minerals and metal review august 2012- 1

20
NEW VOLUME X NO. 32 AUGUST 06, 2012 I N D I A S F I R S T N E W S P A P E R O N M E T A L S Minerals & Metals Review EEKLY W PRICE Rs. 95/- Page 02 Page 03 Page 19 Page 20 IIM Symposium - Converting challenges into opportunities Outlook stable for Indian steel cos for H2'12: Fitch Challenges facing Indian mining industry & global insights Vedanta first quarter core earnings rise 27% BASE & PRECIOUS METALS WEEKLY REVIEW Base metals rise on upbeat US data The base metals pack rose on Friday (August 03) after data showing US employers hired more workers than expected last month that deflated the dollar and boosted prices. Copper jumped the most in three weeks and rose alongside a 3 per cent rally in crude oil and a late- week surge in equities after the Labor Department said nonfarm payrolls rose 63,000 in July, breaking three straight months of job gains below 100,000 and offering some hope for the ailing economy. But an increase in the jobless rate to 8.3 per cent reminded investors of the still-fragile state of the world's largest economy and kept prospects of further monetary stimulus from the Federal Reserve on the table. London Metal Exchange (LME) three-month copper rose $115, or 1.6 per cent, to settle at $7,445 a tonne, its biggest one-day gain since July 13, when prices soared by nearly 2 per cent. Since May, copper prices have been mired in a range between $7,200 and $7,800 in London, pushed and pulled between a waning global growth outlook and a tighter supply base and second- half Chinese demand prospects. On Friday, in other metals, LME three-month aluminium ended up $16 at $1,860 a tonne. Zinc fell 2 per cent last week and was trading at around $1,839 on Friday. The prices are down 1.3 per cent this year, the best performance among the exchange's six main metals. While the three- month lead was trading at $1,894 a tonne. Soldering material tin changed hands at $17,895 a tonne while nickel settled at $ 15,600 a tonne. In precious metals, gold was down 1.6 per cent during week and was on track for its biggest weekly loss in six weeks. Gold managed to climb above $1,600 an ounce on Friday after positive US jobs data that boosted appetite for risk, pushing dollar sharply lower against the euro and boosting stock markets 2 per cent. Spot gold was trading at $1,602.30 an ounce, while US gold futures for December delivery changed hands at $1,605.50. The precious metal erased most of the gains it made after European Central Bank chief Mario Draghi boosted euro by pledging to do whatever necessary to support the single currency. DOMESTIC MARKET REVIEW Gold, silver decline on sluggish demand, weak global cues The prices of gold fell further at the domestic bullion market on Friday (August 03) on lack of buying interest from stockists and traders at current levels and bearish trend in the overseas markets. Silver too dropped on heavy speculative selling on the back of subdued industrial demand. Standard gold (99.5 purity) declined by Rs 115 to end at Rs 29,730 per 10 gm from Wednesday's (August 01) closing level of Rs 29,845. Pure gold (99.9 purity) slipped by Rs 95 to close at Rs 29,880 per 10 gm from Rs 29,975. Silver ready (.999 fineness) dipped by Rs 665 per kg to finish at Rs 53,295 as compared to Rs 53,960 previously. The gold traders stayed on the sidelines as they prepared to face weak rural demand after the weather office forecast a drought which could dent farm incomes and savings. Physical demand has been subdued so far this year and is expected to remain dull after doubling of import duty to 4 per cent. Deficient monsoon rains could further dent gold demand in rural areas, which contribute to 60 per cent of imports. The government signalled the first drought in three years, which could squeeze crop yields and farmers' income. The festival season starts in August in India, the world's biggest gold buyer in 2011, and continues till November. On Friday, the most-active gold for October delivery on the Multi Commodity Exchange was trading lower at Rs 29,946 per 10 grams. Z I N C Z I N C Z I N C Z I N C Z I N C BINANI ZINC LTD. BINANIPURAM-683 502, KERALA. BULLION PRICES (Friday close) Gold (Standard) .............. Mumbai .............. Rs./10g ............. 29,730 Silver (.999) ..................... Mumbai ................ Rs./Kg ............. 53,295 Gold .................................. London ............... $/tr.oz. ........... 1602.00 Silver ................................. London ............... $/tr.oz. ............... 27.25 LME prices in $/metric ton Friday PM Kerb Buy Sell Stock Aluminium 1,835.00 1,837.00 4,864,450 Aluminium Alloy 1,750.00 1,753.00 92,500 Copper 7,435.00 7,435.00 244,725 Lead 1,87500 1,879.00 327,100 Nickel 15,570.00 15,572.00 115,314 Tin 17,870.00 17,871.00 11,650 Zinc 1,838.00 1,840.00 9,92,300 Indian consortium in sight of clinching Afghan deal Afghan Iron & Steel Company (AFISCO), a consortium of Indian miners & steel companies, has just completed its fifth and possibly final negotiations recently. A final contract prepared by lawyers from both sides will be passed by Afghan cabinet, as soon as their new mineral policy is drafted and approved, said senior Afghan official. Last year in November, AFISCO was selected as the preferred bidder for three of the four concessions at Hajigak in the Bamian district. Indian consortium will now have the rights for 30 years to develop the mine and put up a steel & power Orissa government said it was hopeful on the establishment of ArcelorMittal's proposed 12 mtpa steel plant, which is facing local opposition, in Keonjhar district in a peaceful manner. "Orissa government has been supporting industries to set up units. Though there is opposition to land acquisition by local people, we have been undertaking industrialisation peacefully. Orissa govt positive on ArcelorMittal plant (Contd. on page 2) plant that it has promised to the war torn country. As per the sources involved in the negotiations, Afghanistan has given the consortium three years of exploration and another couple of years to put up a steel plant while promising energy and water resources for its running. An export cap of 6 million tonne per annum (mtpa) is to kick-in if there is any delay in setting up a steel and power plant. Officials from the country point out that AFISCO's bid was considered for the promised downstream infrastructure - a steel plant, a power plant, a 200-km railway line linking them to the mine that Indian consortium estimated could cost about $11 billion. Afghanistan has also proposed a sliding royalty of 3-12 per cent charged on international benchmark prices for a more equitable share in the ups and downs of iron ore prices. "Certainly expecting value addition is not uncommon for a country (like Afghanistan) in need of investment and rebuilding. Having said that one must ask whether the ecosystem for an integrated steel plant - energy, water, logistics, and eventually a market for its (steel) use - can be created. Any demand ArcelorMittal has given commitment to set up its plant in the state," said State Steel and Mines Minister, Mr Raghunath Mohanty. He said, "ArcelorMittal had so far invested over Rs 70 cr in its Orissa project and was keen to set up its proposed 12 mtpa steel plant in Keonjhar." Gram sabha meetings for the project had been completed at 7 of 15 villages under Patana Tehsil area of Keonjhar.

