MODERNISATION OF MODERNISATION OF POWER SYSTEM OPERATIONPOWER SYSTEM OPERATION

ULDC SCHEMEsULDC SCHEMEs

Page 2: MODERNISATION OF POWER SYSTEM OPERATION ULDC SCHEMEs

POWERGRID IS IMPLEMENTING ULDC SCHEMES

IN ALL THE FIVE REGIONS WITH STATE OF THE ART

SCADAENERGY MANAGEMENT SYSTEM

ANDDEDICATED COMMUNICATION SYSTEM

UNIFIED LOAD DESPATCH & COMMUNICATION(ULDC) SCHEMES

Page 3: MODERNISATION OF POWER SYSTEM OPERATION ULDC SCHEMEs

OBJECTIVESOBJECTIVES• REAL TIME MONITORING & CONTROL OF POWER SYSTEM REAL TIME MONITORING & CONTROL OF POWER SYSTEM

OPERATION OPERATION

• REAL TIME ENERGY MANAGEMENT SYSTEMREAL TIME ENERGY MANAGEMENT SYSTEM* OPERATION SCHEDULING* OPERATION SCHEDULING* POWER SYSTEM ANALYSIS* POWER SYSTEM ANALYSIS* OPTIMUM LOAD GENERATION BALANCE* OPTIMUM LOAD GENERATION BALANCE

• DYNAMIC PLANNING FOR RELIABLE SYSTEM OPERATIONDYNAMIC PLANNING FOR RELIABLE SYSTEM OPERATION

• REAL TIME EVALUATION OF IMPACT OF POSSIBLE REAL TIME EVALUATION OF IMPACT OF POSSIBLE CONTINGENCIES ON THE SYSTEMCONTINGENCIES ON THE SYSTEM

• PREVENTIVE ACTION TO ENSURE SYSTEM STABILITYPREVENTIVE ACTION TO ENSURE SYSTEM STABILITY

Page 4: MODERNISATION OF POWER SYSTEM OPERATION ULDC SCHEMEs

• QUICK RESTORATION OFQUICK RESTORATION OF GRID IN CASE OF GRID IN CASE OF DISTURBANCEDISTURBANCE

• COORDINATED CONTROL OF MVAR & LOAD FLOW TO COORDINATED CONTROL OF MVAR & LOAD FLOW TO MAINTAIN OPTIMUM VOLTAGE & FREQ. PROFILES MAINTAIN OPTIMUM VOLTAGE & FREQ. PROFILES

• OPERATION OF SYSTEM AT IT’S FULL CAPACITY OPERATION OF SYSTEM AT IT’S FULL CAPACITY THROUGH CONTINUOUS CONTINGENCY ANALYSISTHROUGH CONTINUOUS CONTINGENCY ANALYSIS

• EFFICIENT, RELIABLE & SECURED OPERATION OF EFFICIENT, RELIABLE & SECURED OPERATION OF GRID WITH ALL SYSTEM PARAMETERS & NETWORK GRID WITH ALL SYSTEM PARAMETERS & NETWORK CONDITIONS UPDATED EVERY 4 TO 15 SECCONDITIONS UPDATED EVERY 4 TO 15 SEC

• REAL TIME ENVIRONMENT FOR TRAINING REAL TIME ENVIRONMENT FOR TRAINING DESPATCHERS TO COPE WITH CONTINGENCIES DESPATCHERS TO COPE WITH CONTINGENCIES

Page 5: MODERNISATION OF POWER SYSTEM OPERATION ULDC SCHEMEs

SYSTEM CO-ORDINATION & CONTROL PROJECT

(NORTHERN REGION)

Chandigarh,BBMB

DESU

Lucknow

Panipat(HSEB)

Jutog

Patiala

Panipat (BBMB)

Dadri (B)

Dadri (H)

Sultanpur

Moradabad

Varanasi

Rishikesh

Bhilwara

Kota

Ratangarh

Narwana

Hamirpur

Kunihar

Laltonkalan

Jallandhar (P)

Jallandhar (B)

Ganguwal (B)

