➢ Utilizing Untapped Potential
➢ Installation of Power Generation at Existing Sites
➢ Electrification of Decentralized Communities
➢ Realize Energy Recovery
Turbine Systems Low-Voltage
Generator
Systems
Valves and other
Mechanical
Systems
Electrical
Protection and
Control Equipment
Smart, Integrated Plant and Civil Concepts
Small Hydro @ Voith
Within Small Hydro, Voith has revitalized its product line, drawing on its best solutions
available globally to provide excellent value locally.
Innovative, high quality design, material, and manufacturing are ensured by Voith
Center of Competence in Austria, Koessler.
Mini Hydro @ Voith | 2018
Mini Hydro Application Range
• Mini Hydro includes 5
different turbine solutions
• All are Kaplan-, Francis- or
Pelton-Type Turbines
• Standard Low-Voltage
Electrical Product Line
• Heads from 2 to 200 meters
(6 to 650 feet)
• Output per Unit from 100 to
1,200 kW per unit
Mini Hydro @ Voith | 2018
eQ - Vertical Kaplan Turbine Generator Unit
Mini Hydro @ Voith | 2018
Kaplan - Vertical
2 to 10 m (6 to 33 ft)
2 to 20 m³/s (70 to 700 ft3/s)
Up to 1,000 kW
Design Features
• Vertical, double-regulated Kaplan
• Short erection time due to pre-assembled parts
• Compact design optimized to limit civil structure
• Directly coupled generator or speed increaser
• Maintenance-friendly, modular design
eQ - Horizontal or Vertical Francis Turbine Generator Unit
Mini Hydro @ Voith | 2018
Francis – Horizontal
Up to 150 m (490 ft)
0.5 to 3 m³/s (17 to 110 ft3/s)
Up to 1,200 kW
Design Features
• Vertical or horizontal Francis unit
• Drinking water applications
• Compact, pre-assembled design
• Optimized inlet and draft-tube parts
• High-quality milled runner in-house in Austria
eQ - Vertical or Horizontal Pelton Turbine Generator Unit
Mini Hydro @ Voith | 2018
Pelton – Vertical & Horizontal
Up to 200 m (650 ft)
Up to 1 m³/s (36 ft3/s)
Up to 1,200 kW
Design Features
• Vertical or horizontal Pelton unit
• Design with 1 to 6 nozzles
• Inner-regulated nozzles with hydraulic actuator
• Compact set with integrated generator
• Encased in concrete or free-standing
• Jet deflector
StreamDiver® Turbine Generator Unit
Mini Hydro @ Voith | 2018
StreamDiver
2 to 8 m (6.5 to 27 ft)
Up to 14 m³/s (500 ft3/s)
Up to 850 kW
Design Features
• Designed for cost effective civil integration
• Direct-driven permanent magnet generator
• Water lubricated bearings
• Completely oil and grease-free
• Maintenance-friendly by simplified design
• Runner regulation or variable speed optional
Integration Examples of StreamDiverTM Hydro Plants
Focus is flexible integration and reduction of civil
Run of river in diversion-type plants
Closed pipe systems
Open canals for irrigation or cooling water
Run of river as overflowed concept
Mini Hydro @ Voith | 2018
Application – South Bend
Bypass Channel / Canal
Mini Hydro @ Voith | 2018
Project Data
Location South Bend, Indiana, USA
Start-up 2018
Unit Type SD 13.10 (10 Units)
Generation Type PMG, 300 rpm
Rated Net Head 3.17 m
Rated Discharge 99 cms (110 3 /yds )
Rated Output 2,500 kW
Operation Fixed-speed
Application – South Bend
Mini Hydro @ Voith | 2018
Application – South Bend
Mini Hydro @ Voith | 2018
Application – South Bend
Mini Hydro @ Voith | 2018
location of fish migration
system
bypass (debris, fish)
control room (E-house)
incl. cabinets
10x StreamDiver units
(in stacked formation)
incl. shut-off valves
83 m³/s
(2,931 cfs)
location of horizontal trash
rack
StreamDiver Units in Production –
Units in Assembly – Shipment in 2018
Mini Hydro @ Voith | 2018
Application - PeruEnergy Recovery power plant using residual head
Mini Hydro @ Voith | 2018
Project Data
Owner N.D.
