mining plan- bargad - welcome to environmentenvironmentclearance.nic.in/writereaddata/formb/tor/...r...
TRANSCRIPT
(
Add
PRO
Submitted u
VILLAG
A
Mdress: Sta
M
OGRES
under Rule
RIVGE- BARGAD
Araji No.-1
M/S ASation Roa
AR
MINI
SSIVE M
34 of Uttar and its
VER SAND, TEHSIL-SA
43, Total A
PERM
APP
SHISHad, Parich
Pr
RUN KURQP/A
Validity u
ING INCLUDIN
MINE
Pradesh Ms amendmen
OF
ND/MORADAR, DIST
Allotted Area
MIT PERIOD: 6
PLICANT
H ENThha, Teh
repared B
UMARAJM/242/2upto 21st M
PLANNG
CLOSU
Minor Minerant 2013)
RRUM MTRICT- JHAN
a- 8.50 Acr
6 MONTH
TERPRhsil-Sadar
By R YADA2003/A, May, 2023
N
URE P
al Concessi
MINE NSI, UTTAR P
es (3.4398 H
RISES r, Distric
AV
PLAN
on Rules 19
PRADESH
Ha.)
ct-Jhansi
963
INDEX
CHAPTER TITLE PAGE NO.
1. Introduction 1
2. Chapter – 1 : General Information 2
3. Chapter – 2 : Location 4
4. Chapter – 3 : Geology, Reserve and Replenishment Study 5
5. Chapter – 4 : Mining 10
6. Chapter – 5 : Blasting 12
7. Chapter – 6 : Mine Drainage 12
8. Chapter – 7 : Disposal of Waste 13
9. Chapter – 8 : Use of Mineral 13
10. Chapter – 9 : Mineral Beneficiation 13
11. Chapter – 10 : Surface Transport 13
12. Chapter – 11 : Site Services 14
13. Chapter – 12 : Employment Potential 14
14. Chapter – 13 : Environment Management Plan 15
15. Chapter – 14 : Any other Information 19
16. Progressive Mine Closure Plan 20
LIST OF ANNEXURES
S.No. Particulars Annexure No.
1 Authorization letter/Consent letter from applicant
I
2 LOI II
3 RQP Certificate III
4 Power of Attorney & partnership deed, Registration of firm
IV
LIST OF PLATES
S. No. Particulars Plate Number
1 Location Plan 1
2 Key Plan 2
3 Google Map 3
4 Cadastral Map 4
5 Surface cum Surface Geological Plan & Sections
5
6 Year Wise Development Plan & Sections 6
7 Conceptual Plan 7
Ov
Lette
Ashis
unde
perio
Minin
enclo
The
the r
allott
(U.P)
mm
In or
Exper
appro
given
RQP/
verseas Mi
er of Intent
sh Enterpris
er U.P Minor
od of 6 mon
ng Short ter
osed as Ann
proposed pr
river beds o
ted for mini
).Sand/Morr
to 0.50 mm
rder to proc
rt Appraisal
oval of Minin
the work
/AJM/242/
in-tech Con
(LOI) for mi
ses vide let
r Mineral Co
th The total
m permit is
nexure-II.
roduction cap
of Pahuj Rive
ing of River
rums Grades
and 0.63 m
cess further
Committee
g Plan for th
of Preparati
/2003/A, Va
nsultants
CH
INTR
ning of mino
tter no.184/
oncession Ru
area of min
granted for
pacity of San
er in Jhansi
Sand/Morru
s as fine, me
mm to 2.0 mm
by the con
is necessary
he said area
ion of Minin
alidity 21st M
HAPTER
RODUC
or mineral S
/30MMC/E-N
ules 1963 b
ning is (8.5
a period of
nd/Morrum i
district, U.P
um througho
edium and c
m respective
ncern Depar
y. For the gr
is also one
ng Plan to
May, 2023.Co
R – 1
CTION
Sand/Morrum
NIVIDA/APPR
by District M
50 Acres) 3.
6 month fro
is 8857cum.
P. The propo
out the rive
coarse with r
ely.
rtment, an e
rant of envir
of the comp
RQP- Arun
onsent is att
m has been g
ROVAL/2017
Mining Office
.4398 Hecta
om the date
The short t
osed mining
erbed of Pah
ranges 0.06
environment
ronment clea
ponents. For
n Kumar Ya
tached as An
granted in Fa
7-18 dated
er, Jhansi (U
res approxim
of grant of p
erm permit
g project lan
huj River dis
3 mm to 0.2
t clearance
arance, prep
r this, the Co
adav, havin
nnexure-I.
Page | 1
avor of M/S
19.05.2017
U.P) for the
mately. The
permit Copy
area lies on
nd has been
strict Jhansi
2 mm, 0.25
from State
paration and
ompany has
ng RQP No.
Ov
1.1. G
N
M A
1.2 ST
Pr
P
S
J
S
J
S
J
1.3 M
R
1.4 NP
Ar
RQ
Va
50
P.
E-
W
Te
1.5 N
M
1.6 D
(a
(b
verseas Mi
ENERAL IN
ame and ad
M/S Ashish ddress: Stat
TATUS OF T
rivate ltd. Co
Power of At
hri Ramasha
hansi.
hri Pamod K
hansi .
hri Ashish K
hansi.
INERALS T
iver Sand/M
NAME & ADDREPARED T
run Kumar Y
QP/AJM/242
alidity 21st M
01, Apex Tow
.O. Jaipur-30
-mail- arun@
ebsite- www
elefax- 0141
NAME & ADD
M/S Ashish E
DETAILS OF
a) Allotted a
b) Name of
District- J
State- Utt
Area in he
Status of
Permit Pe
in-tech Con
NFORMATIO
dress of App
Enterprisestion Road, Pa
THE APPLIC
ompany
ttorney Hol
ankar Singh
Kumar S/ o S
umar S/o Sh
THAT THE A
orrum (Mino
DRESS & RETHE MINING
Yadav,
2/2003/A,
May, 2023
wer, Tonk R
02015(Raj.)
@overseasm
w.overseasm
1-2744509, M
DRESS OF P
Enterprises THE MININ
rea of 3.439
the Mineral:
Jhansi
tar Pradesh
ectare: - 3.4
Land: - Rive
eriod- 6 Mont
nsultants
CHON ABOUT A
plicant:
s arichha, Teh
CANT:
ders
S/o Shri Shi
Shri Shri Ra
hri Kailash S
APPLICANT
or Mineral)
EGISTRATIG PLAN: -
oad,
intech.com
mintech.com
M-+91-9460
PROSPECTI
NG SHORT
98 hectares m
: - Sand/Mor
4398ha.
er bed (GM l
ths
HAPTERAPPLICANT
hsil-Sadar, D
iv Charan Si
mashankar S
Singh R/O St
INTENDS T
ON NUMBE
0221084
ING AGENCY
TERM PERM
marked on T
rrum (Minor
and)
R- 1 T
District-Jhans
ngh R/O St
Singh R/O S
ation Road,
TO MINE
ER OF RECO
Y
MIT AREA:
Toposheet No
Mineral)
si
(A
tation Road,
Station Road
Parichha, D
OGNISED PE
-
o refe
Annexure I
Parichha , D
d, Parichha ,
istrict-
ERSON, WH
rs Plate No.
Page | 2
IV)
District-
District-
HO HAS
2.
Ov
DESCRIPT
S. No.
PAHUJ RIV
1
1.7 S
1.8 IN
1.8.1. Rrace
1.8.2. N89
1.8.3. Nar
1.8.4. Nm
1.8.5. Aoflata
1.8.6. E
1.8.7. Ed
1.8.8. Mcoup
1.8.9. R
1.8.10. Oav
verseas Mi
TION OF GH
DISTRIC
ER)
JHANSI
HORT TERM
NFRASTRUC
Railway Statail head for enter of prop
Nearest Airp9Km from th
Nearest Higrea, NH-75 ,
Nearest Towmine activity.
