mohd ghazi credentials

48
Mohd Ghazi (Mechanical Engineer) Project/Design/Planning/Analysis (HVAC/MEP/FIRE) Industry Type: Oil and Gas/Power/EPC/Energy/Constructions Email: [email protected] +966545512679 (Saudi Arabia) +919711698030 (India) Objective: To be at a leading position in company of repute where my contribution to the company is appreciated, technical cum managerial skill is utilized in challenging assignment, while bringing up personal and professional development. Career Summary 8+ years of experience in Design, planning, Execution, Testing and Commissioning strategies. Design, Planning, Execution, Monitoring, Control, Testing Commissioning and Handover For Residential and Commercial projects HVAC Systems, Cooling & Heat Load Estimation/Calculations, Design Of Ventilation & Air Distribution, Design Of Chilled Water System, Duct Sizing Calculation, Chilled/Hot Water Pipe Layouts, Pressure drop calculations, Pump head calculation, Static Pressure Calculation, HVAC Survey, AHU, Duct, Pump and Chillers Sizing & Selection, Detailing and installation of (chillers, AHU’S, PU’S, FCU’S, CU’S). Fire Fighting Systems, Water Distribution System, Exhaust Fans, Smoke Purging Fans, Fire Alarm and Detection System, FM200 Fire Suppression system, CO2 Fire Suppression system, Package Unit, HVAC Panels, DDC Panel, HVAC package units, Sufficiently Handling of Multiple Subcontractors of MEP (Fire Fighting, HVAC, Civil and Low Voltage) throughout the project from Initiation to finalization, Ensures Contractor’s compliance with Quality Assurance and EHS procedures, Evaluation of Contractor’s Payments application certificates. Review, Analysis and Approval:-HVAC system design, HVAC Materials, CO2 & FM200 fire suppression System, Fire Alarm detection & control system, Plumbing and drainage Systems, FF & FA System Materials, OHTC, Telecom Shelters, HVAC Electric Duct heater, Indoor Lighting, Submersible and Oil Pumps, Detail Project Engineering, planning & overall monitoring of execution of all electromechanical work. Monitor the progress of the work against the approved contractor schedule of works, Prepare work procedure and execution sequence for all critical activities Coordinate with site personnel during execution of work Material, Manpower and equipment planning for daily work activities Preparation and Continues Monitoring of KPIs, forecast s_curves, daily weekly and monthly work plans, preparation of detailed scheduling, fixing target for major quantities Visited consultants & clients for conducting techno-commercial meetings, Coordinating schedule & progress review meeting with clients and weekly progress presentations, Preparation of Progress reports, Interaction and compliance of client & consult ant requirements, Technical Bids, Evaluations and Technical Specifications Knowledge of various international codes like ASHRAE, SMACNA, NFPA, ISHRAE, ASME, ASMT, IS, BIS, IPC, AWWA, TESP(NG) Testing and commissioning of all the mechanical/electrical equipment and sign off the relevant documents for acceptance. Certificate of Completion Design Planning Procedure, Design Controls Integrated, Design Procurement and Field Operation, Designer Time Guidelines, Managing a Project Schedule, Project Risk Management, PMACS Project Management, PMO Project Planning, Supplier Relationships. Excellent working experience with Ms-Office, Autocad, Catia, HAP, Elite, MSP, Primavera, LEED. Company Position Client Projects Name JD GE Grid Solution (SAU)- Madina (Saudi Arabia) Jan 2016 To till Project Professional (MEP) Saudi Electricity Company OR National Grid 380KV SUBSTATIONS:- AlSalam (Madina), Al-Madaya 110 KV S/S SUBSTATIONS:- KEC1, KEC2, Tiyam-2, Al-Bayda-2, Uhad, Al-Balad, Al- Bawadi, Al-Barakka, Al-Tuwal, AL-Bida Ext. 132KV S/S:- 8166, 8172, 8068, 8608, 8222, 8130, Jizan, Sabiya, Addard, Baish Addarb, Namerah, Majarda, Albirk JP Green City, JIIT at Noida, Leisure Valley, KRM University Al-Othaim Mall, Al-Sadhan Mall, KFS, FTTH, VDSL Survey, DC Power Batteries Replacement, RDNE Replacement of Data network Equipment’s, CFDED’s complete fundamental engineering detailed design (Civil, Electrical and Mechanical). Design, Execution, testing, Commissioning and Handover Alstom Grid (SAR)- Madina (Saudi Arabia) Aug 2014 To Dec 2015 MEP Design And Execution MTMM-Mohammad Turki MOTT MACDONALD Engineering Consultant- Jeddah Oct 2013 To July 2014 MEP Design Analyst Design Analysis, Approval & Rectifications (MEP) Vikas Associates Pvt Ltd- Noida (India) June 2011 To Oct 2013 MEP Engineer JP Green Developer HVAC & MEP (Design & Installation) Bazy Trading and Contracting Co. Ltd- Riyadh (Saudi Arabia) Jan 2009 To April 2011 HVAC Engineer STC, Mobily Zain and Saudi Aramco Oil HVAC & MEP (Design & Installation) Crown Plaza Today Hotel (IHG Group)- Gurgaon (India) Jul 2008 To Jan 2009 HVAC Maintenance Engineer International Hotel Group HVAC Maintenance

