Page 1: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National
Page 2: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Minutes of Meeting / Workshop (with all States except Goa) on

(I) Review held in 2nd & 3rd week of January 2019 and (II) National Workshop on AAP entry Formats held on 28-29 January, 2019

I. In one to one meetings held with the State Officials (except Goa which has not attended) in 2nd & 3rd week of January 2019, following issues

have been deliberated and the same along with actionable matters are as under:

S. No. Issues Deliberations Action / Remarks

1. Annual Action Plan

preparation

Link regarding AAP formats for 2019-

20 to be filled by the State :

State/District Login--->AAP 2019-20 --

->Entry --->AAP for Ongoing Scheme

(State approval also required)

This year States will fill up AAP templates wherein they

will select schemes based on descending order of

financial liability. E.g. states are to select the schemes in

the following order:

a) Schemes physically 100% completed but

financially incomplete

b) >75 to <100% financially incomplete

c) >50 to <75% financially incomplete

d) >25 to <50% financially incomplete

Objective of this exercise is to ensure funds are used to

prioritise completion of schemes which are nearing

completion.

AAP formats were discussed withStates. It was also

informed that States along with IMIS Co-ordinators must

attend the meetings scheduled to be held on 28-29th

January,2019.

2. IMIS updation before April

1st,2019

Link regarding latest update on Age-

wise analysis of ongoing schemes;

State/District Login--->AAP 2019-20 --

->Entry --->AAP for Ongoing Scheme

(State approval also required)

E-in-C / CE / representative of State are requested to

review and analyse their schemesage-wise for deletion /

continuation with reasons.

3. Reducing unspent balance

and ensuring permissible

Opening Balance (< 10% of

previous year release)

Link for Format D-1B of IMIS

regarding latest update on unspent

balance :

State/District Login--->AAP 2019-20 --

->Entry --->AAP for Ongoing Scheme

(State approval also required)

Representative from State have assured to utilize the

unspent balance by end of March, 2019 reducing the

available funds as per permissible OB for 2019-20. State

was also requested to submit action plan in this regard.

Time line for completion before April 1st, 2019.

4. Household connection -

survey

Link regarding formats for Household

connections survey in the States :

State/District Login--->AAP 2019-20 --

States were explained about the survey for assessing

household connections per village to assess actual

position of Piped Water Supply connections and they

Page 3: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

->House Connection --->Update PWS

House Connection information (State

approval also required)

were asked to start carrying out survey with their

resources by end of March, 2019 positively.

Stateshave shown their agreement to carry out this survey

on priority within this time frame.

5. Registration of PFMS Formats for implementation of PFMS

attached as Annexure-1.

Formats for providing details of Nodal

Officer, Existing Fund Flow, Agency

Registration with Agency Name,

Account No. etc. for smooth

implementation of Receipt,

Expenditure, Advance and Transfer

Module (REAT).

Most of the States have informed that they have already

registered their State level agency and registration /

mapping of child level agency is in progress. Further,

State has also informed about their funds flow.

States are requested to take necessary step for

implementation of REAT module under PFMS

mandatorily by 31.03.2019 as per requirement of Ministry

of Finance, GoI and to provide the desired information to

this Ministry as per prescribed format.

6. Geo-tagging State was asked to review and analyse

Format F-21 of IMIS

As per Format F-21 of IMIS, it is observed that there is

very poor progress (less percentage) of geo-tagging of

NRDWP Assets. Most of the States who have already

geo-tagged their assets are required to integrate the same

with IMIS with the help of NIC team of this Ministry.

States were requested to complete the geo-tagging of

remaining assets.

7. Pending Calamity UC Details of pending UC / ASA under

Calamity Component as Annexure-2.

Concerned States were asked to submit either UC or

refund the unspent funds immediately to this Ministry in

order to comply with the observations of CAG Audit.

8. Pending UC/ASA under

NCEF/MNRE Fund

Details of pending UC / ASA under

NCEF/MNRE Fund as Annexure-3.

Concerned States are requested to submit UC /ASA for

NCEF/MNRE Fund with reporting of the physical

achievements in IMIS formats C-35B & C-35C in order

to comply with the observations of CAG Audit.

9. IT / IMIS Issue IMIS entry issues have been sorted out

instantly or have been brought to the

notice of NIC.

Further, in meeting /workshop with the States (IMIS

Coordinators/IT Managers) to be held on 28-29.01.2019,

all queries will be clarified.

10. NWQSM Action Plan regarding left out quality

affected habitations

Attached herewith.

Page 4: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

II. National Workshop on AAP entry Formats held on 28-29 January, 2019 – This was chaired

by JS(Water) on 28th and Secretary, MDWS on 29th. Secretaries of few States, Chief Engineer of

most of the States and various other officials have participated in this Workshop. Discussions are

summarized as under:

A. Director (Water) in the National has shown PPT and explained following:

a. Reason why a new way of submitting Annual Action Plan Formats (AAP) is being

introduced for 2019-20 which are as under:

i. Huge Nos. of Ongoing Schemes, Huge Liability of Ongoing Schemes

ii. Huge Nos. of old ongoing Schemes,

iii. Huge ongoing Schemes with Nil expenditure in last 3 years

iv. States do not mark the habitations as target for Coverage in the Year

v. Physical Progress (based on Milestone) - not entered / not updated

vi. Work Order date and SLSSC date – not entered

As such, it has been decided that let States go through each scheme while preparing AAP

& update them and let Districts also to be part of the planning and progressing of

Schemes and Coverage of Habitations. For this, State has to furnish physical & financial

progress of each & every scheme and habitations proposed to be covered is required to be

tagged online. Subsequent to this, NIC officials have explained how to fill AAP formats.

Every State has been given one Laptop equipped with Internet to get familiarised with the

process and hands on training in this regard.

b. Regarding huge numbers of Ongoing schemes with huge balance committed liability

across the country which is more than three times the notional annual allocation in

case of few States. Further, there are schemes which are very old or inactive ongoing

schemes which are required to be looked into by the States, failing which these will

be put in a suspense account and would be deleted if States does not submit the

request within a window of 2-3 months. In addition to this, there are non-existent

schemes, may be due to non-updation in IMIS. These are also required to be deleted

(if no expenditure was made on that) to avoid criticism.

c. Utilization of available fund with the States while aiming to reduce Unspent amount

immediately failing which releases for next year will get affected. Huge unspent

balance with the State has also caused a substantial cut in Budgetary Allocation of

2018-19 at Ministry Level.

d. Shared the extract of findings (of the draft report, final report is still awaited) of third

party evaluation survey done by M/s WAPCOS regarding Functionality status of

completed PWSS of NRDWP and requested the States for looking into it and for

taking corrective and preventive actions.

e. Expeditious action on Geo-tagging of Water Supply Schemes.

f. Need for capturing House Hold Connections (Govt. or Own) irrespective of the

funding through which it has been provided. NIC officials have shown a format to be

filled up in IMIS online.

g. Explained proposed ranking (Composite Index) of the States based on their

performance with respect various criteria.

Page 5: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

B. Deputy Advisor has explained

a. The need of taking up Swajal Schemes in all Aspirational Districts and expeditious

action required by the State in this respect. The detail in this regard should also be

furnished in IMIS.

b. The restructuring of procedure / methodology of Appraisal with respect to innovative

technologies to be considered by High Level Standing Committee in this regard.

C. Deputy Secretary (Water) has explained

a. Rankings of Laboratories

b. Demonstrated the roster for sample collection

c. Explained Geo-fencing in sample collection done in West Bengal, this was also

presented in length by officer of West Bengal

D. Joint Secretary (Water), through her presentation, has explained the importance of (a) online

entry of AAP Format while tagging the progress of schemes and coverage of habitations, (b)

expeditious utilization of funds while aiming to reduce unspent amount, (c) geo-tagging, (d)

Household connection survey, (e) proper manning, equipping & utilizing laboratories, (f) ranking

of states for overall performance & performance of laboratories as well, (g) adequate O&M for

keeping the schemes functional, (h) completion of ongoing schemes which are in higher level of

physical progress and sending the old / inactive schemes into suspense account which will be

ultimately closed for progressing further.

E. Secretary, MDWS has stressed upon all the aforesaid issues raised by various officials of MDWS

and requested the State Officials to make all out efforts by them for maximizing the coverage of

piped water supply and household connections in rural areas. He has also impressed on

expeditious completion of ongoing schemes and adequate O&M of completed schemes.

Encl.: Annexures as stated above & PPTs shown in the Workshop

Page 6: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Meeting with States– NRDWP (MDWS)

Agenda

1. Annual Action Plan Strategy

2. Suspense Account of schemes

3. Unspent amount

4. Geo-tagging

5. Comprehensive NRDWP Ranking of States

6. Household Connections - Survey

Page 7: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Annual Action Plan Strategy

• Bottom up Approach

• Spending in the order of descending order of financial liability of schemes (100 – 75 – 50 – 25%)

• All schemes to be mandatorily updated

Page 8: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Suspense Account of Schemes

Page 9: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

24%

4%

72%

Chart Title

All Schemes Prior to31.03.2013

Scheme of 01.04.13 to31.03.15 AND NO FPin 01.01.2016 to23.01.2019

Schemes that will belive or exceptions(NWQSM, LIS)

24%

4%

72%

Chart Title

All Schemes Prior to31.03.2013

Scheme of 01.04.13to 31.03.15 AND NOFP in 01.01.2016 to23.01.2019

Schemes that will belive or exceptions(NWQSM, LIS)

Nos. of Schemes going to the suspense account

Balance Liability of these Schemes which are going to the suspense account Rs. Cr.

Page 10: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Ongoing Schemes – Suspense account liability

S. No.Non NE and Non

Himalayan State Name

Going in SuspenseS. No. NE and Himalayan State Name

Going in Suspense

Nos. Balance Nos. Balance

1 MAHARASHTRA5,291

2,741 1 HIMACHAL PRADESH160 1,011

2 RAJASTHAN67

1,972 2 JAMMU & KASHMIR942 870

3 TELANGANA222

985 3 ASSAM954 408

4 KERALA229

743 4 MEGHALAYA167 347

5 KARNATAKA879

708 5 UTTARAKHAND38 66

Total 8,268 9,232 Total2,590 2,776

Page 11: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Unspent Balance

Page 12: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Unspent Balance – Rs. Cr. (coverage) – Non NE & Non Him States

365.25

224.3

178.48

116.85109.2285.88

68.1 67.08

39.97 33.0722.56 21.17 17.19 15.13 9.98 1.03 0.3 0

0

50

100

150

200

250

300

350

400

Non NE / Non Him States Unspent Balance - Coverage, Rs. Cr.