Upload: sundaravaradhan-iyengar

Post on 21-Jan-2016

123 views

Category:

Documents


0 download

DESCRIPTION

Minerals and Metal Review August 2012- 1

TRANSCRIPT

Page 1: Minerals and Metal Review August 2012- 1

NEW VOLUME X NO. 32 AUGUST 06, 2012

I N D I A ’ S F I R S T N E W S P A P E R O N M E T A L S

Minerals & Metals

Review E E K LYW PRICE Rs. 95/-Page 0

2

Page 0

3

Page 1

9

Page 2

0

IIM Symposium -Converting challenges

into opportunities

Outlook stable for Indiansteel cos for H2'12: Fitch

Challenges facing Indianmining industry &

global insights

○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○

Vedanta first quarter coreearnings rise 27%

BA

SE &

PREC

IOU

S M

ETA

LS W

EEK

LY R

EV

IEW

Base metals rise on upbeat US dataThe base metals pack rose on Friday (August 03)after data showing US employers hired more workersthan expected last month that deflated the dollar andboosted prices.Copper jumped the most in three weeks and rosealongside a 3 per cent rally in crude oil and a late-week surge in equities after the Labor Department saidnonfarm payrolls rose 63,000 in July, breaking threestraight months of job gains below 100,000 and offeringsome hope for the ailing economy.But an increase in the jobless rate to 8.3 per centreminded investors of the still-fragile state of the world'slargest economy and kept prospects of further monetarystimulus from the Federal Reserve on the table.London Metal Exchange (LME) three-month copperrose $115, or 1.6 per cent, to settle at $7,445 a tonne,its biggest one-day gain since July 13, when pricessoared by nearly 2 per cent. Since May, copper priceshave been mired in a range between $7,200 and $7,800in London, pushed and pulled between a waning globalgrowth outlook and a tighter supply base and second-half Chinese demand prospects.On Friday, in other metals, LME three-month aluminiumended up $16 at $1,860 a tonne. Zinc fell 2 per cent lastweek and was trading at around $1,839 on Friday. Theprices are down 1.3 per cent this year, the best performanceamong the exchange's six main metals. While the three-month lead was trading at $1,894 a tonne.Soldering material tin changed hands at $17,895 atonne while nickel settled at $ 15,600 a tonne.In precious metals, gold was down 1.6 per cent duringweek and was on track for its biggest weekly loss insix weeks. Gold managed to climb above $1,600 anounce on Friday after positive US jobs data that boostedappetite for risk, pushing dollar sharply lower againstthe euro and boosting stock markets 2 per cent. Spotgold was trading at $1,602.30 an ounce, while US goldfutures for December delivery changed hands at$1,605.50.The precious metal erased most of the gains it madeafter European Central Bank chief Mario Draghi boostedeuro by pledging to do whatever necessary to supportthe single currency.

DO

MESTIC

M

ARK

ET REV

IEW

Gold, silver decline on sluggish demand, weak global cuesThe prices of gold fell further at the domestic bullion market on Friday (August 03) onlack of buying interest from stockists and traders at current levels and bearish trend inthe overseas markets. Silver too dropped on heavy speculative selling on the back ofsubdued industrial demand.Standard gold (99.5 purity) declined by Rs 115 to end at Rs 29,730 per 10 gm fromWednesday's (August 01) closing level of Rs 29,845. Pure gold (99.9 purity) slipped byRs 95 to close at Rs 29,880 per 10 gm from Rs 29,975. Silver ready (.999 fineness)dipped by Rs 665 per kg to finish at Rs 53,295 as compared to Rs 53,960 previously.The gold traders stayed on the sidelines as they prepared to face weak rural demandafter the weather office forecast a drought which could dent farm incomes and savings.Physical demand has been subdued so far this year and is expected to remain dull afterdoubling of import duty to 4 per cent. Deficient monsoon rains could further dent golddemand in rural areas, which contribute to 60 per cent of imports. The governmentsignalled the first drought in three years, which could squeeze crop yields andfarmers' income.The festival season starts in August in India, the world's biggest gold buyer in 2011, andcontinues till November.On Friday, the most-active gold for October delivery on the Multi Commodity Exchangewas trading lower at Rs 29,946 per 10 grams.

Z I N CZ I N CZ I N CZ I N CZ I N C

BINANI ZINC LTD.BINANIPURAM-683 502, KERALA.

BULLION PRICES (Friday close)

Gold (Standard) ..............Mumbai .............. Rs./10g ............. 29,730

Silver (.999) .....................Mumbai ................ Rs./Kg ............. 53,295

Gold .................................. London ............... $/tr.oz. ........... 1602.00

Silver ................................. London ............... $/tr.oz. ............... 27.25

LME prices in $/metric ton

Friday PM Kerb

Buy Sell StockAluminium 1,835.00 1,837.00 4,864,450Aluminium Alloy 1,750.00 1,753.00 92,500Copper 7,435.00 7,435.00 244,725Lead 1,87500 1,879.00 327,100Nickel 15,570.00 15,572.00 115,314Tin 17,870.00 17,871.00 11,650Zinc 1,838.00 1,840.00 9,92,300

Indian consortium in sightof clinching Afghan deal

Afghan Iron & Steel Company(AFISCO), a consortium of Indianminers & steel companies, has justcompleted its fifth and possiblyfinal negotiations recently.A final contract prepared bylawyers from both sides will bepassed by Afghan cabinet, assoon as their new mineral policyis drafted and approved, saidsenior Afghan official.Last year in November, AFISCOwas selected as the preferredbidder for three of the fourconcessions at Hajigak in theBamian district. Indianconsortium will now have therights for 30 years to develop themine and put up a steel & power

Orissa government said it washopeful on the establishment ofArcelorMittal's proposed 12 mtpasteel plant, which is facing localopposition, in Keonjhar district ina peaceful manner. "Orissagovernment has been supportingindustries to set up units. Thoughthere is opposition to landacquisition by local people, wehave been undertakingindustrialisation peacefully.

Orissa govt positive onArcelorMittal plant

(Contd. on page 2)

plant that it has promised to thewar torn country.As per the sources involved inthe negotiations, Afghanistanhas given the consortium threeyears of exploration and anothercouple of years to put up a steelplant while promising energy andwater resources for its running.An export cap of 6 million tonneper annum (mtpa) is to kick-in ifthere is any delay in setting up asteel and power plant. Officialsfrom the country point out thatAFISCO's bid was considered forthe promised downstreaminfrastructure - a steel plant, apower plant, a 200-km railway linelinking them to the mine that

Indian consortium estimatedcould cost about $11 billion.Afghanistan has also proposeda sliding royalty of 3-12 per centcharged on internationalbenchmark prices for a moreequitable share in the ups anddowns of iron ore prices."Certainly expecting valueaddition is not uncommon for acountry (like Afghanistan) inneed of investment andrebuilding. Having said that onemust ask whether the ecosystemfor an integrated steel plant -energy, water, logistics, andeventually a market for its (steel)use - can be created. Any demand

ArcelorMittal has givencommitment to set up its plant inthe state," said State Steel andMines Minister, Mr RaghunathMohanty. He said, "ArcelorMittalhad so far invested over Rs 70 cr inits Orissa project and was keen toset up its proposed 12 mtpa steelplant in Keonjhar." Gram sabhameetings for the project had beencompleted at 7 of 15 villages underPatana Tehsil area of Keonjhar.

