/html5/thumbnails/4.jpg)
INTRODUCTION
![Page 5: Mojtaba noroozian enermonde](https://reader033.vdocuments.mx/reader033/viewer/2022052218/5584a908d8b42afd5b8b4bee/html5/thumbnails/5.jpg)
INTRODUCTION
![Page 6: Mojtaba noroozian enermonde](https://reader033.vdocuments.mx/reader033/viewer/2022052218/5584a908d8b42afd5b8b4bee/html5/thumbnails/6.jpg)
GENERAL DATA
Electrification system, 25 kV / 50 Hz
Track length: 926 km, Double-tracked system
Headway:
10 minutes for passengers trains
20 minutes for freight trains
Maximum Speed
200 km/hours for passengers trains
100 km/hours for freight trains
Number of Passenger Stations: 18
![Page 7: Mojtaba noroozian enermonde](https://reader033.vdocuments.mx/reader033/viewer/2022052218/5584a908d8b42afd5b8b4bee/html5/thumbnails/7.jpg)
ROLLING STOCK DATA
Passenger trains
2 BoBo locomotives, 15 Wagons, 90 tons, 6.4 MVA
Freight trains
2 CoCo locomotives, 150 tons, 7.5 MVA
![Page 8: Mojtaba noroozian enermonde](https://reader033.vdocuments.mx/reader033/viewer/2022052218/5584a908d8b42afd5b8b4bee/html5/thumbnails/8.jpg)
OVERHEAD CATENARY SYSTEM (OCS)
![Page 9: Mojtaba noroozian enermonde](https://reader033.vdocuments.mx/reader033/viewer/2022052218/5584a908d8b42afd5b8b4bee/html5/thumbnails/9.jpg)
STUDY METHODOLOGY
Train Formula (Speed, mass, route)
Current and power characteristic of trains
Current intake of each train
Modelling of trains as an electrical load
Voltage profile under different scenarios
![Page 10: Mojtaba noroozian enermonde](https://reader033.vdocuments.mx/reader033/viewer/2022052218/5584a908d8b42afd5b8b4bee/html5/thumbnails/10.jpg)
STUDY OUPUTS
Power requirements for the worst cases
Size of TPS (Traction Power Supply)
Rating of transformer Station power
Rating of autotransformer
Current in overhead catenary
Voltage Unbalance
![Page 11: Mojtaba noroozian enermonde](https://reader033.vdocuments.mx/reader033/viewer/2022052218/5584a908d8b42afd5b8b4bee/html5/thumbnails/11.jpg)
STUDY METHODOLOGY
The studies must include the impact of the external network with sufficient precision.
![Page 12: Mojtaba noroozian enermonde](https://reader033.vdocuments.mx/reader033/viewer/2022052218/5584a908d8b42afd5b8b4bee/html5/thumbnails/12.jpg)
TPS STUDY
Distance between Traction Substations
Power Capacity of Traction Substations
To consider:
Various operating scenarios
Passenger and freight trains trafic
Normal Condition
Emergency Conditions
![Page 13: Mojtaba noroozian enermonde](https://reader033.vdocuments.mx/reader033/viewer/2022052218/5584a908d8b42afd5b8b4bee/html5/thumbnails/13.jpg)
RESULT OF TPS STUDY
For simple system
17 TSS
60 km distance
2 x 30 or 2x40 MW
![Page 14: Mojtaba noroozian enermonde](https://reader033.vdocuments.mx/reader033/viewer/2022052218/5584a908d8b42afd5b8b4bee/html5/thumbnails/14.jpg)
TSS POWER CAPACITIES
For autotransformer scheme
12 TSS
80 km distance
2 x 40 or 2x50 MW
![Page 15: Mojtaba noroozian enermonde](https://reader033.vdocuments.mx/reader033/viewer/2022052218/5584a908d8b42afd5b8b4bee/html5/thumbnails/15.jpg)
TOTAL AVERAGE POWER
![Page 16: Mojtaba noroozian enermonde](https://reader033.vdocuments.mx/reader033/viewer/2022052218/5584a908d8b42afd5b8b4bee/html5/thumbnails/16.jpg)
SUPPLY OF ELECTRICAL POWER DEMAND
TSS TSS TSS TSS
FSS FSS FSS
Alternative 1:
![Page 17: Mojtaba noroozian enermonde](https://reader033.vdocuments.mx/reader033/viewer/2022052218/5584a908d8b42afd5b8b4bee/html5/thumbnails/17.jpg)
SUPPLY OF ELECTRICAL POWER DEMAND
Alternative 2:
DG
TSS TSS TSS TSS
FSS FSS FSS
DG DG DG
![Page 18: Mojtaba noroozian enermonde](https://reader033.vdocuments.mx/reader033/viewer/2022052218/5584a908d8b42afd5b8b4bee/html5/thumbnails/18.jpg)
SUPPLY OF ELECTRICAL POWER DEMAND
Alternative 3:
TSS TSS TSS TSS
FSS FSS FSS
PP PP
![Page 19: Mojtaba noroozian enermonde](https://reader033.vdocuments.mx/reader033/viewer/2022052218/5584a908d8b42afd5b8b4bee/html5/thumbnails/19.jpg)
SUPPLY OF ELECTRICAL POWER DEMAND
Alternative 4:
TSS TSS TSS TSS
FSS FSS FSS
PP PP
DG DG
![Page 20: Mojtaba noroozian enermonde](https://reader033.vdocuments.mx/reader033/viewer/2022052218/5584a908d8b42afd5b8b4bee/html5/thumbnails/20.jpg)
FURTHER STUDIES
Reactive power study
Power quality studies
EMF Studies
..
![Page 21: Mojtaba noroozian enermonde](https://reader033.vdocuments.mx/reader033/viewer/2022052218/5584a908d8b42afd5b8b4bee/html5/thumbnails/21.jpg)
CONCLUSIONS
A systematic approach for a typical high speed train study was
demonstrated.
The general data for the system study was discussed.
Number of traction substations and distances were studied.
Some Alternatives for supply of energy to the railway system
were examined.