.- GOVERNMENT OF INDIA MINISTRY OF RAIL WAYS RAILWAY BOARD No. 20 12/RSF /649/2/RP-IV /R WF New Delhi, dt. 01.02.13 The Chief Mechanical Engineer, Rail Wheel Factory, Bangalore - 560064. The Controller of Stores, All India Railways & P/Units. Sub:- Minutes of the Quart1erlyWTA Meeting for the planning of items for the period IV/2012-13 (January - March, 2013). Min:utes of quarterly WTA meeting for the period IV/2012-13 (January - March, 2013) held with the representatives of RWF and Zonal Railways/PUs in Rail Bhawan, New Delhi on 10.01.13 has been uploaded on Indian Railway's website www.indianrailways.g:ov.in. To access the Minutes kindly click on "Ministry of Railways. Then click on "Railway Board". Then click on "About Indian Railways" Tab. Then click on " Railway Board Directorates". Then click on "Stores". Then click on "Conferences / Meetings" to open the page containing the minutes of the meeting. Please ensure that the statement of requirements of WTA items for the Quarter 112013-14 (April - June, 2013) should reach this office latest by 31.03.13 positively. The exact date and venue of the meeting would be advised later on. (Hindi version will follow.) Encl.:- As above. J1 (S' isra ) or, Railway Stores (F) Railway Board. Copy of the Minutes of the meeting together with allocation statement is forwarded for information and necessary action please. 1. The Chief Mechanical Engineers, All India Railways and Production Units. 2. The Comptroller & Auditor Gteneral ofIndia, Room No.222, Rail Bhawan, New Delhi. 3. Mis Jessop & Co. Ltd., 21 & 22, Jessore Road, Kolkata -700028. 4. Mis Bharat Earth Movers Ltd., "BEML SOUDHA", 23/1, 4th Main, S.R. Nagar, Bangalore-560 027. 5. Mis Titagarh Wagons Ltd.,l13, Park Street, Kolkata-700 016. 6. Mis Bharat Heavy Electrical Ltd., (Transportation Business Deptt.), Integrated Office Complex, Lodhi Road, New Delhi-110 003.' . 7. AM(RS), AM(ME), Adv(L)/RS, EDRS(C), EDRS(P), EDME(Chg.), EDME(W), EDME (Tr.), EDEE(RS), DME(PU), DME(P)-l, DEE/G, DRS(W), DRS(M), DF(S)-l and RS(WTA) Branches of Railway Board. . 8. CWM, Eastern Railway, Kancharapara. -'

Upload: others

Post on 01-Mar-2022

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Mis - Indian Railway

.-GOVERNMENT OF INDIAMINISTRY OF RAILWAYS

RAILWAY BOARD

No. 20 12/RSF /649/2/RP-IV /R WF New Delhi, dt. 01.02.13

The Chief Mechanical Engineer,Rail Wheel Factory, Bangalore - 560064.

The Controller of Stores,All India Railways & P/Units.

Sub:- Minutes of the Quart1erlyWTA Meeting for the planning of items forthe period IV/2012-13 (January - March, 2013).

Min:utes of quarterly WTA meeting for the period IV/2012-13 (January - March, 2013)held with the representatives of RWF and Zonal Railways/PUs in Rail Bhawan, New Delhi on10.01.13 has been uploaded on Indian Railway's website www.indianrailways.g:ov.in. To accessthe Minutes kindly click on "Ministry of Railways. Then click on "Railway Board". Thenclick on "About Indian Railways" Tab. Then click on " Railway Board Directorates". Thenclick on "Stores". Then click on "Conferences / Meetings" to open the page containing theminutes of the meeting.

Please ensure that the statement of requirements of WTA items for the Quarter 112013-14(April - June, 2013) should reach this office latest by 31.03.13 positively. The exact date andvenue of the meeting would be advised later on.

(Hindi version will follow.)Encl.:- As above. J1

(S' isra )or, Railway Stores (F)Railway Board.

Copy of the Minutes of the meeting together with allocation statement is forwarded forinformation and necessary action please.

1. The Chief Mechanical Engineers, All India Railways and Production Units.2. The Comptroller & Auditor GteneralofIndia, Room No.222, Rail Bhawan, New Delhi.3. Mis Jessop & Co. Ltd., 21 & 22, Jessore Road, Kolkata -700028.4. Mis Bharat Earth Movers Ltd., "BEML SOUDHA", 23/1, 4thMain, S.R. Nagar,

Bangalore-560 027.5. Mis Titagarh Wagons Ltd.,l13, Park Street, Kolkata-700 016.6. Mis Bharat Heavy Electrical Ltd., (Transportation Business Deptt.), Integrated Office

Complex, Lodhi Road, New Delhi-110 003.'.

7. AM(RS), AM(ME), Adv(L)/RS, EDRS(C), EDRS(P), EDME(Chg.), EDME(W),EDME (Tr.), EDEE(RS), DME(PU), DME(P)-l, DEE/G, DRS(W), DRS(M), DF(S)-l andRS(WTA) Branches of Railway Board. .

8. CWM, Eastern Railway, Kancharapara.

- '

Page 2: Mis - Indian Railway

Items Requirement Source PlanDSP RWF Import RWPIBela

Conventional Loco/S Shape 30000 20,000 0 10000 0loco wheelsHigh Horse Power Wheels 9500 0 0 9500 0MO loco wheels 1000 1000 0 0 0BO coaching wheels 78000 19,000 39000 20000 0including 1600 BOcoaching wheel sets forBEML and OthersEMU wheels 20,000 5000 5000 10000 0LHB coaching wheels 10000 0 0 10000 0MO coaching wheels 2250 0 0 2250 0BOX N wagon wheels 156000 0 146000 0 10000*(including wheels for 16000wagon wheelsets)BLC (840 mm dia) wagon 10000 0 10000 0 0wheels including 1000wheel setsOther wheels i.e. Metro, NO 3250 0 0 3250 0

.

loco & crane wheels etc.Total 320,000 45,000 200000 65000 10000

WTA Meeting 4th quarter _10thJanuary, 2013

Present :

Railway Board AM/PU, Adv.RS(P), EDME(PU), EDME(W), EDRS~,DRS(F), DME(PU), DME/P-I, JDRS(E&S)

Plants CME & CMM/RWF, Bangalore, DOM/SAIL/DSP.No representation from RWP/Bela

COSs/CMMs/JAOs Officers of Zonal Railway & ProductionUnits, CWEs & other Officers of Mechanical Department ofZoanl Railways & Production Units.

Plannin!! ofWTA Items for 2013-14

Railway Units

Total requirement received from Zonal Railways & Production Units for production &maintenance is as follows :

i) Total Wheels - 3,20,000 including wheels for 16000 BOXN wheel sets (WagonProduction), 1600 BO Coaching Wh~:elsets (Coach Production) & 1000 BLC Wheelsets(For BLC Wagons).

ii) Total axles - 1,15,300 including axles for above mentioned wheelsets.

Plan for sourcing of Wheels & Axles for 2013-14 is as follows:

Wheels

* As advised by PU Directorate

Page 3: Mis - Indian Railway

Items Requirement Source PlanDSP RWF Import RWPIBela

Loco axles 8600 0 5300 3300 -EMU 4200 0 4200 0 -BG coachingincluding axles 25000 6000 11000 8000 -for wheelsetsBOXNaxles including axles 68000 0 68000 0 -for wheelsetsLHB axles 4500 0 2500 2000 -BLC axles 3000 0 3000 0 -Others 2000 0 2000 0 -Total 115300 6000 96000 13300 -

WTA Meeting 4th quarter -lOth January, 2013

Axles:

(Ref-PU Directorate file No-2012/M(PU)/1I23)

. RWF must arrange inputs and be ready for supplies of 50000 BG coaching wheels in takecare of any variation in requirement and failure of other sources.

. CME/RWF has requested to reduce one variety of wheels from planning to enable RWFto achieve the production target of 2,00,000 wheels. CME/RWF has also stated that RWFis sourcing axles part requirement from MSF and VISL. It was indicated that axle forgingpress of VISL has broken and replac<::mentof forging press of VISL is likely to take time(around 6 months). Thus VISL will not able to supply axle forgings to RWF by the timetheir axle forging press is re-installed. CME/RWF has requested to reduce the planning ofEMU wheels from RWF.