Availability f Hand Pumpabors. Wateranker.
lectricity: -
ducational
Mode of traonnected to pto the site
River/ Cana
Other relevavailable at Jh
in-tech Con
HATS PILLA
CT NAME RIVE
PAHUJ RIVER
M PERMIT P
CTURE FAC
tion: - Consapproach a
posed mine a
port: - Conshe applied ar
hway: - Ne,11.00Km in
wn/City: -.N
of water: -p located ner required fo
- There is no
Facilities: -
ansportatioTehsil-Sada.Mineral will
l: -Pahuj Riv
ant informhansi district
nsultants
AR IN THE A
OF ER
NAGHA
BARGA
PERIOD: 6
CILITIES: -
sidering the and transpoactivities.
sidering the rea in NNW d
earest highw SSW of the
Nearest town
Water for darby the are
or dust suppr
o electric line
- The school
on of Miner Jhansi by be transpor
ver.
ation: - Bat.
AREA: -
ME OF THE AT/VILLAGE
AD
Months.
extent of rirtation of m
extent of ridirection.
way are SH-4 applied are
n is Jhansi w
drinking purpea is potableression will a
e pass throug
l and College
eral: - The SH-42 to rerted by truck
anking and
LATIT(N
A 25034
B 25034
C 25034
D 25034
E 25034
F 25034
G 25034
ver beds, Jhmineral whic
iver beds Gw
42 at 11.50a.
which is 18 k
pose is broue and being ualso be supp
gh the mine
e facilities ar
allotted areach at the ak/Dumper fr
all other es
COORDINATUDE N)
L
4'21.00'' 78
4'22.35'' 78
4'16.94'' 78
4'10.28'' 78
4'07.38'' 78
4'05.95'' 78
4'14.06'' 78
hansi Railwah is about
walior Airpo
Km in east
km SW from
ught from neused by the plied from th
area.
re available
ea is situatallotted areaom the site
ssential infra
ATE LONGITUDE
(E)
8036'54.00''
8036'55.05''
8037'02.34''
8037'12.72''
8037'18.70''
8037'17.97''
8037'04.32''
y Station is 14.50 km S
rt is the nea
direction of
the center
earby villagevillagers, ha
he Hand Pum
in Jhansi.
ted at BARG, metalled roto nearby M
astructural f
Page | 3
AREA IN(Ha.)
3.4398
the nearestSE from the
arest airport
the applied
of proposed
e. The water abitants and mp by water
GAD village oad is there arket.
facilities are
N
t e
t
Ov
2.0 LOCA2.1 LOCAA) DETAI
2.2. GEN
Location ois shown
verseas Mi
ATION & GEATION ILS OF THE
S. No. 1 2 3 4 5 6 7 8
ERAL
S. No.1 2
3 4 5
of Mine is shin Plate No.
in-tech Con
ENERAL DE
E AREA
Short
DN
.
P
CO
hown in Plat2. Surface G
nsultants
CHSCRIPTION
Particulart term perm
Village Tehsil
District & StName of Riv
Araji NoLatitude
Longitude
ParticulaMinera
eriod of M
Category ofOwnership o
Approach R
te No. 1. GGeological Pl
HAPTERN
s mit area
ate ver
e
ars al Mining
f Land of Land Road
oogle imagean of the ar
R-2
25°34'05.
78°36'54.00
RivLetter omining Sand/MgrantedAshish EU.P MinConcessDistrict Jhansi (Usix monRiver bePrivate
ery showing rea is shown
Descriptio3.4398ha.
BargadJhansi
Jhansi (U.PPahuj Rive
143 95'' N to 25°
0'' E to 78°3
Descriptioer Sand/Mof Intent (LOof minor m
Morrum has bin favor of Enterprises nor Mineralsion Rules 1Mining OffU.P) for a p
nth ed (Non Forlimited com
SH-42
in Plate Noin Plate No
n .
P) er
°34'22.35'' N
37'18.70'' E
n orrum OI) for
mineral been M/S under
l 1963 by fficer, period of
rest Land) mpany
o.3, 5 Km rao. 5.
Page | 4
N
adius area
Ov
3.1 P
Ththex
78arantrthhuplgrtemtem
3.2 G
P
Q
U
M
A
Lo
Thcomwsydugrsyfrthww
3.3 LOCA
MSa
verseas Mi
hysiograph
he topographe state .Jhaxtends betw
8°36'54.00'' rea is chieflynd Pahuj riributaries of hree main riumid and it lace from Jround wateremperature i
month with emperature
minimum tem
eology
robable Ge
Quaternary
pper Protero
Middle Protoe
rchean to
ower Protero
he northern onsisting of
maximum thweathered zoystem. The ugwells and ranite gneissystem. The arequently ochickness of a
wells. Groundwater occurs
AL GEOLOG
Mining area and/Morrum
in-tech Con
hy
phy of the aansi district ween the n
E to 78°37y drained byivers are trDhasan are
vers are peis characterune to Septr. January is 24.10 C amean dailyis 28.80 C.
mperature is
eological Su
---
ozoic
-----
erozoic
----
ozoic
part of the mainly fin
hickness of one of grannorthern atubewells.
sic complex aquifer systeccurring outcabout 20 to 4d water occuin fractures
Y
is situated m is spread a
nsultants
CH
rea is flat. Tis graduallyorth latitud
'18.70'' E y the river Bributaries ofe the Lakherennial. Theized by a hotember. Duis the coldend the meany maximum. The mean19.20 C.
uccession o
--------------
--------------
--------------
district is oe to coarseabout 60.0
nite-gneissicquifer systeIn southernof Archean
em exhibits crops, hilloc40 meters ars under waand in fine i
in the banll over the a
HAPTER
The district y sloping in es of 25°34
falling in theBetwa and mf Pahuj anderi, Sukhnai,e average anot dry summring monsooest month on daily minim
m temperatun monthly m
f the study
-- Unconform
- Unconform
--- Unconfor
occupied by e sand, gra00 meters. c basement em yields m parts of thage and ovheterogenei
cks and lineand yield is later table coninterstices o
k of Pahujarea.
R-3
Jhansi is locthe north-ea4'05.95'' N
e Survey of minor river d Dhasan i, Kurera etcnnual rainfaler and cold on surplus wof the year mum tempeure is 42.6maximum te
y area.
Alterna
with omity---------
mity----------
mity---------
the alluviumavel, pebble
The alluviuform a mo
moderate que district, th
verlying residity to some
ear quartz rimited to monditions in pf the weathe
River .No s
cated in the asterly directo 25°34'2
India toposlike Dhasan s tributary c which are ll is 850.1mwinter. Abouwater is avwhen the
rature is 9.260 C and emperature
ate bed of sa
ccasional be-------------
Vindh
-------------
D
--------------
Bu
m of quartere, silt, clay um togetheore or less uantities of he weatheredual soils laextent due eefs. This aoderate throplains. In theered rock ma
soil is prese
South westction. The a2.35'' N lon
sheet No’s. and Pahuj. of Betwa. mainly eph
m. The climut 91% of raailable for cmean daily
20 C, May is mean dailyis 32.60 C
and and clay
eds of calcret-
hyan Super
elhi Super G
--
undelkhand
rnary age. Tand kanka
er with the homogene
ground wated zone of Brgely forms to imperviouaquifer has ough dug wee granitic teraterial.
ent in the
Page | 5
tern part of llotted areangitudes of
. The The Betwa The major
hemeral. All mate is sub-ainfall takescharging to y maximum
the hottest y minimum
and mean
y
te. -
Group
Group
Granitoids
The alluviumar attains a
underlyingous aquiferter through
Bundelkhandthe aquifer
us nature ofan average
ells and tuberrain ground
area. River
r
r f
Ov
3.3 D
Mreexduinreto
3.4 M
ThprCrivshriv
verseas Mi
DETAILS OF
Mining of Sanequired as thxposed on turing rainy
ntensity of reserves is avo be found in
METHOD OF
his is the frroposed minoncession Rver bed minhall be appliver beds, st
The maximeters mwhicheve
The quarrailway brprohibited
No quarryghat or an
No quarry
The quarupstreampurpose.
No quarryembankmsix) metefurther reone) mete
A. D
Uthdicath
C
C
C
in-tech Con
EXPLORAT
nd/Morrum he river borhe surface. season by
rains on thevailable to mn the area.
ESTIMATIO
reshly allottening for 6 Moules, 1963 a
ning policy acable for exructure and
mum depth measured fror is less.
rrying of Saridge or any d 100 m of b
ying shall beny religious
ying shall be
rrying of Sa and downst
ying shall bements. The qers to 61(sixestricted up ers distance
Details of UN
NFC is a thrhe first digitigit. Each dategory of rehe code is (3
ode (111):
ode (121):
ode (211):
nsultants
TION
is being dorne sedimentMoreover, triver waters
e upstream meet the ma
ON OF RES
ed area for onths is seleand its amennd land form
xcavation of the adjoinin
of Sand/Moom the un-m
nd/Morrumbridge fallin
both sides of
e permitted place etc.
e permitted w
and/Morrumtream from
e permitted quarrying shxty one) meto a depth from the ab
NFC classif
ree digit cod, the feasibi
digit provideesources un334).