Page 13: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Unspent Balance – Rs. Cr. (coverage) NE and Him States

124.83

72.39

52.92

43.39 39.93

24.25 22.9316.49

12.255.08

1.36 1.27 00

20

40

60

80

100

120

140

NE / Him States Unspent Balance - Coverage, Rs. Cr

Page 14: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Geo-Tagging

Page 15: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Geo-Tagging

87.13

71.0970.12

53.2849.8748.56 47.6

38.0934.1

29.6524.59

15.7914.0413.2413.1711.7810.926.94 5.82 5.75 4.88 2.79 1.34 1.27 0.26 0.26 0.16 0 0 0 0 0

0

10

20

30

40

50

60

70

80

90

100

Percentage of Approved Geotagged Photographs

Page 16: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Comprehensive NRDWP Ranking of States

Page 17: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Comprehensive NRDWP Ranking of States

Indices Weightages

assigned

Measurement unit

Coverage 15 %

Performance of Water Quality

Labs

10 Marks

Monitoring 20 In percentages

Finance (Budget) 15 In percentages

Sustainability 40 In percentages

Page 18: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

76.99

69.35 66.34 66.32 66.15 65.66 65.26

60.67 59.90 58.56 57.46

50.25 49.07 47.53 45.45

41.64

32.84 32.74

-

10.00

20.00

30.00

40.00

50.00

60.00

70.00

80.00

90.00

100.00

Ranking of states – Non NE and Non Him

Page 19: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

68.65 66.73 64.41 60.34 59.40

50.98 50.30 49.67 48.18 47.81 45.47

11.52 8.36

-

10.00

20.00

30.00

40.00

50.00

60.00

70.00

80.00

90.00

100.00

Ranking of states - NE and Him states

Page 20: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Household Survey

Page 21: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

House hold Survey:Around 18 % of rural households have PWS connections;

1. SBM directory2. Private connection and Scheme details3. Support fund and their own resources.

Page 22: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

o List of existing schemes in IMIS will be displayed (NRDWP and other schemes):

1

2

o Provision to add new scheme: State Government funded or any other

S.

No.

Name of the scheme Funded through :

Select : State Government /

PRI / other funds

Estimated cost of

the scheme in Cr.

Year of

commissioning

Type of scheme:

Select : PWS /Tube Well, Hand pump / Point

treatment system (CWPPs)

1

2

o Household data from SBM directory will displayed:

S.

No.

Family

Head Name

Father /

Husband

Name

Gender Category Card type Card

NumberDoes this

house exists

in the village

Availability of water tap within premises

(Household Connection)

1 Government

Connection

Private

Connection

Both Connection

2

o Data will be validated by :

1. Junior Engineer / Assistant Engineer, PHED, Panchayat Development Officer (PDO) & Sarpanch Gram Panchayat

Household Connections - Survey

Page 23: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Appendix

Page 24: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Comprehensive NRDWP Ranking of StatesIndices Factors Weightages

assigned

Measurement

unit

Coverage (i) Fully Covered (FC) Habitations

(ii) Piped Water Supply (PWS) Population in FC habitations

(iii) Household Connection

5

5

5

%

Performance of

Water Quality

Labs

Lab Ranking done by the Ministry 10 Marks

In marks

Monitoring (i) Geo-tagging of assets

(ii) Entering the date of approval of the scheme by the State level Scheme

Sanctioning Committee meetings in IMIS

(iii) Entering the date of Work Order in IMIS

(iv)Milestone based physical progress

(v) Having a State level grievance redressal mechanism

5

2.5

2.5

5

5

In percentages

Finance

(Budget)

(i) Ratio of Total Release minus NWQSM to total Allocation minus NWQSM

(ii) Ratio of Total expenditure minus NWQSM to total release minus NWQSM

(iii) Ratio of Pre-finance amount to Notional allocation in pre-finance.

5

5

5

In percentages

Sustainability (i) Third party survey result

(ii) Operation and Maintenance (O&M) Policy implementation

(iii) O&M budget

30

5

5

In percentages

Page 25: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Agenda – Water Quality

1. National Water Quality Sub-missiona) Left out habitationsb) Unspent Balancec) Action Points to States

2. Water Quality Monitoring and Surveillancea) Expenditure 2018-19b) Water Quality Testing Labs

i. Lab Rankingii. Sample Collection

3. Uniform Drinking Water Quality Monitoring Protocol-2019

4. Revamp of High Level Technical Committee

Page 26: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

NWQSM: State-wise left-out habitations as on 24.01.2019S.No. State Name Left out habitations

1 ANDHRA PRADESH 58

2 ASSAM 1421

3 BIHAR 241

4 CHHATTISGARH 18

5 HARYANA 39

6 JHARKHAND 115

7 KARNATAKA 60

8 KERALA 25

9 MADHYA PRADESH 02

10 MAHARASHTRA 21

11 ODISHA 35

12 PUNJAB 265

13 RAJASTHAN 1969

14 TELANGANA 0

15 UTTAR PRADESH 159

16 WEST BENGAL 2453Total 6881

• States are advised to get theleft-out habitations re-testedfor the presence chemicalcontamination in NABLaccredited labs.

Page 27: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

NWQSM: State-wise Unspent Balance as on 24.01.2019S. No State Name Unspent Balance(cr.)

1 ANDHRA PRADESH 25.742 ASSAM 294.983 BIHAR 147.314 CHHATTISGARH 0.95 HARYANA 7.286 JHARKHAND 31.477 KARNATAKA 25.918 KERALA 4.439 MADHYA PRADESH 1.26

10 MAHARASHTRA 16.6211 ODISHA 0.0112 PUNJAB 98.0113 RAJASTHAN 379.9614 TELANGANA 3.815 UTTAR PRADESH 24.9616 WEST BENGAL 778.41

Total 1841.05

• NWQSM funds can be used inconvergence with other fundsi.e. the funds can be in externalaided projects/State schemesto the extent of eligibility.

• State are to provideexpenditure plan for utilizingunspent balance in AAP.

Page 28: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

National Water Quality Sub-Mission (NWQSM)Action Points for States

All States requested to submit proposals for left-outhabitation on or before 31st January, 2019. Noproposal will be considered beyond the cut off date.

NWQSM has sunset clause i.e. to be completed byMarch, 2021.

Page 29: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Water Quality Monitoring and Surveillance (WQMS)Expenditure 2018-19

S. No State

Notional Availability = OB

+ Full Central Allocation

However this will vary as

per the Release In Cr.

Current Availability for the year =

1/18 of expenditure on Hardware

on Coverage In Cr

Expenditure in Cr.Percentage Of

Expenditure

1 MIZORAM 48.31 1.72 1.71 99.56

2 ANDHRA PRADESH 197.99 3.38 3.23 95.65

3 ASSAM 503.5 4.92 4.58 93.14

4 WEST BENGAL 424.48 11.11 10.2 91.77

5 CHHATTISGARH 121.36 1.75 1.21 69.19

… ... … … … …

26 PUDUCHERRY 2.56 0 0 0

27 MANIPUR 67.62 2.66 0 0

28 KARNATAKA 489.63 15.77 0 0

29 ANDAMAN & NICOBAR 1.68 0 0 0

30 BIHAR 341.52 1.3 0 0

States are requested to utilize full available funding under this component as this reflects in the health of the laboratories.

Page 30: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Water Quality Monitoring and Surveillance (WQMS)Water Quality Testing Labs

• Lab Ranking• To encourage competitiveness, greater ownership,

improve the quality and strengthen labs functioning.• 40% weightage to infrastructure & AMC and 60%

weightage for performance based indicators.

• Sample Collection• 75% of tests are to be conducted based on roster

and for remaining 25% flexibility is given to States.

Page 31: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Water Quality Monitoring and Surveillance (WQMS)Lab Ranking - States

Page 32: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Water Quality Monitoring and Surveillance (WQMS)Lab Ranking – Districts

Page 33: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

UDWP-2019• To address emerging contaminants, include technological

enhancements and reforms in procurements the existingProtocol is revised.

• Main Features Flexibility

Regional labs can be set up; can outsource labs

Outcome Oriented

Robust ProceduresRoster based sample collection/testing

Geo-tagging of all sources

AMC/CAMC of instruments/equipment

NABL accreditation as per IS/ISO/IEC 17025:2017

Cross verification of test results and 3rd Party verification of labs

Page 34: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Revamp of High Level Technical Committee

•Composition of Committee – top technical institutions

•Rigorous 360 degree process introduced • First Stage – field evaluation of technology by NEERI• Second Stage – reports by user States • Third State – Appraisal by the Committee

Page 35: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

ASSURED Matrix

• Coined by the Chairman Dr. RA Mashelkar of HLTC

A – Affordability

S – Scalability

S – Sustainability

U – Universality

R – Rapid

E – Excellence

D – Distinctive

• Assured matrix framework

Page 36: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

THANKS

Page 37: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Welcome to

Water Teams from States

Page 38: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

National Rural Drinking Water Programme

National Workshop on Annual Action Plan (AAP)

28-29 January 2019

Govt. of India

Ministry of Drinking Water & Sanitation

2

Page 39: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Agendao Annual Action Plan

o Ongoing schemes

o Very Old or Inactive Ongoing Schemes

o Non-existant Schemes, may be due to non-updatio in IMIS

o Target Marking of Habitations

o Unspent amount

o Geo-tagging

o Household Connections - Survey

Page 40: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Annual Action PlanIt is an Annual Event. Then why this Worksop?

Explanation:

Huge Nos. of Ongoing Schemes, Huge Liability of Ongoing Schemes

Huge Nos. of old ongoing Schemes,

Huge ongoing Schemes with Nil expenditure in last 3 years

States do not mark the habitations as target for Coverage in the Year

Physical Progress (based on Milestone) - not entered / not updated

Work Order date and SLSSC date – not entered

Remedy:

Let States go through each scheme while preparing AAP and update them.

Let Districts also to be part of the planning and progressing of Schemes and Coverage of Habitations.

Page 41: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

-

718 170

1,517 1,840

97 134

1,253 774

1,408 1,082

626

2,720

1,334 1,467

3,409

74 349 11 9

1,399

-640

13,644

64

849

1,750

21

2,827

271

10,571

-

2,000

4,000

6,000

8,000

10,000

12,000

14,000

A&

N

Andh

ra P

radesh

Arunachal…

Assam

Bih

ar

Chh

attis

ga

rh

Goa

Gu

jara

t

Hary

ana

Himachal…

J&

K

Jhark

ha

nd

Karn

ata

ka

Kera

la

Madh

ya P

radesh

Maha

rashtr

a

Manip

ur

Megh

ala

ya

Miz

ora

m

Nag

ala

nd

Odis

ha

Pudu

cherr

y

Punja

b

Raja

sth

an

Sik

kim

Ta

mil

Nad

u

Te

lan

gana

Tri

pura

Utta

r P

radesh

Utt

ara

kh

an

d

West B

en

gal

Ongoing Schemes - Balance Liability (Rs. crore)

Page 42: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

- 1.9 1.6

3.6 2.8

0.5 2.6

4.7

13.9

3.2 2.4

4.4

7.6

2.7 3.6

1.7

6.0

0.4 0.2

4.5

-3.0

11.6

4.9

2.4

6.7

0.3 2.8 2.5

13.0

-

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

20.0A

&N

An

dh

ra P

rad

esh

Aru

nac

hal

Pra

des

h

Ass

am

Bih

ar

Ch

hat

tisg

arh

Go

a

Gu

jara

t

Har

yan

a

Him

ach

al P

rad

esh

J&K

Jhar

khan

d

Kar

nat

aka

Ke

rala

Mad

hya

Pra

des

h

Mah

aras

htr

a

Man

ipu

r

Meg

hal

aya

Miz

ora

m

Nag

alan

d

Od

ish

a

Pu

du

cher

ry

Pu

nja

b

Raj

asth

an

Sikk

im

Tam

il N

adu

Tela

nga

na

Trip

ura

Utt

ar P

rad

esh

Utt

arak

han

d

Wes

t B

enga

l

Balance Liabilty / (Central Allocation in Coverage Component + State matching Share)

Page 43: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

-

1,727

584

1,802 1,632

917

2 149

952

440

1,153

2,553

6,123

322

2,396

7,526

496 194

17 26

4,719

-

398 474 124 191

1,119

143

1,876

470

1,129

-

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

A&

N

An

dhra

Pra

de

sh

Aru

na

ch

al P

rad

esh

Assam

Bih

ar

Ch

ha

ttis

ga

rh

Goa

Gu

jara

t

Ha

rya

na

Him

acha

l P

rad

esh

J&

K

Jh

ark

ha

nd

Ka

rna

taka

Ke

rala

Ma

dh

ya

Pra

de

sh

Ma

ha

rash

tra

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

ga

lan

d

Od

ish

a

Pu

duch

err

y

Pu

nja

b

Ra

jasth

an

Sik

kim

Ta

mil

Na

du

Te

lan

ga

na

Trip

ura

Utta

r P

rad

esh

Utta

rakh

an

d

We

st B

en

ga

l

Schemes Analysis - Nos.