. It was stated that for 1stand 2ndquartl~rof2013-14, no EMU wheels are being planned onRWF as 10,000 EMU wheels have been sourced from import. 5000 nos. EMU wheelsmay be required during last two quarter of2013-14.

RWFIBansdore

. It is expected RWF will achieve its target of 2,00,000 wheels & 1,00,000 axles for 2012-13 as per production plan. Till completion of third quarter RWF has supplied 144160wheels and 70825 axles. Thus in last quarter wheels are being allotted keeping balancequantity of 55840 in view. RWF informed that since axle forging machine of VISL isunder break down. It will not be feasible to complete target of axles. Thus allotment ofaxles has been restricted to 23000 axles only. Supplies of 2000 imported axles have beenreceived.

. EDME(PU) requested for allotment of less quantity of wheels(not more than 51,000-52,000 nos.) on RWF/Bangalore considering the available nos. of working days &production ofMG wheels. This will be kept in view.

\.

Page 4: Mis - Indian Railway

WT A Meeting 4thquarter -1OthJanuary, 2013

. It was decided that in this quarter RWF will produce 650 MG coaching wheels. For 2013-14 and 2014-15 requirement ofMG coaching wheels will be fulfilled through import.

. Stock of HMS in RWF is sufficient. In fact it is all time high. Efforts made by RWF inthis regard were appreciated.

SAILIDSP

. In third quarter (Sep-Dec-12,) SAILlDSP supplied 11880 wheels, against their averagesupply of 11000 wheels per quarter. In Dec-12, SAIL/DSP supplied 5000 wheels.

. DSP/SAIL promised to supply 14000-15000 wheels(BG Coaching & Loco Wheels) in4th quarter. As EMU wheels have aln~adybeen received through import, no EMU wheelsare being allotted the SAIL/DSP for this quarter.

RWPlBela

. As per production plan, RWP/Bela is to produce 15000 BOX-N wheels during 2012-13.Regular production of wheels has not yet commenced. For 2013-14 production target of10,000 nos. has been kept by PU Directorate.

Procurement at Railwav Board level

. Contract for 12054 nos. of LHB coaching wheels has been placed on MisBonatrans/Czech Republic. 1st lot of 1529 wheels has reached Mumbai. 2nd lot of 2500wheels will reach in last week of Feb..13.

. Contract for 2997 nos. WDG-4 and 2523 nos. WAG-9 loco wheels has been issued onMis KLW/Switzerland. Supplies of 1st lot of 316 nos. of wheels are expected to reachMumbai in third week of January-B. Second lot of 700 nos. has also been inspected &passed. This lot is expected to reach Mumbai in second week ofFeb-13.

. Contract for 10000 nos. EMU wheels has been placed on Mis Taiyuan, China. 1st lot of3644 wheels has reached Mumbai. Second lot of 4801 wheels is expected in third weekof January-B.

. Contract for 6000 nos. BG coaching axles was issued on Mis Jinxi/China. 1st lot of 2160axles has reached Mumbai. 2nd lot of 2000 axles is under inspection.

. Next lot of 231 WDG-3A loco axles & 264 WAG-7 loco axles from MisLugcentrakuzlUkrain (PO qty 1005 nos. WAG-7 & 767 nos. WDG-7 axles) is expectedto reach Mumbai by end of January-B.

. Contract for 172 nos. WAP-5 loco wheels has been placed on Mis Bonatrans.

. Tender for 10000 nos. 's' profile loco wheel is under decision.

/"

Page 5: Mis - Indian Railway

i) Contract Period from 1stApril to 31!itMarchAs per para 3 of minutes of WTA meeting held on 9.1.2001 circulated videBoard's letter No. 2000/RSF/649/RP-l/W AP dated 14.1.2011, contract period forWTA items shall be from 1stApril of the year to 31stMatch of next year i.e. as perFinancial year. Instructions were reiterated vide this office letter No.2011/RS(WTA)-149/Procurement Cal(mdar (WTA items) dated 6.12.2011.

ii) Buffer StockIn terms of Board's circular letter No. 2000/RS(G)1779/16 dated 8.3.2002, Buffer.stock of 6 months for imported WTA items and for indigenous WTA items, 3months buffer is required to be taken into account while assessing the requirement.List of imported WTA items was reiterated vide this office letter No.2011/RS(WTA)-149/Procurement Cal(mdar (WTA items) dated 8.3.2012.

iii) Time Schedule for submission of Indents for WT A items:As per policy instructions issued vide letter No. 2000/RSF/649/RP-l/WAP dated14.1.2001 and reiterated vide letter followed by various reminders last letter No.2011/RS(WTA)-149/Procurement Cal(mdar (WTA items) dated 6.12.2001, indentsfor WTA items are due to be submitte:d by 31st July for the next to next financialyear as follows:

Contract Period Due date for submission of indent1.4.2013 to 31.3.2014 31.7.20111.4.2014 to 31.3.2015 31.7.20121.4.2015 to 31.3.2016 31.7.2013 and so on

WTA Meeting 4th quarter -10th January, 2013

. Tender for 10000 nos. BG coaching wheels is under decision.

. Tender for 4000 nos. MG coaching wheels is under decision.

. Tender for 909 nos. Metro Kolkata wheels is under decision.

. Tender for 10700 nos. LHB wheels is due to open on 15.1.13.

· Tender for 10517 nos. Loco wheels (\VAG-9, WDG-4, WDP-4 and WAP-5) is due toopen on 14.1.13.

General

RCF/Kapurthala requested for allotment of 200 BG coaching wheelsets. Thus RWF may supply200 BG coaching wheelsets to RCF/KXH after completion of allotted wheelsets. In case RWFsupplies BG coaching wheelsets to RCF/KXH, allotment ofloose wheels & axles for RCF/KXHis to be proportionally reduced.

Submission of Indents

The need for timely submission of Indents for WTA items was reiterated as follows:

.~/

Page 6: Mis - Indian Railway

No. Item Quantity Actual Variation TotalPlanned Supplies (Oct. (+) excess Supplies(Oct. - Dec., - Dec., (-) shortfall from April

2012) 2012) -December,2012

A LOOSE WHEELS(i) BOX 'N' Wheels 4400 2217 -2183 12909

W1WL-4764/R(ii) MG Chg. Wheels 650 58 -592 535

MG/T -0-1-004(WIWL-770/R)

(WAP-W-031)(iii) BG Chg. Wheels 10900 10145 -755 35404

WIWL-1660/R(iv) BG Loco Wheels 0 0 0 601

W/WL-4984/R(v) MG Loco Wheels 0 0 0 0

WIWL-4955/R(vi) 840 mm dia wheels 732 732 0 2304

for CONCOR(vii) EMUIDMU Wheels 1550 1131 -419 5601

to Drg. No. K-4004(viii) Wheels for BVZC 0 0 0 0

Wagons to Drg. No.W/WL-4747TOTAL WHEELS 18232 14283 -3949 57354

B LOOSE AXLES(i) Nos. 6003 5831 -172 27422(ii) Equated Box 'N' 7054 6760 -295 32194

Units

WTA Meeting 4th quarter _10thJanuary, 2013

iv) Review Statement orkin sheet.As per policy circular No. 91/RS(WTA)-149/MTC dated 28.11.1991, indents forWTA items should be supported with working sheet (review Statement). As perBoard's letter No. 2002/Rs(WTA)-149/MTC dated 18.11.2002 signing of reviewstatement b 3SAG officers was dis ensed with & not the review statement.

v Si nin AuthoriAs per policy instructions covering letter for indents should be signed by an officernot below the rank of JA Grade. Similarly forwarding letter need also to be signedby officer not below the rank of JA Grade & should have the a roval of COSo

The position regarding supplies made by RWF during the previous quarter i.e. October -December,2012 was discussed. The same is tabulatedas under:-

SUPPLIES DURING OCTOBER -DECEMBER. 2012

Page 7: Mis - Indian Railway

C WHEELSETS(i) 16T BG Chg. 500 234 -266 1497

Wheelsets(ii) Wheelsets for BCN 0 0 0 0(Hi) BOX 'N' W/sets 13200 13466 266 41906

including WagonBuilders & BLCWagons

(iv) EMU W/sets for 0 0 0 0Trailer CoachesTOTAL WHEELSE 13700 13700 0 43403TS

WTA Meeting 4th quarter -10th January, 2013

The detailed supply position (Railway wise/Consignee wise) is given in the enclosed Annexure-I.