Page 2: Minerals and Metal Review August 2012- 1

2Minerals & Metals Review WEEKLY

AUGUST 06, 2012

FORTHCOMING EVENTS

CIEXPO 2012 - The 9th China (Beijing) International Casting IndustryExpo 2012, Organised by: Beijing Hiven Exhibition Co Ltd; Date: August22-24, 2012; Venue: China National Convention Center; Contact: Mr.Liu Gang; Email : [email protected], [email protected]; Web:www.bciffe.com

IMPC 2012 - The XXVI International Mineral Processing Congress;Organised by: Indian Institute of Mineral Engineers and Indian Institute ofMetals; Date: September 24-28, 2012; Venue: The Ashok Convention,Hotel Ashok, New Delhi; Tel : +91 20 66086268, 66086203;Email: [email protected]; Web: www.impc2012.org

Mining - Exploration Convention & Trade Show - FIMI is organizingthe Mining Exploration Convention & Trade Show, which is sponsored byMinistry of Mines, Govt. of India. The convention is supported by PDAC,supporter is Geological Society of India and Trade Show supporters areCanadian Association of Mining Equipment and Services for Export(CAMESE); MC-CCPIT. Date : August 30 - September 01, 2012,Venue : Bengaluru International Exhibition Centre; Bengalurue (India);Please Contact : Federation of Indian Minerals Industries, FIMI House,B-311, Okhla Industrial Area, Phase-I, New Delhi-110020; Contact No.:-91-11-26814592; Fax No. : 91-11-26814594; Email : [email protected]

Casting a Greener Future 2012 - The annual foundry seminar now inits 8th edition will deliver resourceful content on the business trends withinterest to the foundry industry and extend a forum for discussion onsustainable production techniques; Date: September 03, 2012; Venue:Hotel Sun-n-Sand, Pune, Maharahstra; Organised by: MMR Events;Contact person: Mr Girish V: 9987784422 / Ms Sushma Hegde -9769020572; Tel: 022 - 22660623 / 4710; Fax: +91-22-2266 0632;E-mail: [email protected]; Web: www.mmronline.com

India International DRI Summit 2012 - an international event on DRItechnology; Date: September 10, 2012; Venue: Hotel Le Meridien, NewDelhi; Organised by: Sponge Iron Manufacturers Association (SIMA);Contact: Deependra Kashiva; Tel: 011 - 26294492, 41619204;Mobile: 9899571963; Fax: 011-26294491; Email: [email protected]/ [email protected]

MMMM 2012 - an international exhibition on minerals, metals, metallurgyand materials; Date: September 27-30, 2012, Venue: Pragati Maidan,New Delhi; Organized by: International Trade and Exhibitions Events PvtLtd; Contact: Mr. Shikhar Choudhury, Tel: +91-11-40828204,E-mail: [email protected]

Mission Metallurgy 2012 - Organized in association with IMSFoundation's industrial exhibition 'India Manufacturing Show 2012', thisseminar will share valuable knowledge from the eminent personalitiesfrom metallurgical sector; Date: September 28, 2012; Venue: BangaloreInternational Exhibition Centre, Bengaluru; Organised by: MMR Events;Contact person: Mr Girish V - 9987784422 / Ms Sushma Hegde -9769020572; Tel: 022 - 22660623 / 4710; Fax: +91-22-2266 0632;E-mail: [email protected]; Web: www.mmronline.com

ICSOBA 2012 - An international congress on bauxite, alumina & aluminium;Date: October 30 - November 02, 2012; Venue: Belem, Brazil; ContactPerson (India): Ms Sudipta Chaudhuri; Mobile: +91 9823289817;E-mail: [email protected]; [email protected];[email protected]; Web: www.icsoba.org

Bauxite, Alumina & Aluminium Industry of Asia Vision 2020 (IBAAS2012) - A conference with a special session on non-metallurgical bauxiteand alumina products; Organised by: International Bauxite Alumina &Aluminium Industry and JNARDDC, Nagpur, Date: December 03-05,2012; Email: [email protected] or [email protected],[email protected]

GP Sheets18G ............................... 48,00020G ................................ 48,00022G ................................ 48,00024G ................................ 48,000Plates5mm ............................... 43,0006mm ............................... 43,0008mm ............................... 43,00010mm ............................. 43,00012mm ............................. 43,00016mm ............................. 43,00020mm ............................. 43,000

GC Sheets24G .................................. 48,000

HR Sheets10G .................................. 43,00012G .................................. 43,00014G .................................. 43,00016G .................................. 43,000

CR Sheets16G .................................. 45,00018G .................................. 45,00020G .................................. 45,000

Prices of Flat Products exclusive of 4% VAT)Mumbai / Ex-Kalamboli (Rs./ton; as on 16th July 2012)

Challenges facing Indian mining industry & global insightsThe challenges facing the Globaland Indian Mining Industry arerapidly reaching anunprecedented level of extremity.Cost inflation for input materialsPOL, Explosives, spare parts ofHEMM have all gone up higher.Land acquisition process isbecoming extremely complex anddifficult and the costs foracquisition have also rocketedsky-high. The volume,unpredictability and associatedcosts are on the rise due tochanges in fiscal, judicial andindustry regulatory policies.Capital projects portfolio in themining sector in India arebulking up as there istremendous pressure on captiveallocation, development andfinally commissioning of nascentcoal blocks. Though,domestically we are still not partof volatile fluctuations in Coaland Iron Ore witnessed by theworld industrial community, yetthe marginal effects have startedrearing its ugly head."As these global forcesconverge, mining executivesmust look beyond the traditionalscenarios they have used in theirplanning. To prepare forpreviously unanticipated risks,companies must begin toincorporate more complexscenarios into their strategicplanning. They also must bewilling to seek unconventionalsolutions to their conventionalchallenges if they truly hope toresolve some of the industry'smost endemic issues."

