MINUTES OF THE 11 th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL OF HOTEL FORTUNE MURALI PARK, M.G.ROAD, LABBIPET, VIJAYAWADA The list of the Members who attended the meeting is appended. Agend a Item Brief Description of the Issue Decision of the Committee 1 Confirmation of the Minutes of the previous Meeting held on 17/03/2016 SLC confirmed the minutes of the previous meeting held on 17/03/2016 2 Follow up action on the minutes of the previous Meeting held on 17/03/2016 Noted. 3 IIPP 2005-10& IIPP 2010-15 schemes Sanction of reimbursement of stamp duty, reimbursement of land cost purchased in IEs/IDAs, reimbursement of power cost and sanction of reimbursement of sales tax - Regarding. ***** The Verification / Scrutiny Committee meetings held on 04/06/2016 & 14/06/2016 has verified / Scrutinized ( 02 ) claim application of reimbursement of Stamp duty (08 ) claim application of reimbursement of Sales Tax and (125) claim applications of reimbursement of power cost as per the Guidelines under respective schemes and recommended for sanction/rejection of eligible Incentives / Concessions to the units. The Minutes of Verification / Scrutiny Committee of Sales Tax and Power cost are appended as Annexures. ABSTRACT S No General Incentives No of claims as per seriatum ( website) No of units Amount (in Rupees ) 1 Stamp Duty 2 2 Rs.34,15,398 2 Sales Tax 12 12 Rs.22,31,29,689 3 Power Cost 115 76 Rs.128,69,69,561 4 Deffered by SVC 11 11 0 GRAND TOTAL 150 101 Rs.151,35,14,648 The Verification / Scrutiny Committee of Investment Subsidy and Sales Tax have recommended for sanction / rejection of eligible Incentives/concessions to the units as mentioned below. SLC has examined the recommendations of the Verification / Scrutiny Committee and decided to sanction eligible incentives / concessions to the industrial units as mentioned below under various schemes: ABSTRACT S No General Incentives No of claims as per seriatum ( website) No of units Amount (in Rupees ) 1 Stamp Duty 2 2 Rs.34,15,398 2 Sales Tax 12 12 Rs.22,31,29,689 3 Power Cost 115 76 Rs.128,69,69,561 4 Deffered by SLC 11 11 0 GRAND TOTAL 150 101 Rs.151,35,14,648 DETAILS 1. Reimbursment of Stamp duty Sanctioned reimbursement of stamp duty to (02) units under IIPP and the list is appended as in Annexure I 2. Reimbursment of Sales tax sanctioned to reimbursement of sales tax (12) units under IIPP and the list is appended as Annexure II 3. Reimbursment of Power cost Sanctioned reimbursement of power cost to (115) units under IIPP and the list is appended as in Annexure III.

Upload: others

Post on 26-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE

HALL OF HOTEL FORTUNE MURALI PARK, M.G.ROAD, LABBIPET, VIJAYAWADA

The list of the Members who attended the meeting is appended.

Agend

a Item Brief Description of the Issue Decision of the Committee

1 Confirmation of the Minutes of the previous Meeting

held on 17/03/2016

SLC confirmed the minutes of the previous

meeting held on 17/03/2016

2 Follow up action on the minutes of the previous Meeting

held on 17/03/2016

Noted.

3

IIPP 2005-10& IIPP 2010-15 schemes – Sanction of

reimbursement of stamp duty, reimbursement of land

cost purchased in IEs/IDAs, reimbursement of power

cost and sanction of reimbursement of sales tax -

Regarding.

*****

The Verification / Scrutiny Committee meetings

held on 04/06/2016 & 14/06/2016 has verified /

Scrutinized ( 02 ) claim application of reimbursement of

Stamp duty (08 ) claim application of reimbursement of

Sales Tax and (125) claim applications of reimbursement

of power cost as per the Guidelines under respective

schemes and recommended for sanction/rejection of

eligible Incentives / Concessions to the units. The

Minutes of Verification / Scrutiny Committee of Sales

Tax and Power cost are appended as Annexures.

ABSTRACT

S No

General Incentives

No of claims

as per

seriatum

( website)

No of units

Amount

(in Rupees )

1 Stamp Duty 2 2 Rs.34,15,398

2 Sales Tax 12 12 Rs.22,31,29,689

3 Power Cost 115 76 Rs.128,69,69,561

4 Deffered by SVC 11 11 0

GRAND TOTAL 150 101 Rs.151,35,14,648

The Verification / Scrutiny Committee of

Investment Subsidy and Sales Tax have

recommended for sanction / rejection of eligible

Incentives/concessions to the units as mentioned

below.

SLC has examined the recommendations of the

Verification / Scrutiny Committee and decided

to sanction eligible incentives / concessions to

the industrial units as mentioned below under

various schemes:

ABSTRACT

S No

General Incentives

No of

claims as

per

seriatum

( website)

No of

units

Amount

(in Rupees )

1 Stamp Duty 2 2 Rs.34,15,398

2

Sales Tax

12

12

Rs.22,31,29,689

3 Power Cost 115 76 Rs.128,69,69,561

4 Deffered by SLC 11 11 0

GRAND TOTAL 150 101 Rs.151,35,14,648

DETAILS

1. Reimbursment of Stamp duty Sanctioned

reimbursement of stamp duty to (02) units

under IIPP and the list is appended as in

Annexure – I

2. Reimbursment of Sales tax sanctioned to

reimbursement of sales tax (12) units under

IIPP and the list is appended as Annexure

– II

3. Reimbursment of Power cost Sanctioned

reimbursement of power cost to (115) units

under IIPP and the list is appended as in

Annexure – III.

Page 2: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 2 ::

1. SANCTION OF REIMBURSEMENT OF

STAMP DUTY

S

No

Date of

received

claim

Meeting

date &

seriol

no

Agenda Decision

1 14/09/20

15

18,

4/06/20

16

The Claim

application of M/s

Maruthi Ispat &

Energy Pvt. Ltd.,

Sy.No. 167,

Madhavaram (V),

Mantralayam

reimbursmenrt of

stamp duty under

IIPP 2010-15

SVC examined the claim and recommended for

sanction of Rs.28,923/- (Rupees twenty eighty

thousand nine hundred and twenty three only)

towards stamp duty reimbursement subject to

submission of the following shortfall

information:1) IEM Part-B 2)Certification of

Incorporation 3) Board resolution on

authorization to sign the claim application 4)

Approved plan from Factories Department 5)

Land Conversion Certificate 6) project report 7)

CA certificate on share holding 8) Valid CFO

from APPCB 9) Approved Plans

from Grampanchayath 10) Minutes of the

District Level Pre-scrutiny Committee 11)

Certification of the Banker on Plant &

Machinery as per guidelines.

2 15/09/20

15

25,

4/06/20

16

The Claim

application of M/s

South India

Krishna Oil and

Fats Pvt. Ltd.,

Sy.No. 275, 279,

280 & 281, Epuru

Bit-IB,

Pantapalem

Muthukur

(V&M), SPSR

Nellore District

sanction of

reimbursement of

Stamp Duty

under IIPP 2005-

10

SVC examined the claim and recommended for

sanction of Rs.33,86,475/- (Rupees thirty three

lakhs eighty six thousand four hundred and

seventy five only) towards sanction of

reimbursement of Stamp Duty under IIPP 2005-

10 subject to submission of the following

shortfall information:1) IEM Part-B 2)Certificate

of Incorporation 3) Board resolution on

authorization to sign the claim application 4)

Approved Plans form Factories Department 5)

Land Conversion Certificate 6) Project report 7)

CA certificate on share holding 8) Minutes of the

District Level Pre-scrutiny Committee 9) Banker

certificate on Plant & Machinery as per

guidelines .

II. SANCTION OF REIMBURSEMENT OF

SALES TAX.

S No

Date of

received

claim

Meeting

date &

seriol no

Agenda Decision

Page 3: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 3 ::

1 8/9/2015

15,

4/06/201

6

The Claim application of

M/s Regen Powertech

Pvt. Ltd., Sy. No. 182 to

188, APIIC, Industrial

Park, Mambattu (V), Tada

(M), Nellore District for

saction of sales tax in

respect of 2013-14 under

IIPP 2005-10

SVC examined the claim and

recommended for sanction of

Rs.11,35,89,444/- (Rupees

eleven crores thirty five lakhs

eighty nine thousand four

hundred and forty four only)

towards sales tax

reimbursement for the year

2013-14 subject to submission

of the following shortfall

information:1) Land Sale Deed

or Lease Deed 2)

Certificate of Incorporation 3)

Board resolution on

authorization to sign the claim

application 4) Approved Plan

from Gram Panchayath, 5)

Approved Plans from Factories

Department, 6) Approved

Plans from IALA 7) Boiler’s

Certificate 8) Land conversion

certificate 9) Bank sanctioned

letter 10) Civil Engineer

certificate 11) Approved

project report 12) Power

release certificate.

2 14/9/2015

19,

4/06/201

6

The Claim application of

M/s Sree Jayajyothi

Cements Limaited,

Yanakandla (V),

Banaganpalli (M),

Kurnool District

reimbursement of sales

tax in respect of 2015-16

under IIPP 2005-10

SVC examined the claim and

recommended for sanction of

Rs.1,64,88,816/- (Rupees one

crore sixty four lakhs eighty

eight thousand eight hundred

and sixteen only) towards sales

tax reimbursement subject to

submission of the following

shortfall information:1) Land

Sale Deed / Lease Deed 2)

Certificate of Incorporation 3)

Board resolution on

authorization to sign the claim

application 4) Approval

Plans from Grampanchayath

5) Approved Plans from

Factories Department 6)

Approved Plans from T&CP 7)

Land Conversion Certificate 8)

CFO issued by APPCB 9)

Bank Statement Letter on Plant

& Machinery 10) Civil

Engineer Certificate 11)

Power Release Certificate

12)Project Report 13) CA

certificate on Share holding

14) Statement of Accounts

from Financial Institution.

3 15/9/2015

24,

4/06/201

6

The Claim application of

M/s A S Jute Product Pvt

Ltd (Existing) Sy No:

20/2 & 21,

Nerallavalasa(V),

Padmanabam (m),

Visakhapatnam for

sanction of

reimbursement of sales

tax in respect of 2014-15

under IIPP 2010-15

SVC examined the claim and

recommended for sanction of

Rs.17,94,255/- (Rupees

seventeen lakhs ninety four

thousand two hundred and fifty

five only) towards sanction of

reimbursement of sales tax in

respect of 2014-15 under IIPP

2010-15 subject to submission

of shortfall document - Civil

Engineer Certificate

Page 4: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 4 ::

4 26/10/2015

36,

4/06/201

6

The Claim application of

M/s.Jaypee Balaji Cement

Plant, Rs No: 99,

Budawada, Jaggaiahpet

(M), Krisna Dist sanction

of reimbursement of sales

tax in respect of 2014-15

under IIPP 2010-15

SVC examined the claim and

recommended for sanction of

Rs.8,22,63,860/- (Rupees eight

crores twenty two lakhs sixty

three thousand eighty hundred

and sixty only) towards

sanction of reimbursement of

sales tax in respect of 2014-15

under IIPP 2010-15 subject to

submission of the following

shortfall information:1) Land

sale deed / lease deed 2)

Certificate of Incorporation 3)

Board resolution on

authorization to sign the claim

application 4) CFO from

APPCB, 6) Certification of

Plant & Machinery as per

guidelines 7) Project

report 8) Chartered Accountant

Certificate on share holding

5 30/10/2015

37,

4/06/201

6

The Claim application of

M/s Net Matrix Limited,

Plot No: 15&15A,

APSEZ, Atchuthapuram,

Visakhapatnam sanction

of reimbursement of sales

tax in respect of 2014-15

under IIPP 2010-15

SVC examined the claim and

recommended for sanction of

Rs.23,70,000/- (Rupees

Twenty three lakhs seventy

thousand only) towards

sanction of reimbursement of

Sales Tax in respect of 2014-

15 under IIPP 2010-15 subject

to submission of the following

shortfall information:1) Land

Sale Deed / Lease Deed 2)

Board resolution on

authorization to sign the claim

application 3) Chartered

Accountant Certificate on

shareholding.

6 31/10/2015

42,

4/06/201

6

The Claim application of

M/s.Rajapalayam Mills

Ltd., Gopinenipalem (V),

Vatsavai (M), Krishna

Dist sanction of

reimbursement of sales

tax in respect of 2014-15

under IIPP 2005-10

SVC examined the claim and

recommended for sanction of

Rs.3,23,470/- (Rupees three

lakhs twenty three thousand

four hundred and seventy only)

towards sanction of

reimbursement of sales tax in

respect of 2014-15 under IIPP

2005-10

7 31/10/2015

48,

4/06/201

6

The Claim application of

M/s.Sudarshanam

Spinning Mills

Tirumalagiri (V),

Jaggaiahpet (M), Krishna

Dist sanction of

reimbursement of sales

tax in respect of 2014-15

under IIPP 2005-10

SVC examined the claim and

recommended for sanction of

Rs.16,48,050/- (Rupees sixteen

lakhs forty eight thousand and

fifty only) towards sanction of

reimbursement of sales tax in

respect of 2014-15 under IIPP

2005-10

8 26/11/2015

2,

14/06/20

6

The Claim application of

M/s Parag Milk Foods

Private Limited,

Samudrapalli(V),

Pengaragunta(PO),

Palamaner(M), Chittoor

District sanction of

reimbursement of sales

tax in respect 2014-15

under Industrial

Investment Promotion

Policy 2010-158

SVC verified the claim and

recommended for sanction of

Rs.21,75,294/- (Rupees twenty

one lakhs seventy five

thousand two hundred ninety

four only) towards

reimbursement of sales tax for

the year of 2014-15 under

IIPP 2010-15 subject to

submission of the following

shortfall information:1) Valid

CFO from APPCB 2.Form –

A Certificate with round seal

of the CT department .

Page 5: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 5 ::

9 31/10/2015

45,

4/06/201

6

The Claim application of

M/s.Sri Harini Textiles

Limited, Tirumalagiri (V),

Jaggaiahpet (M), Krishna

Dist sanction of

reimbursement of sales

tax in respect of 2014-15

under IIPP 2005-10

SVC examined the claim and

recommended for sanction of

Rs.88,370/- (Rupees eighty

eight thousand three hundred

and seventy only) towards

sanction of reimbursement of

sales tax in respect of 2014-15

under IIPP 2005-10

10 31/10/2015

46,

4/06/201

6

The Claim application of

M/s.Sri Vishnu Shankar

Mills Limited,

Gopinenipalem (V),

Vatsavai (M), Krishna

Dist sanction of

reimbursement of sales

tax in respect of 2014-15

under IIPP 2005-10

SVC examined the claim and

recommended for sanction of

Rs.5,59,040/- (Rupees five

lakhs fifty nine thousand and

forty only) towards sanction of

reimbursement of sales tax in

respect of 2014-15 under IIPP

2005-10

11 31/10/2015

47,

4/06/201

6

The Claim application of

M/s.Sandhya Spinning

Mill Ltd., Gopinenipalem

(V), Vatsavai (M),

Krishna Dist sanction of

reimbursement of sales

tax in respect of 2014-15

under IIPP 2005-10

SVC examined the claim and

recommended for sanction of

Rs.4,19,720/- (Rupees four

lakhs nineteen thousand seven

hundred and twenty only)

towards sanction of

reimbursement of sales tax in

respect of 2014-15 under IIPP

2005-10

12 29-12-

2015

62,

14/06/20

6

The Claim application of

M/s Worington Nitin

Cylinders Ltd, VSEZ,

Duvvada(V&M),

Visakhapatnam sanction

of reimbursement of sales

tax in respect 2012-13

under Industrial

Investment Promotion

Policy 2005-10.

SVC verified the claim and

recommended for sanction of

Rs.14,09,370/- ( Rupees

fourteen lakhs nine thousand

three hundred and seventy

only) towards sanction of

reimbursement of Sales tax in

respect of 2012-13 under IIPP

2010-15 subject to submission

of the following shortfall

information: 1. BIS certificate

2.Valid CFO from APPCB

III.REIMBURSEMENT OF POWER COST

S

N

o

Date of

received

claim

Meeting date

& seriol no Agenda Decision

1 02/08/20

15

1,

4/06/2016

The Claim application of

M/s Shri Govindaraja

Textiles Ltd, 708,

Peddarangapuram (V),

Pulivendala (M), Kadapa

for sanction of

reimbursement of power

cost sanctioned from

DCP to 1st quarter as per

Industrial Investment

Promotion Policy 2005-

10.

SVC verified the claim and decided

to consider the proposal under IIPP

2005-10, since the Government have

not issued the G.O on the MOU to

consider it as Mega Project, hence

recommended for sanction of

Rs.4,20,75,189/- (Rupees four crores

twenty lakhs seventy five thousand

one hundred and eighty nine only)

towards present claim of 1st quarter

of 2015-16 with recomputed amount

of the earlier claims as per Industrial

Investment Promotion Policy 2005-

2010.

2 28/08/20

15

2,

4/06/2016

The Claim application of

M/s Sakku Spinning

Mills Ltd, (existing)

Chinakondrupadu (V),

Prathipadu (M), Guntur

for sanction of

reimbursement of power

cost in respect 1st quarter

of 2015 -16 under

Industrial Investment

Promotion Policy 2005-

10.

SVC verified the claim and

recommended for sanction of

Rs.48,56,200/- (Rupees forty eight

lakhs fifty six thousand and two

hundred only) towards power cost

reimbursement for 1st quarter of

2015-16 under IIPP 2005-10, subject

to submission of the following

shortfall information:1) Land

conversion certificate 2)Valid CFO

from APPCB 3) Approved

Project Report 4) CA certificate on

Board resolution authorizing person

signing the claim application for 1st

quarter of 2015-16. 6)

Approved Plans from Gram

Panchayath, T&CP, and Factories

Department 7) Bank sanction letter.

Page 6: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 6 ::

3 28/08/20

15

3,

4/06/2016

The Claim application of

M/s Gajavalli Spinning

Mils (P) Ltd, Narakoduru

(V), Chebrolu (V) & (M),

Guntur Dist for sanction

of reimbursement of

power cost in respect 1st

quarter of 2015 -16

under Industrial

Investment Promotion

Policy 2005-2010.

The Scrutiny Verification Committee

discussed the issue and decided to fix

Base Power Consumption as average

of preceding three years (highest as

per Operational Guidelines) and

recommended for sanction of

Rs.54,58,825/- (Rupees fifty four

lakhs fifty eight thousand eight

hundred and twenty five only)

towards power cost reimbursement

for 1st quarter of 2015-16 under

Industrial Investment Promotion

Policy 2005-2010, subject to

submission of the following shortfall

information:1) Valid CFO from

APPCB 2) Land conversion

certificate 3) Approved Plans from

Gram panchayat, Factories Dept &

T&CP 4) CA certificate on

percentage of share holding

4 28/08/20

15

4,

4/06/2016

The Claim application of

M/s Kallam Spinning

Mils (Open End unit)

Chowdavaram (V),

Guntur Dist for

sanction of

reimbursement of power

cost in respect 1st quarter

of 2015 -16 under

Industrial Investment

Promotion Policy 2005-

2010.

SVC verified the claim and

recommended for sanction of

Rs.34,95,350/- (Rupees thirty four

lakhs ninety five thousand three

hundred and fifty only) towards

power cost reimbursement for 1st

quarter of 2015-16 subject to

submission of the following shortfall

information:1) Board resolution, 2)

Approved Plans from T&CP,

Factories, Gram panchyath 3) Land

conversion certificate 4)Valid CFO

from APPCB 5) CA certificate on

percentage of share holding.

5 28/08/20

15

5,

4/06/2016

M/s Sri Venkata Siva

Parvathi Spinning Mill

(P) Ltd, (2nd Exp) GBC

Road, Chebrolu (V&M),

Guntur Dist sanction of

reimbursement of power

cost in respect 1st quarter

of 2015 -16 under

Industrial Investment

Promotion Policy 2005-

10.

The Scrutiny Verification Committee

has examined the claims from DCP

and confirmed that an excess amount

of Rs.80,09,324/- sanctioned

in earlier claims by the SLC and

recommended for adjustment of the

same amount in the 1st quarter of

2015-16 that is worked out for an

amount of Rs.46,66,353/- and the

balance amount of Rs.33,42,971/-

in future claims. However,

SVC recommedation is subject to

furnishing the shortfalls:1) Land

documents 2) Valid CFO from

APPCB 3) Approved project report

4) Land conversion certificate 5)

Company incorporation 6) Approved

Plans from GP, T&CP Factories Dept

7) Certification on Plant &

Machinery as per guidelines 8) CA

certificate on percentage of share

holding.

6 29/08/20

15

7,

4/06/2016

The Claim application of

M/s Ranganayaka

Spinning Mills (P) Ltd,

Boyapalem (V),

Edlapaldu (M), sanction

of reimbursement of

power cost in respect 1st

quarter of 2015 -16

under Industrial

Investment Promotion

Policy 2005-10.

The Scrutiny Verification Committee

examined the proposal and

recommended to fix the Base Power

Consumption units by adding Plant

& Machinery installed before one

year from DCP. Hence, SVC

recommended for sanction of total

amount of Rs.53,67,331/- (Rupees

fifty three lakhs sixty seven thousand

three hundred and thirty one only)

towards power cost reimbursement

for 1st quarter of 2015-16 and re-

computed amount of the earlier

claims as per revised Base Power

Consumption. However, SVC

recommendation is subject to

furnishing the shortfalls:1) Board

resolution on authorization to sign the

claim application. 2) GP approval 3)

Land conversion certificate 4) CFO

from APPCB 5) Bank sanctioned

letter 6) Approved project report 7)

CA certificate on percentage of

share holding.

7 29/08/20

15

8,

4/06/2016

The Claim application of

M/s Ranganayaka

Spinning Mills (P) Ltd,

(Exp) Boyapalem (V),

Edlapaldu (M), sanction

of reimbursement of

power cost in respect 1st

quarter of 2015 -16

under Industrial

Investment Promotion

Policy 2005-10.

SVC examined the claim and

recommended for sanction of

Rs.10,05,181/-(Rupees ten lakhs five

thousand one hundred and eighty one

only) towards power cost

reimbursement for 1st quarter of

2015-16 duly adjusting the excess

amount of Rs.13,85,823/- sanctioned

earlier as per the revised base power

consumption.However, SVC

recommendation is subject to

furnishing the shortfalls: 1) Approved

Plans from GP, T&CP, Factories

Department 2) Land conversion

certificate 3) Valid CFO from

APPCB, 4) CE Certificate 5)

Approved project report 6) CA

certificate on percentage of share

holding.

Page 7: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 7 ::

8 29/08/20

15

9,

4/06/2016

The Claim application of

M/s Pavan Cotton

Products (P) Ltd (Exx-1)

Pulladigunta(V),

Vatticherukur (M),

Guntur sanction of

reimbursement of power

cost in respect 1st quarter

of 2015 -16 under

Industrial Investment

Promotion Policy 2005-

10.

SVC examined the claim and

recommended for sanction of Rs.

16,02,752/- (Rupees sixteen lakhs

two thousand seven hundred fifty two

only) towards power cost

reimbursement for 1st quarter of

2015-16 duly adjusting the excess

amount of Rs.6,02,930/- sanctioned

in earlier claims.However, SVC

recommendation is subject to

furnishing the shortfalls: land

documents 2) Valid CFO from

APPCB, 3) Land conversion

certificate 4) Approved project

report 5) T&C approval plan 6) CA

certificate on percentage share

holding

9 29/08/20

15

11,

4/06/2016

The Claim application of

M/s Sri Venkata Lakshmi

Narasimha spinning Mills

,(Exp) Sy No: 176/4,

GBC, Road, Chebrolu (V

&M), Guntur for

sanction of

reimbursement of power

cost under Industrial

Investment Promotion

Policy 2010-15

SVC examined the claim and

deferred due to the following

shortfalls (1st claim):1) Land

documents 2) Company

incorporation certificate 3) Board

resolution on authorization to sign the

claim application 4) VGTUDA Plan

Approval 5)Factories Plan approval

6) Land conversion certificate7) CA

certificate on power consumptions on

preceding three years.

1

0

29/08/20

15

12,

4/06/2016

The Claim application of

M/s Krishna Murthy

Spinning Mills (P) Ltd,

NH-5, Thimmapuram

(V), Edladpau (M),

Guntur Dist in respect 1st

quarter of 2015 -16

under Industrial

Investment Promotion

Policy 2005-2010.

SVC examined the claim and

recommended for sanction of

Rs.36,82,550/- towards power cost

reimbursement for 1st quarter of

2015-16 subject to submission of the

following shortfall information:1)

Approved Plans from

Grampanchyath, T&CP, Factories

2) Valid CFO from APPCB 3) Land

Conversion certificate 3) Bank

sanction letter 4) Approved project

report

1

1

05/09/20

15

14,

4/06/2016

The Claim application of

M/s YSR spinning &

weaving Mills (P) Ltd

(3rd Exp) D No: 265 7A,

Gangavaram (V),

Nadendla (M), Guntur

Dist for sanction of

reimbursment of power

cost in respect 1st half

year 2012-13 to 2nd half

year of 2014-15 under

Industrial Investment

Promotion Policy 2010-

2015.

SVC examined the claim and

recommended for sanction of

Rs.10,75,860/- (Rupees ten lakhs

seventy five thousand eight hundred

and sixty only) towards power cost

reimbursement for 1st half year 2012-

13 to 2nd half year of 2014-15

subject to submission of the

following shortfall information:1)

Land documents 2) Board resolution

on authorization to sign the claim

application 3) Approved Plan from

Grampanchayath, 4)Approved Plan

from T&CP Department 5)

Approved Plan from Factories

Department

1

2

10/09/20

15

16,

4/06/2016

The Claim application of

M/s.The KCP Limited

(KCP Cement Unit-

II)Muktyala, Jaggaiapeta

(M) Krishna Dist for

sanction of

reimbursement of power

cost in respect of 1st

quarter of 2015-16 under

IIPP 2005-10

SVC examined the claim and

recommended for sanction of

Rs.81,97,460/- (Rupees eighty one

lakhs ninety seven thousand four

hundred and sixty only) towards

power cost reimbursement for 1st

quarter of 2015-16 Subject to

submission of the following shortfall

information:1) Certification of

Incorporation 2) Board resolution on

authorization to sign the claim

application 3) Approved Plans from

DT&CP / UDA 4) Valid CFO /

Acknowledgment from APPCB 5)

Project report 6) CA certificate for

shareholding 7) Land Conversion

Certificate.

1

3

11/09/20

15

17,

4/06/2016

The Claim application of

M/s Sri Lakshmi

Narasimha Spinning Mill

(India) Pvt Ltd,

Veppalavaripalem (M),

Prakasam Dist sanction

of reimbursement of

power cost in respect of

1st quarter of 2015-16

under IIPP 2005-10

SVC examined the claim and

recommended for sanction of Rs.

56,61,810/- (Rupees Fifty six lakhs

sixty one thousand eight hundred and

ten only) towards power cost

reimbursement for 1st quarter of

2015-16 Subject to submission of the

following shortfall information:1)

Approved Plan from T&CP 2) Valid

CFO / Acknowledgment from

APPCB 3) Approved

Plan from Grampanchayth 4)

Land Conversion Certificate.

Page 8: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 8 ::

1

4

15/09/20

15

20,

4/06/2016

The Claim application of

M/s Sai Global Yarntex

(India) Pvt LTd, Sy No:

103/a, 107,133,143/1,

142/2, Vellampalli (V),

Maddipadu (M),

Prakasam Dist sanction

of reimbursement of

power cost in respect of

1st quarter of 2015-16

under IIPP 2005-10

SVC examined the claim and

recommended for sanction of

Rs.5,55,930/- (Rupees five lakhs fifty

five thousand nine hundred and thirty

only) towards power cost

reimbursement for 1st quarter of

2015-16 subject to submission of the

following shortfall information:1)

Land Sale Deed / Lease Deed

2) Approved Plans from

Grampancyath 3) Approved Plans

from T&CP 4) Approved Plans from

Factories Department 5) Land

Conversion Certificate 6) Civil

Engineer Certificate 7) Approved

Project Report .

1

5

15/09/20

15

21,

4/06/2016

The Claim application of

M/s NSL Textiles Ltd, D

No: 6/275-1, Inkollu ,

Prakasam Dist for

sanction of

reimbursement of power

cost

The Scrutiny Verification Committee

examined the claim and

recommended for sanction of

Rs.3,49,06,296/- towards power cost

reimbursement for 4th quarter of

2014-15 under IIPP 2005-10 as

against Rs.6,74,79,356/- duly

deducting the excess sanctioned

amount of Rs.3,25,73,060/- in earlier

claims towards reimbursement of

Power cost (computation of power

cost reimbursement was done @ 0.75

per unit beyond ‘5’ years period

under Mega Project Category).

However, SVC recommendation is

subject to submission of the

following shortfall documents: 1)

IEM Part-B 2) Approved plans from

Factories Department 3) Land

conversion certificate 4) Project

Report 5) Valid CFO from APPCB

6) Approved Plans from DT& CP 7)

Base Power Consumption units of

preceding three years from Chartered

Accountant 8) Statement of

Accounts and Certification of Plant &

Machinery as per Guidelines Further,

SVC has taken a view to seek the

clarification from the Government on

the extension of Mega Project status

beyond 5 years i.e. 8 years as per

extended the IIPP 2005-10.

1

6

15/09/20

15

22,

4/06/2016

The Claim application of

M/s NSL Textiles Ltd, Sy

No: 371 to 382,

Kunchalavaripalem (V)

Cherukupalli (M), Guntur

Dist for sanction of

reimbursement of power

cost

The Scrutiny Verification Committee

has examined the claim and

recommended for sanction of

Rs.2,67,09,007/- towards power cost

reimbursement for 1st quarter of

2015-16 under IIPP 2005-10

including re-computed power cost

reimbursement of earlier claims @

0.75 per unit beyond ‘5’ years period

under Mega Project Category.

However, SVC recommendation is

subject to submission of the

following shortfalls: 1) Approved

plans from Factories Department 2)

Land conversion certificate 3) Project

Report 4) Valid CFO from APPCB

5) Approved Plans from DT& CP

6) Approved Plans from

Grampanchayat 7) Land Sale

Deed / Lease Deed.Further, SVC has

taken a view to seek the clarification

from the Government on the

extension of Mega Project status

beyond 5 years i.e. 8 years as per

extended the IIPP 2005-10.

1

7

15/09/20

15

23,

4/06/2016

The Claim application of

M/s A S Jute Product Pvt

Ltd (Exp) Sy No: 20/2 &

21, Nerallavalasa(V),

Padmanabam (m),

Visakhapatnam for

sanction of

reimbursement of power

cost in respect of 1st &

2nd half years of 2014-15

under IIPP 2010-15

SVC examined the claim and

recommended for sanction of Rs.

9,19,148/- (Rupees nine lakhs

nineteen thousand one hundred and

forty eighty only) towards power

cost reimbursement for 1st & 2nd half

years of 2014-15 subject to

submission of the following shortfall

information:

Page 9: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 9 ::

1

8

16/09/20

15

26,

4/06/2016

The Claim application of

M/s Sree Jayajyothi

Cements Limaited,

Yanakandla (V),

Banaganpalli (M),

Kurnool District sanction

of reimbursement of

power cost in respect of

1st quarters of 2015-16

IIPP 2005-10

SVC examined the claim and

recommended for sanction of

Rs.11,36,28,130/- (Rupees eleven

crores thirty six lakhs twenty eighty

thousand one hundred and thirty

only) towards sanction of

reimbursement of power cost in

respect of 1st quarters of 2015-16

IIPP 2010-15 subject to submission

of the following shortfall

information:1) Land Conversion

Certificate 2) Plant & Machinery

Statement certified by the Financial

Institution as per guideline 3)

Project report 4) Charted

Accountant Certificate on share

holding 5 ) Sale Deed 6) Board

resolution on authorization to sign the

claim application.

1

9

18/09/20

15

27,

4/06/2016

The Claim application of

The Claim application of

M/s NSL Textiles Ltd,

(Mega Project) Edlapadu

(V), & (M), Guntur Dist

sanction of

reimbursement of power

cost in respect of 1st

quarters of 2015-16 under

IIPP 2005-10

The Scrutiny Verification Committee

examined the claim and

recommended for sanction of Rs

1,59,96,232/- (Rupees one crore fifty

nine lakhs ninety six thousand two

hundred and thirty two only) towards

power cost reimbursement for 1st

quarter of 2015-16 as against

Rs.5,01,89,804/- by deducting

Rs.3,41,93,572/- on considering the

reimbursement of power cost @ 0.75

per unit beyond the period under

Mega Project Category as indicated

in G.O., subject to submission of the

following shortfall information:1)

Land Sale Deed / Lease Deed 2)

Land Conversion Certificate 3) Valid

CFO from APPCB 4) Project Report

5) CA certificate on share holding 6)

Approved Plans from Gram

Panchayat 7) Approved Plans from

T&CP 8) Approved Plans from

Factories Department. Further, SVC

has taken a view to seek the

clarification from the Government on

the extension of Mega Project status

beyond 5 years i.e. 8 years as per

extended the IIPP 2005-10.

2

0

21/09/20

15

28,

4/06/2016

The Claim application of

M/s.NSL Textiles Ltd.,

Veeravalli (V),

Bapulapadu (M), Krishna

Dist sanction of

reimbursement of power

cost in respect of 1st

quarters of 2015-16 under

IIPP 2005-10

SVC examined the claim and

recommended for sanction of

Rs.2,80,76,307/- (Rupees two crores

eighty lakhs seventy six thousand

three hundred and seven only)

towards sanction of reimbursement of

power cost in respect of 1st quarters

of 2015-16 under IIPP 2005-10 as

against Rs.3,05,10,947/- on deducting

Rs.24,34,640/- by considering

reimbursement of power cost @ 0.75

per unit beyond ‘5’ years period

under Mega Project

Category.Further, SVC opined that

seek the clarification from the

Government on the extension of

Mega Project status beyond 5 years

i.e. 8 years as per extended the IIPP

2005-10.

2

1

26/09/20

15

29,

4/06/2016

The Claim application of

The Claim application of

M/s.Paramesu Biotech

Private Limited, sanction

of reimbursement of

power cost in respect of

2nd half year of 2015-16

under IIPP 2005-10

SVC examined the claim and

recommended for sanction of

Rs.7,21,700/- (Rupees seven lakhs

twenty one thousand and seven

hundred only) towards sanction of

reimbursement of power cost in

respect of 2nd half year of 2015-16

under IIPP 2005-10 subject to

submission of the following shortfall

information:1) Project Report 2) IEM

Part-B 3) Approved plans from

Grampanchyath 4) Approved plan

from Factories Department 5)

Approved plans of T&CP

Department 6) Power Release

Certificate duly incorporating power

load.

2

2

28/09/20

15

30,

4/06/2016

The Claim application of

M/s Vasantha Spinners

Ltd, (Exp-I) NH-5,

Thimmapuram (V),

Edlapadu (M), Guntur

Dist sanction of

reimbursement of power

cost in respect

The Scrutiny Verification Committee

examined the claim and decided to

defer for next meeting for re-

computation by taking proper Base

Consumption calculation prior to

expansion.

2

3

09/10/20

15

31,

4/06/2016

The Claim application of

M/s Lohiya Edible Oils

Pvt. Ltd., (Unit-II)

(Existing), Plot No.25,

IDA, Vakalapudi (V),

Kakinada Rural Mandal,

East Godavari District

sanction of

reimbursement of power

Rejected as the claim, since the

eligibility period of 5 years from

DCP is completed by 06/03/2015.

Page 10: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 10 ::

cost in respect of 1st

quarters of 2015-16

under IIPP 2005-10

2

4

17/10/20

15

32,

4/06/2016

The Claim application of

M/s Emami Biotech

Limited, Sy.No. 501 to

510, Krishnapatnam Port

Zero Point, Pantapalem

(V), Muthukuru (M),

SPSR Nellore District

sanction of

reimbursement of power

cost in respect of 2nd

quarters of 2015-16

under IIPP 2005-10

SVC examined the claim and

recommended for sanction of

Rs.65,55,470/- (Rupees sixty five

lakhs fifty five thousand four hundred

and seventy only) towards sanction of

reimbursement of power cost in

respect of 2nd quarters of 2015-16

under IIPP 2005-10 Subject to

submission of the following shortfall

information:1) Meeseva receipt for

the 1st quarter of 2015-16 2) Date of

receipt of application at DIC not

available for the 2nd claim 3) IEM,

Partnership form B, unattested 4)

Gram Panchayth, Factories , T&CP

Dept approved plans 5) M/c

statement not as per guidelines 6)

project report 7) Board resolution

authorizing the person not singed 8)

Land conversion certificate

2

5

17/10/20

15

33,

4/06/2016

The Claim application of

M/s Sree Rayalaseema

Alkalies and Allied

Chemicals Ltd.,

Gondiparla (V), Kurnool

sanction of

reimbursement of power

cost in respect of 2nd

quarters of 2015-16 under

IIPP 2005-10

SVC verified the claim and

recommended for sanction of

Rs.11,82,39,540/- (Rupees eleven

crores eighty two lakhs thirty nine

thousand five hundred and forty only)

towards sanction of reimbursement of

power cost in respect of 2nd quarters

of 2015-16 under IIPP 2005-10

subject to submission of the

following shortfall information:1)

IEM Part-B 2) Land Sale Deed /

Lease Deed 3) Certificate of

Incorporation 4) Board resolution on

authorization to sign the claim

application 5) Approved Plan from

Factories Department 6) Valid Boiler

Certificate 7) Certification of Plant

and Machinery as per operational

guidelines 8) Civil Engineer

Certificate 9) Project Report 10)

Chartered Accountant Certificate on

shareholding 11) Land Conversion

Certificate 12) CA certificate for

consumption of power for previous

period for fix base 12) CFO

certificate not attested 13) Gram

Panchayth approval not furnished 15)

Power release certificate not attested

& Payment proof for the power bills.

2

6

26/10/20

15

34,

4/06/2016

The Claim application of

M/s Sri Anantha Lakshmi

Spinning Mills (P) Ltd,

(Exp-1) 59/1, Boyapalem

(V), Edlapadu (M),

Guntur Dist sanction of

reimbursement of power

cost in respect of 2nd

quarters of 2015-16

under IIPP 2015-16

SVC examined the claim and

recommended for sanction of

Rs.66,04,160/- (Rupees sixty six

lakhs four thousand one hundred and

sixty only) towards sanction of

reimbursement of power cost in

respect of 2nd quarters of 2015-16

under IIPP 2015-20 (as per option

given by the unit) subject to

submission of the shortfall document

- Land conversion certificate

2

7

26/10/20

15

35,

4/06/2016

The Claim application of

M/s.Jaypee Balaji

Cement Plant, Rs No: 99,

Budawada, Jaggaiahpet

(M), Krisna Dist sanction

of reimbursement of

power cost in respect of

1st & 2nd quarters of

2014-15 under IIPP

2010-15

SVC examined the claim and

recommended for sanction of

Rs.6,09,63,560/- (Rupees six crores

nine lakh sixty three thousand five

hundred and sixty only) towards

sanction of reimbursement of power

cost in respect of 1st & 2nd quarters

of 2014-15 under IIPP 2010-15

subject to submission of the

following shortfall information:1)

Land sale deed / lease deed 2)

Certificate of Incorporation 3) Board

resolution on authorization to sign the

claim application 4) CFO from

APPCB 5) Certification of Plant &

Machinery as per guideline by GM

DIC 7) Project Report 8) Chartered

Accountant Certificate on share

holding

2

8

30/10/20

15

38,

4/06/2016

The Claim application of

M/s Net Matrix Limited,

Plot No: 15&15A,

APSEZ, Atchuthapuram,

Visakhapatnam sanction

of reimbursement of

power cost in respect of

1st & 2nd quarters of

2014-15 under IIPP

2010-15

SVC examined the claim and

recommended for sanction of

Rs.16,89,180/- (Rupees sixteen lakhs

eighty nine thousand one hundred

and eighty only) towards sanction of

reimbursement of power cost in

respect of 1st & 2nd quarters of

2014-15 under IIPP 2010-15 Subject

to submission of the following

shortfall information:1) Land Sale

Deed / Lease Deed 2) Board

resolution on authorization to sign the

claim application 3) Chartered

Accountant Certificate for

investment & share holding.