This codemeasured
This codeindicated
The part which as
ne since lonts are deposthese sedims to almost side. Adequ
arket deman
ERVES
mining of riected as perndment 2013m studies. Aminor mine
ng areas: -
orrum quarrymined bed l
shall be prng under anyf any other b
within 50 (f
within 5 (five
shall be pany dam/we
within 46 (hall be restrieters distanof 2.40 met
bove said em
ication
de based sylity axis the
ed Codes 1der UNFC sy
e is provided mineral res
e is providemineral reso
of the meper feasibili
ng time. Nosited all alonents are accmore than
uate quantitnd. There is
iver Sand/Mr the provisi3 under RuleAs per the LOral from rive
ying in the rlevel at any
rohibited wity National Hbridge.
fifty) meters
e) meters fro
prohibited weir or any ot
(forty six) micted up to
nce from theters within 6
mbankments
stem, the ee second dig, 2 and 3 ystem has c
ed for the esources (pro
ed for the eources (prob
asured minty study has
o specific meng the rivercumulated /extracted l
y of Sand/Mno possibilit
Morrum minoon made in e 34 and guOI, the folloer bed in or
iver bed shay point of ti
thin 300 m ighway/Stat
s of any pub
om both ban
within 100 ther structur
meters distaa depth of e said emba61 (sixty on.
conomic viait and the gin decreasi
code (111) a
economicallyoved categor
economicallybable catego
eral resourcs not found
ethod of exr bed and ar/replenished evel dependMorrum in mty of any ot
or mineral. Tthe U.P Miideline conta
owing speciader to ensur
all not exceeme or the w
on both site Highway a
blic place i.e
nks of the riv
(one hundrere erected fo
nce from Fl1.80m withiankments ane) meters to
ability axis regeological axng order. Tand for lowe
y mineable ry reserves).
y mineable ory reserves)
ces (proved economically
Page | 6
ploration is re very well every year
ding on the mixed state her mineral
The area of nor Mineral ained in the l conditions re safety of
ed 3 (three) water table
des of any and shall be
. cremation
ver.
ed) meters or irrigation
ood control in 46 (forty nd shall be o 91(ninety
epresenting xis the third The highest est category
part of the .
part of the ).
category), y mineable.
Ov
Geologic
The totalSand/Morbe realizedone only
verseas Mi
C
C
cal Reserve
l mineable rrum so extred after leavy up to a dep
in-tech Con
ode (222):
ode (333):
s
reserves asracted will bing out 25%pth of 3 m.
nsultants
The reserpermanen
The part which as The reserpermanen
Tonnage,level of co
s estimatedbe replenishe% as blocked
rves blockednt structure.
of the indiper feasibili
rves blockednt structure.
Grade andonfidence an
within theed every ye area in ord
in 7.5 mete
cated minerty study has in 7.5 mete
mineral cond resources
e short termar after moner to protec
ers buffer zo
ral resources not found ers buffer zo
ntents can s are also inf
m permit ansoon. The t the river b
one and 50 m
es (probableeconomically
one and 50 m
be estimateferred from g
re 8857cumextractable
banks. The m
Page | 7
meters from
category), y mineable. meters from
ed with low geological.
m .The rivereserves wi
mining will be
er ll e
O
Sr. No.
(PAHUJ
1.
Overseas Min-t
Name of the Ghats/
Village
RIVER)
ARAJI NO-143 BARGAD
tech Consultan
Name of River
PAHUJ RIVER
nts
Coo
Latitude (N)
25034'21.00''
25034'22.35''
25034'16.94''
25034'10.28''
25034'07.38''
25034'05.95''
25034'14.06''
ordinate
Longitud(E)
78036'54.00''
78036'55.05''
78037'02.34''
78037'12.72''
78037'18.70''
78037'17.97''
78037'04.32''
Short term
permitarea
In sqmde
34398
Page | 8
t
m
Total Proved
GeologicaReveres TONNE=
area*Dept(UNFC cod111)
(in cum)
103194
8
al
he
Blocked arof
25% blocked i
River, banrailwaysRoad / bridges
Short terpermit
Boundaretc.=
(in sqm)
8599
rea
in ks,
s,
s m y
)
GeologReserv
BlockArea(in
(UNCode 211
2579
gical ves in ked cum)
FC 1*222)
MinRes11
georese
c
99 8
neable serves 1% of logical
erve(in um)
8857
Ov
Total Min
The mine
ReservesTotal M
A. Min
1.
2.
B. Rem
1.
2.
3.
4.
5.
6.
Details o
UNFC is afeasibility
Codes 1, (111) and
Code (11
Code (12
Code (21
Code (22
Code (33
Anticipat
The area of grant othe antici
verseas Mi
neable Rese
eral reserve
s of Sand/MMineral Reso
neral Reserv
Proved Mine
Probable Mi
maining Min
Feasibility M
Prefeasibility
Measured M
Indicated M
Inferred Min
Reconnaissa
of UNFC clas
a three digity axis the sec
2 and 3 in dd for lowest
11): This resou
21): This resou
11): The pstudyzone
22): The pstudyzone
33): Tonnaresou
ted life of t
for Sand/Moof permit. Acpated life of
in-tech Con
erves
es are com
Morrum ources (A+
ves
eral Reserve
neral Reserv
neral
Mineral Resou
y Mineral Re
Mineral Resou
ineral Resou
neral Resour
ance Mineral
ssification
t code basecond digit an
decreaSingh category the
code is prorces (proved
code is prorces (probab
part of the my has not fouand 45 mete
part of the iny has not fouand 45 mete
age, Grade arces are also
the mine
orrum (minoccordingly, itmine will be
nsultants
=
=
puted as pe
+B)
s
ves
urces
esources
urces
urces
rces
Resources
d system, tnd the geolo
order. The he code is (33
ovided for thd category re
ovided for tble category
measured miund economers from per
ndicated minund economers from per
and mineral o inferred fro
r minerals) t is proposee 6 Months.
(Proved)
8857cum
er UNFC. Th
he economicogical axis th
highest cate34).
he economiceserves).
he economiy reserves).
ineral resourically minearmanent stru
neral resourcically minearmanent stru
contents canom geologic
has been cod to produce
) reserves
m
he reserves
Code
111
121 & 1
211
221 & 2
331
332
333
334
c viability axhe third digit
gory of reso
cally minea
ically minea
rces (provedble. The res
ucture.
ces (probableble. The res
ucture.
n be estimatal.
nsented for e 8857cum
s are as fol
22
22
xis represen. Each digit
ources under
ble part of
able part of
d category), serves block
e category),serves block
ted with low
a period of 6within 6 mo
lows:
Reser
8857c
Ni
Ni
Ni
Ni
Ni
Ni
Ni
nting the firsprovided.
r UNFC syste
the measu
f the indicat
which as peed in 7.5 m
which as peed in 7.5 m
level of con
6 Months froonth permit
Page | 9
rves
cum
l
l
l
l
l
l
l
st digit, the
em has code
red mineral
ted mineral
er feasibilityeters buffer
er feasibilityeters buffer
nfidence and
om the date period. So,
y r
r
Ov
4.0 P
ItmcaU
Itfosc
M
4.1 P
ThwbeTr
4.2 EX
Prmthbe
T
verseas Mi
resent Met
t is a case ofmechanized oarried out b.P.
t is proposedollowing concientifically.
Mining activity
Lightweig
No OB/ w
No drilling
Proper be
Roads wil
Roads in have slop
ExtractionThis will course.