Page 44: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Age Analysis of ongoing schemes

(Balance in Rs. Cr.)

Total SVS MVS

Nos. Balance Nos. Balance Nos. Balance

Schemes Prior to 31.03.2000 178 934 73 52 105 881

Scheme of 01.04.2000 to 31.03.09 3,229 5,005 2,557 852 672 4,153

Scheme of 01.04.09 to 31.03.13

Total 6,026 12,236 4,235 2,125 1,791 10,111

FP < 5% 608 1,354 503 501 105 852

FP >= 5% 5,418 10,881 3,732 1,623 1,686 9,258

All Schemes Prior to 31.03.2013 9,433 18,175 6,865 3,029 2,568 15,146

Scheme of 01.04.13 to 31.03.14

Total 3,402 9,211 2,702 1,694 700 7,517

FP < 5% 476 3,721 387 431 89 3,290

FP >= 5% 2,926 5,490 2,315 1,263 611 4,227

Scheme of 01.04.14 to 31.03.17

Total 10,798 9,787 9,394 3,856 1,404 5,931

FP < 15% 3,050 3,747 2,648 2,363 402 1,384

FP >=15% 7,748 6,039 6,746 1,492 1,002 4,547

Scheme after 31.03.2017 16,021 13,850 15,435 6,064 586 7,786

All Schemes 39,654 51,025 34,396 14,644 5,258 36,381

Page 45: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Concept of Suspense Account

Page 46: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Suspense Account of Schemes:

There are about 40,000 schemes (PWS) with outstanding liability of still over 52,000 Cr.

oStates to analyze whether these schemes are dead and moribund, by doing ground truthing.

oThese schemes will be put in a separate account from post 31th March (after all AAP

meetings). Exceptions must be discussed during AAP meeting and closed.

o If found to have been completed but not updated in the system or requiring foreclosure, the

said status should be updated in IMIS in March MPR.

oOtherwise, these schemes would be closed and put under the category of completed schemes

and no further funds can be booked against these schemes from central fund (NRDWP).

Page 47: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Suspense Account of Schemes: Rules

Schemes have been classified as –

All Schemes prior to 31.03.2013

Scheme of 01.04.2013 to 31.03.2015

wherein Nil Expenditure has been booked in last 3 years

Page 48: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Ongoing schemes-Inactive

(Balance in Rs. Cr.)

Total SVS MVS

Nos. Balance Nos. Balance Nos. Balance

All Schemes 39,654 51,025 34,396 14,644 5,258 36,381

Schemes prior to 31.03.13

(X)9,433 18,175 6,865 3,029 2,568 15,146

Scheme of 01.04.13 to

31.03.15 having Nil

Expenditure in 01.01.2016

to 23.01.19 (Y)

1,727 1,733 1,530 1,460 197 273

Going in Suspense

(X+Y-NWQSM-LIS)10,858 12,007 8,296 4,434 2,562 7,572

Page 49: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

-

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

A&

N

An

dh

ra P

rad

esh

Aru

nac

hal

Pra

des

h

Ass

am

Bih

ar

Ch

hat

tisg

arh

Go

a

Gu

jara

t

Har

yan

a

Him

ach

al P

rad

esh

J&K

Jhar

khan

d

Kar

nat

aka

Ke

rala

Mad

hya

Pra

des

h

Mah

aras

htr

a

Man

ipu

r

Meg

hal

aya

Miz

ora

m

Nag

alan

d

Od

ish

a

Pu

du

che

rry

Pu

nja

b

Raj

asth

an

Sikk

im

Tam

il N

adu

Tela

nga

na

Trip

ura

Utt

ar P

rad

esh

Utt

arak

han

d

Wes

t B

en

gal

Schemes Analysis - Nos. Nos. Ongoing Nos. Live Ongoing

Page 50: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

-

2,000

4,000

6,000

8,000

10,000

12,000

14,000A

&N

An

dhra

Pra

de

sh

Aru

na

ch

al P

rad

esh

Assam

Bih

ar

Ch

ha

ttis

ga

rh

Goa

Gu

jara

t

Ha

rya

na

Him

acha

l P

rad

esh

J&

K

Jh

ark

ha

nd

Karn

ata

ka

Ke

rala

Ma

dh

ya

Pra

de

sh

Ma

ha

rash

tra

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

ga

lan

d

Od

ish

a

Pu

duch

err

y

Pu

nja

b

Ra

jasth

an

Sik

kim

Ta

mil

Na

du

Tela

ngana

Trip

ura

Utta

r P

rad

esh

Utta

rakh

an

d

We

st B

en

ga

l

Schemes Analysis – Balance (Rs. Crore) Balance (Rs. Cr) Ongoing Balance (Rs. Cr) Live Ongoing

Page 51: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

0

1,428

58

879

194 446 0 0 157 213 369 179

5,320

128 282 125 13 55 35 47721

0 271

3,346

171780 652 80 243 338

3,090

0

1000

2000

3000

4000

5000

6000

7000

An

dam

an &

An

dh

ra P

rad

esh

Aru

nac

hal

Pra

des

h

Ass

am

Bih

ar

Ch

hat

tisg

arh

Go

a

Gu

jara

t

Har

yan

a

Him

ach

al P

rad

esh

Jam

mu

& K

ash

mir

Jhar

khan

d

Kar

nat

aka

Ker

ala

Mad

hya

Pra

des

h

Mah

aras

htr

a

Man

ipu

r

Meg

hal

aya

Miz

ora

m

Nag

alan

d

Od

ish

a

Pu

du

che

rry

Pu

nja

b

Raj

asth

an

Sikk

im

Tam

il N

adu

Tela

nga

na

Trip

ura

Utt

ar P

rad

esh

Utt

arak

han

d

Wes

t B

en

gal

Targeted ( For PWS Schemes) Actual Covered

Page 52: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

- -

1.45

3.89

-

0.51

- 0.01

1.90

4.40

1.25

5.51

1.14

3.24

0.74 0.78

1.52

0.50

1.67 1.25

0.39 -

0.42

2.62

3.49

2.37

3.14

5.13

-

6.61

7.49

An

dam

an &

Nic

ob

ar

An

dh

ra P

rad

esh

Aru

nac

hal

Pra

des

h

Ass

am

Bih

ar

Ch

hat

tisg

arh

Go

a

Gu

jara

t

Har

yan

a

Him

ach

al P

rad

esh

Jam

mu

& K

ash

mir

Jhar

khan

d

Kar

nat

aka

Ke

rala

Mad

hya

Pra

des

h

Mah

aras

htr

a

Man

ipu

r

Meg

hal

aya

Miz

ora

m

Nag

alan

d

Od

ish

a

Pu

du

che

rry

Pu

nja

b

Raj

asth

an

Sikk

im

Tam

il N

adu

Tela

nga

na

Trip

ura

Utt

ar P

rad

esh

Utt

arak

han

d

Wes

t B

en

gal

Habitations Targeted (For PWS Schemes) per Rs. Crore (of Central Allocation + State Matching Share)

Page 53: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Unspent Balance

Page 54: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

-

20

40

60

80

100

120

A&

N

An

dh

ra…

Aru

nac

hal

Ass

am

Bih

ar

Ch

hat

tisg

arh

Go

a

Gu

jara

t

Har

yan

a

Him

ach

al…

J&K

Jhar

khan

d

Kar

nat

aka

Ker

ala

Mad

hya

Mah

aras

htr

a

Man

ipu

r

Meg

hal

aya

Miz

ora

m

Nag

alan

d

Od

ish

a

Pu

du

cher

ry

Pu

nja

b

Raj

asth

an

Sikk

im

Tam

il N

adu

Tela

nga

na

Trip

ura

Utt

ar P

rad

esh

Utt

arak

han

d

Wes

t B

enga

l

Central Expenditure of Coverage Component (in %) Central Expenditure of all Components (in %)

Page 55: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

1

143

53

386 374

41 0 10 22 24

125 96 112

5 18

382

16 23 12 - 21 1

98

604

5 36

71 40

184

43

957

-

200

400

600

800

1,000

1,200

A&

N

An

dh

ra P

rad

esh

Aru

nac

hal

Pra

des

h

Ass

am

Bih

ar

Ch

hat

tisg

arh

Go

a

Gu

jara

t

Har

yan

a

Him

ach

al P

rad

esh

J&K

Jhar

khan

d

Kar

nat

aka

Ke

rala

Mad

hya

Pra

des

h

Mah

aras

htr

a

Man

ipu

r

Meg

hal

aya

Miz

ora

m

Nag

alan

d

Od

ish

a

Pu

du

che

rry

Pu

nja

b

Raj

asth

an

Sikk

im

Tam

il N

adu

Tela

nga

na

Trip

ura

Utt

ar P

rad

esh

Utt

arak

han

d

Wes

t B

en

gal

Closing balance of Coverage Component (Rs. Cr.)

Closing balance of all Components (Rs. Cr.)

Page 56: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Unspent Balance: consequences

Slow pace of physical progress of schemes

Huge unspent balance with the States as on date

(Rs. 3905 Crore)

Ministry could not release funds to States

Cut in Central Budget

To prevent the same in next year, States are required to accelerate the pace of utilization

Page 57: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Unspent Balance – Rs. Cr. (coverage)

365.25

224.3

178.48

116.85109.2285.88

68.1 67.08

39.97 33.0722.56 21.17 17.19 15.13 9.98 1.03 0.3 0

0

50

100

150

200

250

300

350

400

Non NE / Non Him States Unspent Balance - Coverage, Rs. Cr.

