  • PG/QMS/SF/012/00 CV Standard Format Page 1 of 5

    Standard Curriculum Vitae M

    Personal Details:

    Full Name:

    Mohamed Waleed El Saed Hasan Date of Birth: (DD MMM YY) 23 Nov 1974

    Nationality: Egyptian

    Marital Status: Married

    Permanent Address: Giza-Egypt

    Temporary Address: N/A

    Passport: Number: 483912

    Country of Issue: Egypt

    Contact Details:

    Mobile / Home: 01220022397 - 02/33883369

    E-mail:

    Mohamedwaled@allamsons.com / emanwaleed2005@yahoo.com

    Mohamedwaled2892013@gmail.com

    Education:

    Primary Qualification:

    Level: (MSc, BSc, etc) 1. BSC

    Discipline: (e.g. Civil Eng, etc) graduation year

    Civil Eng / may-1998

    Continuing Professional Development: (Reverse chronological order, i.e. latest first) Dates (DD MMM YY) Courses

    From To Subject Provider

    1/6/2011 30/6/2011 Project management

    professional (PMP) Becom-acadimy

    11/5/2010 11/5/2010 OSHA MIRDIF Security and safety Consultant

    8/3/2009 12/3/2009 ISO 9001/2008- internal quality

    management auditor Kaizen Egypt

    1/2/2009 5/2/2009

    Establishing of QMS in

    accordance with ISO

    9001/2008

    Kaizen Egypt

    3/7/2006 10/7/2006 Primavera project planner PROMASTER

    Core Competencies:

    Leadership Solving problem

    Systematic

    Planning Working under pressure

    High communication skills

    mailto:Mohamedwaled@allamsons.com%20/mailto:emanwaleed2005@yahoo.commailto:Mohamedwaled2892013@gmail.com

  • PG/QMS/SF/012/00 CV Standard Format Page 2 of 5

    Career Summary: (Reverse chronological order, i.e. latest first) Years

    Job Titles Employers From (YYYY)

    TO (YYYY)

    Duration (+/- 0.25 yr)

    2011 Now 4.0 Yrs.

    Quality Control Manager

    Hassan Allam Construction

    2007 2010 4.0 yrs quality Control Manager Orascom Construction Industries

    (OCI)

    2006 2007 1 yr Junior site manager El Gabry general contracting Co

    2005 2006 1 yr Senior site engineer JV industrial engineering enterprise &

    VCC

    2004 2005 1.5 yrs Lead civil quality control engineer MORGANTI AIC/ LLC (Joint Venture)

    2003 2004 1.1 Quality Control Engineer ABB Susa INC.

    2002 2003 1 Quality Control Engineer JV Washington international. /

    Contrak

    2000 2002 2 Quality Control Engineer JV Washington international. /

    Contrak

    1998 2000 1.5 Quality Control Engineer JV Washington international. /

    Contrak

    Career History: (Reverse chronological order, i.e. latest first)

    Year From: February 2011

    Year To: Now

    Job Title: Quality Control Manager

    Employer/

    project:

    Hassan Allam Construction

    Project: 40 West Project at Beverly Hills.

    Owner : (SODIC)

    Consultant: MEDHAT ABOU ZEID (MZECH)

    Budget : 550 million L.E

    List Main Duties:

    Responsible for overall monitoring of QA/QC staff in the project and report to the quality director and the project manager.

    Lead effectively a team of quality engineers to achieve the project specified inspection and testing requirements on site and off site.

    Managing all site activities for inspection and testing at frequencies denoted in the contract or ITPs.

    Managing calibration of measurements & laboratories equipments.

    Managing periodic quality reporting at prescribe interval & format.

    Managing submission of time quality documentation and record for handover.

    Communicate all Hassan Allam QMS requirements, procedure and manage the implementation of this system.

    Maintain the record of the inspections of the incoming materials and to reject the defective materials.

    Managing non conformities process and propose the corrective actions.

    Expedite close out of the punch list items during the periodical meeting with the construction team.

  • PG/QMS/SF/012/00 CV Standard Format Page 3 of 5

    Year From: 2007

    Year To: 2011

    Job Title: (Quality Control Manager)

    Employer/

    project:

    Orascom Construction Industries

    Project: El-Tebbin Thermal Power Plant 350x2MW (Oil / Gas Fired Units) Project.

    Budget : 950 million L.E

    List Main Duties:

    Responsible for overall monitoring of QA/QC staff in the project and report to the project manager and business unit quality manager.

    Lead effectively a team of quality engineers to achieve the project specified inspection and testing requirements on site and off site.

    Managing all site activities for inspection and testing at frequencies denoted in the contract or ITPs.

    Managing calibration of measurements & laboratories equipments.

    Managing periodic quality reporting at prescribe interval & format.

    Managing submission of time quality documentation and record for handover.

    Communicate all Orascom QMS requirements, procedure and manage the implementation of this system.

    Maintain the record of the inspections of the incoming materials and to reject the defective materials.

    Managing non conformities process.

    Expedite close out of the punch list items during the periodical meeting with the construction team.

    List Any Notable Achievements:

    Completed and lead the QC team for the project within the contract specifications and obligations

    and without any major quality issues and without any claims from the client.

    Year From: 2006

    Year To: 2007

    Job Title: Junior site manager

    Employer/

    project:

    El Gabry general contracting Co.

    Project :sun shine hotel in Neama bay sharm el shekh

    Budget : 52 million L.E

    Insuring the project run to the schedule and budget.