Page 11: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 11 ::

2

9

31/10/20

15

39,

4/06/2016

The Claim application of

M/s.Sudarshnam

Spinning Mills Ltd.,

Rs.52&53, Tirumalagiri

(V), Jaggaipet (M)

Krishna Dist sanction of

reimbursement of power

cost in respect of 1st

quarters of 2015-16 under

IIPP 2005-

SVC examined the claim and

recommended for sanction of

Rs.38,26,440/- (Rupees thirty eight

lakhs twenty six thousand four

hundred and forty only) towards

sanction of reimbursement of power

cost in respect of 1st quarters of

2015-16 under IIPP 2005-10

3

0

31/10/20

15

40,

4/06/2016

The Claim application of

M/s.Sri Harini Textiles

Limited, Rs.No:47,48 &

49, Tirumalagiri (V),

Jaggaiahpet (M), Krishna

Dist sanction of

reimbursement of power

cost in respect of 1st

quarters of 2015-16

under IIPP 2005-10

SVC examined the claim and

recommended for sanction of

Rs.36,63,940/- (Rupees thirty six

lakhs sixty three thousand nine

hundred and forty only) towards

sanction of reimbursement of power

cost in respect of 1st quarters of

2015-16 under IIPP 2005-10

3

1

31/10/20

15

41,

4/06/2016

The Claim application of

M/s.Sandhya Spinning

Mill Ltd., Gopinenipalem

(V), Vatsavi (M), Krishna

Dist sanction of

reimbursement of power

cost in respect of 1st

quarters of 2015-16

under IIPP 2005-10

SVC examined the claim and

recommended for sanction of

Rs.42,67,010/- (Rupees forty two

lakhs sixty seven thousand and ten

only) towards sanction of

reimbursement of power cost in

respect of 1st quarters of 2015-16

under IIPP 2005-10

3

2

31/10/20

15

43,

4/06/2016

The Claim application of

M/s.Rajapalayam Mills

Ltd., Gopinenipalem (V),

Vatsavai (M), Krishna

Dist sanction of

reimbursement of power

cost in respect of 1st

quarters of 2015-16

under IIPP 2005-10

SVC examined the claim and

recommended for sanction of

Rs.47,32,410/- (Rupees forty seven

lakhs thirty two thousand four

hundred and ten only) towards

sanction of reimbursement of power

cost in respect of 1st quarters of

2015-16 under IIPP 2005-10

3

3

31/10/20

15

44,

4/06/2016

The Claim application of

M/s.Sri Vishnu Shankar

Mill Ltd. Gopinenipalem

(V), Vatsavai (M),

Krishna Dist sanction of

reimbursement of power

cost in respect of 1st

quarters of 2015-16

under IIPP 2005-10

SVC examined the claim and

recommended for sanction of

Rs.45,04,810/- (Rupees forty five

lakhs four thousand eight hundred

and ten only) towards sanction of

reimbursement of power cost in

respect of 1st quarters of 2015-16

under IIPP 2005-10

3

4

01/11/20

15

49,

4/06/2016

The Claim application of

M/s Bala Rama krishna

Spinning Mills (P) Ltd,

(Exp-1) Chowdavaram

(V), Guntur sanction of

reimbursement of power

cost in respect of 1st

quarters of 2015-16

under IIPP 2005-10

SVC examined the claim and

recommended for sanction of

Rs.20,30,212/- (Rupees twenty lakhs

thirty thousand two hundred and

twelve only) subject to submission of

the following shortfall information:1)

IEM Part -B for confirmation of DCP

2) Approved Plans from T &CP

Department 3) Valid CFO from

APPCB 4) Bank Statement

Certification 5) Civil Engineer

Certificate 6) Approved project

report 7) Land Sale Deed /

Lease Deed 8) Approved Plans from

Factories Department

3

5

02/11/20

15

50,

4/06/2016

The Claim application of

M/s Bhavya Cements

Ltd, Tangeda (V),

Dachepalli (M), Guntur

Dist sanction of

reimbursement of power

cost in respect of 2nd

quarters of 2015-16

under IIPP 2005-10

SVC examined the claim and

recommended for sanction of

Rs.5,37,74,480/- (Rupees five crore

thirty seven lakhs seventy four

thousand four hundred and eighty

only) towards sanction of

reimbursement of power cost in

respect of 2nd quarters of 2015-16

under IIPP 2005-10

3

6

03/11/20

15

52,

4/06/2016

The Claim application of

M/s J C Bio Tech (P) Ltd,

Plot No: 548 to 550, IGC,

Gundlapalli (V),

Maddipadu (M),

Prakasam Dist sanction

of reimbursement of

power cost in respect of

1st half year of 2015-16

under IIPP 2010-15

SVC examined the claim and

recommended for sanction of

Rs.25,76,700/- (Rupees twenty five

lakhs seventy six thousand and seven

hundred only) towards sanction of

reimbursement of power cost in

respect of 1st half year of 2015-16

under IIPP 2010-15 subject to

submission of the following shortfall

information:1) Land Conversion

Certificate 2) Valid CFO from

APPCB 3) Approved Plans from

Factories Department 4) Plant &

Machinery Statement from Financial

Institution as per guidelines

Page 12: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 12 ::

3

7

04/11/20

15

53,

4/06/2016

The Claim application of

The Claim application of

M/s Amaravathi Textiles

(P) Ltd (4th Exp) Martur

(V&M), Prakasam Dist

sanction of

reimbursement of power

cost in respect of 2nd

quarter of 2015-16

under IIPP 2010-15

The Scrutiny Verification Committee

examined the issue and recommended

for sanction of Rs.1,33,85,866/-

(Rupees one crore thirty three lakhs

eighty five thousand eight hundred

sixty six only) towards

reimbursement of power cost for

2nd quarter 2015-16 claim as against

Rs.2,88,16,757/- by deducting

Rs.1,54,30,891/- on considering

reimbursement of power cost @ 0.75

per unit beyond ‘5’ years period

under Mega Project

Category.Further, SVC opined that

seek the clarification from the

Government on the extension of

Mega Project status beyond 5 years

i.e. 8 years as per extended the IIPP

2005-10.

3

8

06/11/20

15

54,

4/06/2016

The Claim application of

M/s.PVR Spinning and

Weaving Mills

(Expansion),RSNo.110/2,

108/2,3,4,, Kondaipalem

road, Tetali village,

Tanuku (M), West

Godavari District for

sanction of

reimbursement of power

cost

SVC examined the claim and

recommended for sanction of

Rs.14,68,326/-(Rupees fourteen lakhs

sixty eight thousand three hundred

and twenty six only) towards sanction

of reimbursement of power cost in

respect of 1st half year of 2015-16

duly adjusting the excess amount of

Rs.16,14,540 sanctioned earlier under

IIPP 2010-15 by correcting the base

power consumption, subject to

submission of shortfall documents: 1)

IEM Part-B for expansion project

2) Approved Plans from T&CP

Department 3) Valid CFO From

APPCB 4 ) Project Report

3

9

07/11/20

15

55,

4/06/2016

The Claim application of

M/s Ajantha Spintex

Limited, Kakani (V),

Narasaopet(M) Guntur

sanction of

reimbursement of power

cost in respect of 1st half

year of 2015-16 under

IIPP 2010-15

SVC examined the claim and

recommended for sanction of

Rs.38,52,320/-(Rupees thirty eight

lakhs fifty two thousand three

hundred and twenty only) towards

sanction of reimbursement of power

cost in respect of 1st half year of

2015-16 under IIPP 2010-15 Subject

to submission of the following

shortfall information:1)Approved

Plans from Gram Panchayath 2)

Land Conversion Certificate 3) Valid

CFO from APPCB 4) Approved

Plans from T&CP Department 5)

Approved Plans from Factories

Department 6) Bank sanction letter

4

0

13/11/20

15

57,

4/06/2016

The Claim application of

M/s Teamec Chorate

Limited, Plot No: 558 &

559, IGC, Gundlapalli

(V), Maddi padu (M)

Prakasam Dist sanction

of reimbursement of

power cost in respect of

1st half year of 2015-16

under IIPP 2010-15

SVC examined the claim and

recommended for sanction of

Rs.1,22,20,900/- (Rupees one crore

twenty two lakhs twenty thousand

and nine hounded only) towards

sanction of reimbursement of power

cost in respect of 1st half year of

2015-16 under IIPP 2010-15 subject

to submission of the following

shortfall information:1) Valid CFO

from APPCB 2) Justification whether

new unit or expansion as per IEM

3) Certification of Plant & Machinery

as per operational guidelines.

4

1

16/11/20

15

58,

4/06/2016

The Claim application of

M/s Idupulapadu Cotton

Mils Pvt Ltd , Jonnatali

(V), Martur (M),

Prakasam Dist sanction

of reimbursement of

power cost in respect of

2nd quarter of 2015-16

under IIPP 2005-10

SVC examined the claim and

recommended for sanction of

Rs.3,16,80,240/- (Rupees three crore

sixteen lakhs eighty thousand two

hundred and forty only) towards

sanction of reimbursement of power

cost in respect of 2nd quarter of

2015-16 under IIPP 2005-10.

4

1

18/11/20

15

60,

4/06/2016

The Claim application of

M/s.NSL Textiles Ltd.,

Near JNTU, APIIC,

Pulivendula, YSR

Kadapa dist sanction of

reimbursement of power

cost in respect of 1st

quarters of 2015-16

under IIPP 2005-10

SVC examined the claim and

recommended for sanction of

Rs.1,49,97,650/- (Rupees one crore

forty nine lakhs ninety seven

thousand six hundred and fifty only)

towards sanction of reimbursement of

power cost in respect of 1st quarters

of 2015-16 under IIPP 2005-10

4

2

20/11/20

15

61,

4/06/2016

The Claim application of

M/s Kallam Spinning

Mils Ltd, G T Road,

Martur (V&M),

Prakasam Dist sanction

of reimbursement of

power cost in respect of

1st half year of 2014-15

& 1st half year of 2015-

16 under IIPP 2005-10

SVC examined the claim and

recommended for sanction of

Rs.1,03,30,060/- (Rupees one crore

three lakhs thirty thousand and sixty

only) towards sanction of

reimbursement of power cost in

respect of 1st half year of 2014-15 &

1st half year of 2015-16 under IIPP

2005-10 Subject to submission of

shortfall document - Certification of

Plant & Machinery as per operational

guidelines.

Page 13: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 13 ::

4

3

23/11/20

15

63,

4/06/2016

The Claim application of

M/s.Ravali Spinners Pvt

Ltd., (Exp-1), Khandavali

(V), Peravalli (M) West

Godavari Dist for

sanction of

reimbursement of power

cost

SVC examined the claim and

recommended for sanction of

Rs.1,95,93,928/- (Rupees one crore

ninety five lakhs ninety three

thousand nine hundred and twenty

eight only) towards sanction of

reimbursement of power cost in

respect of 2nd quarter of 2015-16

under IIPP 2005-10, including re-

computed amount of Rs.1,48,65,466/-

as per the revised Base Power

Consumption by considering 75% of

installed capacity utilized (highest as

per operational guidelines), subject to

following shortfalls:1) Meeseva

Receipt conformation form the GM,

DIC 2) Valid CFO from APPCB, 3)

Project report 4) Chartered

Accountant certification on

shareholding 5) Certificate of

Incorporation 6) Board resolution on

authorization to sign the claim

application 7) Statements of

Accounts 8) IEM Part-B 9) Land Sale

Deed / Lease Deed 10) Land

Conversion Certificate 11) Plant &

Machinery statement of the Financial

Institution as per operational

guidelines 12) Civil Engineer

Certificate 13) Chartered Accountant

Certificate for fixing the base units

14) Difference in power load w.r.t.

DCP 15) Approved Plans from Gram

Panchayat 16) Approved Plans from

DT&CP with attestation

17)Approved Plans from Factories

Department with attestation.

4

4

24/11/20

15

64,

4/06/2016

The Claim application of

M/s.The KCP

Limited(KCP Cement

Unit-II), Muktyala,

Jaggaiahpeta (M) Krishna

Dist sanction of

reimbursement of power

cost in respect of 2nd

quarter of 2015-16 under

IIPP 2005-10

SVC examined the claim and

recommended for sanction of

Rs.66,12,650/- (Rupees sixty six

lakhs twelve thousand six hundred

and fifty only) towards sanction of

reimbursement of power cost in

respect of 2nd quarter of 2015-16

under IIPP 2005-10

4

5

24/11/20

15

65,

4/06/2016

The Claim application of

M/s. Mandava Cotton

Mills Pvt Ltd., Sy No:

92/4, Ampapuram (V),

Bapulapadu (M), Krishna

Dist for sanction of

reimbursement of power

cost

SVC examined the claim and

observed that the connected load is

11KV as on DCP, later converted to

33KV after 1 ½ years from DCP.

Hence, no change on Base Power

Consumption units. Hence, the SVC

recommended for sanction of

Rs.64,03,280/- (Rupees sixty four

lakhs three thousand two hundred and

eighty only) towards sanction of

reimbursement of power cost in

respect 1st quarter of 2015-16 under

IIPP 2005-10 subject to submission

the following shortfalls:1) Valid CFO

from APPCB, 2) Bank sanction letter

3) Project report 4) Chartered

Accountant Certification on

shareholding 5) Reasons for

decrease of KVA from 2000 to 1650

and clarification on connection load.

4

6

26/11/20

15

66,

4/06/2016

The Claim application of

M/s.Sri Vishnu Shankar

Mill Ltd. Gopinenipalem

(V), Vatsavai (M),

Krishna Dist sanction of

reimbursement of power

cost in respect 2nd

quarter of of 2015-16

under IIPP 2005-10

SVC examined the claim and

recommended for sanction of

Rs.47,36,821/- (Rupees forty seven

lakhs thirty six thousand eight

hundred and twenty one only)

towards sanction of reimbursement of

power cost in respect 2nd quarter of

2015-16 under IIPP 2005-10,

including difference amount of

Rs1,66,161/-, by correcting the base

rate of power.

4

7

26/11/20

15

67,

4/06/2016

The Claim application of

M/s.Rajapalayam Mills

Ltd., Gopinenipalem (V),

Vatsavai (M), Krishna

Dist sanction of

reimbursement of power

cost in respect 2nd

quarter of of 2015-16

under IIPP 2005-10

SVC examined the claim and

recommended for sanction of

Rs.49,83,559/- (Rupees forty nine

lakhs eight three thousand five

hundred and fifty nine only) towards

sanction of reimbursement of power

cost in respect 2nd quarter of 2015-

16 under IIPP 2005-10 including

difference amount of Rs2,26,118/-,

by correcting the base rate of power.

4

8

26/11/20

15

68,

4/06/2016

The Claim application of

M/s.Sandhya Spinning

Mill Ltd., Gopinenipalem

(V), Vatsavai (M),

Krishna Dist sanction of

reimbursement of power

cost in respect 2nd

quarter of of 2015-16

under IIPP 2005-10

SVC examined the claim and

recommended for sanction of

Rs.47,81,223/- (Rupees forty seven

lakhs eighty one thousand two

hundred and twenty three only)

towards sanction of reimbursement of

power cost in respect 2nd quarter of

2015-16 under IIPP 2005-10

including difference amount of Rs

1,37,243/- by correcting the base rate

of power.

Page 14: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 14 ::

4

9

26/11/20

15

69,

4/06/2016

The Claim application of

M/s.Sri Harini Textiles

Limited, Rs.No:47,48 &

49, Tirumalagiri (V),

Jaggaiahpet (M), Krishna

Dist sanction of

reimbursement of power

cost in respect 1st

quarter of of 2015-16

under IIPP 2005-10

SVC examined the claim and

recommended for sanction of

Rs.44,85,360/- (Rupees forty four

lakhs eighty five thousand three

hundred and sixty only)towards

sanction of reimbursement of power

cost in respect 2nd quarter of 2015-

16 under IIPP 2005-10 including

difference amount of Rs 6,44,270/-

by correcting the base rate of power.

5

0

26/11/20

15

70,

4/06/2016

The Claim application of

M/s.Sudarshanam

Spinning Mills Rs No: 52

& 53 Tirumalagiri (V),

Jaggaiahpet (M), Krishna

Dist sanction of

reimbursement of power

cost in respect 1st

quarter of of 2015-16

under IIPP 2005-10

SVC examined the claim and

recommended for sanction of

Rs.41,19,245/- (Rupees forty one

lakhs nineteen thousand two hundred

and forty five only) towards sanction

of reimbursement of power cost in

respect 2nd quarter of 2015-16 under

IIPP 2005-10 including difference

amount of Rs1,40,645/- by correcting

the base rate of power.

5

1

26/11/20

15

1,

14/06/206

The Claim application of

M/s.Vennar Ceramics

Ltd, Perikigudem,

Mandavalli (M), Krishna

Dist sanction of

reimbursement of power

cost in respect 1st quarter

of 2015 -16 under

Industrial Investment

Promotion Policy 2010-

15

SVC verified the claim and

recommended for sanction of

Rs.28,99,800/- (Rupees twenty eight

lakhs ninety nine thousand and eight

hundred only) towards

reimbursement of power cost for 1st

half year of 2015-16 under IIPP

2010-15, subject to submission of the

following shortfall information:1)

Board resolution for authorizing

persons to sign the claim. 2) Project

report 3) CA certificate for share

holding.

5

2

26/11/20

15

3,

14/06/206

The Claim application of

M/s Parag Milk Foods

Private Limited,

Samudrapalli(V),

Pengaragunta(PO),

Palamaner(M), Chittoor

District sanction of

reimbursement of power

cost in respect 1st quarter

of 2015 -16 under

Industrial Investment

Promotion Policy 2010-

15

SVC verified the claim and

recommended for sanction of

Rs.21,75,294/- (Rupees twenty one

lakhs seventy five thousand two

hundred ninety four only) towards

reimbursement of sales tax for the

year of 2014-15 under IIPP 2010-15

subject to submission of the

following shortfall information:1)

Valid CFO from APPCB 2.Form – A

Certificate with round seal of the CT

department .

5

3

27/11/20

15

4,

14/06/206

The Claim application of

M/s.Silica Ceramica Pvt

Ltd., Narayanapuram (V),

Unguturu (M), W G Dist.

sanction of

reimbursement of power

cost in respect 2nd

quarter of 2015 -16

under Industrial

Investment Promotion

Policy 2005-10.

SVC verified the claim and

recommended for sanction of

Rs.79,07,950/- (Rupees seventy nine

lakhs seven thousand nine hundred

and fifty only) towards

reimbursement of power cost for 2nd

quarter of 2015-16 and

Rs.3,69,180/- (Rupees three lakhs

Sixty nine thousand and one hundred

and eighty only) for a period 1st and

2nd quarter of 2015-16 for their

gasifies plant total an amount of

Rs.82,77,130/- (Rupees eighty two

lakhs seventy seven thousand one

hundred and thirty only) under IIPP

2005-10, subject to submission of the

following shortfall information:1.

Land sale deed or lease deed 2.

Company incorporation certificate, 3.

Project report 4. Valid CFO from

APPCB, 5. CA certificate for share

holding, 6. Machinery statement as

per guidelines 7.Factories Dept

approval with plans 8) Land

conversion certificate 9.Board

resolution for authorizing the person

to sign the claim 10.Bank sanction

letter 11. Statement of Account with

attestation.

Page 15: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 15 ::

5

4

27/11/20

15

5,

14/06/206

The Claim application of

M/s.Sri Srinivasa Spintex

(India) Limited

(Expansion-I),

Pedatadepalli (V),

Tadapalligudem (M),

W.G Dist sanction of

reimbursement of power

cost in respect 1st quarter

of 2015 -16 under

Industrial Investment

Promotion Policy 2005-

10.

SVC verified the claim and

recommended for sanction of

Rs.41,38,086/- (Rupees Forty one

lakhs thirty eight thousand and eighty

six only) towards reimbursement of

power cost for 1st half year of 2015-

16 under IIPP 2010-15, including re-

computed amount of Rs.18,54,797/-

as per the revised Base Power

Consumption by considering 75% of

installed capacity utilized (highest as

per operational guidelines), subject to

submission of the following shortfall

information:1. Land lease or sale

deed, 2. Company incorporation

certificate, 3. Board resolution, 4.

5.Valid CFO, 6.Statement of

Accounts, 7.Machinery statement as

per guidelines, 8. Civil Engineer

certificate, 9. Power release

certificate, 10.C.A. Certificate for

expansion project. 11.Grampanchyath

approval 12. Land conversion

certificate 13.Bank term loan

sanction letter 14. Project report 15.

CA certificate for shareholding 16.

DT&CP approval 17. Factories Dept

approved plans.

5

5

27/11/20

15

6,

14/06/206

The Claim application of

M/s.Sri Srinivasa Spintex

Private Limited.

(existing), Pedatadepalli

(V), Tadapalligudem

(M), W.G Dist sanction

of reimbursement of

power cost in respect 1st

half year of 2015 -16

under Industrial

Investment Promotion

Policy 2005-10.

SVC verified the claim and

recommended for sanction of

Rs.58,48,780/- (Rupees fifty eight

lakhs forty eight thousand seven

hundred and eighty only) towards

reimbursement of power cost for 1st

quarter of 2015-16 under IIPP 2005-

10, subject to submission of the

following shortfall information1.

Grampanchyath approval 2. Land

conversion certificate 3.Bank term

loan sanction letter 4. Project report

5. CA certificate for shareholding 6.

DT&CP approval 7. Factories Dept

approved plans 8. Justification for

increase in power load.

5

6

27/11/20

15

7,

14/06/206

The Claim application of

M/s.Sri Srinivasa Spintex

Private Limited

(existing), Pedatadepalli

(V), Tadapalligudem

(M), W.G Dist sanction

of reimbursement of

power cost in respect 1st

and 2nd quarter of 2015 -

16 under Industrial

Investment Promotion

Policy 2005-10.

SVC verified the claim and

recommended for sanction of Rs.

60,34,790/- (Rupees sixty lakhs thirty

four thousand seven hundred and

ninety only) towards reimbursement

of power cost for 2nd quarter of

2015-16 under IIPP 2005-10 subject

to submission of the following

shortfall information1.

Grampanchyath approval 2. Land

conversion certificate 3.Bank term

loan sanction letter 4. Project report

5. CA certificate for shareholding 6.

DT&CP approval 7. Factories Dept

approved plans 8. Justification for

increase in power load.

5

7

27/11/20

15

8,

14/06/206

The Claim application of

M/s.SVR Spinning Mills

Private Limited,

Malleswaram (V),

Peravalli (M), W G Dist

sanction of

reimbursement of power

cost in respect 1st half

year of 2015 -16 under

Industrial Investment

Promotion Policy 2010-

15.

SVC verified the claim and

recommended for sanction of Rs.

21,44,430/- (Rupees twenty one

lakhs forty four thousand four

hundred and thirty only) towards

reimbursement of power cost for 1st

half year of 2015-16 under IIPP

2010-15, subject to submission of the

following shortfall information: 1.

Board resolution 2. Valid CFO from

APPCB, 3.Civil Engineer certificate

4. Project report 5.CA certificate for

share holding 6. Reason for increase

in power load from 750KVA to 1501

KVA

5

8

27/11/20

15

9,

14/06/206

The Claim application of

M/s.Sri Srinivasa Spintex

(India) Limited (Exp-2),

Pedatadepalli (V),

Tadapalligudem (M),

W.G Dist sanction of

reimbursement of power

cost in respect 1st quarter

of 2015 -16 under

Industrial Investment

Promotion Policy 2005-

10.

SVC verified the claim and

recommended for sanction of Rs.

32,56,942/- (Rupees thirty eight lakhs

fifty six thousand nine hundred and

forty two only) towards

reimbursement of power cost for 1st

half year of 2015-16 under IIPP

2010-15 duly adjusting the excess

amount of Rs.32,93,015/- sanctioned

earlier under IIPP 2010-15 by

correcting the Base Power

Consumption by considering 75% of

installed capacity utilized (highest as

per operational guidelines), subject to

submission of the following shortfall

information: 1. IEM part-B, 2. Land

sale deed or lease deed 3. Gram

Panchayath approval 4. DT&CP

approval/ UDA approval 5.

Machinery statement duly certified as

per guidelines 6. Company

incorporation certificate 7. Board

authorization 8. Land conversion 9.

Civil engineer certificate 10.CA

certificate.

Page 16: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 16 ::

5

9

02/12/20

15

10,

14/06/206

The Claim application of

M/s Bhavanam Spinning

Mills (P) Ltd, (Exp),

Bhimenenivaripalem,

Guntur Dist sanction of

reimbursement of power

cost in respect 2nd

quarter of 2015 -16

under Industrial

Investment Promotion

Policy 2005-10.

SVC verified the claim and

recommended for sanction of

Rs.32,88,840/-( Rupees Thirty two

lakhs eighty eight thousand eight

hundred and forty only) towards

reimbursement of power for 2nd

quarter of 2015-16 under IIPP 2005-

10.

6

0

02/12/20

15

11,

14/06/206

The Claim application of

M/s Sree Veerabramedra

Swamy Spinning Mills,

Lingam gutta (V),

Chilakalurpeta (M),

Guntur Dist sanction of

reimbursement of power

cost in respect 2nd

quarter of 2015 -16

under Industrial

Investment Promotion

Policy 2005-10.

SVC verified the claim and

recommended for sanction of

Rs.43,89,500/- (Rupees Forty three

lakh eighty nine thousand five

hundred only) towards

reimbursement of power cost for2nd

quarter of 2015-16 under IIPP 2005-

10.

6

1

02/12/20

15

12,

14/06/206

M/s Sakku Spinning

Mills Ltd,

(existing)Chinakondrupa

du (V), Prathipadu (M),

Guntur sanction of

reimbursement of power

cost in respect 2nd

quarter of 2015 -16

under Industrial

Investment Promotion

Policy 2005-10.

SVC verified the claim and

recommended for sanction of

Rs.36,50,100/- (Rupees thirty six

lakhs fifty thousand and one hundred

only) towards reimbursement of

power cost for 2nd quarter of 2015-

16 under IIPP 2010-15 subject to

submission of the following shortfall

information:1. Land conversion

certificate 2. Valid CFO from

APPCB 3. Approved project port

4.CA certificate 5. Board resolution

for person to sign in claim

application. 6. Gram Panchyath,

T&CP and Factories Dept approval 7.

Bank sanctioned letter.

6

2

02/12/20

15

13,

14/06/206

The Claim application of

M/s Sri Lakshmi

Godavari Spinning Mills

(P) Ltd, (Existing) S.No:

113, Chebrolu (V) &

(M), Guntur Dist sanction

of reimbursement of

power cost in respect 2nd

quarter of 2015 -16

under Industrial

Investment Promotion

Policy 2005-10.

SVC verified the claim and

recommended for sanction of

Rs.59,26,440/- (Rupees fifty nine

lakhs twenty six thousand four

hundred and forty only) towards

reimbursement of power cost for 2nd

quarter of 2015-16 under IIPP 2005-

10 subject to submission of the

following shortfall information: 1.

Confirmation of the GM, DIC on

installation of additional machinery

due to increase in power load from

650 kva to 4950 kva

6

3

02/12/20

15

14,

14/06/206

M/s Bhavanam Spinning

Mills (P) Ltd, (Exp -2,)

Bhimenenivaripalem,

Guntur Dist sanction of

reimbursement of power

cost in respect 2nd

quarter of 2015 -16

under Industrial

Investment Promotion

Policy 2005-10.

SVC verified the claim and

recommended for sanction of

Rs.88,95,970/- (Rupees eighty eight

lakhs ninety five thousand nine

hundred and seventy only) towards

reimbursement of power cost for 2nd

quarter of 2015-16 under IIPP

2005-10.

6

4

02/12/20

15

15,

14/06/206

M/s Sakku Spinning

Mills Ltd,

(Exp)Chinakondrupadu

(V), Prathipadu (M),

Guntur sanction of

reimbursement of power

cost in respect 1st half

year of 2015 -16 under

Industrial Investment

Promotion Policy 2010-

15.

SVC verified the claim and

recommended for sanction of

Rs.76,84,160/- (Rupees seventy six

lakhs eighty four thousand one

hundred and sixty only) towards

reimbursement of power cost for 1st

half year of 2015-16 under IIPP

2010-15, subject to submission of the

following shortfall information:

1. Board resolution 2.

Grampanchayath, T&CP Dept,

Factories Dept plan approval for

expansion 3. Land conversion

certificate 4.Valid CFO from APPCB

5. Approved project report 6. Reason

for increase the power load.

6

5

02/12/20

15

16,

14/06/206

M/s Vasantha Spinners

Ltd, (Exp-I) NH-5,

Thimmapuram (V),

Edlapadu (M), Guntur

Dist sanction of

reimbursement of power

cost in respect 1st & 2nd

quarter of 2015 -16

under Industrial

Investment Promotion

Policy 2005-10.

SVC verified the claim and

recommended for sanction of

Rs.96,64,822/- (Rupees Ninety six

lakhs sixty four thousand eight

hundred and twenty two only)

towards reimbursement of power cost

for 1st & 2nd quarters of 2015-16

under IIPP 2005-10 including re-

computed amount of Rs.51,33,912/-

as per the revised Base Power

Consumption as per operational

guidelines.

Subject to submission of the

following shortfall information: 1.

land documents 2. Board resolution

authorizing person to sign to claim 3.

Grama panchayath, Factories Dept,

T&CP dept approved plan 4.

Approved project report 5. Land

conversion certificate 6. Bank

sanctioned letter 7. CA certificate

Page 17: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 17 ::

indicating Investments

6

6

02/12/20

15

18,

14/06/206

The Claim application of

M/s Sri Venkata Siva

Parvathi Spinning Mill

(P) Ltd, (2nd Exp) GBC

Road, Chebrolu (V&M),

Guntur Dist sanction of

reimbursement of power

cost in respect 2nd

quarter of 2015 -16

under Industrial

Investment Promotion

Policy 2005-10.

SVC verified the claim and

recommended for sanction of Rs.

11,49,700/- (Rupees Eleven lakhs

forty nine thousand seven hundred

only) towards reimbursement of

power cost for 2nd quarter of 2015-

16 under IIPP 2005-10, duly

deducting the deference amount of

Rs.33,42,621/- as per decision of

SVC in its meeting held on

04.06.2016.

6

7

02/12/20

15

19,

14/06/206

The Claim application of

M/s Sri Sai Balaji

Spintex (P) Ltd,

Unnava(V), Edlapadu

(M), Gutnur sanction of

reimbursement of power

cost in respect 1st half

year of 2015 -16 under

Industrial Investment

Promotion Policy 2010-

15.

SVC verified the claim and

recommended for sanction of

Rs.84,58,286/- (Rupees Eighty four

lakhs fifty eight thousand two

hundred and eighty six only) towards

reimbursement of power cost for 1st

half year of 2015-16 under IIPP

2010-15, subject to submission of the

following shortfall information:1.

T&CP, Factories Dept approval 2.

Valid CFO from APPCB..

6

8

02/12/20

15

20,

14/06/206

The Claim application of

M/s.Usha Spincoat Pvt

Ltd, Chikkavaram ,

Gannavaram (M),

Krishna Dist sanction of

reimbursement of power

cost in respect 2nd

quarter of 2015 -16

under Industrial

Investment Promotion

Policy 2005-10.

SVC verified the claim and

recommended for sanction of

Rs.83,73,470/- (Rupees eighty three

lakhs Seventy three thousand four

hundred and seventy only) towards

reimbursement of power cost for 2nd

quarter of 2015-16 under IIPP

2010-15.

6

9

02/12/20

15

21,

14/06/206

The Claim application of

M/s Lanco Industries(2nd

Expansion),

Rachagunneri(V),

Srikalahasthi(M),

Chittoor Districtsanction

of reimbursement of sales

tax in respect 2015 -16

under Industrial

Investment Promotion

Policy 2005-10.

SVC examine the G.O Ms No: 30

Inds & Com (IP) Dept Dt: 1/4/2011,

where in orders were issued duly

extending 50% VAT / CST or SGST

reimbursement to the unit for a period

of 5 year from the DCP for the Mega

Project with an investment of Rs.

369.00 Cr in a phased manner

provided employment to 1000

persons. The SVC observed that there

is an ambiguity in the G.O whether it

is applicable for the 1st expansion or

for the second expansion or for both.

Therefore the SVC decided to

recommend the sanction the eligible

amount of Rs.2,55,92,425/- (Rupees

two crores fifty five lakhs ninety two

thousand four hundred and twenty

five only) towards reimbursement of

sales tax for the year 2013-14.

Subject to clarification and

conformation of the Mega status and

applicability of GO for 1st expansion

from the Government and also

subject to submission of short fall

information 1. Land sale deed or

lease deed 2. Company incorporation

certificate,3.Grama Panchayat

approval, 4.Town and country

planning approval 5. Land conversion

certificate 6.Power release certificate

7. Valid CFO issued by APPCB 8.

Board resolution authorizing the

person to sign the claim applications

9. Project report. 10.CA certificate

for shareholding 10.GM, DIC, has

not mentioned the line of activity in

his recommendation.

7

0

04/12/20

15

22,

14/06/206

The Claim application of

M/s Vasantha Spinners

Ltd, (Exp-II) NH-5,

Thimmapuram (V),

Edlapadu (M), Guntur

Dist sanction of

reimbursement of power

cost in respect 1st & 2nd

SVC verified the claim and

recommended for sanction of

Rs.2,71,82,699/-(Rupees two crores

Seventy one lakhs eighty two

thousand six hundred and ninety nine

only) towards power cost

reimbursement for 1st and 2nd

quarter of 2015-16 under IIIPP 2005-

Page 18: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 18 ::

quarter of 2015 -16

under Industrial

Investment Promotion

Policy 2005-10.

2010 duly adjusting the excess

amount of Rs 27,61,576/- sanctioned

earlier under IIPP 2010-15 as per

revised base power consumption,

subject to submission of the

following shortfall information: 1.

Land documents 2. Valid CFO from

APPCB, 3. Company incorporation

certificate 4. Board resolution

authorising to sing on claim

application 5, GP, T&CP Factories

Dept approval 6. Land conversion

certificate 7. Bank sanction letter 8.

CA Certificate 9. Reason for increase

power load 10. GM to clarify the

name of the unit is M/s Vasantha

Industries Ltd as per power bill claim

is preferred in the name of M/s

Vasantha spinners Ltd.

7

1

04/12/20

15

23,

14/06/206

The Claim application of

M/s Viswateja Spinning

Mills Ltd (Exp-2) D No:

219, Boyapalem (V),

Edlapadu (M), Guntur

sanction of

reimbursement of power

cost in respect 2nd

quarter of 2015 -16

under Industrial

Investment Promotion

Policy 2005-10.

SVC verified the claim and

recommended for sanction of Rs.

1,46,19,330/-( Rupees one crore forty

six lakhs nineteen thousand three

hundred and thirty only) towards

reimbursement of power cost for 2nd

quarter of 2015-16 under IIPP 2005-

10.

7

2

04/12/20

15

24,

14/06/206

The Claim application of

M/s Gajavalli Spinning

Mils (P) Ltd, Narakoduru

(V), Chebrolu (V) & (M),

Guntur Dist sanction of

reimbursement of power

cost in respect 2nd

quarter of 2015 -16

under Industrial

Investment Promotion

Policy 2005-10.

SVC verified the claim and

recommended for sanction of

Rs.54,85,380/- (Rupees fifty four

lakhs eighty five thousand three

hundred and eighty only) towards

reimbursement of power cost for2nd

quarter of 2015-16 under IIPP 2010-

15.

7

3

04/12/20

15

25,

14/06/206

The Claim application of

M/s Kallam Spinning

Mils (Open End unit)

Chowdavaram (V),

Guntur Dist sanction of

reimbursement of power

cost in respect 2nd

quarter of 2015 -16

under Industrial

Investment Promotion

Policy 2005-10.

SVC verified the claim and

recommended for sanction of

Rs.41,43,680/- ( Rupees forty one

lakh forty three thousand six hundred

and eighty only) towards

reimbursement of power cost for2nd

half year of 2015-16 under IIPP

2005-10, subject to submission of the

following shortfall information:

1.Board resolution 2. T&CP dept GP

Factories Dept plan approval 3. Land

conversion certificate 4. Valid CFO

from APPCB 5.CA certificate

indicating share holding

7

3

04/12/20

15

26,

14/06/206

The Claim application of

M/s Ranganayaka

Spinning Mills (P) Ltd,

Boyapalem (V),

Edlapaldu (M), sanction

of reimbursement of

power cost in respect 2nd

quarter of 2015 -16

under Industrial

Investment Promotion

Policy 2005-10.

SVC verified the claim and

recommended for sanction of

Rs.45,81,930/-( Rupees forty five

lakh eighty one thousand nine

hundred and thirty only) towards

reimbursement of power cost for 2nd

quarter of 2015-16 under IIPP 2005-

10, subject to submission of the

following shortfall information: 1. D

T&CP dept GP Factories Dept plan

approval 2. Land conversion

certificate 3. CE certificate 4.

Approved project report 5.CA

certificate for share holding

7

4

04/12/20

15

27,

14/06/206

The Claim application of

M/s Ranganayaka

Spinning Mills (P) Ltd,

(Exp) Boyapalem (V),

Edlapaldu (M), sanction

of reimbursement of

power cost in respect 2nd

quarter of 2015 -16

under Industrial

Investment Promotion

Policy 2005-10.

SVC verified the claim and

recommended for sanction of Rs.

25,37,360/- (Rupees twenty five

lakhs thirty seven thousand three

hundred and sixty only) towards

reimbursement of power cost for 2nd

quarter of 2015-16 under IIPP 2010-

15 subject to submission of the

following shortfall information:. 1)

Gram panchayath plan approval 2.

Land conversion certificate 3. Board

resolution 4. Valid CFO from

APPCB 5.Bank sanctioned letter 6.

Approved project report 7. CA

certificate for share holding.

7

5

04/12/20

15

28,

14/06/206

The Claim application of

M/s Idupulapadu Cotton

Mills (Exp-5)

Ganapavaram (V),

Nadendla(M), Guntur

sanction of

reimbursement of power

cost in respect 3rd

quarter of 2015 -16

under Industrial

Investment Promotion

Policy 2005-10.

SVC verified the claim and

recommended for sanction of

Rs.63,97,810/- (Rupees sixty three

lakhs ninety seven thousand eight

hundred and ten only) towards

reimbursement of power cost for3rd

quarter of 2015-16 under IIPP 2005-

10

Page 19: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 19 ::

7

6

04/12/20

15

29,

14/06/206

The Claim application of

M/s Sri Ravi Chandra

Textiles, Ponnekalu (V),

Tadikonda (M), Guntur

sanction of

reimbursement of power

cost in respect 1st half

year of 2015 -16 under

Industrial Investment

Promotion Policy 2010-

15

SVC verified the claim and

recommended for sanction of

Rs.31,76,730/-(Rupees thirty one

lakh seventy six thousand seven

hundred and thirty only) towards

reimbursement of power cost for1st

half year of 2015-16 under IIPP

2010-15.

7

7

04/12/20

15

30,

14/06/206

The Claim application of

M/s Mittpalli Spinners

Ltd, Chinaturakapalem

(V), Narasaropeta (M),

Guntur Dist sanction of

reimbursement of power

cost in respect 1st half

year of 2015 -16 under

Industrial Investment

Promotion Policy 2010-

15

SVC verified the claim and

recommended for sanction of

Rs.78,33,476/- (Rupees Seventy eight

lakh thirty three thousand four

hundred and seventy six only)

towards reimbursement of power cost

for1st half year of 2015-16 under

IIPP 2010-15 subject to submission

of the following shortfall

information: 1) Board resolution 2)

DT&CP approval 3) Factories Dept

approval 3) valid CFO from APPCB

4) Land conversion certificate 5) List

of Plant & Machinery as per

operational guidelines.

7

8

04/12/20

15

31,

14/06/206

The Claim application of

M/s Pavan Cotton

Products (P) Ltd (Exx-1)

Pulladigunta(V),

Vatticherukur (M),

Guntur sanction of

reimbursement of power

cost in respect 2nd

quarter of 2015 -16

under Industrial

Investment Promotion

Policy 2005-10.

SVC verified the claim and

recommended for sanction of Rs.

26,98,750/-(Rupees twenty six lakhs

ninety eight thousand seven hundred

and fifty only) towards

reimbursement of power cost for2nd

quarter of 2015-16 under IIPP 2005-

10, subject to submission of the

following shortfall information: 1.

Land documents 2. Valid CFO from

APPCB 3. Land conversion

certificate 4. Approved project report

5. DT&CP approval plan 6. CA

certificate indicating % of share

holding

7

9

04/12/20

15

32,

14/06/206

The Claim application of

M/s Nandhivardana

Textiels Milsl LTd, NH-

5, Thimmapuram (V0,

Edlapadu (M) Guntur

Dist sanction of

reimbursement of power

cost in respect 1st quarter

of 2015 -16 under

Industrial Investment

Promotion Policy 2005-

10.

SVC verified the claim, suggested for

recalculation and after recalculation

recommended for sanction of

Rs.24,33,774/- (Rupees twenty four

lakhs thirty three thousand seven

hundred and seventy four only)

towards reimbursement of power cost

for1st half years of 2015-16 under

IIPP 2010-15, subject to submission

of the following shortfall

information: 1. Land documents 2.

Board resolution authorized to sign

on claim application 3. T&CP, GP,

Factories Dept approved plans 4.

