minesched coming
TRANSCRIPT
-
7/28/2019 Minesched Coming
1/1
The upcoming release o MineSched
8.0 provides greatly enhanced
perormance; allowing even
operations with complex schedules or
large deposits to create underground
and open pit schedules in a raction o
the time compared to earlier versions.
Here are some o the highlights rom
the upcoming release which will be
available ree o charge as part o
your Update Service and Technical
Support (USTS) subscription.
Perfrmace Imprvemets
Production scheduling is up to 50
times aster while development
scheduling is 10 times aster,
making most scheduling runs almost
instantaneous.
Majr Ehacemets t
Activities
Activities are now created in anintuitive 2D canvas. MineSched
8.0 comes with a toolbar o typical
mining activities or the user to
quickly add to the scenario using
drag and drop operations.
Activities now appear earlier in
the scheduling workow, allowing
the user to support previously
unsupported cases such as a
drilling only schedule.
Activities also appear as
properties o each location, allowing
or graphical selection and or
multiple properties to be set at
the same time.
MieSched Viewer
A new option has been added allowing
users to share all scheduling results
in one fle. These fles can be viewed
in a standalone viewer application that
includes all the MineSched animation
canvas eatures.
Better Scheduli Arud
Develpmet Itersectis
New eatures added permit or
more rules to be adhered to during
development scheduling around heading
intersections. These allow MineSched
to schedule past the intersection point
at a user-specifed distance beore
starting a child branch. A distance rule
is also available or the child branch
as well as time delays on each branch.
With these, MineSched provides the
ability to stop the schedule and model
the time required to install services
lines (e.g. air and water pipes) beore
continuing development on each branch.
This leads to more correct estimation o
stope opening dates and provides the
time required or development crews to
saely develop heading intersections.
CoMIng Soon: gemcm MieSched 8.0
D.12.1
Fr mre ifrmati email [email protected] r visit
www.emcmsftware.cm/miesched.
Disclaimer ad cpyrihts
This document gives only a general description o products and services and except where expressly provided otherwise shall not orm parto any contract. Changes may be made in products or services at any time without notice. Copyright 2012, Gemcom Sotware International
Inc. Gemcom, the Gemcom logo, combinations thereo, and MineSched are trademarks o Gemcom Sotware International Inc. All other
names are trademarks, registered trademarks, or service marks o their r espective owners.
Gemcom MineSched provides scheduling or surace and
underground mines o all sizes and types, improving productivity
and profts beyond whats possible in manual scheduling.
Autmatic Precedece Creati
Create multiple precedences
automatically in one pass using
wildcards. This allows or primary
to secondary stope precedences,
as well as cross cut to stope
precedences, to be created
much aster.
The wildcards used or automatic
precendence creation eature
named wildcards where portions o
location names ollowing two naming
conventions can be matched. This
lowers the amount o overhead
needed to create precedences.
Multiple Levels f Pririty
All priorities are now set in the
precedence tab. Multiple prioritycolumns can be added to all priorities
grids, making scheduling or large
operations aster and easier to
manage.
Users can set priorities using wildcards
or change them using events in the
Priority Changes data grid.
Similar to Production Locations,
users can set development priorities
in an Initial and Priority Changes data
grid or Development.
A complete list o new eatures,enhancements and fxes will be made
available on the Support website
(www.gemcomsupport.com) when the
sotware is released.
The mii slutis yu expect. Frm the peple yu trust.
MineSched 8.0 provides a toolbar o typical
mining activities.