Page 1: Modern Improvements COMPACT 200 RAPID REACTION BRIDGE SYSTEM

Modern Improvements

COMPACT 200 RAPID REACTION BRIDGE SYSTEM

Page 2: Modern Improvements COMPACT 200 RAPID REACTION BRIDGE SYSTEM

Modern Improvements

Page 3: Modern Improvements COMPACT 200 RAPID REACTION BRIDGE SYSTEM

Modern Improvements

COMPACT 200 RAPID REACTION BRIDGE SYSTEM

The design of the Mabey Compact 200 bridge allows the system to be used in a logistic role throughout the support area. As a Line of Communication bridge it can carry loads of up to Class 110 over gaps of up to 60m (200ft). The bridge is ideally suited for areas where speed of deployment is vital.

Page 4: Modern Improvements COMPACT 200 RAPID REACTION BRIDGE SYSTEM

Modern Improvements

Rapid Construction The bridge is designed to be built by hand. A 30m bridge can be assembled and conventionally launched by 29 men in two or three hours, depending on site conditions. Where cranes or materials handling equipment is available, the total number of man hours to assemble a bridge is substantially reduced.

Page 5: Modern Improvements COMPACT 200 RAPID REACTION BRIDGE SYSTEM

Modern Improvements

Load Testing

Launching Nose

Page 6: Modern Improvements COMPACT 200 RAPID REACTION BRIDGE SYSTEM

Modern Improvements

Page 7: Modern Improvements COMPACT 200 RAPID REACTION BRIDGE SYSTEM

Modern Improvements

B Co, 23rd Engr Bn replacing the Brcko Bridge with the Compact 200 (MAR 96)

Page 8: Modern Improvements COMPACT 200 RAPID REACTION BRIDGE SYSTEM

Modern Improvements

M2 BaileyMabey Compact

200MLC MLC 80(T) 70 (W) MLC 80 (T) 110 (W)

# of Bays 13 13

Construction DT DS

# of Panels156 -- 2 ½ Sets of

Bailey 52

# of Transoms 66 14

Roadway Width 12 ft. 6 in (3.8m) 13 ft. 9 in. (4.2m)

Type of Deck Timber Steel

Total Weight 87 t 55 tBased on the launch and erection of a 130ft (39.62m) clear span, single lane bridge.

Page 9: Modern Improvements COMPACT 200 RAPID REACTION BRIDGE SYSTEM

Modern Improvements

M2 BaileyMabey

Compact 200# of Bridging Sets

Required2 ½ Sets 1

# Men Required 90 29

# of Trucks RequiredAt Least 15 PLS (7

PLS per Set)11 PLS

# of Crane Picks Required

222 66

HOURS REQUIRED 12-14 hours 8-9 hours

Based on the launch and erection of a 130ft (39.62m) clear span, single lane bridge to carry MLC80 (T). Note, the M2 Bailey is unable to accommodate MLC 96 (W) Traffic.