Valid CFO from APPCB 5. Land

conversion.6. Bank sanction letter.

8

0

04/12/20

15

33,

14/06/206

The Claim application of

M/s Sree Lalitha

Parameswari Spinning

Mills (P) Ltd, Guntur

sanction of

reimbursement of power

cost in respect 1st & 2nd

quarter of 2015 -16

under Industrial

Investment Promotion

Policy 2005-10.

SVC verified the claim and

recommended for sanction of

Rs.1,65,96,163/- (Rupees One crore

sixty five lakh ninety six thousand

one hundred and sixty three only)

towards reimbursement of power cost

for1st and 2nd half years of 2015-

16 under IIPP 2010-15, subject to

submission of the following shortfall

information: 1. Land documents 2.

Board resolution authorizing sing on

claim application 3. T&CP, GP,

Factories Dept approved plans 4.

Valid CFO from APPCB 5. Land

conversion.

8

1

04/12/20

15

34,

14/06/206

The Claim application of

M/s Krishna Ganga

Spinning(P) Ltd, Guntur

Dist sanction of

reimbursement of power

cost in respect 1st quarter

of 2015 -16 under

Industrial Investment

Promotion Policy 2005-

10.

SVC verified the claim, suggested for

recalculation from DCP i.e

05.01.20118 and after recalculation,

recommended for sanction of Rs.

1,10,63,200 /- (Rupees one crore ten

lakhs sixty three thousand two

hundred only) towards

reimbursement of power cost for 4th

quarter of 2010-11 to 2nd quarter of

2015-16 under IIPP 2010-15, subject

to submission of the following

shortfall information: 1. Land

documents 2.. T&CP, GP, Factories

Dept approved plans 3. Valid CFO

from APPCB 5. Land conversion.6.

Approved project report 7.Reason for

increase of power load 8. Plant and

Machinery statement attestation on

documents.

Page 20: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 20 ::

8

2

04/12/20

15

35,

14/06/206

The Claim application of

M/s Sriven Spincot Pvt

Ltd , D No: 8-87,

Karuchela Road,

Edlapadu (V&M), Guntur

sanction of

reimbursement of power

cost in respect 1st half

year 2015 -16 under

Industrial Investment

Promotion Policy 2010-

15

SVC verified the claim and

recommended for sanction of

Rs.36,93,750/- (Rupees thirty six

lakhs ninety three thousand seven

hundred and fifty only) towards

reimbursement of power cost for1st

half year of 2015-16 under IIPP

2010-15, subject to submission of the

following shortfall information: T&

CP plan 2. Land conversion

certificate 3. Valid CFO from

APPCB.

8

3

04/12/20

15

36,

14/06/206

The Claim application of

M/s Sri Lakshmi

Godavari Spinniner,

(EXP-I) S.No: 113,

Chebrolu (V) & (M),

Guntur Dist sanction of

reimbursement of power

cost in respect 1st & 2nd

quarter of 2015 -16

under Industrial

Investment Promotion

Policy 2005-10.

he Scrutiny Verification Committee

has verified the claims from DCP and

observed that an excess amount of

Rs.1,44,63,271/- sanctioned in

earlier claims by the SLC as per the

revised calculation and recommended

for adjustment of the same amount in

the 1st & 2nd quarter of 2015-16 in

the claim of 1st expansion which is

worked out an amount of

Rs.1,01,53,480/- and the balance

amount of Rs.43,09,792/- may be

adjusted in the present claim of 2nd

expansion of 1st half year of 2015-16

under IIPP 2005-10, subject to

submission of the following shortfall

information: 1. Land documents 2.

Board resolution 3. T&CP , Factories,

Gram panchayath approved plan 4.

Valid CFO from APPCB, 5. Land

conversion certificate.

8

4

04/12/20

15

37,

14/06/206

The Claim application of

M/s Sri Venkata Lakshmi

Narasimha spinning Mills

,(Exp) Sy No: 176/4,

GBC, Road, Chebrolu (V

&M), Guntur sanction of

reimbursement of power

cost in respect 2nd half

year of 2014-15 and 1st

half year of 2015-16

under Industrial

Investment Promotion

Policy 2010-15

SVC verified the claim and

recommended for sanction of

Rs.27,83,900/-(Rupees Twenty seven

lakhs eighty three thousand nine

hundred only) towards

reimbursement of power cost for 2nd

half year of 2014-15 and 1st half

year of 2015-16 under IIPP 2010-15,

subject to submission of the

following shortfall information: 1.

IEM Part -B 2.DT&CP , Factories,

Gram panchayath approved plan 3.

Land conversion 4. CA certificate in

original 5. Reason for increase of

power load.

8

5

04/12/20

15

38,

14/06/206

The Claim application of

M/s Sri Venkata Uma

Sankara Spintex (P) Ltd,

Sy No: 33, 35/1,

Vemavaram,

Phirangipuram(M),

Guntur Dist sanction of

reimbursement of power

cost in respect 1st half

year of 2015 -16 under

Industrial Investment

Promotion Policy 2005-

10.

SVC verified the claim and

recommended for sanction of

Rs.50,66,890/-(Rupees fifty lakhs

sixty six thousand eight hundred and

ninety only) towards reimbursement

of power cost for1st half year of

2015-16 under IIPP 2010-15 subject

to submission of the following

shortfall information:1. DT&CP,

Factories Dept approved plan 2. Land

conversion certificate 3. Valid CFO

from APPCB 4. Statement of

Account 5. Bank sanction letter. .

8

6

04/12/20

15

39,

14/06/206

The Claim application of

M/s Thatavarthi Apparels

Ltd, (Spinning Division),

Kavuru (V),

Chilakaluriperta (M),

Guntur Dist sanction of

reimbursement of power

cost in respect 1st half

year of 2015 -16 under

Industrial Investment

Promotion Policy 2005-

10.

SVC verified the claim and

recommended for sanction of

Rs.60,40,819 /- (Rupees sixty lakhs

forty thousand eight hundred and

nineteen only) towards

reimbursement of power cost for1st

half year of 2015-16 under IIPP

2010-15 subject to submission of the

following shortfall information: 1

GP, Factories , DT&CP plan

approval 2.Valid CFO from APPCB

3. CE Certificate 4. Approved project

report 4. Machinery statement as per

guidelines

8

7

04/12/20

15

40,

14/06/206

The Claim application of

M/s Veera Assosicates,

(Exp-1), NH-5,

Ganapavaram (V),

Nadendla (M), Guntur

Dist sanction of

reimbursement of power

cost in respect 1st quarter

of 2015 -16 under

Industrial Investment

Promotion Policy 2005-

10.

This unit has falls under MSME

category. Hence this file to be

returned to GM, DIC, Guntur for take

further necessary action

8

8

04/12/20

15

41,

14/06/206

The Claim application of

M/s Sai Manasa Spintex

(India) Ltd , Martur

(V&M) Guntur sanction

of reimbursement of

power cost in respect 1st

quarter of 2015 -16

under Industrial

Investment Promotion

Policy 2005-10.

SVC verified the claim and

recommended for sanction of

Rs.4,20,333/- (Rupees four lakhs

twenty thousand three hundred and

thirty three only) towards

reimbursement of power cost for 1st

half year of 2015-16 under IIPP

2010-15, subject to submission of the

following shortfall information1:1.

DT&CP and Factories approved plan

2, Valid CFO 3. Land conversion 4.

M/c list as per guideline

Page 21: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 21 ::

8

9

04/12/20

15

42,

14/06/2016

The Claim application of

M/s Gajavalli spinning

(P) Ltd (Exp), Chebrolu

(V&M) Guntur sanction

of reimbursement of

power cost in respect 2nd

half year of 2014-15 &

1st half year of 2015 -16

under Industrial

Investment Promotion

Policy 2005-10.

SVC verified the claim and

recommended for sanction of Rs.

99,43,150/-( Rupees ninety nine lakhs

forty three thousand one hundred and

fifty only) towards reimbursement of

power cost for 2nd half year of

2014-15 and first half year of 2015-

16 under IIPP 2010-15, subject to

submission of the following shortfall

information:1. Company

Incorporation 2 T&CP plan

3.Factories Dept approved plan for

expansion 4. Land conversion

certificate, 5. Valid CFO 6. Bank

sanctioned letter 7. CE certificate 8.

Approved project report

9

0

04/12/20

15

43,

14/06/2016

The Claim application of

M/s Supriya Spinning

Mills Pvt Ltd (Exp),

Boyapalem, Edlapadu

(M), Guntur Dist sanction

of reimbursement of

power cost in respect 1st

quarter of 2015 -16

under Industrial

Investment Promotion

Policy 2005-10.

SVC examined the claim and decided

to defer the issue for recalculate the

eligible amount for reimbursement of

power cost.

9

1

04/12/20

15

44,

14/06/2016

The Claim application of

M/s Lakshmi Godavari

Spinning Mills Ltd (2nd

Exp), Guntur sanction of

reimbursement of power

cost in respect 1st half

year of 2015 -16 under

Industrial Investment

Promotion Policy 2010-

15

SVC verified the claim and

recommended for sanction of Rs.

1,27,41,314/- (Rupees one crore

twenty seven lakhs forty one

thousand three hundred and fourteen

only) towards reimbursement of

power cost for1st half year of 2015-

16 under IIPP 2010-15, subject to

submission of the following shortfall

information:1. Land documents 2.

Land conversion certificate 3.Valid

CFO from APPCB 4. CA Certificate

for share holdings

9

2

04/12/20

15

45,

14/06/2016

The Claim application of

M/s Kalpataru Spinnning

Mills (Exp), Sy NO: 210,

211/a, Thimmapuram

(V), Edlapadu (M)

Guntur Dist sanction of

reimbursement of power

cost in respect 1st half

year of 2015 -16 under

Industrial Investment

Promotion Policy 2010-

15

SVC verified the claim and

recommended for sanction of Rs.

42,84,913/-(Rupees forty two lakh

eighty four thousand nine hundred

and thirteen only ) towards

reimbursement of power cost for 1st

half year of 2015-16 under IIPP

2010-15 subject to submission of the

following shortfall information: 1.

IEM Part-B, 2,DT&CP , Factories

Dept approval 3, Valid CFO from

APPCB

9

3

04/12/20

15

46,

14/06/2016

The Claim application of

M/s Sri Venkata Siva

Parvathi Spinning Mills

(P) Ltd (unit -II),

Cherbrolu (V&M),

Guntur sanction of

reimbursement of power

cost in respect 1st half

year of 2015 -16 under

Industrial Investment

Promotion Policy 2010-

15

SVC verified the claim and

recommended for sanction of Rs.

58,79,240/- ( Rupees fifty eight lakhs

seventy nine thousand two hundred

and forty only) towards

reimbursement of power cost for 1st

half year of 2015-16 under IIPP

2010-15, subject to submission of the

following shortfall information: 1.

DT& CP , Factories Dept plan 2

Valid CFO from APPCB 3, Land

conversion 4. Statement of Accounts

in original.

9

4

04/12/20

15

47,

14/06/2016

The Claim application of

M/s Krishna Murty

Spinning Mills (P) Ltd,

NH-5, Thimmapuram

(V), Edlapadu (M)

Guntur Dist sanction of

reimbursement of power

cost in respect 2nd

quarter of 2015 -16

under Industrial

Investment Promotion

Policy 2005-10.

SVC verified the claim and

recommended for sanction of

Rs.39,19,130/- (Rupees thirty nine

lakhs nineteen thousand one hundred

and thirty only) towards

reimbursement of power cost for 2nd

quarter of 2015-16 under IIPP 2010-

15 subject to submission of the

following shortfall information:1.GP,

Factories, 2. DT&CP Dept approval

3. Valid CFO from APPCB 4. Land

conversion certificate 5. Bank

sanctioned letter 6.Approved project

report

9

5

07/12/20

15

48,

14/06/2016

The Claim application of

The Claim application of

M/s NSL Textiles Ltd,

(Mega Project) Edlapadu

(V), & (M), Guntur

DistSanction of

reimbursement of power

cost in respect 2nd

quarter of 2015 -16 under

Industrial Investment

Promotion Policy 2005-

10.

The Scrutiny Verification Committee

examined the claim and

recommended for sanction of Rs.

4,88,71,500/-(Rupees four crores

eighty eight lakhs seventy one

thousand fifty only) under IIPP

2005-10, subject to submission of the

following shortfall documents: 1)

IEM Part-B 2) Approved plans from

Factories Department 3) Land

conversion certificate 4) Project

Report 5) Valid CFO from APPCB

6) Approved Plans from DT& CP 7)

Base Power Consumption units of

preceding three years from Chartered

Accountant 8) Statement of

Accounts and Certification of Plant &

Machinery as per Guidelines.

Further, SVC has taken a view to

seek the clarification from the

Page 22: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 22 ::

Government on the extension of

Mega Project status beyond 5 years

i.e. 8 years as per extended the IIPP

2005-10.

9

6

07/12/20

15

49,

14/06/2016

The Claim application of

M/s NSL Textiles LTd

(Garments Division) Sy

nO: 253, Budampadu

(V), Guntur Dist sanction

of reimbursement of

power cost in respect 1st

quarter of 2015 -16

under Industrial

Investment Promotion

Policy 2005-10.

SVC verified the claim and

recommended for sanction of

Rs.5,99,640/- (Rupees five lakhs

ninety nine thousand six hundred and

forty only) towards reimbursement of

power cost for 2nd quarter of 2015-

16 under IIPP 2005-10, subject to

submission of the following shortfall

information: 1.Company

incorporation certificate 2, Board

resolution 3. GP Factories Dept

approved plan 4.Land conversion

certificate 5. Valid CFO from

APPCB 6 Statement of Accounts 6.

Machinery list not as per guideline 7.

CE certificate.

9

7

07/12/20

15

50,

14/06/2016

The Claim application of

M/s NSL Textiles Ltd, Sy

No: 371 to 382,

Kunchalavaripalem (V)

Cherukupalli (M), Guntur

Dist sanction of

reimbursement of power

cost in respect 2nd

quarter of 2015 -16

under Industrial

Investment Promotion

Policy 2005-10.

The Scrutiny Verification Committee

examined the claim and

recommended for sanction of

Rs.2,00,04,500/- (Rupees two crores

four thousand five hundred only)

towards reimbursement of power cost

for2nd quarter of 2015-16 under

IIPP 2005-10 subject to submission

of the following shortfall

information: 1) Approved plans from

Factories Department 2) Land

conversion certificate 3) Project

Report 4) Valid CFO from APPCB

5) Approved Plans from DT& CP , 6)

Approved Plans from Grampanchayat

7) Land Sale Deed / Lease Deed.

Further, SVC has taken a view to

seek the clarification from the

Government on the extension of

Mega Project status beyond 5 years

i.e. 8 years as per extended the IIPP

2005-10.

9

8

07/12/20

15

51,

14/06/2016

The Claim application of

M/s.Ravali Spinners Pvt

Ltd., (Expansion),

Khandavalli (V), Peravali

(M), W G Dist sanction

of reimbursement of

power cost in respect 1st

half year of 2015 -16

under Industrial

Investment Promotion

Policy 2010-15.

SVC verified the claim and

recommended for sanction of

Rs.67,17,811/- (Rupees Sixty seven

lakhs seventeen thousand eight

hundred and eleven only) towards

reimbursement of power cost for1st

half year of 2015-16 under IIPP

2010-15 duly adjusting the excess

amount of Rs.54,67,703/- sanctioned

earlier as per the revised base power

consumption, subject to submission

of the following shortfall

information: 1.DT&CP approval 2.

Land conversion certificate 3. Valid

CFO from APPCB 4. List of Plant &

Machinery as per guidelines

9

9

07/12/20

15

52,

14/06/2016

The Claim application of

M/s.Avanthi Feeds,

Kovvuru, W G Dist

sanction of

reimbursement of power

cost in respect 1st half

year of 2015 -16 under

Industrial Investment

Promotion Policy 2010-

15

SVC verified the claim and

recommended for sanction of

Rs.41,82,026/- (Rupees forty one

lakhs eighty two thousand and twenty

six only) towards reimbursement of

power cost for1st half year of 2015-

16 under IIPP 2010-15 subject to

submission of valid CFO from

APPCB

1

0

0

07/12/20

15

53,

14/06/2016

The Claim application of

M/s.Paramesu Biotech

Private Limited,

Devarapalli (V & M), W

G Dist sanction of

reimbursement of power

cost in respect 1st half

year of 2015 -16 under

Industrial Investment

Promotion Policy 2005-

10.

SVC verified the claim and

recommended for sanction of Rs.

25,47,370/- (Rupees twenty five

lakhs forty seven thousand three

hundred and seventy only) towards

reimbursement of power cost for1st

half year of 2015-16 under IIPP

2010-15 subject to submission of the

following shortfall information:1

Project report 2 IEM part-B 3.

Gramapanchayath, Factories Dept

and T&CP approved plans 4.Power

release certificate

1

0

1

14/12/20

15

55,

14/06/2016

The Claim application of

M/s Sudha Agro Oil &

Chemical Industries

Ltd.(Spinning Division),

Valuthimmapuram(V),

Peddapuram(M), East

Godavari District

sanction of

reimbursement of power

cost in respect 1st half

year of 2015 -16 under

Industrial Investment

Promotion Policy 2005-

10.

SVC verified the claim and

recommended for sanction of Rs.

30,32,660/- (Rupees thirty lakhs

thirty two thousand six hundred and

sixty only) towards reimbursement of

power cost for 1st half year of 2015-

16 under IIPP 2010-15 subject to

submission of the following shortfall

information:

1) Land documents 2. Board

resolution 3.Machinery statement as

per guideline 4. T&CP approved plan

5. Valid CFO from APPCB 6.CE

certificate 7.Power release certificate.

Page 23: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 23 ::

1

0

2

15/12/20

15

56,

14/06/206

The Claim application of

M/s.Balabalajee Textiles

Limited (Exp-I), Tanuku

(V&M), W G Dist

sanction of

reimbursement of power

cost in respect 1st quarter

of 2015 -16 under

Industrial Investment

Promotion Policy 2005-

10.

SVC verified the claim and

recommended for sanction of

Rs.96,57,257/- (Rupees ninety six

lakhs fifty seven thousand two

hundred and fifty seven only)

towards reimbursement of power cost

for 1st half year of 2015-16 under

IIPP 2010-15, subject to submission

of the following shortfall

information:

1. Land sale/lease deed 2. Board

resolution 3.Company incorporation

4. DT&CP & Factories Department

approved plan 5. Valid CFO from

APPCB 6.Bank TL sanctioned letter

7.Project report.

1

0

3

16/12/20

15

57,

14/06/206

The Claim application of

M/s Jagadguru Textiels

(P) Ltd (Exp) , Prakasam

sanction of

reimbursement of power

cost in respect 1st quarter

of 2015 -16 under

Industrial Investment

Promotion Policy 2005-

10.

SVC verified the claim and

recommended for sanction of

Rs.19,22,061/- ( Rupees nineteen

lakhs twenty two thousand and sixty

one only) towards reimbursement of

power cost for1st half year of 2015-

16 under IIPP 2005-10 subject to

submission of the following shortfall

information:

1. Board resolution 2Lanbd

conversion certificate 3 Valid CFO

from APPCB 4. Approved project

report 5.CA certificate

1

0

4

18/12/20

15

58,

14/06/206

The Claim application of

M/s NSL Textiles Ltd, D

No: 6/275-1, Inkollu ,

Prakasam Dist sanction

of reimbursement of

power cost in respect 2nd

quarter of 2015 -16

under Industrial

Investment Promotion

Policy 2005-10.

The Scrutiny Verification Committee

examined the claim and

recommended for sanction of Rs.

3,60,36,270/- (Rupees three crore

sixty lakhs thirty six thousand two

hundred and twenty only) towards

reimbursement of power cost for 2nd

half year of 2015-16 under IIPP

2010-15 subject to submission of the

following shortfall information:

1. IEM Part-B,2. Factories Dept

approved plans 3.Land conversion 4.

Approved project report 5. Valid

CFO from APPCB 6. Factories,

T&CP approved plan 7. List of Plant

and machinery and statement of

account.

Further, SVC has taken a view to

seek the clarification from the

Government on the extension of

Mega Project status beyond 5 years

i.e. 8 years as per extended the IIPP

2005-10.

1

0

5

18/12/20

15

59,

14/06/206

The Claim application of

M/s.Shri Govindaraja

Textiles Pvt Ltd,

(Existing)

Peddaragapuram (V),

Pulivendula (M), YSR

Kadapa Dist sanction of

reimbursement of power

cost in respect 1st quarter

of 2015 -16 under

Industrial Investment

Promotion Policy 2005-

10.

SVC verified the claim and

recommended for sanction of

Rs.1,03,68,386/- (Rupees one crores

three lakhs sixty eight thousand three

hundred and eighty six only) towards

present claim of 2nd quarter of 2015-

16 under IIPP2005-10, subject to the

following short fall information:

1. Gram panchayat approval, 2. Land

conversion.

1

0

6

18/12/20

15

60,

14/06/206

The Claim application of

M/s.Shri Govindaraja

Textiles

(Expansion)Peddaragapur

am (V), Pulivendula (M),

YSR Kadapa Dist

sanction of

reimbursement of power

cost in respect 1st quarter

of 2015 -16 under

Industrial Investment

Promotion Policy 2005-

10.

The Scrutiny Verification Committee

examined the claim and

recommended for sanction of

Rs.2,75,92,413- (Rupees one crores

sixty six lakhs eighty five thousand

six hundred and seventy only)

towards reimbursement of power cost

for1st half year of 2015-16 under

IIPP 2010-15 including an amount of

Rs 5,81,367 /- as per revised base

power consumption, subject to

submission of the following shortfall

information: 1. Gram panchayat

approval , 2. Land conversion.3.

Valid CFO from APPCB, 4.

Approved Project report 5. Form B

not properly filed

1

0

7

28/12/20

15

61,

14/06/206

The Claim application of

M/s Bhavya Cements

Ltd, Tangeda (V),

Dachepalli (M), Guntur

Dist sanction of

reimbursement of power

cost in respect 3rd

quarter of 2015 -16

under Industrial

Investment Promotion

Policy 2005-10.

SVC verified the claim and

recommended for sanction of

Rs.2,42,05,540/-/- (Rupees two crore

forty two lakhs five thousand five

hundred and forty only) towards

reimbursement of power cost for3rd

quarter of 2015-16 under IIPP 2010-

15

Page 24: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 24 ::

1

0

8

31/12/20

15

63,

14/06/206

The Claim application of

M/s RBA Textiles Private

Limited Firm. Ltd.,

Krishnagiri Road, Foood

Processing Industrial

Park, Kuppam(M),

Chittoor sanction of

reimbursement of power

cost in respect 1st quarter

of 2015 -16 under

Industrial Investment

Promotion Policy 2005-

10.

The Scrutiny Verification Committee

has verified the claims from DCP and

observed that an excess amount of

Rs.2,27,62,502/- sanctioned in

earlier claims by the SLC as per the

revised base power consumption

basing on CA certificate, hence

recommended for adjustment of the

same amount in the current claims of

existing/expansion unit.

Hence, SVC has recommended that

the eligible amount of the present

claim of the existing unit is computed

as zero, subject to submission of the

short fall documents/information.

1. Company Incorporation 2)

Grampanchyath , Factories Dept and

T&CP approval plans 3) Valid CFO

from APPCB 4) Bank sanctioned

letter 5) Plant and Machinery

statement as per guideline 6) Project

report 9) CA certificate for sharing 7)

Reasons for increasing the power

load

SVC further recommended that the

balance excess amount of

Rs.40,39,307/- from the existing

claim after adjustment as detailed

above is to be adjusted in the current

claim of expansion proposal. .

1

0

9

31/12/20

15

64,

14/06/206

The Claim application of

M/s RBA Textiles Private

Limited Firm. Ltd.,

Krishnagiri Road, Foood

Processing Industrial

Park, Kuppam(M),

Chittoor sanction of

reimbursement of power

cost in respect 1st quarter

of 2015 -16 under

Industrial Investment

Promotion Policy 2005-

10.

SVC verified the claim and observed

that an amount of Rs1,93,44,069/-

was sanctioned less by SLC in earlier

claims and payable to the unit as per

revised base power consumption

units basing on the CA certificate.

After adjusting the excess amount of

Rs.40,39,307/- sanctioned by the

SLC in the current claim of the

existing unit from the recomputed

amount of Rs.1,93,44,069/-, SVC

recommended to sanction an amount

of Rs. 1,87,85,917/- (Rupees one

crore eighty seven lakhs eighty five

thousand nine hundred and seventeen

only) by considering the present

claim of Rs.34,81,156/- of the

expansion unit for 1st half year of

2015-16, Subject to conditions 1.

Land sale deed 2) Company

incorporation 3) Board resolution

authorizing. 4) Grampanchayath,

T&CP dept approval 5) Land

conversion approval 6) valid CFO

issued APPCB 8) Project report 9)

CA certificate 10) Reasons for

increasing the power

1

1

0

04/01/20

16

65,

14/06/206

The Claim application of

M/s.The Gowthami

Solvent Oils Ltd.,

Mortha, Undrajavaram

(M), W G Dist sanction

of reimbursement of

power cost in respect 1st

half year of 2015 -16

under Industrial

Investment Promotion

Policy 2005-10.

SVC verified the claim and

recommended for sanction of Rs.

42,03,780 ( Rupees forty two lakhs

three thousand seven hundred and

eighty only) towards reimbursement

of power cost for1st half year of

2015-16 under IIPP 2010-15 subject

to submission of the following

shortfall information: 1) IEM Part-B2

) Land documents 3) Certificate of

Incorporation 4) Board resolution 5)

GP, Factories and DT&CP approval

6) Land conversion 7) CFO from

APPCB 8) Bank sanctioned letter 9)

Statement of Accounts as per

guidelines 9) M/c statement as per

guidelines 10) CE certificate 11)

Project report 12) Power release

certificate

1

1

1

04/01/20

16

66,

14/06/206

The Claim application of

M/s.Gowthami Spintex

(India) Limited,

Duvva(V), Tanuku (M),

W G Dist sanction of

reimbursement of power

cost in respect 1st half

year of 2015 -16 under

Industrial Investment

Promotion Policy 2005-

10.

SVC verified the claim and

recommended for sanction of

Rs.38,74,100/- (Rupees thirty eight

lakhs seventy four thousand one

hundred only) towards

reimbursement of power cost for1st

half year of 2015-16 under IIPP

2010-15 subject to submission of the

following shortfall information: 1)

IEM Part-B 2) Land documents 3)

Memorandum of Articles 4) GP,

Factories T&CP dept approved plan s

5) Valid CFO from APPCB 6)

Statement of Accounts 7) List of M/c

as per guidelines 8) CE certificate 9)

Project report

Page 25: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 25 ::

1

1

2

04/01/20

16

67,

14/06/206

The Claim application of

M/s.The Gowthami

Solvent Oils Limited,

Tetali (V), Tanuku (M),

W G Dist sanction of

reimbursement of power

cost in respect 1st quarter

of 2015 -16 under

Industrial Investment

Promotion Policy 2005-

10.

SVC verified the claim and

recommended for sanction of

Rs.1,91,42,536/- (Rupees one crore

ninety one lakhs forty two thousand

and five hounded and thirty six only)

towards reimbursement of power cost

for1st and 2nd quarter of 2015-16

under IIPP 2005-10 including re-

computed amount of Rs.27,76,480/-

as per the revised Base Power rate as

Rs.2.60 per unit, subject to

submission of the following shortfall

information 1) IEM part -B, 2) Land

documents 3) Certificate of

Incorporation 4) Board resolution 5)

Grampanchayat, Factories dept and

T&CP planning approved plans 6)

Land conversion certificate 7) CFO

from APPCB, 10) Bank term loan

sanctioned letter 11) Statement of

Accounts issued by the Financing

bank 12) Plant & Machinery as per

guide lines 13) CE certificate 14)

Project report 15) Power release

certificate.

1

1

3

04/01/20

16

70,

14/06/206

The Claim application of

M/s.Praveen Spinners

(India) Pvt Ltd.,

Ravicherla (V), Nuzivid

(M), Krishna Dist

sanction of

reimbursement of power

cost in respect 1st half

year of 2015 -16 under

Industrial Investment

Promotion Policy 2005-

10.

SVC verified the claim and

recommended for sanction of Rs.

50,28,740/- (Rupees fifty lakhs

twenty eight thousand seven hundred

and forty only) towards

reimbursement of power cost for1st

half year of 2015-16 under IIPP

2010-15 subject to submission of the

following shortfall information: 1)

Company incorporation 2) Land

conversion 3) Valid CFO from

APPCB

1

1

4

05/01/20

16

72,

14/06/206

The Claim application of

M/s.Amoda Spintex Ltd.,

Ravikampadu (V),

Jaggaipeta (M)Krishna

Dist sanction of

reimbursement of power

cost in respect 1st quarter

of 2015 -16 under

Industrial Investment

Promotion Policy 2005-

10.

SVC verified the claim and

recommended for sanction of Rs.

45,68,550/- ( Rupees forty five lakhs

sixty eight thousand five hundred and

fifty only) towards reimbursement of

power cost for1st half year of 2015-

16 under IIPP 2010-15 subject to

submission of the following shortfall

information: valid CFO issued by

APPCB, 2) Bank term loan

sanctioned letter 3) Project report 4)

CA certificate for share holding

1

1

5

05/01/20

16

73,

14/06/206

The Claim application of

M/s.Mohan Spintex India

Limited (Unit-II),

Remalle (V), Bapulapadu

(M), Krishan Dist

sanction of

reimbursement of power

cost in respect 1st quarter

of 2015 -16 under

Industrial Investment

Promotion Policy 2005-

10.

SVC verified the claim and

recommended for sanction of

Rs.3,14,20,658/-( Rupees three

crores fourteen lakhs ninety three

thousand four hundred and eighteen

only) after adjustment of excess

amount of Rs.6,72,760/- sanctioned

by the SLCs for 2nd quarter of 2015-

16 under IIPP 2005-10, subject to

submission of the following shortfall

information:

1) Land sale deed 2) Reason for

increase Power 4000 to 5000KVA 3)

T& CP planning Dept 4) Board

resolution 5) Land conversion 6)

Grampanchayath approved plans 7)

CFO from APPCB

1

1

6

05/01/20

16

74,

14/06/206

The Claim application of

M/s.Mohan Spintex India

Ltd., (Expansion),

Vattgudipadu(V),

Agripalli (M) Krishna

Dist sanction of

reimbursement of power

cost in respect 1st quarter

of 2015 -16 under

Industrial Investment

Promotion Policy 2005-

10.

SVC verified the claim and

recommended for sanction of

Rs.87,39,910/- (Rupees eighty seven

lakhs thirty nine thousand nine

hundred and ten only) towards

reimbursement of power cost for 2nd

quarter of 2015-16 under IIPP 2005-

10 subject to submission of the

following shortfall information:1)

Mee seva receipt 2) Land sale deed 2)

Bank sanctioned letter4) Project

report 5) T&CP dept approval 6)

Statement of Accounts 7) Plant &

M/c statement as per guidelines 8)

Status of original unit and no

correlation between IEM of original

and expansion project 9) IEM Part -

B indicated only DCP of expansion

project and does not indicates the

capacity of original unit to decided

the eligibility and IEM is not clear

10) claim application is not

completely filled in leaving blank the

capacity of original unit. However

earlier claims are sanctioned 11)

Variation in line of activity to be

clarified by GM DIC 12) T&CP ,

Grampanchayath approval 13) Land

conversion approval 14) CFO from

APPCB

Page 26: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 26 ::

1

1

7

05/01/20

16

75,

14/06/206

The Claim application of

M/s.Zuari Cement

Limited (Expansion)

Krishna Nager,

Yerraguntla (M), YSR

Kadapa Dist sanction of

reimbursement of power

cost in respect 1st quarter

of 2015 -16 under

Industrial Investment

Promotion Policy 2005-

10.

SVC verified the claim and it is

observed that the unit has not availed

reimbursement of power cost from

DCP to 4th quarter of 2013-14 and

some of the claims are rejected by the

SLC, since the base consumption

recommended for sanction of Rs.

34,96,183/- (Rupees Thirty Four

lakhs Ninety Six thousand one

hundred and eighty three only)

towards reimbursement of power cost

for1st, 2nd & 3rd quarters of 2014-15

under IIPP 2005 -10 subject to

submission of the following shortfall

information:1) land sale deed or lease

deed 2) company incorporation 3)

Grampanchayath and T&CP and

Factories approval 4) Boiler

certificate 5) Land conversion

certificate 6) Bank sanctioned letter

9) Project report 10) CA certificate

for share holding 11) Statement of

Accounts and Plant & Machinery as

per operational guidelines.

1

1

8

07/01/20

16

77,

14/06/206

The Claim application of

M/s.Swarnalatha Spintex

Pvt Ltd.,

Serinarasannapalem (V),

Bapulapadu (M), Krishna

Dist sanction of

reimbursement of power

cost in respect 1st half

year of 2015 -16 under

Industrial Investment

Promotion Policy 2010-

15.

SVC verified the claim and

recommended for sanction of

Rs.77,08,390./- ( Rupees seventy

seven lakhs eight thousand three

hundred and ninety only) towards

reimbursement of power cost for1st

half year of 2015-16 under IIPP

2010-15 subject to submission of the

following shortfall information:1)

Land conversion certificate 2) CFO

from APPCB

1

1

9

08/01/20

16

78,

14/06/206

The Claim application of

M/s South India Krishna

Oil and Fats Pvt. Ltd.,

Sy.No. 275, 279, 280 &

281, Epuru Bit-IB,

Pantapalem Muthukur

(V&M), SPSR Nellore

District sanction of

reimbursement of power

cost in respect 1st quarter

of 2015 -16 under

Industrial Investment

Promotion Policy 2005-

10.

SVC verified the claim and

recommended for sanction of

Rs.45,74,890/- (Rupees forty five

lakhs seventy four thousand eight

hundred and ninety only) towards

reimbursement of power cost for1st

and 2nd quarter of 2015-16 under

IIPP 2005-10 and deferred the

quarter claim as the required

documents i. e 4th Power bill of

January 2015 not furnished to prepare

appraisal for 4th quarter of 2014-15,

subject to submission of the

following shortfall information:1)

T&CP approval plan 2) Boiler

certificate 3) Land conversion

certificate 4) GM, DIC has

certificated the activity in claim

refined oil and not in his covering

letter 5) Person signing the claim has

not indicated name of the person to

verify the board resolution

Authorization 6) Factories Dept

approval 7) Boiler certificate 8) land

conversion certificate 9) Statement of

Accounts not certified by GM DIC

10) Machinery statement as per

guideline 11) reason for increase the

power load 12) Original DCP

27/09/2011 Additional power has

given 07/12/2013as per Form-B13)

Power bill for Jan 2015 is not

finishing and hence we may consider

duly 3rd quarter of 2014-15 which

works out to Rs23,78,800/- for

placing in SVC.

4 STATUS NOTE ON RELEASE OF SANCTIONED

INCENTIVE / CONCESSIONS OF TO THE

INDUSTRIEAL UNITS UNDER IIPP 2005-10 &

IIPP 2010-15

General Budget:

Government have allocated budget of Rs.272.91 Crores

for the year 2016-17 towards incentives for industrial

promotion under single head of account, instead of three

head of accounts issued separately for General incentives

(excluding power and Pavala vaddi), Reimbursement of

power cost, Reimbursement of Interest subsidy under

Noted.

Page 27: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 27 ::

pavalavaddi scheme.

The details of the sanctioned cases pending for releases

are as detailed below: Nature of Incentive Sanctioned as on

date 15.06.2016

Releases

made

Pending for

releases

No. of

cases

Amount

Rs in Cr

No.

of

case

s

Amo

unt

in

Cr

No Amount

Rs.in Cr

General Incentives

Investment subsidy

319 168.28 0 0 319 168.28

100% Reimbursement of Stamp

Duty

100% Reimbursement of

Mortgage Duty

25% Reimbursement of Land

Cost

Quality certification

Land Conversion charges

Reimbursement of Sales tax

Reimbursement of Power Cost (General)

The details of sanctioned cases pending for releases is as

follows.

Nature of Incentive

Sanctioned as on date

15.06.2016 Releases made

Pending for

releases

No. of

cases

Amount

Rs in Cr

No. of

cases

Amou

nt in

Cr

No Amount

Rs.in Cr

Power cost

reimbursement 1295 301.19 0 0 1295 310.44

Reimbursement of Pavala Vaddi (General)

The details of sanctioned cases pending for releases is as

follows

Nature of Incentive

Sanctioned as on date

15.06.2016 Releases made

Pending for

releases

No. of

cases

Amount Rs

in Cr

No. of

cases

Amount

in Cr No

Amou

nt

Rs.in

Cr

Interest subsidy 584 39.75 0 0 584 39.75

TOTAL CASES:

Nature of Incentive

Sanctioned as on date

15.06.2016 Releases made

Pending for

releases

No. of

cases

Amount Rs

in Cr

No. of

cases

Amou

nt in

Cr

No

Amou

nt

Rs.in

Cr

State Level sanctions by

SLC 2198 518.47 0 0 2198

518.4

7

District level sanctioned

by DLC 122.00 0 0

122.0

0

TOTAL

640.47 0 0

640.4

7

Budget released for the year 2016-17 – Rs 272.51

Crores

Net demand to clear all pending sanctioned cases =

Page 28: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 28 ::

Rs 640.47Crores – Rs 272.51 Crores =

Rs 367.96 Crs.

5 STATUS REPORT ON THE PROPOSALS SENT

TO THE GOVERNMENT AS ON:03/06/2016

Sl. No

Date of

SLC

Meetin

g

SLC Decision Statues of the issue

1 01/03/1

3

IIPP 2005-10 – M/s. Visaka Industries Limited – RS

No. 385,386, jujjuru, Veerullapadu (M), Krishna

District – Sanction of reimbursement of power cost –

regarding.

The SLC has examined the issue on the following

points:

G.O. Ms. No.108, Industries & Commerce (IP)

Department, dt.20/05/1996 pertains to Target – 2000

Scheme – New Industrial Policy 1995 and policy

period is from 15.11.1995 to 31.03.2000, in which

line of activity “Mangalore Tiles / Asbestos

Products” is listed at Sl. No.49 in the ineligible

industrial activities.

In this regard vide G.O. Ms. No.196, Industries &

Commerce (IP) Department, dt.11.06.1998 an

amendment was issued that words “Asbestos

Products” occurring against item 49 in the list of

ineligible industries annexed to G.O. Ms. No.108,

Industries & Commerce (IP) Department,

dt.20/05/1996 shall be deleted”.

While issuing the G.O. Ms. No.178, Industries &

Commerce (IP) Department, dt. 21-06-2005, the

Government has not taken the order issued for

amendment to the G.O. Ms. No.108, Industries &

Commerce (IP) Department, dt.20/05/1996. They

have taken only ineligible list annexure with the

G.O.Ms.9 Industries & Commerce (IP) Department,

dt. 05-01-2001.

M/s. Visaka Industries Limited – RS No. 385,386,

jujjuru, Veerullapadu (M), Krishna District were also

processed for sanction of incentives under IIPP

2005-2010 and sanctioned in various SLCs an

amount of Rs.30,18,270/- and also an amount of

Rs.13,05,190/- were released pertaining to

reimbursement of power cost.

In view of the above circumstances, the SLC has

decided to recommend the issue to the Government

for making eligible for the line of activity of

“Asbestos Products” and issue amendment

accordingly to the G.O. Ms. No.178, Industries &

Commerce (IP) Department, dt. 21/06/2005, since

the same line of activity are eligible under IIPP

2010-15 schemes.

Accordingly, the proposals were recommended to the

Government vide letter No. 10/3/2007/0568,

dt.21/03/2013.

Government

Orders are awaited.

2. 20/05/1

5

IIPP 2010-15 – Sanction of Investment Subsidy –

M/s. MNR Complex Sy.No.189/2 , Nandyal Road,

Banaganapalli post and mandal, Kurnool District –

sanctioned by DIPC – release of incentives –

regarding

The SLC discussed the issue in detail and

decided to send the proposal of extending incentives

to differently able persons, to Government for the

issue of appropriate orders on the operational

guidelines in respect of G.O.Ms.No.188 Industries

and Commerce (IP) Department dated 20.12.2013.

Accordingly, the proposals were

recommended to the Government vide letter No. Lr.

No. 30/1/15/0288, dated 18/06/2015.

Government

Orders are awaited.

3. 20/05/1

5

IIPP 2005-2010 and 2010-15- claim applications

revised for reimbursement of sales tax – clarification

– regarding.

The SLC discussed the issue in detail and

decided to seek clarification from the Government

regarding the reimbursement of sales tax paid by the

unit in the united state of Andhra Pradesh when the

physical location of the unit is in residual Andhra

Pradesh. In view of the above Sales Tax

reimbursement is sanctioned to all such units subject

to outcome of Government orders.