The cost of doing businessDue to the increasing demandfor coal and other minerals,accelerated production hasbecome the mantra of publicsector as well as private sectormining countries in the country.But the upward pressure oncosts in the form of higher wagecost due to pay revision of Publicsector employees and hiring andretaining mining talent for theprivate sector has startedshowing its effect on the bottomline of mining companies. Bymid-2011, the price of haul trucktires alone had tripled, touching$100,000 on the spot market. ThePOL costs have also gone updue to upward surge in oil prices.There has been a mark increasein Capex costs as well for

12345678901234567890123456789012123456123456789012345678901234567890121234561234567890123456789012345678901212345612345678901234567890123456789012123456123456789012345678901234567890121234561234567890123456789012345678901212345612345678901234567890123456789012123456123456789012345678901234567890121234561234567890123456789012345678901212345612345678901234567890123456789012123456123456789012345678901234567890121234561234567890123456789012345678901212345612345678901234567890123456789012123456

PERSPECTIVE

Indian consortium in sight of clinching Afghan deal(Contd. from page 1)

Greenfield as well as brownfieldprojects because of increase inland acquisition costs, mining coalblocks in poor infrastructuredistricts. Indian mining companiesneed to invest in developingGreenfield opportunities in areaslacking in evacuation infrastructuresuch as Mand Raigarh coalfield,Talcher, etc. The Coal Block ownersare finding it difficult to raise andallocate capital expenditure forconstruction of infrastructure inthese remote areas. Thecombination of "Cluster Concept"and Public private partnershipwhere, the coal block owners? pooltogether their available resourcesand make infrastructural extensiona viable economic proposition isan interesting idea to explore andadvance. What further is neededto jumpstart such, cooperativestructuring for infrastructural gainsis the initial inertia of being isolated.Cost management in the Capital

Project phase and duringoperations should remain criticalpriority, impelling forward-thinkingcompanies to institute long-termoptimization and efficiencymeasures in an effort to foster moreresilient operations into the future.

The battle to keep profitsThe Draft MMDR Bill, 2011proposes 26% profit sharing incase of coal and lignite and 100%royalty to be paid as compensationfor other minerals, raising rates onroyalty is a prime example of battlefor mining profits. The royalty ratesin the past year have also risen inAustralia, Chile, Peru, South Africa,Ghana, Tanzania and Burkina Faso.Some of the global eventsillustrating this segment ofchallenge have been imposingsuper profit taxes, discoverybonuses, resource rents, licensefees, indigenization quotas,environmental levies, and miningproperty auction prices. This hasthrown mining companies financialprojections into disarray and inIndia where mining sector is tightlylinked to utilities and metals sector,the financial impact has been feltacross these sectors as well. Todeal with it, the mining industryrequires a proactive, collaborativeapproach that illustrates to all

stakeholders the extent to whichmining activities, and miningprofits, contribute to well-beingof both local communities andsociety at large.

Labour pains in the industryAlthough, the situation in Indiahas not reached such desperateproportions as the mining boomglobal nationalities like Australiaand Canada but with 194 CoalBlocks in various phases ofconcept to commissioning andramp up, the mining talentrequirement may shoot up in nextthree to four years. Already,global firms like Rio Tinto, BHPBilliton are hiring fresh miningengineers directly from thecollege alongwith theexperienced industryprofessionals with substantialwork experience which will createa real glut of talent when we startneeding our mining engineersfor the upcoming undergroundmining blocks. The real shortagewill be felt in disciplines like MinePlanning and Optimization,Ventilation Simulation for deepunderground mines, groundcontrol & rock mechanics, roofsupport planning, deep shaftsinking, winding and transport,maintenance optimizationtechniques for Miningmachinery, simulation andexecution and advancedgeological disciplines.Presently, 90% of our coalproduction comes fromopencast mines where the earliermentioned skill sets are notrequired to great extent andthis is the reason our humanresource managers for themining Industry are not ableto visualize the kind ofpremium skills requirementour country will face in thevery near future.Although the indications foracute labour shortages areemerging from variousnational level reports yet, insome ways, mining companiescontinue to respond in thesame manner every year whileexpecting different results.Certainly, traditional industryresponses to the talent gapwill remain valid but also moreextensive solutions need tobe applied.

for steel can only come frominfrastructure, or housing thatagain will depend on global aid,"said a senior official from PwC.However, an expert said, it issomewhat new and unusual insuch international concession forlong contracts to be linked tobenchmark prices. Theinternational concessions havemostly been signed on a fixedroyalty linked to an ad valoremprice. "Afghanistan seems to have

learnt from other countries whohave had difficulty coming toterms with the wild fluctuations ofiron ore prices, feeling particularlydeprived of the boom that minersencashed in the last couple ofyears," said a senior executivefrom the consortium.AFISCO comprises governmentpromoted Steel Authority ofIndia Ltd, NMDC, RINL andprivate players including JindalSteel & Power Ltd, JSW SteelLtd, JSW Ispat and Monnet Steel

& Power. A joint venturecompany respecting each firmrespective share will beregistered soon. A similar public-private consortium is nowpursuing its chances withcopper deposits on the block inAfghanistan, and will be makinga commercial bid for a copperblock soon. In 2010, the USDepartment of Defence revealedthat Afghan mineral riches couldtotal $1 trillion. Afghanistanbelieves it's closer to $3 trillion.

- A Deloitte research report

Page 3: Minerals and Metal Review August 2012- 1

Minerals & Metals Review WEEKLY

AUGUST 06, 20123

FERROUS BITSIron ore worth Rs 14,768 cr exported from Goa in FY’12The state government of Goa exported iron ore worth Rs 14,768crore for the financial year 2011-2012. This includes direct exportsor iron ore as well as penultimate sales which are also consideredas exports for the purposes of Central Sales Tax Act, 1956.Chief Minister, Manohar Parrikar said that as per the budget estimatesthe total estimated royalty to be collected by the state during theyear 2012-13 is Rs 890 crore. The state government has collected28.38 crore Value Added Tax on local sale of iron ore and Rs 83.01crore is collected in the form of Central Sales Taxes on inter-state saleof iron ore. The revenue earned by way of income tax from miningsector for the year 2011-2012 is Rs 1,756 crores. "Central governmentalso earn substantial revenue by taking exports duty at 30 per cent ofore price" said Parrikar in written reply in assembly.

DSP's saleable steel output rises 6 pc in July'12Durgapur Steel Plant (DSP), a unit of Steel Authority of IndiaLimited recorded a 6 per cent growth in production of saleablesteel in July 2012 compared to corresponding period last year.More significant, special steels and value-added steels constituted75% of total saleable steel production during the month. "Wehave achieved this in tandem with our strategy to maximiseproduction of special and value-added steels in DSP's saleablesteel basket," said Mr P K Singh, CEO, DSP.In July, 2012 production of hot metal and crude steel also recordeda growth of 6% each over production of hot metal and crude steelin July 2011. The plant also managed to put up an impressiveperformance in the production of blend mix at the Raw MaterialsHandling Plant, concast billets at the Continuous Casting Plantand medium structurals at the Section Mill.

NMDC appoints new directorsMr E K Bharat Bhushan, Additional Secretary and Financial Advisor,Ministry of Steel, has been appointed as Government Director onthe board of NMDC Ltd with effect from July 26. Mr Bhushan replacesMr S. Machendranathan, the state-run mining firm said in a filing tothe BSE. Mr J.P. Shukla, Joint Secretary in the Ministry of Steel, hasbeen appointed as Government Director on NMDC board in theplace of Mr U P Singh with effect from July 30, the company said.