Approach permanendestinatio
roposed Ye
he river Sanwill be require done by srucks. It is p
XTENT OF Mresently, no
mining operathe following e deployed a
he ProposeS.No. Ma
1. JCB
3. Du
4. Tra
in-tech Con
hod of Min
f freshly graonly in nighty the LOI h
d to producesideration ta
y will be car
ht excavato
waste materia
g/ blasting is
enching of 3.
l be properly
the short tepes more tha
n activities wnot obstruct
roads fromnt tar roadsons.
ear wise de
d/Morrum ised for the msemi- mechaproposed to
MECHANIZAmining is c
tions. To acmachinery i
and their Sp
ed Mining Mchine
B
umper/Truck
ctor Trolley
nsultants
CH
METHOing: -
nt of short tt) as per theolder with d
e 8857cum Saken for the
rried out by o
rs will be us
al will be pro
s required as
.0 m height
y made and
erm permit an 1 in 20.
will start in t the movem
m the various on both sid
evelopment
s exposed anmining of rivanized meaproduce abo
ATION carried out inhieve the des proposed ecifications a
Machinery is
ks
HAPTER
OD OF M
term permite provisions due permiss
Sand/Morrume proposed m
open cast Se
ed for diggin
oduced.
s the materi
will be main
sprayed by
area for the
the blocks ment of wate
s blocks as des of the r
t for Six Mo
nd does not er bed Sandans and traout 8857cum
n the allotteesired produto be deployare as follow
s as followsMa
JC
Ashok
Mahindra
R-4
MINING
. The mininglaid in the nion from the
m (minor minmine layout
emi-mechan
ng & loading
al is loose in
tained.
water for su
e movement
from the uer, if any, d
already desriver for tra
onths: -
have any ovd/Morrum. Ensportation
m.
ed area, so tuction, as pryed for Sandws - :
s: - ake
CB
Leyland
a/Sonalika
G
g is being donew Sand/Me departmen
nerals) withito be carrie
ized method
g of mineral
n nature.
uppression o
of loaded t
pstream sidduring mons
cribed earliensportation
ver burden sExtraction of
will be don
there is no moposed in sid/Morrum m
Capa
0.9
20 To
4 To
one by manuMorrum policynt of Mines
in six monthed out syste
d.
in Dumpers
f dust.
trippers/ tru
e to downstoon period
er will be mof the mine
so no develoriver Sand/
ne by hired
machinery dix month peining. The M
acity
m3
onne
nne
Page | 10
ually (semi-y. Mining is & Geology,
hs , for this, ematically &
& Trucks.
cks will not
tream side. in the river
erging with eral to final
opment work/Morrum willDumpers &
deployed forrmit period,
Machinery to
k l
&
r
Ov
4.3 P
Thar
4.4 P
Thre
4.5 M
Thth
4.6 P
O
M
ThSaw
M
TharbawrivdowbycoisthSaThbesesibe
Conceptu
The concework the mineral to
verseas Mi
roduction f
he productiorea will be re
ROPOSED R
he required equired targe
MINERAL RE
he area for She date of au
ROPOSED M
Opencast W
Method for d
he Mining wand/Morrum
will be exploit
Method of m
he area allotrea of Araji ank and stre
won from Rivver Sand/Moone by man
with proper ly formation onsumers ofs to be remohe dust supand/Morrumhe max. depe carried oueason. Movedes throughe done.
Mining wierosion.
Mining wiprotection
Excavatedarea.
The maximeters mwhicheve
ual Mining
eptual Minindeposit by
o its fullest e
in-tech Con
for the six m
on of Sand &eplenished n
RATE OF PR
rate of pret is planned
ESERVE AN
Sand/Morrumuction .So, t
METHOD OF
orking
developing
will be carrm will be tranted in its nat
mining
tted is for a NO-143 in eam for rivever Ghat wilorrum brougnually from ighting. Theof benches
f Jhansi Distoved before ppressed at
m is soft. Thpth of workinut in a mannement of trih approach ro
ill be confin
ill be done ln.
d area will b
mum depth measured fror is less.
Plan and lif
g Plan has bformation
extent. The p
nsultants
month: -
& Morrum wilnaturally due
RODUCTION
roduction is d & will be a
D ANTICIPA
m (minor mhe anticipate
F MINING:
and workin
ried out asnsported. Thtural form by
period of 6 BARGAD viller bed blockl be exploite
ght out durinmorning to
e river Sand/s & it will brict. Water wthe starts a
t the sourcherefore, Envng shall not ner so that ippers/ truckoads connec
ed within ce
eaving 25%
be replenish
of Sand/Moom the un-m
fe of Mine.
been prepareof benches proposed pla
ll be 8857cue to sedimen
N WHEN MI
around ofchieved duri
ATED LIFE
inerals) has ed life of min
-
ng the depo
s per New he river Sany semi- mec
Months in Plage. Miningks around thed and it wing monsoon evening, af/Morrum wile directly lowill be sprinand thereaftce itself. Thvironment abe more ththere is no ks after rivecting to tar r
entral of the
% of the tota
hed naturally
orrum quarrymined bed l
ed up to thetill the end
anned produ
m as given nt inflow from
INE IS FULL
8857cum Sing six mont
OF MINE: -
been consene will be 6
osits
Sand Policynd/Morrum dchanized ope
Pahuj River.g will be donhe Applied Aill be simultperiod. The
fter evening ll be excavaoaded into Dkled in the aer of exploithere is no and Ecology an 3m fromobstruction
er Sand/Morroads. No pr
e river. This
l area as sa
y due to se
ying in the rlevel at any
e mining con of short te
uction is 885
by the govt.m the catchm
LY DEVELO
Sand/Morrumth permit pe
-
ented for a pMonths.
y by U.P Gdeposited asen cast meth
Allotted areane in leavinArea. The rivaneously rec
e river Sand/it will be/
ated by lightDumpers & area from wtation, at re
need for of the area
m the river beto the flow
rrum loadingrocessing of
s will preven
afety zone fr
ediment inflo
river bed shay point of ti
tract of 6 Merm permit7cum.
in the auctiment area.
OPED: -
m minor miriod.
period of 6 M
Government the river b
hod.
a consists ofng safety disver Sand/Moclaimed by /Morrum mican be usedt weight excTrucks for
where the Saegular intervdrilling &
a remains ued Mining acof water, d
g will be toriver Sand/M
nt collapse o
rom the ban
ow from the
all not exceeime or the
onths. It is contract to
Page | 11
ion. Excavat
inerals. The
Months from
. Only dry ed material
f 3.4398 ha stance form orrum to be replenished ning will be d excavator cavators/jcbdispatch to
and/Morrumvals to keep blasting as ndisturbed. ctivities will during rainy wards both Morrum will
of bank and
nks for bank
e catchment
ed 3 (three) water table
proposed toexploit the
ted
Ov
The river
The prese
undertake
Drainage
verseas Mi
Sand/Morru
ent short te
en during ra
map of Jhan
in-tech Con
m is a loose
erm permit
iny season.
nsi is shown
nsultants
CH
Be material so
CH
MINarea is situa
The main riv
in Figure be
Fig. Dr
HAPTER
BLASTINo no blasting
HAPTER
E DRAIated in the
ver/stream w
elow-
rainage ma
R- 5
NG is required
R- 6
INAGEbank of Pa
will not be d
ap of Jhansi
for its minin
ahuj River M
iverted in an
i district
ng.
Mining work
ny case.
Page | 12
will not be
Ov
STACThere is ndoes not
The mineThere will
Const
Raw m
Raw m
The river required.
Mode of
During thTrucks, fomine is si
verseas Mi
CKING Ono waste or marise for the
ral river Sanl be no bene
truction mat
material for
material for
Sand/Morru
Transport o
he Mining Plor onward trtuated very
in-tech Con
OF MINmineral reje
e stacking of
nd/Morrum iseficiation or t
erial for buil
construction
roads constr
MIum will be u
of Mineral t
an period, transport to close to the
nsultants
CH
NERAL Rcts generatithe same.
CH
USE
s used for thtreatment be
dings,
n of dams,
ruction, pavi
CH
INERALused as bui
CH
SURFAC
to the Disp
the mineral the consum
e SH-42.
HAPTER
REJECTSon in the pro
HAPTER
OF MIN
he following efore its disp
ing, etc.
HAPTER
L BENEFlding constr
HAPTER
CE TRA
atch Point:
produced wer as well a
R – 7
S & DISoposed mini
R- 8
NERAL
uses and it wpatch.