Accordingly, the proposals were recommended

to the Government vide letter No. Lr. No.

30/1/14/0288/0288/ID, dated 23/05/2015

Government

Orders are awaited.

11 17/03/1

6

IIPP 2010-15 – Claim application for sanction of

reimbursement of power cost – M/s My Home

Industries Ltd., unit II Mulakalapalli Village,

Yelamanchi Mandal, Visakhapatnam District -

Government

Orders are awaited.

Noted.

Page 29: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 29 ::

proposals for ascertaining the status of Unit II as new

Unit or expansion project - Regarding.

SLC discussed the following issues in detail:

1. Common Power

Members from FAPSIA and AP Chamber of

Commerce and Industry expressed to seek a

clarification from APEPDCL as why a

separate meter was not installed instead of

erecting the submeter and sealing it, due to

sealing of the submeter, the total units

consumed by Unit-I and Unit-II are recorded

in the main meter.

2. Common Railway Track:

Standing Scrutiny Committee has pointed

that the raw material unloading system

through rail is common for both Unit-I and

Unit-II. Further, Unit-I and Unit-II were

using common rail loading system for

Cement transportation. After detailed

discussions, State Level Committee has taken

a view that the unit should ensure that the

premises of common railway transport or

loading system should be notified as the

public property in accordance with relevant

Railway Acts. for considering the proposal as

separate identifiable investment.

3. Stock transfer from sister concerned unit

Standing Scrutiny Committee has pointed

that the main Raw material i.e., Clinker to

Unit-II is through a stock transfer from its

parent unit i.e., M/s My Home Industries

Ltd., located in Nalgonda district, Telangana

State and whereas the company was paying

the Central Excise on the Clinker by the

Parent unit at Nalgonda. During the

discussions in the SLC meeting, three views

are emerged:

View – I.

The representatives from the Commercial

Taxes Department have stated that the Stock

transfer is permissible and it is common for

the industries/dealers for effecting Sales

Transaction across various places.

Representative of FAPSIA has confirmed that

it is common procedure being allowed by

Sales Tax Department for effecting Sale

Transaction beyond the production point

across other places/States.Hence, sales tax

reimbursement may be allowed on 100% sale

value of cement manufactured through

clinker grinding at unit – II.

View – II.

By considering the Transfer of clinker, a

major Raw Material, from parent unit of My

Home Industries Ltd., Nalgonda District,

Telangana State to unit – II through sale

transaction, the eligibility of Sales Tax

reimbursement will net sale value of

diference between cement and clinker. In the

manufacturing process of cement major

process is upto clinker and cement is simply

the result of grinding of clinker with gypsum

and other aditives as the case may be.

View – III.

The Sales Tax reimbursement on the cement

sales at unit-II will be on 100% sale value of

the cement if the clinker from parent unit of

Nalgonda District, Telangana State is

considered as clinker supplied on free of cost

by stock transfer.

Since, the proposal of the unit-II of My

Home Industries Ltd is to consider it as a

separate identifiable investment and in view

of the financial implications, clarification

from Government on stock transfer of clinker

from parent unit in view of the above.

4. Machinery Bills

Standing Scrutiny Committee has pointed

that machinery invoices are not in the name

of Unit-II and they are in the name of M/s My

Home Industries Ltd., but they were showing

the expenditure in the books of accounts of

Unit-II as Machinery purchased.

During the discussions in the SLC, the

representatives from APSFC and FAPCCI

have given their views that the expenditure

Page 30: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 30 ::

for the machinery should be booked under

new identity, Unit-II separately by having

invoices of such plant and machinery only in

the name of unit-II. That is, the procedure of

invoices for plant & machinery in the name

of main company My Home Industries Ltd

and booking expenditure to unit – II will not

come under the category of “Separate Books

of Accounts”.

5. Statutory Approvals

Standing Scrutiny Committee (SSC) has

pointed that the originally approved the plan

by VUDA, Factories, CFO and found that

they are initially taken approvals under

expansion and later modified as Unit-II.

Representative of APPCB stated that the

unit – I & II of My Home Industries Ltd. is

running with single CFO.

The SLC decided to verify the CFE and CFO

obtained for both the units.

6. Remaining Items under common usage

The SLC examined the remaining items of

common usage pointed out by the Standing

Scrutiny Committee and taken a view that

they are not of major nature in view of

investment made in unit – II vis-à-vis the

investment in the remaining items of common

usage and independent production line.

Hence, the remaining items of common

utilities may be exempted from the ambit of

common utilities as per operational

guidelines under IIPP 2010-15.

Accordingly, the above issue has been place before

SLC meeting held on 17/03/2016 and decision of the

SLC, the issue referred to the Government with the

observations of the State Level Committee vide Lr.

No. 30/1/14/22105, dated 26/03/2016.

6

IIPP – 2005-10 – Claim application of M/s.P.V.R.

Spinning and Weaving Ltd. (Expansion), R.S.No.110/2,

108/2,3,4, Kondayapalem Road, Tetali (V), Tanuku (M),

West Godavari District for sanction of reimbursement of

power cost – Regarding.

*****

The General Manager, District Industries Centre,

West Godavari District has recommended the claim

proposal M/s. P.V.R. Spinning and Weaving Ltd.

(Expansion), R.S.No.110/2, 108/2,3,4, Kondayapalem

Road, Tetali (V), Tanuku (M), West Godavari District for

sanction of reimbursement of power cost for the 1st half

year of 2015-16. The unit has taken up expansion

programme for the line of activity of “Cotton Spinning in

Mills” and obtained IEM bearing No.996/IIM/Prod/2007,

Dated:28/05/2007. The unit has commenced commercial

production w.e.f.27/08/2010 under expansion.

The unit has been sanctioned reimbursement of

power cost over & above base consumption fixed as

694189 and also 612433 units per month under IIPP

2010-15 in different stages. It is observed that the

following deviations for sanctioning the reimbursement

of power cost:

As per the operational guidelines para No. 5.4.7

under IIPP 2010-15 us as follows:

SLC has examined the recommendation of

the verification /scruitiny committee and

decided to sanction an amount of Rs.14,68,326/-(Rupees fourteen lakhs sixty eight

thousand three hundred and twenty six only)

towards reimbursement of power cost in respect

of 1st half year of 2015-16 duly adjusting the

excess amount of Rs.16,14,540 sanctioned earlier

under IIPP 2010-15 by correcting the base power

consumption, subject to submission of shortfall

documents:

1.IEM Part-B for expansion project

2) Approved Plans from T&CP

Department

3) Valid CFO From APPCB

4 ) Project Report”

Page 31: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 31 ::

“The base annual consumption will be

either average annual power

consumption of previous three

financial years of the

Expansion/Diversification project as

certified by Chartered Accountant or

power consumption for 75% of

installed capacity utilization of the

original industrial enterprise,

whichever is higher. Power consumed

over and above the base consumption

will be eligible for reimbursement of

power cost. If the Enterprise/Industry

taken up expansion/diversification in

the same year, the base power

consumption will be calculated

proportionately.”

As per C.A. Certificate, the units consumed for

the last 3 years from the DCP of the expansion project:

Year No of units 33KV – the unit is eligible @Rs.0.75 per unit

2007-08 5301146 (July to

March)

Existing unit – DCP – 26/05/2007

2008-09 8311059 Expansion unit – DCP – 27/08/2010

2009-2010 8435381

2007-08 is not a full year and hence 2 years have beenn.

A: Average of 2 years : 8373220 units per year –

8373220/12= 697768 units per month.

Monthly base may be fixed as 8373220/12= 697768 units

per month instead of 694189 or 612433.

By duly revising the base power consumption

units the detailed computation is done and same is

appended as Annexure – I:

Earlier base power consumption was fixed taking

75% of average units instead of 75% of annual higher

consumption of previous years. Further, earlier

consumption was done without any relevance with

respect to fixing base power consumption.

The detailed computation is prepared from DCP and

variations are as follows:

SLC Wise sanctioned and Eligible cost

SLC Sanctioned Eligible Excess Amount sanctioned

90 4886890 4854680 32210

94 2149140 2133033 16107

96 1157530 1157535 -5

98 366330 -17670 384000

100 1306670 976453 330217

102 3466570 3082568 384002

3 2391040 2307033 84007

Page 32: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 32 ::

7 3676570 3292568 384002

Total 19400740 17786200 1614540

Amount Eligible from DCP to 2nd half year of 2014-15 17786200

Amount sanctioned from DCP to 2nd half year of 2014-15 19400740

Differential amount (i.e. excess amount sanctioned) 1614540

Differential amount may be adjusted in 1st half year of

2015-16 Rs. 16,14,540/-

Amount computed for 1st half year of 2015-16

Rs. 30,82,868/-

Total amount to be considered for 1st half year of 2015-

16 Rs. 14,68,326/-

The unit is eligible for sanction of reimbursement

of power cost to a tune of Rs.14,68,326/- for 1st half year

of 2015-16 after deducting the excess amount of

Rs.16,14,540/- sanctioned earlier duly fixing the base

consumption as 694189 or 612433 units per month

instead of 697768 units per month.

The issue has been placed before SVC

Meeting held on 04/06/2016 and the decision of

SVC is as follows:

“SVC examined the claim and recommended

for sanction of Rs.14,68,326/-(Rupees fourteen

lakhs sixty eight thousand three hundred and

twenty six only) towards sanction of

reimbursement of power cost in respect of 1st half

year of 2015-16 duly adjusting the excess amount

of Rs.16,14,540 sanctioned earlier under IIPP 2010-

15 by correcting the base power consumption,

subject to submission of shortfall documents:

1) IEM Part-B for expansion project

2) Approved Plans from T&CP

Department 3) Valid CFO From

APPCB 4 ) Project Report”

SLC may take a view

7 IIPP 2005-10 - Claim application of M/s. NSL Textiles

Ltd., Veeravalli (V), Bapulapadu (M), Krishna District

for the sanction of reimbursement of power cost under

IIPP 2005-10 - Regarding.

M/s. NSL Textiles Ltd. has established the unit at

Veeravalli (V), Bapulapadu (M), Krishna District for the

line of activity of “Cotton Spinning”, obtained IEM

bearing No.165/SIA/IMO/2007, dated.01/12/2007 from

the Government of India and commenced commercial

SLC has examined the recommendation of

the verification /scruitiny committee and

decided to sanction an amount of Rs.2,80,76,307/- (Rupees two crores eighty lakhs

seventy six thousand three hundred and seven

only) towards reimbursement of power cost in

respect of 1st quarters of 2015-16 under IIPP

2005-10 as against Rs.3,05,10,947/- duly

deducting Rs.24,34,640/- by considering

reimbursement of power cost @ 0.75 per unit

beyond ‘5’ years period under Mega Project

Page 33: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 33 ::

production w.e.f.01/01/2009.

As per the G.O.Ms. No.684 Industries &

Commerce (IP) Department, dated:27/10/2006,

Government has offered the following incentives to the

above unit treating as “Mega Project”:

1. Reimbursement of power cost by keeping

the power cost at Rs.1/- below the rate as on

01/04/2005 for a period of 5 years from the

date of commercial production.

2. Additional tax reimbursement at the rate of

25% of VAT paid during first five years to

be done from 2nd to 6th year, 50% of the

VAT paid 6th and 7th year in the 7th and 8th

year of commercial production respectively.

3. 50% of the cost of infrastructure from IIDF

with a ceiling of Rs.1.00 crore as per IIPP

2005-10.

4. Right of way for discharge pipeline along

drains / roads from processing plant site to

sea.

5. Other benefits applicable as per the Textile

and Apparel Promotion Policy 2005-10.

Accordingly, the reimbursement of power cost

Rs.1/- per unit was sanctioned for the period from

January, 2009 to March, 2015 as against eligible

period upto 31/12/2014.

Further, Government of Andhra Pradesh

extended the eligibility period for spinning mills

commissioned during IIPP 2005-10 period by another 3

years making total eligibility period as 8 years vide

G.O.Ms. No.42 Industries & Commerce (IP) Department,

dated:05/05/2011 and the captioned unit is falling under

IIPP 2005-10.

As per the G.O.Ms. No.684 Industries &

Commerce (IP) Department, dated:27/10/2006, the unit is

eligible for sanctioned of reimbursement of power cost @

Rs.1/- per unit for a period of 5 years i.e. upto

31/12/2014 as “Mega Project”.

The extended the eligibility period for spinning

mills commissioned during IIPP 2005-10 period by

another 3 years, the unit is not eligible for sanctioned of

Category.

Further, SLC decided to seek the clarification

from the Government on the extension of Mega

Project status beyond 5 years i.e. 8 years as per

extended the IIPP 2005-10.

Page 34: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 34 ::

reimbursement of power cost without any amendment to

the above G.O. and it is eligible @ Rs.0.75 i.e. per IIPP

2005-10 only from 01/01/2015 onwards.

The General Manager, District Industries Centre,

Krishna District has recommended the claim application

for sanction of reimbursement of power cost for the

period of 1st quarter of 2015-16 by considering Rs.1/- per

unit towards power cost reimbursement.

The revised calculation is appended at

Annexure.

ABSTRACT

From 4th Quarter of 2014-15 in Rupees 4th quarter of 2014-15 already sanctioned by SLC 1st quarter of 2015-16 to be sanctioned

As per Mega Project As per IIPP

2005-10

Deference As per Mega

Project

As per

IIPP 2005-

10

Defe

rence

32579348 30144710 -2434638 33152817 30510947 -2641870

Total amount to be sanctioned including 1st quarter of 2015-16

As mega project As per IIPP 2005-10

Rs.3,31,52,817/- Rs.2,80,76,307/-

The issue has been placed before SVC

Meeting held on 04/06/2016 and the decision of

SVC is as follows:

“SVC examined the claim and

recommended for sanction of

Rs.2,80,76,307/- (Rupees two crores

eighty lakhs seventy six thousand three

hundred and seven only) towards

sanction of reimbursement of power cost

in respect of 1st quarters of 2015-16

under IIPP 2005-10 as against

Rs.3,05,10,947/- on deducting

Rs.24,34,640/- by considering

reimbursement of power cost @ 0.75 per

unit beyond ‘5’ years period under Mega

Project Category.

Further, SVC opined that seek the

clarification from the Government on

the extension of Mega Project status

beyond 5 years i.e. 8 years as per

extended the IIPP 2005-10.”

Page 35: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 35 ::

SLC may take a view.

8 IIPP – 2005-10 – Claim application of M/s. Ravali

Spinners Pvt. Ltd. (Expansion-1), Khandavali, Peravali

(M), West Godavari District for sanction of

reimbursement of power cost – Regarding.

*****

The General Manager, District Industries Centre,

West Godavari District has recommended the claim

proposal M/s. Ravali Spinners Pvt. Ltd. (Expansion-1),

Khandavali, Peravali (M), West Godavari District for

sanction of reimbursement of power cost for the 2nd

quarter of 2015-16. The unit has taken up 1st expansion

programme for the line of activity of “Cotton Yarn” and

obtained IEM bearing No.4667/SIA/IMO/2005,

Dated:03/10/2005. The unit has commenced commercial

production w.e.f.01/01/2009 under 1st expansion.

The unit has been sanctioned reimbursement of

power cost over & above base consumption of 623776

units per month. Further, the unit has gone into 2nd

expansion and commenced commercial production w.e.f.

20/11/2010. Hence, the 1st expansion unit is eligible for

availing reimbursement of power cost over & above the

base consumption and below the base consumption of 2nd

expansion project.

It is observed that the following deviations for

sanctioning the reimbursement of power cost:

The units consumed for the last 3 years from the DCP of

the 2nd expansion:

Year No of units 33KV – Rate as on April, 2005 =

Rs.3.35

2007-08 7485315 Expn-I – DCP – 01/01/2009

2008-09 11103361 Expn-II – DCP – 20/11/2010

2009-2010 19870021

A: Average of 3 years : 12819566 units –

12819566/12= 1068297 units per month.

B: 75% of highest consumption : 75% x19870021

= 14902516 units per year.

B: Criteria is highest of A and B

Monthly base is fixed as 14902516/12

SLC has examined the recommendation of the

verification /scruitiny committee and decided

to sanction an amount of Rs.1,95,93,928/-

(Rupees one crore ninety five lakhs ninety three

thousand nine hundred and twenty eight only)

towards reimbursement of power cost in respect

of 2nd quarter of 2015-16 under IIPP 2005-10,

including re-computed amount of Rs.1,48,65,466/-

as per the revised Base Power Consumption by

considering 75% of installed capacity utilized

(highest as per operational guidelines), subject to

following shortfalls:

1) Meeseva Receipt conformation form the GM,

DIC 2) Valid CFO from APPCB, 3) Project

report 4) Chartered Accountant certification on

shareholding 5) Certificate of Incorporation

6) Board resolution on authorization to sign the

claim application 7) Statements of Accounts 8)

IEM Part-B 9) Land Sale Deed / Lease Deed 10)

Land Conversion Certificate 11) Plant &

Machinery statement of the Financial Institution

as per operational guidelines 12) Civil Engineer

Certificate 13) Chartered Accountant Certificate

for fixing the base units 14) Difference in power

load w.r.t. DCP 15) Approved Plans from Gram

Panchayat 16) Approved Plans from DT&CP

with attestation 17)Approved Plans from

Factories Department with attestation.”

Page 36: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 36 ::

= 1241876 units per month.

Power cost reimbursement of 2nd quarter of 2015-16 of M/s Ravali Spinners Pvt Ltd.( 1st

Expansion)

Month Yr

El

ig

ib

le

ba

se

base

alre

ady

fixe

d

Base of

1st

Expn.

Units

eligib

le

rate

b

as

e

e

li

g

i

b

l

e

r

a

t

e

Amt

eligible

July 2015

12

41

87

6

106

829

7

623776

.4

6180

99.6 5.15

2.

6

2

.

5

5 1576154

August 2015

12

41

87

6

106

829

7

623776

.4

6180

99.6 5.15

2.

6

2

.

5

5 1576154

Septe

mber 2015

12

41

87

6

106

829

7

623776

.4

6180

99.6 5.15

2.

6

2

.

5

5 1576154

4728462

By duly revising the base power consumption

units the detailed computation is done at – Annexure and

details are as follows:

The detailed computation is prepared from

SLC Wise sanctioned and Eligible cost

SL

C Sanctioned Eligible Differential Amount

96

962360

(Dec.20010) 401765

560595

97 5827660 8103286 2275626

98 4720800 6564218 1843418

10

0 6363972 4822661 -1541311

10

1 837248 5006607 4169359

10

2 3600610 5006607 1405997

2 3067190 4264887 1197697

3 3067190 4264887 1197697

5 3067190 4264887 1197697

6 3067190 4264887 1197697

7 3067190 4264887 1197697

9 3289450 4573937 1284487

Tot

al 40938050 55803516 14865466

Amount Eligible from 3rd qtr of 2009-2010 to 1st qtr of 2015-16 55803516

Amount sanctioned from 3rd qtr of 2009-2010 to 1st qtr of 2015-16 40938050

Differential amount (less amount sanctioned) 14865466

Page 37: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 37 ::

Differential amount to be sanctioned as upto 1st qtr of

2015-16 Rs. 1,48,65,466/-

Amount computed for 2nd quarter of 2015-16

Rs. 47,28,462/-

Total amount to be considered as on 2nd quarter of 2015-

16 Rs. 1,95,93,928/-

As per the operational guidelines para No. 5.4.7

under IIPP 2010-15 us as follows:

“The base annual consumption will be

either average annual power

consumption of previous three financial

years of the Expansion/Diversification

project as certified by Chartered

Accountant or power consumption for

75% of installed capacity utilization of

the original industrial enterprise,

whichever is higher. Power consumed

over and above the base consumption

will be eligible for reimbursement of

power cost. If the Enterprise/Industry

taken up expansion/diversification in

the same year, the base power

consumption will be calculated

proportionately.”

I. If the base consumption for the 2nd expansion

project fixed as 12819566 units per year –

12819566/12= 1068297 units per month duly

taking the average power consumption of the

last three years prior to 2nd expansion, the 1st

expansion unit is eligible for sanction of

reimbursement of power cost is arrived

Rs.32,89,450/- for 2nd quarter of 2015-16.

II. If the base consumption for the 2nd expansion

project fixed as 14902516 units per year –

14902516/12 = 1241876 units per month duly

taking the 75% of highest consumption of the

last three years prior to 2nd expansion, the 1st

expansion unit is eligible for sanction of

reimbursement of power cost is arrived Rs.

47,28,462/- for 2nd quarter of 2015-16 and Rs.

1,48,65,466/- of differential amount totaling an

amount of Rs.1,95,93,928/- is eligible.

Page 38: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 38 ::

The issue has been placed before SVC Meeting

held on 04/06/2016 and the decision of SVC is as

follows:

“SVC examined the claim and recommended

for sanction of Rs.1,95,93,928/- (Rupees one

crore ninety five lakhs ninety three thousand

nine hundred and twenty eight only)

towards sanction of reimbursement of power

cost in respect of 2nd quarter of 2015-16

under IIPP 2005-10, including re-computed

amount of Rs.1,48,65,466/- as per the revised

Base Power Consumption by considering

75% of installed capacity utilized (highest as

per operational guidelines), subject to

following shortfalls:

1) Meeseva Receipt conformation form the

GM, DIC 2) Valid CFO from APPCB, 3)

Project report 4) Chartered Accountant

certification on shareholding 5)

Certificate of Incorporation 6) Board

resolution on authorization to sign the claim

application 7) Statements of Accounts 8)

IEM Part-B 9) Land Sale Deed / Lease Deed

10) Land Conversion Certificate 11) Plant &

Machinery statement of the Financial

Institution as per operational guidelines 12)

Civil Engineer Certificate 13) Chartered

Accountant Certificate for fixing the base

units 14) Difference in power load w.r.t. DCP

15) Approved Plans from Gram Panchayat

16) Approved Plans from DT&CP with

attestation 17)Approved Plans from Factories

Department with attestation.”

SLC may take a view

9 IIPP – 2005-10 – Claim application of M/s.Rajapalayam

Mills Ltd., Gopinenipalem (V), Vatsavai (M), Krishna

District for sanction of reimbursement of power cost –

Regarding.

*****

The General Manager, District Industries Centre,

Krishna District has recommended the claim proposal

M/s.Rajapalayam Mills Ltd., Gopinenipalem (V),

Vatsavai (M), Krishna District for sanction of

reimbursement of power cost for the 2nd quarter of 2015-

16. The line of activity of the unit is “Cotton Yarn,

SLC has examined the recommendation of

the verification /scruitiny committee and

decided to sanction an amount of Rs.49,83,559/- (Rupees forty nine lakhs eight

three thousand five hundred and fifty nine only)

towards reimbursement of power cost in respect

of 2nd quarter of 2015-16 under IIPP 2005-10

including difference amount of Rs2,26,118/-, by

correcting the base rate of power.

Page 39: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 39 ::

Synthetic Yarn” and obtained IEM bearing

No.1977/IIM/PROD/2009, Dated:29/01/2009. The unit

has commenced commercial production

w.e.f.07/12/2008.

The unit has been sanctioned reimbursement of

power cost duly fixing the base rate as Rs.2.65 instead of

Rs.2.60 per unit from April, 2010 to September, 2011.

The details are as follows:

Power connected load to the unit as

on DCP

33 KV

Power rate as on 1st April, 2005 Rs.3.35 per

unit

Base rate should be fixed for

sanction of reimbursement of

power cost

Rs.2.60 per

unit

(3.35 –

0.75)

The detailed computation from April, 2010 to

September, 2011 variations is appended as Annexure.

ABSTRACT

SLC Wise sanctioned and Eligible cost

SL

C Sanctioned Eligible

Less Amount

sanctioned

90 1623010 1772160 -149150

91 923520 1000488 -76968

To

tal 2546530 2772648 -226118

Amount Eligible from April, 2010 to September, 2011 2772648

Amount sanctioned from April, 2010 to September, 2011 2546530

Differential amount (i.e. less amount sanctioned) 226118

Amount computed for 2nd quarter of 2015-16

Rs. 47,57,440/-

Differential amount to be sanctioned

Rs. 2,26,118/-

Total amount to be considered for 1st half year of 2015-

16 Rs. 49,83,558/-

The unit is eligible for sanction of reimbursement

of power cost to a tune of Rs.49,83,558/- for 2nd quarter

of 2015-16 duly considering the deferential amount of

Page 40: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 40 ::

Rs. 2,26,118/- sanctioned earlier duly fixing the base rate

as Rs.2.65 per unit instead of Rs.2.60 per unit.

The issue has been placed before SVC Meeting

held on 04/06/2016 and the decision of SVC is as

follows:

“SVC examined the claim and

recommended for sanction of

Rs.49,83,559/- (Rupees forty nine

lakhs eight three thousand five

hundred and fifty nine only)

towards sanction of reimbursement

of power cost in respect 2nd

quarter of 2015-16 under IIPP

2005-10 including difference

amount of Rs2,26,118/-, by

correcting the base rate of power.”

SLC may take a view

10 IIPP – 2005-10 – Claim application of M/s.Sandhya

Spinning Mills Ltd., Gopinenipalem (V), Vatsavai (M),

Krishna District for sanction of reimbursement of power

cost – Regarding.

*****

The General Manager, District Industries Centre,

Krishna District has recommended the claim proposal

M/s.Sandhya Spinning Mills Ltd., Gopinenipalem (V),

Vatsavai (M), Krishna District for sanction of

reimbursement of power cost for the 2nd quarter of 2015-

16. The line of activity of the unit is “Cotton Yarn,

Synthetic Yarn” and obtained IEM bearing

No.2345/SIA/IMO/2007, Dated:17/08/2007. The unit has

commenced commercial production w.e.f.01/05/2009.

The unit has been sanctioned reimbursement of

power cost duly fixing the base rate as Rs.2.65 instead of

Rs.2.60 per unit from April, 2010 to September, 2011.

The details are as follows:

Power connected load to the unit as on DCP 33 KV

Power rate as on 1st April, 2005 Rs.3.35 per unit

Base rate should be fixed for sanction of reimbursement of

power cost

Rs.2.60 per unit

(3.35 – 0.75)

The detailed computation from April, 2010 to

September, 2011 variations is appended as Annexure.

ABSTRACT

SLC Wise sanctioned and Eligible cost

SLC has examined the recommendation of

the verification /scruitiny committee and

decided to sanction an amount of Rs.47,81,223/- (Rupees forty seven lakhs eighty

one thousand two hundred and twenty three only)

towards reimbursement of power cost in respect

of 2nd quarter of 2015-16 under IIPP 2005-10

including difference amount of Rs 1,37,243/- by

correcting the base rate of power.

Page 41: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 41 ::

SLC Sanctioned Eligible Less Amount sanctioned

90 1095080 1171615 -76535

91 728460 789168 -60708

Tota

l 1823540 1960783 -137243

Amount Eligible from April, 2010 to September, 2011 1960783

Amount sanctioned from April, 2010 to September, 2011 1823540

Differential amount (i.e. less amount sanctioned) 137243

Amount computed for 2nd quarter of 2015-16

Rs. 46,43,980/-

Differential amount to be sanctioned

Rs. 1,37,243/-

Total amount to be considered for 1st half year of 2015-

16 Rs. 47,81,223/-

The unit is eligible for sanction of reimbursement

of power cost to a tune of Rs.47,81,223/- for 2nd quarter

of 2015-16 duly considering the deferential amount of

Rs. 1,37,243/- sanctioned earlier duly fixing the base

rate as Rs.2.65 per unit instead of Rs.2.60 per unit.

The issue has been placed before SVC Meeting

held on 04/06/2016 and the decision of SVC is as

follows:

“SVC examined the claim and

recommended for sanction of Rs.47,81,223/-

(Rupees forty seven lakhs eighty one thousand

two hundred and twenty three only) towards

sanction of reimbursement of power cost in

respect 2nd quarter of 2015-16 under IIPP

2005-10 including difference amount of Rs

1,37,243/- by correcting the base rate of

power.”

SLC may take a view.

11 IIPP – 2005-10 – Claim application of M/s.Sri

Harini Textiles Ltd., R.S.No.47, 48 & 49,

Tirumalagiri (V), Jaggaiahpet (M), Krishna District

for sanction of reimbursement of power cost –

Regarding.

*****

The General Manager, District Industries

Centre, Krishna District has recommended the claim

proposal M/s.Sri Harini Textiles Ltd., R.S.No.47, 48

SLC has examined the recommendation of

the verification /scruitiny committee and

decided to sanction an amount of

Rs.44,85,360/- (Rupees forty four lakhs

eighty five thousand three hundred and sixty

only) towards reimbursement of power cost

in respect of 2nd quarter of 2015-16 under

IIPP 2005-10 including difference amount

of Rs 6,44,270/- by correcting the base rate

of power.

Page 42: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 42 ::

& 49, Tirumalagiri (V), Jaggaiahpet (M), Krishna

District for sanction of reimbursement of power cost

for the 2nd quarter of 2015-16. The line of activity

of the unit is “Cotton Yarn” and obtained IEM

bearing No.1664/IIM/Prod/2008, Dated:15/07/2008.

The unit has commenced commercial production

w.e.f.12/06/2005.

The unit has been sanctioned reimbursement

of power cost duly fixing the base rate as Rs.2.65

instead of Rs.2.60 per unit from DCP to March,

2012. The details are as follows:

Power connected load to the unit as on DCP 33 KV

Power rate as on 1st April, 2005 Rs.3.35 per unit

Base rate should be fixed for sanction of reimbursement of

power cost

Rs.2.60 per unit

(3.35 – 0.75)

The detailed computation from DCP to

March, 2012 & variations is appended as Annexure.

ABSTRACT

SLC Wise sanctioned and Eligible cost

SLC Sanctioned Eligible Less Amount sanctioned

80 1770760 2032812 -262052

85 821790 958755 -136965

90 1304010 1423470 -119460

91 642730 696297 -53567

93 866690 938917 -72227

Tot

al 5405980 6050251 -644271

Amount Eligible from April, 2010 to September, 2011 6050251

Amount sanctioned from April, 2010 to September, 2011 5405980

Differential amount (i.e. less amount sanctioned) 644270

Amount computed for 2nd quarter of 2015-16

Rs. 38,41,090/-

Differential amount to be sanctioned

Rs. 6,44,270/-

Total amount to be considered for 1st half year of

2015-16 Rs. 44,85,360/-

The unit is eligible for sanction of

Page 43: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 43 ::

reimbursement of power cost to a tune of

Rs.44,85,360/- for 2nd quarter of 2015-16 duly

considering the deferential amount of Rs. 6,44,270/-

sanctioned earlier duly fixing the base rate as

Rs.2.65 per unit instead of Rs.2.60 per unit.

The issue has been placed before SVC

Meeting held on 04/06/2016 and the decision of

SVC is as follows:

“SVC examined the claim and

recommended for sanction of

Rs.44,85,360/- (Rupees forty four

lakhs eighty five thousand three

hundred and sixty only)towards

sanction of reimbursement of

power cost in respect 2nd quarter

of 2015-16 under IIPP 2005-10

including difference amount of Rs

6,44,270/- by correcting the base

rate of power.”

SLC may take a view.

12 IIPP – 2005-10 – Claim application of M/s.Sudarsanam

Spinning Mills Ltd., R.S.No.52 & 53. Tirumalagiri (V),

Jaggaiahpet (M), Krishna District for sanction of

reimbursement of power cost – Regarding.

*****

The General Manager, District Industries Centre,

Krishna District has recommended the claim proposal

M/s.Sudarsanam Spinning Mills Ltd., R.S.No.52 & 53.

Tirumalagiri (V), Jaggaiahpet (M), Krishna District for

sanction of reimbursement of power cost for the 2nd

quarter of 2015-16. The line of activity of the unit is

“Cotton Yarn” and obtained IEM bearing

No.5876/SIA/IMO/2006, Dated:24/11/2006. The unit has

commenced commercial production w.e.f.26/08/2008.

The unit has been sanctioned reimbursement of

power cost duly fixing the base rate as Rs.2.65 instead of

Rs.2.60 per unit from April, 2010 to September, 2011.

The details are as follows:

Power connected load to the unit as on DCP 33 KV

Power rate as on 1st April, 2005 Rs.3.35 per unit

Base should be fixed for sanction of reimbursement of power

cost

Rs.2.60 per unit

(3.35 – 0.75)

SLC has examined the recommendation of

the verification /scruitiny committee and

decided to sanction an amount of Rs.41,19,245/- (Rupees forty one lakhs nineteen

thousand two hundred and forty five only)

towards reimbursement of power cost in respect

of 2nd quarter of 2015-16 under IIPP 2005-10

including difference amount of Rs1,40,645/- by

correcting the base rate of power.

Page 44: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 44 ::

The detailed computation from April, 2010 to

September, 2011 variations is appended as Annexure.

ABSTRACT

SLC Wise sanctioned and Eligible cost

SL

C Sanctioned Eligible

Less Amount

sanctioned

90 1068380 1159433 -91053

91 595010 644602 -49592

Tot

al

1804035 -140645

Amount Eligible from April, 2010 to September, 2011 1804035

Amount sanctioned from April, 2010 to September, 2011 1663390

Differential amount (i.e. lessess amount sanctioned) 140645

Amount computed for 2nd quarter of 2015-16

Rs. 39,78,600/-

Differential amount to be sanctioned

Rs. 1,40,645/-

Total amount to be considered for 1st half year of 2015-

16 Rs. 41,19,245/-

The unit is eligible for sanction of reimbursement of

power cost to a tune of Rs. 41,19,245/- for 2nd quarter of

2015-16 duly considering the deferential amount of

Rs.1,40,645/- sanctioned earlier duly fixing the base

rate as Rs.2.65 per unit instead of Rs.2.60 per unit.

The issue has been placed before SVC Meeting

held on 04/06/2016 and the decision of SVC is as

follows:

“SVC examined the claim and

recommended for sanction of

Rs.41,19,245/- (Rupees forty one lakhs

nineteen thousand two hundred and

forty five only) towards sanction of

reimbursement of power cost in

respect 2nd quarter of 2015-16 under

IIPP 2005-10 including difference

amount of Rs1,40,645/- by correcting

the base rate of power.”

SLC may take a view.

13 IIPP – 2005-10 – Claim application of M/s.Sri Vishnu

Shankar Mills Ltd., Gopineni Palem (V), Valsavai (M),

Krishna District for sanction of reimbursement of power

SLC has examined the recommendation of

the verification /scruitiny committee and

decided to sanction an amount of Rs.47,36,821/- (Rupees forty seven lakhs thirty

six thousand eight hundred and twenty one only)

Page 45: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 45 ::

cost – Regarding.

*****

The General Manager, District Industries Centre,

Krishna District has recommended the claim proposal

M/s.Sri Vishnu Shankar Mills Ltd., Gopineni Palem (V),

Valsavai (M), Krishna District for sanction of

reimbursement of power cost for the 2nd quarter of 2015-

16. The line of activity of the unit is “Cotton Yarn,

Synthetic Yarn, Synthetic Yarn” and obtained IEM

bearing No.2344/IMO/SIA/2007, Dated:17/08/2007. The

unit has commenced commercial production

w.e.f.12/03/2009.

The unit has been sanctioned reimbursement of

power cost duly fixing the base rate as Rs.2.65 instead of

Rs.2.60 per unit from April, 2010 to September, 2011.

The details are as follows:

Power connected load to the unit as on DCP 33 KV

Power rate as on 1st April, 2005 Rs.3.35 per unit

Base rate should be fixed for sanction of reimbursement of

power cost

Rs.2.60 per unit

(3.35 – 0.75)

The detailed computation from April, 2010 to

September, 2011 variations is appended as Annexure.

ABSTRACT

SLC Wise sanctioned and Eligible cost

SL

C Sanctioned Eligible

Less Amount

sanctioned

90 1195780 1302031 -106251

91 718890 778800 -59910

Tot

al 1914670 2080831 -166161

Amount Eligible from April, 2010 to September, 2011 2080831

Amount sanctioned from April, 2010 to September, 2011 1914670

Differential amount (i.e. less amount sanctioned) 166161

Amount computed for 2nd quarter of 2015-16

Rs. 45,70,660/-

Differential amount to be sanctioned

Rs. 1,66,161/-

Total amount to be considered for 1st half year of 2015-

16 Rs. 47,36,821/-

The unit is eligible for sanction of reimbursement

of power cost to a tune of Rs.45,70,660/- for 2nd quarter

of 2015-16 duly considering the deferential amount of

Rs. 1,66,161/- sanctioned earlier duly fixing the base

towards reimbursement of power cost in respect

of 2nd quarter of 2015-16 under IIPP 2005-10,

including difference amount of Rs1,66,161/-, by

correcting the base rate of power.

Page 46: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 46 ::

rate as Rs.2.65 per unit instead of Rs.2.60 per unit.

The issue has been placed before SVC Meeting

held on 04/06/2016 and the decision of SVC is as

follows:

“SVC examined the claim and

recommended for sanction of

Rs.47,36,821/- (Rupees forty seven

lakhs thirty six thousand eight

hundred and twenty one only)

towards sanction of reimbursement

of power cost in respect 2nd quarter

of 2015-16 under IIPP 2005-10,

including difference amount of

Rs1,66,161/-, by correcting the base

rate of power.”

SLC may take a view

14 IIPP 2005-10 – Claim application of M/s Gajavalli

Spinning Mills Pvt Ltd , Narakoduru Chebrolu (V&M)

Guntur Dist Guntur for sanction of reimbursement of

power cost under IIPP 2005-10 – Reg

The General Manager, Dist Industries Centre,

Guntur has recommended the claim proposal of M/s

Gajavalli Spinning Mills Pvt Ltd , Narakoduru Chebrolu

(V&M) Guntur Dist for sanction of 1st quarter of 2015-

16. The existing unit gone in to production on

21/04/2008 further the unit was gone in to expansion on

19/09/2011.

As per power release certificate, the total power

released as on 01/04/2008 is 1250KVA. Later, the unit

has gone in to expansion with DCP on 19/09/2011 and

working with power load of 1250KVA up to May 2010.

In June 2010, KVA in the power bill was changed from

1250KVA to 1160KVA. However the GM, DIC has

taken 1250 KVA as existing power and calculated base

units is follows.

1250KVA x 24 x 350 = 10500000/12 = 875000 units /

month

75% of monthly consumption taken as base units per

month i.e 0.75 x 875000 = 656250units/month

Accordingly, the unit has been

sanctioned reimbursement of power cost from Oct-2011

to Sep-2012 as per the above base. But, the GM, DIC has

furnished proposals from Oct-2012 by considering the

base units 609000 units / month by taking the power

connection 1160KVA

1160KVA x 24 x 350 = 9744000/12 = 812000 units /

SLC has examined the recommendation of the

verification /scruitiny committee and decided

to sanction an amount of Rs.54,58,825/-

(Rupees fifty four lakhs fifty eight thousand eight

hundred and twenty five only) towards power

cost reimbursement for 1st quarter of 2015-16

under Industrial Investment Promotion Policy

2005-2010, subject to submission of the following

shortfall information:

1) Valid CFO from APPCB 2) Land conversion

certificate 3) Approved Plans from Gram

panchayat, Factories Dept & T&CP 4) CA

certificate on percentage of share holding

Page 47: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 47 ::

month

75% of monthly consumption taken as base units per

month i.e 0.75 x 812000 = 609000 units/month

As on date 609000 units has taken as base unit

and sanction reimbursement of power cost accordingly

this office has sanction the amount towards power cost to

the unit

In view of the above, as per IIPP 2005-10 &

IIPP 2010-15 guidelines, the base is

recalculated as per power consumption units

certified by the CA as detailed below.

Base -I

AS per CA Certificate

Year units

2008-

09 6488200

2009-

10 7760000

2010-

11 7915000

Total

2216320

0

3 years average 7387733

Base per month 615644.4

Base-1

Base-II

AS per CA Certificate

2010-

11 7915000

75% of total consumption

(7915000x75/100) 5936250

Mont

h

Base 494687.5

Base-

II

Base-III

Power (KVA)

Ho

urs

per

day

No

of

days

in

one

year (axbxc)

75%

Install

ed

Capac

ity

Per

mon

th

Base

a b c d e f

1250 24 350

1050000

0

78750

00

6562

50

Base -

III

Base-IV

Power (KVA)

Ho

urs

per

day

No of

days

in one

year

(axbxc

)

75%

Install

ed

Capac

ity

Per

mon

th

Base

a b c d e f

1160 24 350

97440

00

73080

00

6090

00

Base -

IV

Total eligibility amount as per IIPP 2005-10

& IIPP 2010-15 to be sanction from expansion to 1st

quarter of 2015-16 with 4 bases ( Calculation are at

Annexure) for fix the base as per IIPP guidelines (

para no 5.3.6 of 2005-10 and, para 5.4.7 of IIPP

2010-15 operational guidelies)

The same issue was placed in SVC meeting

held on 04/06/2016 and decision is as follows

Page 48: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 48 ::

The Scrutiny Verification Committee discussed the issue

and decided to fix Base Power Consumption as average

of preceding three years (highest as per Operational

Guidelines) and recommended for sanction of

Rs.54,58,825/- (Rupees fifty four lakhs fifty eight

thousand eight hundred and twenty five only) towards

power cost reimbursement for 1st quarter of 2015-16

under Industrial Investment Promotion Policy 2005-

2010, subject to submission of the following shortfall

information:

1) Valid CFO from APPCB 2) Land conversion

certificate 3) Approved Plans from Gram panchayat,

Factories Dept & T&CP 4) CA certificate on

percentage of share holding

The SLC may take a view.