Location Huampani, Peru
Start-up 2018
Unit Type
SD 13.10 (2 Units),
Existing Channel,
Overflowed Plant
Generation Type PMG, 327 RPM
Rated Net Head 4.5 m
Rated Discharge 18 cms
Rated Output 700 kW
Operation Fixed-speed
Application - PeruWorkshop and Delivery
Mini Hydro @ Voith | 2018
Application - PeruInstallation
Mini Hydro @ Voith | 2018
Prototype Operation in Nussdorf (Austria)
5 years of Maintenance-free Operation
Mini Hydro @ Voith | 2018 18
Turbine Data:
• Power Unit: SD 13.10 (Ø 1310 mm)
• Power: 314 kW / max. 450 kW
• Net head: 3.58 m / max. 4.68 m
• Flow: 9.96 cms
• Generator speed: 333 rpm, 50 Hz
Project Status:
• Commissioned August 2012
• Operating hours: > 40,000 hrs
• Exported electricity: > 10.0 GWh
• On-site inspections: 2
Housing After 42 Months of Operation Shows Slight Organic
Layer, but Intact Coating
Mini Hydro @ Voith | 2018 19
• Generator leakage test good, temperature and leakage sensors functioning properly
• Anti-corrosion coating intact (covered by thin organic layer)
Unit in Excellent Condition
Mini Hydro @ Voith | 2018 20
• Runner blade condition excellent, proper tip clearance maintained, no abrasion, cavitation
• Guide vane coating intact with some impacts on leading edge
Tubular Kaplan Turbine Generator Unit
Mini Hydro @ Voith | 2018
Tubular Turbine
Up to 20 m (66 ft)
Up to 4 m³/s (140 ft3/s)
Up to 250 kW
Design Features
• Fixed or variable blades
• Cost-efficient off-the-shelf generator
• Higher head through serial arrangement
• Higher flow through parallel arrangement
• Tubular design with high setting - easy access
• Special application in drinking water, treatment
plants, irrigation
Mini Hydro @ Voith | 2018
To water tank: Sewage, Factory utilityTo mid-point of piping: Waterworks, Industrial water
To sustainable discharge: Dam, Weir To open channels: Irrigation canal, River
Application Examples
Irrigation Application – Nogawa
Mini Hydro @ Voith | 2018
Project Data
Owner N.D.
Location Japan
Start-up 2013
Unit Type L Series
Generation Type Asynchronous
Rated Net Head 7.2 m
Rated Discharge 2.2 cms
Rated Output 125 kW
Operation Variable Blades
PRV Application – Kotsube
Mini Hydro @ Voith | 2018
Project Data
Owner N.D.
Location Japan
Start-up 2013
Unit Type M Series
Generation Type Asynchronous
Rated Net Head 17 m
Rated Discharge 1.53 cms
Rated Output 198 kW
Operation Variable Blades
PRV Application – Kotsube
Mini Hydro @ Voith | 2018
Other Applications
Mini Hydro @ Voith | 2018
Morigasaki Sewage Plant (East)
Sewage Water Treatment Plant
Output: 94 kW
Start-up: 2004
Single unit installation, Type L, movable blades.
Standardized Mini Hydro Automation Solutions
Mini Hydro @ Voith | 2018
Low Voltage Control and Protection
• Low voltage circuit breaker assembly
• Protection and synchronization
• Central plant control (common control) via
integrated HMI
• Automatic voltage regulator (AVR) *
• Remote monitoring and alarming system
• House supply for support systems (motors and
actuators)
• Uninterruptible power supply (UPS) (option)
• Pre-assembled stand-alone container system
(option)
• Island operation system (option)
* not standard for permanent magnet generator
HyService – The Six Business Segments
A 360° Approach
Voith | HyService 28
Assessment
& Consulting
Maintenance
Spare Parts
Refurbishment
& Upgrade
Repairs
Education
& Training
Service and Support for All Voith Brands
Voith | HyService 29
•AEG / Hydro
•Allis Chalmers
•Ebara
•Fuji Electric
•Kössler
•S. Morgan Smith
•Shanghai Hydro-Power Equip. Co.
•Siemens
•TDPS (Toyo Denki)
•VG Power
•Vortex Hydrosystems
•Westinghouse Generators
•Riva, Tosi, Ansaldo, Hydroart
Mini Hydro @ Voith | 2018
The Future is Mini.
Mini Hydro @ Voith stands for comprehensive solutions for the
sustainable generation of electricity from small hydro resources.
Standardized products for individual applications provide high
performance, quality and cost-efficiency at the same time.
Contacts:
Daniel P. Olson Steven R. Potter
Small Hydro Manager – U.S. Western Regional Manager
Tel: 1 717-659-0573 Tel: 1 541-743-6353
[email protected] [email protected]
Mini Hydro @ Voith | 2018