ministerial direction -...
TRANSCRIPT
GANNAWARRA PLANNING SCHEME
SCHEDULE TO CLAUSE 72.04 DOCUMENTS INCORPORATED IN THIS PLANNING SCHEME
1.0 Incorporated documents
Name of document Introduced by:
Australian Standard AS2021-2015, Acoustics – Aircraft Noise Intrusion – Building Siting and Construction, Standards Australia, 2015
VC107
Fibre Optic Project, Integrated Approval Requirements, December 2002 VC17
Goulburn-Murray Water Connections Project Incorporated Document, August 2015
GC35
Goulburn-Murray Water Native Vegetation Code of Practice, February 2011
C31
Hospital Emergency Medical Services - Helicopter Flight Path Protection Areas Incorporated Document, June 2017
GC49
Obstacle Limitation Surface Plan, Plan Sheet 2 of 2, Reference Number F1359, prepared by Price Merrett and Associates Pty Ltd
NPS1
Rail Gauge Standardisation Project, Integrated Approval Requirements, December 2002
VC17
Regional Fast Rail Project, Integrated Approval Requirements, December 2002
VC17
Wimmera Mallee Pipeline Project Gannawarra Planning Scheme Incorporated Document
C20
Wimmera Mallee Pipeline Project Supply System 5 Murray/Culgoa, August 2007
C18
OPERATIONAL PROVISIONS – CLAUSE 72.04 - SCHEDULE PAGE 1 OF 1
31/07/2018VC148
31/07/2018VC148