BREAKUP OF PUNCTUEQUIPMENT FAIL
S N Equipment Failures for the year 2017-18
Asset F
R il F t 161. Engg
Rail Fracture 16Weld Failure*
27Failure*
2. Diesel Loco 263. Electric Loco 144. Wagon Detachment 705. Train Parting 326. Hot Axle 457. Coach Detachment 98 OHE Failures 288. OHE Failures 289. Signal Failures 127
T t l 138
UALITY LOSS DUE TO LURES (2017-18)Failures Punctuality
Losses% Punctuality
Loss
641 47319 65 1641 47319 65.1728 *Includes
Others-
Others653 5007 6.8476 3774 5.203 3189 4.528 - -53 - -97 - -81 1194 1 681 1194 1.6
7995 12263 16.88355 72746 100
LINE CAPADUE TO EQUIPMDUE TO EQUIPM
OVER MAJOR SECTI
SectionDaily Average
Duration of failures
(In Minutes) (In Minutes)
SWR SCENARIO (APR-18):B l J l t1 Bengaluru-Jolarpet-
Bengalure 622 Mysuru-Bengaluru-Mysuru 56y g y
Average / Section 59ECoR SCENARIO (2017-18):ECoR SCENARIO (2017 18):
1 Bhadrak-Palasa-Bhadrak 1012 Palasa-Visakhapatnum- 612 Palasa 61
Average / Section 81.2
ACITY LOST MENT FAILURE MENT FAILURE IONS (SWR & ECOR)
Line Capacity with MTCE(Trains/day)
No of Paths Lost / Day
(Trains/day)
% of Line Capacity lost due
to Failures wrt 1440 minwrt 1440 min
96 4.13 4.31 %96 3.74 3.90 %96 7.87 4.10 %
104 7.31 7.03%110 4 67 4 25%110 4.67 4.25%107 6.03 5.64%
ASSET RERAIL & WELRAIL & WEL
(TACKLE RAIL & T
SN Item Unit Ao
1 TRR Km2 TSR (P) Km2 TSR (P) Km
3 TWR Km
In 2017-18,TRR increased from1233 to 2273 Kms1233 to 2273 Kms
At current rate, arrears2021 222021-22.
LIABILITY D FAILURES D FAILURES RACK RENEWALS)Arrears as on 01.04.18
Annual arisings
Target 2018-19
9413 3000 55094687 1000 27124687 1000 2712
11330 1700 3526
m 2600 to 4400 Kms,TSR from
s can get wiped out by
REDUCING RFAILUFAILU
Adoption of Thick Webo Adoption of Thick WebLonger Life- 8 Lacs against
o Adoption of Wider Sleeand thicker rubber padp
o High Performance Trac
o Mechanised USFD TestRecording Cars
o Rail mounted vehiclesworks
RAIL & WELD URESURES
b Switches (Hi h S db Switches- (Higher Speed, t 4 Lacs)
epers (150 to 210 mm)s(10/6.2mm)( )
ck Machines
ting and Modern Track
s for Welding and other
DYNAMIC 3X TAMPING MACHINE
MODERN TRACK RECORDING CAR
DUAL RAIL TESTER
RAIL MOUNTED VEHICLE
SIGNALLTELECOMMTELECOMM
Complete redundancy of A Complete redundancy of Adiversity (Quad cable + OFBlock Proving Axle Counteroc o g e Cou te
Replacement of Block instrBlock Instrument with minimBlock Instrument with minim
Protection of Signalling Cain ducts especially in busyin ducts especially in busy
Air Conditioning of Relay ro
LING AND UNICATIONUNICATION
Axle counter as well as mediaAxle counter as well as mediaFC) to improve functioning ofrssruments by Universal Fail Safemum relays (UFSBI)mum relays (UFSBI)able during works and layingyardsyards
ooms
ROLLING STO
o Upgrading CTRBs with no Upgrading CTRBs with ncage Bearings having impr
Fixing age limit like forFixing age limit like foro Proliferation of Bogie
(BMBS)-1/3rd Population a(BMBS)-1/3 Population ao Large scale proliferatio
(WD 70) Present populati(WD-70) Present populatio Encouraging Own Your
i t )maintenance)
OCK(GOODS)
new low friction poly amidenew low friction, poly amideroved grease sealsr Coaching Bearingsr Coaching Bearings
Mounted Brake Systemat presentat presenton of upgraded knuckle ion is 82000 wagons (35%)ion is 82000 wagons (35%)r Wagon Scheme (better
IMPROVING ASSLOCOMOTIVE
Tackle cases of Power ALOCOMOTIVE
locos Fix codal life of Control Ca
o Locomotive Control Como Brake System
Promote REMMLOT-Remanagement of Diesel Loc
Proper use of Numerical rfor quick fault diagnosis a
Use Thermovision camera Instrumented Tower W
monitoring
SET RELIABILITYES/TRACTIONAssembly failures in HHPES/TRACTION
ards formputer
emote Monitoring andcosrelays in TRD Substationsand attention
as for Hot spots in OHE &Wagons for Condition
Rolling stock (Contd )Rolling stock (Contd…)
Implementing Track SImplementing Track -SRolling stock.