The item-wise planning for January - March, 2013 is shown in Annexure - II.

-----

Page 8: Mis - Indian Railway

I I I IANNEXURE . I IPosition regarding quantities planned vis a . vis actual supplies made by RWF/Bangalore during the IIIrdQuarter (October -December, 2012).

S.NOS. DRAWING & RLY./CONSIGNEE QTY.PLANNED QTY. SUPPLIED VARIATIONDESCRIPTION (OCTOBER. (OCTOBER. (+) EXCESS

IDECEMBER 12\ D ER.12\ I.' IWHEELS

1 Wheel disc. BOX 'N' CRIPR 100 65 -35Type to Drg. No. ERlJMP 600 292 -308WIWL-4764/R NRIJUDW 500 252 -248(WAP/SKlM-155) NCRlJHS 700 384 -316

NFRlNBQ 300 84 -216NWRIAIl 200 43 -157SCR/GTPL 700 739 39SER/KGP 300 134 -166SECRlRWSS 600 111 -489SWRlUBL 100 0 -100WR/DHD 200 42 -158WCR/KTT 100 71 -29Total 4400 2217 .2183

2 BG Chg. Wheels to CRlMTN/PR 600 600 0Drg. NoWIWL- ERlLLH 500 492 -81660/R Eco.RIMCS 400 414 14

NRlAMV/JUDW 700 666 -34NRlCWM/ASR 100 100 0NERlGKP 400 393 -7NFRlDBRT 300 274 -26NWRIAIl 400 371 -29SR/CW/PERI 1100 1004 / -96LW/PER/GOCSCR/TPTY/LGD 600 553 -47SERlKGP 500 474 -26SWRlUBUAP 1000 751 -249SWRlUBL(For BVZI) 100 100 0WRlPL 400 384 -16WRlCWM/PL (BEML 500 500 0AlC)WCRlBPL 600 404 -196ICF 1300 1307 7RCF 1400 1358 -42Total 10900 10145 -755

3 MG Coaching NERlIZN 200 30 -170Wheels to RDSO's NFRlNBQ 100 0 -100Drg. NO.CG-K 6099 NWRlBKN 200 28 -172(WAP-W-031) WRlBVP 150 0 -150

Total 650 58 -692

4 840 dia wheel for Eco.RNSKP 32 32 0CONCOR for BLC NRIJUDW 500 500 0wagon SRIGOC 100 100 0

WCRlKTT 100 100 0

Total 732 732 0

Page 9: Mis - Indian Railway

5 EMUIDEMUWheel CRlMTN 300 239 -61to Drg. No. K-4004 ERlKPA 100 60 -40

NRlGZB 100 0 -100SRICW/PER 100 100 0SCRlLGD 100 54 -46SER/KGP 150 93 -57WRlPL 0 34 34ICF 400 200 -200RCF 300 351 51Total 1550 1131 -419

TOTAL WHEELS 18232 14283 -3949AXLES

1 BG DSL Loco aaxle SRILW/PER 25 24 -1to Drg. NoW/WL- Total 25 24 -14973/R

2 Axle for WDG-2 A NERlGKP 8 0 -8(Axle RT (with light SCRlTPTY 10 0 -10wt. 5002 FZ) to Drg. DMW 200 200 0No. TPL-5868 Alt 'b' Total 218 200 -18part No.11231622

3 Axle rough turned CLW 24 35 11for WAP-4 loco to Total 24 35 11Drg. No.03/2/11/55All. 1

4 Axle rough for WDS- DLW 24 19 -56 to Drg. No. TPL- Total 24 19 -52585

5 Axle driving rough DMW 200 192 -8turned for WDM-2C CRIPR 18 0 -18& WDM-3A Locos to SWRIAP 24 0 -24Drg. No.D/WL- Total 242 192 -505058/R All. NIL

6 Axle rough NCRlCNB 6 0 -6machined for WDG- CLW 150 152 22 & WAG-7 to DRg. BHEUJHS 150 158 8No.06/2I11/2

Total 306 310 4

7 Axle to TPL-6687 SCRIELS/BZA 10 0 -10rough for WDP-2 & Total 10 0 -10WDM-2

8 Axle assembly for NFRlNBQ 10 0 -10WDP-4 without TM NWRIAIl 4 4 0EMD Pt.No.40088126 DLW SCRIGOOTY 0 6 6

No. 17230184 Total 14 10 -4

Page 10: Mis - Indian Railway

9 Axles for WAG-9 & CLW 50 61 11WAP-7 (Rough ERlKPA 18 18 0machined) to CLW'sDrg. NO.1209-01- Total 68 79 11011-002

10 Axle rough for WDG- DLW 84 7 -774 & WDP-4 to EMS-804 to Drg. No. Total 84 7 -775061/R

11 Axle rough GM Loco NWRIAIl 16 16 0to EMD Pt. Total 16 16 0No.40076350 &DLW Pt.No.17230011

12 Axle rough BHEUJHS 72 72 0machined for TAO- Total 72 72 0659 Hitachi typewheelset to Drg. No.SKEL-4516

TOTAL AXLES (1) 1103 964 -139TO (12) IN NOS.TOTAL AXLES IN 2096 1832 -264EQUATED NOS.lX bv 1JU=

13 BG EMU Motor CRlMTN 24 24 0Coach Axles to Drg. Total 24 24 0NO.DC/EMU-M-Q-1-005

14 Axle for AC Motor ERlHLR 12 18 6Coach to Drg.No.EMUlMC-1-025 Total 12 18 6

15 EMU Motor Coach ICF 200 203 3Axles to Drg. NRICB 16 30 14NO.ACmC-EMU/B- SRILW/PER 12 12 002-002 Alt. A/2 item1 (WAP's Drg. No. BEMUMYSS 28 18 -10WAP-A-087) Total 256 263 7

TOTAL EMU 292 305 13AXLES IN NOS.

TOTAL EMU 350 366 15.6AXLES INEQUATED NOS.(X by 1.2)=

16 EMU Axles for JESSOP/KPA 48 48 0Trailor Coaches to TITAGARH 48 48 0Drg. No. BEML 16 16 0AC/DC/EMUl02l204 SRICW/PER 25 25 0001 00/RWF-A-157 Total 137 137 0

Page 11: Mis - Indian Railway

17 BG MEMU TC Axles NRlGZB 10 0 -10to Drg. No. WTAC3- Total 10 0 -100-2-303 Alt. F

18 Axles for BOX'N' to CRIPR 50 52 2Drg. No.w/WL- NFRlNBQ 50 39 -114901/R (WD-89025/SL-2) SRICW/PER 100 107 7

Total 200 198 -2

19 20T powered axles SCRlLGD 6 0 -6for DHMUlDPC as

Total 6 0 -6per ICF Drg. No.DHMUlDPC/0-2-001item KPC 733-804-01-50 Alt. A

20 Axles for LHB RCF/KXH 130 130 0coaches to Drg. ER/LLH 40 43 3NO.LW 021049

WRlPL 30 30 0

Total 200 203 321 BG Coaching Axles CRlMTN/PR 125 122 -3

to Drg. No.WTAC-3- ERlLLH 350 369 1902-303 Eco.RlMCS 50 55 5

NRIJUDW 150 188 38NRlCWM/ASR 100 100 0NERlGKP 160 56 -104NFRlDBRT 50 55 5NWRIAIl 100 86 -14SRlLW/PERlCW/PE 350 322 -28RlGOCSCRlLGD 100 90 -10SECRlRWSS 50 44 -6SWRlUBUAP 70 88 18SWRlUBL(For BVZI) 200 200 0WRlPL 100 109 9WRlCWM/PL 300 315 15WCRlBPL 100 106 6ICF 800 795 -5RCF 900 924 24Total 4055 4024 -31

TOTAL AXLES 4608 4562 -46S.NOS.16 to 21'INNOS.GRAND TOTAL 6003 5831 -172AXLES IN NOS.=GRAND TOTAL 7054 6760 -294.5AXLES INEQUATED UNITS =WHEELSETS

1 16T BG BEML 500 234 -266CHG.Wheelsets Total 500 234 -266

Page 12: Mis - Indian Railway

2 BOX 'N' Wheelsets Wagon Builders 12600 13074 474ECRlSPJ 100 0 -100Total 12700 13074 374

3 Wheelsets for Cast CONCOR 500 392 -108Steel Bogie of BLC Total 600 392 -108Wagon to Drg. No.CONTR-9404-S/12AIt.3

4 Wheelsets for BCN NRiJUDW 300 0 -300Waaon

Total 300 0 -300TOTAL 14000 13700 -300WHEELSETS

Page 13: Mis - Indian Railway

I I I I ANNEXURE-11/

Allocation sheet for supply of WTA items for the IVth quarter i.e. January -March, 2013 onRWF/Bangalore.