124.83

72.39

52.92

43.3939.93

24.25 22.9316.49

12.255.08

1.36 1.27 00

20

40

60

80

100

120

140

NE / Him States Unspent Balance - Coverage, Rs. Cr

Page 58: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Monitoring

Page 59: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Monitoring Physical Progress of Water supply schemes

• Focus is on completion and functioning of schemes

• Monitoring through:

o Mandatory Entry of SLSSC date and First Work Order Date

o Scheme to be considered as ‘ongoing’ only if Work Order date is

entered.

o Physical progress of PWSS through Milestone based entry

o Physical progress to be reported, even if progress is Nil

o Likely date of completion to be regularly updated

Page 60: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

-

10

20

30

40

50

60

70

80

90

100

AN

DH

RA

PR

AD

ESH

AR

UN

AC

HA

L P

RA

DES

H

ASS

AM

BIH

AR

CH

HA

TTIS

GA

RH

GO

A

GU

JAR

AT

HA

RYA

NA

HIM

AC

HA

L P

RA

DES

H

JAM

MU

& K

ASH

MIR

JHA

RK

HA

ND

KA

RN

ATA

KA

KER

ALA

MA

DH

YA P

RA

DES

H

MA

HA

RA

SHTR

A

MA

NIP

UR

MEG

HA

LAYA

MIZ

OR

AM

NA

GA

LAN

D

OD

ISH

A

PU

NJA

B

RA

JAST

HA

N

SIK

KIM

TAM

IL N

AD

U

TELA

NG

AN

A

TRIP

UR

A

UTT

AR

PR

AD

ESH

UTT

AR

AK

HA

ND

WES

T B

ENG

AL

Physical Progress based on Milestone for PWSS not mentioned (in %)

Work Order date not mentioned (in %)

SLSSC not mentioned (in %)

Page 61: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Geo-Tagging

Page 62: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Provision for Geo-Tagging assetsGeo-tagging:•To uniquely identify and locate physical objects in latitude-longitude using GPS enabled electronic device including smart mobile phones•To map all rural water supply assets (existing & to be commissioned) using the geo-tagged photographs to bring transparency / remove duplicity•Ministry / NIC has developed mobile application

Lat-Lon (GPS) location

Time Stamp

Page 63: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Geo-Tagging

87.13

71.0970.12

53.2849.8748.56 47.6

38.0934.1

29.6524.59

15.7914.0413.2413.1711.7810.926.94 5.82 5.75 4.88 2.79 1.34 1.27 0.26 0.26 0.16 0 0 0 0 0

0

10

20

30

40

50

60

70

80

90

100

Percentage of Approved Geotagged Photographs

Page 64: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Composite NRDWP Ranking of States- proposed to start from next yeat

Proposed Indicators:

Coverage

Laboratories

Monitoring

Financial

Sustainability of Schemes

Page 65: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Composite NRDWP Ranking of StatesIndicators Factors Unit Weightage Purpose

Coverage Fully Covered (FC) Habitations

Piped Water Supply (PWS) Population in FC habitations

Household Connection

% 15 To assess the availability

WQ Labs Lab Ranking done by the Ministry Score 10 To assess the quality

Monitoring Geo-tagging of assets

Entry of SLSSC date in IMIS

Entry of First Work Order date in IMIS

Entry of Milestone based physical progress of PWSS in

IMIS

% 20 To monitor Progress of

Ongoing Schemes

Financial Ratio of total Release under NWQSM to total Allocation

under NWQSM

Ratio of total expenditure under NWQSM to total

release under NWQSM

Ratio of Pre-finance amount to Notional allocation in

pre-finance.

Ratio 15% To access the ability to

utilize funds

Sustainability

of Schemes

Functionality status in Third Party Evaluation

O&M policy implementation / Collection of Water

Charges

O&M budget

% 40% Access the scheme’s

performance

sustainability

Page 66: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

76.99

69.35 66.34 66.32 66.15 65.66 65.26

60.67 59.90 58.56 57.46

50.25 49.07 47.53

45.45

41.64

32.84 32.74

-

10.00

20.00

30.00

40.00

50.00

60.00

70.00

80.00

90.00

100.00

Ranking of states – Non NE and Non Him

Page 67: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

68.65 66.73

64.41

60.34 59.40

50.98 50.30 49.67 48.18 47.81 45.47

11.52 8.36

-

10.00

20.00

30.00

40.00

50.00

60.00

70.00

80.00

90.00

100.00

Ranking of states - NE and Him states

Page 68: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

House hold Survey

Page 69: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

House hold Survey:Around 18 % of rural household have connections;therefore a nationwide attempt is taken to re-affirm the data:

1. SBM directory is being used as base2. Attempt to capture private connection and scheme details3. States can take up this using support fund and their own resources.

Page 70: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

o List of existing schemes in IMIS will be displayed (NRDWP and other schemes):

1

2

o Provision to add new scheme: State Government funded or any other

S.

No.

Name of the scheme Funded through :

Select : State Government /

PRI / other funds

Estimated cost of

the scheme in Cr.

Year of

commissioning

Type of scheme:

Select : PWS /Tube Well, Hand pump / Point

treatment system (CWPPs)

1

2

o Household data from SBM directory will displayed:

S.

No.

Family

Head Name

Father /

Husband

Name

Gender Category Card type Card

NumberDoes this

house exists

in the village

Availability of water tap within premises

(Household Connection)

1 Government

Connection

Private

Connection

Both Connection

2

o Data will be validated by :

1. Junior Engineer / Assistant Engineer, PHED, Panchayat Development Officer (PDO) & Sarpanch Gram Panchayat

Household Connections - Survey

Page 71: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National
Page 72: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Appendix

Page 73: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Balance liability– State wise : Non NE and Non Himalayan

S.No.

Non NE and Non

Himalayan State,

(Amount in Rs. Cr.)

Nos. of Schemes

Schemes

physically 100%

complete but

financially

incomplete

75 to < 100%

Physically

Completed

50 to < 75%

Physically

Completed

25 to < 50%

Physically

Completed

0 > to < 25%

Physically

Completed

0% Physically

Completed

Total Nos. Of

Schemes where %

of Physical

Progress not

updated

Nos. Balance Nos. Balance Nos. Balance Nos. Balance Nos. Balance Nos. Balance Nos. Balance Nos. Balance

1 Rajasthan 474 13,644 141 1,253 84 5,494 29 2,223 20 1,618 42 727 70 866 88 1,463

2 West Bengal 1,129 10,571 305 581 312 1,956 106 295 135 2,326 260 5,054 6 37 5 323

3 Maharashtra 7,526 3,409 1,473 579 1,963 856 1,044 497 469 215 106 53 1,430 756 1,041 452

4 Uttar Pradesh 1,876 2,827 586 232 467 625 217 301 130 246 39 69 194 507 243 847

5 Karnataka 6,123 2,720 2,431 594 647 430 382 817 545 267 286 437 45 15 1,787 160

6 Bihar 1,632 1,840 167 167 144 512 122 117 148 124 203 149 102 71 746 700

7 Telangana 1,119 1,750 239 313 782 1,105 35 200 7 25 11 39 3 3 42 64

8 Madhya Pradesh 2,396 1,467 210 211 217 144 214 114 457 299 1,164 651 11 2 123 45

9 Odisha 4,719 1,399 743 31 604 74 1,193 75 684 139 1,263 928 176 126 56 25

10 Kerala 322 1,334 48 145 65 150 24 98 28 284 32 265 118 255 7 136

11 Gujarat 149 1,253 48 127 16 295 15 514 17 12 11 25 30 46 12 234

12 Tamil Nadu 191 849 12 162 58 661 4 9 - - 99 13 - - 18 4

13 Haryana 952 774 318 175 118 88 84 56 102 85 234 176 6 5 90 189

14 Andhra Pradesh 1,727 718 886 226 118 42 64 51 323 217 191 47 18 4 127 131

15 Punjab 398 640 142 39 74 22 29 69 36 10 54 14 4 1 59 484

16 Jharkhand 2,553 626 1,223 53 490 213 160 53 146 21 274 187 185 22 75 77

17 Goa 2 134 - - 1 22 - - - - 1 112 - - - -

18 Chhattisgarh 917 97 356 9 187 12 91 10 63 12 137 30 2 0 81 23

Total 34,205 46,050 9,328 4,898 6,347 12,703 3,813 5,499 3,310 5,903 4,407 8,974 2,400 2,716 4,600 5,357

Page 74: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Balance liability – State wise : NE and Himalayan

S.No.

NE and

Himalayan

State, (Amount

in Rs. Cr.)

Nos. of

Schemes

Schemes

physically

100% complete

but financially

incomplete

75 to < 100%

Physically

Completed

50 to < 75%

Physically

Completed

25 to < 50%

Physically

Completed

0 > to < 25%

Physically

Completed

0% Physically

Completed

Total Nos. Of

Schemes where

% of Physical

Progress not

updated

Nos.Balanc

eNos.

Balanc

eNos.

Balanc

eNos.

Balanc

eNos.

Balanc

eNos.

Balanc

eNos.

Balanc

eNos.

Balanc

e

1 Assam 1,802 1,517 673 144 558 307 139 367 196 347 191 228 31 89 14 36

2 Himachal Pradesh 440 1,408 50 21 129 146 58 33 60 43 85 1,009 30 141 28 14

3 Jammu & Kashmir 1,153 1,082 289 89 217 139 298 326 261 421 51 94 34 10 3 2

4 Meghalaya 194 349 164 9 17 76 1 11 2 11 6 242 4 0 - -

5 Uttarakhand 470 271 198 19 86 88 29 43 37 45 31 24 1 0 88 52

6 Arunachal Pradesh 584 170 104 2 33 6 31 8 46 13 86 34 192 54 92 54

7 Manipur 496 74 186 (2) 42 2 48 6 90 23 97 34 6 0 27 11

8 Sikkim 124 64 9 - 4 1 6 15 - - 104 46 - - 1 2

9 Tripura 143 21 27 3 20 3 7 6 39 4 48 5 1 0 1 0

10 Mizoram 17 11 - - 5 1 5 3 7 7 - - - - - -

11 Nagaland 26 9 9 1 - - 4 3 - - 7 3 - - 6 3

Total 5,449 4,976 1,709 286 1,111 769 626 822 738 913 706 1,718 299 295 260 174

Page 75: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

S.No

.GEOTAGGING

As on

(01/04/201

8)

PWS (MVS) PWS (SVS)Tubewell / HP / Well

etc.Recharge Structure

Point Treatment

SystemTotal(31/03/2019)

Nos. Of

Sources

And

Delivery

Point

Nos. Of

Approved

Geotagge

d

Photograp

hs

Nos. Of

Sources

And

Delivery

Point

Nos. Of

Approved

Geotagge

d

Photograp

hs

Nos. Of

Sources

And

Delivery

Point

Nos. Of

Approved

Geotagge

d

Photograp

hs

Nos. Of

Sources

And

Delivery

Point

Nos. Of

Approved

Geotagge

d

Photograp

hs

Nos. Of

Sources

And

Delivery

Point

Nos. Of

Approved

Geotagge

d

Photograp

hs

Nos. Of

Sources

And

Delivery

Point

Nos. Of

Approved

Geotagge

d

Photograp

hs

Percentag

e of

Approved

Geotagge

d

Photograp

hs

Total 19,55,404 15,24,569 17,804 23,39,509 59,642 61,20,641 1,81,104 24,744 352 6,015 196 90,04,174 22,14,555 24.59

