![Page 1: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/1.jpg)
Pipeline Risk Management
Modeling of Corrosion
NACE ECDA Seminar
Jan 2009
![Page 2: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/2.jpg)
What can a risk assessment do?
• where will the next failure
happen?
• when will a failure occur?
• how many failures next year?
where are the hot spots?
what is the best use of my resources?
what are the priorities?
![Page 3: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/3.jpg)
Key Concepts
• Risk = (hazard likelihood) X (hazard consequence)
• Probability = Degree of Belief
• Risk Assessment -- Risk Management
• Management = choices in resource allocation
![Page 4: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/4.jpg)
Historical (Informal) Risk Mgmt
ADVANTAGES:
• simple/intuitive
• consensus is often sought
• utilizes experience and engr judgment
• successful
![Page 5: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/5.jpg)
Historical (Informal) Risk Mgmt
REASONS TO CHANGE:
• more at stake from mistakes
• inefficiencies/subjectivities
• lack of consistency
• need to consider complicated factors
• regulatory mandates
![Page 6: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/6.jpg)
Gas IM Rule
Objectives• Prioritize pipeline segments
• Evaluate benefits of mitigation
• Determine most effective mitigation
• Evaluate effect of inspection intervals
• Assess the use of alternative assessment
• Allocate resources more effectively
ASME B31.8S, Section 5
![Page 7: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/7.jpg)
Gas IM Rule
Points to consider• Account for relevant attributes
• Use conservative defaults for unknown data
• Identify significant risk-driving factors
• Sufficient segment discretization or resolution
• Predictive or “what-if” capability
• Updateable to reflect changes or new information
• Populating risk model is resource intensive
• Validate model, show to be plausible with respect to known
history and significance of threats
ASME B31.8S, Section 5
![Page 8: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/8.jpg)
Threat Categories
• ASME B31.8 Supplement considers 3 categories
of threat:
– Time Dependent – May worsen over time;
require periodic reassessment
– Time Stable – Does not worsen over time; one-
time assessment is sufficient (unless conditions
of operation change)
– Time Independent – Occurs randomly; best
addressed by prevention
![Page 9: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/9.jpg)
Bathtub Curve
Failures
Time
![Page 10: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/10.jpg)
Threat Categories
Time Dependent Threats
• External corrosion
• Internal corrosion
• Stress-corrosion cracking (SCC)
• (Fatigue)
![Page 11: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/11.jpg)
Threat Categories Time Independent
(Random) Threats
• Third-party/Mechanical damage
– Immediate failure
– Delayed failure (previously damaged)
– Vandalism
• Incorrect operations
• Weather related
– Cold weather
– Lightning
– Heavy rain, flood
– Earth movement
![Page 12: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/12.jpg)
Threat CategoriesTime Stable Threats (resistance)
• Manufacturing-related flaws in
– Pipe body
– Pipe seam
• Welding / Fabrication-caused
flaws in
– Girth welds
– Fabrication welds
– Wrinkled / buckled bend
– Threads / couplings
• Defects present in equipment
– Gaskets, O-rings
– Control / relief devices
– Seals, packing
– Other equipment
![Page 13: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/13.jpg)
ASME B31.8s
• Subject Matter Experts
• Relative Assessments
• Scenario Assessments
• Probabilistic Assessments
![Page 14: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/14.jpg)
Better Way to Conceptualize
