mm 1 · 2015-12-03 · mm1/mm4/mm5/mm8/mmio/ pile & deck wharf edge mm12/mm14/mm15/mme1t8 to ma...

1
KW 09/15 CY ST NTS A 09/15 Mitigation Measures Update CY Mitigation Measures Plan for TCW site (Sheet 2 of 3) Figure 11.5ba Legend: Mitigation Measure Code Summary Description Construction Phase MM 1 Optimization of Construction Areas & Providing Temporary Landscape on Temporary Construction MM 2 Minimize Topographical Changes MM 3 Preservation of Potentially Registrable OVTs, Rare and Protective Vegetation MM 4 Transplanting of Existing Trees MM 5 Screen Hoarding MM 6 Adopting Non-dredge Method for the Reclamation MM 7 Protection of Natural Rivers and Streams MM 8 Preservation of Natural Coastline MM 9 Providing Natural Rock Material/ Planting for Artificial Seawall Operational Phase MM 10 Compensatory Planting MM 11 Woodland Restoration MM 12 Screen Planting MM 13 Roadside Planting MM 14 Aesthetic Design of Built Development MM 15 Maximise Greening on Structures MM 16 Noise Barrier Design MM 17 Landscape Treatment for Polders & Stormwater Attenuation and Treatment Ponds Construction Phase & Operation Phase MM 18 Landscaping on Slopes MM 19 Landscape Treatment on Channelized Watercourses MM 20 Lighting Control B Migaon Measures Renamed KS 11/15 B

Upload: others

Post on 25-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MM 1 · 2015-12-03 · MM1/MM4/MM5/MM8/MMIO/ Pile & Deck Wharf Edge MM12/MM14/MM15/MMe1t8 To Ma Wan Chung Ball Courts Amphitheater Surface Proposed Recreational Area Mead MM1(MYW/MM3/MM4ŽMM5

KW 09/15 CY STNTS

A

A 09/15Mitigation Measures Update CY

Mitigation Measures Plan for TCW site (Sheet 2 of 3)

Figure 11.5ba

Legend:

1

Mitigation MeasuresMitigation Measure Code

Summary Description Mitigate Landscape Impacts

Mitigate Visual Impacts

Construction PhaseMM 1 Optimization of Construction Areas &

Providing Temporary Landscape onTemporary Construction

√ √

MM 2 Minimize Topographical Changes √ √MM 3 Preservation of Potentially Registrable OVTs,

Rare and Protective Vegetation √

MM 4 Transplanting of Existing Trees √MM 5 Screen Hoarding √MM 6 Adopting Non-dredge Method for the

Reclamation√

MM 7 Protection of Natural Rivers and Streams √

MM 8 Preservation of Natural Coastline √MM 9 Providing Natural Rock Material/ Planting for

Artificial Seawall√ √

Operational PhaseMM 10 Compensatory Planting √MM 11 Woodland Restoration √MM 12 Screen Planting √ √MM 13 Roadside Planting √ √MM 14 Aesthetic Design of Built Development √

MM 15 Maximise Greening on Structures √ √MM 16 Noise Barrier Design √MM 17 Landscape Treatment for Polders &

Stormwater Attenuation and Treatment Ponds √ √

Construction Phase & Operation PhaseMM 18 Landscaping on Slopes √ √

MM 19 Landscape Treatment on ChannelizedWatercourses

√ √

MM 20 Lighting Control √

B Mitigation Measures Renamed KS 11/15

B