Bhushan Steel Q1 NP declines marginally to Rs 206 crBhushan Steel reported a marginal decline of 1.90 per cent in its netprofit to Rs 205.97 crore for the quarter ended June 30, 2012, largelydue to increase in interest payments. The Delhi-based steel majorhad posted a net profit of Rs 209.96 crore during the correspondingquarter of the last fiscal. The net sales of the company rose by nearly27 per cent to Rs 2,747.34 crore during the quarter against Rs 2,165.85crore in the April-June period of 2011-12, it said in a filing to the BSE.Besides, the company's interest payments increased by over 75 percent to Rs 377.80 crore during the quarter, impacting its profitability.In a separate filing, the company said its board has recommended adividend of Rs 0.50 per share for the ordinary shareholders for thelast fiscal, while a dividend of Rs 10 per share has been recommendedfor the shareholders having preferential shares of the company.

Man Industries Q1 net profit rises 8%Pipe maker, Man Industries, has posted eight per cent rise in netprofit at Rs 26 crore (Rs 24 crore) for Q1 FY13. Net sales weredown at Rs 326 crore (Rs 466 crore). Mr. R C Mansukhani, Chairman,said, "The results are in line with our expectations, in spite of thefact that the company has booked MTM losses of Rs 17.79 crorewhich would hopefully be recouped in the coming quarters. Thebusiness outlook remains stable despite global challenges."

RINL, PowerGrid team up to make electrical steelRashtriya Ispat Nigam Ltd (Visakhapatnam Steel Plant) has signed amemorandum of understanding with Power Grid Corporation of Indiafor setting up a joint venture electrical steel production facility inVisakhapatnam. According to a press release, the MoU was signedhere on Monday last by Mr A.P Choudhary, CMD of RINL, and MrR.N. Nayak, CMD of Power Grid Corporation. RINL is taking steps toset up production units for value-added products like silicon steel.

IMFA Q1 net declines 24% to Rs 28.45 crThe ferro chrome producer Indian Metals and Ferro Alloys Ltd(IMFA) reported a decline of nearly 24 per cent in net profit to Rs28.45 crore for the quarter ended June 30, 2012, largely due to higherinterest outgo. The Orissa-based company had reported a net profitof Rs 37.42 crore during the corresponding quarter of the last fiscal.The net sales of the company, during the quarter, went up by 10.50per cent to Rs 287.88 crore compared to Rs 260.41 crore in April-Juneof 2011-12, it said in a statement. Besides, the interest payments ofthe company increased by over three times to Rs 32.02 crore.

Outlook stable for Indian steel cos for H2'12: FitchThe outlook for Indian steel makerswill remain stable in H2'12, despitethe slowdown in the growth ofdomestic steel demand, accordingto Fitch Ratings. The agencyexpects steel demand growth torange between 6 per cent and 7 percent for the whole of 2012, with thepace of activity picking up fromOctober after the monsoon. Theproportion of 'Stable' ratingoutlooks in Fitch's portfolio is96 per cent.The slowdown in domesticdemand growth stems from India'sunfavourable macroeconomicenvironment. Fitch has reviseddown its forecasts for real GDPgrowth to 6.5 per cent and 7 percent for the financial year endingMarch 2013 (FY13) and FY14,respectively, from previousforecasts of 7.5 per cent and8 per cent. Less-than-normalmonsoon could also depress

economic growth.Fitch expects profit margins toremain under pressure in H212,given persistent increases in thecost of steel production and steelproducers' limited ability to passon higher costs - due to subdueddemand from end-user industries.The pressure will be greater onnon-integrated steel producers.However, most of the rated entitiesshould be able to keep up with theshort-term demand slowdownwithout a major weakening of theircredit profiles.The cost of funding working-capital requirements remains highdespite a 50 bp reduction in therepo rate in April 2012 by theReserve Bank of India. Inflationremains high, and Fitch expects acontinued, gradual reduction in theinterest rate. Indian steel producerswill have to use a prudent mix ofdomestic and international funding

to contain interest costs. Lower-rated issuers are affected the mostby high interest costs, due to theirlimited financial flexibility.Margins of companies producingsteel through blast furnaces hasbeen affected by a weaker Indianrupee, despite import price parityof Indian steel and softening ofinternational prices of coking coal,the bulk of which is imported. Fitchexpects the weaker rupee to raisethe financial leverage of steelproducers with significant un-hedged foreign-currency liabilities.However, the financial leverage ofrated entities should remain withintheir rating categories. Majority ofIndian steel producers are inexpansion mode, resulting innegative free cash flows. Theliquidity situation is aggravatedfurther by persistent high interestcosts resulting in weaker demandfor steel from end-user industries.

The steelmakers in China sawtheir profits plunge by 96 percent in the first half comparedto a year ago, a Chinese officialsaid recently, as the economicslowdown turned the industryinto a 'disaster zone'.Zhu Jimin, chairman of theChina Iron and SteelAssociation (CISA), said in aspeech posted on theassociation's website that theaggregate profit of the nation'ssteelmakers fell to £376m in thefirst half year due to falling

Chinese steel producers' profits decline by 96% in H1demand and rising costs.Chinese companies have issueda string of profit warnings inrecent weeks as the slightdownturn in economic growthhas had a disproportionateeffect on profits. The ChinaSecurities Journal, an officialnewspaper, described the steelindustry as the "main disasterzone" in the current downturn,with more than 80 per cent oflisted steel producers warningthat their results will be worsethan forecast.

"The first half saw a big drop ininvestments in property andalso in railways, cars and ships,so demand for steel hasweakened," Mr Zhu said.Shipping industry productiondropped 10.1 per cent year onyear while auto production grewby only 6.7 per cent in the firsthalf, depressing demand forsteel.Meanwhile, costs of iron orehave soared, rising to $153 atonne in May from $136 at theend of last year, he said.

The domestic steel producer JSWSteel's plans to list on the LondonStock Exchange (LSE) are back onthe table, according to sourcesprivy to development.As per the sources, the JindalGroup unit is planning toconsolidate its internationalbusinesses under one umbrella,and will list its operations on theLSE post the consolidation.At present, JSW Steel has plateand pipe operations in the US andiron ore operations in Chile & SouthAmerica. The company aims to

JSW Steel revives plans for London listingexpand its international network,both organically and inorganicallyvia acquisitions.Currently, 90 per cent of JSW Steel'sbusiness comes from domesticoperations, which are undergoinga turbulent phase. The slowingeconomic growth, high cost offunds and severe fuel shortage hascrippled corporate India, and JSWSteel has not been spared.Thedepreciation of the rupee has alsohad a huge impact on the profitson the company. For the quarterended June 2012, JSW

consolidated net profit fellsignificantly to Rs 50 crore from Rs485 crore in the year ago period.The company held forex losses ofaround Rs 592 crore responsiblefor the decline in profits.As compared to this, theinternational operations of thebusiness recently turned EBITDApositive. The company is yet toappoint bankers to formulate thevaluation for the listing process.And sources say the timeline ofthe listing will be subjective tomarket conditions.