• Types of Models
– Absolute Results
– Relative Results
• Tools for All Models
– Probabilistic methods
• Scenarios
• Trees
– SME (input and validation)
![Page 15: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/15.jpg)
Relative, Index, Scoring Models
• intuitive
• comprehensive
• ease of setup and use
• optimum for prioritization
• mainstream
• served us well in the past
![Page 16: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/16.jpg)
Scoring Model Issues
• Difficult to anchor
• Potential for masking
• Technical compromises
– weightings
– scale direction
– interactions of variables (dep vs indep)
• Validation (reg reqmt)
• New Uses
![Page 17: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/17.jpg)
Index Sum vs. Fail Probability
Scenario 1 Scenario 2
Index Score
Probability of Failure Score
Index Score
Probability of Failure Score
Third Party Damage 60 90
Corrosion 70 10
Design 80 90
Operations 70 90
280 280
![Page 18: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/18.jpg)
Index Sum vs. Fail Prob
Scenario 1 Scenario 2
Index Score
Probability of Failure Score
Index Score
Probability of Failure Score
Third Party Damage 60 0.4 90 0.1
Corrosion 70 0.3 10 0.9
Design 80 0.2 90 0.1
Operations 70 0.3 90 0.1
280 76.5% 280 92.7%
![Page 19: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/19.jpg)
Now
• plan for centerpiece of public scrutiny
• plan for legal challenges
• support integrity verification schedule
• determine appropriate reaction to risk
• anticipate desire for anchoring the numbers
• few computer limitations
![Page 20: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/20.jpg)
Enhanced Modeling Approach
![Page 21: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/21.jpg)
Probability of Failure
• Exposure
• Mitigation
• Resistance
![Page 22: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/22.jpg)
Definitions
• Exposure: liklihood of an active failure mechanism reaching the pipe
when no mitigation applied
• Mitigation measure: prevents or reduces likelihood or intensity of the
exposure reaching the pipe
• Resistance: ability to resist failure given presence of exposure/threat
![Page 23: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/23.jpg)
Information Use--Exposure, Mitigation, or
Resistance?
pipe wall thickness
air patrol frequency
soil resistivity
coating type
CP P-S voltage reading
date of pipe manufacture
operating procedures
nearby traffic type and volume
nearby AC power lines (2)
ILI date and type
pressure test psig
maintenance pigging
surge relief valve
casing pipe
flowrate
depth cover
training
SMYS
one-call system type
SCADA
geotech study
pipe wall lamination
wrinkle bend
![Page 24: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/24.jpg)
Absolute Risk Values
Frequency of consequence
– Temporally
– Spatially
•Incidents per mile-year
•fatalities per mile-year
•dollars per km-decade
conseq prob
![Page 25: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/25.jpg)
Dependent vs Independent
InteractionsAND Gates
– CP failure AND coating failure = failure of mitigation
– CP effectiveness = P/S reading AND P/S distance AND P/S age
OR gates
– PoF = PoF1 OR PoF2 OR PoF3
– Corr control = coating effectiveness OR CP effectiveness
![Page 26: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/26.jpg)
Combination of Likely Events
0.8 AND 0.8 AND 0.8 AND 0.8 AND 0.8
= 0.8 x 0.8 x 0.8 x 0.8 x 0.8 = 0.3actually unlikely
0.8 OR 0.8 OR 0.8
= [1-(1-0.8) x (1-0.8) x (1-0.8)] = 0.992very likely
![Page 27: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/27.jpg)
Failure Probabilities
Overall Pf is Prob Failure by [(Thd Pty) OR (Corr) OR (GeoHaz)…]
Ps = 1 - Pf
Overall Ps is Prob Surviving [(Thd Pty) AND (Corr) AND (GeoHaz)….]
