dated 12/7/18
56th St. N
Sunnyside
ScenicOverlook
Pickett Ave.
StillwaterDockwall
warded
0 Awarded
0 Awarded
oposed
Stillwater
Bayport
to Chestnut Street
St. Croix Crossing Project - Minnesota Landscaping Projects
LEGENDS.P. 8214-164: Letting Sept. 26, 2014; Constructed in 2015
S.P. 8214-160: Letting Oct. 23, 2015; Constructed in 2016
S.P. 8214-161: Letting March 23, 2018; Construction in 2018 and Spring 2019
S.P. 8214-176: Letting October 26, 2018; Construction in Spring of 2019 & Spring of 2020
Ore
n Av
e. N
.
Tuen
ge R
d.
N. Frontage Rd.N. Frontage Rd.
S. Frontage Rd. S. Frontage Rd.
Old
�eld
Ave
. N.
Nor
thw
este
rn A
ve.
Indu
stria
l Blv
d.
Osg
ood
Ave.
Beach Rd.62nd St. N
58th St. N
62nd St. N
S. Frontage Rd.
S. Frontage Rd.
Stagecoach Trail
Penrose Ave.
Peller Ave.
Look
out T
rail
Upper 61st
Peab
ody
Ave
Paris
Ave
. N.
Oxb
oro
Ave.
N.
Ode
l Ave
. N.
Oakgr
een
Ave.
Gre
eley
St.
Osg
ood
Ave.
Oxb
oro
Ave.
N.
ClubTara
Water Treatment
Plant
Ore
n Av
e. N
.
Om
aha
Ave.
N.
Ole
ne A
ve. N
.
Shelton Dr.
56th St.
Oak Park Heights
For more information about the St. Croix Crossing Project:
Visit the project websitewww.mndot.gov/stcroixcrossing