R- 9
FICIATIruction mate
- 10
ANSPOR
: -
will be loadeas to the Ma
SPOSALng of river S
will be dispa
ION erial so no m
RT
ed into truckarket nearby
L OF WASand/Morrum
atched in its
mineral ben
ks/dumpers/y the allotte
Page | 13
ASTESm so questio
crude form.
eficiation is
/Dumpers &d area. The
n
&
Ov
Working
structure
be kept in
Rest She
mine site. Primary
the first a Protectiv
sprinkling
for their s
Requiremscientific
a. M
b. H
c. S
d. S
e. Se
To
verseas Mi
Office: Te
and can eas
n covered bu
elter: A tem
.
Health/Fir
aid treatmen
ve Measure
g will be done
safety measu
ent of Technmining: -
Mining Engine
.E.M.M. Ope
upervisor
killed Worke
emiskilled W
otal
in-tech Con
emporary w
sily shifted o
uckets / clay
mporary struc
st Aid: First
t to the wor
es: Shoes an
e to check th
ures.
DEnical and oth
eer
erators
ers
Workers
nsultants
CH
SITworking offic
one side to
pitcher and
cture as a re
t aid box wi
kers.
nd helmet w
he dust pollu
CH
ETAILS her superviso
-
-
-
-
-
-
HAPTER
E SERVce will be m
another side
will be prov
est shelter t
ith principal
will be provi
ution. Ear Pl
HAPTER
OF EMPory staff will
1
4
2
10
20
37
- 11
VICES maintained a
e as & when
vided to min
to labours w
medicine w
ded to all th
ug & dust m
- 12
PLOYMEl be as follow
at site. This
n required. S
e workers.
will be provid
ill be kept a
he workers
mask will be p
ENT ws for the pr
s will be a
Safe drinking
ded to the w
at mine site
during mini
provided to t
roposed syst
Page | 14
temporary
g water will
workers near
to facilitate
ng. Regular
the workers
tematic and
Ov
13.1 B
(i
(i
(i
(i
(
verseas Mi
ASE LINE I
i) EXIST
The aagricupermioperaseaso
ii) WATE
Surfa
whic
Grou
iii) FLOR
Top s
this is
specie
like K
Amp
Indian
iv) CLIM
Temp
and c
mons
month
mean
maxim
The m
is 19.
Rainf
(v) SOC
Peopl
Occu
in-tech Con
ENVIRO
INFORMATI
TING LAND
allotted shorulture land iit lies within
ation. The rivon. The ultim
Sum
Riv
ER REGIME
ce Water: S
ch is a peren
nd Water: W
RA & FAUNA
soil layer is
s a river ban
es like pipal
Kaner, Madar
hibians and
n Rohu are a
MATIC COND
perature: Tcold winter.
oon surplus
h of the ye
daily minim
mum tempe
mean month
20 C. fall: Average
IAL ENVIR
es, mainly in
pation
nsultants
CH
ONMEN
ION
D USE PATT
rt term permin the allotte river beds over Sand/Mo
mate land use
mmary
ver bed
Short term p
nnial water b
Water level
A
not present
nk of river So
, mango, Ne
r, Dhatura, M
reptiles are
also common
DITION
The climate i
About 91%
water is ava
ar when the
mum temper
rature is 42
ly maximum
e rain fall in
ONMENT
n this area b
HAPTER
T MANA
ERN
mit area of ed short terof Pahuj Riveorrum will be of the allot
permit area
body.
in wells vari
hence the
on where mi
eem, Ber, Ba
Makoi, and M
e common i
n in river wa
is sub-humid
% of rainfall
ailable for ch
e mean dai
rature is 9.2
2.60 C and
m temperatu
the month o
belong to Hin
- 13
AGEMEN
mining is arm permit aer and therebe replenishetted short te
Area (in
3.4398
is in the ban
es 5-15mbg
area devoid
neral (river
abool etc ar
Munj are a fe
in such type
ater.
d and it is c
takes place
harging to g
ly maximum
0 C, May is
mean daily
re is 32.60
of July Augu
ndu commun
NT PLA
a river bed.rea. The en
e will be no ced every yeerm permit a
Ha)
nk of River P
gl.
d of any kin
sand) is spr
e common i
ew common
e of habitat
characterized
e from June
round water
m temperatu
the hottest
minimum te
C and mean
st is around
nity.
AN
. There is ntire allotted change in lanar during th
area will not
Pahuj .
d of vegetat
read over the
n nearby ar
species.
. Species of
d by a hot d
e to Septem
r. January is
ure is 24.10
month with
emperature
n minimum t
850mm.
Page | 15
no forest or short term
nd use after he monsoon change.
tion. Infect,
e area. Tree
eas. Shurbs
f fishes like
dry summer
ber. During
s the coldest
0 C and the
mean daily
is 28.80 C.
temperature
r
t
Ov
(v
13.2 E
ThracoSa
i.
ii.
iii
iv
v.
So
i.
ii.
iii
Thex
Th
Thinlim
Thcow
Asm
ThseSa
13.3 E
MPoexthof
Ththac
verseas Mi
The m
other
vi) PUBL
The aconne
NVIRONME
he Sand/Moather it will honfined to tand/Morrum
Dust gene
Noise poll
. Impact on
v. Impact on
. Impact on
ome of the b
Regular d
Upgradati
. Vital supp
he baseline xcept monso
he study are
he data obtandicates thatmits which is
he surface woncentrationithin permis
s far as themineral. More
here is no rensitive areand/Morrum
NVIRONME
Mining of riveolicy, and xploitation ohe river will f infrastructu
he project inhe riverbedschieved by m
in-tech Con
main occupat
main occup
LIC BUILDI
llotted area ecting road f
ENT IMPACT
orrum mininhave beneficthe dry por
m mining:
eration durin
lution
n river water
n ground wa
n flora and f
beneficial eff
de-siltation o
ion of socio-
port to const
study of thoon.
ea also witne
ained from tt for a numbs quite obvio
water qualit of microbisible limits e
noise level eover, no po
rare speciesa, wildlife
m short term
ENTAL MAN
er Sand/MorU.P Minor
of river Sandbe used for ures, buildin
nvolves colle and to prev
maintaining t
nsultants
tion in the a
ations in ne
NG, PLACES
is parts of rfor local tran
T ASSESSM
ng activity wcial impact. Trtion of the
ng handling
r quality
ater
auna
fects from Sa
of the river to
-economic le
truction activ
e various e
esses huge t
the ambient ber of occasioous since the
ty data shoal organismexcept the d
is concernepulated area
s of flora orsanctuary apermit.
NAGEMENT
rum will be Mineral Co
d/Morrum neits exploitatg bridges, ro
ection of rivevent floodingthe existing
area is agricu
arby villager
S AND MON
river Ghats hnsportation.
MENT STATE
will have mThe removalbed. Howe
and transpo
and/Morrum
o avoid flood
evel of the ar
vity
nvironmenta
ransportatio
air quality aons the levee area has b
ws that all ms. Moreove
issolved min
ed, it is onlya found with
r endangereand nationa
PLAN
carried out oncession Recessary as tion so that oad etc.
er bed mateg off and dacourse of th
ultural. Teac
rs.
NUMENTS
having no inf
EMENT
inimum advl of the Sandever, the fo
rtation.
m mining acti
ding
rea
al paramete
on activities o
analysis carrel of air qualeen declared
the paramer the grounneral concen
y during thein 500 mete
ed fauna in al parks in
as per the gRules (amen
constructionit will be us
erial. This wamage to thehe river. This
ching, small
frastructures
verse impactd/Morrum frollowing area
ivity are:
rs is being
of minerals,
ried out by oity was highd critically p
eters are wnd water anntration level
e loading aners from the
the study a10 kms ra
guidelines isnded thereon material. Tsed in const
ill also help e adjoining s is ensured
business, m
s, except fai
t on the enom the riveras are affec
studied for
men, mater
our EIA/EMPher than the olluted area
within range nalysis data l.
nd transportaedge of the
area. There adius of th
sued under of).This proThe area allruction of va
to prevent areas. This through the
Page | 16
mining is the
r weathered
nvironment; r bed will be cted due to
one season
rial, etc.
P consultant permissible .
except the was found
ation of the river.
is no eco-e proposed
U.P Mineral oject is for lotted along arious kinds
widening of can only be
e following:
Ov
1.
2.
3.
4.
5.
6.
7.
8.
9.
10
11
12
13
14
15
16
17
18
Pbe
P
Plneso1pepe
verseas Mi
. The maxmeters mwhicheve
. The quarailway bbe prohi
. No quarror any re
. No quarr
. The quaupstreampurpose.