So…
Pf overall = 1-[(1-Pfthdpty) x (1-Pfcorr) x (1-Pfgeohaz) x (1-Pfincops)]
![Page 28: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/28.jpg)
Final PoF
PoF overall = PoFthdpty+ PoFTTF + PoFtheftsab+ PoFincops+ PoFgeohazard
PoF overall = 1-[(1-PoFthdpty) x (1-PoFTTF) x (1-PoFtheftsab) x (1-PoFincops) x
(1-PoFgeohazard)]
Guess PoF if 1%, 4%, 2%, 2%, 0%
Calc:
![Page 29: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/29.jpg)
Probability of Failure
• Exposure
• Mitigation
• Resistance
![Page 30: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/30.jpg)
Estimating Threat Exposure
• Events per mile-year for time independent /
random mechanism– third party
– incorrect operations
– weather & land movements
– equipment failures
• MPY for degradation mechanisms– ext corr
– int corr
– SCC / fatigue
![Page 31: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/31.jpg)
Failure Rates
Failures/yr Years to Fail Approximate Rule Thumb
1,000,000 0.000001 Continuous failures
100,000 0.00001 fails ~10 times per hour
10,000 0.0001 fails ~1 times per hour
1,000 0.001 fails ~3 times per day
100 0.01 fails ~2 times per week
10 0.1 fails ~1 times per month
1 1 fails ~1 times per year
0.1 10 fails ~1 per 10 years
0.01 100 fails ~1 per 100 years
0.001 1,000 fails ~1 per 1000 years
0.0001 10,000 fails ~1 per 10,000 years
0.00001 100,000 fails ~1 per 100,000 years
0.000001 1,000,000 One in a million chance of failure
0.0000000001 1,000,000,000 Effectively, it never fails
![Page 32: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/32.jpg)
Time Dependent Mech
PoF time-dep = f (TTF)
where
TTF = “time to failure”
TTF = (available pipe wall) / [(wall loss rate) x (1 – mitigation
effectiveness)]
![Page 33: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/33.jpg)
Advantages of New Exposure
Estimates• Estimates can often be validated over time
• Estimate values from several causes are directly additive. E.g. falling
objects, landslide, subsidence, etc, each with their own frequency of
occurrence can be added together
• Estimates are in a form that consider segment-length effects and
supports PoF estimates in absolute terms
• Avoids need to standardize qualitative measures such as “high”,
“medium”, “low” avoids interpretation and erosion of definitions over
time and when different assessors become involved.
• Can directly incorporate pertinent company and industry historical
data.
• Forces SME to provide more considered values. It is more difficult to
present a number such as 1 hit every 2 years
![Page 34: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/34.jpg)
Measuring Mitigation
Strong, single measure
or
Accumulation of lesser measures
Mitigation % = 1 - (remaining threat)
Remaining Threat = (remnant from mit1) AND (remnant from mit2) AND
(remnant from mit3) …
![Page 35: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/35.jpg)
Measuring Mitigation
Mitigation % = 1-[(1-mit1) x (1-mit2) x (1-mit3)…]
In words: mitigation % = 1 - (remaining threat)
remaining threat = (remnant from mit1) AND (remnant from mit2) AND (remnant
from mit3) …
What is cumulative mitigation benefit from 3 measures that independently produce
effectiveness of 60%, 60%, and 50%?
![Page 36: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/36.jpg)
Coating-CP Interaction
PoD of coating
OR gate
CP effectiveness
![Page 37: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/37.jpg)
Calibrating Coating Fail Rate
calibrate coating fail rate using DOT stats
coat defect rate
dia
A, sq-
ft/linear ft
A, sq-
ft/mi fail/mil-yr
% corr
fail
coating
fail fctr
fails/per
sq ft/yr
24 6.3 33,175 0.001 0.3 100 9.0E-07 0.003 fails per yr per 33K sq ft
12 3.1 16,588 0.001 0.3 100 1.8E-06
10 2.6 13,823 0.001 0.3 100 2.2E-06
8 2.1 11,058 0.001 0.3 100 2.7E-06
6 1.6 8,294 0.001 0.3 100 3.6E-06
assume 100x as many coating failures as corr failures
% bare from CP current demand….
or
![Page 38: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/38.jpg)
PoD for Coating
12” diameter
PoD = 1 - EXP[-[surface area, ft2)x(failure rate per ft2)]
L = 1 ft L = 10 ft L = 100 ft L = 1000 ft L = 5280 ft
excellent 5.0E-07 0.00% 0.00% 0.02% 0.16% 0.83%
good 2.5E-06 0.00% 0.02% 0.18% 1.75% 8.91%
fair 3.2E-04 2.46% 22.1% 91.8% 100% 100%
poor 4.0E-02 11.8% 71.4% 100% 100% 100%
absent 1.0E+07 100% 100% 100% 100% 100%
Probability of Defect in Segment, per yeardefect rate
per sq ft
Coating
Score
![Page 39: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/39.jpg)
Corrosion Control Effectiveness
Coating Condition
Coating Defect Type
Prob of Defect Type per sq ft
Is CP fully eff?
