mississippi dot smart work zone systems performance measures
DESCRIPTION
Presentation on the MS DOT Interstate 55 project near Jackson MS and performance measures related to the Smart Work Zone SystemTRANSCRIPT
![Page 1: Mississippi DOT Smart Work Zone Systems Performance Measures](https://reader035.vdocuments.mx/reader035/viewer/2022062308/558a9e88d8b42acc108b4758/html5/thumbnails/1.jpg)
MISSISSIPPI DOT I-55 SPLIT DIAMOND INTERCHANGE SMART WORK ZONE SYSTEM AND
PERFORMANCE MEASURES
![Page 2: Mississippi DOT Smart Work Zone Systems Performance Measures](https://reader035.vdocuments.mx/reader035/viewer/2022062308/558a9e88d8b42acc108b4758/html5/thumbnails/2.jpg)
Smart Work Zone Systems (SWZS), utilize computers, communication systems and other ITS field devices to inform motorists, reduce congestion, clear accidents, reduce secondary accidents and make work zones safer for the highway workers and the motorists.
www.MDOTTraffic.comwww.fhwa.dot.gov/workzones
Introduction
![Page 3: Mississippi DOT Smart Work Zone Systems Performance Measures](https://reader035.vdocuments.mx/reader035/viewer/2022062308/558a9e88d8b42acc108b4758/html5/thumbnails/3.jpg)
MDOT Goals for SWZS1. Safety a. Alert Drivers to slow or stopped traffic b. Clear accidents more quickly2. Reduce Congestion a. Monitor travel times b. Alert drivers of delays c. Provide information before decision points3. Evaluate for the Future
Goals
![Page 4: Mississippi DOT Smart Work Zone Systems Performance Measures](https://reader035.vdocuments.mx/reader035/viewer/2022062308/558a9e88d8b42acc108b4758/html5/thumbnails/4.jpg)
Vicinity Map
![Page 5: Mississippi DOT Smart Work Zone Systems Performance Measures](https://reader035.vdocuments.mx/reader035/viewer/2022062308/558a9e88d8b42acc108b4758/html5/thumbnails/5.jpg)
Project Map
47,000
71,000
33,000
20,000
Annual Average Daily Traffic
![Page 6: Mississippi DOT Smart Work Zone Systems Performance Measures](https://reader035.vdocuments.mx/reader035/viewer/2022062308/558a9e88d8b42acc108b4758/html5/thumbnails/6.jpg)
Project Background1. Funding Mechanism2. MDOT SWZS Philosophy3. Design Procedure4. Bidding Process
Project Design
![Page 7: Mississippi DOT Smart Work Zone Systems Performance Measures](https://reader035.vdocuments.mx/reader035/viewer/2022062308/558a9e88d8b42acc108b4758/html5/thumbnails/7.jpg)
I55 Split-Diamond Interchange ProjectMinimum Requirements1. 10 Portable Message Boards 2. 20 Side-Fired Radar Devices3. Typical Sign Messages Provided Normal: “Road Work Ahead, Reduced Speed Ahead” 35mph> “Congestion Ahead, Expect Delays” 5mph > “Slow Traffic Ahead, Expect Long Delays” Stopped: “Stopped Traffic Ahead, Prepare To Stop”
Specifications
![Page 8: Mississippi DOT Smart Work Zone Systems Performance Measures](https://reader035.vdocuments.mx/reader035/viewer/2022062308/558a9e88d8b42acc108b4758/html5/thumbnails/8.jpg)
Smart Work Zone System Delivered 1. Contractor Designed2. 13 miles vs 5 miles req’d3. 10 Signs Deployed vs 8 req’d4. No Devices in the
Work Zone5. Website and Field
Monitoring
System Delivered
![Page 9: Mississippi DOT Smart Work Zone Systems Performance Measures](https://reader035.vdocuments.mx/reader035/viewer/2022062308/558a9e88d8b42acc108b4758/html5/thumbnails/9.jpg)