The rating agency Standard &Poor's has cut ArcelorMittal's long-term debt to 'junk' status recentlyand said uncertainty about thedebt reduction plans of the steelmajor and a weak sector outlookmeant it could cut further. Therating firm said it had downgradedthe Luxembourg-based companybecause it felt the steel industrywas continuing to weaken.ArcelorMittal's second-quarterresults were below its expectations.The company reported second-quarter core profit (EBITDA)broadly in line with marketexpectations, when a one-off gainwas removed. It forecast steelearnings would be lower in thesecond half than the first, but with

S&P lowers ArcelorMittal debt to junk statusrising income from mining.Europe was stalling a steelindustry pick-up, it added.Another rating agency, Moody'shas also cut its outlook forArcelorMittal to negative,although retained its rating of'Baa3'. It said it would hold offcutting that rating if the companysucceeded in reducing debt by $5billion over the next six months,although more may be needed ifthe operating performancematerially worsened. A stabilisingof the outlook would require asharp reduction of debt and animprovement in operatingperformance, it said.Global steel industry, often seenas a gauge for the world's

economy, is suffering from fallingdemand in Europe due to theeurozone debt crisis and aslowdown in China.S&P expected ArcelorMittal'sadjusted ratio of funds fromoperations to debt to drop below20 per cent in 2012 and be around20 per cent in 2013. It previouslyforecast 25 per cent for next year.Itsaid this new forecast camedespite ArcelorMittal's disposalof non-core assets and othermeasures to enhance its credit.When reporting second-quarterearnings, ArcelorMittal's chieffinancial officer told that it wasa strategic priority for thecompany to retain its investmentgrade rating.

Page 4: Minerals and Metal Review August 2012- 1

4Minerals & Metals Review WEEKLY

AUGUST 06, 2012

COALMINING

AUTOMOBILE

Clariant Mining Solutions, aleading global supplier of servicesand custom chemical specialtiesfor the mining industry, hasincreased production capacity atits plant dedicated to chemicalsolutions for iron ore flotation,located at the Suzano IndustrialPark in the metro area of Sao PauloBrazil. The company's decisionto invest in the facility's upgradeand process optimization aims tomeet the growing market demandresulting from increased activityin the mining industry,especially in the iron segment.These investments have allowedClariant Mining Solutions tomore than double the plant'scurrent production of iron oreflotation chemicals."This increase in production isessential to maintaining ourstandard of excellence in servingour commercial partners and ournew clients," said Jorge Arias,Head of Clariant MiningSolutions, North - Latin America.According to Arias, thisincreased production capacityreflects the company'scommitment to growth in themining industry-Clariant is theonly chemical solutions supplierwith local production for reverse

Clariant ups production capacityin chemical solutions for mining

OMDC gets MoEF nod to mine at OdishaOrissa Mineral Development Corporation Limited (OMDC), a subsidiaryof RINL, received a nod from ministry of environment and forests tomine three-million tonne of iron-ore and 2.4 lakh tonne of manganesefrom leases it already owns at Kolha Roida in Odisha recently. HindustanSteelworks Construction Limited (HSCL) is likely to get the job ofcontract mining at OMDC's Kohla Roida mine complex in Odisha.When mining operations actually resume at the complex, it will greatlybenefit RINL which does not have captive iron-ore mines. So long,the steel company has been dependent on sourcing iron ore throughmerchant purchases from state-owned mining major, NMDC Limited.Incidentally, OMDC owns reserves of 200-million tonne of iron-oreand 40-million tonne of manganese in Odisha.RINL got steel ministry approval to acquire 51% stake in OMDC in 2010.The latest development is likely to boost prospects of RINL, which isslated to hit the market as part of its forthcoming initial public offer.

iron ore flotation processes.Brazil is the second largest ironore producer in the world and thecountry registered significantgrowth last year, according to theBrazilian Mining Institute (Ibram).Clariant Mining Solutions hasextensive operations in the miningsector as a products and servicesprovider. Its main differentiatingaspect is its global presence, withproduction plants and researchlabs close to major markets,allowing the company to develop,manufacture and supply theindustry's specific chemical needs.Clariant is an internationally active

specialty chemical company,based in Muttenz near Basel. Thegroup owns over 100 companiesworldwide and employed 22 149employees on December 31, 2011.In the financial year 2011, Clariantproduced a turnover of CHF 7.4billion. Clariant is divided intoeleven business units: Additives;Catalysis & Energy; Emulsions,Detergents & Intermediates;Functional Materials; Industrial& Consumer Specialties; LeatherServices; Masterbatches;Oil & Mining Services; PaperSpecialties; Pigments; TextileChemicals.

Coal India Ltd (CIL) recentlydecided to revise the contentiouspenalty clause in the fuel supplyagreements (FSAs) to be signedwith power firms. The state-runcompany also agreed to supply atleast 80 per cent of the required fuelto power firms. It would meet theproduction gap through imports,amounting to 15 per cent this year."We are revising the FSAs draftedin mid-April; the trigger remainssame, at 80 per cent. There arechanges in the penalty side. Wehave proposed some changes andwe will meet again soon to finalisethese," Chairman S Narsing Raosaid after the company's boardmeeting here. He, however, refusedto share the details of CIL'sproposals on the penalty clause.Prices of imported and domesticcoal would be pooled to supplycoal at an average price to powergeneration utilities. "We haveagreed to import. Import ispracticable when there's pooling.The percentage of import variesfrom year to year. This year, itwould be 18-20 million tonne. Ofour supplies, 65 per cent would bedomestic coal and 15 per centwould be imported. There is abroad agreement on pooling, butthe nitty-gritties need to be

CIL decides to revisepenalty clause in FSA

finalised," Rao said.The penalty clause, as well as thedetails of the price pooling wouldbe finalised in the next boardmeeting to be held on August 7.According to a Presidentialdirective to CIL, it has to sign FSAswith power plants commissionedbetween April 2009 and December2011. A committee of secretaries,under the principal secretary of thePrime Minister's Office (PMO), alsowants CIL to sign FSAs for allpower projects scheduled to comeup by March 2015. So far, CIL hassigned 15 FSAs with companiessuch as Reliance Power, Lanco, etc.However, the FSA with NTPC, thecountry's largest power producer,has been stuck, owing to the powerpublic sector undertakingopposing provisions in the draft.Under the terms of the draft FSAs,CIL has to ensure at least 80 percent of coal supply to powerproducers or pay a penalty of 0.01per cent. Power producers hadopposed the low penalty andthe provisions that granted athree-year exemption frompaying penalties.Citing production constraints, CILsaid it was not comfortable with the80 per cent trigger. It had sought a65 per cent threshold.