15 IIPP 2005-10 - Claim application of M/s. Shri

Govindaraja Textiles Ltd., 708, Peddarangapuram (V),

Pulivendala (M), Kadapa Dist for the sanction of

reimbursement of power cost under IIPP 2005-10 -

Regarding.

Background:

M/s. Shri Govindaraja Textiles Ltd. has established the

unit at 708, Peddarangapuram (V), Pulivendala (M),

Kadapa District for the line of activity of “Cotton Yarn

Spinning”, obtained IEM bearing

No.2145/SIA/IMO/2007 from the Government of India

and commenced commercial production

w.e.f.01/04/2008.

The unit has entered MoU with Government of

Andhra Pradesh on 16/11/2006. As per MoU, the

Government has offered the following incentives:

6. GoAP shall provide land measuring 100

acres to the proposed textile unit at

Peddarangapuram (V), Pulivendala (M),

Kadapa District, cost of which shall be the

actual cost of acquisition as mutually agreed

between GoAP/APIIC and SGT.

7. GoAP shall provide necessary infrastructure

facilities such as roads, electricity,

communication facilities and water at the

‘door step’ of the unit at the cost of the

GoAP.

8. The unit shall be exempted from any

SLC has examined the recommendation of the

verification /scruitiny committee and decided to

consider the proposal under IIPP 2005-10, since

the Government have not issued the G.O on the

MOU to consider it as Mega Project, hence

decided to sanction of Rs.4,20,75,189/- (Rupees

four crores twenty lakhs seventy five thousand

one hundred and eighty nine only) towards

present claim of 1st quarter of 2015-16 with

recomputed amount of the earlier claims as per

Industrial Investment Promotion Policy 2005-

2010.

Page 49: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 49 ::

statutory power cuts to ensure uninterrupted

production. A special concession of Rupee

One per unit unit on the power tariff as

prevailing on November, 1st 2006 shall be

provided to the unit for a minimum period of

5 years from the date of preferring the claim

for reimbursement of subsidy provided such

claims are preferred before 31st December

2010.

9. GoAP shall supply water to the doorstep of

the unit and the tariff for such water shall be

Rs.15/- per kiloliter, for a minimum period

of five years from the date of

commencement of commercial operations,

provided the unit commence production

before 31st December 2010.

10. GoAP shall provide an approach road

linking to the site of the unit.

11. GoAP shall provide the unit with an

additional tax reimbursement at the rate of

25% of VAT paid during first five years to

be done from 2nd to 6th year, 50% of the

VAT paid 6th and 7th years in the 7th and 8th

year of commercial production respectively.

12. GoAP shall provide incentive of Rs.5,000/-

for every person of the origin of AP trained

and employed by the unit, provided the

employee stays in the employment for a

period of at least one year.

13. GoAP shall declare the unit as Public Utility

Services and the women will be allowed to

work in all the three shifts in the units

subject to taking necessary safety and

welfare measures.

14. GoAP shall reimburse 100% stamp duty and

transfer duty related to transaction of land

between the Government and the unit, as per

the IIPP 2005-10.

15. GoAP shall provide all other incentives as

applicable under the relevant IIPP 2005-10.

Page 50: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 50 ::

The Government has not issued G.O. for the

above MoU. Only basing on the above MoU, the claims

are processed for reimbursement of power cost duly

fixing @ Rs. 1/- per unit as per 2005-06 power tariff and sanctioned duly following the pegged down as per

IIPP 2005-10 for the claims received up to December,

2010. From January, 2011, the claims are processed for

reimbursement of power cost duly fixing @ 0.75/- per

unit as per 2005-06 power tariff and sanctioned duly

following the pegged down as per IIPP 2005-10 upto

December, 2013. The pegged down eligibility from DCP

for various quarters are as detailed below:

For the year 2005-06 power tariff – Rs.3.35/- per unit

As per IIPP 2005-10, base price at the time of

DCP – 3.35 – 0.75 = 2.60

Eligibility as per MoU – Rs.1/-

DCP of the unit – 01/04/2008.

Period

Actual

Power

tariff

Pegge

d

down price

as per

policy

Eligi

ble

tariff

Tariff

considere

d for earlier

claims as

per MoU

2008-09 3.00 2.60 0.40 0.65

2009-10 2.95 2.60 0.35 0.60

2010-11

(upto July, 2010) 2.95 2.60 0.35 0.60

August & September, 2010 3.25 2.60 0.65 0.90

From October, 2010 to

March, 2011 3.25 2.60 0.65 0.65

2011-12 3.25 2.60 0.65 0.65

2012-13 4.37 2.60 1.77 1.77

2013-14 (upto December, 2013)

Not applied 0

January, 2014 5.30 2.60 2.70 1.00

February & March, 2014 4.90 2.60 2.30 1.00

2014-15 4.90 2.60 2.30 1.00

2015-16 (1st quarter) 5.15 2.60 2.55 2.55

From the above, it is clear that the Power Tariff

sanctioned is not either as per MoU or as per IIPP 2005-

10 for the period from April, 2008 to December, 2010.

However, Rs.1/- per unit was sanctioned for the period

from January, 2014 to March, 2015 is not as per IIPP

2005-10 under the provisions of G.O.Ms. No.42

Industries & Commerce (IP) Department,

dated:05/05/2011. MoU expires on 31/12/2010.

Further, Government of Andhra Pradesh

extended the eligibility period for spinning mills

commissioned during IIPP 2005-10 period by another 3

years making total eligibility period as 8 years vide

G.O.Ms. No.42 Industries & Commerce (IP) Department,

dated:05/05/2011 and the captioned unit is falling under

IIPP 2005-10.

Further it is observed that the claims from

January 2014 to March 2015 were processed and

Page 51: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 51 ::

sanctioned power cost reimbursement @Rs.1/- per unit

(upper sealing) without following the method of pegged

down by erroneously.

The captioned unit represented on 21/09/2015

that their claims are considered at the fixed power cost

Rs. 1/- per unit instead of Pegged down as per policy

applicable to their unit as per G.O.Ms.No. 42 Industries

& Commerce (IP) Department, dated: 05/05/2011 from

the claims from January 2014 to March 2015.

The General Manager, District Industries

Centre, YSR Kadapa District has recommended the claim

application for sanction of reimbursement of power cost

for the period of 1st quarter of 2015-16. The same has

been placed before Scrutiny/Verification Committee

(SVC) meeting held on 12/02/2016 and SLC Meeting

held on 17/03/2016 the decision of SLC is as follows:

“SLC examined the sanction of previous claims

and decided to recompute the eligible power cost

reimbursement from the Date of commencement

of Commercial Production as per operational

guidelines under Industrial Investment Promotion

Policy 2005-2010 issued vide G.O.Ms.No. 178

Industries and Commerce (IP) Department dated

21.06.2005 and operational guidelines issued

under IIPP 2010-15 vide G.O.Ms.No.42 Industries

and Commerce (IP) Department Dated

05.05.2011.

Further, SLC also directed the SVC

to put up the computation in a statement format

duly 1) as per MoU, 2) as per IIPP 2005-10, 3)

differential amounts for each claim by computing

with earlier sanctioned amounts for taking a

view”.

Issue for SLC:

Accordingly, detailed statement showing

eligible amount as per MoU, as per IIPP 2005-10 &

differential amount and appraisal for 1st Quarter of

2015-16 is appended as Annexure – I.

ABSTRACT

From DCP to 4th Quarter of 2014-15 in Rupees Eligible amount

Already

sanction

ed by

SLC

Deference to be

sanctioned

Eligible amount for

1st quarter of 2015-

16

As per

MoU

As per

IIPP

2005-10

Deferenc

e As per

MoU

As per

IIPP

2005-10

As per

MoU

As per

IIPP

2005-10

162219782

1410323

04

21187478

115395224

46824558

25637080

18073960

16438109

Page 52: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 52 ::

Total amount to be sanctioned including 1st quarter of 2015-16

As per MoU As per IIPP 2005-10

Rs.6,48,98,518/- Rs.4,20,75,189/-

The issue has been placed before SVC

Meeting held on 04/06/2016 and the decision of

SVC is as follows:

“SVC verified the claim and decided to consider

the proposal under IIPP 2005-10, since the

Government have not issued the G.O on the MOU

to consider it as Mega Project, hence

recommended for sanction of Rs.4,20,75,189/-

(Rupees four crores twenty lakhs seventy five

thousand one hundred and eighty nine only)

towards present claim of 1st quarter of 2015-16

with recomputed amount of the earlier claims as

per Industrial Investment Promotion Policy 2005-

2010.

SLC may take a view.

16 IIPP 2005-10 – Claim application of M/s Kallam

Spinning Mills Ltd (Open End Unit), NH-5,

Chowdavaram (V), Guntur Dist for sanction of

reimbursement of power cost under IIPP 2005-10 –

Regarding.

The General Manager, Dist Industries

Centre, Guntur has recommended the claim proposal

of M/s Kallam Spinning Mills Ltd (Open End Unit),

NH-5, Chowdavaram (V), Guntur Dist for sanction

of reimbursement of power cost for 1st quarter of

2015-16 for the line of activity “ “Open end cotton

yarn manufacturing” and obtain IEM bearing no:

3184/SIA/IMO, 2008 dt: 10/01/2005. The unit has

commenced commercial production w.e.f

18/03/2010

The General Manager, Dist Industries Centre

Guntur has informed that approved capacity of unit

is 1248Rotores, But the unit has installed machinery

have a capacity 2080 Rotors ( 5 open end spinning

of 416 rotors each) The installed capacity of the unit

exceeds the approved capacity by 832 rotors.

Proportionate consumption of the excess ineligible

machinery is calculated as shown in GM’s Performa

Col No:5 is deducting while computing net eligible

consumption.

SLC has examined the recommendation of the

verification /scruitiny committee and decided

to sanction an amount of Rs.34,95,350/-

(Rupees thirty four lakhs ninety five

thousand three hundred and fifty only)

towards power cost reimbursement for 1st

quarter of 2015-16 subject to submission of

the following shortfall information:

1) Board resolution, 2) Approved Plans from

T&CP, Factories, Gram panchyath 3) Land

conversion certificate 4)Valid CFO from

APPCB 5) CA certificate on percentage of

share holding.

Page 53: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 53 ::

Statement is as follows.

Month

Consumption as per

installed capacity of

2080 spindles

Open

access

power

used

Net power used from

DISCOMs

Consumption as per approved

capacity of 1248 Spindles =

1248/2080*consumption for 2080

spindles

Eligible subsidy rate per

unit

Eligible amount

for reimbursement

Apr-15 208429 208429 125057 2.7 337655

Apr-15 304483 304483 182690 2.97 542589

May-15 728725

37452 691273 414764 2.97

1231848

Jun-15 776243 776243 465746 2.97 138326

5

Total 349535

7

Or say Rs.34,95,350/-

The issue of the unit above has been placed

before SVC meeting held on 04/06/2016 and

decision of the SVC is as follows:

SVC verified the claim and recommended

for sanction of Rs.34,95,350/- (Rupees thirty

four lakhs ninety five thousand three

hundred and fifty only) towards power cost

reimbursement for 1st quarter of 2015-16

subject to submission of the following

shortfall information:

1) Board resolution, 2) Approved

Plans from T&CP, Factories, Gram

panchyath 3) Land conversion certificate

4)Valid CFO from APPCB 5) CA certificate

on percentage of share holding.

The SLC may take a view.

17 IIPP 2005 -10 – M/s. Srikalahasthi Pipes Limited

(formerly M/s. Lanco Industries Limited),

Rachagunneri (V), Srikalahasthi (M), Chittoor

district – Sanction of reimbursement of Sales Tax

for Expansion – I & II – Regarding.

M/s. Srikalahasthi Pipes Limited (formerly

M/s. Lanco Industries Limited) is an existing

industry for manufacture of Ductile Iron Pipes with

capacity of 60,000 M.Ts per annum at Rachagunneri

(V), Srikalahasthi (M), Chittoor district. The unit has

expanded their capacity from 60,000 M.Ts to

1,20,000 M.Ts per annum (1st Expansion) and gone

into commercial production on 25/03/2007.

The unit again expanded their capacity from

1,20,000 M.Ts to 1,80,000 M.Ts per annum (2nd

SLC has examined the recommendation of the

verification /scruitiny committee and decided

to defer the issue for the next meeting.

Page 54: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 54 ::

Expansion) and gone in production on 01/02/2009.

The SLC meeting held on 05/03/2010 has

sanctioned 25% reimbursement of Sales Tax

Rs.1,06,21,830/- for the 1st Expansion to M/s. Lanco

Industries Limited for the year 2008-09 and released

the amount to the unit. Further, the SLC meeting

held on 05/08/2010 has sanctioned 25%

reimbursement of Sales Tax of Rs.1,14,25,670/- for

1st Expansion and same to release to the unit.

The unit vide its letter

No.LIL/HYD/FI/291/304, Dated:17.05.2007

addressed to the Hon’be Chief Minister, has

informed that the company has planned for an

additional investment of Rs 360.00 crores in II phase

during the period 2005-2009 period to increase its

productivity and economic scale of DI pipes to make

the unit complete not only in the domestic and

international producers of Ductile iron pipes in

terms of both volumes and cost.

The unit have requested among other

incentives, 100% of the sale tax reimbursement for a

period of 10 years commencing from 2005 onwards

and hence covers all the phases of expansion

including the I phase.

Government vide G.O. Ms. No. 30 Industries

& Commerce (IP) Dept., dated 01/04/2011 issued

orders duly extending 50% VAT/CST or SGST

reimbursement to the unit for a period of 5 years

from the date of commercial production for their

Mega Project with an investment of Rs.369.00

Crores in a phased manner and for providing

employment to about 1000 persons.

As per above G.O., the unit has filed

applications for additional S.T of 25% for the year

2008-09 & 2009-10 for the 1st expansion and 50%

reimbursement of S.T. for the year 2010-11, 2011-

12. The SLC has examined and sanction 50%

reimbursement of Sales Tax to the unit for their 1st

expansion and 2nd expansion.

During the process of subsequent claims a

view was emerged that the above G.O was issued

for extending special incentives, applicable only for

2nd expansion and but not for 1st expansion, as the

1st expansion not achieved the desired investment

Page 55: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 55 ::

levels and employment as envisaged in the

Government orders.

An amount of Rs4,54,57,790/- was

sanctioned and released towards sales tax

reimbursement for the year 2008-09 and 2009-10

subject to condition of obtaining of proper C.A

certificate on investment made for expansion and

also physical verification and confirmation of

investment made under expansion as per charted

Accountant to treat the unit as Mega project (i.e

above 100crore fresh investment under IIPP 2005-

10) extend additional 25% reimbursement of VAT

as per G.O Ms No.30 Industrial and Commerce (IP)

Department dated:01.04.2011.

An amount of Rs 2,17,89,049/- towards sales

tax reimbursement was also sanctioned by 98th SLC

held on 14.08.2013 for the year 2012-13 for 2nd

expansion subject to verification by Commercial

Tax Department and subject to verification by the

GM,DIC with relevant Charted Accountant

Certificate.

Now the claim for reimbursement of Sales

Tax for the 2013-14 for the 2nd expansion received

in this office for an amount of Rs 2,55,92,425/-.

Since the present claim is the last claim, the claims

may be examined on reimbursement of sales tax as

per the G.O.

“SVC examine the G.O Ms

No: 30 Inds & Comm (IP) Dept Dt:

1/4/2011, where in orders were issued

duly extending 50% VAT / CST or

SGST reimbursement to the unit for a

period of 5 years from DCP for the

Mega Project with an investment of

Rs.369.00 Cr in a phased manner

provided employment to 1000 persons.

The SVC observed that there is an

ambiguity in the G.O whether it is

applicable for the 1st expansion or for

the second expansion or for both.

Therefore the SVC decided to

recommend the sanction the eligible

amount of Rs.2,55,92,425/- (Rupees two

crores fifty five lakhs ninety two

thousand four hundred and twenty five

only) towards reimbursement of sales

Page 56: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 56 ::

tax for the year 2013-14. Subject to

clarification and conformation of the

Mega status and applicability of GO for

1st expansion from the Government”.

The SLC may take a view.

18 IIPP 2010 – 15 Scheme – M/s. Vasundhara Cotton

Mills Private Limited (Expansion), S. No. 24A,

Boyapalem (V), Edlapadu (M), Guntur district –

Sanction of reimbursement of Power cost for their

expansion programme – Eligibility – Regarding.

M/s. Vasundhara Cotton Mills Private

Limited (Expansion), S. No. 24A, Boyapalem (V),

Edlapadu (M), Guntur district has submitted claim

applications for sanction of reimbursement of Power

cost under IIPP Scheme 2010 – 15.

The Existing unit M/s. Vasundhara Cotton

Mills Private Limited (Expansion), S. No. 24A,

Boyapalem (V), Edlapadu (M), Guntur district was

established for the activity “Cotton Yarn” with a

capacity of 14400 spindles and the date of

commencement of commercial production of the

Original unit was 01-06-2007. The unit had taken up

1st expansion with a capacity of 3600 spindles, thus

increasing the total capacity to 18000 spindles. The

enhancement of capacity, by virtue of this

expansion, is 25%, satisfying the given norms as per

guidelines.

The General Manager, District Industries

Centre, Guntur has informed that in respect of

investment, the unit holder had actually invested

Rs.465.00 Lakhs on Plant & Machinery without any

further investment on Land and Buildings. The

details of investments are given below:

Sl. No. Details Land

Rs. Lakhs

Buildings

Rs. Lakhs

Plant &

Machinery

Rs. Lakhs

Total

Rs. Lakhs

1 Existing Project 12.00 477.00 1837.00 2326.00

2 Expansion Project 0 0 465.00 465.00

% increase 25.31% 19.99%

As per the operational guidelines, the

expansion project is eligible for incentives, if there

is an increase in the fixed capital investment by at

least 25%. As seen from above, the investment

exceeded 25%, in case of plant & machinery, but the

% increase in investment is less than 25%,(19.99%),

SLC has examined the recommendation of the

verification /scruitiny committee and

observed, there is a deviation in considering

the expansion as per the operational

guidelines i.e the increasing fixed capital

investment is only 19.99% instead of at least

25%. The SLC discussed the issue in detail

and decided to recommend the issue to the

Government to consider the unit for sanction

of incentives on the circumstances and the

recommendation of the GM, DIC for

considering the claim.

Page 57: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 57 ::

if the total fixed capital investment is considered.

In this regard, earlier this Office processing

claim applications of the unit the value of

investment has taken wrongly i.e the existing value

has taken as expansion value and expansion value

has taken as existing value, hence the value was

shown as increased to 500.2% and also processed

the claim applications filed from the date of

commencement of production i.e 14.01.2011 to till

date. The same was sanctioned and released.

In this regard, the General Manager, District

Industries Centre, Guntur while recommending the

first claim application, vide his letter No.

4359/C/2015, Dated: 04.11.2015, was informed that

certain units shall have sufficient place in the

existing building for erection of additional

machinery as part of the expansion projects and

hence they do not require any further investments on

land and buildings. In such a case, it would be

appropriate, if the investment on additional

machinery is compared to the investment on the

existing machinery, but not to the total fixed capital

investment. He further informed that the Cotton

Spinning industry is generating huge employment

opportunities this unit may be considered for

incentives under 2010 – 15 and recommended for

favourable consideration of the Commissioner.

In view of the above it is noticed that the

General Manager was recommended the claim in

deviation of the operational guidelines, the same was

processed by this office and was also sanctioned by

the SLC. The claims were sanctioned without

conscious decision with due deliberations in

SVC/SLC and it tantamount to misleading the SVC

and SLC.

The above issue of the unit has been placed

before SVC meeting held on 14/06/2016 and

decision of the SVC is as follows:

“SVC examined the issue in detail and

observed that there is a deviation in

considering the expansion as per the

operational guidelines i.e the increasing

Page 58: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 58 ::

fixed capital investment by at least 25%. In

this case the fixed capital investment is

increased only 19.99%. Hence SVC decided

to refer to Government on the circumstances

and the recommendation of the GM, DIC

for considering the claim.

The SLC may take a view.

19 IIPP 2010-15 – M/s. NCL Industries Limited

(Expansion), Kodimipothavaram (V), G.

Konduru (M), Krishna District – Extending

sanction of reimbursement of Sales Tax to the

unit – Regarding.

********

The General Manager, District Industries

Centre, Krishna District has forwarded the claim

application of M/s. NCL Industries Limited

(Expansion), Kodimipothavaram (V), G. Konduru

(M), Krishna District towards sanction of

reimbursement of sales tax for 2014-15 under IIPP

2005-10.

The unit commenced its regular commercial

production w.e.f. 13.03.2007 and obtained IEM

bearing No.3647/SIA/IMO, dt.01.08.2005 for the

line of activity “Cement (Grinind unit) ordinary

portland Cement Pozolona Portland Cement”. The

unit was financed by State Bank of India, Commrl.

Branch, Koti, Hyderabad.

Subsequently, the unit has taken up

Expansion Programme and obtained IEM vide No.

2395/SIA/IMO/2007, dated: 22.08.2007, enhancing

the Installed capacity of the unit from 330000 MTs

to 9,90,000 MTs per annum. State Bank of

Hyderabad, Industrial Finance Branch, Hyderabad

has sanctioned a Term Loan of Rs. 50.00 crores

vide sanction letter No IFB/CR/3230, dated

05.02.2008. The industry has commenced

Commercial Production w.e.f. 11-12.2009 for their

Expansion Plant and filed Part B to Govt. of India

vide SIA No. 2714/IIM/PROD.2009, dt. 21.12.2009.

The General Manager, DIC, Krishna District has

recommended the claim application of the unit for

sanction of Sales Tax Reimbursement for their

Expansion Plant.

As per the endorsement of Additional

SLC discussed the issue in detail and

observed that the claim is similar to the case

of M/s My Home Industries Ltd.,

Visakhapatnam on stock transfer of the

Clinker from the parent unit, which was refer

to the government for clarification and

pending with the government.

Hence the SLC decided to defer the issue, till

receipt of clarification on M/s My Home

Industries Ltd., Visakhapatnam from the

Government.

Page 59: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 59 ::

Director at para No.137 N.F., the claim was

recalculated taking into Form-A Certified by the

CTO, Nalgonda & CTO, Vijayawada. The unit is

eligible for sanction of Rs.1,50,27,836/- pertaining

to reimbursement of sales tax for the year 2014-15

upto November, 2014 under IIPP 2005-10.

Further, the unit is eligible sales tax

reimbursement against the tax paid in residual A.P.

shall be paid by A.P. Government as per procedure

laid down in A.P.State Reorganisation Act. Hence

SVC recommended for sanction of Rs.1,50,27,836/-

and released the sanctioned amount of Rs.

1,17,24,605/- against the tax paid in residual Andhra

Pradesh. In respect of an eligible amount of Rs.

33,03,231/- signed by CT Department, Nalgonda

District towards sales tax reimbursement, the release

of funds shall be shared by the State of A.P and

Telangana as per the outcome of the Government

decision.

The State Level Committee in its meeting

held on 8.12.2011 has deferred the issue for

sanction of Sales Tax Reimbursement for Existing

and Expansion Units and referred to inspection of

the Standing Scrutiny Committee for Verification.

The standing scrutiny Committee has

inspected the unit M/s. NCL Industries Limited

(Expansion), Kodimipothavaram (V), G. Konduru

(M), Krishna District on 19.01.2013. The Standing

Scrutiny Committee observations is as follows :

1. There is no purchase of Clinker except Stock

Transfer from Nalgonda unit. However, the unit

is paying Central Excise to the Cement

Manufacturing here at Value Added Price. In

this connection, the Committee has taken a view

that if the unit purchased clinker from its

Original Unit, the Sales Tax Reimbursement at

the selling value of the Cement is appropriate.

2. The facility of Reimbursement of Sales T ax

at the price of Cement will pass the benefit of

Sales Tax Reimbursement to an extent of clinker

value by Stock Transfer will go to the Original

Unit at Nalgonda. However, the Committee is of

the view that the unit is eligible for Sales Tax

Reimbursement to the extent of value addition

from Clinker to Cement only.

Page 60: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 60 ::

In the similar case of M/s My Home Industries

Ltd., unit II Mulakalapalli Village, Yelamanchi

Mandal, Visakhapatnam District, the decision of

SLC in its meeting held on 17/03/2016 is as follows:

“Stock transfer from sister concerned

unit

Standing Scrutiny Committee has pointed

that the main Raw material i.e., Clinker to

Unit-II is through a stock transfer from its

parent unit i.e., M/s My Home Industries Ltd.,

located in Nalgonda district, Telangana State

and whereas the company was paying the

Central Excise on the Clinker by the Parent

unit at Nalgonda. During the discussions in the

SLC meeting, two views are emerged:

View – I. The representatives from the

Commercial Taxes Department have stated

that the Stock transfer is permissible and it is

common for the industries/dealers for effecting

Sales Transaction.

Representative of FAPSIA has confirmed

that it is common procedure to allow by Sales

Tax Department for effecting Sale Transaction

beyond the production point across other

places/States.

View – II. By considering the Stock

Transfer of clinker a major Raw Material from

parent unit of My Home Industries Ltd.,

Nalgonda District, Telangana State to unit – II

on free of cost, the eligibility of Sales Tax

reimbursement will be on net sale value of

cement.

View – III. The Sales Tax

reimbursement on the cement sales at unit-II

will be on 100% sale value of the cement if the

clinker from parent unit of Nalgonda District,

Telangana State by stock transfers.

Where as

the Sales Tax reimbursement on cement

sales at unit-II of My Home Industries Ltd. will

be on the net value of Cement – Clinker, if the

clinker from parent unit of My Home Industries

Ltd. is booked under the sales transaction.

It is further submitted that if the unit – II

procures clinker, a major Raw material from

Page 61: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 61 ::

any other unit, the Sales Tax reimbursement is

to be calculated as stated above by considering

clinker transaction as sale transaction.

Since, the proposal of the unit-II of My

Home Industries Ltd is to consider it as

separate identifiable investment and in view of

the financial implications, clarification from

Government may be sought on considering

stock transfer of clinker from parent unit of My

Home Industries Ltd. at Nalgonda District,

Telangana State to Unit-II at Visakhapatnam

District as a sale transaction for computing the

eligibility.

The issue has been placed before SVC

Meeting held on 04/06/2016 and the decision of

SVC is as follows:

“SVC examined the claim with similar case of M/s

My Home Industries Ltd., Visakhapatnam on

stock transfer of the Clinker from the parent unit

and decided to defer till receipt of clarification

from Government.”

SLC may take a view.

20 IIPP 2005-10 – Claim application of M/s N.S.L Textiles

Limited, D No: 6/275/1, Inkollu, Prakasam Dist for

sanction of reimbursement of power cost under IIPP

2005-10 – Reg

M/s N.S.L Textiles Limited, has established the

unit at Inkollu, Prakasam Dist for the line of activity “

Cotton Spinning ” , obtained IEM bearing No:

2564SIA/IMO/2006 Dt:16/10/2008 from the

Government of India and commence commercial

production dt: 01/02/2008.

As per G O Rt No:684 Inds & Comm (IP) Dept

Dt: 27/10/2006 and GO Ms No: 351 Inds & Comm (IP)

Dept Dt: 24/06/2009 ( enclosed ) the power

reimbursement extended as para 4 (1) the power cost

reimbursement for M/s NSL Cotton Corporate Ltd

extended at the rate Rs.1/- per unit on the prevailing rate

as on 01/04/2015 as “Mega Project” for the period of 5

years from DCP.

Accordingly the unit sanction Power cost

reimbursement from the DCP i.e 01/02/2008to

31/01/2013. Subsequently as per guideline issued IIPP

2010-15 policy at para no: 7.7.1 the eligibility period for

spinning /weaving/garmenting enterprises /Industries

commenced during IIPP 2005-10 period is extending by

SLC has examined the recommendation of the

verification /scruitiny committee and decided

to sanction an amount of Rs.3,49,06,296/-

towards power cost reimbursement for 4th quarter

of 2014-15 under IIPP 2005-10 as against

Rs.6,74,79,356/- duly deducting the excess

sanctioned amount of Rs.3,25,73,060/- in earlier

claims towards reimbursement of Power cost

(computation of power cost reimbursement was

done @ 0.75 per unit beyond ‘5’ years period

under Mega Project Category), subject to

submission of the following shortfall documents:

1) IEM Part-B 2) Approved plans from Factories

Department 3) Land conversion certificate 4)

Project Report 5) Valid CFO from APPCB 6)

Approved Plans from DT& CP 7) Base Power

Consumption units of preceding three years from

Chartered Accountant 8) Statement of Accounts

and Certification of Plant & Machinery as per

Guidelines.

Further, SLC has decided to seek the clarification

from the Government on the extension of Mega

Project status beyond 5 years i.e. 8 years as per

extended the IIPP 2005-10

Page 62: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 62 ::

another 3 year, making total eligibility period as 8 years.

However there is no mention about the

special incentives provided to Maga Projects. In this

particular case even after completion of 5 years

period as Mega Project status, this office has

erroneously calculated at rate of Rs.1/- as per G O

Rt No:684 Inds & Comm (IP) Dept Dt: 27/10/2006.

After examination it is found that the unit the

unit obtained power load 132 KVA in the phased

manner September 2008 onwards. Accordingly, it

is recalculated from Oct -2008 to Jan -2013 at the

rate of Rs.1/- as per Mega project and at the rate of

Rs.0.75/- from Feb -2013 to till date as per IIPP

2010-15 i.e. after completion of 5 years Mega

Project status.

The General Manager, District Industries

Centre Prakasam District has recommended the

claim application for sanction of reimbursement of

power cost for the period of 4th quarter of 2014-15

and 1st quarter of 2015-16 at what rate. Calculation

nth

Total units consumed Base

Elgible units

Actual rate

Base rate

Eligible rate

Eligible amount as per Rs.0.75/-

Eligible amount as per Rs.1/-

Jan-15

5624955

1268327.5

4356627.5

4.90

2.5 2.4

10455906 11545063

Feb-15

6121517

1268327.5

4853189.5

4.90

2.5 2.4

11647655 12860952

Mar-15

4976637

1268327.5

3708309.5

4.90

2.5 2.4 8899943 9827020

Apr-15

2466905

491857.0

1975048.0

4.90

2.5 2.4 4740115 5233877

384000

0 776470.

0 3063530.

0 5.1

5 2.5 2.65 8118355 8884237

May-15

5659135

1268327.5

4390807.5

5.15

2.5 2.65

11635640 12733342

Jun-15

5789740

1268327.5

4521412.5

5.15

2.5 2.65

11981743 13112096

Jul-15 583793

0 126832

7.5 4569602.

5 5.1

5 2.5 2.65

12109447 13251847

Aug-15

5776033

1268327.5

4507705.5

5.15

2.5 2.65

11945420 13072346

Sep-15

5789613

1268327.5

4521285.5

5.15

2.5 2.65

11981407 13111728

1035156

29 11363250

9

Excess amount already sanctioned

-2253220

2 -4318090

Eligible amount to be sanctioned after deduction 8098342

7 10931441

9

If the unit is eligible as Mega project for 8 years, the eligble amount to be sanctioned by deducting the excess amount already sanctioned by the SLC from the 4th quarter of 2014-15 and 1st quarter 2015-16 claims

109314419

Page 63: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 63 ::

If the unit is eligible as Mega project for 5 years, the eligble amount to be sanctioned by deducting the excess amount already sanctioned by the SLC from the 4th quarter of 2014-15 and 1st quarter 2015-16 claims. 80983427

ABSTRACT

As per

GO As per Rs1/-

As per recalculation year wise eligibility amount is

267809

529 296064495

As per SLC sanctioned and released

300382

589 300382589

Total Difference Amount

-

325730

60 -4318094

Total amount to be sanctioned including 1st quarter of 2015-16

As mega project As per IIPP 2005-10

Rs.6,98,78,493/- Rs.3,49,06,296/-

The issue has been placed before SVC

Meeting held on 04/06/2016 and the decision of

SVC is as follows:

“ The Scrutiny Verification Committee examined the

claim and recommended for sanction of

Rs.3,49,06,296/- towards power cost reimbursement for

4th quarter of 2014-15 under IIPP 2005-10 as against

Rs.6,74,79,356/- duly deducting the excess sanctioned

amount of Rs.3,25,73,060/- in earlier claims towards

reimbursement of Power cost (computation of power

cost reimbursement was done @ 0.75 per unit beyond

‘5’ years period under Mega Project Category).

However, SVC recommendation is subject to

submission of the following shortfall documents: 1)

IEM Part-B 2) Approved plans from Factories

Department 3) Land conversion certificate 4) Project

Report 5) Valid CFO from APPCB 6) Approved Plans

from DT& CP 7) Base Power Consumption units of

preceding three years from Chartered Accountant 8)

Statement of Accounts and Certification of Plant &

Machinery as per Guidelines.

Further, SVC has taken a view to seek the

clarification from the Government on the

extension of Mega Project status beyond 5

years i.e. 8 years as per extended the IIPP

2005-10.SLC may take a view.”

SLC may take view

21 IIPP 2005-10 – Claim application of M/s Ranganayaka

Spinning Mills (P) Ltd, Boyapalem (V), Edlapadu

(M) Guntur Dist for sanction of reimbursement of

power cost under IIPP 2005-10 – Reg

SLC has examined the recommendation of the

verification /scruitiny committee and decided

to sanction an amount Rs.10,05,181/-(Rupees

ten lakhs five thousand one hundred and eighty

one only) towards power cost reimbursement for

Page 64: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 64 ::

The General Manager, Dist Industries

Centre, Guntur has recommended the claim proposal

of M/s Ranganayaka Spinning Mills (P) Ltd,

Boyapalem (V), Edlapadu (M) Guntur Dist for

sanction of reimbursement of power cost for 1st

quarter of 2015-16 for the line of activity “ Cotton

yarn manufacturing” and obtain IEM bearing no:

2948/SIA/IMO 2009 The unit has commenced

commercial production w.e.f 09/04/2010.

It is observed that the 3rd & 4th quarters of

2012-13 and 1st quarter of 2013-14 was considered

as "0" value instead of "-" value, when the monthly

consummation is not reached the base units As per

guidelines the worksheet is prepared and shown as

Annexure

. The difference amount is as follows.

As per recalculation year wise eligibility amount is 11384557

As per SLC sanctioned and released 12770380

Total Difference Amount -1385823

Present sanction claim 1st quarter of 2015-16

Apr-15 340223 205698.33

134524.67 5.3 2.6 2.7 363217

462492 308547.5 153944.5 5.57 2.6 2.97 457215

May-15 762524 514245.83

248278.17 5.57 2.6 2.97 737386

Jun-15 794780 514245.83 280534.1

7 5.57 2.6 2.97 833186

1st of 2015-16 Amount 2391004

Deducing Excess amount -1385823

Total Eligible amount 1005181

An excess amount of Rs 13,85,823/- was

sanctioned by the SLC earlier. The eligible amount

to be sanctioned is Rs 10,05,181/- after deducting

the excess amount from the 1st quarter claim of

2015-16.

The same issued was placed in SVC meeting

held on 04/06/2016 and the decision is as follows

SVC examined the claim and recommended for

sanction of Rs.10,05,181/-(Rupees ten lakhs five

thousand one hundred and eighty one only) towards

power cost reimbursement for 1st quarter of 2015-16

duly adjusting the excess amount of Rs.13,85,823/-

sanctioned earlier as per the revised base power

consumption.However, SVC recommendation is subject

to furnishing the shortfalls: 1) Approved Plans from

GP, T&CP, Factories Department 2) Land conversion

1st quarter of 2015-16 duly adjusting the excess

amount of Rs.13,85,823/- sanctioned earlier as per

the revised base power consumption, subject to

furnishing the shortfalls: 1) Approved Plans from

GP, T&CP, Factories Department 2) Land

conversion certificate 3) Valid CFO from APPCB,

4) CE Certificate 5) Approved project report 6)

CA certificate on percentage of share holding.

Page 65: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 65 ::

certificate 3) Valid CFO from APPCB, 4) CE

Certificate 5) Approved project report 6) CA certificate

on percentage of share holding.

SVC may take a view. 22 IIPP 2005-10 – Claim application of M/s

Ranganayaka Spinning Mills (P) Ltd,

Boyapalem(V), Edlapadu (M) Guntur Dist for

sanction of reimbursement of power cost under IIPP

2005-10 – Reg.

The General Manager, Dist Industries Centre,

Guntur has recommended the claim proposal of M/s

Ranganayaka Spinning Mills (P) Ltd, Boyapalem(V),

Edlapadu (M) Guntur Dist for sanction of reimbursement

of power cost for 1st quarter of 2015-16 for the line of

activity “ “Cotton yarn manufacturing” and obtain IEM

bearing no: 5591/SIA/IMO/2006 dt: 27/10/2006. The unit

has commenced commercial production w.e.f 10/04/2008

The GM, DIC has fixed the base unit 428538

units duly deducting the inedible machinery i.e., added

additional Machinery i.e 2400 spindles after 6 months of

DCP and recommended the same for sanction from 4th

quarter of 2009-10 to 3rd quarter of 2012-13.

The Government of have issued GO Ms No: 4

Inds & Comm (IP) Dept Dt: 30/01/2013 by considering

the plant & machinery installed within one year as

eligible for incentives under IIPP 2005-10 policy in

respect of spinning mills.

The General Manager, DIC has submitted the

proposals requesting to recompute the claims of 4th

quarter of 2009-10 to 3rd quarter of 2012-13 by taking the

base 514245.83 duly deducting the ineligible machinery

which was added after 6 months of DCP and commended

the same for sanction 4th quarter of 2009-10 to 3rd quarter

of 2012-13. 514245.83 per a month

(6170950/12=514245.83)units considering machinery

(2400 Spindles) added after 6 months but before one year

and requested the COI to concerned for sanction of

eligible balance as per the above G.O.

The no.of units has not cross the base but

earlier the said taken has (0) value instead of (-)

value. Now the total consumption is taken for a

period of one year and cumulative amount would be

taken in to consideration for calculation.

SLC has examined the recommendation of the

verification /scruitiny committee and decided

to sanction an amount of Rs.53,67,331/-

(Rupees fifty three lakhs sixty seven thousand

three hundred and thirty one only) towards

power cost reimbursement for 1st quarter of

2015-16 and re-computed amount of the earlier

claims as per revised Base Power Consumption,

subject to furnishing the shortfalls:1) Board

resolution on authorization to sign the claim

application. 2) GP approval 3) Land conversion

certificate 4) CFO from APPCB 5) Bank

sanctioned letter 6) Approved project report 7)

CA certificate on percentage of share holding.”

Page 66: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 66 ::

The difference amount is as follows

As per above base units recalculate difference amount is as follows

Base As per base calculation SLC amount Difference

Base-1 44555946 50216294 -5660348

Base-II 51060536 50216294 844242

Actual rate

Base rate

Eligible Rate

Total units consumed Base -1

Eligible Amount as per Base -1

Total units consumed Base -2

Eligible Amount as per Base -2

Apr-15 5.3 2.6 2.7 182129 491747

217937 588430

Apr-15 5.57 2.6 2.97 246409 731836

296309 880038

May-15 5.57 2.6 2.97 428538 1272758

514246 1527311

Jun-15 5.57 2.6 2.97 428538 1272758

514246 1527311

Total 3769099 4523089

Difference Amount -5660348 844242

Eligible Amount -1891250 5367331

The same issue was placed in SVC meeting

held on 04/06/2016 and the decision is as follows

“The Scrutiny Verification Committee

examined the proposal and recommended to fix the

Base Power Consumption units by adding Plant &

Machinery installed before one year from DCP. Hence,

SVC recommended for sanction of total amount of

Rs.53,67,331/- (Rupees fifty three lakhs sixty seven

thousand three hundred and thirty one only) towards

power cost reimbursement for 1st quarter of 2015-16

and re-computed amount of the earlier claims as per

revised Base Power Consumption. However, SVC

recommendation is subject to furnishing the

shortfalls:1) Board resolution on authorization to sign

the claim application. 2) GP approval 3) Land

conversion certificate 4) CFO from APPCB 5) Bank

sanctioned letter 6) Approved project report 7) CA

certificate on percentage of share holding.”