1 Punjab 8,707 20,285 8,267 19,140 13,644 2,892 2,103 9 7 0 0 37,569 32,734 87.13

2 Madhya Pradesh 4,04,380 23,501 111 44,781 6,005 6,34,644 73,952 450 86 42 5 6,81,603 4,84,555 71.09

3 Tripura 52,176 18,964 2 44,358 66 16,577 102 0 0 5 0 74,648 52,346 70.12

4 Tamil Nadu 2,95,678 1,93,860 918 3,67,610 15,069 1,93,975 966 0 0 93 0 5,86,783 3,12,631 53.28

5 Manipur 1,166 5,979 1,302 8,694 3,358 198 82 1 0 0 0 11,851 5,910 49.87

6 Mizoram 1,476 2,225 147 4,939 1,174 61 7 0 0 0 0 5,774 2,804 48.56

7 Chhattisgarh 1,40,139 33,882 10 67,460 976 2,33,937 5,352 283 0 3,437 144 3,08,033 1,46,621 47.6

8 Andhra Pradesh 1,84,123 1,55,126 184 2,36,421 3,524 2,44,607 7,523 4,760 17 551 13 5,12,976 1,95,405 38.09

9 Jammu & Kashmir 5,058 14,758 2,230 5,779 1,183 8,906 1,888 0 0 0 0 30,381 10,359 34.1

10 Uttar Pradesh 6,91,730 33,624 715 56,217 546 24,01,150 47,105 4,016 81 81 30 24,96,164 7,40,208 29.65

11 Rajasthan 35,943 45,721 26 44,532 2 1,47,605 5 13 0 622 0 2,27,823 35,976 15.79

12 Maharashtra 6,015 77,816 480 1,54,795 8,826 74,437 19,937 82 0 90 0 2,51,178 35,259 14.04

13 Himachal Pradesh 17,098 82,500 279 34,395 544 18,762 444 2 0 0 0 1,38,709 18,365 13.24

14 Haryana 7,138 31,429 0 29,433 5 166 0 452 0 8 0 54,241 7,143 13.17

15 Jharkhand 40,494 20,193 7 28,237 254 4,00,595 10,664 2,190 161 1 0 4,37,711 51,580 11.78

16 Meghalaya 3,499 13,513 214 22,324 421 6,069 6 8 0 3 0 37,918 4,140 10.92

17 Karnataka 47,417 2,67,478 0 5,67,733 49 1,03,553 1 47 0 212 0 6,84,199 47,467 6.94

18 Assam 3,546 51,203 2,778 36,591 3,583 1,63,935 4,604 0 0 31 3 2,49,298 14,520 5.82

19 Sikkim 434 3,974 0 7,382 0 4 0 0 0 0 0 7,553 434 5.75

20 Nagaland 479 3,558 0 9,678 1 11 0 6 0 10 0 9,834 480 4.88

21 Bihar 5,134 5,694 70 8,490 203 3,99,946 6,101 82 0 19 1 4,13,157 11,509 2.79

22 Arunachal Pradesh 14 7,493 3 20,070 144 978 130 124 0 1 0 21,722 291 1.34

23 Gujarat 2,484 97,904 0 1,61,587 0 10,321 0 6 0 230 0 1,95,656 2,484 1.27

24 Uttarakhand 157 45,987 26 47,019 37 2,803 0 0 0 1 0 85,874 220 0.26

25 West Bengal 889 43,949 25 5,245 1 3,44,969 113 0 0 159 0 3,97,534 1,028 0.26

26 Kerala 26 26,779 10 14,036 27 500 0 2 0 16 0 40,339 63 0.16

27 Andaman & Nicobar 0 471 0 462 0 115 0 0 0 0 0 904 0 0

28 Goa 0 204 0 340 0 0 0 0 0 0 0 427 0 0

29 Odisha 4 35,090 0 54,873 0 4,67,037 0 1 0 117 0 5,36,322 4 0

30 Puducherry 0 290 0 503 0 148 0 0 0 0 0 792 0 0

31 Telangana 0 1,61,119 0 2,36,385 0 2,41,740 19 12,210 0 286 0 4,67,201 19 0

Page 76: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Ranking of states – Non NE and Non HimState Fully

Covered

Habitation

s

PWS

Population

residing in

Fully

Covered

Habitation

s

Household

Connection

Lab

scoreMonitoring-Geotagging

Monitoring-SLSSC

Monitoring-Work order

Monitoring-Milestone based physical progress

Budget -(Total-NWQSM Release)/ (Total -NWQSM allocation)

Budget -(Total-NWQSM expenditure)/(Total -NWQSM release)

Budget-Prefinance Amount / Notional Allocation in Prefinance

Sustainability-Third party survey result

Sustainability-O&M policy implementation

Sustainability-O&M budget

Ranking marks

unit % % % marks % % % % % % % % % %

weightage 5.00 5.00 5.00 10 10 2.5 2.5 5 5.00 5.00 5.00 30 5 5 100.00

max 5.00 5.00 3.95 10.00 10.00 2.48 2.48 4.73 5.00 5.00 5.00 29.43 - - 76.99

min 1.41 - - - - 0.87 0.97 1.40 1.70 1.98 - 7.82 - - 32.74

average 3.94 2.47 1.18 4.58 2.49 1.86 1.92 3.27 3.83 4.15 3.53 23.02 56.23

PUNJAB 3.50 3.67 2.61 6.77 10.00 2.13 2.20 4.34 2.67 5.00 5.00 29.09 76.99

TAMIL NADU 4.80 5.00 1.50 6.69 6.12 1.57 1.57 3.10 3.64 3.68 5.00 26.70 69.35

ANDHRA PRADESH 3.58 3.36 1.69 4.91 4.37 1.89 2.03 3.91 5.00 1.98 5.00 28.61 66.34

HARYANA 4.85 4.97 2.69 7.50 1.51 2.23 2.25 4.48 5.00 5.00 5.00 20.83 66.32

MADHYA PRADESH 4.99 2.14 0.58 5.23 8.15 2.08 2.25 3.79 4.74 4.80 5.00 22.39 66.15

TELANGANA 3.11 3.05 1.68 6.15 - 2.30 2.38 4.09 5.00 3.99 5.00 28.92 65.66

GUJARAT 5.00 4.99 3.95 6.34 0.15 1.49 1.70 2.85 5.00 4.78 5.00 24.02 65.26

WEST BENGAL 2.68 1.26 0.05 6.67 0.03 2.48 2.48 4.73 4.98 2.90 5.00 27.42 60.67

KERALA 1.41 1.38 0.84 5.38 0.02 2.04 1.80 2.66 5.00 4.94 5.00 29.43 59.90

ODISHA 4.92 2.38 0.19 10.00 - 2.25 2.24 2.05 2.67 5.00 2.87 24.00 58.56

UTTAR PRADESH 4.93 0.77 0.03 6.38 3.36 1.41 1.64 2.76 4.66 4.50 5.00 22.02 57.46

CHATTISGARH 4.89 1.86 0.44 0.44 5.45 1.96 2.04 4.00 2.67 3.61 - 22.89 50.25

KARNATAKA 2.12 2.78 2.17 - 0.80 1.80 1.95 3.30 3.67 5.00 5.00 20.49 49.07

MAHARASHTRA 4.49 3.65 1.92 - 1.49 1.78 1.64 2.42 2.67 2.63 - 24.83 47.53

RAJASTHAN 2.45 1.53 0.62 - 1.81 1.93 1.88 3.02 5.00 4.44 5.00 17.77 45.45

GOA 4.97 - - - - 1.25 1.25 2.50 2.67 5.00 - 24.00 41.64

JHARKHAND 4.97 1.33 0.29 2.03 1.30 2.00 2.23 3.51 1.70 5.00 0.65 7.82 32.84

BIHAR 3.20 0.34 0.07 7.91 0.28 0.87 0.97 1.40 2.16 2.39 - 13.15 32.74

Page 77: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Ranking of states – NE and HimState Fully

Covered

Habitation

s

PWS

Population

residing in

Fully

Covered

Habitation

s

Household

Connection

Lab

scoreMonitoring-Geotagging

Monitoring-SLSSC

Monitoring-Work order

Monitoring-Milestone based physical progress

Budget -(Total-NWQSM Release)/ (Total -NWQSM allocation)

Budget -(Total-NWQSM expenditure)/(Total -NWQSM release)

Budget-Prefinance Amount / Notional Allocation in Prefinance

Sustainability-Third party survey result

Sustainability-O&M policy implementation

Sustainability-O&M budget

Ranking marks

unit % % % marks % % % % % % % % % %

weightage 5.00 5.00 5.00 10 10 2.5 2.5 5 5.00 5.00 5.00 30 5 5 100.00 max 4.05 4.29 5.00 5.35 8.05 2.50 2.50 5.00 5.00 5.00 5.00 30.00 - - 68.65 min 2.00 1.72 0.05 - - - - - - - - - - - 8.36 average 2.96 2.89 1.17 1.47 2.15 1.86 1.88 3.45 3.75 3.46 3.26 20.31 48.60 MIZORAM 3.39 3.52 0.76 0.44 5.55 2.50 2.50 5.00 5.00 5.00 5.00 30.00 68.65 HIMACHAL PRADESH 4.05 4.17 2.89 4.65 1.52 2.01 2.00 3.54 5.00 3.58 5.00 28.33 66.73 SIKKIM 2.00 1.88 5.00 - 0.66 2.48 2.48 4.92 5.00 5.00 5.00 30.00 64.41 TRIPURA 2.84 2.91 0.13 4.80 8.05 2.32 2.32 4.41 3.67 5.00 5.00 18.89 60.34 MANIPUR 3.60 3.87 0.27 3.93 5.60 2.28 2.28 4.55 5.00 5.00 5.00 18.00 59.40 JAMMU AND KASHMIR 2.99 3.14 1.56 - 3.91 2.41 2.43 4.70 3.67 2.95 2.39 20.82 50.98 UTTARAKHAND 2.90 2.25 0.71 - 0.03 2.07 2.11 4.06 5.00 2.94 5.00 23.24 50.30 NAGALAND 2.53 2.92 0.25 - 0.56 1.94 1.94 3.52 2.67 5.00 - 28.33 49.67 ASSAM 3.13 1.72 0.11 5.35 0.66 2.33 2.43 4.67 1.07 5.00 - 21.71 48.18 MEGHALAYA 2.00 1.82 0.05 - 1.20 2.42 2.47 3.13 5.00 2.70 5.00 22.03 47.81 ARUNACHAL PRADESH 2.13 2.14 0.44 - 0.15 1.35 1.46 2.30 5.00 2.78 5.00 22.71 45.47 ANDAMAN and NICOBAR 4.05 4.29 0.51 - - - - - 2.67 - - - 11.52 PUDUCHERRY 2.88 2.95 2.53 - - - - - - - - - 8.36

Page 78: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Ongoing Schemes – Liability (Rs. Cr.) and suspense account

S. No. Non NE / Non Him States

All Ongoing

Presently in C-39

Going in

SuspenseLive Ongoing

S. No. NE / Him States

All Ongoing

Presently in C-39Going in Suspense Live Ongoing

Nos. Balance Nos. Balance Nos. BalanceNos. Balance Nos. Balance Nos. Balance

1 RAJASTHAN 474 13,644 67 1,972 407 11,672 1 ASSAM 1,802 1,517 954 408 848 1,109

2 WEST BENGAL 1,129 10,571 166 326 963 10,245 2 HIMACHAL PRADESH 440 1,408 160 1,011 280 397

3 MAHARASHTRA 7,526 3,409 5,291 2,741 2,235 667 3 JAMMU & KASHMIR 1,153 1,082 942 870 211 212

4 UTTAR PRADESH 1,876 2,827 43 72 1,833 2,755 4 MEGHALAYA 194 349 167 347 27 1

5 KARNATAKA 6,123 2,720 879 708 5,244 2,012 5 UTTARAKHAND 470 271 38 66 432 205

6 BIHAR 1,632 1,840 110 97 1,522 1,742 6 ARUNACHAL PRADESH 584 170 171 66 413 105

7 TELANGANA 1,119 1,750 222 985 897 765 7 MANIPUR 496 74 104 (2) 392 75

8 MADHYA PRADESH 2,396 1,467 83 111 2,313 1,355 8 SIKKIM 124 64 1 5 123 59

9 ODISHA 4,719 1,399 584 414 4,135 985 9 TRIPURA 143 21 53 4 90 17

10 KERALA 322 1,334 229 743 93 591 10 MIZORAM 17 11 - - 17 11

11 GUJARAT 149 1,253 40 130 109 1,123 11 NAGALAND 26 9 - - 26 9

12 TAMIL NADU 191 849 9

251 182 598 12 ANDAMAN & NICOBAR - - - - - -

13 HARYANA 952 774 212 146 740 628 13 PUDUCHERRY - - - - - -

14 ANDHRA PRADESH 1,727 718 161 361 1,566 357 Total 5,449 4,976 2,590 2,776 2,859 2,200

15 PUNJAB 398 640 9

3 389 636

16 JHARKHAND 2,553 626 143 34 2,410 592

17 GOA 2 134 2

134 - -

18 CHHATTISGARH 917 97 18 3 899 95

Total 34,205 46,050 8,268 9,232 25,937 36,819

Page 79: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Unspent Balance – Coverage (Amount Rs. Cr.)