Heerapura

Pakistan

N e pa l

ChinaJammu & Kashmir

HimachalPradesh

Punjab

Har

y

UttarPradesh

Rajasthan

Delhi

Gujarat

MadhyaPradesh

Bemina

J&K SEB

• 1 SLDC • 1 Sub-LDC• 13 RTUs

PSEB

• 1 SLDC • 2 Sub-LDC• 19 RTUs

HVPNL

• 1 SLDC • 2 Sub-LDC• 40 RTUs

RVPN

• 1 SLDC • 3 Sub-LDC• 21 RTUs

HPSEB

• 1 SLDC •2 Sub-LDC• 16 RTUs

BBMB

• 1 SLDC • 4 Sub-LDC• 21 RTUs

DVB

• 1 SLDC • 4 Sub-LDC• 31 RTUs

UPPCL

• 1 SLDC•5 Sub-LDC• 82 RTUs

RLDC•NEW DELHI• 38 RTUs

CPCCKANPUR4 RTUs

SLDCSub - LDC

Gladni

Panki

ana

Page 6: MODERNISATION OF POWER SYSTEM OPERATION ULDC SCHEMEs

Control System Hierarchy For Northern Region

SLDC UPSEB

SLDC HVPNL

SLDCPSEB

SLDC RVPNL

SLDCJ&K

SLDCBBMB

SLDC HPSEB

SLDCDVB

CPCCKanpur

Sub-LDC (RTUs)

Sub-LDC (RTUs)

Sub-LDC (RTUs)

Sub-LDC (RTUs)

Sub-LDC (RTUs)

Sub-LDC (RTUs)

Sub-LDC (RTUs)

Sub-LDC (RTUs)

Moradabad (17)

Panki (13)

Rishikesh (27)

Sultanpur (8)

Varanasi (16)

(RTU-L) Lucknow

Bhilwara (29)

Ratangarh (12)

Kota (11)

Panipat (12)

Narwana (15)

Dadri (14)

Patiala (12)

Jalandhar II (20)

Lalton Kalan (8)

Gladini (8)

Bemina (8)

Hamirpur (8)

Kunihar (8)

Dadri (5)

Ganguwal (6)

Jalandhar I (4)

Panipat (5)

Bawana (5)

Bamanauli (12)

Gazipur (8)

Gopalpur (5)

RTUs - 6

(RTU-L) Panipat

(RTU-L) Chandigarh

(RTU-L) Minto Road

RSCC Delhi RTUs - 36

Heerapura ( 12)

Page 7: MODERNISATION OF POWER SYSTEM OPERATION ULDC SCHEMEs
Page 8: MODERNISATION OF POWER SYSTEM OPERATION ULDC SCHEMEs

Unique Features of Northern Region ULDC Scheme

•Three Level Hierarchical Control centres

•More than ten electrical utilities involved

•Highly Complex system First Time attempted in the world as a Single Project

•Dedicated communication Infrastructure

•Live Line Fibre Optic Cable Stringing

•More than 30 control centres and 400 RTUs

•Advance Despatcher training Simulator

Page 9: MODERNISATION OF POWER SYSTEM OPERATION ULDC SCHEMEs

TYPICAL HIERARCHICAL REGIONAL CONTROL CENTRE SETUP

RTU RTU RTU

SUB LDC SUB LDC SUB LDC

SLDC SLDC SLDC

ERLDC WRLDC NRLDC SRLDC NERLDCREGIONAL

LOAD DESPATCH

CENTRE

STATE LOAD DESPATCH

CENTRE

AREA LOAD DESPATCH

CENTRE

REMOTE TERMINAL

UNIT(AT SUB-

STATIONS &GENERATIN

G STNS)

Page 10: MODERNISATION OF POWER SYSTEM OPERATION ULDC SCHEMEs

IMPLEMENTATION STATUS OF REGIONAL ULDC SCHEMES IN VARIOUS REGIONS

REGION EST. COST (M US $ .)

STATUS COMPLETION ANTICIPATED

NORTHERN 141 COMMISSIONING OF MAJOR SYSTEMS COMMENCED

JUNE 2002

SOUTHERN 151 COMMISSIONING OF MAJOR SYSTEMS COMMENCED

JUNE 2002

NORTH EASTERN 57 UNDER CONSTRUCTION JUNE 2003

EASTERN 62 UNDER CONSTRUCTION SEP 2003

WESTERN 56 PROCUREMENT ACTION INITIATED

FEB 2005

Page 11: MODERNISATION OF POWER SYSTEM OPERATION ULDC SCHEMEs
Page 12: MODERNISATION OF POWER SYSTEM OPERATION ULDC SCHEMEs

POWERGRID’s

Strategic Plan

for

Diversification

into

Telecom Business

Page 13: MODERNISATION OF POWER SYSTEM OPERATION ULDC SCHEMEs

• Convergence - merging and overlapping of traditionally unrelated industries to provide essential services – provides opportunity to add value to the business