Car sales in India witnessedmoderate growth during July withmajor manufacturers like MarutiSuzuki, Hyundai and Tata Motorsreporting rise in their monthlynumbers amid a difficult marketconditions.Other car makers, includingGeneral Motors, Ford andHonda Siel, saw decline in theirsales during last month. Thelockout at its Manesar plantnotwithstanding, the country'slargest carmaker Maruti suzukiIndia (MSI) said its domesticsales in last month stood at71,024 units compared to 66,504units in July last year, up 6.80%.On July 21, MSI had announceda lockout at its Manesar plantfollowing violence and arson, inwhich a senior company officialwas killed and 100 otherswere injured.Rival Hyundai Motor India Ltd(HMIL) recorded sales of 27,585units compared to 25,642 units inthe year-ago period, a growthof 7.58%."The overall market demand issuppressed due to generalinflationary trend, high fuelprices and interest rates. Unlessany major triggers get activated,market sentiment is not expectedto improve very much," HMILVice-President (National Sales)Rakesh Srivastava said.Homegrown Tata Motors'

Car sales witness moderate increasepassenger vehicles sales werehigher by 52.63% to 26,240 unitsin July from 17,192 units sold inthe same month last year. Its totalsales during the month went upby 15.26% to 73,491 units from63,761 units in the year-agoperiod.Auto major Mahindra &Mahindra's domestic sales stoodat 42,799 units during the monthagainst 37,323 units in July 2011,up 14.67%. "We are happy to haveachieved a growth...During July2012 in spite of difficult anduncertain market conditionscontinuing... A cut in interestrates would have helped lowerthe cost of manufacturing andproduct, thereby improvingindustry confidence," M&MChief Executive (AutomotiveDivision) Pravin Shah said.Another car maker ToyotaKirloskar Motor (TKM) reporteda 7% increase in its sales at 14,574units during July as against13,592 units in the same monthlast year. "We have registered agrowth this month based on thestrength of Innova and Fortunersales. The Innova and Fortunersales continue to grow with theincrease in production."There has been a drop in salesof the Etios series, as we exported1,488 units to South Africa,"TKM Deputy Managing DirectorMarketing Sandeep Singh said.

Page 5: Minerals and Metal Review August 2012- 1

MMR Landed Prices is a neutral pricing mechanism for the domestic market. Currently, this has beendeveloped for copper products, aluminium, lead and zinc. These prices are derived from LME Rates andtake into account premia on CIF, duties and other costs.

MMR Landed Prices = CIF Value + Duty + Other Costs

Thus, MMR Landed Prices provide a realistic estimate of landed costs of imports and as such, arecomparable with domestic producer prices. Details on the calculation of MMR Landed Prices can befound in the explanatory notes alongside. For the convenience of users, two sets of Prices, includingand excluding excise duty, have been provided.

We urge readers to use MMR Landed Prices as a barometer of domestic prices, just as LMErates are synonymous with international prices.

Explanatory Notes

* MMR Landed Prices are expressed per tonne and are rounded off to the nearest Rupee.*The dutystructure and the premia used is shown in the table below. * Notional landing charges (1% of CIF) havebeen taken into account .*Other costs like wharfage, terminal handling charges and bank charges havebeen taken as Rs.1,950 per tonne.*Sales tax and octroi have not been included.

*Premium on Duty (%)CIF ($/tonne) BCD CVD Cess Spl Total

CVD

Copper Cathode 120 5 12 3 4 22.85Copper CC Rods 210 5 12 3 4 22.85Zinc 160 5 12 3 4 22.85Lead 120 5 12 3 4 22.85Aluminium 200 5 12 3 4 22.85

* All premium indicated are “Spot premiums”BCD=Basic Customs Duty, CVD=Countervailing Duty, Cess = Education Tax

Averages for week ended 03 August 2012(excl. excise in Rs./tonne)

Product Producer MMR LandedPrice* Price

Copper Cathode ....................................................................... 454,032 ....................... 447,065Copper CC Rod ........................................................................ 461,128 ....................... 452,348Zinc SHG.................................................................................. 121,100 ....................... 118,429Lead ........................................................................................ 124,800 ....................... 120,202Aluminium ............................................................................... 137,400 ....................... 121,528

*Copper Products:HCL, Zinc SHG & Lead (ExSmelter):HZL,Aluminium:NALCO

MMR Landed Prices v/s Producer Prices

Non-ferrous Metals: MMR Landed PricesLondon Metal Exchange Prices

NYMEX, COMEX Stocks

(troy ounces)

As on As on18 Jul 2012 01 Aug 2012

Copper * ............................................... 48,296 ............................................ 48,152Gold ............................................... 10,811,054 .................................... 10,808,835Silver ............................................ 143,420,356 .................................. 138,309,747Palladium ............................................... 5,719 .............................................. 5,707Platinum ................................................. 3,926 .............................................. 3,861

* In tonnes (1 Troy Oz = 31.104 gms)

Minor & Precious Metal Prices

LME Settlement Rates ($/tonne)

Aluminium HGCopper Grade A

Note: lb: pound; tr.oz: troy ounce

Unit 02-Aug-2012

Antimony (min. 99.65%) .................................. $/tonne .................................................. 13,000

Arsenic (min. 99%) ........................................... $/lb ............................................................. 0.80

Bismuth (min. 99.99%) ..................................... $/lb ........................................................... 10.60

Cadmium (min. 99.95%) .................................. cent/lb ...................................................... 85.00

Cadmium (min. 99.99%) .................................. cent/lb ...................................................... 90.00

Cobalt (min. 99.8%) ......................................... $/lb ........................................................... 13.50

Chromium (min. 99%) ...................................... $/tonne ............................................. 11,700.00

Gold (London) .................................................. $/tr oz ................................................. 1,597.00

Germanium Dioxide ........................................... $/kg ..................................................... 1,125.00

Indium (min. 99.97%) ...................................... $/kg ........................................................ 510.00

Iridium (min. 99.9%) ......................................... $/kg ..................................................... 1,075.00

Magnesium (min. 99.9%) ................................. $/tonne ............................................... 3,300.00

Manganese (min. 99.7%) .................................. $/tonne ............................................... 3,200.00

Mercury (min. 99.99%) ..................................... $/flask ................................................. 3,300.00

Molybdenum Oxide ........................................... $/lb ........................................................... 12.90

Palladium (min. 99.9%) ..................................... $/tr oz .................................................... 575.50

Platinum (min. 99.9%) ...................................... $/tr oz ................................................. 1,391.00

Rhodium (min. 99.9%) ..................................... $/tr oz ................................................. 1,260.00