Upload: mohd-ghazi

Post on 09-Feb-2017

68 views

Category:

Engineering


2 download

TRANSCRIPT

Page 1: Mohd ghazi credentials

Mohd Ghazi (Mechanical Engineer) Project/Design/Planning/Analysis (HVAC/MEP/FIRE)

Industry Type: Oil and Gas/Power/EPC/Energy/Constructions

Email:­ [email protected] +966545512679 (Saudi Arabia) +919711698030 (India)

Objective:­ To be at a leading position in company of repute where my contribution to the company is appreciated, technical

cum managerial skill is utilized in challenging assignment, while bringing up personal and professional development.

Career Summary 8+ years of experience in Design, planning, Execution, Testing and Commissioning strategies. Design, Planning, Execution, Monitoring, Control, Testing Commissioning and Handover

For Residential and Commercial projects HVAC Systems, Cooling & Heat Load Estimation/Calculations, Design Of Ventilation & Air Distribution, Design Of Chilled Water System, Duct Sizing Calculation, Chilled/Hot Water Pipe Layouts, Pressure drop calculations, Pump head calculation, Static Pressure Calculation, HVAC Survey, AHU, Duct, Pump and Chillers Sizing & Selection, Detailing and installation of (chillers, AHU’S, PU’S, FCU’S, CU’S). Fire Fighting Systems, Water Distribution System, Exhaust Fans, Smoke Purging Fans, Fire Alarm and Detection System, FM200 Fire Suppression system, CO2 Fire Suppression system, Package Unit, HVAC Panels, DDC Panel, HVAC package units,

Sufficiently Handling of Multiple Subcontractors of MEP (Fire Fighting, HVAC, Civil and Low Voltage) throughout the project from Initiation to finalization, Ensures Contractor’s compliance with Quality Assurance and EHS procedures, Evaluation of Contractor’s Payments application certificates.

Review, Analysis and Approval:-HVAC system design, HVAC Materials, CO2 & FM200 fire suppression System, Fire Alarm detection & control system, Plumbing and drainage Systems, FF & FA System Materials, OHTC, Telecom Shelters, HVAC Electric Duct heater, Indoor Lighting, Submersible and Oil Pumps,

Detail Project Engineering, planning & overall monitoring of execution of all electro­mechanical work. Monitor the progress of the work against the approved contractor schedule of works, Prepare work procedure and execution sequence for all critical activities Coordinate with site personnel during execution of work Material, Manpower and equipment planning for daily work activities Preparation and Continues Monitoring of KPIs, forecast s_curves, daily weekly and monthly work plans, preparation of detailed scheduling, fixing target for major quantities

Visited consultants & clients for conducting techno-commercial meetings, Coordinating schedule & progress review meeting with clients and weekly progress presentations, Preparation of Progress reports, Interaction and compliance of client & consult ant requirements, Technical Bids, Evaluations and Technical Specifications

Knowledge of various international codes like ASHRAE, SMACNA, NFPA, ISHRAE, ASME, ASMT, IS, BIS, IPC, AWWA, TESP(NG)

Testing and commissioning of all the mechanical/electrical equipment and sign off the relevant documents for acceptance.

