modernization pe/athletics sf parking woodbridge high school · 2015-10-28 · physical education...

3
LR M M Woodbridge High School Facilities Master Plan– Woodbridge High School 2 Meadowbrook | Irvine, CA 92604 Re-configure Space Modernize/Re-Purpose Space Demolish Space Addition/Expansion Modernization Eligible UTILIZATION LEGEND Classroom Clusters Science Business/Design/Engineering Special Ed (SDC/SH) Physical Education Performing Arts/Multi Media ASB/Library/Student Union Portable (Color based on Program) Other Spaces Main Entry Secondary Entry Drop-Off Playfields/ Landscape Hardcourts Play Apparatus Parking Trees LEGEND Main Quad Academic Quad LR C C 2 ND FLOOR 1 ST FLOOR MODERNIZATION ENGLISH (18,625 SF) & MATH (27,228 SF) MODERNIZATION PE/ATHLETICS 24,324 SF NEW SYNTHETIC TRACK & FIELD *SAFETY ISSUE: CAMPUS WIDE OUTDOOR LIGHTING UPGRADE Academic Quad REMOVE LOCKERS & ENHANCE ACADEMIC QUAD PARKING (+/167) PLAYFIELDS ADMIN AQUATIC CENTER GYM THEATRE COUNSELING SP ED COUNSELING UPPER GYM LIBRARY/ MEDIA/ COUNSELING HARDCOURTS PARKING (+/26) HISTORY ENGLISH MATH MATH ENGLISH HISTORY PARKING (+/144) SCIENCE AUXILARY GYM FOREIGN LANGUAGE SCIENCE SCALE 1:200 N Project 1 PROPOSED SCOPE Modernization Reconfiguration New Construction New Site Work Demolition Grades: 2014/15 Enrollment: Year Built: Modernization: Site Acreage: # Portables: Existing Parking: Targeted Enrollment SCHOOL STATISTICS 9-12 2455 1981 Some Bldgs 22.1 4 ± 310 2400 MODERNIZATION SCIENCE MODERNIZATION SCIENCE 7,000 SF CAPACITY 69 Standard Classrooms +6 SDC = 75 Permanent Teaching Stations +4 Science (Relo’s) = 79 Teaching Stations Sept 2015 ADD (1) PORTABLE The Master Plan for this site is conceptual in nature and shows potential/possible facility improvements at the site aligned to IUSD Educational Specifications. Funding and prioritization of the scope of work listed will determine how the Master Plan for the site is implemented.

Upload: others

Post on 01-Jan-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MODERNIZATION PE/ATHLETICS SF PARKING Woodbridge High School · 2015-10-28 · Physical Education Performing Arts/Multi Media ASB/Library/Student Union Portable (Color based on Program)

LR

M

M

Woo

dbrid

ge H

igh

Scho

olFa

cilit

ies

Mas

ter P

lan–

Woo

dbrid

ge H

igh

Scho

ol2

Mea

dow

broo

k |

Irvi

ne, C

A 9

2604

Re-configure SpaceModernize/Re-Purpose SpaceDemolish SpaceAddition/ExpansionModernization Eligible

UTILIZATION LEGENDClassroom Clusters

Science

Business/Design/Engineering

Special Ed (SDC/SH)

Physical Education

Performing Arts/Multi Media

ASB/Library/Student Union

Portable (Color based on Program)

Other Spaces

Main Entry Secondary EntryDrop-OffPlayfields/ LandscapeHardcourts

Play Apparatus

Parking

Trees

LEGEND

Main QuadAcademicQuad

LR

CC

2ND FLOOR1ST FLOORMODERNIZATIONENGLISH (18,625 SF) & MATH (27,228 SF)

MODERNIZATIONPE/ATHLETICS24,324 SF

NEW SYNTHETIC TRACK & FIELD

*SAFETY ISSUE:  CAMPUS WIDE OUTDOOR LIGHTING UPGRADE

AcademicQuadREMOVE LOCKERS 

& ENHANCE ACADEMIC QUAD

PARKING(+/‐167) 

PLAYFIELDS

ADMIN

AQUATIC CENTER

GYM

THEATRE

COUNSELING

SP ED

COUNSELING

UPPER GYM

LIBRARY/MEDIA/

COUNSELING

HARDCOURTSPARKING(+/‐ 26) 

HISTORY

ENGLISHMATH

MATHENGLISH

HISTORY

PARKING(+/‐ 144) 

SCIENCE

AUXILARYGYM

FOREIGN LANGUAGE

SCIENCE

SCALE 1:200

N

Project 1PROPOSED SCOPE

Modernization

Reconfiguration

New Construction

New Site Work

Demolition

Grades: 2014/15 Enrollment:Year Built:Modernization:Site Acreage: # Portables: Existing Parking:Targeted Enrollment

SCHOOL STATISTICS

9-1224551981

Some Bldgs22.1

4± 3102400

MODERNIZATIONSCIENCE 

MODERNIZATIONSCIENCE7,000 SF

CAPACITY 69 Standard Classrooms+6 SDC

= 75 Permanent Teaching Stations+4 Science (Relo’s)

= 79 Teaching Stations

Sept 2015

ADD (1) PORTABLE

The

MasterPlan

forthis

site

isconceptual

inna

ture

and

show

spo

tential/p

ossib

lefacility

improvem

entsat

thesitealignedto

IUSD

Educationa

lSpecifications.Fund

ingan

dprioritiza

tionof

thescop

eof

worklistedwilldeterm

ineho

wtheMasterP

lanforthe

siteisim

plem

ented.