Good
n .
Con
ditio
of
Bea
ring
Bad
Time
Side Monitoring ofSide Monitoring of
INSTALLATION RAILWAY RAILWAY
11
ON NORTHERN PANIPAT PANIPAT
TRACK SIDE MON
SN ItSN Item
1 Hot Axle/Roller Acous1. Hot Axle/Roller Bearing Failures
Acous
2. Braking system/ Brake Binding
High svideosg
3. Flat tyres Wheel
4. Location 500 toBeforeBefore
ITORING Contd….
S t P i iSystem Provision
stic measurementsstic measurements
speed photography ands with thermal imagingg g
Condition Monitoring
750 Kms aparte e amination ardse examination yards
TRAIN MANAGE
o Operational Control Cenmovement information o
o Decision Support System
KUR Control Office
EMENT SYSTEM
ntres with Real Time Trainon Displayp yms
TMS Mumbai
ASSET MAINTSIDING O
o Overlapping loads oftecapacity of Terminals
o Stabling of Loads waiteating up sectional cag p
o Infrastructure in SidinYard,Tipplers,Silo and
o Speeds in yards of sidingy go Incentive be given to s
releases and high uptequipment like Tippler
TENANCE BY OWNERSen 2 times the handling
ting to go into siding is apacityp y
gs like Traffic gd Hoppers are vital
s also need to be increasedsidings for quick ime of handling rs
OTH
o Effective use of Track MDirected Maintenance o
o RFID Tagging of wagono RFID Tagging of wagonmanagement
o Use Loco Trol for Lono Use Loco Trol for Lon
o Judicious spacing of so Judicious spacing of s
Ri ht P i f t io Right Powering of train(Proliferate WAG7/9 and(
ERS
Management System for g yof Tracksns for better assetns for better asset
g Haul Trainsg Haul Trains
signals on Up Gradesignals on Up Grade
(C t l l i 40 %)ns (Current level is 40 %)d WDG5 locos))
OTHERS
o Make Critical Sectionso Make Critical Sections • Kapilas Road : Bar• Duvada : Go• Bengaluru : Jolag
o Upgradation of skills ao Positioning of staff foo Positioning of staff fo
o Adopt ISO 55001 for ao Adopt ISO 55001 for a
o Adequate Revenue buo dequate e e ue bu
Contd....
failure freefailure freerangpalapatnamarpettaipand Training of staffor new assetsor new assets
asset maintenanceasset maintenance
udget including AMCs.udget c ud g Cs
COST IMPItemItem
Thick Web switches(25000)Dynamic tamping m/c(70)y p g ( )
Modern TRCs(5)Rail Borne vehicles (100)Rail Borne vehicles (100)Additional Axle counters(5250)Universal Fail safe Block InstrumenUniversal Fail safe Block InstrumenTrain Management system(40)
( )Instrumented tower wagons(470)
Conversion to bogie mounted brake
Total
LICATIONUnit Cost implicationUnit costCr
Cost implication for IR
(in Rs. Cr)( )00.08 200027.0 1890
24.0 1203 3 3303.3 3300.2 1050
t(7100) 0 1 710t(7100) 0.1 710 45.0 180001.5 705
es .014 2560NA 11,165