mission linen - images3.loopnet.com · mission linen building 1001 south 1st street las vegas,...
TRANSCRIPT
MISSION LINEN BUILDING1001 SOUTH 1ST STREETLAS VEGAS, NEVADA 89101
JEFF MITCHELL, [email protected] 702.374.0211View Profile
JEFF MITCHELL, [email protected] 702.374.0211View Profile
ANDREW [email protected] 702.374.0220View Profile
ANDREW [email protected] 702.374.0220View Profile
MICHAEL [email protected] 702.235.7300View Profile
MICHAEL [email protected] 702.235.7300View Profile
CLICK TO VIEW VIDEO
2241 West Charleston Boulevard, Suite 103 l Las Vegas, Nevada 89102 l Office 702.374.0220 l www.mtnwest.com
MISSION LINEN BUILDING
MISSION LINEN BUILDING1001 SOUTH 1ST STREETLAS VEGAS, NEVADA 89101
PREPARED BY
JEFF MITCHELL, [email protected] 702.374.0211View Profile
JEFF MITCHELL, [email protected] 702.374.0211View Profile
MICHAEL [email protected] 702.235.7300View Profile
MICHAEL [email protected] 702.235.7300View Profile
ANDREW [email protected] 702.374.0220View Profile
ANDREW [email protected] 702.374.0220View Profile
3241 West Charleston Boulevard, Suite 103 l Las Vegas, Nevada 89102 l Office 702.374.0220 l www.mtnwest.com
MISSION LINEN BUILDING
Unique Architectural Landmark In part because of its height, but also because of its architectural uniqueness, The Mission Linen Building stands as the most recognizable building in downtown south. This property allows for redevelopment of a high-end use with a creative, open floor plan while maintaining the upcycled modern-industrial design language that can only come from a converted WWII era warehouse (high ceilings and exposed trusses).
Las Vegas Arts District From a small collective of artists, the Arts District has risen to become Southern Nevada’s cultural core. It’s upward trajectory continues unabated with the near monthly opening of a restaurant, brewery, gallery or retail shop. Low-rise residential projects now in the works seek to meet pent up demand for housing in the area from those who want to begin and end their day in the region’s developing 24-hour, live/work, urban neighborhood. The City of Las Vegas seeks to sustain this revitalization within the Arts District through cooperation with qualified tenants at catalyst projects.
PROPERTY INFORMATION
LEASE RATE$1.25 (As-is)
$2.25 (Tenant Allowance)
TOTAL GLA (SF)30,226
21,226 SF First Floor9,000 SF Second Floor
TOTAL SIZE (ACRES) 1.13
APN 139-34-401-011
CLEAR HEIGHT (1ST FLOOR)
Up to 20’
CLEAR HEIGHT (2ND FLOOR)
Up to 12’
PARKING67 Dedicated Spaces, On Street ParkingFuture City Parking Garage in Plan Phase
ZONING General Commercial (C-2)
OPPORTUNITY HIGHLIGHTS
4241 West Charleston Boulevard, Suite 103 l Las Vegas, Nevada 89102 l Office 702.374.0220 l www.mtnwest.com
MISSION LINEN BUILDING
4
RENDERINGS
LOBBY 1st STREET FACADE
1st FLOOR NORTH WING
5241 West Charleston Boulevard, Suite 103 l Las Vegas, Nevada 89102 l Office 702.374.0220 l www.mtnwest.com
MISSION LINEN BUILDING
UP
UPUP
21,000 SF +/-149'
- 3"
141' - 4"
tel. 702.598.1723mail@jawastudio com
107 E. Charleston Suite 250Las Vegas NV 89104
scale: 1/16" = 1'-0"
7/13
/201
7 4:
03:1
7 PM
E:\D
rop
bo
x\01
JAW
A ST
UD
IO L
AS V
EGA
S\20
16\1
6037
Mis
sio
n Li
nen
Off
ice
Co
nve
rsio
n\d
raw
ing
s\16
037
Mis
sio
n Li
nen
Off
ice
Co
nve
rsio
n C
D 2
.0 R
ev
1.rv
t
16037
12/06/161001 S First St.
