m.k. verma chief engineer ( civil) bsnl civil ap zone, hyderabad

10
DEVELOPMENT MEETING IN CIRCLE OFFICE ON 06.08.2015 M.K. VERMA Chief Engineer ( Civil) BSNL Civil AP Zone, Hyderabad.

Upload: lester-baker

Post on 03-Jan-2016

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: M.K. VERMA Chief Engineer ( Civil) BSNL Civil AP Zone, Hyderabad

DEVELOPMENT MEETING IN CIRCLE OFFICE ON 06.08.2015

M.K. VERMAChief Engineer ( Civil)

BSNL Civil AP Zone, Hyderabad.

Page 2: M.K. VERMA Chief Engineer ( Civil) BSNL Civil AP Zone, Hyderabad

A.P.CIVIL ZONE TERRITORIAL JURISDICTION(14 SSAs)

1.KHAMMAM 8. KURNOOL2.KRISHNA 9. ANANTAPUR3. GUNTUR. 10 WEST GODAVARI 4. PRAKASHAM 11. EAST GODAVARI5. NELLORE 12. VISHAKAPTNAM6. CHITTOOR 13. VIZIANAGARAM.7. KADAPA 14. SRIKAULAM

Page 3: M.K. VERMA Chief Engineer ( Civil) BSNL Civil AP Zone, Hyderabad

HYDERABAD ZONE TERRITORIAL JURISDICTION(9 SSAs)

1. HYDERABAD.2. MEDAK.3. MAHABOOBNAGAR4. WARANGAL5. NALGONDA6. KARIMNAGAR.7. NIZAMABAD.8. ADILALABAD.9. RANAGAREDDY

Page 4: M.K. VERMA Chief Engineer ( Civil) BSNL Civil AP Zone, Hyderabad

BUILDINGS (2015-16)

1. Construction of Admin. Building at ONGOLE (Balance work)

Present Status : Decision is awaited from Corporate Office New Delhi for Construction of Balance work .

Page 5: M.K. VERMA Chief Engineer ( Civil) BSNL Civil AP Zone, Hyderabad

CMTS TOWERS Phase- VII

All the CMTS towers under Phase VII, except those which were dropped later on due to non availability of site, site disputes and public objection are completed except 7 Towers which are in progress .Sl.No No of Sites

allotted2014-15

Completed WIP YTS/Under Planning

1 (142-78*)=64

50 7 7

Page 6: M.K. VERMA Chief Engineer ( Civil) BSNL Civil AP Zone, Hyderabad

External Works on handin AP CIVIL ZONE

Sl.No

Name of the work

Client Organization

Cost of the Project

Status of the work

Expected Revenue

1 PMC for Construction of Shore based Laboratory building and Training Annexes for NIO Regional Centre at VISAKHAPATNAM

National Institute of Oceanography

Rs 20 crores Planning stage

90.00 lakhs

2 Architectural and Engineering Consultancy Services for Construction of New Office Building Of Guntur Municipal Corporation, Guntur, Andhra Pradesh

Municipal Corporation Guntur

Rs 5.10 crores

Architectural drawings are to be approved

9.35 lakhs

3 PMC for Construction of Regional Office and Br. Office AP Grameena Vikas Bank at KHAMMAM

Andhra Pradesh Grameena Vikas Bank

Rs 16.00 crores

Work in progress ( 25% completed)

96.09 lakhs

Page 7: M.K. VERMA Chief Engineer ( Civil) BSNL Civil AP Zone, Hyderabad

External Works on handin HYDERABAD

Sl.No

Name of the work Client Organization

Cost of the Project (In Lakhs)

Status of the work

Expected Revenue

1 Consultancy work on Construction of Infrastructure works for IIT, Hyderabad

IIT , Hyderabad 64300 80% work completed

610.85 lakhs

2 Construction Administrative Building and Hostel Blocks for MANUU at Hyderabad

Maulana Azad National Urdu University Hyderabad

1350 90% work completed

66.15 lakhs

3 PMC for Construction of Regional Office and Br. Office AP Grameena Vikas Bank at Sangareddy

AP Grameena Vikas Bank

652 25% work completed

39.12 lakhs

4 DOT- RMC-DC DOT 29.23 Planning stage

2.63 lakhs

Page 8: M.K. VERMA Chief Engineer ( Civil) BSNL Civil AP Zone, Hyderabad

SPACE AUIDT CASES PROCESSED IN REVENUE REALIZATION BY OFFERING

VACANT SPACE TO OTHER PSUs:

PARTICIPATED IN BIDDING CALLED BY BHARATIYA MAHILA BANK AT VISHAKPATNAM BY OFFERING VACANT SPACE IN TE

BUILDING AT DABA GARDENS IN VISHAKAPATNAM.

PROCESSED THE CASE FOR PARTICIPATION IN BIDDING CALLED BY ORIENTAL INSURANCE CORPORATION BY

OFFERING THE VACANT SPACE IN TE BUILDING AT TIRUPATHI.

Page 9: M.K. VERMA Chief Engineer ( Civil) BSNL Civil AP Zone, Hyderabad

DETAILS OF SPACE AUDIT SSA WISESl.No SSA Name Total No

of Bldgs( Numbers)

Total Available Area(In Sq.m)

Area occupied(In Sq m)

Spare and unutilized Area( In Sq m)

1 Krishna 48 16759 15502 1257

2 Khammam 17 5494 5363 131

3 Guntur 41 14903 14085 818

4 Prakasham 27 6121 5564 557

5 Nellore 39 10812 9838 974

6 Kurnool 44 12734 12207 527

7 Kadapa 31 9707 7497 2210

8 Chittoor 12 2987 2117 870

9 Anantapur 38 12033 7481 4544

10 West Godavari 69 19826 17909 1917

11 East Godavari 45 19520 15548 3972

12 Vishakapatnam

26 13194 10747 2447

13 Vizianagaram 26 7034 6634 670

14 Sri Kakulam 23 6642 5994 648

Page 10: M.K. VERMA Chief Engineer ( Civil) BSNL Civil AP Zone, Hyderabad

THANK YOU