Certificate of Completion Design Planning Procedure, Design Controls Integrated, Design Procurement and Field Operation, Designer Time Guidelines, Managing a Project Schedule, Project Risk Management, PMACS Project Management, PMO Project Planning, Supplier Relationships.

Excellent working experience with Ms-Office, Autocad, Catia, HAP, Elite, MSP, Primavera, LEED.

Company Position Client Projects Name JD GE Grid Solution (SAU)- Madina (Saudi Arabia) Jan 2016 To till

Project Professional (MEP)

Saudi Electricity

Company OR

National Grid

380KV SUBSTATIONS:- AlSalam (Madina), Al-Madaya 110 KV S/S SUBSTATIONS:- KEC1, KEC2, Tiyam-2, Al-Bayda-2, Uhad, Al-Balad, Al-Bawadi, Al-Barakka, Al-Tuwal, AL-Bida Ext. 132KV S/S:- 8166, 8172, 8068, 8608, 8222, 8130, Jizan, Sabiya, Addard, Baish Addarb, Namerah, Majarda, Albirk JP Green City, JIIT at Noida, Leisure Valley, KRM University

Al-Othaim Mall, Al-Sadhan Mall, KFS, FTTH, VDSL Survey, DC Power Batteries Replacement, RDNE Replacement of Data network Equipment’s, CFDED’s complete fundamental engineering detailed design (Civil, Electrical and Mechanical).

Design, Execution, testing, Commissioning and Handover

Alstom Grid (SAR)- Madina (Saudi Arabia) Aug 2014 To Dec 2015

MEP Design And Execution

MTMM-Mohammad Turki MOTT MACDONALD Engineering Consultant- Jeddah Oct 2013 To July 2014

MEP Design Analyst

Design Analysis, Approval & Rectifications (MEP)

Vikas Associates Pvt Ltd- Noida (India) June 2011 To Oct 2013

MEP Engineer JP Green Developer

HVAC & MEP (Design & Installation)

Bazy Trading and Contracting Co. Ltd- Riyadh (Saudi Arabia) Jan 2009 To April 2011

HVAC Engineer STC, Mobily Zain and Saudi Aramco Oil

HVAC & MEP (Design & Installation)

Crown Plaza Today Hotel (IHG Group)- Gurgaon (India) Jul 2008 To Jan 2009

HVAC Maintenance Engineer

International Hotel Group

HVAC Maintenance

Page 2: Mohd ghazi credentials

Degree Curriculum Project Information Computer Skills Project title (Major): Design and Selection of Air Conditioning Description of the project: We Design and Selection of Air Conditioning system of VRV type as per as the requirements of the all Classrooms of mechanical Engineering department of Jamia Millia Islamia University at New Delhi. Project title (Minor): Estimation and Costing of Air Conditioning Description of the project: We did the Estimation and Costing for Air Conditioning for all Class Rooms of Mechanical Engineering of Jamia Millia Islamia University at New Delhi 110025

Worked On Ms-Project Planning, P6, HAP and Risk Project Management. Good Knowledge of MS OFFICE (Word, Excels, Power Point, Access and Outlook etc) Good knowledge of AUTOCAD, CATIA and PROE etc. Good knowledge of computer Hardware’s, Troubleshooting and Designing software’s. Excellently working with all OS (Win XP (98 to 2007), Vista,Win 7/8 /10 and Intranet & Networking

Industrial Visits and Professional TrainingsAttended two months summer training in Mother Son Sumi Pvt Ltd, Noida in 2007 (INDIA).Attended Safety Orientation Program organized by Saudi Aramco Oil (Saudi Arabia) Work Permit receiver from Saudi Aramco Oil 2011. Certificate of Completion (Spirit and Letter Basic: Overview/Induction Training, Controllership, Improper Payments, Conflict of Interest, Supplier Relationships, Competition Law, Fair Employment Practice, Working with government) In 2016. GE Certificate of Completion (E-Learning High Risk Activity, E-Ethics, EHS Fundamental, Introduction to Open Reporting) in 2015 from Alstom University.