• Power Transmission utilities can provide alternative broadband network at incremental cost– Valuable Right-of-Way readily available– Optimal utilisation of infrastructure– Sturdy and stable infrastructure– Less prone to vandalism and rodent menace– Proven technology

CONVERGENCE

Page 14: MODERNISATION OF POWER SYSTEM OPERATION ULDC SCHEMEs

WRAP AROUND

ADSS

FIBRE OPTIC CABLE INSTALLATION

OPGW

Page 15: MODERNISATION OF POWER SYSTEM OPERATION ULDC SCHEMEs

OPGW ADSS WRAP AROUND

AERIAL OPTICAL FIBRE CABLES

FIBRESTRENGTH MEMBERS

LOOSE TUBEALUMINIUM TUBEACSR STRANDS

FIBRE

Page 16: MODERNISATION OF POWER SYSTEM OPERATION ULDC SCHEMEs

FIBRE PAIRS TO BEUSED BY POWERGRID

LDCA

TAX

DARK FIBRE PAIRS

SDH / DWDM

Transport Module

Capacity Eq. voice channels

STM - 1 155 Mbps 1920

STM - 4 622 Mbps 7500 STM - 16 2.5 Gbps 30000

STM - 64 10.0 Gbps 120000

DWDMN * 2.5 N*2.5 Gbps N*30000N *10 N*10 Gbps N*120000For example32*2.5 80 Gbps 96000032*10 320 Gbps 3840000

Single pair of fibres

LDCA

TAX

Page 17: MODERNISATION OF POWER SYSTEM OPERATION ULDC SCHEMEs

WORLDWIDE DIVERSIFICATION IN TELECOM

World wide utilities like electric, gas, railways, water and roads have

successfully diversified into telecom business

Electric - 63% , Gas - 18%, Railways - 12%, Water - 7% and Roads - 2%

Majority of these utilities are Transmission Utilities

Out of about major 50 utilities, 30 are Transmission Utilities in UK,

Germany, Italy, Spain, Japan , USA etc.

New entrants have been successful in penetrating long distance market

Page 18: MODERNISATION OF POWER SYSTEM OPERATION ULDC SCHEMEs

Optimal point

Business Reward

Business Risk

DoNothing

LeaseWayleave

LeaseDarkFibre

SelectiveCommercial

Service

FullNetworkService

BUSINESS RISK / REWARD ASSESSMENT

Page 19: MODERNISATION OF POWER SYSTEM OPERATION ULDC SCHEMEs

Phased Scheme of Implementation POWERGRID plans to enter Telecom business in a

phased mannerPhase-I (Selective Commercial Services)

– Utilise the spare/ excess capacity already available under modernisation of load despatch and communication facilities

– Enter Telecom business as IP-II & introduce value added services • Internet Data Centers and Managed Network Services to be

introduced in 1-2 year time

• International Connectivity

Phase-II (NLDO Participation) To enter into NLDO segment with a strategic partner

by forming a Joint Venture Company

Page 20: MODERNISATION OF POWER SYSTEM OPERATION ULDC SCHEMEs

Telecom Road Map

• POWERGRID Builds and operates Capacity Business and Value Added Services on a focused network ( ~14,000 Km)

– Delhi - Mumbai progressively by Mid, 2002

– Hyderabad – Bangalore – Chennai by October 2002

– Delhi – Hyderabad by October 2002

– Hyderabad – Calcutta by December 2002

– Delhi – Calcutta by December 2002

– Network to be completed by December 2003

Telecom Network – Map (Audio Visual)

Page 21: MODERNISATION OF POWER SYSTEM OPERATION ULDC SCHEMEs

Technology• State-of-the-art Technology adopted • Transmission Equipment

– Synchronous Digital Hierarchy (SDH) and Dense Wave Division Multiplexing (DWDM)

• Optical Ground Wire (OPGW)– Mostly Live line installation without disturbing the

power system– Capable of carrying SDH & DWDM

• Network Management System (NMS)– Network to have a dedicated NMS for monitoring &

maintenance of the telecom network from central location

– Four remote independent Regional NMS

• Future Proof

Page 22: MODERNISATION OF POWER SYSTEM OPERATION ULDC SCHEMEs

Kopili

Khandong

*

**

(Ambala)