S.No. State Coverage S.No. State Coverage

1 MAHARASHTRA 365.25 1 JAMMU & KASHMIR 124.83

2 RAJASTHAN 224.3 2 ASSAM 72.39

3 WEST BENGAL 178.48 3 ARUNACHAL PRADESH 52.92

4 ANDHRA PRADESH 116.85 4 UTTARAKHAND 43.39

5 BIHAR 109.22 5 TRIPURA 39.93

6 KARNATAKA 85.88 6 HIMACHAL PRADESH 24.25

7 UTTAR PRADESH 68.1 7 MEGHALAYA 22.93

8 TELANGANA 67.08 8 MANIPUR 16.49

9 CHHATTISGARH 39.97 9 MIZORAM 12.25

10 TAMIL NADU 33.07 10 SIKKIM 5.08

11 JHARKHAND 22.56 11 ANDAMAN & NICOBAR 1.36

12 ODISHA 21.17 12 PUDUCHERRY 1.27

13 MADHYA PRADESH 17.19 13 NAGALAND 0

14 HARYANA 15.13 Total 417.09

15 GUJARAT 9.98

16 KERALA 1.03

17 GOA 0.3

18 PUNJAB 0

Total 1,375.56

Page 80: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Evaluation of Innovative Technologies – Revamped procedure

Water Division

Ministry of Drinking Water and Sanitation

Page 81: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Background

Constituted on 10.9.2014

Objective

identify, evaluate and empanel besttechnologies

classify them

Ultimately linked to achieving SwachhBharat by 2019

A 18 member committee

Representation from Academia, ResearchInstitutions, Industry, Government

Page 82: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Journey so far

Eleven meetings held so far

Technologies received – 271, Water –167, Sanitation – 104

After internal scrutiny by Ministry,technologies placed before thecommittee.

Wide range of areas – mentioned in thenote para 2.2

Page 83: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Classification of technologiesCategory What it means

I Technology approved/ recommended

II In principle cleared; but, some more information required

III Existing proven technology

IV Technology not recommended.

Sl.

No.

Subject Total

Techno-

logies

received

Category

I

Category

II

Category

III

Category

IV*

1 Water 167 38 4 25 100

2 Sanitation 104 15 2 21 66

Total 271 53 6 46 166

*Category-IV includes duplicate applications

Page 84: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Swajal

Programme, Progress and Points to Ponder

Page 85: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

The Swajal Film

Film

Page 86: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Community owned Source sustainability Community driven O&M

Strengthening of Institutions

Use of TechnologyGrassroot

Innovations

SWAJAL FUNDAMENTALS

Providing Safe Piped Water Supply to Households

Page 87: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

SWAJAL IN ASPIRATIONAL DISTRICTS

Only 24.46% Piped Water Supply Coverage

in Aspirational Districts habitations

44.4% of India’s habitations covered

with Piped Water Supply

Page 88: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

State-wise Aspirational DistrictsState Districts State Districts

Andhra Pradesh 3 Manipur 1

Arunachal Pradesh

1 Meghalaya 1

Assam 7 Mizoram 1

Bihar 13 Nagaland 1

Chhattisgarh 10 Odisha 10

Gujarat 2 Punjab 2

Himachal Pradesh 1 Rajasthan 5

Haryana 1 Sikkim 1

J&K 2 Tamilnadu 2

Jharkhand 19 Telangana 3

Karnataka 2 Tripura 1

Kerala 1 Uttar Pradesh 8

Madhya Pradesh 8 Uttarakhand 2

Maharashtra 4

Total 74 38

112 Districts in 27 States

Page 89: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Swajal – A customised small PWS

Most Aspirational Districts endowed withgroundwater.

Surface and springs based schemes eligible

Even 10 household habitations can be taken up –suitable for small tribal communities

Wide cost variation - up to Rs 50 lakhs perscheme allowed

Habitations with iron contamination can also betaken up

No power costs and almost maintenance free.

Inbuilt community participation and O&M

Page 90: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

MODEL SWAJAL UNITMODEL SWAJAL UNIT

Page 91: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Swajal Project Cycle

• GP/Village/Habitation selected

• Contribution Accounts opened

• Key Functionaries oriented

Pre-planning

• Community selecting options through a participatory planning process

• Detailed project report based on informed choice by community

Planning

• Community involvement in social audit of scheme implementation

• Barefoot technician trainings

Implementation

• Scheme implemented as per DPR and handed over to community.

• O&M managed by community

O and M and Exit

Page 92: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

GRASS ROOT INNOVATIONS

• Pre Fab/ Pre Cast Structures-Can be installed in a day

• Dual Pump- Existing Hand Pump Used

• Theft Prevention- Solar Panel on Top, Anti theft Bolting

• Purification- Attached Chlorinator/UV System

• RMS- Remote Monitoring System

Page 93: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Brief Programme Guideline contents Challenge mode –intra State competition Advisory guidelines – ease of implementation No compromises on community participation O&M funds

and takeover No per-capita cost ceiling Flexible financial scaling few lakhs to Rs 50 lakhs (less than

cost of a 2 BHK house) Completion period six months to one year Inbuilt

Scheme sustainability through financial and source sustainability

Community empowerment through information sharing using IT

Page 94: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Swajal Management by Community

Location of source Location and number of stand

posts Carry out social audit Pay for O&M in full (GP +

Community) Pay the Jal Prerak for daily

regulation Take over assets

Page 95: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

SWAJAL ELABORATE FINANCIAL ASPECTS

Advisory to States for accessing under NRDWP ‘Flexi Funds”component

This is to be up to 5% out of overall allocation (both centraland state share put together).

Individual scheme estimated cost up to 50 lakhs -dependingon topography and to address quality issues

Access to credit for household connections for individuals –States to arrange

Funding pattern NE and Himalayan States 81:09:10 (Centre:State:GP)

Other States 45:45:10 (Centre:State:GP)

Page 96: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Capacity building under Swajal

First time training programme of this scale

Five Training of Trainers (ToTs) programmecompleted

Bhopal, Pune, Ranchi, Raipur, Guwahati and Vadadora

311 Trainees trained

21 States covered

Officers/Officials from 83 districts participated

South Zone to be covered in February 2019

Page 97: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Journey so far

Initial guidelines issued for six pilot States in March2018

Up-scaled to all aspirational districts in April 2018 Revised guidelines issued on 31.8.2018 Six ToT trainings completed – 311 personnel trained

(September to November) First Swajal Scheme Foundation stone laid by Hon’ble

Vice President at Jharkhand on 27.9.2018 First Swajal Scheme inaugurated on 19th November,

2018 on World Toilet Day 2462 schemes already identified

Page 98: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Schemes identified so far

S.No. State Name Number of Schemes

1 ANDHRA PRADESH 301

2 CHHATTISGARH 137

3 GUJARAT 58

4 JHARKHAND 1251

5 MADHYA PRADESH 7

6 MAHARASHTRA 157

7 ODISHA 518

8 RAJASTHAN 1

9 UTTAR PRADESH 32

TOTAL 2462

Page 99: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Major Concerns

Lack of enthusiasm by States

States not aware of the major revision made i.e.schemes can be taken up in safe blocks and in allother blocks in aspirational districts.

Beneficiaries of this revision - Punjab, Rajasthanand Haryana.

Only 9 States have identified schemes

96% identified schemes only in 5 States(Jharkhand, Odisha, AP, Chhattisgarh andMaharashtra)

Swajal progress entry in IMIS is lagging behind

Page 100: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Sr. No State

Assigned Districts by NITI Aayog

1Andhra Pradesh Vishakhapatnam2

AssamDarrang

3 Barpeta4

ChhattisgarhKorba

5 Kanker6 Mahasamund7

JharkhandPakur

8 Sahibganj9

Madhya Pradesh

Badwani10 Khandwa11 Singrauli12 Damoh13 Vidisha14

MaharashtraOsmanabad

15 Nandurbar16Uttarakhand Udhamsinagar

Development Partner and Districts assigned

Piramal Group has signed a Statement of Intent with NITI Aayog to assist States in aspirational districts

Page 101: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Sl. No State No. UNICEF District

1Andhra Pradesh 1Kadapa2Vizianagaram

2Assam 3Dhubri

4Sitamarhi3Chhattisgarh 5Bastar

6Dantewda7Rajnandgaon

4Gujarat 8Dahod5Jharkhand 9Bokaro

10Chatra

11Giridih12Godda13Lohardaga

14Palamau15Ramgarh16Ranchi17Simdega18West Singhbhum

6Karnataka 19Raichur7Madhya Pradesh 20Chhatarpur

21Guna8Maharashtra 22Gadchiroli9Odisha 23Dhenkanal

24Gajapati25Nuapada

10Rajasthan 26Karauli11Tamilnadu 27Ramanadhapuram

28Virudhanagar12Uttar Pradesh 29Chitrakoot

Page 102: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Way Forward

Participatory Rural Appraisal is indispensable under Swajal

Use the development partners – UNICEF, Piramal and Tata Trusts at district level.

Entry of scheme progress details in IMIS is mandatory

States to take up more schemes - Only coverage component where new scheme is allowed to be taken up.

Ministry is coming out with Training modules for Sarpanches

Page 103: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

How to identify village? Canwe take up habitation?

Village/GP located in any ofthe blocks with no PWSscheme and preferably ODF.

Yes. Individual habitationscan be taken up withminimum of 10households. In fact, Statescan adopt a saturation modeand cover all habitations in avillage.

Swajal FAQs

Page 104: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

What are the mandatorycomponents?

Bore/tube well withcasing

Pump with dry run sensor

Pipes

Standposts

Recharge structure

Soak pit

Infra for schools andanganwadis

Customer Care Centre

Swajal FAQs

Page 105: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

What are the componentswhere alternatives/alternative materialsare allowed?

Solar panel or electricity

Mounting structure (steelor concrete)

Storage structure (PVC orothers)

Stand-post to householdconnection -Infrastructure funding byGP

Swajal FAQs

Page 106: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

What are the optionalcomponents?

Community watertreatment plant

Online chlorination

LED light for waterdrawl at night

Cattle troughs

Washing clothes

Mobile chargers

Sensors for discharge

Lightning conductor

Swajal FAQs

Page 107: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

What is funding pattern?(Centre: State: GP)North Eastern States andHimalayan States81:09:10Other States 45:45:10

10% funding can fromany of the followingsources (i) GP funds (ii)MP/MLA LAD funds (iii)CSR funds (iv) DistrictMineral Fund (v)Community Contribution

Swajal FAQs

Page 108: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Swajal FAQs Model O&M Calculation(All figures in INR) for illustration purpose only

Assumptions madeMonthly charges for maintenance personnel Rs 500 x 12 = 6,000

No. of households in the habitation 30

Annual maintenance of the drinking water system@2% of estimated cost (for solar based system)

Cap on per year contribution by individual household as decided by the State for contribution to three year O&M pool of funds 200

Payment to be made by a household for three years 3 x 200 600Annual O&M cost for scheme with an estimated cost say Rs 5 lakhsMonthly payment to bare foot technician, say, @Rs 500/- 6, 000Maintenance of panel, pump, pipelineand other accessories @2% of the capital cost 10,000Total 16,000Three year O&M pool cost 48,000Three year O&M pool Cost to be met by the community (600 x 30) 18,000

Cost to be met by GP 30,000

Page 109: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

The village community isunwilling to pay for threeyear O&M pool cost andwilling only for one or twoyears. What should be done?The concerned GP has to payfor creating the three yearO&M pool cost.Willing communities

Can a state adopt a 5 yearO&M pool instead of 3years?Yes. Three years is theminimum period.

