    The upcoming release o MineSched

    8.0 provides greatly enhanced

    perormance; allowing even

    operations with complex schedules or

    large deposits to create underground

    and open pit schedules in a raction o

    the time compared to earlier versions.

    Here are some o the highlights rom

    the upcoming release which will be

    available ree o charge as part o

    your Update Service and Technical

    Support (USTS) subscription.

    Perfrmace Imprvemets

    Production scheduling is up to 50

    times aster while development

    scheduling is 10 times aster,

    making most scheduling runs almost

    instantaneous.

    Majr Ehacemets t

    Activities

    Activities are now created in anintuitive 2D canvas. MineSched

    8.0 comes with a toolbar o typical

    mining activities or the user to

    quickly add to the scenario using

    drag and drop operations.

    Activities now appear earlier in

    the scheduling workow, allowing

    the user to support previously

    unsupported cases such as a

    drilling only schedule.

    Activities also appear as

    properties o each location, allowing

    or graphical selection and or

    multiple properties to be set at

    the same time.

    MieSched Viewer

    A new option has been added allowing

    users to share all scheduling results

    in one fle. These fles can be viewed

    in a standalone viewer application that

    includes all the MineSched animation

    canvas eatures.

    Better Scheduli Arud

    Develpmet Itersectis

    New eatures added permit or

    more rules to be adhered to during

    development scheduling around heading

    intersections. These allow MineSched

    to schedule past the intersection point

    at a user-specifed distance beore

    starting a child branch. A distance rule

    is also available or the child branch

    as well as time delays on each branch.

    With these, MineSched provides the

    ability to stop the schedule and model

    the time required to install services

    lines (e.g. air and water pipes) beore

    continuing development on each branch.

    This leads to more correct estimation o

    stope opening dates and provides the

    time required or development crews to

    saely develop heading intersections.

    CoMIng Soon: gemcm MieSched 8.0

    D.12.1

    Fr mre ifrmati email [email protected] r visit

    www.emcmsftware.cm/miesched.

    Disclaimer ad cpyrihts

    This document gives only a general description o products and services and except where expressly provided otherwise shall not orm parto any contract. Changes may be made in products or services at any time without notice. Copyright 2012, Gemcom Sotware International

    Inc. Gemcom, the Gemcom logo, combinations thereo, and MineSched are trademarks o Gemcom Sotware International Inc. All other

    names are trademarks, registered trademarks, or service marks o their r espective owners.

    Gemcom MineSched provides scheduling or surace and

    underground mines o all sizes and types, improving productivity

    and profts beyond whats possible in manual scheduling.

    Autmatic Precedece Creati

    Create multiple precedences

    automatically in one pass using

    wildcards. This allows or primary

    to secondary stope precedences,

    as well as cross cut to stope

    precedences, to be created

    much aster.

    The wildcards used or automatic

    precendence creation eature

    named wildcards where portions o

    location names ollowing two naming

    conventions can be matched. This

    lowers the amount o overhead

    needed to create precedences.

    Multiple Levels f Pririty

    All priorities are now set in the

    precedence tab. Multiple prioritycolumns can be added to all priorities

    grids, making scheduling or large

    operations aster and easier to

    manage.

    Users can set priorities using wildcards

    or change them using events in the

    Priority Changes data grid.

    Similar to Production Locations,

    users can set development priorities

    in an Initial and Priority Changes data

    grid or Development.

    A complete list o new eatures,enhancements and fxes will be made

    available on the Support website

    (www.gemcomsupport.com) when the

    sotware is released.

    The mii slutis yu expect. Frm the peple yu trust.

    MineSched 8.0 provides a toolbar o typical

    mining activities.