MINISTRY OF TRANSPORT AND COMMUNICATIONS OF THE REPUBLIC OF LATVIA
Progress of Riga and Pieriga Mobility Plan
(RRMP)
Andulis ŽidkovsDeputy State Secretary,
Head of Responsible Authority
MINISTRY OF TRANSPORT AND COMMUNICATIONS OF THE REPUBLIC OF LATVIA
Procurement Plan and Implementation of RPMP
2008 2009 2010
N D J F M A M J JL A S O N D J F M A M J JL A S O N D
1 2 3 4 5 6 7 8 9
Technical Assistance
contract execution €
Prep TD Procur 52d TD eval
Reporting to Steering
Commette x x X X X X
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
RPMP elaboration contract execution €
MINISTRY OF TRANSPORT AND COMMUNICATIONS OF THE REPUBLIC OF LATVIA
RPMP management structure
Steering Committee (MoT, Riga City, Municipalities,
“Latvian Railway”, “Passenger Train”, “Riga Traffic” and other stakeholders
Working group(MoT, Riga City)
Project coordinator of Ministry of
Transport
Contractor for RPMP
MINISTRY OF TRANSPORT AND COMMUNICATIONS OF THE REPUBLIC OF LATVIA
Structure of RPMP (content)
Assessment of existing situation
Setting up and approval of goals to be reached
Development of modelling system (based on existing EMME/2)
Elaboration of various scenarios for development of transport system
Detailed elaboration of recommended scenario
Elaboration of Working program for implementation of selected scenario
MINISTRY OF TRANSPORT AND COMMUNICATIONS OF THE REPUBLIC OF LATVIA
Development of major infrastructure projects in Riga
Transfer of port activities out from city centre to the Krievu sala (CF):
Construction 2010 -2013
Transfer of activities after 2013
Modernization of infrastructure of Riga airport and access roads (CF):
Construction 2010-2013
Construction of new passenger terminal in airport
Riga– 2010 -2012 (PPP project)
MINISTRY OF TRANSPORT AND COMMUNICATIONS OF THE REPUBLIC OF LATVIA
Other important infrastructure projects
Reconstruction of Riga railway junction – partly enssure access to the port terminals on the left bank of Daugava– 2010- 2013 (CF)
Construction of railway access road to the Riga airport (Rail Baltica branch) – 2011- 2014 (CF)
MINISTRY OF TRANSPORT AND COMMUNICATIONS OF THE REPUBLIC OF LATVIA
MINISTRY OF TRANSPORT AND COMMUNICATIONS OF THE REPUBLIC OF LATVIA
Feasibility studies on the left bank of Daugava
Supporting feasibility studies before implementation these projects:
“Feasibility Study on Railway Routes to the Port Terminals on the left bank of the Daugava River and to the International Airport “Riga”” - need to be prolonged until 2010! (2004/LV/16/C/PA/001)
“Technical Assistance Project “Renovation of Riga Railway Network” -need to be prolonged until 2010! (2004/LV/16/C/PA/001)
Connection of Riga airport to the main road network and Riga city – 2009 – 2010
All activities above are included in ToR of RPMP and must be considered within elaboration process!