Mission LinenOffice Conversion
Existing 1st Floor SK-3
0' 8' 16' 32'
NORTH
DN
9,000 SF +/-
149'
- 3"
141 4
tel. 702.598.1723mail@jawastudio com
107 E. Charleston Suite 250Las Vegas NV 89104
scale: 1/16" = 1'-0"
7/13
/201
7 4:
03:1
7 PM
E:\D
rop
bo
x\01
JAW
A ST
UD
IO L
AS V
EGA
S\20
16\1
6037
Mis
sio
n Li
nen
Off
ice
Co
nve
rsio
n\d
raw
ing
s\16
037
Mis
sio
n Li
nen
Off
ice
Co
nve
rsio
n C
D 2
.0 R
ev
1.rv
t
16037
12/06/161001 S First St.
Mission LinenOffice Conversion
Existing 2nd Floor SK-4
0' 8' 16' 32'
NORTH
SITE PLANS
FIRST FLOOR SECOND FLOOR
21,226 SF
±9,000 SF
6241 West Charleston Boulevard, Suite 103 l Las Vegas, Nevada 89102 l Office 702.374.0220 l www.mtnwest.com
MISSION LINEN BUILDING
Imagery ©2018 , DigitalGlobe, U.S. Geological Survey, USDA Farm Service Agency
CHARLESTON BOULEVARD & RANCHO DRIVELAS VEGAS, NEVADA
376 East 400 South, Suite 120 l Salt Lake City, Utah 84111Offi ce 801.456.8800 l Fax 801.578.5500 l www.mtnwest.com
The above information while not guaranteed has been secured from sources deemed reliableMap Data and/or Imagery Courtesy of Google, Nevada DOT (2016)
0 0.2 0.4Mi les
36,000 cars/day
276,
000
cars
/day
29,000 cars/day
12,000 cars/day
23,000 cars/day
Charleston BoulevardM
.L.K. B
oulevard
Shadow Lane
Rancho D
rive
Alta Drive
15
36,000 cars/day Charleston Boulevard
Las
Vega
s Bo
ulev
ard
276,
000
cars
/day
1,350 Employees
1,000 Employees
34,000 cars/day
Tacos HuevosBlue Sky Yoga
The Arts Factory
Clark CountyGovernment Center
Casa Don Juan
JUHLCONDOS
El SombreroMexican Bistro
FederalCourthouse
Clark County CourthouseLas Vegas Municipal Courts
(Coming Soon)
LAS VEGAS NORTHPREMIUM OUTLETS
TRADE AREA MAP
7241 West Charleston Boulevard, Suite 103 l Las Vegas, Nevada 89102 l Office 702.374.0220 l www.mtnwest.com
MISSION LINEN BUILDING
DOWNTOWN
Connected to Downtown The Mission Linen Building is located conveniently at the southernmost stop of the free Loop Shuttle that services all major downtown Las Vegas activity nodes throughout the day.
Drive-time Center of Town Mission Linen stands at the center of Las Vegas with I-15 and I-95 pumping traffic from all corners of the Valley. Moreover, the property is sandwiched by the region’s largest employment & tourism nodes: The Strip, Fremont, Downtown Legal District & Medical District.