S.NOS DRAWING & RLYS./PUs QTY. PLANNED Consignee RemarksDESCRIPTION (JAN. - MARCH,

2013

WHEELS1 Wheel disc. BOX 'N' Type CR 100 PR

to Drg. No. WIWL-4764/R ER 1200 700-HLR(WAP/SKlM-155)

400-JMP100-LLH

NR 700 JUDWNCR 1300 JHSNFR 400 NBQSCR 1500 RYPSSER 700 KGPSECR 1200 RWSSSWR 100 UBLWR 600 DHDWCR 600 KTT

Total 84002 BG Coaching Wheels to CR 300 MTN

Drg. NO.WIWL-1660/R ER 600 LLHEco.R 400 MCSNR 600 300-AMV

300-JUDW300 CWM/ASR Against RSP

NER 600 100-IZN500-GKP

NFR 400 200-DBRT200-NBQ

NWR 500 250-AII250-JU

SR 1100 550-GOC550-CW/PER

SCR 500 250-LGD250-TPTY

SER 800 KGPSWR 400 UBL

200 CWM/UBL Aaainst RSPWR 400 250-PL

150-BVP600 CWM/PL Aaainst RSP

WCR 300 BPLICF 2000RCF 2100Total 12100

3 MG Chg. Wheels to NER 200 IZNRDSO's Drg. NO.CG-K NFR 100 NBQ6099 Alt. latest (MGIT -0- NWR 200 BKN1-004)(WAP-W-031 ) WR 150 BVP

Total 650

Page 14: Mis - Indian Railway

4 840 dia wheel for CR 100 PRCONCOR for BLC wagon NR 600 JUDW

NCR 250 JHSSR 200 CW/PERWR 100 DHDWCR 200 KTTTotal 1450

TOTAL WHEELS 22600

AXLES

1 BG DSL Loco axle to Drg. ER 12 KPANO.WIWL-4973/R SR 40 20-LW/PER(WAP/SKlMA-245) 20-CW/PER

Total 52

2 Axle for WDG-2 A (Axle NR 90 CBRT (with light wt. 5002 NER 15 GKPFZ) to Drg. No. TPL-5868

SCR 10 ELS/BZAAlt. 'b' part No. 11231622

DMW 100 SMM/D Ph-II,DMW

Total 215

3 Axle rough turned for CLW 76WAP-4 Loco to Drg. Total 76t\ln n~/?/11/55

4 Axle driving rough turned DMW 200 SMM/D Ph-II,for WDM-3A Locos to DMWDrg. No. DIWL-5058/R CR 18 PRAlt. NIL Total 218

5 Axle rough machined for CR 24 BSLWDG-2 & WAG-7 to Drg.NO.06/2/11/2 ER 20 KPA

NCR 6 CNB

BHEL 100 JHS

Total 150

6 Axle assembly for WDP- NFR 10 NBQ41ocosto Drg. No.WDG- Total 104/PS/22 GM pt.No.40088369

7 Axle rugh for WDS-6 to DLW 36Drg. No. TPL-2585

Total 36

8 Axle rouh GM Loco to CR 6 PREMD pt. No.40077315 NR 6 CB(Geared) & DLW pt.

SCR 12 RYPSNO.17230019SWR 10 UBL

Total 34

Page 15: Mis - Indian Railway

9 Axles for WAG-9 & WAP- CLW 1087 (Rough machined) to CR 18 BSLCLWs Drg. No. 1209-01- ER 13 KPA011-002 Alt.

Total 139

10 Axle rough GM Loco to SCR 6 RYPSEMD Pt. NO.40076350 & Total 6DLW Part NO.17230011

11 Axle (3 Phase) for WAP- CR 16 BSL5 Loco to CLW Drg. Total 16NO.1210-01-311-025

12 Axle rough machined for CR 40 BSLTA0-659 Hitachi type NR 40 GZBwheelset to Drg. No. WR 12 DHDSKEL-4516 BHEL 100 JHS

Total 192

13 Axle rough turned for ER 24 JMP140T Crane CR/808 Total 24

TOTAL AXLES (1) TO 11681(13)IN NOS.TOTAL AXLES IN 2219EQUATED NOS.

14 BG EMU MTR Coach CR 34 MTNAxles to Drg. No. NR 30 CBDC/EMU-M-0-1-005 SER 24 KGP

Total 88

15 Axle for AC Motor Coach ER 40 HLRto Drg. No.EMUlMC-1- BEML 24 SWR/UBL025 TWL 24 ER/KPA

JESSOP 24 ER/KPATotal 112

16 EMU Axles for Motor ICF 200Coaches to Drg. No. BEML 16 MYSSAC/DC/EMUlB-02-002 Total 216

17 Axle for MEMUlDMC to RCF 30DRg. No. EMU/M-0-1-025 BEML 16 SWR/UBL

TWL 24 ER/KPAJESSOP 2 ER/KPATotal 72

TOTAL EMU AXLES IN 488NOS.TOTAL EMU AXLES IN 586EQUATED NOS. (X by1.2)=

Page 16: Mis - Indian Railway

18 EMU Axles for Trailor JESSOP 48 ER/KPACoaches to Drg. No. Titagarh 48 ER/KPAAC/DC/EMU/02/204-001 BEML 16 SWR/UBL00/RWF-A-157

NR 10 GZB

SCR 10 LGDTotal 132

19 BG MEMU TC Axles to RCF 120 GZBDrg. No. WTAC3-0-2-303 SCR 4 ELS/BZAAIt.F BEML 48 SWR/UBL

TWL 72 ER/KPA

JESSOP 6 ERlKPA

Total 250

20 Axle for YDM-4 Loco to NER 15 IZNDrg. No. DIWL-4984/R

Total 15

21 Axle for BOX 'N'/BCN ER 12 HLRWagon to Drg. NO.WD- NR 10 JUDW92039/S-1 Item-1, AIt.-2 SWR 12 UBL

Total 34

22 BOX 'N' Axles to Drg. No. CR 44 PRWIWL-4901/R (WD- NR 30 JUDW89025/SL-2)

NCR 30 JHS

NFR 30 NBQ

SR 60 CW/PER

SCR 100 RYPS

SECR 40 RWSS

SWR 20 UBL

Total 354

23 MG ICF Chg. Axles to NER 30 IZNDrg. No. MGIT-02-017 WR 25 BVP

Total 55

24 20T powered axles for SCR 26 LGDDHMU/DPC as per ICF Total 26

25 Finish turned axle for SCR 8 LGDDHMUlDPC power axle Total 8to Drg. No.DHMUlDPC/O-20991 Alt. b2

Page 17: Mis - Indian Railway

26 Axles for LHB Coaches to ER 80 LLHDrg. No.LW 021049 SR 16 CW/PER

SCR 12 LGDWR 30 PLTotal 138

27 Axle driving 20T crane to ER 10 JMPDrg. No.NR/9076/R Total 10

28 Axle Idler 20T crane to ER 30 JMPDrg. No.NR/9076/R Total 30

29 Axle 19.3T cap. for BG SCR 6 TPTYbogie milk tank van to Total 6RDSO Drg.K-65261 Alt.d/Nii

30 16 T BG Coaching Axles CR 125 75-MTNto Drg. No. CG-K 6015 ER 350 LLH

Eco.R 50 MCSNR 150 JUDW

100 CWM/ASR Against RSP

NER 160 GKPNFR 50 DBRTNWR 100 All

SR 350 50-LWIPERSCR 100 LGD

SECR 50 RYPSSWR 70 UBL

200 UBL For BVZIWR 100 PL

I300 CWM/PL For BEML

...I

WCR 100 BPL

ICF 800

RCF 900

Total 4055

TOTAL AXLES S.NOS. 511318 to 30 IN NOS.