. No quarembankmsix) metfurther rone) me
. The irrigno case
. No quarrof 5 met
. The extrCertificatirrigation
0. No quarother tharaiyat.
1. No quarrnotifies a
2. Water sp
3. Maintain
4. Transpor
5. Maintena
6. Use of p
7. No withd
8. This proprovides
rogram of e afforeste
ROGRAMM
lantation wilearby schooource. The .13hectare her hectare aermit period
in-tech Con
ximum depthmeasured frer is less.
arrying of Sabridge or anbited 100 m
rying shall beligious plac
rying shall b
arrying of Sm and downs.
rying shall bments. The ters to 61(srestricted upters distance
gation outlet the river bed
rying shall bters.
raction of Ste’ from thn channels a
rying of Sanan the settle
rying of Sanas a restricte
praying alon
the health o
rtation by co
ance of truck
roper PPE’s
drawal/ pum
oject operats employmen
afforestatied.
E FOR PLAN
ll be carriedol, Hospital,
total allotthas to be coas a tree ded. The rainfa
nsultants
h of Sand/Morom the un-
and/Morrumny bridge fal of both side
be permittede etc.
e permitted
Sand/Morrumstream from
be permittedquarrying s
sixty one) mp to a depthe from the a
shall be mad level shall
be permitted
and/Morrume Water Re
are out flowin
nd/Morrum see unless the
nd/Morrum sed area.
g the haul ro
of the transp
overed truck
ks to preven
for the work
ping of wate
ion will pront to the peo
on, for six
NTATION
out side thpolice statioed area is
overed underensity, the aall in the are
orrum quarr-mined bed
m shall be plling under aes of any oth
d within 50 (
within 5 (fiv
m shall be m any dam/w
d within 46hall be restr
meters distan of 2.40 me
above said e
aintained at be permitte
d around the
m shall be pesources Deng.
shall be pere settlee obt
hall be perm
oads & trans
portation roa
ks.
nt spillage an
kforce is ens
er from Sand
vide livelihoople residing
month per
he river bedon and the 3.4398 hecr plantationapplicant wi
ea is also ina
rying in the rlevel at any
prohibited wany Nationaher bridge.
(fifty) meter
ve) meters f
prohibited wweir or any o
(forty six) mricted up to nce from theters within mbankment
the same leed to be belo
e infiltration
permitted onepartment i
mitted in antains the con
mitted in any
sportation ro
ads.
nd noise min
ured.
d/Morrum sh
ood to the g in vicinity d
rmit period
, at approacplace for cotare out of during the Pll plant min
adequate he
river bed shay point of t
ithin 300 ml Highway/S
s of any pub
rom both ba
within 100 other structu
meters distaa depth of e said emb61 (sixty ons.
evel as that ow the irrigat
well / intak
nly after obtn the case
ny private lansent of the
y area which
outes to prev
nimization.
hort term pe
poorest secdirectly or in
d indicating
ch road, traommon utilit
which 33%Permit perionimum 23 sance it is ess
all not exceeime or the
m on both sState Highwa
blic place i.e
anks of the r
(one hundrure erected f
ance from Fl1.80m withankments a
ne) meters t
of the rivertion outlet le
ke well up to
taining a ‘Nof rivers w
and owned bconcerned l
h the State G
vent air pollu
rmit areas.
ction of the directly by t
g number o
nsport road ty to arrest
% of the totd. Consideriaplings withsential that t
Page | 17
ed 3 (three) water table
ides of any ay and shall
e. cremation
iver.
red) meters for irrigation
lood control in 46 (forty nd shall be
to 91(ninety
r bed and in evel.
o a distance
o Objection where from
by a person land owner/
Government
ution.
society. It the project.
f plants to
of mineral,the dust at
tal area i.e. ng 20 trees in 6 month the saplings
Ov
ofpl
P
Plmdu
M
CPSa
1
2
3
4
Mea
1.
2.
3.
4.
5.
STA
Theso s
TRE
Therequman
MEA
No min
AFF
As twill
PRE
Themin
verseas Mi
f plants sholant 23 sapli
lace of pro
lantation shmineral, nearust at source
MEASURES F
ontrol of Arocessing ame Within
. Waterpoint
. Prope
. At evconcemeasthe ainterv
. Silenc
asures to C
All thegener
Noise
Atten
Noise
Densezone.
ABILISATIO
ere will be nstabilization
EATMENT A
e proposed muired. Therenagement.
ASURES FO
impact will neral nor any
FORESTATI
there is no bnot be requ
EPARATION
ere will be noneral nor any
in-tech Con
uld be of thngs of local
posed plan
all be donerby school, He.
FOR DUST S
Air PollutioOperations
n Permissib
r spray will of the minin
er care & freq
very work pentration ofurement at vailable con
vals not exce
cers will be f
Control Imp
e machinerieration of nois
source will
uation betwe
will be kept
e plantation
ON AND VE
o waste genof waste wil
AND DISPOS
mine workine will be no
OR MINIMIS
take place y toxic subst
ION OF TAI
beneficiationuired.
N OF DUMP
o generationy waste will r
nsultants
he variety wvariety with
ntation: -
in the ouHospital, po
SUPPRESSI
n Due To Ds For Minoble Limits S
be done thrng short term
quent maint
place where,f the respany workpla
ncentration oeeding 3 mo
fitted to the
pacts of Noi
es including se.
be isolated.
een source &
t as a prime
in mining a
GETATION
neration froml not be req
SAL OF WA
ngs will be treatment o
SINGH ADV
due to protance will be
LING POND
so tailing p
ING GROUN
of toxic subrequire dum
which requirehin 6 month
utside the rilice station
ION
Dust, Exhaor Mineral Specified Un
ice in a day m permit dur
enance of m
, the air bopirable dustace, source of permissibnths or 1 mo
dumpers.
ise: -
transport v
& receive po
consideratio
area will also
OF DUMPS
m the propouired.
ATER FROM
above the gof mineral to
VERSE EFFE
posed minin discharged
DS
onds are no
ND FOR STA
bstances, dumping ground
e minimum as recomme
ver bed, at and the plac
ust Emissio& Related
nder : -
over the haring the wor
machines will
orne dust get will be the concentle limit. Meaonth respect
ehicles will b
oints will be i
on while pur
o reduce pro
S
osed mining
MINE AND
ground wateo produce ef
ECTS ON WA
ng activities to the groun
t proposed,
ACKING TO
e to the prod for stacking
water and hended by the
approach rce for comm
ons or FumActivities
aul road & urking hour
be done.
enerated, todeterminedration in accasurements tively.
be properly
incased.
chasing the
opagation of
of Sand/Mo
BENEFICIA
er table thuffluent hence
ATER REGI
on water qnd water.
hence affore
OXIC MINER
posed mining the toxic m
hence it is pe regional fo
road, transpmon utility to
mes DuringAnd Cont
pto 2 km fro
o be sampled semesterlcess of 50%shall be car
maintained
machines.
f noise outsi
orrum (mino
ATION PLA
us no measue it will not
ME
quality also
estation of ta
RAL SUBSTA
ng. So, neithmineral / sub
Page | 18
proposed to rest officer.
port road ofo arrest the
Mining oraining the
om the end
ed and the y. If any
% or 75% of rried on, at
to minimize
ide the core
r minerals),
ANT
ures will berequire any
neither the
ailing ponds
ANCE
er the bstance.
f
r
y
Ov
In prepar
Place :
Date :
verseas Mi
ation of this
Jaipur
in-tech Con
AN
Mining plan
nsultants
CH
NY OTHE
n Mrs. Prer
HAPTER
ER INFO
na Chauha
R-14
ORMAT
n Bisht Geo
ION
ologist has p
(
RQP
rovided her
(Arun Kum
RQP/ AJM/2
Validity 21s
Page | 19
assistance.
mar Yadav)
242/2003/Ast May, 2023
A
Ov
verseas Mi
P
CL
in-tech Con
PRO
LOS
nsultants
OG
M
SU
GRE
MIN
URE
ESS
NE
E P
SIV
PLA
VE
AN
Page | 20
N
Ov
1.0 IN
Le
M
19
(U
ap
of
Th
on
be
Jh
m
In
Ex
an
C
ha
A
1.1 R
Th
1.2 St
The limposthe InCentrcomp
The capproimposany o
1.3 C
M A
verseas Mi
NTRODUCT
etter of Inte
M/S Ashish
9.05.2017 u
U.P) for the
pproximately
f grant of pe
he proposed
n the river b
een allotted
hansi (U.P).S
mm, 0.25 mm
n order to p
xpert Appra
nd approval
ompany has
aving RQP
Annexure-I.