PERSONAL DETAILS Educational Qualifications

B Tech (Mechanical) from Jamia Millia Islamia University (INDIA) in 2008 with 1st division.

10th and 12th from Jamia Senior Secondary School (Jamia Millia Islamia-New delhi) in 2001 & 2003.

DOB

01/02/1987

Strength & SkillsHardworking, regularity and punctuality are the keys to success. Ready to accept any challenges and very enthusiastic to solve a problem, Quick grasping and retaining new updates, information and procedure. Excellent competency in English language & PC skills. Ability to work under stress Possess team spirit with pleasant manner to develop & maintain good working relationship. Easily relocate to any location and Ambitious to achieve career goals. Good in interpersonal, presentation, analytical skills and team leading

Father’s name Mohd Mohiuddin

Marital status Unmarried

Sex Male

Religious Islam

Driving license (LMV)

India and Saudi Arabia

Passport Data J1120893 Valid Till 28-02-2020.

Availability within 01-Month

Hobbies Plantation and listening Music

LANGUAGES English Arabic Urdu/Hindi Extra-Curriculum Achievement ROCK CLIMBING certificate received from National Adventure Council (India). Flag hoisting certificate, Gold Medal, and “A” certificate received from NCC in 2001. Listening Music and Reading Scripture and Culture.

Read Excellent Excellent Excellent

Speak Excellent Initial Excellent

Write Excellent Initial Excellent

Using 15 years 06 Years 23 years

DeclarationI Mohd Ghazi clarify that all the information mentioned above is Correct as per as my knowledge.

Date: - 18th December 2016

Place: - New Delhi (India) Signature:-

Page 3: Mohd ghazi credentials
Page 4: Mohd ghazi credentials
Page 5: Mohd ghazi credentials
Page 6: Mohd ghazi credentials
Page 7: Mohd ghazi credentials
Page 8: Mohd ghazi credentials
Page 9: Mohd ghazi credentials

Certificate of Completion

This certifies that

Mohd Ghazi

has successfully completed

Advanced International Trade Compliance (ITC) Overview English Completed on 9/17/2016

_____________________________________________________________

Page 1 of 1SumTotal

9/17/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=18...

Page 10: Mohd ghazi credentials
Page 11: Mohd ghazi credentials

GHAZI, MOHD

has successfully completed the online course module for

Confined & Permit Space Entry Authorized

Date of issue: 21 November 2016

This is to certify that

Chapter

Page 1 of 1Confined & Permit Space Entry Authorized

11/21/2016http://content.mylearning.ge.com/TemplateV2/course.html?CRSE=CSAI&CHAP=1&LAN...

Page 12: Mohd ghazi credentials

Certificate of Completion

This certifies that

Mohd Ghazi

has successfully completed

CONFINED SPACE AUTHORIZED INITIAL Completed on 11/21/2016

_____________________________________________________________

Page 1 of 1SumTotal

11/24/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=1...

Page 13: Mohd ghazi credentials

Certificate of Completion

This certifies that

Mohd Ghazi

has successfully completed

GEHC_GQP_10.01.002 Design Controls Integrated Design Planning (DOC0505542 Rev4)

Completed on 12/9/2016

_____________________________________________________________

Page 1 of 1SumTotal

12/10/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=1...

Page 14: Mohd ghazi credentials

Certificate of Completion

This certifies that

Mohd Ghazi

has successfully completed

OEC PR11014 Design Planning Procedure, Rev9 Completed on 12/9/2016

_____________________________________________________________

Page 1 of 1SumTotal

12/10/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=1...

Page 15: Mohd ghazi credentials

Certificate of Completion

This certifies that

Mohd Ghazi

has successfully completed

Constructability 4- Design, Procurement and Field Operation Phases (1)

Completed on 12/9/2016

_____________________________________________________________

Page 1 of 1SumTotal

12/10/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=1...

Page 16: Mohd ghazi credentials

Certificate of Completion

This certifies that

Mohd Ghazi

has successfully completed

Designer Time Guidelines Completed on 12/6/2016

_____________________________________________________________

Page 1 of 1SumTotal

12/6/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=35...