Swajal FAQs O&M

Page 110: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Question and Answer and

Suggestion time

Page 111: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National
Page 112: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Agenda – Water Quality

1. National Water Quality Sub-missiona) Left out habitationsb) Unspent Balancec) Action Points to States

2. Water Quality Monitoring and Surveillancea) Expenditure 2018-19b) Water Quality Testing Labs

i. Lab Rankingii. Sample Collection

3. Uniform Drinking Water Quality Monitoring Protocol-2019

4. Revamp of High Level Technical Committee

Page 113: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

NWQSM: State-wise left-out habitations as on 24.01.2019S.No. State Name Left out habitations

1 ANDHRA PRADESH 58

2 ASSAM 1421

3 BIHAR 241

4 CHHATTISGARH 18

5 HARYANA 39

6 JHARKHAND 115

7 KARNATAKA 60

8 KERALA 25

9 MADHYA PRADESH 02

10 MAHARASHTRA 21

11 ODISHA 35

12 PUNJAB 265

13 RAJASTHAN 1969

14 TELANGANA 0

15 UTTAR PRADESH 159

16 WEST BENGAL 2453Total 6881

• States are advised to get theleft-out habitations re-testedfor the presence chemicalcontamination in NABLaccredited labs.

Page 114: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

NWQSM: State-wise Unspent Balance as on 24.01.2019S. No State Name Unspent Balance(cr.)

1 ANDHRA PRADESH 25.742 ASSAM 294.983 BIHAR 147.314 CHHATTISGARH 0.95 HARYANA 7.286 JHARKHAND 31.477 KARNATAKA 25.918 KERALA 4.439 MADHYA PRADESH 1.26

10 MAHARASHTRA 16.6211 ODISHA 0.0112 PUNJAB 98.0113 RAJASTHAN 379.9614 TELANGANA 3.815 UTTAR PRADESH 24.9616 WEST BENGAL 778.41

Total 1841.05

• NWQSM funds can be used inconvergence with other fundsi.e. the funds can be in externalaided projects/State schemesto the extent of eligibility.

• State are to provideexpenditure plan for utilizingunspent balance in AAP.

Page 115: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

National Water Quality Sub-Mission (NWQSM)Action Points for States

All States requested to submit proposals for left-outhabitation on or before 31st January, 2019. Noproposal will be considered beyond the cut off date.

NWQSM has sunset clause i.e. to be completed byMarch, 2021.

Page 116: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Water Quality Monitoring and Surveillance (WQMS)Expenditure 2018-19

S. No State

Notional Availability = OB

+ Full Central Allocation

However this will vary as

per the Release In Cr.

Current Availability for the year =

1/18 of expenditure on Hardware

on Coverage In Cr

Expenditure in Cr.Percentage Of

Expenditure

1 MIZORAM 48.31 1.72 1.71 99.56

2 ANDHRA PRADESH 197.99 3.38 3.23 95.65

3 ASSAM 503.5 4.92 4.58 93.14

4 WEST BENGAL 424.48 11.11 10.2 91.77

5 CHHATTISGARH 121.36 1.75 1.21 69.19

… ... … … … …

26 PUDUCHERRY 2.56 0 0 0

27 MANIPUR 67.62 2.66 0 0

28 KARNATAKA 489.63 15.77 0 0

29 ANDAMAN & NICOBAR 1.68 0 0 0

30 BIHAR 341.52 1.3 0 0

States are requested to utilize full available funding under this component as this reflects in the health of the laboratories.

Page 117: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Water Quality Monitoring and Surveillance (WQMS)Water Quality Testing Labs

• Lab Ranking• To encourage competitiveness, greater ownership,

improve the quality and strengthen labs functioning.• 40% weightage to infrastructure & AMC and 60%

weightage for performance based indicators.

• Sample Collection• 75% of tests are to be conducted based on roster

and for remaining 25% flexibility is given to States.

Page 118: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Water Quality Monitoring and Surveillance (WQMS)Lab Ranking - States

Page 119: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Water Quality Monitoring and Surveillance (WQMS)Lab Ranking – Districts

Page 120: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

UDWP-2019• To address emerging contaminants, include technological

enhancements and reforms in procurements the existingProtocol is revised.

• Main Features Flexibility

Regional labs can be set up; can outsource labs

Outcome Oriented

Robust ProceduresRoster based sample collection/testing

Geo-tagging of all sources

AMC/CAMC of instruments/equipment

NABL accreditation as per IS/ISO/IEC 17025:2017

Cross verification of test results and 3rd Party verification of labs

Page 121: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Revamp of High Level Technical Committee

•Composition of Committee – top technical institutions

•Rigorous 360 degree process introduced • First Stage – field evaluation of technology by NEERI• Second Stage – reports by user States • Third State – Appraisal by the Committee

Page 122: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

ASSURED Matrix

• Coined by the Chairman Dr. RA Mashelkar of HLTC

A – Affordability

S – Scalability

S – Sustainability

U – Universality

R – Rapid

E – Excellence

D – Distinctive

• Assured matrix framework

Page 123: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

THANKS

Page 124: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Agenda – Water Quality

1. National Water Quality Sub-missiona) Left out habitationsb) Unspent Balancec) Revised Guidelines, Jan-2019, modificationsd) Sunset Clause

2. JE/AES Status of Expenditure

3. WQMS- Lab Ranking / Uniform Drinking Water Quality Monitoring Protocol

4. Jalmani

5. NGT Case OA 156/2015

6. Lab Ranking

7. Roster for sampling

8. UDWP

Page 125: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

State-wise left-out habitations as on 24.01.2019

State Name

Nos. of Habs as on

18/08/2016 Habs Covered

YDU (Marked as non-quality)

Habs Being Covered

Proposal received for

Habs

Left out habitations as

on 24-Jan-2019ANDHRA PRADESH 421 244 71 48 - 58ASSAM 3881 297 169 1994 - 1421BIHAR 2120 250 696 529 404 241CHHATTISGARH 75 13 25 18 1 18HARYANA 245 21 121 64 39JHARKHAND 1128 176 763 74 - 115KARNATAKA 1059 795 71 133 - 60KERALA 73 34 7 7 - 25MADHYA PRADESH 136 105 9 0 20 02MAHARASHTRA 100 39 15 25 - 21ODISHA 65 22 3 5 - 35PUNJAB 777 198 38 202 74 265RAJASTHAN 6849 2404 614 1845 17 1969TELANGANA 1041 1040 1 0 - 0UTTAR PRADESH 462 103 1 127 72 159WEST BENGAL 9112 2750 915 2560 434 2453

Total 27544 8491 3519 7631 1022 6881

Page 126: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

State-wise Unspent Balance as on 24.01.2019 (Rs. in Cr.)

S. No State Name NWQSM Release NWQSM Expenditure Unspent Balance1 ANDHRA PRADESH 25.74 0 25.742 ASSAM 330.96 35.98 294.983 BIHAR 171.96 24.65 147.314 CHHATTISGARH 0.92 0.02 0.95 HARYANA 16.91 (*) 7.63 9.286 JHARKHAND 38.72 7.25 31.477 KARNATAKA 26.99 1.08 25.918 KERALA 4.43 0 4.439 MADHYA PRADESH 4.41 3.15 1.26

10 MAHARASHTRA 18.79 2.17 16.6211 ODISHA 1.12 1.11 0.0112 PUNJAB 98.01 0 98.0113 RAJASTHAN 895.5 515.54 379.9614 TELANGANA 700.23 696.43 3.815 UTTAR PRADESH 49.95 24.99 24.9616 WEST BENGAL 1305.7 527.29 778.41

Total 3690.34 1847.29 1843.05

(*): State has returned Rs. 2Cr.

Page 127: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Revised Guidelines of NWQSM, Jan-2019Modifications

Schemes Related Modifications

oCluster based Community Water Purification Plants

oExtension of Pipelines from Existing Schemes

oCanal based / Ranney Well based schemes

oRetrofitting PWS with Community Water Purification Systems

Funding Related Modifications

oKitty based releases

oFor En-route Habitations NRDWP funds may be utilized.

oNWQSM funds can be used in convergence with other funds. Assuch, NWQSM funds can be utilized for covering affectedhabitations in external aided projects/State schemes to the extentof eligibility.

Page 128: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Revised Guidelines of NWQSM, Jan-2019Sunset Clause

National Water Quality Sub-Mission will come to end on31st March, 2021. Accordingly, all the habitations left-out and incomplete NWQSM Schemes will be State’sresponsibility after 31st March, 2021.

States have to submit commitment letter before31.01.2019 that all the left-out habitations /incomplete NWQSM schemes after 31.03.2021 if anywill be State’s responsibility.

Page 129: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

National Water Quality Sub-Mission (NWQSM)

Action Points for States:

All States requested to submit proposals for left-outhabitation on or before 31st January, 2019.

No proposal will be considered beyond the cut offdate.

States have to submit commitment letter before31.01.2019 that State will take responsibility of all theleft-out habitations / incomplete NWQSM schemes after31.03.2021

Page 130: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Japanese Encephalitis- Acute Encephalitis Syndrome

Following activities are allowed in JE/AES affected districts.

o IEC Activities

o Conversion of shallow hand pump to India Mark-II or higher version

o Solid Liquid Waste Management activities

o Conducting Sanitary Survey

o Installation of energized stand post.

o Raising of hand pump platform.

o Construction of Soak pits

Under NRDWP,

o States are allowed to take new PWS schemes in JE-AES affected districts.

o Irrespective of physical progress, States are allowed spend funds on the scheme whichare in JE-AES affected districts.

o States are allowed to take new hand pumps (India Mark-II and above) schemes in JE-AES affected districts using JE-AES fund.

Page 131: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

JE/AES Expenditure status as on 24.01.2019

(Rs. in Cr.)

S. No. State OBCentral

AllocationCentral Release

Central Expenditure

Closing balance

1 ASSAM 0.07 1.71 0 0 0.07

2 BIHAR 5.57 7.74 3.87 0 9.44

3 TAMIL NADU 0 5.42 2.71 0 2.71

4 UTTAR PRADESH 4.44 121.05 121.05 63.56 61.93

5 WEST BENGAL 0.15 4.08 2.04 2.19 0

Total 10.2 140 129.67 65.75 74.15

Note : All states are requested to update activities carried out in JE-AES

affected districts in IMIS Format C-48

Page 132: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Japanese Encephalitis- Acute Encephalitis Syndrome

Survey :oPre-monsoon survey is to be conducted in April – May month

oPost monsoon survey is to be conducted in November-December month

JE-AES Survey sample collection roster has been prepared and all affected states are requested to carry survey in these identified sources only.

Page 133: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Water Quality Monitoring and Surveillance (WQMS)

States can utilize up to 5% of funds released to them underNational Rural Drinking Water Programme (NRDWP) for WaterQuality Monitoring and Surveillance (WQMS).

Which includes testing of drinking water sources, upgrading ofexisting water quality testing laboratories and setting up of newState / district / sub-district / mobile water quality testinglaboratories, providing chemicals and consumables tolaboratories, providing field test kits/refills to Gram Panchayatsetc.

Page 134: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

WQMS: Expenditure 2018-19

S. No State

Notional Availability = OB

+ Full Central Allocation

However this will vary as

per the Release In Cr.