Reasons for
he area is fr
tatutory ob
egal obligatsed while exndian Bureaural Pollution Cliance positi
company wiloval of Shorsed by the Mther organiz
losure plan
M/S AshishAddress: Sta
in-tech Con
TION: -
ent (LOI) for
Enterprises
under U.P M
period of 6
y. The Minin
ermit Copy e
d production
beds of Pah
for mining
Sand/Morrum
m to 0.50 mm
rocess furth
isal Commit
of Mining
s given the
No. RQP/A
Closure : -
eshly allotte
bligations :
tions, if anyxecution of su of Mines, cControl Boaron there of:
l implementt term permMinistry of Ezation.
n preparatio
h Enterpriseation Road,
nsultants
CH
r mining of m
s vide lett
inor Mineral
6 month The
ng Short term
enclosed as A
capacity of
uj River in J
of River San
ms Grades a
m and 0.63
her by the co
tee is neces
Plan for the
work of Pr
AJM/242/2
-
ed area there
-
y which the short term pconditions imrd or by any
t like specialmit, directiveEnvironment
on : -
es Parichha, TE
HAPTER
minor miner
ter no.184
l Concession
e total area
m permit is
Annexure-I
Sand/Morru
Jhansi distri
nd/Morrum t
as fine, med
mm to 2.0 m
oncern Depa
ssary. For th
e said area
reparation o
003/A, Va
efore closure
applicant ipermit ,appromposed by ty other organ
l conditions es issued by & Forests,
EHSIL-SADA
R –1
ral Sand/Mo
/30MMC/E-N
n Rules 1963
of mining
granted for
II.
m is 8857cu
ct, U.P. The
throughout
dium and co
mm respectiv
artment, an
he grant of e
is also one
f Mining Pla
lidity 21st M
e of mine is
s bound to oval of Shorthe Ministrynization desc
imposed why the CentraState or Ce
AR, District-J
rrum has be
NIVIDA/APPR
3 by District
is (8.50 A
a period of
um. The sho
e proposed m
the riverbed
arse with ra
vely.
environmen
environment
of the com
an to RQP-
May, 2023.C
not applicab
implement rt term permof Environmcribing the n
hile executioal & State Gentral Polluti
hansi
een granted
ROVAL/2017
t Mining Off
Acres) 3.439
6 month fro
rt term perm
mining proje
d of Pahuj R
anges 0.063
nt clearance
t clearance,
mponents. F
Arun Kum
Consent is a
ble at this sta
like speciamit, directivement & Foresnature of con
on of short tGovernmenton Control B
Page | 21
in Favor of
7-18 dated
ficer, Jhansi
98 Hectares
om the date
mit area lies
ect land has
River district
mm to 0.2
from State
preparation
or this, the
mar Yadav,
attached as
age.
l conditions es issued by sts, State or nditions and
term permit , conditions Board or by
Ov
1.4 N
Ar
RQ
Va
50
P.
E-
W
Te
1.4 Ex
M A
verseas Mi
Name & add
run Kumar Y
QP/AJM/242
alidity 21st M
01, Apex Tow
.O. Jaipur-30
-mail- arun@
ebsite- www
elefax- 0141
xecuting Ag
M/S Ashish EAddress: Stat
in-tech Con
dress and R
Yadav,
2/2003/A,
May, 2023
wer, Tonk R
02015(Raj.)
@overseasm
w.overseasm
1-2744509, M
gency
nterprises tion Road, P
nsultants
Registration
oad,
intech.com
mintech.com
M-+91-9460
arichha, TEH
n Number o
0221084
HSIL-SADAR
of the Recog
R, District-Jh
gnized pers
ansi
son
Page | 22
Ov
2.1 G
P
Q
U
M
A
Lo
almwsydugrsyfrthtugr
3.3 LOCA
MSa
2.2 R
More
2
2
verseas Mi
EOLOGY
robable Ge
Quaternary
pper Protero
Middle Protoe
rchean to
ower Protero
The nolluvium cons
maximum thweathered zoystem. The ugwells and ranitegneissystem. The arequently ochickness of ubewells. Grround water
AL GEOLOG
Mining area and/Morrum
Reserves
Reserves
Proved rese
e details ar
.3.1 Minin
Miningmovin
.3.2 Mine
The ribenef
in-tech Con
eological Su
---
ozoic
-----
erozoic
----
ozoic
orthern partsisting of mahickness of one of grannorthern atubewells.
ic complex aquifer systeccurring outcabout 20 to
round water r occurs in fr
Y
is situated m is spread a
erves
re given in c
ng Method
g will be dng machiner
ral Benefic
iver Sand/Mficiation is re
nsultants
CH
MINE
uccession o
--------------
--------------
--------------
t of the distainly fine to
about 60.0nite-gneissicquifer systeIn southernof Archean em exhibits crops, hilloco 40 metersoccurs und
ractures and
in the banll over the a
San
chapter- 3
one by opery will be dep
iation
orrum will bequired.
HAPTER
DESCRI
f the study
-- Unconform
- Unconform
--- Unconfor
trict is occucoarse sand
00 meters. c basement em yields m parts of thage and ovheterogenei
cks and lines and yield er water tain fine inter
k of Pahujarea.
nd/Morrum
8857
of Mining P
en cast manployed. More
be used as bu
R –2
IPTION
y area.
Alterna
with omity---------
mity----------
mity---------
pied by thed, gravel, pe
The alluviuform a mo
moderate que district, therlying residity to some
ear quartz ris limited t
ble conditionrstices of the
River. No s
m in cum
Plan.
nual (semi-me details are
uilding const
N
ate bed of sa
ccasional be-------------
Vindh
-------------
D
--------------
Bu
e alluvium obble, silt, claum togetheore or less uantities of he weatheredual soils laextent due eefs. This ato moderatens in plains.e weathered
soil is prese
mechanized given in cha
truction mat
and and clay
eds of calcret-
hyan Super
elhi Super G
--
undelkhand
f quarternaray and kank
er with the homogene
ground wated zone of Brgely forms to imperviouaquifer has e through du. In the grarock materi
ent in the
method) Hapter- 4 of M
terial so no m
Page | 23
y
te. -
Group
Group
Granitoids
ry age. Thekar attains a
underlyingous aquiferter through
Bundelkhandthe aquifer
us nature ofan averageugwells andnitic terrainal.
area. River
Heavy earth Mining plan.
mineral
r
r f
Ov
REVIEW UP TO TH
This is a fPlan up to
4.1 M
No re
4.2 W
Mi im
4.3 A
Dp
Asecompr
4.4 W
Ddimprdemsu
This
4.5 To
Th
4.6 In
ThrasoIfdesupiinlikus
verseas Mi
OF IMPLEMHE FINAL C
freshly allotto the final cl
Mined out la
o proposal caplenished by
Water Qualit
ining activitympact on watAir Quality m
Describe therevention o
mbient air qeason monitollected on e
movement of revention of
Waste mana
escribe the isposal pract
material will revention ofescribed. If
measures to urface and g
here is no gs proposed. T
op Soil Man
here is no ge
nfrastructu
he existing ailways, powources in thef retained, tescribed. If upport faciliipeline, wat
nfrastructureke electrical se
in-tech Con
MENTATIONCLOSURE OF
ted area, so osure of min
and
an be given y the river. ty Managem
y (collecting ter quality. managemen
e existing of pollution
quality has btoring will beach day in f vehicles anpollution of
agement
type, qualittice. If no utbe stabilize
f siltation, ertoxic and
be taken forground water
eneration ofThe entire m
nagement
eneration of
ure
infrastructurwer lines, bue area etc. ahe measure
decommissities and otter works, e like roads,
cables, tran
nsultants
CHN OF MINIF MINE.
review of imne is not app
CH
CLO
for concurre
ment
sand) will b
nt
air qualityn of air shou
een monitorbe carried ou
future as ped machinerie
f Air quality e
y and quanttilization of wed should brosion and dhazardous r preventionr etc. should
f waste durinmineral produ
topsoil.
ral facilities uildings & stand their futs to be takesioning propther infrastsewer line, rail, bridge
nsformers to
HAPTERNG PLAN I
mplementatiplicable.