Prob of CP
protecting pipe
Scenario Prob
Resultant MPY
Y 0.9 99.99% 0 none 99.9%
N 0.1 0.01% 0
Y 0.9 0.09% 0 hole 0.1%
N 0.1 0.01% 16
Y 0.1 0.0% 0
excellent
shielding 0.0% N 0.9 0.0% 16
Final probability of 16 mpy damage rate per sq ft 0.01% 16
Final probability of 0 mpy damage rate per sq ft 99.99% 0
![Page 40: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/40.jpg)
Damage vs Failure
• Probability of Damage (PoD) = f (exposure, mitigation)
• Probability of Failure (PoF) = f (PoD, resistance)
Exposure PoD
Mitigation PoF
Resistance
![Page 41: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/41.jpg)
Estimating Resistance
• pipe spec (original)
• historical issues
– low toughness
– hard spots
– seam type
– manufacturing
• pipe spec (current)
– ILI measurements
– calcs from pressure test
– visual inspections
– effect of estimated degradations
• required pipe strength
– normal internal pressure
– normal external loadings
![Page 42: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/42.jpg)
Best Estimate of Pipe Wall Today
Press Test
1992
ILI
2005
Measurement error Degradation Since Meas
8 mpy x 15 yrs = 120 mils
8 mpy x 2 yrs = 16 mils+/- 15%
+/- 5%(inferred)
2007 Estimate
![Page 43: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/43.jpg)
Best Estimate of Pipe Wall Today
Press Test 1
Press Test 2
Bell Hole 1
Bell Hole 2
ILI 1
ILI 2
NOP
Best Est Today
![Page 44: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/44.jpg)
ILI Capability Matrix
Dent/ Ovality/
Gouge Buckling
Aggressive 5 5 100 10 20 50 50 5 100
Routine 10 10 100 50 50 50 50 10 100
Min 15 15 100 100 50 50 50 15 100
Aggressive 10 10 100 50 50 50 50 10 100
Routine 15 15 100 100 50 50 50 15 100
Min 20 20 100 100 50 50 50 20 100
5 5 100 100 20 20 5 5 100
TFI 20 20 5 10 50 50 50 20 5
EMAT 50 50 10 10 50 50 10 50 10
50 50 10 10 50 50 10 50 10
100 100 100 100 5 5 100 100 100
Press test 5 5 5 5 2 2 2 5 5
Defect Type
External
Corrosio
Internal
Corrosio
Axial
Crack
Circum
Crack Lamin
Ultrasound
Ultrasound shear wave crack tool
Caliper, sizing, gauging, inertial
Max Surviving Defect
Metal Loss
Inspection
Type
Validation (Pig-
Digs) Protocol Crack
MFL high
resolution
MFL std
resolution
![Page 45: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/45.jpg)
NOP & Integrity
+ Integrity info -Rupture potential
-Higher stress
-Fatigue
![Page 46: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/46.jpg)
Time
PoF
TTF to PoF
![Page 47: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/47.jpg)
Time
PoF
TTF to PoF
![Page 48: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/48.jpg)
PoF: TTF & TTF99
time
PoF PoF=100%
PoF=1%
TTF99
![Page 49: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/49.jpg)
Examples
• TTF = 0.160” / [(16 mpy) x (1 - 0.9)] = 100 years
• TTF99 = 0.160” / (16 mpy) = 10 years
• PoF => lognormal or other =>0.001%
• TTF = 0.016” / [(16 mpy) x (1 - 0.9)] = 10 years
• TTF99 = 0.016” / (16 mpy) = 1 year
• PoF = 1/TTF = 1%
![Page 50: Modeling of Corrosion NACE ECDA Seminar Jan 2009events.nace.org/conferences/ecda2009/images_presentations/KMuhl...Modeling of Corrosion NACE ECDA Seminar Jan 2009. ... ASME B31.8S,](https://reader034.vdocuments.mx/reader034/viewer/2022052211/5ab308307f8b9ac3348de456/html5/thumbnails/50.jpg)
Approach Advantages
• more intuitive
• better models reality
• distinguishes between unmitigated exposure to a threat,
mitigation effectiveness, and system resistance--better risk
management decisions
• eliminates need for unrealistic and expensive re-weighting of
variables for new technologies or other changes
• flexibility to present results in either absolute terms or relative
terms
• more audit friendly