Page 17: Mohd ghazi credentials
Page 18: Mohd ghazi credentials

5/2/2015 Certificate

https://alstom.adobeconnect.com/_a847585302/ehs­fundamentals­en/default/content/resources/certificate.html 1/1

Mohd Ghazi

ALSTOM EHS Fundamentals

5/2/2015

Page 19: Mohd ghazi credentials

GHAZI, MOHD

has successfully completed the online course module for

Fall Protection – Competent Person

Date of issue: 21 November 2016

This is to certify that

Chapter

Page 1 of 1Fall Protection – Competent Person

11/21/2016http://content.mylearning.ge.com/TemplateV2/course.html?CRSE=FPCP&CHAP=1&LAN...

Page 20: Mohd ghazi credentials

Certificate of Completion

This certifies that

Mohd Ghazi

has successfully completed

Fall Protection Competent Person Completed on 11/21/2016

_____________________________________________________________

Page 1 of 1SumTotal

11/24/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=3...

Page 21: Mohd ghazi credentials

Certificate of Completion

This certifies that

Mohd Ghazi

has successfully completed

08.118 HPI DCAR PMACS Project Management Completed on 12/6/2016

_____________________________________________________________

Page 1 of 1SumTotal

12/10/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=6...

Page 22: Mohd ghazi credentials
Page 23: Mohd ghazi credentials

Certificate of Completion

This certifies that

Mohd Ghazi

has successfully completed

Introduction to Open Reporting Completed on 1/25/2016

_____________________________________________________________

Page 1 of 1SumTotal

7/18/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=18188...

Page 24: Mohd ghazi credentials

Certificate of Completion

This certifies that

Mohd Ghazi

has successfully completed

LOCKOUT/TAGOUT AUTHORIZED Completed on 11/20/2016

_____________________________________________________________

Page 1 of 1SumTotal

11/24/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=1...

Page 25: Mohd ghazi credentials

GHAZI, MOHD

has successfully completed the online course module for

Lockout/Tagout Authorized

Date of issue: 20 November 2016

This is to certify that

Chapter

Page 1 of 1Lockout/Tagout Authorized

11/20/2016http://content.mylearning.ge.com/TemplateV2/course.html?CRSE=LOTO&CHAP=1&LA...

Page 26: Mohd ghazi credentials

Certificate of Completion

This certifies that

Mohd Ghazi

has successfully completed

Nuclear CP-19-116 Project Risk Management Completed on 12/7/2016

_____________________________________________________________

Page 1 of 1SumTotal

12/10/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=3...

Page 27: Mohd ghazi credentials

Certificate of Completion

This certifies that

Mohd Ghazi

has successfully completed

Nuclear NSAI-20-04 Work Planning Completed on 12/6/2016

_____________________________________________________________

Page 1 of 1SumTotal

12/10/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=3...

Page 28: Mohd ghazi credentials

Certificate of Completion

This certifies that

Mohd Ghazi

has successfully completed

Nuclear Read Acknowledgement Completed on 12/7/2016

_____________________________________________________________

Page 1 of 1SumTotal

12/10/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=1...

Page 29: Mohd ghazi credentials
Page 30: Mohd ghazi credentials

Certificate of Completion

This certifies that

Mohd Ghazi

has successfully completed

Spirit and Letter Basic: Conflict of Interest Completed on 11/13/2016

_____________________________________________________________

Page 1 of 1SumTotal

11/13/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=8...

Page 31: Mohd ghazi credentials

Certificate of Completion

This certifies that

Mohd Ghazi

has successfully completed

Spirit & Letter Annual Acknowledgement – New Hires Completed on 1/25/2016

_____________________________________________________________

Page 1 of 1SumTotal

7/18/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=17297...

Page 32: Mohd ghazi credentials

Certificate of Completion

This certifies that

Mohd Ghazi

has successfully completed

Spirit & Letter Annual Acknowledgement Completed on 1/25/2016

_____________________________________________________________

Page 1 of 1SumTotal

7/18/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=16949...

Page 33: Mohd ghazi credentials

Certificate of Completion

This certifies that

Mohd Ghazi

has successfully completed

Spirit and Letter Basic: Conflict of Interest Completed on 8/1/2016

_____________________________________________________________

Page 1 of 1SumTotal

8/1/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=821...