Current Availability for the year =

1/18 of expenditure on Hardware

on Coverage In Cr

Expenditure in Cr.Percentage Of

Expenditure

1 MIZORAM 48.31 1.72 1.71 99.56

2 ANDHRA PRADESH 197.99 3.38 3.23 95.65

3 ASSAM 503.5 4.92 4.58 93.14

4 WEST BENGAL 424.48 11.11 10.2 91.77

5 CHHATTISGARH 121.36 1.75 1.21 69.19

6 UTTARAKHAND 104.17 2.67 1.58 59

7 TELANGANA 165.76 4.91 2.85 57.97

8 SIKKIM 22.47 0.88 0.48 54.89

9 JHARKHAND 179.73 3.86 2.11 54.82

10 UTTAR PRADESH 518.26 14.52 7.96 54.81

11 JAMMU & KASHMIR 346.85 6.3 3.31 52.58

12 MADHYA PRADESH 280.49 12.05 5.53 45.89

13 NAGALAND 34.72 0.78 0.35 44.57

14HIMACHAL

PRADESH91.12 3 1.3 43.24

15 KERALA 88.28 4.37 1.82 41.67

Page 135: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

WQMS: Expenditure 2018-19

S. No State

Notional Availability = OB

+ Full Central Allocation

However this will vary as

per the Release In Cr.

Current Availability for the year =

1/18 of expenditure on Hardware

on Coverage In Cr

Expenditure in Cr.Percentage Of

Expenditure

16 PUNJAB 124.25 3.8 1.57 41.43

17 HARYANA 96.99 4.06 1.61 39.63

18 ARUNACHAL PRADESH 109.49 2.58 0.98 37.83

19 MEGHALAYA 52.78 1.24 0.33 26.3

20 TRIPURA 103.75 1.73 0.45 26.29

21 MAHARASHTRA 724.17 5.46 1.37 25.15

22 GUJARAT 238.24 11.73 2.25 19.18

23 TAMIL NADU 176.25 4.89 0.86 17.65

24 ODISHA 196.73 5.07 0.85 16.87

25 RAJASTHAN 749.99 21.72 0.72 3.31

26 PUDUCHERRY 2.56 0 0 0

27 MANIPUR 67.62 2.66 0 0

28 KARNATAKA 489.63 15.77 0 0

29 ANDAMAN & NICOBAR 1.68 0 0 0

30 BIHAR 341.52 1.3 0 0

Page 136: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

S. No. Name of State/UTSanctioned

Amount (lakhs)

Amount Utilized(lakhs)

Unspent Amount (lakhs)

Present Status

1 ANDHRA PRADESH 1,923.45 194.31 1,729.14 UC Not received.

2ARUNACHAL PRADESH

52.66 52.66 0 UC received for the full amount utilized.

3 ASSAM 1409.64 1144.89 264.75UC received for utilized funds. Balance fund awaited

4 BIHAR 766.16 608.13 158.03 UC Not received.

5 CHHATTISGARH 192.74 131.08 61.65 UC & Unspent Balance received.

6 GOA 8.75 8.73 0.0231

UC received for utilized funds of Rs. 8.73 lakhs and the unspent balance of Rs. 0.0231 lakhs has been received. Details of interest on unspent balance are awaited.

7 GUJARAT 1765.96 1404.78 361.18UC received for utilized funds. Balance Amount Awaited

8 HARYANA 174.57 262.69 0 UC received for the full amount utilized.

9 HIMACHAL PRADESH 749.05 749.05 0 UC received for the full amount utilized.

10 JAMMU AND KASHMIR 435.92 85.09 350.83 UC Not received.

Jalmani -(CAG Audit Para)

Page 137: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Jalmani...Continued- (CAG Audit Para)

S.No. Name of State/UTSanctioned

Amount (lakhs)

Amount Utilized(lakhs)

Unspent Amount (lakhs)

Present Status

11 JHARKHAND 250.59 119.28 131.31UC received for utilized funds refunding unspent amount but interest for the balance fund is still awaited.

12 KARNATAKA 1,228.40 1,228.40 0 UC Received

13 KERALA 256.4 25.04 231.36 UC Not received.

14 MADHYA PRADESH 546.87 546.05 0.82UC received for utilized funds. Govt. of MP has stated that they will be adjusting this amount against upcoming grants from Central Govt.

15 MAHARASHTRA 1,669.64 1,063.74 605.9UC/Unspent Balance received in Jan, 2019. State has been requested to confirm the details of unspent balance.

16 MANIPUR 110.24 110.24 0 UC received for the full amount utilized.

17 MEGHALAYA 183.83 177.43 6.4UC received for utilized funds and balance fund is returned.

18 MIZORAM 196.64 196.64 0 UC received for the full amount utilized.

19 NAGALAND 99.18 99.18 0 UC received for the full amount utilized.

20 ORISSA 692.16 622.81 69.35UC received for utilized funds stating that Unutilized amount of 69.35 was refunded, however, it is yet to be ascertained by Govt. of Orissa.

Page 138: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Jalmani...Continued- (CAG Audit Para)

S.No.Name of State/UT

Sanctioned Amount (lakhs)

Amount Utilized(lakhs)

Unspent Amount (lakhs)

Present Status

21 PUNJAB 544.49 544.492 0 UC received for the full amount utilized.

22 RAJASTHAN 688.66 99.03 589.63UC received for utilized funds. Balance fund awaited

23 SIKKIM 87.89 53.48 34.41 UC Not received.

24 TAMIL NADU 1,699.85 1,336.37 363.48 UC Not received.

25 TELANGANA 514.20 439.5 UC Not received.

26 TRIPURA 160.56 160.56 0 UC received for the full amount utilized.

27 UTTAR PRADESH 2756.9 1656 1100.9UC received for utilized funds. Received Unspent Balance. Interest awaited.

28 UTTARAKHAND 142.3 142.3 0 UC received for the full amount utilized.

29 WEST BENGAL 1206.48 1206.48 0 UC received for the full amount utilized.

Page 139: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Compliance of NGT Case OA 156/2015

OA No. 156 of 2015 (MA No. 474 of 2015) Mrs Sunita PandeyVs Union of India regarding availability of clean water in Baliaand Other Districts of Uttar Pradesh.

Vide Para 19 of the said Judgement, Secretaries, Ministry ofDrinking Water and Ministry of Water Resources, Govt. of India,have been directed to file a joint report after compiling therelevant information about the compliance of the directionsissued vide the instant Order on or before 31.03.2019 (may beinadvertently mentioned as 31.03.2018 in the Order).

Page 140: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Compliance of NGT Case OA 156/2015… (continued)S. No. State/Uts Remarks

1 Andaman and Nicobar Islands Information Awaited2 Andhra Pradesh Information Awaited3 Arunachal Pradesh Information Awaited4 Assam Information Received5 Chandigarh Information Awaited6 Chhattisgarh Information Awaited7 Dadra and Nagar Haveli Information Awaited8 Daman and Diu Information Awaited

9 National Capital Territory of Delhi Information Awaited10 Gujarat Information Awaited11 Haryana Information Received12 Himachal Pradesh Information Awaited13 Jammu and Kashmir Information Awaited14 Jharkhand Information Awaited15 Karnataka Information Awaited16 Kerala Information Awaited17 Maharashtra Information Awaited18 Manipur Information Awaited

Page 141: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Compliance of NGT Case OA 156/2015…..(continued)

No. State/Uts Remarks

19 Meghalaya Information Awaited20 Mizoram Information Awaited21 Nagaland Information Awaited22 Odisha Information Awaited23 Puducherry Information Awaited24 Punjab Information Awaited25 Sikkim Information Awaited26 Uttar Pradesh Information Awaited

27 West Bengal Information Awaited28 Bihar Information Received29 Goa Information Received30 Lakshadweep Information Received31 Madhya Pradesh Information Received32 Rajasthan Information Received33 Tamil Nadu Information Received34 Telangana Information Received35 Tripura Information Received36 Uttarakhand Information Received

Page 142: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Lab Ranking

Why Lab Ranking?

5% WQMS funding

With assistance from Government of India, 2,298 water quality testinglaboratories at various levels, have been set up in the country as on15.01.2019

In order to encourage competitiveness, greater ownership, improve the quality and strengthen the functioning.

The decision was taken in consultation with States during the workshop held at MDWS, New Delhi on 10th May, 2018.

Accordingly, a ranking score based on 8 indicators was developed and was shared with States for comments /suggestions.

Page 143: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Roster for sample collection :

To ensure representative sampling

Random sampling

75% of tests are to be conducted based on roster and for remaining 25% flexibility is given to States.

Page 144: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

UDWP-2019

Why revision ?

1. Emerging contaminants

2. Advanced Equipments

3. Technological innovations

4. Reforms in procurements

A need was felt to revise the same and a committee was constituted under theChairpersonship of Director, CSIR-NEERI, Nagpur comprising experts from:-

State Rural Water Supply Departments,

MDWS

National institutes of repute namely BIS, NABL, NEERI, NIV, ICMR, CGWB & NCDWSQ

The Committee held several meetings and revised the 1st edition of the Protocol which wassubjected to internal and external review and comments were received on the protocol.

These comments were thoroughly analyzed and appropriately considered in the Protocol(Second Edition).

Page 145: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

ObjectiveWith the flexibility to States/UTs, this document will provide handholding technical support to RuralWater Supply Departments as under:-

Setting-up and strengthening of drinking water quality testing laboratories at State, District andSub-division/block level including mobile water quality testing laboratories.

Providing guidance to personnel at different managerial levels in water quality testing, monitoring,data interpretation and reporting.

Involving Panchayati Raj Institutions (PRIs) and empowering community on water quality issues

Creating awareness generation amongst the community

Conducting sanitary survey and indicative testing of drinking water at grass root level

Corrective actions for chemical contaminants by identifying safe source and identifying suitabletreatment technologies

Page 146: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Main Features of Protocol (Second Edition)

The Protocol plays an advisory role with flexibility as per state specific needs

Incorporation of revised standards of Iron and Arsenic as per amendments in IS 10500:2012

Strengthened institutional framework with the flexibility to States/UTs regarding merger oflower level laboratories with higher category of laboratories depending on local context andneed

Well defined functions of laboratories at all levels as under:-

State Level

District and Sub-divisional/block level

Mobile Drinking Water Quality Testing

Fixing targets for sampling/testing of sources by State level laboratory also

Page 147: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Main Features of Protocol (Second Edition) contd

Clearly defined roles and responsibilities of Institutions at national, State, District, Sub-divisional, block and Gram Panchayat level

Clearly defined roles and responsibilities of RWSS Department and laboratory personnel

Strengthened structure of human resource at various levels with flexibility to States/UTs as perlocal needs

Testing of samples from pre-planned roster of sources to be generated on NRDWP IMIS everymonth

Ranking of State and district laboratories and felicitating the best performing labs in thecountry

Cross verification by States and 3rd Party verification of labs by MDWS

Page 148: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National

Main Features of Protocol (Second Edition) contd

Strategy for AMC/CAMC of instruments/equipments

Incorporation of advanced instruments like Ion Chromatograph, GC-MS, ICP-MS,ICP-OES

Focus on quality assurance and quality control

Emphasis on use of GeM portal for procurement

Focus on NABL accreditation as per IS/ISO/IEC 17025:2017

Incorporation of best practices from States

Page 149: Minutes of Meeting / Workshop (with all States …...Minutes of Meeting / Workshop (with all States except Goa) on (I) Review held in 2nd & 3rd week of January 2019 and (II) National