POWERGRID Transmission Lines

NEWDELHI

Lucknow

CALCUTTA

MUMBAI

HYDERABAD

CHENNAIBANGALORE

****

***

**

*

*

BadarpurBallabhgarh Dadri

MuradnagarMoradabad

Singrauli

JabalpurItarsiIndore

Dehgam(Ahmedabad)

Asoj

Gandhar

Padghe

*

*

N’Sagar

Nellore* Gooty

**

*

RamagundamChandrapur

Bhilai

Korba *

* Vindhyachal

***

*

*

**

Kanpur

Allahabad

Sasaram

BiharsariffKhalgoan Farakka

Jeerat

*

*

Panipat

DhulekotChandigarh

**Panchkula

KuniharJutogh(Shimla)

Jaipur

*

*

**

*

*

*

*

Khamam

Vijayawada

Gazuwaka(Vishakapatnam)

JeyporeIndravati

Rengali Talcher

Jam’pur

Rourkela

Durgapur

*

* Lonikhand(Pune)

VadodaraBaruchKawas

(Surat)

* Raipur

Mysore*

*

*

*

*

Madurai

Trichy

NeyveliSalem

*CoimbatoreUdumalpet

* Agra

***

**

Ludhiana

Moga

JallandharKishenpur

Udhampur

Glandi(Jammu)

*Varanasi

Patna

*Koradi(Nagpur)

Bhopal

*

*Kozikode

Trichur

Kalamassery (Eranakulum)

Trivandrum

Fibre To Be Installed

Existing/Under Construction Fibre UNDERGROUND FIBRE CABLE

POWERGRID ULDC ProjectPOWERGRID Transmission Line Project

* DhuleNasik

**

Hamirpur IIGagal

Access Link.

Dimapur

Misa

*

*Badarpur*Kumarohat

*Agartala GPPAgartala

*Khleihriat

*

Shillong* * *Nehu

Umium I

Umium III

***

Kahelipara *

*

*

BaliparaBongaigaon

Malda

Imphal

Kohima

Tezpur

*

Guwahati

*

*

*

*

Bhubaneswar**

*

Page 23: MODERNISATION OF POWER SYSTEM OPERATION ULDC SCHEMEs

POWERGRIDTelecom

SERVICES

Virtual

Private Networks

(VPN)

Internet Data Centre (IDC)–Web Hosting

–Co-location services

–Dedicated Server Products

–Application Service Provision

NLD

Services

End-to-End Bandwidth

SERVICES

International Connectivity

Page 24: MODERNISATION OF POWER SYSTEM OPERATION ULDC SCHEMEs

City 3

NEW MILLENNIUM INFOCOM NETWORK

Town 4

KOLKATTATown 3Town 2Town 1

City1

City 2

NATIONAL LONG DISTANCE NETWORK(POWERGRID)

State Network

Access Network Within City/Townusing LT distribution Network

HOMES EDUCATIONALINSTITUTES HOSPITALS

MARKETS BANK DEPARTMENTALSTORES

PCO FACTORY GOVT. OFFICES

MUMBAIDELHI

EHV NETWORK

DISTRIBUTION NETWORK

LT DISTRIBUTION NETWORK

Page 25: MODERNISATION OF POWER SYSTEM OPERATION ULDC SCHEMEs

POWERGRID Strength is from Concept to Commissioning• Trained Manpower

> 70 Engineers for Planning, Design and Engineering

> 150 Engineers in field Implementation

• Telecom, SCADA, DMS, EMS Consultancy for

- BSES

- NDMC

- PONDICHERRY

- DVB

• Acknowledging strength of POWERGRID M/S KEMA (Consultants of International Repute) Signed MOU for providing consultancy in International Market

Page 26: MODERNISATION OF POWER SYSTEM OPERATION ULDC SCHEMEs

SCADA/EMS/DMS Consultancy

SCADA/EMS Consultancy

Feasibility Studies

System Design & Engineering

Turnkey Execution

ProjectImplementation

• Ready to extend Consultancy in other countriesMOU With KEMA

Page 27: MODERNISATION OF POWER SYSTEM OPERATION ULDC SCHEMEs

Telecom Business Consultancy

TelecomBusiness

Consultancy

Feasibility Studies

FinancialManagement

Design ofNetwork

ProjectImplementation

Regulatory andMarket Assessment

Turnkey Execution

O & MBusiness Option Evaluation

• Ready to extend arm in other countriesJoint VenturesEquity stakes

Page 28: MODERNISATION OF POWER SYSTEM OPERATION ULDC SCHEMEs

Thank You