GRAND TOTAL AXLES 6769IN NOS.=GRAND TOTAL AXLES 7918IN EQUATED UNITS =

~)E\~'

Page 18: Mis - Indian Railway

WHEELSETS

1 16T BG Coaching W/sets BEMl 400 Will be sent to Hublifor machining.

Total 400

2 BOX 'N' Wheelsets Wagon 15000 Consignee to beBuilders advised by DRS(W)

Total 15000

3 Wheelsets for Cast Steel CONCOR 700Bogie of BlC Wagon to

Total 700Drg. No.CONTR-9404-5/12 AIt.3

TOTAL WHEELSETS 16100

Page 19: Mis - Indian Railway

GOVERNMENT OF INDIAMINISTRY OF RAIL WAYS

RAILWAY BOARDNo.2012/RSF/649/2/RP-IV/DSP New Delhi, dt 5, .02.13

1. Mis Steel Authority of India Ltd.,Central Marketing Organisation,S&RM Division,Ispat Bhawan,40-Jawahar Lal Nehru Marg,Kolkata - 700 071.

2 The Controller of Stores,All India Railways & PlUnits.

Sub:- Minutes of the Quarterly WTA Meeting for the planning of WTA items for the periodIV/2012-13 (January - March, 2013).

Minutes of quarterly WTA meeting foorthe period IV/2012-13 (January - March, 2013) held withthe representatives of DSP in Rail Bhawan, New Delhi on 10.01.13 has been uploaded on IndianRailway's website www.indianrailwavs.gov.in. To access the Minutes kindly click on "Ministry ofRailways. Then click on "Railway Board". Then click on "About Indian Railways" Tab. Thenclick on " Railway Board Directorates". Then click on "Stores". Then click on "Conferences IMeetings" to open the page containing the minutes of the meeting.

Please ensure that the statement of requirements of WTA items for the Quarter 1/2013-14 (April -June, 2013) should reach this office latest by 31.03.13 positively. The exact date and venue of themeeting would be advised later on.

(Hindi version will follow.)Isra )

Director, Railway Stores (F)Railway Board.

Copy to:1. The Chief Mechanical Engineers, All Indian Railways/Production Units.2. The Comptroller & Auditor General oflndia, Room No.222, Rail Bhawan, New Delhi.3. GM (BBM & WAP), Mis SAILIDSP, Durgapur-713203.4. The DGM I/C, WAP, Mis SAIL/DSP" Durgapur - 713203.5. The Chief Marketing Manager, Mis SAIL/DSP, SCOPE MINAR (17th floor), North Block,

Laxmi Nagar District Centre, Delhi - 110 092.6. SOOVinay Kumar, Dy.GM, Mis SAIL/DSP, SCOPE MINAR (20th floor), North Block, Laxmi

Nagar District Centre, Delhi - 110 092.7. GM(I), Mis RITES (ER), Quality Assurance Division, Central Station Building (Metro), 56, CR

Avenue, 3rdFloor, Kolkata':'" 700012.8. S.I.E(M) Incharge, Inspection Wing, ~v1/sRITES c/o DSP, Durgapur-713203.9. Mis Jessop & Co. Ltd., 21 & 22, Jessore Road, Kolkata-700 028.10. Mis Titagarh Wagons Ltd., 113, Park Street, Kolkata-700 016.II. Mis Bharat Heavy Electrical Ltd., (Tr~msportation Business Deptt.), Integrated Office Complex,

Lodhi Road, New Delhi-II 0 00312. Adv./RS, AM/ME, AM/PU, Adv(L)RS, Adv.RS(P), EDRS (C), EDME(W), EDEE(RS),

DME(PU), DME(P)-I, DRS(W), DRS(M) & RS(WTA) Branch.

Page 20: Mis - Indian Railway

Items Requirement Source PlanDSP RWF Import RWP/Bela .

Conventional Loco/S Shape 30000 20,000 0 10000 0loco wheelsHigh Horse Power Wheels 9500 0 0 9500 0MG loco wheels 1000 1000 0 0 0BG coaching wheels 78000 19,000 39000 20000 0including 1600 BGcoaching wheel sets forBEML and OthersEMU wheels 20,000 5000 5000 10000 0LHB coaching wheels 10000 0 0 10000 0MG coaching wheels 2250 0 0 2250 0BOX N wagon wheels 156000 0 146000 0 10000*(including wheels for 16000wagon wheelsets)BLC (840 mm dia) wagon 10000 0 10000 0 0wheels including 1000wheel setsOther wheels i.e. Metro, NG 3250 0 0 3250 0loco & crane wheels etc.Total 320,000 45,000 200000 65000 10000

WT A Meeting 4tb quarter - 10tb January, 2013

Present:

Railway Board AM/PU, Adv.RS(P), EDME(PU), EDME(W), EDRS(C),DRS(F), DME(PU), DME/P-I, JDRS(E&S)

Plants CME & CMM/RWF, Bangalore, DGM/SAIL/DSP.No representation from RWP/Bela

COSs/CMMs/JAGs Officers of Zonal Railway & ProductionUnits, CWEs & other Officers of Mechanical Department ofZoanl Railways & Production Units.

Plannin2 ofWTA Items for 2013-14

Railway Units

Total requirement received from Zonal Railways & Production Units for production & maintenance is asfollows :

i) Total Wheels - 3,20,000 including wheels for 16000 BOXN wheelsets (Wagon Production),1600 BG Coaching Wheelsets (Coach Production) & 1000 BLC Wheelsets (For BLC Wagons).

ii) Total axles - 1,15,300 including axle:sfor above mentioned wheelsets.

Plan for sourcing of Wheels & Axles for 2013-14 is as follows:

Wheels

* As advised by PU Directorate

Page 21: Mis - Indian Railway

Items Reauirc~ment Source PlanDSP RWF Import RWPlBeia

Loco axles 8600 0 5300 3300 -EMU 4200 0 4200 0 -BG coaching including axles 25000 6000 11000 8000 -for wheelsetsBOXNaxles including axles 68000 0 68000 0 -for wheelsetsLHB axles 4500 0 2500 2000 -BLC axles 3000 0 3000 0 -Others 2000 0 2000 0 -Total 115300 6000 96000 13300 -

WTA Meeting 4th quarter _10th January, 2013

Axles:

(Ref-PU Directorate file No-2012/M(PU)/1I23)

. RWF must arrange inputs and be ready for supplies of 50000 BG coaching wheels

1;take care of any variation in requirement and failure of other sources.

. CME/R WF has requested to reduce one variety of wheels from planning to enableRWF to achieve the production target of 2,00,000 wheels. CME/RWF has alsostated that RWF is sourcing axles part requirement from MSF and VISL. It wasindicated that axle forging press of VISL has broken and replacement of forgingpress ofVISL is likely to take time (around 6 months). Thus VISL will not able tosupply axle forgings to RWF by the time their axle forging press is re-installed.CME/R WF has requested to reduce the planning of EMU wheels from RWF.

. It was stated that for 1stand 2ndquarter of 2013-14, no EMU wheels are beingplanned on RWF as 10,000 EMU wheels have been sourced from import. 5000nos. EMU wheels may be required during last two quarter of2013-14.