    Managing programs of work (planning)

    Arranging delivery of material.

    Managing arrange of subcontractors.

    Contact and communicate with the local authorities for work permits.

    Conducting a regular site safety checks.

    Maintaining of strict quality control procedures.

    Liaising with client/consultant periodical meetings to keep them informed of progress.

    Year From: 2005

    Year To: 2006

    Job Title: Senior site engineer

    Employer/

    project:

    JV industrial engineering enterprise & VCC

    Project : urban water and sanitation project (waste water treatment

    plant and pump stations and related buildings)

    Budget : 103 million L.E List Main Duties:

    Providing a technical advice to subcontractors and construction junior site engineers.

    Supervising (setting out, levelling, surveying the site.

    Ensure delivering of the materials and their quantities.

    Checking plans, drawings and quantities for accuracy of calculations.

    Day to day management of the site including supervision and monitoring the site labour force and the work of any subcontractor.

    Resolving any unexpected technical difficulties.

    Overseeing quality control, health and safety matters at site.

    List Any Notable Achievements:

  • PG/QMS/SF/012/00 CV Standard Format Page 4 of 5

    Completed the project with minor punch list items

    Year From: 2004

    Year To: 2005

    Job Title: Lead civil quality control engineer.

    Employer/

    project:

    MORGANTI AIC/ LLC (Joint Venture)

    Project : Alexandria water general authority

    Egypt utilities management /Alexandria

    USAID Grant NO 263-0270.20

    Contract NO. 263-C-00-01-00016-00

    Budget : 112 million L.E

    List Main Duties:

    Leading a staff of junior QC engineers and inspectors

    Monitoring all inspection activities related to rehabilitation of a water treatment plant and erecting of new water treatment plant

    Monitoring inspection and transmission and distribution pipe line on installation.

    Monitoring inspection and testing pipes (D.I, PVC, CS) for hydrostatic and disinfection tests.

    Review all inspection report for compliance

    Assist QC manager in the organization, maintenance and control of quality system.

    Assist QC manager and construction engineers in resolving any discrepancies

    Prepare non conformance report to QA/QC manager

    Review the work procedures and method statement for compliance

    Attending a weekly meeting with client to discuss the quality issues

    List Any Notable Achievements:

    Complete the water treatment plant with issuance minor amount of non conformance reports from

    the consultant.

    Year From: 2003

    Year To: 2004

    Job Title: Quality control engineer

    Employer/

    project:

    ABB Susa INC.

    Design/build construction project for middle Egypt cities.

    Budget : 101 million L.E

    List Main Duties:

    Perform a complete inspection for the delivered material

    Prepare MRR for all the approved material

    Perform all inspection activities related to erection of new water treatment plant including (concrete work, finishing work and paving, landscaping)

    Perform inspection of the installation and testing of gravity and pressure pipe line

    Verify the work procedures and MS for compliance.

    Ensure the work is correctly prepared prior to any inspection being undertaken.

    Follow up all laboratories testing activity includes (soil, concrete, asphalt, etc).

    Prepare a QC daily report and NCR to the QC manger.

    List Any Notable Achievements:

    Complete the project without issuance any surveillance notice report from the consultant.

  • PG/QMS/SF/012/00 CV Standard Format Page 5 of 5

    Year From: 2002

    Year To: 2003

    Job Title: Quality control engineer

    Employer/

    project:

    JV Washington international. / Contrak

    Project : Luxor Waste Water Facilities Project

    Budget : 40 million L.E

    List Main Duties:

    Perform inspection and testing for precast concrete and various type of pipes (PVC, RC, DI)

    Perform inspection on the Suring system of deep excavation according to the design drawing

    Insuring the work is correctly prepared prior to inspection

    Perform the inspection of all the delivered materials and prepare the MRR

    Follow up all laboratories testing activity includes (soil, concrete, asphalt, etc).

    Prepare a QC daily report to the QC manger.

    Prepare non conformance report to the QA/QC manager if needed.

    List Any Notable Achievements:

    Complete the project within the targeted quality according to the project specifications.

    From March 2000 to feb.2002

    Employer : Proof. Dr: Ahmed Abel wraith Consulting Engineering J. V. ` With camp dresser&Mckee international inc.

    Owner : National organization of potable water and sanitary drainage (NOPWSD)

    Contractor : Morrison Knudson International / Contrak (J.V.). Project : Aswan Cities Water & Waste Water Facilities Project

    USAID : Project with total cost 108 million $ - Grand NO.263 -0236. Job : Quality Control Engineer Duties : Inspection and testing for R.C, PVC, and VCP.

    Inspection and testing and finishing for precast manhole and cast in place

    Manholes and precast house connection following lab activities through the project including material acceptance.

    From July 1998 to Feb. 2000

    Quality control Engineer for Consulting Engineering Laboratories for canal cities water and wastewater project for sewer rehabilitation of Port Said contract variation order CVO 009 PS

    Employer : Proof. Dr: Ahmed Abel wraith Consulting Engineering J. V With camp dresser&Mckee international Inc.

    Owner : National organization of potable water and sanitary drainage (NOPWSD)

    Contractor : Morrison Knudson International / Contrak (J.V.). Project : port said Water & Waste Water Facilities Project

    USAID : Project with total cost 91million $ - Grand NO.263 -0262. Job : Quality Control Engineer Duties : Inspection and testing for R.C, PVC, and VCP.

    Inspection and testing and finishing for precast manhole and cast in place.