Page 2: MODERNIZATION PE/ATHLETICS SF PARKING Woodbridge High School · 2015-10-28 · Physical Education Performing Arts/Multi Media ASB/Library/Student Union Portable (Color based on Program)

CC

LR

LR

M

M

Woo

dbrid

ge H

igh

Scho

olFa

cilit

ies

Mas

ter P

lan–

Woo

dbrid

ge H

igh

Scho

ol2

Mea

dow

broo

k |

Irvi

ne, C

A 9

2604

Re-configure SpaceModernize/Re-Purpose SpaceDemolish SpaceAddition/ExpansionModernization Eligible

Project 2PROPOSED SCOPE

Modernization

Reconfiguration

New Construction

New Site Work

Demolition

UTILIZATION LEGENDClassroom Clusters

Science

Business/Design/Engineering

Special Ed (SDC/SH)

Physical Education

Performing Arts/Multi Media

ASB/Library/Student Union

Portable (Color based on Program)

Other Spaces

CAPACITY 79 Teaching Stations+4 Tech Arts+2 Performing Arts

= 85 Teaching Stations

Grades: 2014/15 Enrollment:Year Built:Modernization:Site Acreage: # Portables: Existing Parking:Targeted Enrollment

SCHOOL STATISTICS

Main Entry Secondary EntryDrop-OffPlayfields/ LandscapeHardcourts

Play Apparatus

Parking

Trees

LEGEND

Main QuadAcademicQuad

2ND FLOOR1ST FLOOR

AcademicQuad

SCALE 1:200

N

RECONFIGURE DROP‐OFF.  REMOVE (53) CARS

THEATERTHEATER

SYNTHETICTRACK & FIELD

ADMIN

AQUATIC CENTER

GYM

COUNSELING

SP ED

UPPER GYM

HARDCOURTSPARKING(+/‐ 26) 

HISTORY

ENGLISHMATH

MATHENGLISH

HISTORY

SCIENCE

AUXILARYGYM

FOREIGN LANGUAGE

SCIENCE

THEATRE

LIBRARY/MEDIA/

COUNSELING

COUNSELING

NEW (2) TSDRAMA/DANCE(SF INCLUDED W/ THEATER)

NEW 700 SEAT THEATER28,500 SFNEW (4) TECHNICAL ARTS TS10,308 SF

NEW PERFORMING ARTS

9-1224551981

Some Bldgs22.1

4± 3102400

PARKING(+/‐ 156) 

PARKING(+/‐114) 

Sept 2015

The

MasterPlan

forthis

site

isconceptual

inna

ture

and

show

spo

tential/p

ossib

lefacility

improvem

entsat

thesitealignedto

IUSD

Educationa

lSpecifications.Fund

ingan

dprioritiza

tionof

thescop

eof

worklistedwilldeterm

ineho

wtheMasterP

lanforthe

siteisim

plem

ented.

Page 3: MODERNIZATION PE/ATHLETICS SF PARKING Woodbridge High School · 2015-10-28 · Physical Education Performing Arts/Multi Media ASB/Library/Student Union Portable (Color based on Program)

CC

LR

LR

M

M

Woo

dbrid

ge H

igh

Scho

olFa

cilit

ies

Mas

ter P

lan–

Woo

dbrid

ge H

igh

Scho

ol2

Mea

dow

broo

k |

Irvi

ne, C

A 9

2604

Re-configure SpaceModernize/Re-Purpose SpaceDemolish SpaceAddition/ExpansionModernization Eligible

Project 3PROPOSED SCOPE

Modernization

Reconfiguration

New Construction

New Site Work

Demolition

UTILIZATION LEGENDClassroom Clusters

Science

Business/Design/Engineering

Special Ed (SDC/SH)

Physical Education

Performing Arts/Multi Media

ASB/Library/Student Union

Portable (Color based on Program)

Other Spaces

CAPACITY 81 Permanent Teaching Stations

4 Portable Science

Grades: 2014/15 Enrollment:Year Built:Modernization:Site Acreage: # Portables: Existing Parking:Targeted Enrollment

SCHOOL STATISTICS

Main Entry Secondary EntryDrop-OffPlayfields/ LandscapeHardcourts

Play Apparatus

Parking

Trees

LEGEND

Main QuadAcademicQuad

2ND FLOOR1ST FLOOR

AcademicQuad

SCALE 1:200

N

THEATERTHEATER

SYNTHETICTRACK & FIELD

ADMIN

AQUATIC CENTER

GYM

COUNSELING

SP ED

UPPER GYM

HARDCOURTSPARKING(+/‐ 26) 

HISTORY

ENGLISHMATH

MATHENGLISH

HISTORY

SCIENCE

AUXILARYGYM

FOREIGN LANGUAGE

SCIENCE

THEATRE

LIBRARY/MEDIA/

COUNSELING

COUNSELINGSTUDENTUNION

STUDENTUNION

RECONFIGURE EXISTING LIBRARY AND PERFORMING ARTS TO MEDIA CENTER/STUDENT UNION & LECTURE HALL18,031 SF

2D/3DART

CONVERT EXISTING AUTO SHOP TO 2D/3D CERAMICS ART PROGRAM7,870 SF

9-1224551981

Some Bldgs22.1

4± 3102400

PARKING(+/‐ 156) 

PARKING(+/‐114) 

Sept 2015

The

MasterPlan

forthis

site

isconceptual

inna

ture

and

show

spo

tential/p

ossib

lefacility

improvem

entsat

thesitealignedto

IUSD

Educationa

lSpecifications.Fund

ingan

dprioritiza

tionof

thescop

eof

worklistedwilldeterm

ineho

wtheMasterP

lanforthe

siteisim

plem

ented.