RWFlBansdore

. It is expected RWF will achieve its target of 2,00,000 wheels & 1,00,000 axles for2012-13 as per production plan. Till completion of third quarter RWF hassupplied 144160 wheels and 70825 axles. Thus in last quarter wheels are beingallotted keeping balance quantity of 55840 in view. RWF informed that since axleforging machine of VISL is under break down. It will not be feasible to completetarget of axles. Thus allotment of axles has been restricted to 23000 axles only.Supplies of2000 imported axles have been received.

. EDME(PU) requested for allotment of less quantity of wheels(not more than51,000-52,000 nos.) on RWF/Bangalore considering the available nos. of workingdays & production ofMG wheels. This will be kept in view.

~

Page 22: Mis - Indian Railway

WTA Meeting 4th q[uarter _10th January, 2013. It was decided that in this quart.~r RWF will produce 650 MG coaching wheels.

For 2013-14 and 2014-15 requirement of MG coaching wheels will be fulfilled.through import. ~

. Stock of HMS in RWF is sufficient. In fact it is all time high; Efforts made byRWF in this regard were appreciated.

SAIL/DSP

. In third quarter (Sep-Dec-12,) SAIL/DSP supplied 11880 wheels, against theiraverage supply of 11000 wheels per quarter. In Dec-12, SAIL/DSP supplied 5000wheels.

. DSP/SAIL promised to supply 14000-15000 wheels(BG Coaching & LocoWheels) in 4th quarter. As EMU wheels have already been received throughimport, no EMU wheels are being allotted the SAIL/DSP for this quarter.

RWP/Bela

. As per production plan, RWPlBeia is to produce 15000 BOX-N wheels during2012-13. Regular production of wheels has not yet commenced. For 2013-14production target of 10,000 nos. has been kept by PU Directorate.

Procurement at Railwav Board level

. Contract for 12054 nos. of LHB coaching wheels has been placed on MisBonatrans/Czech Republic. 1st lot of 1529 wheels has reached Mumbai. 2nd lot of2500 wheels will reach in last wec~kofFeb-13.

. Contract for 2997 nos. WDG-4 and 2523 nos. WAG-9 loco wheels has beenissued on Mis KLW/Switzerland. Supplies of 1st lot of 316 nos. of wheels areexpected to reach Mumbai in third week of January-B. Second lot of 700 nos. hasalso been inspected & passed. This 16t is expected to reach Mumbai in secondweek of Feb-13.

. Contract for 10000 nos. EMU wheels has been placed on Mis Taiyuan, China. 1stlot of 3644 wheels has reached Mumbai. Second lot of 480 1 wheels is expected inthird week of January-13.

. Contract for 6000 nos. BG coaching axles was issued on Mis Jinxi/China. 1st lotof 2160 axles has reached Mumba.i. 2nd lot of 2000 axles is under inspection.

. Next lot of 231 WDG-3A loco axles & 264 WAG-7 loco axles from MisLugcentrakuz/Ukrain (PO qty 1005 nos. WAG-7 & 767 nos. WDG-7 axles) isexpected to reach Mumbai by end of January-B.

. Contract for 172 nos. WAP-5 loco wheels has been placed on Mis Bonatrans.

. Tender for 10000 nos. OS'profile loco wheel is under decision.

~.

Page 23: Mis - Indian Railway

i) Contract Period from 1stApril to 31st March

As per para 3 of minutes of \VTA meeting held on 9.1.2001 circulated videBoard's letter No. 2000/RSF/649/RP-l/WAP dated 14.1.2011, contract period forWTA items shall be from 1st April of the year to 31st Match of next year Le. as perFinancial year. Instructions were reiterated vide this office letter No.2011/RS(WTA)-149/Procurement Calendar (WTA items) dated 6.12.2011.

ii) Buffer StockIn terms of Board's circular letter No. 2000/RS(G)/779/16 dated 8.3.2002, Bufferstock of 6 months for imported WTA items and for indigenous WTA items, 3months buffer is required to be taken into account while assessing the requirement.List of imported WTA items was reiterated vide this office letter No.2011/RS(WTA)-149/Procurement Calendar (WTA items) dated 8.3.2012.

Hi) Time Schedule for submission of Indents for WT A items:As per policy instructions issued vide letter No. 2000/RSF/649/RP-l/WAP dated14.1.2001 and reiterated vide letter followed by various reminders last letter No.2011/RS(WTA)-149/Procurement Calendar (WTA items) dated 6.12.2001, indentsfor WTA items are due to be submitted by 31st July for the next to next financialyear as follows:

Contract Period Due date for submission of indent1.4.2013 to 31.3.2014 31.7.20111.4.2014 to 31.3.2015 31.7.20121.4.2015 to 31.3.2016 ~n.7.2013 and so on

WTA Meeting 4th q[uarter-l0th January, 2013

· Tender for 10000 nos. BG coaching wheels is under decision.

. Tender for 4000 nos. MG coaching wheels is under decision.

. Tender for 909 nos. Metro Kolkata wheels is under decision.

. Tender for 10700 nos. LHB whel~lsis due to open on 15.1.13.

. Tender for 10517 nos. Loco whec~ls(WAG-9, WDG-4, WDP-4 and WAP-5) isdue to open on 14.1.13.

General

RCF/Kapurthala requested for allotment of 200 BG coaching wheelsets. Thus RWF maysupply 200 BG coaching wheelsets to RCF/K.XH after completion of allotted wheelsets.In case RWF supplies BG coaching wheel sets to RCF/K.XH, allotment of loose wheels &axles for RCF/K.XH is to be proportionally reduced.

Submission of Indents

The need for timely submission of Indents for WTA items was reiterated as follows:

Page 24: Mis - Indian Railway

S.Nos. Item Quantity Actual Variation TotalPlanned Supplies (+) excess Supplies from

(October - (October - (-)shortfall April, -December, December, December,

2012) 2012) 2012A ASSEMBLED

WHEELSETS(i) 16TBG Coaching 300 20 -300 59

WheelsetsB LOOSE

WHEELS(i) BG Chg. Wheels 6700 3911 -2789 9167

W/WL-1660/R(ii) BG Loco Wheels 7078 5811 -1267 14753

W/WL-4948/R(iii) BG Loco Wheels 1550 1026 -524 4543

"S" Shaped(iv) MG Loco Wheels 100 0 -100 592

W/WL-4955/R(v) EMU/DEMU 1520 1092 -428 "4457

Wheels to Drg.No.K-4004TOTAL 16948 11840 -5108 33512WHEELS

C LOOSE AXLES(i) 16TBG Coaching 1670 1400 -270 3995

Axles CG-K-6015(ii) Axles forgings 0 0 0 0

(heat treated andtempered butwithout machinin~)TOTAL AXLES 1670 1400 -270 3995

WT A Meetin 4th uarter - 10th Janua , 2013

iv) Review Statement orkin sheet.As per policy circular No. 91/RS(WTA)-149/MTC dated 28.11.1991, indents forWTA items should be supported with working sheet (review Statement). As perBoard's letter No. 2002/Rs(WTA)-149/MTC dated 18.11.2002 signing of reviewstatement b 3SAG officers was dis ensed with & not the review statement.

v Si nin AuthoriAs per policy instructions covering letter for indents should be signed by an officernot below the rank of JA Grade. Similarly forwarding letter need also to be signedb officer not below the rank of JA Grade & should have the a rovalofCOS.

The position regarding supplies made by Mis SAIL/DSP during the previous quarter i.e.October - December, 2012 was discussed. The same is tabulated as under:-

SUPPLIES DURING OCTOBER -DECEMBER. 2012

Page 25: Mis - Indian Railway

WTA Meeting 4th((uarter _10th January, 2013The detailed supply position (Railway wise/Consignee wise) IS gIven in the

enclosed Annexure-I.

The item-wise planning for January - March, 2013 is shown in Annexure - II.

