SINDBADSystSystèème INtme INtéégrgréé De gestion du BAssin pour la rDe gestion du BAssin pour la rééutilisation Des eaux usutilisation Des eaux uséées es
pour lpour l’’agricultureagriculture(Integrated River Basin management for wastewater reuse in Agric(Integrated River Basin management for wastewater reuse in Agriculture)ulture)
Fostering Sustainability in Arid and Water Scarce ZonesThrough Local Actions
Presented at the World Water Forum-Mexico City, 20th March 2006 Rachid Taibi (ANRH) and Augusto Pretner (SGI)
Italian Ministry for the Environment
MINISTERE DES MINISTERE DES RESSOURCES EN EAURESSOURCES EN EAU
ALGERIEALGERIE
2
BackgroundBackground
• Algeria is characterized by a semi-arid climate facing decreasing rain fall since the three last decades
• Shortage in water supply and irrigation
3
RationaleRationale
• Increase of water consumption (demographic growth and economic development)
• Increased volume of untreated wastewater • Agriculture water demand = 2700 million m3/year• Wastewater produced = 750 Million m3/Year• Need to manage this resource to maximise
productive activities (e.g. agriculture) and to minimise adverse health and environmental impacts
• Benefits: less energy consumption, less impacts on environment.
4
Algerian NeedsAlgerian NeedsTechnical • Developing integrated water / wastewater planning and
models;• Assessing the most suitable technologies for wastewater
treatment and reuse;Knowledge• Understanding health, environmental impacts and
consequences of using wastewater in irrigated agriculture;• Understanding economic and financial aspects of wastewater
reuse;• Designing programmes for capacity building, awareness raising
and information dissemination;Legislation• Advising on regulatory and institutional framework.
5
Algeria - UNESCO cooperationAlgeria - UNESCO cooperation
• In the framework of the UNESCO-WPA Water Programme for Africa, a feasibility study for the use of non-conventional water resources has been agreed.
• The study is funded by the Italian Ministry of Environment through UNESCO and UNEP/GPA
• Within the cooperation framework UNESCO provides international experts in the concerned disciplines
6
Algeria - UNESCO cooperationAlgeria - UNESCO cooperation
ALGERIAN STAKEHOLDERS
Ministry of Water Resources (MRE)
Ministry of Agriculture and Rural Development (MADR)
Ministry of Territory and Environment (MATE)Ministry of Health
Municipalities
Associations
7
Pilot projectsPilot projects
REGHAIA CONSTANTINE
Focus on two pilot sites that represent the complexity of the problem related to the management and use of wastewater in Algeria:- The area of the Lake Reghaia, near Algiers- The area of Constantine, at the east part.
9
Water quality in the lakeWater quality in the lake
• Advanced eutrophication is appearing
• Methane, evident anoxia phenomena
• Is the lake going to die?
• 400.000 population discharge is only a part of the causes.
• An integrated approach is needed
10
JustificationJustification
• Less than one third of urban/industrial wastewater is treated;
• No measures are taken for controlling no-point pollution sources (farming, fertilizer, other contaminants)
• Untreated wastewater is reused for 700 ha of irrigated agriculture
11
The The integratedintegrated approachapproach
CSO INDUSTRIAL DISCARGE
WWTPSEWER NETWORK
RAIN EVENT
DIRECT DISCHARGE INTO THE SEA
CSO
PS
NO POINT POLLUTION
SEA POLLUTION
EU Water Framework DirectiveRiver Basin Management Plan
13
FeasibilityFeasibility StudyStudy objectivesobjectives
• Propose a viable solution for wastewater management and reuse in the pilot areas of Reghaia and Constantine;
• Promote the application of innovative management technologies;
• Enhance skills of Algerian stakeholders through capacity building
• Support dissemination of project results by establishing a multi-stakeholder platform
• Identify and design needed infrastructure• Apply for national and international funding
for the implementation of the structures identified
14
Stakeholders involvementStakeholders involvement
Reghaia Constantine
National TeamInternational Team
Facilitatingthe process
Maghreb AfricaMiddle East
15
Technical activitiesTechnical activitiesTechnical activities
• Data gathering and organisation (Database)
• Field and water quality survey
• Construction and testing of an integrated water quality/quantity model
• Simulation of different treatment options
• Design of the integrated wastewater management system and wastewater reuse in agriculture
16
Combining tradition and modern technologiesCombining tradition and modern technologies
Traditional and modern water meter
17
Integrated modelling
MEDITERRANEAN SEA
FARMING FERTLIZER
RECEIVINGWATER BODY
SEWAGE NETWORK
CENTRALISEDPRE TREATMENT FOR INDUSTRIES
IRRIGATION FOR AGRICULTURE
RAIN FALL
WWTP
20
Expected outputsExpected outputs
• Feasibility study on integrated river basin integrated river basin management for wastewater reuse in management for wastewater reuse in agricultureagriculture in Reghaia et Constantine.
• Project proposals, based on the results of the feasibility study, aimed at applying for funding the structural works;
• Training courses for Algerian stakeholders• Dissemination of the results aimed at
replicating the project