SLC may take view 23 IIPP 2005-10 – Claim application of M/s RBA Textiles

(P) Limited (Existing), Krishnagiri Road, Food

Processing Indul. Park, Kuppam (M) Chitoor Dist for

sanction of reimbursement of power cost under IIPP

2010-15 – Reg

M/s RBA Textiles (P) Limited (Existing),

Krishnagiri Road, Food Processing Indul. Park, Kuppam

(M) Chitoor Dist for the line of activity “Mfg of Trading

cotton yarn,” obtained IEM bearing No:

1351/IIM/PROD/2007 dt: 22/11/2007 from the

Government of India and commence commercial

SLC has examined the recommendation of the

verification /scruitiny committee and observed

that an excess amount of Rs.2,27,62,502/-

sanctioned in earlier claims by the SLC as per

the revised calculation as per CA certificate and

sanctioned for adjustment of the same amount in

the present claim i.e 1st half year of 2015-16 after

adjustment, the remaining excess amount of Rs

40,39,307/- to be adjusted in the present claim of

expansion, subject to submission of short fall

documents

1. Company Incorporation

Page 67: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 67 ::

production 06/11/2009.

Further, the unit has taken up expansion

programme on 25/12/2010 and it is observed that the

base was fixed 1575000 per month in expansion

project and same was taken ceiling in Existing unit,

but as CA certification the base is fix 1069273. The

detailed work sheet is appended as Annexure.

The issue of the unit is placed before SVC

meeting held on 14/06/2016 and decision of the SVC is

as follows:

The Scrutiny Verification Committee has

verified the claims from DCP and observed

that an excess amount of Rs.2,27,62,502/-

sanctioned in earlier claims by the SLC as per

the revised calculation as per CA certificate

and recommended for adjustment of the same

amount in the present claim i.e 1st half year of

2015-16 after adjustment, the remaining excess

amount of Rs 40,39,307/- to be adjusted in the

present claim of expansion.

1. Company Incorporation 2) Grampanchyath ,

Factories Dept and T&CP approval plans 3)

Valid CFO from APPCB 4) Bank sanctioned

letter 5) Plant and Machinery statement as per

guideline 6) Project report 9) CA certificate for

sharing 7) Reasons for increasing the power.

The SLC may take a view.

2) Grampanchayath , Factories Dept and

T&CP approval plans 3) Valid CFO from

APPCB 4) Bank sanctioned letter 5) Plant

and Machinery statement as per guideline

6) Project report 9) CA certificate for

sharing 7) Reasons for increasing the

power.

24 IIPP 2005-10 – Claim application of M/s RBA

Textiles (P) Limited (Expansion), Krishnagiri Road,

Food Processing Indu. Park, Kuppam (M) Chitoor

Dist for sanction of reimbursement of power cost

under IIPP 2010-15 – Reg

M/s RBA Textiles (P) Limited (Exp),

Krishnagiri Road, Food Processing Indu. Park,

Kuppam (M) Chitoor Dist for the line of activity “

Mfg of Trading cotton yarn ” , obtained IEM bearing

No: 3492/IIM/PROD/2011 from the Government of

India and commence commercial production

25/12/2010.

Further, it is observed that the base was fixed

1575000 per month in expansion project, but as CA

certification the base is fix 1069273. The detailed

work sheet is appended as Annexure.

The issue of the unit is placed before SVC

meeting held on 14/06/2016 and decision of the

SLC has examined the recommendation

of the verification /scruitiny committee

and decided to sanction an amount of

1,87,85,917/- (Rupees one crore eighty

seven lakhs eighty five thousand nine

hundred and seventeen only) after

adjustment of Rs 34,81,156 i.e.

deferencial amount in existing project

claim, subject to submission of the

following shortfall documents:

1. Land sale deed 2) Company

incorporation 3) Board resolution

authorizing sing 4) Grampanchayath,

T&CP dept approval 5) Land converion

approval 6) valied CFO issued APPCB 8)

Project report 9) CA certificate 10)

reasons for increasing the power

Page 68: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 68 ::

SVC is as follows:

SVC verified the claim and observed that

an amount of Rs1,93,44,0692/-is due to

pay ot the unit on revised calculation from

DCP as per CA certificate and also

observed an excess amount Rs 40,39,307/-

sanctioned by the SLC is pending for

adjustment in the existing unit . The SVC

decided to recommend to the SLC to

adjust the balance amount in the present

claim (Rs 34,81,156) of the expansion unit

i.e 1st half year of 2015-16 and also the

amount which is due to pay to the unit on

revised calculation. The SVC

recommended to sanction an amount of Rs

1,87,85,917/-( Rupees one crore eighty

seven lakhs eighty five thousand nine

hundred and seventeen only) after

adjustment. Subject to conditions 1. Land

sale deed 2) Company incorporation 3)

Board resolution authorizing sing 4)

Grampanchayath, T&CP dept approval 5)

Land converion approval 6) valied CFO

issued APPCB 8) Project report 9) CA

certificate 10) reasons for increasing the

power

The SLC may take a view

25 IIPP 2005-10 - Claim application of M/s. NSL Textiles

Ltd., Sy No: 371 to 382, Kunchalavaripalem (V),

Cherukupalli (M) Guntur Dist for the sanction of

reimbursement of power cost under IIPP 2005-10 -

Regarding.

M/s N.S.L Textiles Limited, has

established the unit at Kunchalavaripalem (V),

Cherukupalli (M) Guntur Dist for the line of activity “

Weaving & Processing ” , obtained IEM bearing No:

3247/SIA/IMO/2006 Dt:12/11/2007 from the

Government of India and commence commercial

production dt: 31/03/2010.

As per G O Rt No G O Ms NO: 917 Ind &

Comm (IP) Dept dt: 19/12/2008 ( enclosed ) the power

reimbursement extended as para 3(2) the power cost

reimbursement for M/s NSL Cotton Corporate Ltd

extended at the rate Rs.1/- per unit on the prevailing rate

as on 01/04/2015.

Accordingly the unit sanction Power cost

reimbursement from the DCP i.e 31/03/2010 to

SLC has examined the recommendation of the

verification /scruitiny committee and decided

to sanction an amount of Rs.2,67,09,007/-

towards power cost reimbursement for 1st quarter

of 2015-16 under IIPP 2005-10 including re-

computed power cost reimbursement of earlier

claims @ 0.75 per unit beyond ‘5’ years period

under Mega Project Category, subject to

submission of the following shortfalls: 1)

Approved plans from Factories Department 2)

Land conversion certificate 3) Project Report 4)

Valid CFO from APPCB 5) Approved Plans from

DT& C 6) Approved Plans from Grampanchayat

7) Land Sale Deed / Lease Deed.

Further, SLC decided to seek the clarification

from the Government on the extension of Mega

Project status beyond 5 years i.e. 8 years as per

extended the IIPP 2005-10.

Page 69: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 69 ::

31/03/2015. Subsequently as per guideline issued IIPP

2010-15 policy at para no: 7.7.1 the eligibility period for

spinning /weaving/garmenting enterprises /Industries

commenced during IIPP 2005-10 period is extending by

another 3 year, making total eligibility period as 8 years.

As per the G O Ms NO: 917 Ind & Comm (IP)

Dept dt: 19/12/2008, the unit is eligible for sanctioned of

reimbursement of power cost @ Rs.1/- per unit for a

period of 5 years i.e. upto 31/03/2015 as “Mega Project”.

The extended the eligibility period for spinning

mills commissioned during IIPP 2005-10 period by

another 3 years, the unit is not eligible for sanctioned of

reimbursement of power cost without any amendment to

the above G.O. and it is eligible @ Rs.0.75 i.e. per IIPP

2005-10 only from 01/04/2015 onwards.

The General Manager, District Industries Centre,

Krishna District has recommended the claim application

for sanction of reimbursement of power cost for the

period of 1st & 2nd quarter of 2015-16.

The detailed statement is appended as Annexure.

As per recalculation year wise eligibility amount is Rs.18,88,34,055/-

As per SLC sanctioned and released Rs.18,18,69,250/-

Total Difference Amount Rs.69,64,805/-

Total amount to be sanctioned including 1st quarter of 2015-16

As mega project As per IIPP 2005-10

Rs.2,83,90,873/- Rs.2,67,09,007/-

The issue has been placed before SVC

Meeting held on 04/06/2016 and the decision of

SVC is as follows:

The Scrutiny Verification Committee has

examined the claim and recommended for sanction of

Rs.2,67,09,007/- towards power cost reimbursement for

1st quarter of 2015-16 under IIPP 2005-10 including re-

computed power cost reimbursement of earlier claims

@ 0.75 per unit beyond ‘5’ years period under Mega

Project Category. However, SVC recommendation is

subject to submission of the following shortfalls: 1)

Approved plans from Factories Department 2) Land

conversion certificate 3) Project Report 4) Valid CFO

from APPCB 5) Approved Plans from DT& C 6)

Approved Plans from Grampanchayat 7) Land Sale

Deed / Lease Deed.

Page 70: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 70 ::

Further, SVC has taken a view to seek the

clarification from the Government on the extension of

Mega Project status beyond 5 years i.e. 8 years as per

extended the IIPP 2005-10.

SVC may take view

26

IIPP 2005-10 – Claim application of M/s Sri

Lakshmi Godavari Spinning Mills (P) Ltd (Exp-1) ,

Sy No: 113, Chebrolu (V&M), Guntur Dist for

sanction of reimbursement of power cost under IIPP

2005-10 – Reg

M/s Sri Lakshmi Godavari Spinning Mills

(P) Ltd (Exp-1), Sy No: 113, Chebrolu (V&M),

Guntur Dist for the line of activity “Cotton yarn

manufacturing”, obtained IEM bearing No:

3098/SIA/IMP/2010 dt: 26/06/2010 from the

Government of India and commence commercial

production 26/06/2010.

It is observed that from the 1st half year of

2013-14 to 2nd half year of 2014-15, the base was

taken 1470000 per month but as CA certification the

base is fix 1238350 in 2nd expansion project. (DCP-

22/03/2013)

Subsequently 1st expansion base was re- fix

with base 573204 per month instead of 804854. The

detailed work sheet is appended as Annexure.

The issue of the unit is placed before SVC

meeting held on 04/06/2016 and decision of the

SVC is as follows:

“The Scrutiny Verification

Committee has verified the claims

from DCP and observed that an

excess amount of Rs.1,44,63,271/-

sanctioned in earlier claims by the

SLC as per the revised calculation

and recommended for adjustment of

the same amount in the 1st & 2nd

quarter of 2015-16 in the claim of 1st

expansion that is worked out for an

amount of Rs.1,01,53,480/- and the

balance amount of Rs.43,09,792/-

may be adjusted in the present claim

of 2nd expansion of 1st half year of

2015-16 under IIPP 2005-10, subject

to submission of the following

shortfall information:

SLC has examined the recommendation of

the verification /scruitiny committee and

decided to sanction an amount of

Rs.1,44,63,271/- sanctioned in earlier

claims by the SLC as per the revised

calculation and accorded sanction for

adjustment of the same amount in the 1st &

2nd quarter of 2015-16 in the claim of 1st

expansion that is worked out for an amount

of Rs.1,01,53,480/- and also accorded

sanction for adjustment of the balance

amount of Rs.43,09,792/- in the present

claim of 2nd expansion of 1st half year of

2015-16 under IIPP 2005-10, subject to

submission of the following shortfall

information:

1. Land documents 2. Board resolution 3.

T&CP , Factories, Gram panchayath

approved plan 4. Valid CFO from APPCB, 5.

Land conversion certificate”.

Page 71: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 71 ::

1. Land documents 2. Board

resolution 3. T&CP , Factories, Gram

panchayath approved plan 4. Valid

CFO from APPCB, 5. Land

conversion certificate”.

The SLC may take a view.

27 IIPP 2005-10 – Claim application of M/s Sri

Lakshmi Godavari Spinning Mills (P) Ltd (Exp-2),

Sy No: 113, Chebrolu (V&M), Guntur Dist for

sanction of reimbursement of power cost under IIPP

2010-15 – Reg.

M/s Sri Lakshmi Godavari Spinning Mills

(P) Ltd (Exp-2), Sy No: 113, Chebrolu (V&M),

Guntur Dist for the line of activity “ Cotton yarn

manufacturing ” , obtained IEM bearing No:

2760/SIA/IMOP/2011 dt: 30/08/2011 from the

Government of India and commence commercial

production 22/03/2013.

Further, it is observed that from the 1st half

year of 2013-14 to 2nd half year of 2014-15, the

base was taken 1470000 per month but as CA

certification the base is fix 1238350. The worksheet

is placed below. The detailed work sheet is

appended as Annexure.

The issue of the unit is paced before SVC

meeting held on 14/06/2016 and decision of the

SVC is as follows:

“SVC verified the claim and recommended

for sanction of Rs. 1,27,41,314/- (Rupees

one crore twenty seven lakhs forty one

thousand three hundred and fourteen

only) towards reimbursement of power

cost for1st half year of 2015-16 under

IIPP 2010-15, subject to submission of the

following shortfall information:

1. Land documents 2. Land conversion

certificate 3.Valid CFO from APPCB 4.

CA Certificate for share holdings.”

The SLC may take a view.

SLC has examined the recommendation of the

verification /scruitiny committee and decided

to sanction an amount of Rs. 84,31,522/-

(Rupees Eighty four laksh thirty one thousand

five hundred and twenty two only) towards

reimbursement of power cost for1st half year

of 2015-16 under IIPP 2010-15, after

deduction of the balance excess amount of

43,09,792/- pertaining expansion-1, subject to

submission of the following shortfall

information:

1. Land documents 2. Land conversion

certificate 3.Valid CFO from APPCB

4. CA Certificate for share holdings.

28 IIPP 2005-10 – Claim application of M/s Vasantha

Spinners Ltd (Exp-1) NH-5, Thimmapuram (V),

Edlapdau (M) Guntur for sanction of

reimbursement of power cost under IIPP 2005-10

SLC has examined the recommendation of the

verification /scruitiny committee and decided

to sanction an amount of Rs.70,13,739/-

Page 72: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 72 ::

– Reg

M/s Vasantha Spinners Ltd (Exp-1) , has

established the unit at Thimmapuram (V), Edlapdau

(M) Guntur Dist for the line of activity “ Cotton

Spinning ” , obtained IEM bearing No:

3099/SIA/IMO/2009 Dt:1/12/2009 from the

Government of India and commence commercial

production dt: 22/03/2010.

It is to submit that after verification of the

claim application of the captioned unit , The CA

has corticated the 3 years units consumed by the

unit the detailed are as follows.

Year Year Units consumed

1 2007-08 11390800

2 2008-09 13174530

3 2009-10 15993400

Thus the highest average is in the year 2009-

10 of 1332783 units/ month

As per Central office computation, the

consumption of units taken in the month of March

2010is for 22 days only as the DCP was on

04/12/20090 and calculated the proportionate

consumption for 22 days is 797535units only Thus

the total units consumed in the year 2009-10are

taken as 15667135 units and the base calculated per

month 1305594 . Further computation with two bases

are prepared i.e 1) 1332783 and 2) 1305594 and

shone has annexure -1

The different amount is as follows

As per above base units recalculate difference amount is as follows

Base As per base calculation SLC amount Difference

Base-1 22397962 19557950 2840012

Base-II 19400494 19557950 -157456

1st quarter of 2015-16 As per base -1 As per base -2

Month

2nd Expansion Base -1

1st Expansion Base

Eligible units as per Base -1

Actual rate

Base rate

Eligible rate

Eligible amount as per Base -1

2nd Expansion Base -2

Eligible units as per Base -2

Eligible amount as per Base -2

(Seventy lakhs thirteen thousand seven hundred

and thirty nine only) towards reimbursement of

power cost for1st & 2nd quarters of 2015-16

under IIPP 2005-10 Subject to submission of the

following shortfall information: 1. land documents

2. Board resolution authorizing person to sign to

claim 3. Grampanchayath, Factories Dept, T&CP

dept approved plan 4. Approved project report 5.

Land conversion certificate 6. Bank sanctioned

letter 7. CA certificate indicating Investments”

Page 73: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 73 ::

Apr-15

542091

496570

45521

5.3

2.6

2.7

122907

522237.6 25667.6

69303

79069

2 60130

7 1893

85 5.

57 2.6

2.97

562473

783356.4

182049.4

540687

May-15

1332783

1097877.5

234905.5

5.57

2.6

2.97

697669

1305594

207716.5

616918

Jun-15

1332783

1097877.5

234905.5

5.57

2.6

2.97

697669

1305594

207716.5

616918

Jul-15

1332783

1097877.5

234905.5

5.57

2.6

2.97

697669

1305594

207716.5

616918

Aug-15

1332783

1097877.5

234905.5

5.57

2.6

2.97

697669

1305594

207716.5

616918

Sep-15

1332783

1097877.5

234905.5

5.57

2.6

2.97

697669

1305594

207716.5

616918

Total 4173

727 3694

579

Difference Amount 2840

012

-1574

56

Total Eligible Amount 7013

739 3537

123

The same issue was placed in SVC meeting held on

04/06/2016 and decision is as follows

“ SVC verified the claim and observed the DCP

of the first expansion is 04/12/2009 and subsequently

gone into2nd expansion and DCP is 22.03.2010 i.e

within a year. The GM has recommended the base by

taking consumption of units for 11 months and twenty

days proportionately. The revised calculations made by

taking 11months 11 days consumption and also for a

complete one year consumption. The SVC observed, if

base is calculated by taking 11 months 22 days into

consideration the reimbursement will be more and if we

take the full one year into consideration reimbursement

will be less. There are claims for both first and 2nd

expansion simultaneously, the SVC decided to

recommend to consider the base fixed 1332783 fin 2nd

expansion as per CA certificate for the year 2009-10,

which is beneficial to the Government. In view the 2nd

expansion, the eligible units for the 1st expansion

considered fixed i.e (Units in 2nd base - Units in

second base) recommended for sanction of

Rs.70,13,739/-( Seventy lakhs thirteen thousand seven

hundred and thirty nine only) towards reimbursement

of power cost for1st & 2nd quarters of 2015-16 under

IIPP 2005-10 including the amount of Rs 28,40,012/-

due to pay to the unit in view of revised calculation.

Subject to submission of the following shortfall

information: 1. land documents 2. Board resolution

authorizing person to sign to claim 3. Grampanchayath,

Factories Dept, T&CP dept approved plan 4. Approved

project report 5. Land conversion certificate 6. Bank

sanctioned letter 7. CA certificate indicating

Investments”

SLC may take a view

Page 74: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 74 ::

29 IIPP 2005-10 – Claim application of M/s Vasantha

Spinners Ltd (Exp-2) NH-5, Thimmapuram (V),

Edlapdau (M) Guntur for sanction of

reimbursement of power cost under IIPP 2005-10

– Reg

M/s Vasantha Spinners Ltd (Exp-2) , has

established the unit at Thimmapuram (V), Edlapdau

(M) Guntur Dist for the line of activity “ Cotton

Spinning ” , obtained IEM bearing No:

3099/SIA/IMO/2009 Dt:1/12/2009 from the

Government of India and commence commercial

production dt: 22/03/2010.

It is to submit that after verification of the

claim application of the captioned unit , The CA

has corticated the 3 years units consumed by the

unit the detailed are as follows.

S No Year Units consumed

1 2007-08 11390800

2 2008-09 13174530

3 2009-10 15993400

Thus the highest average is in the year 2009-

10 of 1332783 units/ month

As per Central office computation, the

consumption of units taken in the month of March

2010is for 22 days only as the DCP was on

22/03/2010 and calculated the proportionate

consumption for 22 days is 797535units only Thus

the total units consumed in the year 2009-10are

taken as 15667135 units and the base calculated per

month 1305594

The no.of units has not cross the base but

earlier the said taken has (0) value instead of (-)

value. Now the total consumption is taken for a

period of one year and cumulative amount would be

taken in to consideration for calculation.

In view of the above we may prepare

computation with two bases i.e 1) 1332783 and 2)

1305594 is placed as Annexure

As per above base units recalculate difference amount is as follows

Base As per base calculation

SLC amount Difference

Base-1 112353958 113031268 -677310

SLC has examined the recommendation of the

verification /scruitiny committee and decided

to sanction an amount of Rs.2,96,03,220/-

(Rupees two crores ninety six lakhs three

thousand two hundred and twenty only) towards

power cost reimbursement for 1st and 2nd quarter

of 2015-16 under IIIPP 2005-2010 subject to

submission of the following shortfall information:

. Land documents 2. Valid CFO from APPCB, 3.

Company incorporation certificate 4. Board

resolution authorising to sing on claim application

5, GP, T&CP Factories Dept approval 6. Land

conversion certificate 7. Bank sanction letter 8.

CA Certificate 9. Reason for increase power load

10. GM to clarify the name of the unit is M/s

Vasantha Industries Ltd as per power bill claim is

preferred in the name of M/s Vasantha spinners

Ltd

Page 75: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 75 ::

Base-II 114811308 113031268 1780040

Ist quarter of 2015-16 claim application

Month

No of Units

Base -1

Elgible units as per Base -1

Actual rate

Base rate

Eligible rate

Eligible amount

Base -2

Elgible units as per Base -2

Eligible amount

Apr-

15

137716

2 599752

777410

5.

30

2.60

2.

70

209900

6 5905

20 786642

212393

3

166710

6 733031

934075

5.

57

2.60

2.

97

277420

4 7150

74 952032

282753

5

May-15

292527

6

133278

3

159249

3

5.

57

2.60

2.

97

472970

4 1305

594

161968

2

481045

6

Jun-15

312129

6

133278

3

178851

3

5.

57

2.60

2.

97

531188

4 1305

594

181570

2

539263

5

2nd quarter of 2015-16 claim

Jun-15

299634

8

133278

3

166356

5

5.

57

2.60

2.

97

494078

8 1305

594

169075

4

5021539.4

Jul-

15

310772

2

133278

3

177493

9

5.

57

2.60

2.

97

527156

9 1305

594

180212

8

5352320.2

Aug-

15

306792

6

133278

3

173514

3

5.

57

2.60

2.

97

515337

5 1305

594

176233

2

523412

6

Total 1st & 2nd quarter 2015-

16

302805

29

307625

45

Difference

-677310

178004

0

Total Elgible

amount

296032

20

325425

85

The same issue was placed in SVC meeting held in

14/06/2016 and decision was placed below

Page 76: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 76 ::

”SVC verified the claim and recommended for

sanction of Rs.2,96,03,220/-( Rupees two crores ninety

six lakhs three thousand two hundred and twenty only)

towards power cost reimbursement for 1st and 2nd

quarter of 2015-16 under IIIPP 2005-2010 duly

adjusting the excess amount of Rs 6,77,310/- sanctioned

earlier under IIPP 2010-15 by correcting the base power

consumption, subject to submission of the following

shortfall information: . Land documents 2. Valid CFO

from APPCB, 3. Company incorporation certificate 4.

Board resolution authorising to sing on claim application

5, GP, T&CP Factories Dept approval 6. Land

conversion certificate 7. Bank sanction letter 8. CA

Certificate 9. Reason for increase power load 10. GM to

clarify the name of the unit is M/s Vasantha Industries

Ltd as per power bill claim is preferred in the name of

M/s Vasantha spinners Ltd.

SLC may take view

30 IIPP 2005-10 – Claim application of M/s Sri Venakta

Siva Parvathi Spinning Mills (P) Ltd ( Exp-II) GBC

Road, Chebrolu (M), Guntur Dist for sanction of

reimbursement of power cost under IIPP 2005-10 – Reg

M/s Sri Venkata Siva Parvathi Spinning Mills (P)

Ltd ( Exp-II) has established the unit at Chebrolu (M),

Guntur Dist for the line of activity “ Spinning Yarn” ,

obtained IEM bearing No: 1689/SIA/IMO/2007 dt:

080/06/2007 from the Government of India and

commence commercial production 07/07/2008.

It is observed that from the 3rd quarters of

2012-13 to 2nd quarter of 2013-14 zero value taken

and compute calculation but as per guidelines "0"

value instead of "-" value effect when the monthly

consumption is not reached the base value . The

worksheet is placed as Annexure

. The difference amount is as follows.

As per recalculation year wise eligibility amount is 29930626

As per SLC sanctioned and released 37939600

Total Difference Amount -8008974

1st quarter of 2015-16 ( Present Claim) Ap

r.

15

6125

89

3813

31

23125

8

5.

3 2.6 2.7 624396.06 Ap

r.

15

9382

71

5719

97

36627

4

5.

57 2.6 2.97 1087834.37

SLC has examined the recommendation of the

verification /scruitiny committee and observed an

excess amount of Rs.80,09,324/- sanctioned in

earlier claims by the SLC and decided for

adjustment of the same amount in the 1st quarter

of 2015-16 that is worked out for an amount of

Rs.46,66,353/- and the balance amount of

Rs.33,42,971/- should be adjusted in future

claims. Hence sanction of reimbursement of

power cost towards 1st quarter of 2015-16 is

treated as “Zero”, subject to furnishing the

shortfalls:1) Land documents 2) Valid CFO from

APPCB 3) Approved project report 4) Land

conversion certificate 5) Company incorporation

6) Approved Plans from GP, T&CP Factories

Dept 7) Certification on Plant & Machinery as per

guidelines 8) CA certificate on percentage of

share holding.

Page 77: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 77 ::

M

ay.

15

1428

620

9533

28

47529

2

5.

57 2.6 2.97 1411617.24 Ju

ne.

15

1472

690

9533

28

51936

2

5.

57 2.6 2.97 1542505.14

Total 4666352.81

Difference amount -8009324

-3342970.9

An excess amount of Rs 80,09,324/- was sanctioned by the SLC, earlier. The same amount may be adjusted in the 1st quarter of 2015-16 and the balance amount of Rs 33.42,971/-,after adjustment may be adjusted in the future claims.

The issue has been placed before the SVC

meeting held on 04/06/2016 and the decision of the

SVC is as follows

“ The Scrutiny Verification Committee has examined

the claims from DCP and confirmed that an excess

amount of Rs.80,09,324/- sanctioned in earlier

claims by the SLC and recommended for adjustment of

the same amount in the 1st quarter of 2015-16 that is

worked out for an amount of Rs.46,66,353/- and the

balance amount of Rs.33,42,971/- in future claims.

However, SVC recommedation is subject to furnishing

the shortfalls:1) Land documents 2) Valid CFO from

APPCB 3) Approved project report 4) Land conversion

certificate 5) Company incorporation 6) Approved

Plans from GP, T&CP Factories Dept 7) Certification

on Plant & Machinery as per guidelines 8) CA

certificate on percentage of share holding.”

In view of the above SVC may take a view.

31 IIPP 2005 – 2010 Scheme – M/s. Viswa Teja

Spinning Mills Ltd., Boyapalem (V), Edlapadu (M),

Guntur district – Permission for change of Financial

Institution of the unit – Regarding.

M/s. Viswa Teja Spinning Mills Ltd.,

Boyapalem (V), Edlapadu (M), Guntur district has

obtained IEM bearing No. 2623/SIA/IMO/2004,

dated 22/07/2004 with line of activity “Cotton Yarn”

and commencement of commercial production on

09/04/2005. Further, the unit has taken up 1st

expansion on 16/06/2006 and 2nd Expansion on

26/09/2007. The Financial Institution i.e., State

Bank of India, Commercial Branch, Guntur has

financed the unit.

Further, the General Manager, District

Industries Centre, Guntur has informed that M/s.

Viswa Teja Spinning Mills Ltd., Boyapalem (V),

Edlapadu (M), Guntur district has submitted

proposal for approval of change of Bank from State

SLC discussed the issue in detail and

accorded permission for change of financial

institution from State Bank of India, Commercial Bank branch, Guntur to HDFC Bank Limited, Guntur

Page 78: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 78 ::

Bank of India, Commercial Bank branch, Guntur to

HDFC Bank Limited, Guntur and submitted the

following documents:

1. NOC from BM, SBI, Commercial

Branch, Guntur.

2. Letter from BM, HDFC Bank

Limited, Guntur.

In this regard, the General Manager,

District Industries Centre, Guntur has requested to

consideration of the proposal for change of Financial

Institution i.e., State Bank of India to HDFC Bank

Limited, Guntur of M/s. Viswa Teja Spinning Mills

Ltd., Boyapalem (V), Edlapadu (M), Guntur district.

As per Para 11.0 of guidelines of IIPP 2005

– 10 “The Industrial units that availed

incentives/concessions should obtain the No

Objection Certificate from the concerned financing

institutions in respect of aided units before seeking

the approval of Commissioner of Industries for any

change of the constitution/Management/name &

style of the unit within the first six (6) years from

the date of commencement of Commercial

production”.

The SLC may take a view.

32 IIPP – 2005-10 – Claim application of M/s. Sri Srinivasa

Spintex (India) Limited (Expansion-I), 8-104 & 105,

Pedatadepalli (V), Tedepalligudem (M), West Godavari

District for sanction of reimbursement of power cost –

Regarding.

*****

The General Manager, District Industries Centre,

West Godavari District has recommended the claim

proposal M/s. Sri Srinivasa Spintex (India) Limited

(Expansion-I), 8-104 & 105, Pedatadepalli (V),

Tedepalligudem (M), West Godavari District for sanction

of reimbursement of power cost for the 1st half year of

2015-16. The unit has taken up 1st expansion programme

for the line of activity of “Cotton Yarn/other fabric yarn”

and obtained IEM bearing No.2840/IIM/PROD/2010,

Dated:02/03/2010. The unit has commenced commercial

production w.e.f.01/01/2011 under 1st expansion.

The unit has been sanctioned reimbursement of

power cost over & above base consumption of 688903

units per month. Further, the unit has gone into 2nd

SLC has examined the recommendation of the

verification /scruitiny committee and decided

to sanction an amount of Rs.41,32,086/-

(Rupees Forty one lakhs thirty two thousand and

eighty six only) towards reimbursement of power

cost for 1st half year of 2015-16 under IIPP

2010-15, subject to submission of the following

shortfall information:

1. Land lease or sale deed, 2. Company

incorporation certificate, 3. Board resolution, 4.

5.Valid CFO, 6.Statement of Accounts,

7.Machinery statement as per guidelines, 8. Civil

Engineer certificate, 9. Power release certificate,

10.C.A. Certificate for expansion project.

11.Gramapanchayath approval 12. Land

conversion certificate 13.Bank term loan sanction

letter 14. Project report 15. CA certificate for

shareholding 16. DT&CP approval 17. Factories

Page 79: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 79 ::

expansion and commenced commercial production w.e.f.

14/06/2012. Hence, the 1st expansion unit is eligible for

availing reimbursement of power cost over & above the

base consumption and below the base consumption of 2nd

expansion project.

It is observed that the following deviations for

sanctioning the reimbursement of power cost:

The units consumed for the last 3 years from the DCP of

the 2nd expansion:

Year No of units 33KV – Rate as on April, 2005 = Rs.3.35

2007-08 8266841 Expn-I – DCP – 01/01/2011

2008-09 12069055 Expn-II – DCP – 14/06/2012

2009-2010 19302994

A: Average of 3 years : 13212963 units –

13212963/12= 1101080 units per month.

B: 75% of highest consumption : 75% x

19302994 = 14477246 units per year.

B: Criteria is highest of A and B

Monthly base is fixed as 14477246 /12 =

1206437 units per month.

As per the operational guidelines para No. 5.4.7

under IIPP 2010-15 us as follows:

“The base annual consumption will be either

average annual power consumption of previous

three financial years of the

Expansion/Diversification project as certified by

Chartered Accountant or power consumption for

75% of installed capacity utilization of the original

industrial enterprise, whichever is higher. Power

consumed over and above the base consumption

will be eligible for reimbursement of power cost. If

the Enterprise/Industry taken up

expansion/diversification in the same year, the

base power consumption will be calculated

proportionately.”

Dept approved plans.”

Page 80: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 80 ::

Power cost reimbursement of 2nd quarter of 2015-16 of M/s Sri

Srinivasa Spintex (India) Ltd.( 1st Expansion)

Month Y

r

Eligi

ble base

base

alrea

dy fixe

d

Base of 1st

Expn

.

Units

eligible

Fix

ed

eligible

rate

Amt eligible

April

2

01

5

1206

437

6889

03

5175

34

0.7

5 388151

May

20

1

5

1206

437

6889

03

5175

34

0.7

5 388151

June

2

0

1

5

1206

437

6889

03

5175

34

0.7

5 388151

July

2

0

15

1206437

688903

517534

0.75 388151

Augus

t

2

01

5

1206

437

6889

03

5175

34

0.7

5 388151

Septe

mber

2

01

5

1206

437

6889

03

5175

34

0.7

5 388151

Eligible amount for 1st half year of 2015-16 2328903

By duly revising the base power consumption

units the detailed computation is done at – Annexure – I

and details are as follows:

The detailed computation is prepared from

SLC Wise sanctioned and Eligible cost

S

L

C N

o. Sanctioned Eligible Differential Amount

98 1169340 2328903 1159563

10

2 3834460 4071520 237060

10

2 3709580 4333468 623888

7 1854790 2328903 474113

8 1854790 2328903 474113

T

otal 12422960 15391697 2968737

Amount Eligible from 1st half year 2012-13 to 2nd half year

2014-15

1423214

3

Amount sanctioned from 1st half year 2012-13 to 2nd half year 2014-15

1242296

0

Page 81: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 81 ::

Differential amount (less amount sanctioned) 1809183

Differential amount to be sanctioned as upto 2nd half year

2014-15 Rs. 18,09,183/-

Amount computed for 1st half year of 2015-16

Rs. 23,28,903/-

Total amount to be considered as on 2nd quarter of 2015-

16 Rs. 41,38,086/-

I. If the base consumption for the 2nd expansion

project fixed as 13212963 units upper year –

13212963/12 = 1101080 units per month.duly

taking the average power consumption of the last

three years prior to 2nd expansion, the 1st

expansion unit is eligible for sanction of

reimbursement of power cost is arrived Rs.

23,28,903/- for 1st half year of 2015-16.

II. If the base consumption for the 2nd expansion

project fixed as 14477246 units per year –

14477246 /12 = 1206437 units per month

duly taking the 75% of highest consumption of

the last three years prior to 2nd expansion, the 1st

expansion unit is eligible for sanction of

reimbursement of power cost is arrived Rs.

23,28,903/- for 1st half year of 2015-16 and Rs.

18,09,183/- of differential amount totaling an

amount of Rs. 41,38,086/- is eligible.

The issue has been placed before SVC Meeting

held on 14/06/2016 and the decision of SVC is as

follows:

“SVC verified the claim and

recommended for sanction of

Rs.41,32,086/- (Rupees Forty one lakhs

thirty two thousand and eighty six only)

towards reimbursement of power cost

for 1st half year of 2015-16 under

IIPP 2010-15, including re-computed

amount of Rs.18,52,797/- as per the

revised Base Power Consumption by

considering 75% of installed capacity

utilized (highest as per operational

guidelines), subject to submission of the

following shortfall information:

Page 82: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 82 ::

1. Land lease or sale deed, 2. Company

incorporation certificate, 3. Board

resolution, 4. 5.Valid CFO, 6.Statement

of Accounts, 7.Machinery statement as

per guidelines, 8. Civil Engineer

certificate, 9. Power release certificate,

10.C.A. Certificate for expansion

project. 11.Grampanchyath approval 12.

Land conversion certificate 13.Bank

term loan sanction letter 14. Project

report 15. CA certificate for

shareholding 16. DT&CP approval 17.

Factories Dept approved plans.”

SLC may take a view.

33 IIPP – 2005-10 – Claim application of M/s. Ravali

Spinners Pvt. Ltd. (Expansion-2), Khandavali, Peravali

(M), West Godavari District for sanction of

reimbursement of power cost – Regarding.

*****

The General Manager, District Industries Centre,

West Godavari District has recommended the claim

proposal M/s. Ravali Spinners Pvt. Ltd. (Expansion-2),

Khandavali, Peravali (M), West Godavari District for

sanction of reimbursement of power cost for the 2nd

quarter of 2015-16. The unit has taken up 2nd expansion

programme for the line of activity of “Cotton Yarn” and

obtained IEM bearing No.1497/SIA/IMO/2012,

Dated:02/07/2012. The unit has commenced commercial

production w.e.f.20/11/2010 under 2nd expansion.

The unit has been sanctioned reimbursement of

power cost over & above base consumption of 1068297

units per month.

It is observed that the following deviations for

sanctioning the reimbursement of power cost:

The units consumed for the last 3 years from the DCP of

the 2nd expansion:

Year No of units 33KV – Rate as on April, 2005 = Rs.3.35

2007-08 7485315 Expn-I – DCP – 01/01/2009

2008-09 11103361 Expn-II – DCP – 20/11/2010

2009-2010 19870021

A: Average of 3 years : 12819566 units –

SLC has examined the recommendation of the

verification /scruitiny committee and decided

to sanction an amount of Rs.67,17,811/-

(Rupees Sixty seven lakhs seventeen thousand

eight hundred and eleven only) towards

reimbursement of power cost for 1st half year of

2015-16 under IIPP 2010-15, subject to

submission of the following shortfall information:

1.DT&CP approval 2. Land conversion

certificate 3. Valid CFO from APPCB 4. List of

Plant & Machinery as per guidelines

Page 83: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 83 ::

12819566/12= 1068297 units per month.

B: 75% of highest consumption : 75% x19870021

= 14902516 units per year.

B: Criteria is highest of A and B

Monthly base is fixed as 14902516/12

= 1241876 units per month.

As per the operational guidelines para No. 5.4.7

under IIPP 2010-15 us as follows:

“The base annual consumption will be

either average annual power

consumption of previous three financial

years of the Expansion/Diversification

project as certified by Chartered

Accountant or power consumption for

75% of installed capacity utilization of

the original industrial enterprise,

whichever is higher. Power consumed

over and above the base consumption

will be eligible for reimbursement of

power cost. If the Enterprise/Industry

taken up expansion/diversification in

the same year, the base power

consumption will be calculated

proportionately.”

By duly revising the base power consumption

units the detailed computation is done at – Annexure – I

and details are as follows:

Details of SLC wise sanctioned amount in Rs.

Sl. No. SLC No. Amount

1 97 15895880

2 98 1329500

3 101 3320430

4 2 8897540

5 5 8128820

6 7 8944940

Total 46517110

Present claim for 1st half year of 2015-16

April

201

5 2585935 1241876 1344059

0.7

5 1008044

May

201

5 3291947 1241876 2050071

0.7

5 1537553

Page 84: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 84 ::

June

201

5 3586155 1241876 2344279

0.7

5 1758209

July

201

5 4138695 1241876 2896819

0.7

5 2172614

August

201

5 4743875 1241876 3501999

0.7

5 2626499

September

201

5 5352000 1241876 4110124

0.7

5 3082593

Eligible amount for 1st Quarter of 2015-16 12185513

Eligible amount for 2nd Quarter of

2015-16 after deducting the earlier

excess sanctioned amount of

Rs.54,67,703/- duly revised tbe base

consumption 75% of highest power

utilised in the precedent 3years from the

2nd expansion.

671781

1

The issue has been placed before SVC Meeting

held on 14/06/2016 and the decision of SVC is as

follows:

SVC verified the claim and recommended

for sanction of Rs.67,17,811/- (Rupees Sixty

seven lakhs seventeen thousand eight hundred

and eleven only) towards reimbursement of

power cost for1st half year of 2015-16 under

IIPP 2010-15, subject to submission of the

following shortfall information:

1.DT&CP approval 2. Land conversion

certificate 3. Valid CFO from APPCB 4. List of

Plant & Machinery as per guidelines

SLC may take a view

34 IIPP 2005-10 – Claim application of M/s Amaravathi

Textiles Pvt LTd ( 4th Exp) NH-5, Martur Prakasam Dist

for sanction of reimbursement of power cost under IIPP

2005-10 – Reg

M/s Amaravathi Textiles Pvt LTd ( 4th Exp), has

established the unit at NH-5, Martur Prakasam Dist for

the line of activity “ Cotton yarn Spinning ” , obtained

IEM bearing No: 1523/SIA/IMO/2007 Dt:23/05/2007

from the Government of India and commence

commercial production dt: 23/07/2009

As per G O Rt No: 370 Inds & Comm (IP) Dept

Dt: 21/06/2007 ( enclosed as Annexure -1) the power

reimbursement extended as para 5 (1) the power cost

reimbursement for M/s Amaravathi Textiles Pvt Ltd

extended at the rate Rs.1/- per unit on the prevailing rate

as on 01/04/2015.

Accordingly the unit sanction Power cost

SLC has examined the recommendation of

the verification /scruitiny committee and

decided to sanction an amount of Rs.1,33,85,866/- (Rupees one crore thirty three

lakhs eighty five thousand eight hundred sixty six

only) towards reimbursement of power cost for

2nd quarter 2015-16 claim as against

Rs.2,88,16,757/- by deducting Rs.1,54,30,891/-

on considering reimbursement of power cost @

0.75 per unit beyond ‘5’ years period under Mega

Project Category.