HAPTER
OSURE P
ent back-filli
e done in th
y status. Tuld be desc
red by us anut on two der the normes will produexcept sprin
tity of overbwaste materbe describeddust generatelements p
n of their disd be describe
ng mining ouced is usea
available sutructures, wture utilizatioen for their posed, dismructure like, telephonees, culverts o be describe
R –3 INCLUDING
on of Mining
R –4
PLAN
ng. Further,
he bank of riv
The correctcribed:
nd external adays in a wes laid down uce impact okling of wate
burden, minial is proposd. The protion from theresent in th
spersal in thed:
peration, thble.
uch as roadsater treatmon should bephysical sta
mantling ande electric tr cables, unetc, electric
ed in connec
G PROGRES
g Plan includ
mined out r
ver Pahuj. S
tive measu
agency. For eek with 24by MoEF. E
on air. As suer on haul ro
eral reject esed, the manective measese waste mhe waste me air enviro
erefore, no
s, aerial ropeent plant, tre evaluated ability and md disposal oransmission nderground cal equipmenction with re
SSIVE CLOS
ing Progress
reserve will b
So, there sha
ures to be
baseline stu4-hourly samEmission of dch there is noad etc. in d
etc. availablenner in whichsures to be
materials shomaterial the nment, leac
provision of
eways, convransport, waon case-to-
maintenanceof building line, watertanks, tran
nts and infrstoring land
Page | 24
SURE PLAN
sive Closure
be
all be no
taken for
dy, in each mples being dust due to no need for dry season.
e and their h the waste e taken for ould also be
protective ching in the
stock yard
veyer belts, ater supply case basis.
e should be structures,
r line, gas nsportation astructures for further
Ov
4.7 D
MM
4.8 Sa
Exetop
Dpr
Se
4.9 D
Thinemcalo
Henfoth
4.10 C
Foorunannean
DanthD
Sem
ECO
Manpowemeasures
At this sthave been
verseas Mi
Disposal of M
Mining is proMining plan.
afety & Sec
xplain the satc. and arrapened for ge
.G.M.S. approposed plan
ecurity guar
Disaster Man
his should dnundation inmergency papability of ocal authority
igh risk facncountered or quick evahe working a
are and Ma
or Short termr incompletenforeseen cind monitorinear future. Tnd objective
ue to unforend staffs wilhe concerneepartment w
ecurity guamanagement
ONOMIC
r retrenchms consequent
age there wn discussed.
in-tech Con
Mining Mac
posed for op
curity
afety measungements peneral public
proved Safetn period ther
rds are enga
nagement a
deal with an undergroulan proposeapplicant toy should also
ctors such anor anticipatcuation, pro
area is far aw
aintenance
m permit pee programmircumstanceng of status This should .
eseen reasol be taken. T
ed authority within the st
rds to takein case of a
C REPERMAN
ment, compet to the closu
will be no ma
nsultants
chinery
pen cast sem
ures implemroposed dur
c should be d
ty shoes andre is no prop
ged for secu
and Risk As
ction plan fund mines, d for quick meet such o be describ
as landslide,ted during potective meaway from the
during tem
riod an ememe due to co
s, should inof unplannedetail item
on the mine Temporary d
of D.G.M.Sipulated tim
e care of tny temporar
CH
RCUSSINPOWER
ensation to ure of mines
anpower ret
m i-mechani
ented to prering the mindescribed:
d helmets aposal to clos
urity.
ssessment
for high-riskfire, seism
evacuation,eventualitieed:
, subsidenceproposed Sixasures are ne locality.
mporary dis
ergency planourt order onclude a planed discontinwise status
will be a clodiscontinuanS., concernee.
the infrastrury discontinu
HAPTER
IONS OR RETR
be given, ss should be d
trenchment e
ized mining.
event accessne abandonm
re being proe the mine.
k accidents mic activitie, amelioratives and the a
e flood, firex Months planot proposed
continuanc
n for the situr due to stan indicating ued mining monitoring
osed tempoce notice in ed State Go
ucture shalluation.
R-5
F CLOSRENCHM
socio – econdescribed, sp
etc. in the a
. Details are
s to surface ment plan an
ovided to th
like landslides, tailing dve measuresassistance to
, tailing damn period. As
d. Also, no l
ce
uation of tematutory requmeasures ooperations eand mainte
rarily then pthe prescrib
overnment a
be kept u
SURE OFMENTS
nomic reperpecifically st
area, hence,
e given in Ch
openings; end up to the
e all workm
des, subsidedam failures to be takeo be require
m failure ets such, emerocal habitan
mporary discuirements orof care, maiexpected to enance with
proper care bed form willand concern
under the
F MINE
cussions antating the fo
, no proposa
Page | 25
hapter 4 of
excavations e site being
men. During
ence flood, e etc. and en etc. The ed from the
tc. are not rgency plan nt exists as
continuance r any other intenances, re-open in periodicity
of workers l be sent to ned Labour
roll of the
AND
d remedial llowing.
al for these
Ov
Not Applic
Not Applic
The finan
Area cons
The amou
Accordingassurance
Thus the or the off
verseas Mi
TIcable
cable
ncial assura
sidered for F
unt of Financ
g to rule 34e is Rs. 2 lak
applicant shicer authoris
in-tech Con
ME SCH
Fance has be
Financial Ass
cial Assuranc
4(6) of amekh.
hall submit ased by the S
nsultants
CH
HEDULI
CH
ABAND
CH
FINANCeen calcula
urance: 3.43
ce: Rs. 5159
nded rules
financial astate Govern
HAPTER
ING FOR
HAPTER
DONMEN
HAPTER
IAL ASSated on the
398ha
97
of UP MMCR
ssurance of Rment in this
R –6
R ABAN
R –7
NT COS
R –8
SURANbasis of fo
R 1963, the
Rs. 2.0 Lakhs behalf.
NDONME
ST
CE ollowing pa
e minimum
as applicab
ENT
rameters:
amount as
ble to the dis
Page | 26
a financial
strict officer
Ov
9.0 P
A
1
2
3
4
5
Place :
Date :
verseas Mi
LANS, SECT
ll relevant p
. Locat
. Key P
. Surfa
. Year W
. Conce
Jaipur
in-tech Con
TIONS
lans & sectio
ion Plan
Plan
ce Cum Surf
Wise Develo
eptual Plan
nsultants
CH
ons have bee
face Geologi
opment Plan
HAPTER
en enclosed.
cal Plan & S
& Sections
R –9
.
Sections
(
RQP V
(Arun Kum
RQP/ AJM/2
Validity 21st
Page | 27
mar Yadav)
242/2003/At May, 2023
A
Ov
An area o
river sand
concessio
Yadav, h
I request
recognize
Ar
RQ
Va
50
P.
E-
W
Te
I hereby
deemed t
on me in
same.
Date : Place:
verseas Mi
of about (8.5
d in village
on rule 1963
aving RQP N
t to make f
ed person on
run Kumar Y
QP/AJM/242
alidity 21st M
01, Apex Tow
.O. Jaipur-30
-mail- arun@
ebsite- www
elefax- 0141
undertake t
to have been
all respect
in-tech Con
CONSEN
50 Acres) 3.4
Bargad, Te
3. The mine
No. RQP/AJ
further corre
his followin
Yadav,
2/2003/A,
May, 2023
wer, Tonk R
02015(Raj.)
@overseasm
w.overseasm
1-2744509, M
hat all the i
n made with
. I have un
nsultants
NT LETT
4398 Hectar
ehsil-Sadar-
e plan in res
M/242/20
espondence
g address:
Road,
intech.com
mintech.com
M-+91-9460
nformation
my knowled
nderstood th
TER FRO
res of Araji N
Jhansi & D
spect of abo
03/A, Valid
regarding t
0221084
provided in
dge and con
he content o
M APPLI
No.-143 has
District-Jhan
ove area ha
ity 21st May
the modifica
Mining plan
sent and sha
of this mine
ICANT
s been grant
si, U.P. und
as been prep
, 2023
ation in min
n by the reco
all be accept
plan and a
Annex
ted for the e
der U.P. mi
pared by Ar
ning plan wi
ognized pers
table to me
agree to imp
M/S Ashish
Appli
Page | 28
xure-I
extraction of
nor mineral
run Kumar
ith the said
son may be
and binding
plement the
Enterprises
cant
f
r