J;!j)/

;

Page 26: Mis - Indian Railway

ANNEXURE - IPosition regarding quantities planned vis a - vis actual supplies made by Mis SAIUDSP during the Ilird Quarter(October-December, 2012).S.NOS. DRAWING & RLY./CONSIGNEE QTY. PLANNED QTY. SUPPLIED VARIATION

DESCRIPTION (OCTOBER - (OCTOBER - (+) EXCESSDECEMBER., 12) DECEMBER,12) (-) SHORTFALL

AXLES1 BG Chg. Axles to CR/MTN 50 50 0

Drg. No. WTAC-3- ER/LLH 200 200 002-303 Eco.R/MCS 50 34 -16

NR/JUDW 100 149 49NR/CWM/ASR 50 0 -50NERlGKP 60 53 -7NFR/NBQ 50 0 -50NWR/JU 50 42 -8SR/CW/PER 120 111 -9SCRITPTY 50 43 -7SECR/RWSS 50 43 -7SWR/AP 40 0 -40SWR/CWM/UBL 100 0 -100WR/PL 50 50 0ICF 450 444 -6RCF 200 181 -19TOTAL 1670 1400 -270

TOTAL AXLES 1670 1400 -270WHEELS

1 BG Chg. Wheels CRlMTN/PR 400 272 -128to Drg. No.WIWL- ER/LLH/HLR 1000 1038 381660/R Eco.R/MCS 200 179 -21

NR/AMV 400 253 -147NER 200 182 -18NFRlDBRT 100 0 -100NWR/JUIAIl 300 183 -117SR/CW/PER/LW/PER/G 400 150 -250OCSCRITPTY/LGD 500 375 -125SERlKGP 400 400 0SECR/RWSS 100 52 -48SWR/AP 300 150 -150WR/PL 200 195 -5WCR/BPL 100 81 -19ICF 900 145 -755RCF 1200 256 -944TOTAL 6700 3911 -2789

2 BG Loco Wheels CR/BSUPR 700 698 -2IDSL Mono Block ERlKPAlJMP 1300 1300 0Rough machined Eco.RNSKP 78 69 -9WDM2, WDM3 NRlCB/ASR 500 488 -12and WAG5 to Drg. NCR/CNB 100 96 .-4No. DIWL-4948/R NWR/AII 250 146 -104

SR/GOC/LW/PER 700 682 -18

Page 27: Mis - Indian Railway

SCRITPTY 250 222 -28SERlKGPITATANAGAR: 700 590 -110SECR/RWSS 100 39 -61WR/DHD 500 384 -116CLW 1000 500 -500DLW 200 0 -200DMW 300 280 -20BHEUJHS 400 317 -83TOTAL 7078 5811 -1267

3 BG Loco Wheels NER/GKP 30 0 -30"5" Shaped to Drg. SER/KGP 400 200 -200No. DIWL-5060/R WR/DHD 200 184 -16

CLW 220 169 -51DLW 400 184 -216DMW 300 289 -11TOTAL 1550 1026 -524

5 MG Loco Wheels NERlIZN 50 0 -50to Drg. No.WIWL- WRISBI 50 0 -504955/R TOTAL 100 0 -100

6 EMU/DEMU CR/MTN 50 36 -14Wheels to Drg. ER/HLR/KPA 350 301 -49No.K-4004 NR/GZB 150 147 -3

SR/CW/PER 300 175 -125SCR/LGD 50 0 -50SER/KGP 50 0 -50ICF 350 260 -90RCF 100 97 -3BEMUMYSS 120 76 -44TOTAL 1520 1092 -428

TOTAL WHEELS 16948 11840 -5108WHEELSETS

1 Complete RCF 300 20 -280wheelset (Foraed) TOTAL 300 20 -280

Page 28: Mis - Indian Railway

IANNEXURE -II IAllocation sheet for supply ofWTA Items for the IVth quarter I.e. January - March, 2013 on MIsSAIUDSP.

S.NOS. DRAWING & RLYS.lPUs QTY.PLANNED Consignee RemarksDESCRIPTION (.IAN. - MARCH,

2013\AXLES

1 BG Chg. Axles to Drg. No. CR 110 MTNWTAC-3-02-303 ER 200 LLH

NR 110 CWM/ASRNER 100 GKPSWR 110 CWM/UBLrCF 300RCF 500TOTAL 1430

WHEELS1 BG Chg. Wheels to Drg. CR 400 200-MTN

No.WIWL-1660/R 200-PRER 700 400-LLH

300-HLREco.R 220 MCSNR 700 400-AMV

300-JUDWNER 500 GKP

NFR 300 150-DBRT150-NBQ

NWR 300 150-AII150-JU

SR 500 LW/PER

SCR 600 300- TPTY300-LGD

SER 400 KGP

SECR 110 RWSSSWR 300 APWR 400 PL

WCR 400 BPLICF 1000RCF 1100TOTAL 7930

2 MG Loco Wheels to Drg. NER 60 IZNNo.WIWL-4955/R NFR 50 NBQ

WR 100 SBITOTAL 210

3 BG Loco Wheels IDSL CR 800 BSLMono Block Roughmachined WDM2, WDM3 ER 900 500-JMPand WAG5 to Drg. No. 400-KPAWIWL-4948/R Eco.R 150 VSKP

NR 500 400-CB100-ASR

NCR 100 CNB

Page 29: Mis - Indian Railway

NWR 150 AllSR 700 600-GOC

100-LW/PERSCR 200 150-RYPS

50-TPTYSER 150 150-TATASECR 100 RWSSWR 300 DHDCLW 600BHEL 300TOTAL 4950

4 BG Loco Wheels "S" CR 300 PRShaped to Drg. No. DIWL- ER 400 300-KPA5060/R 100-JMP

NR 200 CBSR 300 LW/PERSCR 50 RYPSSWR 50 APWR 300 DHDCLW 500DLW 240DMW 600 SMM/D Ph-II,

DMWTOTAL 2940

5 BG Loco Wheel "S" SCR 100 RYPSShaped to DLW's Drg. No. DLW 300 KPA17230251 'C'

TOTAL 400TOTAL WHEELS 16430WHEELSETS

1 Complete Wheelsets RCF 300(Forced) TOTAL 300

..

---

Page 30: Mis - Indian Railway

GOVERNMENT OF INDIAMIJ"IISTRYOF RAIL WAYS

RAILWAY BOARD

No. 2012/RSF /649/2/RP-IV /BELA New Delhi, dt. 61.02.13

The CAO/WP,Ministry of Railways,CHAMBER BHA WAN,1st Floor, J.C. Road,Patna-800 001

Sub:- Minutes of the Quarterly WTA Meeting for the planning of items forthe period IV/2012-Jl3 (January - March, 2013).

Minutes of quarterly WTA meeting for the period IV/2012-13 (January - March, 2013)held with the representatives of RWF and Zonal Railways/PUs in Rail Bhawan, New Delhi on10.01.13 has been uploaded on Indian Railway's website www.indianrailways.gov.in. To accessthe Minutes kindly click on "Ministry of Railways. Then click on "Railway Board". Thenclick on "About Indian Railways" Tab. Then click on " Railway Board Directorates". Thenclick on "Stores". Then click on "Conferences / Meetings" to open the page containing theminutes of the meeting.

Please ensure that the statement of requirements of WTA items for the Quarter 1/2013-14(April - June, 13) should reach this office latest by 31.03.13 positively. The exact date and venueof the meeting would be advised later on.

(Hindi version will follow.)

Encl.:- As above.

~eev Misra)DIrector, Railway Stores (F)

Railway Board.1. The Chief Mechanical Engineers, ER, NR, NCR, SCR, SECR & WCR.2. The Controller of Stores, ER, NR, NCR, SCR, SECR & WCR.3. The Comptroller & Auditor General of India, Room No.222, Rail Bhawan, New Delhi.4. AM(ME), Adv.(RS), Adv(L)/RS, EDRS(C), Adv.RS(P), EDME(Chg.), EDME(W),

EDME (Tr.), EDEE(RS), DME(PU), DME(P)-I, DEE/G, DRS(W), DRS(M), DF(S)-1 andRS(WT A) Branches of Railway Board.