Further, SLC decided to seek the clarification

from the Government on the extension of Mega

Project status beyond 5 years i.e. 8 years as per

extended the IIPP 2005-10.”

Page 85: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 85 ::

reimbursement from the DCP i.e 27/03/2009 to

31/03/2014. Subsequently as per guideline issued IIPP

2010-15 policy at para no: 7.7.1 the eligibility period for

spinning /weaving/garmenting enterprises /Industries

commenced during IIPP 2005-10 period is extending by

another 3 year, making total eligibility period as 8 years.

However there is no mention about the

special incentives provided to Mega Projects.

In this particular case even after completion of 5

years period this office has erroneously calculated at

rate of Rs.1/- as per GO No:370.

The no.of units has not cross the base but

earlier the said taken has (0) value instead of (-)

value. Now the total consumption is taken for a

period of one year and cumulative amount would be

taken in to consideration for calculation shown as

Annexure

The same issue was placed before SVC held

on 04/06/2016 and decision is as follows

“The Scrutiny Verification Committee examined the issue

and recommended for sanction of Rs.1,33,85,866/-

(Rupees one crore thirty three lakhs eighty five thousand

eight hundred sixty six only) towards reimbursement of

power cost for 2nd quarter 2015-16 claim as against

Rs.2,88,16,757/- by deducting Rs.1,54,30,891/- on

considering reimbursement of power cost @ 0.75 per

unit beyond ‘5’ years period under Mega Project

Category.Further, SVC opined that seek the clarification

from the Government on the extension of Mega Project

status beyond 5 years i.e. 8 years as per extended the

IIPP 2005-10.”

SLC may take a view

35 IIPP 2005-10 – Claim application of M/s Kalpataruvu

spinning Mills Ltd ( Expansion) Thimmapuram (V),

Edlapadu Guntur Dist for sanction of reimbursement of

power cost under IIPP 2010-15 – Reg

M/s Kalpataruvu spinning Mills Ltd ( Expansion)

Thimmapuram (V), Edlapadu Guntur Dist for the line of

activity “ Cotton yarn ” , obtained IEM bearing No:

1130/SIA/IMO/2011 dt: 06/04/2011 from the

Government of India and commence commercial

production dt: 01/06/2012

It is to submit that after verification of the

claim application of the captioned unit , The CA has

corticated the 3 years units consumed by the unit the

detailed are as follows.

SLC has examined the recommendation of the

verification /scruitiny committee and decided

to sanction an amount of Rs. 42,84,913/-

(Rupees forty two lakh eighty four thousand nine

hundred and thirteen only) towards

reimbursement of power cost for 1st half year of

2015-16 under IIPP 2010-15, subject to

submission of the following shortfall information:

1. IEM Part-B, 2.DT&CP, Factories Dept

approval 3. Valid CFO from APPCB

Page 86: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 86 ::

CRITERIA 1 : AVERAGE ANNUAL CONSUMPTION FOR 3 YEARS PRIOR TO EXPANSION

YEAR

YEARLY

CONSUMPTION BEFORE EXPANSION

AVERAGE YEARLY CONSUMPTION

UNITS IN LAST 3 YEARS BEFORE EXPANSION

2009-10 7132531

7307285 2010-11 7693750

2011-12 7095575

CRITERIA 2 : CONSUMPTION AT 75% CAPACITY UTILIZATION OF EXISTING PROJECT PRIOR TO

EXPANSION

Installed Power Capacity prior to

Expansion 1150 KVA

Consumption per annum at 100%

Capacity utilization prior to Expansion

1150 KVA X 24 Hrs X 350 Days =

9660000 KVAH

Consumption per annum at 75% Capacity utilization prior to Expansion

9660000 X 75% = 7245000 KVAH

CRITERIA 3 : CONSUMPTION Highst year of 75% CAPACITY UTILIZATION OF EXISTING PROJECT PRIOR TO EXPANSION

2010-11 7693750 5770312.5

Base Consumption fixed for Expansion project

= 73,07,285 Units per Annum i.e., 6,08,940 units per Month

The same issue was placed before the SVC held on

14/06/2016 and decision is as follows

SVC verified the claim and recommended for sanction

of Rs. 42,84,913/-(Rupees forty two lakh eighty four

thousand nine hundred and thirteen only ) towards

reimbursement of power cost for 1st half year of

2015-16 under IIPP 2010-15 subject to submission of

the following shortfall information: 1. IEM Part-B,

2,DT&CP , Factories Dept approval 3, Valid CFO

from APPCB

SLC may take a view

36

IIPP 2010-15 – Special incentives to SC / ST

entrepreneurs – Claim application of M/s. Sri Sai

Lakshmi Multi Specialty Hospital & CT Scan

Centre, D. No. 12-3-55, 4th Cross, Sai Nagar,

Anantapuram - Release of Investment Subsidy –

Change of project cost – Regarding.

The General Manager, District Industries

Centre, Anantapuram District has informed that M/s.

Sri Sai Lakshmi Multi Specialty Hospital & CT

Scan Centre, D. No. 12-3-55, 4th Cross, Sai Nagar,

SLC has examined the recommendation of the

verification/scruitiny committee and approved

the revised project cost of Rs. 85, 38,377/-

and sanctioned an amount of Rs.29,88,431/-

towards Investment subsidy instead of

Rs.38,63,430/- and advised to release the

amount of Rs.29,88,431/- as per procedure in

vogue.

Page 87: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 87 ::

Anantapuram has filed application within the

prescribed time limit for sanction of investment

subsidy for the line of activity of Health and

Medical Services and the unit financed by State

Bank of India, Anantapur, the entrepreneur belongs

to ST Community and the Director of Industries

sanctioned investment subsidy for an amount of

Rs.38,63,430/-

Further, this office has issued consolidated

proceedings No. 39/1/2015/8042/8042, dated

03/07/2015 for release and the GM has submitted

that the unit was inspected by him along with IPO

on 09/04/2015 and found that the CT Scan

machinery was not present at the time of inspection

and not released the amount sanctioned and

requested the unit holder to submit the reasons for

non-availability of the CT Scan Machine.

The unit holder has submitted his

representation vide his letter dated 06/08/2015

stating that CT Scan machine was sent to Chennai

for repairs and will be returned by the end of

August, 2015 and also stated that he is unable to pay

loan instalments to the bank and requested for

release of investment subsidy.

Further, the GM has submitted that the unit

was once again inspected on 29/01/2016 found the

unit has working satisfactorily and informed that the

CT Scan Machine was not present in the premises

and the CT Scan machine was sent to Mednob

Healthcare, Madhurai, Tamilnadu for repair and

requested to sanction the investment subsidy to

the unit for an amount of Rs.29,88,431/- basing on

the revised project cost duly eliminating the CT scan

machine instead of already sanctioned investment

subsidy of Rs.38,63,430/-.

Further, it is to submit that the SLC in its

meeting held on 15/05/2014 sanctioned an amount

of Rs.38,63,430/- @35% on the total eligible project

cost of Rs.1,10,38,377/-. Revised project cost

submitted by the GM after elimination of CT Scan

Machine is as follows:

Original Project Cost 1,10,38,377

(-) CT Scan Machine cost 25,00,000

Revised project cost after elimination of CT Scan Machine 85,38,377

Availability of machinery at the unit, at the time inspection is 85,38,377

Quantum of subsidy calculated at the rate of 35% 29,88,431

Page 88: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 88 ::

Director of Industries &

Chairman, State Level Committee (SLC).

In view of the above, the proposal is placed

before the SLC for ratifying the previous SLC

decision and also to take a decision for sanction and

release of investment subsidy @ 35% of

Rs.29,88,431/- on the eligible revised project cost of

Rs.85,38,377/- to the captioned unit.

SLC may take a view.

Page 89: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 89 ::

LIST OF MEMBERS ATTENDED THE 9th STATE LEVEL COMMITTEE MEETING HELD ON 20/02/2016

AT 11.30AM. IN THE CONFERENCE HALL OF M.D, A.P.S.F.C, CHIRAG ALI LANE, HYDERABAD-A.P

SL.NO. MEMBERS NAME & DESIGNATION OF MEMBER /

__________________________________________________ REPRESENTAT___________________ _______

Sri/Smt:

1. Chairman, Kartikeya Misra, IAS.,

State Level Committee. Chairman, SLC / Director of Industries.

2. The President T. Sujatha

FAPCCI, Hyderabad Deputy Director

3. The Chairman Y V Krishna Mohan

CII. Hyderabad Convener, MSME,

4. The President GRK Reddy

FAPSIA, Working President

5. The Managing Director, V.Siva Ramakrishna ,

APSFC, Hyderabad. Senior Branch Manager.

6. The Chairman, D.Dharma Teja

AP Spinning Mill Assosiation President

7. The Managing Director B.Maheswara rao

APIIC. DGM(B), APIIC

8. The Commissioner, R.Sadananda rao

Commercial Taxes, AP, Hyderabad. Assistant Commissioner

9. The Cheif Engineer (Commercial), Ch.V Ramana

APTRANSCO, Hyderabad. ADE (Comml.), Hyd

10. The Member Secretary, R Sreeramulu

APPCB, Hyd SEE, Hyderabad

11. The Convenor K.Siva Kumar

SLBC, Hyderabad Chief Manager, AB, ZO, Vijayawada.

12. The Chief Manager A.Venkata Reddy

Syndicate Bank Assit General .Manager, Vijayawada.

13. The Commissioner Khushbu Kothari

B.C Welfare, Hyderabad Asst B C Welfare Officer, Vijayawada.

14. The Chief Manager, P.Sudhakar

SBI, SME Br, Hyderabad. AGM (SME)

15. The Deputy General Manager Ch.S R Prasad

SME, Head Office, SBH, Hyderabad Chief Manager.

16. The President D Bujji Babu

DICCI, (AP), Hyderabad Member

17. The President K Kanaka Durga

ALEAP, Hyderabad . Member

18. The President Dr.Bhrama reddy

FSME, Hyderabad Member

Page 90: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 90 ::

19. The President P.Bhaskara Rao

AP Chambers of Commerce & Industry Member.

Fadaration

20. The Additional Director B.Suresh Babu

Central Office, Hyderabad Additional Director

Page 91: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 91 ::

I. SANCTION OF REIMBURSEMENT OF STAMP DUTUY Annexure -1

S No

Date of received claim

Agenda Sanctioned amount

1 14/09/2015

M/s Maruthi Ispat & Energy Pvt. Ltd., Sy.No. 167, Madhavaram (V), Mantralayam

Rs.28,923/- (Rupees twenty eighty thousand nine hundred and twenty three only) towards stamp duty reimbursement subject to submission of the following shortfall information:1) IEM Part-B 2)Certification of Incorporation 3) Board resolution on authorization to sign the claim application 4) Approved plan from Factories Department 5) Land Conversion Certificate 6) project report 7) CA certificate on share holding 8) Valid CFO from APPCB 9) Approved Plans from Grampanchayath 10) Minutes of the District Level Pre-scrutiny Committee 11) Certification of the Banker on Plant & Machinery as per guidelines.

2 15/09/2015

M/s South India Krishna Oil and Fats Pvt. Ltd., Sy.No. 275, 279, 280 & 281, Epuru Bit-IB, Pantapalem Muthukur (V&M), SPSR Nellore District

Rs.33,86,475/- (Rupees thirty three lakhs eighty six thousand four hundred and seventy five only) towards sanction of reimbursement of Stamp Duty under IIPP 2005-10 subject to submission of the following shortfall information:1) IEM Part-B 2)Certificate of Incorporation 3) Board resolution on authorization to sign the claim application 4) Approved Plans form Factories Department 5) Land Conversion Certificate 6) Project report 7) CA certificate on share holding 8) Minutes of the District Level Pre-scrutiny Committee 9) Banker certificate on Plant & Machinery as per guidelines .

Page 92: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 92 ::

II.REIMBURSEMENT OF SALES TAX Annexure –II

S No

Date of

received

claim

Name & address of the unit Sanctioned amount

1 08/09/2015

M/s Regen Powertech Pvt. Ltd.,

Sy. No. 182 to 188, APIIC,

Industrial Park, Mambattu (V),

Tada (M), Nellore District

Rs.11,35,89,444/- (Rupees eleven crores thirty five lakhs

eighty nine thousand four hundred and forty four only)

towards sales tax reimbursement for the year 2013-14

subject to submission of the following shortfall

information:1) Land Sale Deed or Lease Deed

2) Certificate of Incorporation 3) Board resolution on

authorization to sign the claim application 4) Approved

Plan from Gram Panchayath, 5) Approved Plans from

Factories Department, 6) Approved Plans from IALA 7)

Boiler’s Certificate 8) Land conversion certificate 9)

Bank sanctioned letter 10) Civil Engineer certificate 11)

Approved project report 12) Power release certificate.

2 14/09/2015

M/s Sree Jayajyothi Cements

Limaited, Yanakandla (V),

Banaganpalli (M), Kurnool

District

Rs.1,64,88,816/- (Rupees one crore sixty four lakhs

eighty eight thousand eight hundred and sixteen only)

towards sales tax reimbursement subject to submission of

the following shortfall information:1) Land Sale Deed /

Lease Deed 2) Certificate of Incorporation 3) Board

resolution on authorization to sign the claim application

4) Approval Plans from Grampanchayath 5)

Approved Plans from Factories Department 6) Approved

Plans from T&CP 7) Land Conversion Certificate 8)

CFO issued by APPCB 9) Bank Statement Letter on

Plant & Machinery 10) Civil Engineer Certificate 11)

Power Release Certificate 12)Project Report 13) CA

certificate on Share holding 14) Statement of Accounts

from Financial Institution.

3 15/09/2015

M/s A S Jute Product Pvt Ltd

(Existing) Sy No: 20/2 & 21,

Nerallavalasa(V), Padmanabam

(m), Visakhapatnam

Rs.17,94,255/- (Rupees seventeen lakhs ninety four

thousand two hundred and fifty five only) towards

sanction of reimbursement of sales tax in respect of

2014-15 under IIPP 2010-15 subject to submission of

shortfall document - Civil Engineer Certificate

4 26/10/2015

M/s.Jaypee Balaji Cement Plant,

Rs No: 99, Budawada,

Jaggaiahpet (M), Krisna Dist

Rs.8,22,63,860/- (Rupees eight crores twenty two lakhs

sixty three thousand eighty hundred and sixty only)

towards sanction of reimbursement of sales tax in respect

of 2014-15 under IIPP 2010-15 subject to submission of

the following shortfall information:1) Land sale deed /

lease deed 2) Certificate of Incorporation 3) Board

resolution on authorization to sign the claim application

4) CFO from APPCB, 6) Certification of Plant &

Machinery as per guidelines 7) Project report 8)

Chartered Accountant Certificate on share holding

Page 93: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 93 ::

5 30/10/2015

M/s Net Matrix Limited, Plot

No: 15&15A, APSEZ,

Atchuthapuram, Visakhapatnam

Rs.23,70,000/- (Rupees Twenty three lakhs seventy

thousand only) towards sanction of reimbursement of

Sales Tax in respect of 2014-15 under IIPP 2010-15

subject to submission of the following shortfall

information:1) Land Sale Deed / Lease Deed 2) Board

resolution on authorization to sign the claim application

3) Chartered Accountant Certificate on shareholding.

6 31/10/2015

M/s.Rajapalayam Mills Ltd.,

Gopinenipalem (V), Vatsavai

(M), Krishna Dist

Rs.3,23,470/- (Rupees three lakhs twenty three thousand

four hundred and seventy only) towards sanction of

reimbursement of sales tax in respect of 2014-15 under

IIPP 2005-10

7 31/10/2015

M/s.Sudarshanam Spinning

Mills Tirumalagiri (V),

Jaggaiahpet (M), Krishna Dist

Rs.16,48,050/- (Rupees sixteen lakhs forty eight

thousand and fifty only) towards sanction of

reimbursement of sales tax in respect of 2014-15 under

IIPP 2005-10

8 26/11/2015

M/s Parag Milk Foods Private

Limited, Samudrapalli(V),

Pengaragunta(PO),

Palamaner(M), Chittoor District

Rs.21,75,294/- (Rupees twenty one lakhs seventy five

thousand two hundred ninety four only) towards

reimbursement of sales tax for the year of 2014-15

under IIPP 2010-15 subject to submission of the

following shortfall information:1) Valid CFO from

APPCB 2.Form – A Certificate with round seal of the

CT department .

9 31-10-

2015

M/s.Sri Harini Textiles Limited,

Tirumalagiri (V), Jaggaiahpet

(M), Krishna Dist

Rs.88,370/- (Rupees eighty eight thousand three

hundred and seventy only) towards sanction of

reimbursement of sales tax in respect of 2014-15

under IIPP 2005-10.

Page 94: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 94 ::

10 31-10-

2015

M/s.Sri Vishnu Shankar Mills

Limited, Gopinenipalem (V),

Vatsavai (M), Krishna Dist

Rs.5,59,040/- (Rupees five lakhs fifty nine thousand

and forty only) towards sanction of reimbursement

of sales tax in respect of 2014-15 under IIPP 2005-

10

11 31-10-

2015

M/s.Sandhya Spinning Mill

Ltd., Gopinenipalem (V),

Vatsavai (M), Krishna Dist

Rs.4,19,720/- (Rupees four lakhs nineteen thousand

seven hundred and twenty only) towards sanction of

reimbursement of sales tax in respect of 2014-15

under IIPP 2005-10

12 29-12-

2015

M/s Worington Nitin Cylinders

Ltd, VSEZ, Duvvada(V&M),

Visakhapatnam

Rs.14,09,370/- ( Rupees fourteen lakhs nine

thousand three hundred and seventy only) towards

sanction of reimbursement of Sales tax in respect of

2012-13 under IIPP 2010-15.

Page 95: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 95 ::

III.REIMBURSEMENT OF POWER COST Annexure –III

S

No

Date of

received

claim

Name of the unit Sanctioned amount

1 02/08/2015

M/s Shri Govindaraja Textiles Ltd,

708, Peddarangapuram (V),

Pulivendala (M), Kadapa

Rs.4,20,75,189/- (Rupees four crores twenty lakhs

seventy five thousand one hundred and eighty nine only)

towards present claim of 1st quarter of 2015-16

incluring deferential amount.

2 28/08/2015

M/s Sakku Spinning Mills Ltd,

(existing) Chinakondrupadu (V),

Prathipadu (M), Guntur

Rs.48,56,200/- (Rupees forty eight lakhs fifty six

thousand and two hundred only) towards power cost

reimbursement for 1st quarter of 2015-16 under IIPP

2005-10, subject to submission of the following shortfall

information:1) Land conversion certificate 2)Valid CFO

from APPCB 3) Approved Project Report 4) CA

certificate on Board resolution authorizing person

signing the claim application for 1st quarter of 2015-16.

6) Approved Plans from Gram Panchayath, T&CP, and

Factories Department 7) Bank sanction letter.

3 28/08/2015

M/s Gajavalli Spinning Mils (P) Ltd,

Narakoduru (V), Chebrolu (V) & (M),

Guntur Dist

Rs.54,58,825/- (Rupees fifty four lakhs fifty eight

thousand eight hundred and twenty five only) towards

power cost reimbursement for 1st quarter of 2015-16

under Industrial Investment Promotion Policy 2005-

2010, subject to submission of the following shortfall

information:1) Valid CFO from APPCB 2) Land

conversion certificate 3) Approved Plans from Gram

panchayat, Factories Dept & T&CP 4) CA certificate

on percentage of share holding

4 28/08/2015 M/s Kallam Spinning Mils (Open End

unit) Chowdavaram (V), Guntur Dist

Rs.34,95,350/- (Rupees thirty four lakhs ninety five

thousand three hundred and fifty only) towards power

cost reimbursement for 1st quarter of 2015-16 subject

to submission of the following shortfall information:1)

Board resolution, 2) Approved Plans from T&CP,

Factories, Gram panchyath 3) Land conversion

certificate 4)Valid CFO from APPCB 5) CA certificate

on percentage of share holding.

Page 96: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 96 ::

5 28/08/2015

M/s Sri Venkata Siva Parvathi

Spinning Mill (P) Ltd, (2nd Exp) GBC

Road, Chebrolu (V&M), Guntur Dist Zero

6 29/08/2015 M/s Ranganayaka Spinning Mills (P)

Ltd, Boyapalem (V), Edlapaldu (M),

Rs.53,67,331/- (Rupees fifty three lakhs sixty seven

thousand three hundred and thirty one only) towards

power cost reimbursement for 1st quarter of 2015-16

subject to furnishing the shortfalls:1) Board resolution

on authorization to sign the claim application. 2) GP

approval 3) Land conversion certificate 4) CFO from

APPCB 5) Bank sanctioned letter 6) Approved project

report 7) CA certificate on percentage of share holding.

7 29/08/2015

M/s Ranganayaka Spinning Mills (P)

Ltd, (Exp) Boyapalem (V), Edlapaldu

(M),

Rs.10,05,181/-(Rupees ten lakhs five thousand one

hundred and eighty one only) towards power cost

reimbursement for 1st quarter of 2015-16 subject to

furnishing the shortfalls: 1) Approved Plans from GP,

T&CP, Factories Department 2) Land conversion

certificate 3) Valid CFO from APPCB, 4) CE Certificate

5) Approved project report 6) CA certificate on

percentage of share holding.

8 29/08/2015

M/s Pavan Cotton Products (P) Ltd

(Exx-1) Pulladigunta(V),

Vatticherukur (M), Guntur

Rs. 16,02,752/- (Rupees sixteen lakhs two thousand

seven hundred fifty two only) towards power cost

reimbursement for 1st quarter of 2015-16 subject to

furnishing the shortfalls: land documents 2) Valid CFO

from APPCB, 3) Land conversion certificate 4)

Approved project report 5) T&C approval plan 6) CA

certificate on percentage share holding

9 29/08/2015

M/s Sri Venkata Lakshmi Narasimha

spinning Mills ,(Exp) Sy No: 176/4,

GBC, Road, Chebrolu (V &M),

Guntur

deferred

10 29/08/2015

M/s Krishna Murthy Spinning Mills

(P) Ltd, NH-5, Thimmapuram (V),

Edladpau (M), Guntur Dist

Rs.36,82,550/- ( Rupees thirty six lakhs eighty two

thousand five hundred and fifty only) towards power

cost reimbursement for 1st quarter of 2015-16 subject

to submission of the following shortfall information:1)

Approved Plans from Grampanchyath, T&CP,

Factories 2) Valid CFO from APPCB 3) Land

Conversion certificate 3) Bank sanction letter 4)

Page 97: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 97 ::

Approved project report

11 05/09/2015

M/s YSR spinning & weaving Mills

(P) Ltd (3rd Exp) D No: 265 7A,

Gangavaram (V), Nadendla (M),

Guntur Dist

Rs.10,75,860/- (Rupees ten lakhs seventy five

thousand eight hundred and sixty only) towards power

cost reimbursement for 1st half year 2012-13 to 2nd half

year of 2014-15 subject to submission of the following

shortfall information:1) Land documents 2) Board

resolution on authorization to sign the claim application

3) Approved Plan from Grampanchayath, 4)Approved

Plan from T&CP Department 5) Approved Plan from

Factories Department

12 10/09/2015

M/s.The KCP Limited (KCP Cement

Unit-II)Muktyala, Jaggaiapeta (M)

Krishna Dist

Rs.81,97,460/- (Rupees eighty one lakhs ninety seven

thousand four hundred and sixty only) towards power

cost reimbursement for 1st quarter of 2015-16 Subject to

submission of the following shortfall information:1)

Certification of Incorporation 2) Board resolution on

authorization to sign the claim application 3) Approved

Plans from DT&CP / UDA 4) Valid CFO /

Acknowledgment from APPCB 5) Project report 6) CA

certificate for shareholding 7) Land Conversion

Certificate.

13 11/09/2015

M/s Sri Lakshmi Narasimha Spinning

Mill (India) Pvt Ltd,

Veppalavaripalem (M), Prakasam Dist

Rs.56,61,810/- (Rupees Fifty six lakhs sixty one

thousand eight hundred and ten only) towards power

cost reimbursement for 1st quarter of 2015-16 Subject to

submission of the following shortfall information:1)

Approved Plan from T&CP 2) Valid CFO /

Acknowledgment from APPCB 3)

Approved Plan from Grampanchayth 4) Land

Conversion Certificate.

14 15/09/2015

M/s Sai Global Yarntex (India) Pvt

LTd, Sy No: 103/a, 107,133,143/1,

142/2, Vellampalli (V), Maddipadu

(M), Prakasam Dist

Rs.5,55,930/- (Rupees five lakhs fifty five thousand

nine hundred and thirty only) towards power cost

reimbursement for 1st quarter of 2015-16 subject to

submission of the following shortfall information:1)

Land Sale Deed / Lease Deed 2) Approved

Plans from Grampancyath 3) Approved Plans from

T&CP 4) Approved Plans from Factories Department

5) Land Conversion Certificate 6) Civil Engineer

Certificate 7) Approved Project Report .

Page 98: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 98 ::

15 15/09/2015 M/s NSL Textiles Ltd, D No: 6/275-1,

Inkollu , Prakasam Dist

Rs.3,49,06,296/-(Rupees three crores forty nine lakhs

six thousand two hundred and ninety six only) towards

power cost reimbursement for 4th quarter of 2014-15

subject to submission of the following shortfall

documents: 1) IEM Part-B 2) Approved plans from

Factories Department 3) Land conversion certificate 4)

Project Report 5) Valid CFO from APPCB 6)

Approved Plans from DT& CP 7) Base Power

Consumption units of preceding three years from

Chartered Accountant 8) Statement of Accounts and

Certification of Plant & Machinery as per Guidelines,

16 15/09/2015

M/s NSL Textiles Ltd, Sy No: 371 to

382, Kunchalavaripalem (V)

Cherukupalli (M), Guntur Dist

Rs.2,67,09,007/- towards power cost reimbursement for

1st quarter of 2015-16 under IIPP 2005-10 subject to

submission of the following shortfalls: 1) Approved

plans from Factories Department 2) Land conversion

certificate 3) Project Report 4) Valid CFO from APPCB

5) Approved Plans from DT& CP 6)

Approved Plans from Grampanchayat 7) Land Sale

Deed / Lease Deed.

17 15/09/2015

M/s A S Jute Product Pvt Ltd (Exp)

Sy No: 20/2 & 21, Nerallavalasa(V),

Padmanabam (m), Visakhapatnam

Rs. 9,19,148/- (Rupees nine lakhs nineteen thousand

one hundred and forty eighty only) towards power cost

reimbursement for 1st & 2nd half years of 2014-15

18 16/09/2015

M/s Sree Jayajyothi Cements

Limaited, Yanakandla (V),

Banaganpalli (M), Kurnool District

Rs.11,36,28,130/- (Rupees eleven crores thirty six

lakhs twenty eighty thousand one hundred and thirty

only) towards sanction of reimbursement of power cost

in respect of 1st quarters of 2015-16 IIPP 2010-15

subject to submission of the following shortfall

information:1) Land Conversion Certificate 2) Plant &

Machinery Statement certified by the Financial

Institution as per guideline 3) Project report 4)

Charted Accountant Certificate on share holding 5 ) Sale

Deed 6) Board resolution on authorization to sign the

claim application.

Page 99: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 99 ::

19 18/09/2015

M/s NSL Textiles Ltd, (Mega

Project) Edlapadu (V), & (M), Guntur

Dist

Rs 1,59,96,232/- (Rupees one crore fifty nine lakhs

ninety six thousand two hundred and thirty two only)

towards power cost reimbursement for 1st quarter of

2015-16 subject to submission of the following shortfall

information:1) Land Sale Deed / Lease Deed 2) Land

Conversion Certificate 3) Valid CFO from APPCB 4)

Project Report 5) CA certificate on share holding 6)

Approved Plans from Gram Panchayat 7) Approved

Plans from T&CP 8) Approved Plans from Factories

Department.

20 21/09/2015 M/s.NSL Textiles Ltd., Veeravalli

(V), Bapulapadu (M), Krishna Dist

Rs.2,80,76,307/- (Rupees two crores eighty lakhs

seventy six thousand three hundred and seven only)

towards sanction of reimbursement of power cost in

respect of 1st quarters of 2015-16

21 26/09/2015 M/s.Paramesu Biotech Private

Limited, West Godavari District

Rs.7,21,700/- (Rupees seven lakhs twenty one thousand

and seven hundred only) towards sanction of

reimbursement of power cost in respect of 2nd half year

of 2015-16 under IIPP 2005-10 subject to submission

of the following shortfall information:1) Project Report

2) IEM Part-B 3) Approved plans from Grampanchyath

4) Approved plan from Factories Department 5)

Approved plans of T&CP Department 6) Power Release

Certificate duly incorporating power load.

22 28/09/2015

M/s Vasantha Spinners Ltd, (Exp-I)

NH-5, Thimmapuram (V), Edlapadu

(M), Guntur Dist

deferred

23 09/10/2015

M/s Lohiya Edible Oils Pvt. Ltd.,

(Unit-II) (Existing), Plot No.25, IDA,

Vakalapudi (V), Kakinada Rural

Mandal, East Godavari District

Rejected

Page 100: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 100 ::

24 17/10/2015

M/s Emami Biotech Limited, Sy.No.

501 to 510, Krishnapatnam Port Zero

Point, Pantapalem (V), Muthukuru

(M), SPSR Nellore District

Rs.65,55,470/- (Rupees sixty five lakhs fifty five

thousand four hundred and seventy only) towards

sanction of reimbursement of power cost in respect of

2nd quarters of 2015-16 under IIPP 2005-10 Subject to

submission of the following shortfall information:1)

Meeseva receipt for the 1st quarter of 2015-16 2) Date

of receipt of application at DIC not available for the

2nd claim 3) IEM, Partnership form B, unattested 4)

Gram Panchayth, Factories , T&CP Dept approved plans

5) M/c statement not as per guidelines 6) project report

7) Board resolution authorizing the person not singed 8)

Land conversion certificate

25 17/10/2015

M/s Sree Rayalaseema Alkalies and

Allied Chemicals Ltd., Gondiparla

(V), Kurnool

Rs.11,82,39,540/- (Rupees eleven crores eighty two

lakhs thirty nine thousand five hundred and forty only)

towards sanction of reimbursement of power cost in

respect of 2nd quarters of 2015-16 under IIPP 2005-10

subject to submission of the following shortfall

information:1) IEM Part-B 2) Land Sale Deed / Lease

Deed 3) Certificate of Incorporation 4) Board resolution

on authorization to sign the claim application 5)

Approved Plan from Factories Department 6) Valid

Boiler Certificate 7) Certification of Plant and

Machinery as per operational guidelines 8) Civil

Engineer Certificate 9) Project Report 10) Chartered

Accountant Certificate on shareholding 11) Land

Conversion Certificate 12) CA certificate for

consumption of power for previous period for fix base

12) CFO certificate not attested 13) Gram Panchayth

approval not furnished 15) Power release certificate not

attested & Payment proof for the power bills.

26 26/10/2015

M/s Sri Anantha Lakshmi Spinning

Mills (P) Ltd, (Exp-1) 59/1,

Boyapalem (V), Edlapadu (M), Guntur

Dist

Rs.66,04,160/- (Rupees sixty six lakhs four thousand

one hundred and sixty only) towards sanction of

reimbursement of power cost in respect of 2nd quarters

of 2015-16 under IIPP 2015-20 subject to submission

of the shortfall document - Land conversion certificate

27 26/10/2015

M/s.Jaypee Balaji Cement Plant, Rs

No: 99, Budawada, Jaggaiahpet (M),

Krisna Dist

Rs.6,09,63,560/- (Rupees six crores nine lakh sixty

three thousand five hundred and sixty only) towards

sanction of reimbursement of power cost in respect of

1st & 2nd quarters of 2014-15 under IIPP 2010-15

subject to submission of the following shortfall

information:1) Land sale deed / lease deed 2) Certificate

of Incorporation 3) Board resolution on authorization to

sign the claim application 4) CFO from APPCB 5)

Certification of Plant & Machinery as per guideline by

GM DIC 7) Project Report 8) Chartered Accountant

Certificate on share holding

Page 101: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 101 ::

28 30/10/2015

M/s Net Matrix Limited, Plot No:

15&15A, APSEZ, Atchuthapuram,

Visakhapatnam

Rs.16,89,180/- (Rupees sixteen lakhs eighty nine

thousand one hundred and eighty only) towards sanction

of reimbursement of power cost in respect of 1st & 2nd

quarters of 2014-15 under IIPP 2010-15 Subject to

submission of the following shortfall information:1)

Land Sale Deed / Lease Deed 2) Board resolution on

authorization to sign the claim application 3) Chartered

Accountant Certificate for investment & share holding.

29 31/10/2015

M/s.Sudarshnam Spinning Mills Ltd.,

Rs.52&53, Tirumalagiri (V), Jaggaipet

(M) Krishna Dist

Rs.38,26,440/- (Rupees thirty eight lakhs twenty six

thousand four hundred and forty only) towards sanction

of reimbursement of power cost in respect of 1st

quarters of 2015-16 under IIPP 2005-10

30 31/10/2015

M/s.Sri Harini Textiles Limited,

Rs.No:47,48 & 49, Tirumalagiri (V),

Jaggaiahpet (M), Krishna Dist

Rs.36,63,940/- (Rupees thirty six lakhs sixty three

thousand nine hundred and forty only) towards sanction

of reimbursement of power cost in respect of 1st

quarters of 2015-16 under IIPP 2005-10

31 31/10/2015

M/s.Sandhya Spinning Mill Ltd.,

Gopinenipalem (V), Vatsavi (M),

Krishna Dist

Rs.42,67,010/- (Rupees forty two lakhs sixty seven

thousand and ten only) towards sanction of

reimbursement of power cost in respect of 1st quarters of

2015-16 under IIPP 2005-10

32 31/10/2015

M/s.Rajapalayam Mills Ltd.,

Gopinenipalem (V), Vatsavai (M),

Krishna Dist

Rs.47,32,410/- (Rupees forty seven lakhs thirty two

thousand four hundred and ten only) towards sanction of

reimbursement of power cost in respect of 1st quarters

of 2015-16 under IIPP 2005-10

33 31/10/2015

M/s.Sri Vishnu Shankar Mill Ltd.

Gopinenipalem (V), Vatsavai (M),

Krishna Dist

Rs.45,04,810/- (Rupees forty five lakhs four thousand

eight hundred and ten only) towards sanction of

reimbursement of power cost in respect of 1st quarters

of 2015-16 under IIPP 2005-10

34 01/11/2015

M/s Bala Rama krishna Spinning

Mills (P) Ltd, (Exp-1) Chowdavaram

(V), Guntur

Rs.20,30,212/- (Rupees twenty lakhs thirty thousand

two hundred and twelve only) subject to submission of

the following shortfall information:1) IEM Part -B for

confirmation of DCP 2) Approved Plans from T

&CP Department 3) Valid CFO from APPCB 4) Bank

Statement Certification 5) Civil Engineer Certificate 6)

Approved project report 7) Land Sale Deed / Lease

Deed 8) Approved Plans from Factories Department

Page 102: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 102 ::

35 02/11/2015 M/s Bhavya Cements Ltd, Tangeda

(V), Dachepalli (M), Guntur Dist

Rs.5,37,74,480/- (Rupees five crore thirty seven lakhs

seventy four thousand four hundred and eighty only)

towards sanction of reimbursement of power cost in

respect of 2nd quarters of 2015-16 under IIPP 2005-10

36 03/11/2015

M/s J C Bio Tech (P) Ltd, Plot No:

548 to 550, IGC, Gundlapalli (V),

Maddipadu (M), Prakasam Dist

Rs.25,76,700/- (Rupees twenty five lakhs seventy six

thousand and seven hundred only) towards sanction of

reimbursement of power cost in respect of 1st half year

of 2015-16 under IIPP 2010-15 subject to submission

of the following shortfall information:1) Land

Conversion Certificate 2) Valid CFO from APPCB 3)

Approved Plans from Factories Department 4) Plant &

Machinery Statement from Financial Institution as per

guidelines

37 04/11/2015 M/s Amaravathi Textiles (P) Ltd (4th

Exp) Martur (V&M), Prakasam Dist

Rs.1,33,85,866/- (Rupees one crore thirty three lakhs

eighty five thousand eight hundred sixty six only)

towards reimbursement of power cost for 2nd quarter

2015-16

38 06/11/2015

M/s.PVR Spinning and Weaving

Mills (Expansion),RSNo.110/2,

108/2,3,4,, Kondaipalem road, Tetali

village, Tanuku (M), West Godavari

District

Rs.14,68,326/-(Rupees fourteen lakhs sixty eight

thousand three hundred and twenty six only) towards

sanction of reimbursement of power cost in respect of

1st half year of 2015-16 subject to submission of

shortfall documents: 1) IEM Part-B for expansion

project 2) Approved Plans from T&CP

Department 3) Valid CFO From APPCB 4 ) Project

Report

Page 103: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 103 ::

39 07/11/2015 M/s Ajantha Spintex Limited, Kakani

(V), Narasaopet(M) Guntur

Rs.38,52,320/-(Rupees thirty eight lakhs fifty two

thousand three hundred and twenty only) towards

sanction of reimbursement of power cost in respect of

1st half year of 2015-16 under IIPP 2010-15 Subject to

submission of the following shortfall

information:1)Approved Plans from Gram Panchayath

2) Land Conversion Certificate 3) Valid CFO from

APPCB 4) Approved Plans from T&CP Department 5)

Approved Plans from Factories Department 6) Bank

sanction letter

40 13/11/2015

M/s Teamec Chorate Limited, Plot

No: 558 & 559, IGC, Gundlapalli (V),

Maddi padu (M) Prakasam Dist

Rs.1,22,20,900/- (Rupees one crore twenty two lakhs

twenty thousand and nine hounded only) towards

sanction of reimbursement of power cost in respect of 1st

half year of 2015-16 under IIPP 2010-15 subject to

submission of the following shortfall information:1)

Valid CFO from APPCB 2) Justification whether new

unit or expansion as per IEM 3) Certification of Plant

& Machinery as per operational guidelines.

41 16/11/2015

M/s Idupulapadu Cotton Mils Pvt Ltd

, Jonnatali (V), Martur (M), Prakasam

Dist

Rs.3,16,80,240/- (Rupees three crore sixteen lakhs

eighty thousand two hundred and forty only) towards

sanction of reimbursement of power cost in respect of

2nd quarter of 2015-16 under IIPP 2005-10.

42 18/11/2015 M/s.NSL Textiles Ltd., Near JNTU,

APIIC, Pulivendula, YSR Kadapa dist

Rs.1,49,97,650/- (Rupees one crore forty nine lakhs

ninety seven thousand six hundred and fifty only)

towards sanction of reimbursement of power cost in

respect of 1st quarters of 2015-16 under IIPP 2005-10

Page 104: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 104 ::

43 20/11/2015 M/s Kallam Spinning Mils Ltd, G T

Road, Martur (V&M), Prakasam Dist

Rs.1,03,30,060/- (Rupees one crore three lakhs thirty

thousand and sixty only) towards sanction of

reimbursement of power cost in respect of 1st half year

of 2014-15 & 1st half year of 2015-16 under IIPP

2005-10 Subject to submission of shortfall document -

Certification of Plant & Machinery as per operational

guidelines.

44 23/11/2015

M/s.Ravali Spinners Pvt Ltd., (Exp-

1), Khandavali (V), Peravalli (M)

West Godavari Dist

Rs.1,95,93,928/- (Rupees one crore ninety five lakhs

ninety three thousand nine hundred and twenty eight

only) towards sanction of reimbursement of power cost

in respect of 2nd quarter of 2015-16 under IIPP 2005-

10, subject to following shortfalls:1) Meeseva Receipt

conformation form the GM, DIC 2) Valid CFO from

APPCB, 3) Project report 4) Chartered Accountant

certification on shareholding 5) Certificate of

Incorporation 6) Board resolution on authorization to

sign the claim application 7) Statements of Accounts 8)

IEM Part-B 9) Land Sale Deed / Lease Deed 10) Land

Conversion Certificate 11) Plant & Machinery statement

of the Financial Institution as per operational guidelines

12) Civil Engineer Certificate 13) Chartered Accountant

Certificate for fixing the base units 14) Difference in

power load w.r.t. DCP 15) Approved Plans from Gram

Panchayat 16) Approved Plans from DT&CP with

attestation 17)Approved Plans from Factories

Department with attestation.