Page 34: Mohd ghazi credentials

Certificate of Completion

This certifies that

Mohd Ghazi

has successfully completed

Spirit and Letter Basic: Controllership Completed on 7/18/2016

_____________________________________________________________

Page 1 of 1SumTotal

7/18/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=12202...

Page 35: Mohd ghazi credentials

Certificate of Completion

This certifies that

Mohd Ghazi

has successfully completed

Spirit and Letter Basic: Improper Payments Completed on 3/27/2016

_____________________________________________________________

Page 1 of 1SumTotal

3/27/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=82183...

Page 36: Mohd ghazi credentials

Certificate of Completion

This certifies that

Mohd Ghazi

has successfully completed

Spirit and Letter Basic: Improper Payments Completed on 3/27/2016

_____________________________________________________________

Page 1 of 1SumTotal

7/18/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=82749...

Page 37: Mohd ghazi credentials

Certificate of Completion

This certifies that

Mohd Ghazi

has successfully completed

Spirit and Letter Basic: Overview/Induction Training Completed on 12/19/2015

_____________________________________________________________

Page 1 of 1SumTotal

7/18/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=49194...

Page 38: Mohd ghazi credentials

Certificate of Completion

This certifies that

Mohd Ghazi

has successfully completed

Spirit and Letter Basic: Supplier Relationships Completed on 7/18/2016

_____________________________________________________________

Page 1 of 1SumTotal

7/18/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=12185...

Page 39: Mohd ghazi credentials

Certificate of Completion

This certifies that

Mohd Ghazi

has successfully completed

Spirit and Letter Basic: Competition Law Completed on 6/20/2016

_____________________________________________________________

Page 1 of 1SumTotal

7/18/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=82185...

Page 40: Mohd ghazi credentials

Certificate of Completion

This certifies that

Mohd Ghazi

has successfully completed

Spirit and Letter Basic: Improper Payments Completed on 3/27/2016

_____________________________________________________________

Page 1 of 1SumTotal

3/27/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=82749...

Page 41: Mohd ghazi credentials

Certificate of Completion

This certifies that

Mohd Ghazi

has successfully completed

Spirit and Letter Basic: Fair Employment Practices Completed on 8/1/2016

_____________________________________________________________

Page 1 of 1SumTotal

8/1/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=121...

Page 42: Mohd ghazi credentials
Page 43: Mohd ghazi credentials

Certificate of Completion

This certifies that

Mohd Ghazi

has successfully completed

Managing a Project Schedule Pre Exam Completed on 12/6/2016

_____________________________________________________________

Page 1 of 1SumTotal

12/6/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=21...

Page 44: Mohd ghazi credentials

Certificate of Completion

This certifies that

Mohd Ghazi

has successfully completed

Planning Screens SCM Completed on 12/6/2016

_____________________________________________________________

Page 1 of 1SumTotal

12/10/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=2...

Page 45: Mohd ghazi credentials

Certificate of Completion

This certifies that

Mohd Ghazi

has successfully completed

08.118 HPI DCAR PMACS Project Management Completed on 12/6/2016

_____________________________________________________________

Page 1 of 1SumTotal

12/6/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=66...

Page 46: Mohd ghazi credentials

Certificate of Completion

This certifies that

Mohd Ghazi

has successfully completed

PMO Project Planning Completed on 12/9/2016

_____________________________________________________________

Page 1 of 1SumTotal

12/10/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=2...

Page 47: Mohd ghazi credentials

Certificate of Completion

This certifies that

Mohd Ghazi

has successfully completed

Quality QMS and QP13 Acknowledgement Completed on 12/6/2016

_____________________________________________________________

Page 1 of 1SumTotal

12/6/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=35...

Page 48: Mohd ghazi credentials

Certificate of Completion

This certifies that

Mohd Ghazi

has successfully completed

01.081_ Wipro GE Pest Control Process_ DOC1536102 Completed on 8/1/2016

_____________________________________________________________

Page 1 of 1SumTotal

8/1/2016https://ge.sumtotalsystems.com/sumtotal/app/management/LMS_ActReports.aspx?ActId=163...