Page 31: Mis - Indian Railway

Items Requirement Source PlanDSP RWF Import RWP/Bela

Conventional Loco/S Shape 30000 20,000 0 10000 0loco wheelsHigh Horse Power Wheels 9500 0 0 9500 0MG loco wheels 1000 1000 0 0 0BG coaching wheels 78000 19,000 39000 20000 0including 1600 BGcoaching wheelsets forBEML and OthersEMU wheels 20,000 5000 5000 10000 0LHB coaching wheels 10000 0 0 10000 0MG coaching wheels 2250 0 0 2250 0BOX N wagon wheels 156000 0 146000 0 10000*(including wheels for 16000wagon wheelsets)BLC (840 mm dia) wagon 10000 0 10000 0 0wheels including 1000wheel setsOther wheels Le. Metro, NG 3250 0 0 3250 0loco & crane wheels etc.Total 320,000 45,000 200000 65000 10000

WTA Meeting 4th quarter _10thJanuary, 2013

Present :

Railway Board AM/PU, Adv.RS(P), EDME(PU), EDME(W), EDRS@,DRS(F), DME(PU), DME/P-I, JDRS(E&S)

Plants CME & CMM/RWF, Bangalore, DGM/SAIL/DSP.No representation from RWPlBela

COSs/CMMs/JAGs Officers of Zonal Railway & ProductionUnits, CWEs & other Officers of Mechanical Department ofZoanl Railways & Production Units.

Plannin2 ofWTA Items for 2013-14

Railway Units

Total requirement received from Zonal Railways & Production Units for production &maintenance is as follows:

i) Total Wheels - 3,20,000 including wheels for 16000 BOXN wheelsets (WagonProduction), 1600 BG Coaching Whe:e1sets(Coach Production) & 1000 BLC Wheelsets(For BLC Wagons).

ii) Total axles - 1,15,300 including axles for above mentioned wheelsets.

Plan for sourcing of Wheels & Axles for 2013-14 is as follows:

Wheels

* As advised by PU Directorate

Page 32: Mis - Indian Railway

Items Requirement Source PlanDSP RWF Import RWPlBela

Loco axles 8600 0 5300 3300 -EMU 4200 0 4200 0 -BG coachingincluding axles 25000 6000 11000 8000 -for wheelsetsBOXN axles including axles 68000 0 68000 0 -for wheelsetsLHB axles 4500 0 2500 2000 -BLC axles 3000 0 3000 0 -Others 2000 0 2000 0 -Total 115300 6000 96000 13300 -

WTA Meeting 4thquarter _10thJanuary, 2013

Axles:

(Ref-PU Directorate file No-2012/M(PU)/1/23)

. RWF must arrange inputs and be ready for supplies of 50000 BG coaching wheels in takecare of any variation in requirement and failure of other sources.

. CME/RWF has requested to reduce one variety of wheels from planning to enable RWFto achieve the production target of 2,00,000 wheels. CME/RWF has also stated that RWFis sourcing axles part requirement from MSF and VISL. It was indicated that axle forgingpress of VISL has broken and replacement of forging press of VISL is likely to take time(around 6 months). Thus VISL will not able to supply axle forgings to RWF by the timetheir axle forging press is re-installed. CME/RWF has requested to reduce the planning ofEMU wheels from RWF.

. It was stated that for 1stand 2ndquart(~rof2013-14, no EMU wheels are being planned on

RWF as 10,000 EMU wheels have been sourced from import. 5000 nos. EMU wheelsmay be required during last two quarter of2013-14.

RWFlBane:lore

. It is expected RWF will achieve its target of 2,00,000 wheels & 1,00,000 axles for 2012-13 as per production plan. Till completion of third quarter RWF has supplied 144160wheels and 70825 axles. Thus in last quarter wheels are being allotted keeping balancequantity of 55840 in view. RWF"informed that since axle forging machine of VISL isunder break down. It will not be fea.sible to complete target of axles. Thus allotment ofaxles has been restricted to 23000 axles only. Supplies of 2000 imported axles have beenreceived.

. EDME(PU) requested for allotment of less quantity of wheels(not more than 51,000-52,000 nos.) on RWF/Bangalore considering the available nos. of working days &production ofMG wheels. This will be kept in view.

Page 33: Mis - Indian Railway

WTA Meeting 4thquarter _10thJanuary, 2013

. It was decided that in this quarter RWF will produce 650 MG coaching wheels. For 2013-14 and 2014-15 requirement ofMG coaching wheels will be fulfilled through import.

· Stock of HMS in RWF is sufficient. In fact it is all time high. Efforts made by RWF inthis regard were appreciated.

SAIL/DSP

. In third quarter (Sep-Dec-12,) SAIL/DSP supplied 11880 wheels, against their averagesupply of 11000 wheels per quarter. In Dec-12, SAIL/DSP supplied 5000 wheels.

. DSP/SAIL promised to supply 140001-15000wheels(BG Coaching & Loco Wheels) in4th quarter. As EMU wheels have already been received through import, no EMU wheelsare being allotted the SAILIDSP for this quarter.

RWP/Bela

. As per production plan, RWPlBela is to produce 15000 BOX-N wheels during 2012-13.Regular production of wheels has not yet commenced. For 2013-14 production target of10,000 nos. has been kept by PU Directorate.

Procurement at Railwav Board level

. Contract for 12054 nos. of LHB coaching wheels has been placed on MisBonatrans/Czech Republic. 1st lot of 1529 wheels has reached Mumbai. 2nd lot of 2500wheels will reach in last week ofFeb-13.

. Contract for 2997 nos. WDG-4 and 2523 nos. WAG-9 loco wheels has been issued onMis KLW/Switzerland. Supplies of 1st lot of 316 nos. of wheels are expected to reachMumbai in third week of January-B. Second lot of 700 nos. has also been inspected &passed. This lot is expected to reach Mumbai in second week of Feb-13.

. Contract for 10000 nos. EMU wheels has been placed on Mis Taiyuan, China. 1st lot of3644 wheels has reached Mumbai. Second lot of 4801 wheels is expected in third weekof January-B.

. Contract for 6000 nos. BG coaching axles was issued on Mis Jinxi/China. 1st lot of 2160axles has reached Mumbai. 2nd lot 01'2000 axles is under inspection.

. Next lot of 231 WDG-3A loco axles & 264 WAG-7 loco axles from MisLugcentrakuzlUkrain (PO qty 1005 nos. WAG-7 & 767 nos. WDG-7 axles) is expectedto reach Mumbai by end of January-B.

. Contract for 172 nos. WAP-5 loco wheels has been placed on Mis Bonatrans.

. Tender for 10000 nos. 's' profile loco wheel is under decision.

Page 34: Mis - Indian Railway

AS per pi:1H:1 :J VI. 11lUu.n"'03 V.I. n.l.... U'--~"'O_____ ___ _ __

Board's letter No. 2000/RSF/649/RP-l/WAP dated 14.1.2011, contract period forWTA items shall be from 1st April of the year to 31st Match of next year i.e. as perFinancial year. Instructions were reiterated vide this office letter No.2011/RS(WTA)-149/Procurement Calcmdar (WTA items) dated 6.12.2011.

ii) Buffer StockIn terms of Board's circular letter No.. 2000/RS(G)/779/16 dated 8.3.2002, Bufferstock of 6 months for imported WTA items and for indigenous WTA items, 3months buffer is required to be taken into account while assessing the requirement.List of imported WTA items wa.s reiterated vide this office letter No.2011/RS(WTA)-149/Procurement Calendar (WTA items) dated 8.3.2012.

iii) Time Schedule for submission of Indents for WT A items:As per policy instructions issued vide letter No. 2000/RSF/649/RP-1/WAP dated14.1.2001 and reiterated vide letter fi)llowed by va,rious reminders last letter No.2011/RS(WTA)-149/Procurement Calendar (WTA items) dated 6.12.2001, indentsfor WTA items are due to be submitted by 31st July for the next to next financialyear as follows:

Contract Period Due date for submission of indent1.4.2013 to 31.3.2014 31.7.20111.4.2014 to 31.3.2015 31.7.20121.4.2015 to 31.3.2016 31.7.2013 and so on

WTA Meeting 4th quarter _10thJanuary, 2013

. Tender for 10000 nos. BG coaching wheels is under decision.

. Tender for 4000 nos. MG coaching wheels is under decision.

. Tender for 909 nos. Metro Kolkata whl~elsis under decision.

--~-