45 24/11/2015

M/s.The KCP Limited(KCP Cement

Unit-II), Muktyala, Jaggaiahpeta (M)

Krishna Dist

Rs.66,12,650/- (Rupees sixty six lakhs twelve thousand

six hundred and fifty only) towards sanction of

reimbursement of power cost in respect of 2nd quarter

of 2015-16 under IIPP 2005-10

Page 105: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 105 ::

46 24/11/2015

M/s. Mandava Cotton Mills Pvt Ltd.,

Sy No: 92/4, Ampapuram (V),

Bapulapadu (M), Krishna Dist

Rs.64,03,280/- (Rupees sixty four lakhs three thousand

two hundred and eighty only) towards sanction of

reimbursement of power cost in respect 1st quarter of

2015-16 under IIPP 2005-10 subject to submission the

following shortfalls:1) Valid CFO from APPCB, 2)

Bank sanction letter 3) Project report 4) Chartered

Accountant Certification on shareholding 5) Reasons

for decrease of KVA from 2000 to 1650 and

clarification on connection load.

47 26/11/2015

M/s.Sri Vishnu Shankar Mill Ltd.

Gopinenipalem (V), Vatsavai (M),

Krishna Dist sanction of

reimbursement of power cost in

respect 2nd quarter of of 2015-16

under IIPP 2005-10

Rs.47,36,821/- (Rupees forty seven lakhs thirty six

thousand eight hundred and twenty one only) towards

sanction of reimbursement of power cost in respect 2nd

quarter of 2015-16 under IIPP 2005-10

48 26/11/2015

M/s.Rajapalayam Mills Ltd.,

Gopinenipalem (V), Vatsavai (M),

Krishna Dist

Rs.49,83,559/- (Rupees forty nine lakhs eight three

thousand five hundred and fifty nine only) towards

sanction of reimbursement of power cost in respect 2nd

quarter of 2015-16 under IIPP 2005-10

49 26/11/2015

M/s.Sandhya Spinning Mill Ltd.,

Gopinenipalem (V), Vatsavai (M),

Krishna Dist

Rs.47,81,223/- (Rupees forty seven lakhs eighty one

thousand two hundred and twenty three only) towards

sanction of reimbursement of power cost in respect 2nd

quarter of 2015-16 under IIPP 2005-10

50 26/11/2015

M/s.Sri Harini Textiles Limited,

Rs.No:47,48 & 49, Tirumalagiri (V),

Jaggaiahpet (M), Krishna Dist

Rs.44,85,360/- (Rupees forty four lakhs eighty five

thousand three hundred and sixty only)towards sanction

of reimbursement of power cost in respect 2nd quarter

of 2015-16 under IIPP 2005-10

Page 106: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 106 ::

51 26/11/2015

M/s.Sudarshanam Spinning Mills Rs

No: 52 & 53 Tirumalagiri (V),

Jaggaiahpet (M), Krishna Dist

Rs.41,19,245/- (Rupees forty one lakhs nineteen

thousand two hundred and forty five only) towards

sanction of reimbursement of power cost in respect 2nd

quarter of 2015-16 under IIPP 2005-10

52 26/11/2015

M/s.Vennar Ceramics Ltd,

Perikigudem, Mandavalli (M), Krishna

Dist

Rs.28,99,800/- (Rupees twenty eight lakhs ninety nine

thousand and eight hundred only) towards

reimbursement of power cost for 1st half year of 2015-

16 under IIPP 2010-15, subject to submission of the

following shortfall information:1) Board resolution for

authorizing persons to sign the claim. 2) Project report

3) CA certificate for share holding.

53 26/11/2015

M/s Parag Milk Foods Private

Limited, Samudrapalli(V),

Pengaragunta(PO), Palamaner(M),

Chittoor District

Rs. 53,22,700/- ( Rupees fifty three lakhs twenty two

thousand and seven hundred only) towards

reimbursement of power cost for 1st half year of 2015-

16 under IIPP 2010-15, subject to submission of the

following shortfall information: 1) Civil Engineering

certificate, 2) Original Statement of Accounts, 3) Plant

and machinery statement as per guidelines, 4) As per the

claim application it is expansion, the GM, DIC should

confirm whether it is expansion project or new.

54 27/11/2015

M/s.Silica Ceramica Pvt Ltd.,

Narayanapuram (V), Unguturu (M), W

G Dist.

Rs.82,77,130/- (Rupees eighty two lakhs seventy seven

thousand one hundred and thirty only) towards

reimbursement of power cost for 1st and 2nd quarter of

2015-16 subject to submission of the following shortfall

information:1. Land sale deed or lease deed 2. Company

incorporation certificate, 3. Project report 4. Valid CFO

from APPCB, 5. CA certificate for share holding, 6.

Machinery statement as per guidelines 7.Factories Dept

approval with plans 8) Land conversion certificate

9.Board resolution for authorizing the person to sign the

claim 10.Bank sanction letter 11. Statement of Account

with attestation.

Page 107: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 107 ::

55 27/11/2015

M/s.Sri Srinivasa Spintex (India)

Limited (Expansion-I), Pedatadepalli

(V), Tadapalligudem (M), W.G Dist

Rs.41,38,086/- (Rupees Forty one lakhs thirty eight

thousand and eighty six only) towards reimbursement of

power cost for 1st half year of 2015-16 under IIPP

2010-15, subject to submission of the following shortfall

information:1. Land lease or sale deed, 2. Company

incorporation certificate, 3. Board resolution, 4. 5.Valid

CFO, 6.Statement of Accounts, 7.Machinery statement

as per guidelines, 8. Civil Engineer certificate, 9. Power

release certificate, 10.C.A. Certificate for expansion

project. 11.Grampanchyath approval 12. Land

conversion certificate 13.Bank term loan sanction letter

14. Project report 15. CA certificate for shareholding 16.

DT&CP approval 17. Factories Dept approved plans.

56 27/11/2015

M/s.Sri Srinivasa Spintex Private

Limited. (existing), Pedatadepalli (V),

Tadapalligudem (M), W.G Dist

Rs.58,48,780/- (Rupees fifty eight lakhs forty eight

thousand seven hundred and eighty only) towards

reimbursement of power cost for 1st quarter of 2015-16

under IIPP 2005-10, subject to submission of the

following shortfall information1. Grampanchyath

approval 2. Land conversion certificate 3.Bank term

loan sanction letter 4. Project report 5. CA certificate for

shareholding 6. DT&CP approval 7. Factories Dept

approved plans 8. Justification for increase in power

load.

57 27/11/2015

M/s.Sri Srinivasa Spintex Private

Limited (existing), Pedatadepalli (V),

Tadapalligudem (M), W.G Dist

Rs 60,34,790/- (Rupees sixty lakhs thirty four thousand

seven hundred and ninety only) towards reimbursement

of power cost for 2nd quarter of 2015-16 under IIPP

2005-10 subject to submission of the following shortfall

information1. Grampanchyath approval 2. Land

conversion certificate 3.Bank term loan sanction letter 4.

Project report 5. CA certificate for shareholding 6.

DT&CP approval 7. Factories Dept approved plans 8.

Justification for increase in power load.

58 27/11/2015

M/s.SVR Spinning Mills Private

Limited, Malleswaram (V), Peravalli

(M), W G Dist

Rs. 21,44,430/- (Rupees twenty one lakhs forty four

thousand four hundred and thirty only) towards

reimbursement of power cost for 1st half year of 2015-

16 under IIPP 2010-15, subject to submission of the

following shortfall information: 1. Board resolution 2.

Valid CFO from APPCB, 3.Civil Engineer certificate 4.

Project report 5.CA certificate for share holding 6.

Page 108: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 108 ::

Reason for increase in power load from 750KVA to

1501 KVA

59 27/11/2015

M/s.Sri Srinivasa Spintex (India)

Limited (Exp-2), Pedatadepalli (V),

Tadapalligudem (M), W.G Dist

Rs. 32,56,942/- (Rupees thirty eight lakhs fifty six

thousand nine hundred and forty two only) towards

reimbursement of power cost for 1st half year of 2015-

16 under IIPP 2010-15 subject to submission of the

following shortfall information: 1. IEM part-B, 2. Land

sale deed or lease deed 3. Gram Panchayath approval 4.

DT&CP approval/ UDA approval 5. Machinery

statement duly certified as per guidelines 6. Company

incorporation certificate 7. Board authorization 8. Land

conversion 9. Civil engineer certificate 10.CA

certificate.

60 02/12/2015

M/s Bhavanam Spinning Mills (P)

Ltd, (Exp), Bhimenenivaripalem,

Guntur Dist

Rs.32,88,840/-(Rupees Thirty two lakhs eighty eight

thousand eight hundred and forty only) towards

reimbursement of power for 2nd quarter of 2015-16

under IIPP 2005-10.

61 02/12/2015

M/s Sree Veerabramedra Swamy

Spinning Mills, Lingam gutta (V),

Chilakalurpeta (M), Guntur Dist

Rs.43,89,500/- (Rupees Forty three lakh eighty nine

thousand five hundred only) towards reimbursement of

power cost for2nd quarter of 2015-16 under IIPP 2005-

10.

62 02/12/2015

M/s Sakku Spinning Mills Ltd,

(existing)Chinakondrupadu (V),

Prathipadu (M), Guntur

Rs.36,50,100/- (Rupees thirty six lakhs fifty thousand

and one hundred only) towards reimbursement of power

cost for 2nd quarter of 2015-16 subject to submission

of the following shortfall information:1. Land

conversion certificate 2. Valid CFO from APPCB 3.

Approved project port 4.CA certificate 5. Board

resolution for person to sign in claim application. 6.

Gram Panchyath, T&CP and Factories Dept approval 7.

Bank sanctioned letter.

Page 109: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 109 ::

63 02/12/2015

M/s Sri Lakshmi Godavari Spinning

Mills (P) Ltd, (Existing) S.No: 113,

Chebrolu (V) & (M), Guntur Dist

Rs.59,26,440/- (Rupees fifty nine lakhs twenty six

thousand four hundred and forty only) towards

reimbursement of power cost for 2nd quarter of 2015-16

subject to submission of the following shortfall

information: 1. Confirmation on installation of

additional machinery due to increase in power load from

650 kva to 4950 kva

64 02/12/2015

M/s Bhavanam Spinning Mills (P) Ltd,

(Exp -2,) Bhimenenivaripalem, Guntur

Dist

Rs.88,95,970/- (Rupees eighty eight lakhs ninety five

thousand nine hundred and seventy only) towards

reimbursement of power cost for 2nd quarter of 2015-

16 under IIPP 2005-10

65 02/12/2015

M/s Sakku Spinning Mills Ltd,

(Exp)Chinakondrupadu (V),

Prathipadu (M), Guntur

Rs.76,84,160/- (Rupees seventy six lakhs eighty four

thousand one hundred and sixty only) towards

reimbursement of power cost for 1st half year of 2015-

16 subject to submission of the following shortfall

information:

66 02/12/2015

M/s Vasantha Spinners Ltd, (Exp-I)

NH-5, Thimmapuram (V), Edlapadu

(M), Guntur Dist

Rs.96,64,822/- (Rupees Ninety six lakhs sixty four

thousand eight hundred and twenty two only) towards

reimbursement of power cost for 1st & 2nd quarters of

2015-16 Subject to submission of the following

shortfall information: 1. land documents 2. Board

resolution authorizing person to sign to claim 3. Grama

panchayath, Factories Dept, T&CP dept approved plan

4. Approved project report 5. Land conversion

certificate 6. Bank sanctioned letter 7. CA certificate

indicating Investments

67 02/12/2015

M/s Sri Venkata Siva Parvathi

Spinning Mill (P) Ltd, (2nd Exp) GBC

Road, Chebrolu (V&M), Guntur Dist

Rs. 11,49,700/- (Rupees Eleven lakhs forty nine

thousand seven hundred only) towards reimbursement

of power cost for 2nd quarter of 2015-16 under IIPP

2005-10,

68 02/12/2015 M/s Sri Sai Balaji Spintex (P) Ltd,

Unnava(V), Edlapadu (M), Gutnur.

Rs.84,58,286/- (Rupees Eighty four lakhs fifty eight

thousand two hundred and eighty six only) towards

reimbursement of power cost for 1st half year of 2015-

16 under IIPP 2010-15, subject to submission of the

following shortfall information:1. T&CP, Factories Dept

approval 2. Valid CFO from APPCB.

Page 110: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 110 ::

69 02/12/2015

M/s.Usha Spincoat Pvt Ltd,

Chikkavaram , Gannavaram (M),

Krishna Dist

Rs.83,73,470/- (Rupees eighty three lakhs Seventy

three thousand four hundred and seventy only) towards

reimbursement of power cost for2nd quarter of 2015-

16 under IIPP 2010-15

70 02/12/2015

M/s Lanco Industries(2nd Expansion),

Rachagunneri(V), Srikalahasthi(M),

Chittoor District

Rs.2,55,92,425/- (Rupees two crores fifty five lakhs

ninety two thousand four hundred and twenty five only)

towards reimbursement of sales tax for the year 2013-

14, subject to clarification and conformation of the

Mega status and applicability of GO for 1st expansion

from the Government and also subject to submission of

short fall information 1. Land sale deed or lease deed 2.

Company incorporation certificate,3.Grama Panchayat

approval, 4.Town and country planning approval 5.

Land conversion certificate 6.Power release certificate

7. Valid CFO issued by APPCB 8. Board resolution

authorizing the person to sign the claim applications 9.

Project report. 10.CA certificate for shareholding

10.GM, DIC, has not mentioned the line of activity in

his recommendation.

71 04/12/2015

M/s Vasantha Spinners Ltd, (Exp-II)

NH-5, Thimmapuram (V), Edlapadu

(M), Guntur Dist

Rs.2,71,82,699/-(Rupees two crores Seventy one lakhs

eighty two thousand six hundred and ninety nine only)

towards power cost reimbursement for 1st and 2nd

quarter of 2015-16 under IIIPP 2005-2010 subject to

submission of the following shortfall information: 1.

Land documents 2. Valid CFO from APPCB, 3.

Company incorporation certificate 4. Board resolution

authorising to sing on claim application 5, GP, T&CP

Factories Dept approval 6. Land conversion certificate

7. Bank sanction letter 8. CA Certificate 9. Reason for

increase power load 10. GM to clarify the name of the

unit is M/s Vasantha Industries Ltd as per power bill

claim is preferred in the name of M/s Vasantha spinners

Ltd.

72 04/12/2015

M/s Viswateja Spinning Mills Ltd

(Exp-2) D No: 219, Boyapalem (V),

Edlapadu (M), Guntur

Rs. 1,46,19,330/- Rupees one crore forty six lakhs

nineteen thousand three hundred and thirty only)

towards reimbursement of power cost for1st & 2nd

quarter of 2015-16 under IIPP 2005-10.

73 04/12/2015

M/s Gajavalli Spinning Mils (P) Ltd,

Narakoduru (V), Chebrolu (V) & (M),

Guntur Dist

Rs.54,85,380/- (Rupees fifty four lakhs eighty five

thousand three hundred and eighty only) towards

reimbursement of power cost for2nd quarter of 2015-16

under IIPP 2010-15.

74 04/12/2015 M/s Kallam Spinning Mils (Open End

unit) Chowdavaram (V), Guntur Dist .

Rs.41,43,680/- (Rupees forty one lakh forty three

thousand six hundred and eighty only) towards

reimbursement of power cost for2nd half year of 2015-

Page 111: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 111 ::

16 under IIPP 2005-10, subject to submission of the

following shortfall information: 1.Board resolution 2.

T&CP dept GP Factories Dept plan approval 3. Land

conversion certificate 4. Valid CFO from APPCB 5.CA

certificate indicating share holding

75 04/12/2015 M/s Ranganayaka Spinning Mills (P)

Ltd, Boyapalem (V), Edlapaldu (M),

Rs.45,81,930/- (Rupees forty five lakh eighty one

thousand nine hundred and thirty only) towards

reimbursement of power cost for 2nd quarter of of

2015-16 under IIPP 2005-10, subject to submission of

the following shortfall information: 1D T&CP dept GP

Factories Dept plan approval 2. Land conversion

certificate 3. CE certificate 4. Approved project report

5.CA certificate for share holding

76 04/12/2015

M/s Ranganayaka Spinning Mills (P)

Ltd, (Exp) Boyapalem (V), Edlapaldu

(M),

Rs. 25,37,360/- (Rupees twenty five lakhs thirty seven

thousand three hundred and sixty only) towards

reimbursement of power cost for2nd quarter of 2015-16

under IIPP 2010-15 subject to submission of the

following shortfall information:. 1) Gram panchayath

plan approval 2. Land conversion certificate 3. Board

resolution 4. Valid CFO from APPCB 5.Bank

sanctioned letter 6. Approved project report 7. CA

certificate for share holding.

77 04/12/2015

M/s Idupulapadu Cotton Mills (Exp-5)

Ganapavaram (V), Nadendla(M),

Guntur

Rs.63,97,810/- (Rupees sixty three lakhs ninety seven

thousand eight hundred and ten only) towards

reimbursement of power cost for3rd quarter of 2015-16

under IIPP 2005-10

78 04/12/2015

M/s Sri Ravi Chandra Textiles,

Ponnekalu (V), Tadikonda (M),

Guntur

Rs.31,76,730/- (Rupees thirty one lakh seventy six

thousand seven hundred and thirty only) towards

reimbursement of power cost for1st half year of 2015-

16 under IIPP 2010-15.

79 04/12/2015

M/s Mittpalli Spinners Ltd,

Chinaturakapalem (V), Narasaropeta

(M), Guntur Dist

Rs.78,33,476/- (Rupees Seventy eight lakh thirty three

thousand four hundred and seventy six only) towards

reimbursement of power cost for1st half year of 2015-

16 under IIPP 2010-15 subject to submission of the

following shortfall information: 1) Board resolution 2)

DT&CP approval 3) Factories Dept approval 3) valid

CFO frrom APPCB 4) Land conversion certificate 5)

List of Plant & Machinery

Page 112: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 112 ::

80 04/12/2015

M/s Pavan Cotton Products (P) Ltd

(Exx-1) Pulladigunta(V),

Vatticherukur (M), Guntur

Rs. 26,98,750/-(Rupees twenty six lakhs ninety eight

thousand seven hundred and fifty only) towards

reimbursement of power cost for2nd quarter of 2015-16

under IIPP 2005-10, subject to submission of the

following shortfall information: 1. Land documents 2.

Valid CFO from APPCB 3. Land conversion certificate

4. Approved project report 5. DT&CP approval plan 6.

CA certificate indicating % of share holding

81 04/12/2015

M/s Nandhivardana Textiels Milsl

LTd, NH-5, Thimmapuram (V0,

Edlapadu (M) Guntur Dist

Rs.24,33,774/- (Rupees twenty four lakhs thirty three

thousand seven hundred and seventy four only) towards

reimbursement of power cost for1st half years of 2015-

16 under IIPP 2010-15, subject to submission of the

following shortfall information: 1. Land documents 2.

Board resolution authorized to sign on claim application

3. T&CP, GP, Factories Dept approved plans 4. Valid

CFO from APPCB 5. Land conversion.6. Bank sanction

letter

82 04/12/2015 M/s Sree Lalitha Parameswari

Spinning Mills (P) Ltd, Guntur

Rs.1,65,96,163/- (Rupees One crore sixty five lakh

ninety six thousand one hundred and sixty three only)

towards reimbursement of power cost for1st and 2nd

half years of 2015-16 under IIPP 2010-15, subject to

submission of the following shortfall information: 1.

Land documents 2. Board resolution authorizing sing on

claim application 3. T&CP, GP, Factories Dept

approved plans 4. Valid CFO from APPCB 5. Land

conversion.

83 04/12/2015 M/s Krishna Ganga Spinning(P) Ltd,

Guntur Dist

Rs. 1,10,63,200/- (Rupees one crore ten lakhs sixty

three thousand two hundred only) towards

reimbursement of power cost for 4th quarter of 2010-11

to 2nd quarter of 2015-16 under IIPP 2010-15, subject to

submission of the following shortfall information: 1.

Land documents 2.. T&CP, GP, Factories Dept

approved plans 3. Valid CFO from APPCB 5. Land

conversion.6. Approved project report 7.Reason for

increase of power load 8. Plant and Machinery statement

attestation on documents.

84 04/12/2015

M/s Sriven Spincot Pvt Ltd , D No: 8-

87, Karuchela Road, Edlapadu

(V&M), Guntur

Rs.36,93,750/- (Rupees thirty six lakhs ninety three

thousand seven hundred and fifty only) towards

reimbursement of power cost for1st half year of 2015-

16 under IIPP 2010-15, subject to submission of the

following shortfall information: T& CP plan 2. Land

conversion certificate 3. Valid CFO from APPCB.

85 04/12/2015

M/s Sri Lakshmi Godavari Spinniner,

(EXP-I) S.No: 113, Chebrolu (V) &

(M), Guntur Dist Zero

Page 113: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 113 ::

86 04/12/2015

M/s Sri Venkata Lakshmi Narasimha

spinning Mills ,(Exp) Sy No: 176/4,

GBC, Road, Chebrolu (V &M),

Guntur

Rs.27,83,900/-(Rupees Twenty seven lakhs eighty three

thousand nine hundred only) towards reimbursement of

power cost for 2nd half year of 2014-15 and 1st half

year of 2015-16 under IIPP 2010-15, subject to

submission of the following shortfall information: 1.

IEM Part -B 2.DT&CP , Factories, Gram panchayath

approved plan 3. Land conversion 4. CA certificate in

original 5. Reason for increase of power load.

87 04/12/2015

M/s Sri Venkata Uma Sankara Spintex

(P) Ltd, Sy No: 33, 35/1, Vemavaram,

Phirangipuram(M), Guntur Dist

Rs.50,66,890/-(Rupees fifty lakhs sixty six thousand

eight hundred and ninety only) towards reimbursement

of power cost for1st half year of 2015-16 under IIPP

2010-15 subject to submission of the following shortfall

information:1. DT&CP, Factories Dept approved plan 2.

Land conversion certificate 3. Valid CFO from APPCB

4. Statement of Account 5. Bank sanction letter.

88 04/12/2015

M/s Thatavarthi Apparels Ltd,

(Spinning Division), Kavuru (V),

Chilakaluriperta (M), Guntur Dist

sanction of reimbursement of power

cost in respect 1st half year of 2015 -

16 under Industrial Investment

Promotion Policy 2005-10.

Rs.60,40,819/- (Rupees sixty lakhs forty thousand eight

hundred and nineteen only) towards reimbursement of

power cost for1st half year of 2015-16 under IIPP

2010-15 subject to submission of the following shortfall

information: 1 GP, Factories , DT&CP plan approval

2.Valid CFO from APPCB 3. CE Certificate 4.

Approved project report 4. Machinery statement as per

guidelines

89 04/12/2015

M/s Veera Assosicates, (Exp-1), NH-

5, Ganapavaram (V), Nadendla (M),

Guntur Dist

Transferred (MSME)

90 04/12/2015 M/s Sai Manasa Spintex (India) Ltd ,

Martur (V&M) Guntur

Rs.4,20,333/- (Rupees four lakh twenty thousand three

hundred and thirty three only) towards reimbursement of

power cost for 1st half year of 2015-16 under IIPP

2010-15, subject to submission of the following shortfall

information1:1. DT&CP and Factories approved plan 2,

Valied CFO 3. Land conversion 4. M/c list as per

guideline

Page 114: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 114 ::

91 04/12/2015 M/s Gajavalli spinning (P) Ltd (Exp),

Chebrolu (V&M) Guntur

Rs. 99,43,150/-(Rupees ninety nine lakhs forty three

thousand one hundred and fifty only) towards

reimbursement of power cost for 2nd half year of

2014-15 and first half year of 2015-16 under IIPP 2010-

15, subject to submission of the following shortfall

information:1. Company Incorporation 2 T&CP plan

3.Factories Dept approved plan for expansion 4. Land

conversion certificate, 5. Valid CFO 6. Bank sanctioned

letter 7. CE certificate 8. Approved project report

92 04/12/2015

M/s Supriya Spinning Mills Pvt Ltd

(Exp), Boyapalem, Edlapadu (M),

Guntur Dist Deferred

93 04/12/2015 M/s Lakshmi Godavari Spinning Mills

Ltd (2nd Exp), Guntur

Rs. 84,31,522/- (Rupees Eighty four lakhs thirty one

thousand five hundred and twenty two only) towards

reimbursement of power cost for1st half year of 2015-

16 under IIPP 2010-15, subject to submission of the

following shortfall information:1. Land documents 2.

Land conversion certificate 3.Valid CFO from APPCB

4. CA Certificate for share holdings

94 04/12/2015

M/s Kalpataru Spinnning Mills (Exp),

Sy NO: 210, 211/a, Thimmapuram

(V), Edlapadu (M) Guntur Dist

Rs. 42,84,913/-(Rupees forty two lakh eighty four

thousand nine hundred and thirteen only ) towards

reimbursement of power cost for 1st half year of 2015-

16 under IIPP 2010-15 subject to submission of the

following shortfall information: 1. IEM Part-B,

2,DT&CP , Factories Dept approval 3, Valid CFO from

APPCB

95 04/12/2015

M/s Sri Venkata Siva Parvathi

Spinning Mills (P) Ltd (unit -II),

Cherbrolu (V&M), Guntur

Rs. 58,79,240/- ( Rupees fifty eight lakhs

seventy nine thousand two hundred and forty only)

towards reimbursement of power cost for 1st half year

of 2015-16 under IIPP 2010-15, subject to submission

of the following shortfall information: 1. DT& CP ,

Factories Dept plan 2 Valid CFO from APPCB 3, Land

conversion 4. Statement of Accounts in original.

96 04/12/2015

M/s Krishna Murty Spinning Mills (P)

Ltd, NH-5, Thimmapuram (V),

Edlapadu (M) Guntur Dist

Rs.39,19,130/- (Rupees thirty nine lakhs nineteen

thousand one hundred and thirty only) towards

reimbursement of power cost for 2nd quarter of 2015-16

under IIPP 2010-15 subject to submission of the

following shortfall information:1.GP, Factories, 2.

DT&CP Dept approval 3. Valid CFO from APPCB 4.

Land conversion certificate 5. Bank sanctioned letter

6.Approved project report

97 07/12/2015 M/s NSL Textiles Ltd, (Mega Project)

Edlapadu (V), & (M), Guntur Dist

Rs. 4,88,71,500/-(Rupees four crores eighty eight lakhs

seventy one thousand fifty only) under IIPP 2005-10,

subject to submission of the following shortfall

documents: 1) IEM Part-B 2) Approved plans from

Factories Department 3) Land conversion certificate 4)

Project Report 5) Valid CFO from APPCB 6)

Page 115: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 115 ::

Approved Plans from DT& CP 7) Base Power

Consumption units of preceding three years from

Chartered Accountant 8) Statement of Accounts and

Certification of Plant & Machinery as per Guidelines.

98 07/12/2015

M/s NSL Textiles LTd (Garments

Division) Sy nO: 253, Budampadu

(V), Guntur Dist

Rs.5,99,640/- (Rupees five lakhs ninety nine thousand

six hundred and forty only) towards reimbursement of

power cost for 2nd quarter of 2015-16 under IIPP

2005-10, subject to submission of the following shortfall

information: 1.Company incorporation certificate 2,

Board resolution 3. GP Factories Dept approved plan

4.Land conversion certificate 5. Valid CFO from

APPCB 6 Statement of Accounts 6. Machinery list not

as per guideline 7. CE certificate.

99 07/12/2015

M/s NSL Textiles Ltd, Sy No: 371 to

382, Kunchalavaripalem (V)

Cherukupalli (M), Guntur Dist

Rs.2,00,04,500/- (Rupees two crores four thousand five

hundred only) towards reimbursement of power cost

for2nd quarter of 2015-16 under IIPP 2005-10 subject

to submission of the following shortfall information: 1)

Approved plans from Factories Department 2) Land

conversion certificate 3) Project Report 4) Valid CFO

from APPCB 5) Approved Plans from DT& CP , 6)

Approved Plans from Grampanchayat 7) Land Sale

Deed / Lease Deed.

100 07/12/2015

M/s.Ravali Spinners Pvt Ltd.,

(Expansion), Khandavalli (V),

Peravali (M), W G Dist

Rs.67,17,811/- (Rupees Sixty seven lakhs seventeen

thousand eight hundred and eleven only) towards

reimbursement of power cost for1st half year of 2015-

16 under IIPP 2010-15, subject to submission of the

following shortfall information: 1.DT&CP approval 2.

Land conversion certificate 3. Valid CFO from APPCB

4. List of Plant & Machinery as per guidelines

101 07/12/2015 M/s.Avanthi Feeds, Kovvuru, W G

Dist

Rs.41,82,026/- (Rupees forty one lakhs eighty two

thousand and twenty six only) towards reimbursement

of power cost for1st half year of 2015-16 under IIPP

2010-15 subject to submission of valid CFO from

APPCB

102 07/12/2015

M/s.Paramesu Biotech Private

Limited, Devarapalli (V & M), W G

Dist

Rs. 25,47,370/- (Rupees twenty five lakhs forty seven

thousand three hundred and seventy only) towards

reimbursement of power cost for1st half year of 2015-

16 under IIPP 2010-15 subject to submission of the

following shortfall information:1 Project report 2 IEM

part-B 3. Gramapanchayath, Factories Dept and T&CP

approved plans 4.Power release certificate

103 14/12/2015

M/s Sudha Agro Oil & Chemical

Industries Ltd.(Spinning Division),

Valuthimmapuram(V), Peddapuram

(M), East Godavari District

Rs. 30,32,660/- (Rupees thirty lakhs thirty two

thousand six hundred and sixty only) towards

reimbursement of power cost for 1st half year of 2015-

16 under IIPP 2010-15 subject to submission of the

following shortfall information: 1) Land documents 2.

Board resolution 3.Machinery statement as per guideline

4. T&CP approved plan 5. Valid CFO from APPCB

6.CE certificate 7.Power release certificate.

Page 116: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 116 ::

104 15/12/2015 M/s.Balabalajee Textiles Limited

(Exp-I), Tanuku (V&M), W G Dist

Rs.96,57,257/- (Rupees ninety six lakhs fifty seven

thousand two hundred and fifty seven only) towards

reimbursement of power cost for 1st half year of 2015-

16 under IIPP 2010-15, subject to submission of the

following shortfall information:1. Land sale/lease deed

2. Board resolution 3.Company incorporation 4.

DT&CP & Factories Department approved plan 5. Valid

CFO from APPCB 6.Bank TL sanctioned letter

7.Project report.

105 16/12/2015 M/s Jagadguru Textiels (P) Ltd (Exp) ,

Prakasam

Rs.19,22,061/- (Rupees nineteen lakhs twenty two

thousand and sixty one only) towards reimbursement of

power cost for1st half year of 2015-16 under IIPP

2005-10 subject to submission of the following shortfall

information: 1. Board resolution 2. Land conversion

certificate 3. Valid CFO from APPCB 4. Approved

project report 5.CA certificate

106 18/12/2015 M/s NSL Textiles Ltd, D No: 6/275-1,

Inkollu , Prakasam Dist Rs. 3,60,36,270/- (Rupees three crore sixty lakhs thirty

six thousand two hundred and twenty only) towards

reimbursement of power cost for 2nd half year of

2015-16 under IIPP 2010-15 subject to submission of

the following shortfall information:1. IEM Part-B,2.

Factories Dept approved plans 3.Land conversion 4.

Approved project report 5. Valid CFO from APPCB 6.

Factories, T&CP approved plan 7. List of Plant and

machinery and statement of account.

107 18/12/2015

M/s.Shri Govindaraja Textiles Pvt Ltd,

(Existing) Peddaragapuram (V),

Pulivendula (M), YSR Kadapa Dist

Rs.1,03,68,386/- (Rupees one crores three lakhs sixty

eight thousand three hundred and eighty six only)

towards present claim of 2nd quarter of 2015-16 under

IIPP2005-10, subject to the following short fall

information: 1. Gram panchayat approval, 2. Land

conversion.

108 18/12/2015

M/s.Shri Govindaraja Textiles

(Expansion)Peddaragapuram (V),

Pulivendula (M), YSR Kadapa Dist

Rs.2,75,92,413- (Rupees Two crores seventy five lakhs

ninety two thousand four hundred and thirteen only)

towards reimbursement of power cost for1st half year

of 2015-16 under IIPP 2010-15 subject to submission

of the following shortfall information: 1. Gram

panchayat approval , 2. Land conversion.3. Valid CFO

from APPCB, 4. Approved Project report 5. Form B not

properly filed

Page 117: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 117 ::

109 28/12/2015 M/s Bhavya Cements Ltd, Tangeda

(V), Dachepalli (M), Guntur Dist

Rs.2,42,05,540/- (Rupees two crore forty two lakhs

five thousand five hundred and forty only) towards

reimbursement of power cost for3rd quarter of 2015-16

under IIPP 2010-15

110 29/12/2015

M/s Worington Nitin Cylinders Ltd,

VSEZ, Duvvada(V&M),

Visakhapatnam

Rs.14,09,370/- ( Rupees fourteen lakhs nine thousand

three hundred and seventy only) towards sanction of

reimbursement of Sales tax in respect of 2012-13

under IIPP 2010-15 subject to submission of the

following shortfall information: 1. BIS certificate

2.Valid CFO from APPCB 3. IEM part-B 4) Land

conversion certificate 5. Project report 6 Factories Dept

palns

111 31/12/2015

M/s RBA Textiles Private Limited

Firm. Ltd., Krishnagiri Road, Foood

Processing Industrial Park,

Kuppam(M), Chittoor

Zero

112 31/12/2015

M/s RBA Textiles Private Limited

Firm. Ltd., Krishnagiri Road, Foood

Processing Industrial Park,

Kuppam(M), Chittoor

Rs. 1,87,85,917/- (Rupees one crore eighty seven lakhs

eighty five thousand nine hundred and seventeen only)

for 1st half year of 2015-16, Subject to conditions 1.

Land sale deed 2) Company incorporation 3) Board

resolution authorizing. 4) Grampanchayath, T&CP dept

approval 5) Land conversion approval 6) valid CFO

issued APPCB 8) Project report 9) CA certificate 10)

Reasons for increasing the power.

113 04/01/2016 M/s.The Gowthami Solvent Oils Ltd.,

Mortha, Undrajavaram (M), W G Dist

Rs. 42,03,780/-(Rupees forty two lakhs three thousand

seven hundred and eighty only) towards reimbursement

of power cost for1st half year of 2015-16 under IIPP

2010-15 subject to submission of the following shortfall

information: 1) IEM Part-B2 ) Land documents 3)

Certificate of Incorporation 4) Board resolution 5) GP,

Factories and DT&CP approval 6) Land conversion 7)

CFO from APPCB 8) Bank sanctioned letter 9)

Statement of Accounts as per guidelines 9) M/c

statement as per guidelines 10) CE certificate 11)

Project report 12) Power release certificate

114 04/01/2016

M/s.Gowthami Spintex (India)

Limited, Duvva(V), Tanuku (M), W G

Dist

Rs.38,74,100/- (Rupees thirty eight lakhs seventy four

thousand one hundred only) towards reimbursement of

power cost for1st half year of 2015-16 under IIPP

2010-15 subject to submission of the following shortfall

information: 1) IEM Part-B 2) Land documents 3)

Memorandum of Articles 4) GP, Factories T&CP dept

approved plan s 5) Valid CFO from APPCB 6)

Statement of Accounts 7) List of M/c as per guidelines

8) CE certificate 9) Project report

Page 118: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 118 ::

115 04/01/2016

M/s.The Gowthami Solvent Oils

Limited, Tetali (V), Tanuku (M), W G

Dist

Rs.1,91,42,536/- (Rupees one crore ninety one lakhs

forty two thousand and five hounded and thirty six

only) towards reimbursement of power cost for1st and

2nd quarter of 2015-16 under IIPP 2005-10 subject to

submission of the following shortfall information 1)

IEM part -B, 2) Land documents 3) Certificate of

Incorporation 4) Board resolution 5) Grampanchayat,

Factories dept and T&CP planning approved plans 6)

Land conversion certificate 7) CFO from APPCB, 10)

Bank term loan sanctioned letter 11) Statement of

Accounts issued by the Financing bank 12) Plant &

Machinery as per guide lines 13) CE certificate 14)

Project report 15) Power release certificate.

116 04/01/2016

M/s.Praveen Spinners (India) Pvt Ltd.,

Ravicherla (V), Nuzivid (M), Krishna

Dist

Rs. 50,28,740/- (Rupees fifty lakhs twenty eight

thousand seven hundred and forty only) towards

reimbursement of power cost for1st half year of 2015-

16 under IIPP 2010-15 subject to submission of the

following shortfall information: 1) Company

incorporation 2) Land conversion 3) Valid CFO from

APPCB

117 05/01/2016

M/s.Amoda Spintex Ltd.,

Ravikampadu (V), Jaggaipeta

(M)Krishna Dist

Rs. 45,68,550/- ( Rupees forty five lakhs sixty eight

thousand five hundred and fifty only) towards

reimbursement of power cost for1st half year of 2015-

16 under IIPP 2010-15 subject to submission of the

following shortfall information: valid CFO issued by

APPCB, 2) Bank term loan sanctioned letter 3) Project

report 4) CA certificate for share holding

118 05/01/2016

M/s.Mohan Spintex India Limited

(Unit-II), Remalle (V), Bapulapadu

(M), Krishan Dist

Rs.3,14,20,658/- ( Rupees three crores fourteen lakhs

ninety three thousand four hundred and eighteen only)

subject to submission of the following shortfall

information: 1) Land sale deed 2) Reason for increase

Power 4000 to 5000KVA 3) T& CP planning Dept 4)

Board resolution 5) Land conversion 6)

Grampanchayath approved plans 7) CFO from APPCB

119 05/01/2016

M/s.Mohan Spintex India Ltd.,

(Expansion), Vattgudipadu(V),

Agripalli (M) Krishna Dist

Rs.87,39,910/- (Rupees eighty seven lakhs thirty nine

thousand nine hundred and ten only) towards

reimbursement of power cost for 2nd quarter of 2015-

16 under IIPP 2005-10 subject to submission of the

following shortfall information:1) Mee seva receipt 2)

Land sale deed 2) Bank sanctioned letter4) Project

report 5) T&CP dept approval 6) Statement of Accounts

7) Plant & M/c statement as per guidelines 8) Status of

original unit and no correlation between IEM of original

and expansion project 9) IEM Part -B indicated only

DCP of expansion project and does not indicates the

capacity of original unit to decided the eligibility and

IEM is not clear 10) claim application is not completely

filled in leaving blank the capacity of original unit.

However earlier claims are sanctioned 11) Variation in

Page 119: MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT ... of 11th SLC held on 17.06... · MINUTES OF THE 11th S.L.C. MEETING HELD ON 17/06/2016 AT 11.30 AM. IN THE CONFERENCE HALL

:: 119 ::

line of activity to be clarified by GM DIC 12) T&CP ,

Grampanchayath approval 13) Land conversion

approval 14) CFO from APPCB

120 05/01/2016

M/s.Zuari Cement Limited

(Expansion) Krishna Nager,

Yerraguntla (M), YSR Kadapa Dist

Rs. 34,96,183/- (Rupees Thirty Four lakhs Ninety Six

thousand one hundred and eighty three only) towards

reimbursement of power cost for1st, 2nd & 3rd quarters

of 2014-15 under IIPP 2005 -10 subject to submission

of the following shortfall information:1) land sale deed

or lease deed 2) company incorporation 3)

Grampanchayath and T&CP and Factories approval 4)

Boiler certificate 5) Land conversion certificate 6) Bank

sanctioned letter 9) Project report 10) CA certificate for

share holding 11) Statement of Accounts and Plant &

Machinery as per operational guidelines.

121 07/01/2016

M/s.Swarnalatha Spintex Pvt Ltd.,

Serinarasannapalem (V), Bapulapadu

(M), Krishna Dist

Rs.77,08,390/- ( Rupees seventy seven lakhs eight

thousand three hundred and ninety only) towards

reimbursement of power cost for1st half year of 2015-

16 under IIPP 2010-15 subject to submission of the

following shortfall information:1) Land conversion

certificate 2) CFO from APPCB

122 08/01/2016

M/s South India Krishna Oil and Fats

Pvt. Ltd., Sy.No. 275, 279, 280 & 281,

Epuru Bit-IB, Pantapalem Muthukur

(V&M), SPSR Nellore District

Rs.45,74,890/- (Rupees forty five lakhs seventy four

thousand eight hundred and ninety only) towards

reimbursement of power cost for1st and 2nd quarter of

2015-16 under IIPP 2005-10 subject to submission of

the following shortfall information:1) T&CP approval

plan 2) Boiler certificate 3) Land conversion certificate

4) GM, DIC has certificated the activity in claim refined

oil and not in his covering letter 5) Person signing the

claim has not indicated name of the person to verify the

board resolution Authorization 6) Factories Dept

approval 7) Boiler certificate 8) land conversion

certificate 9) Statement of Accounts not certified by GM

DIC 10) Machinery statement as per guideline 11)

reason for increase the power load 12) Original DCP

27/09/2011 Additional power has given 07/12/2013as

per Form-B13) Power bill for Jan 2015 is not finishing