Drive time to Las Vegas Strip: 10 minutesDowntown Resort Corridor/Fremont: 5 minutesLegal District (Courts/Govt. Offices): 2 minutesMedical District: 5 minutesMcCarran International Airport: 17 minutesRaiders Stadium: 12 minutesSummerlin: 19 minutesGreen Valley: 20 minutes
8241 West Charleston Boulevard, Suite 103 l Las Vegas, Nevada 89102 l Office 702.374.0220 l www.mtnwest.com
MISSION LINEN BUILDING
PROJECTS FUELING LAS VEGAS GROWTH
Las Vegas StadiumLas Vegas Stadium is the working name for a domed stadium under construction in Paradise, Nevada for the Las Vegas Raiders of the National Football League (NFL) and the UNLV Rebels football team of the University of Nevada, Las Vegas (UNLV). It is located on about 62 acres west of Mandalay Bay at Russell Road and Hacienda Avenue and between Polaris Avenue and Dean Martin Drive, just west of Interstate 15. Construction of the $1.8 billion stadium began in September 2017 and is expected to be completed in time for the 2020 NFL season.
Wynn Paradise ParkSteve Wynn announced in April 2016 the development of a new $1.5 billion expansion project, currently called Wynn Paradise Park, which will include an additional hotel property holding 1,000 rooms and a which will include water skiing and other water sport activities. A 4,000 foot (1,200 m) boardwalk is anticipated to surround the 1,500 foot (460 m)-foot-long lagoon, along with white sand beaches, bars, and other food service. Waterfront convention and meeting space will be available for business uses. Other features are expected to draw additional traffic to the hotels. Fireworks shows are anticipated at night. Construction is expected to start in late 2017 or early 2018 for completion in 2019. Steve Wynn called the “Disney-style” attraction the “most fun project in my 45 years.” The project is expected to improve conservation and reduce water usage of the property by replacing the irrigated golf course.
9241 West Charleston Boulevard, Suite 103 l Las Vegas, Nevada 89102 l Office 702.374.0220 l www.mtnwest.com
MISSION LINEN BUILDING
PROJECTS FUELING LAS VEGAS GROWTH
Resorts World Las VegasResorts World Las Vegas is a casino and resort currently under construction on the Las Vegas Strip in Clark County Nevada, planned to open in 2020. It is owned and operated by Genting Group. The estimated cost is about US$ 7.2 billion.
The $7.2 billion project will include:• 4 hotel towers with a total of 6,583
hotel rooms[11]• 175,000-square-foot (16,300 m2) casino• 4,000-seat theater• Retail, dining and convention space• Rooftop sky park and observation deck• Aquarium
• Movie theater• Ice skating rink• Bowling alley• Indoor water park• Panda exhibit• 21,847,314-square-foot (2,029,681.9 m2)
total area at completion
UNLV School of MedicineUniversity of Nevada, Las Vegas (UNLV) School of Medicine, is an academic division of the University of Nevada, Las Vegas (UNLV) with 60 students matriculated on July 17, 2017. The students began their education with a 6 week EMT course. The school is the first to grant the Doctor of Medicine (MD) degree in Southern Nevada. The school uses facilities in the University Medical Center of Southern Nevada (UMCSN) clinical building at the Las Vegas Medical District.
10241 West Charleston Boulevard, Suite 103 l Las Vegas, Nevada 89102 l Office 702.374.0220 l www.mtnwest.com
MISSION LINEN BUILDING
PROJECTS FUELING LAS VEGAS GROWTH
Interstate 11Construction of the first 15 miles of Interstate 11, which will link Las Vegas to Phoenix and could eventually stretch from Mexico to Canada, is making progress.
The Nevada Department of Transportation is in charge of the 2.5-mile phase one, while the Regional Transportation Commission is heading the 12.5-mile phase two. Both phases have been under construction since 2015 and are expected to be completed by 2018.
The first phase of the $318 million Interstate 11 project is about 60 percent complete, according to the Nevada Department of Transportation.
Convention CenterThe $1.4 billion Las Vegas Convention Center expansion and improvement project authorized in a special session of the Nevada Legislature in October took a big step forward Tuesday.
The Las Vegas Convention and Visitors Authority board of directors approved the second phase of the project by unanimously authorizing an eight-month $1.28 million contract extension with its builder representative, Cordell Corp., to begin the process of designing a 600,000-square-foot exhibit hall.