ASTI Web Features
![Page 10: Mississippi DOT Smart Work Zone Systems Performance Measures](https://reader035.vdocuments.mx/reader035/viewer/2022062308/558a9e88d8b42acc108b4758/html5/thumbnails/10.jpg)
1. Mobility 1. Mobility
2. Safety2. Safety
3. Traveler Information
4. System Performance4. System Performance
Goals
SWZS Performance Measures
![Page 11: Mississippi DOT Smart Work Zone Systems Performance Measures](https://reader035.vdocuments.mx/reader035/viewer/2022062308/558a9e88d8b42acc108b4758/html5/thumbnails/11.jpg)
1. Mobility 1. Mobility
PM Mobility
SWZS Performance Measures
Rate of DiversionDelaySpeedsWork Zone Throughput
Travel TimesReduced DemandIncidents in the WZMaximum Queue Lengths
![Page 12: Mississippi DOT Smart Work Zone Systems Performance Measures](https://reader035.vdocuments.mx/reader035/viewer/2022062308/558a9e88d8b42acc108b4758/html5/thumbnails/12.jpg)
2. Safety2. Safety
PM Safety
SWZS Performance Measures
Number of CrashesCrash RateCrash SeverityCitationsReduction in aggressive maneuvers (forced merges)
![Page 13: Mississippi DOT Smart Work Zone Systems Performance Measures](https://reader035.vdocuments.mx/reader035/viewer/2022062308/558a9e88d8b42acc108b4758/html5/thumbnails/13.jpg)
3. Traveler Information
PM Traveler Information
SWZS Performance Measures
Web – Email AlertsSmart phone apps511Message BoardsHighway Advisory RadioSurvey Questions
![Page 14: Mississippi DOT Smart Work Zone Systems Performance Measures](https://reader035.vdocuments.mx/reader035/viewer/2022062308/558a9e88d8b42acc108b4758/html5/thumbnails/14.jpg)
4. System Performance4. System Performance
PM System Performance
SWZS Performance Measures
Error logsMissing dataDown timeWeb site featuresBenefits – Users perspective
![Page 15: Mississippi DOT Smart Work Zone Systems Performance Measures](https://reader035.vdocuments.mx/reader035/viewer/2022062308/558a9e88d8b42acc108b4758/html5/thumbnails/15.jpg)
Sample Report
Speed, Volume, Occupancy Report
![Page 16: Mississippi DOT Smart Work Zone Systems Performance Measures](https://reader035.vdocuments.mx/reader035/viewer/2022062308/558a9e88d8b42acc108b4758/html5/thumbnails/16.jpg)
Speed Data
![Page 17: Mississippi DOT Smart Work Zone Systems Performance Measures](https://reader035.vdocuments.mx/reader035/viewer/2022062308/558a9e88d8b42acc108b4758/html5/thumbnails/17.jpg)
Volume Data
![Page 18: Mississippi DOT Smart Work Zone Systems Performance Measures](https://reader035.vdocuments.mx/reader035/viewer/2022062308/558a9e88d8b42acc108b4758/html5/thumbnails/18.jpg)
Occupancy Data
![Page 19: Mississippi DOT Smart Work Zone Systems Performance Measures](https://reader035.vdocuments.mx/reader035/viewer/2022062308/558a9e88d8b42acc108b4758/html5/thumbnails/19.jpg)
PM Report
7:00
57 58 59 60 61 62 63 64
January 2013 Speed Chart - SB 1st Lane
28-Jan21-Jan14-Jan7-Jan
![Page 20: Mississippi DOT Smart Work Zone Systems Performance Measures](https://reader035.vdocuments.mx/reader035/viewer/2022062308/558a9e88d8b42acc108b4758/html5/thumbnails/20.jpg)
ITS Installations
Future Performance Measures1. Spot Speed Studies2. Project Diary3. Crash Report Analysis4. Continue to develop PM Reports5. Integrate info 5116. Survey Questionaires