Ruthenium (min. 99.9%) .................................. $/tr oz .................................................... 120.00

Selenium (min. 99.5%) ..................................... $/lb ........................................................... 44.00

Silver (London) ................................................. $/tr oz ...................................................... 27.42

Silicon .............................................................. $/tonne ............................................... 2,100.00

Minerals & Metals Review WEEKLY

AUGUST 06, 2012 5

July - Aug. 2012 AverageWeek July

30 31 01 02 03 ended 201203/08/12

LME Prices ($/tonne)

Copper Grade A 7520.00 7581.00 7500.00 7386.50 7327.00 7462.90 7589.39Zinc SHG 1840.50 1849.50 1816.50 1808.00 1807.00 1824.30 1851.18Lead 1909.00 1946.50 1886.50 1868.50 1862.00 1894.50 1876.39Aluminium HG 1851.50 1862.50 1844.00 1821.00 1806.50 1837.10 1874.14

MMR Landed Prices (Incl. excise, in Rs./tonne)

Copper Cathodes 522,981 528,942 322,086 517,387 512,661 520,811 527,153Copper CC Rods 529,119 535,101 528,229 523,568 518,832 526,970 533,285Zinc SHG 138,380 139,464 136,865 137,084 136,846 137,728 138,960Lead 140,324 143,364 138,912 138,492 137,875 139,793 137,959Aluminium Ingots 141,858 143,090 141,472 140,722 139,554 141,339 143,253

MMR Landed Prices (Excl. excise, in Rs./tonne)

Copper Cathodes 448,927 454,040 448,159 444,128 440,073 447,065 452,506Copper CC Rods 454,192 459,324 453,429 449,430 445,367 452,348 457,766Zinc SHG 118,989 119,919 117,689 117,877 117,673 118,429 119,487Lead 120,657 123,265 119,446 119,085 118,556 120,202 118,628Aluminium Ingots 121,972 123,030 121,641 120,999 119,997 121,528 123,170

Exchange Rates (Rs./$)

Bank Rate (Selling) 55.41 55.60 55.46 55.79 55.72 55.60 55.36

July 2012 Aluminium HG Copper (A) Zinc SHG Lead Tin HG Nickel Al. Alloy

/ Aug. Sett 3m Sett 3m Sett 3m Sett 3m Sett 3m Sett 3m Sett 3m

Daily LME Rates ($/tonne)

23 1835.50 1861.00 7387.00 7389.50 1799.00 1807.00 1850.50 1859.00 18455.00 18495.00 15650.00 15650.00 1721.00 1750.00

24 1840.00 1872.00 7396.00 7405.00 1800.00 1805.001840.5001852.5017840.0017730.00 15605.00 15685.00 1745.50 1770.00

25 1847.00 1881.00 7441.00 7441.00 1805.00 1810.00 1849.00 1864.90 17800.00 17770.00 15715.00 15760.00 1755.00 1775.00

26 1865.50 1898.00 7510.50 7512.00 1809.00 1815.50 1870.00 1880.00 17700.00 17700.00 15930.00 15970.00 1752.00 1775.00

27 1860.00 1894.00 7555.00 7560.50 1835.00 1843.00 1907.50 1917.50 18225.00 18225.00 15860.00 15910.00 1765.00 1780.00

30 1851.50 1886.50 7520.00 7530.00 1840.50 1847.00 1909.00 1917.00 18100.00 18100.00 16020.00 16065.00 1746.50 1771.00

31 1862.50 1900.50 7581.00 7586.00 1849.50 1858.50 1946.50 1957.00 18220.00 18250.00 16000.00 16025.00 1745.50 1780.00

01 1844.00 1877.50 7500.00 7505.00 1816.50 1827.50 1886.50 1900.00 17950.00 17955.00 15710.00 15800.00 1759.00 1780.00

02 1821.00 1855.00 7386.50 7395.00 1808.00 1820.50 1868.50 1882.00 17650.00 17675.00 15480.00 15595.00 1745.00 1770.00

03 1806.50 1841.00 7327.00 7328.00 1807.00 1820.00 1862.00 1866.50 17775.00 17775.00 15400.00 15405.00 1721.00 1760.00

LME Averages ($/tonne)

Jul 11 2512.00 2542.55 9619.24 9640.26 2390.55 2419.07 2682.60 2697.95 27312.86 27357.62 23731.19 23770.71 2318.67 2329.81

Jul 12 1874.14 1905.89 7589.39 7591.18 1851.18 1854.86 1876.39 1888.55 18612.50 18616.14 16159.09 16209.32 1765.66 1789.14

LME Month-end Stocks (tonnes)

Aluminium HG Copper Grade A Zinc SHG Lead Tin HG Nickel Al Alloy

Jul 2012 4,886,725 248,825 999,750 326,950 11,765 114,912 92,680

Jul 2011 4,453,250 466,550 889,550 311,450 20,865 102,540 124,280

Jul 2010 4,385,300 413,500 620,350 184,150 15,000 117,498 67,660

Rs. ‘000 $/tonne

Copper Cathodes(per tonne in excl. excise)

Page 6: Minerals and Metal Review August 2012- 1

Non-ferrous Metals : Producer’s Prices(Updated as on 03/08/2012)

Domestic Prices :Ex. Kalamboli

Mandi GobindgarhOpen Market Rates of Finished

PRIMARY MATERIAL & SEMI-FINISHED PRODUCTSMandi Gobindgarh (Open market rates of rerollables)

(Rs./tonne incl. excise duty) :

Rates of MG,there is a 1% disc. on cash purchases.(Rs./tonne incl. excise duty & sales tax)

Minerals & Metals Review WEEKLY

AUGUST 06, 20126

28-07-12 21-07-12Mild MS Rounds (mm)4 45,000 45,00010 41,500 41,50022/25 41,600 41,500Heavy rounds (mm)28 - 53 41,500 41,50063 - 100 42,020 42,020200 45,220 45,220CTD Bars(Untested-mm)8 42,800 42,80010 43,200 43,20016 / 18 44,100 44,10028 / 32 44,300 44,300CTD Bars (ISI - mm)8 48,000 48,00010 47,000 47,00016 / 18 46,500 46,50028 / 32 47,300 47,300MS Squares (mm)4 45,500 45,3008 41,100 41,00010 41,200 41,00012 42,200 42,000MS Angles (mm x mm)3 x 20 43,300 43,4005 x 25 42,400 42,4206 x 32 42,190 42,190MS Flats (mm x mm)3 x 20 42,800 42,6005 x 25 43,400 42,4706 x 32 43,300 42,470MS Patra (Gauge, mm)10,80 44,300 44,30012,102 43,800 43,60014,127 43,400 43,10016,47 46,300 46,10018,57 45,700 45,50020,76 45,200 45,50021,95 45,900 45,70024,125 48,200 48,000Girders (mm x mm)150 x 75 44,050 43,930175 x 90 44,050 43,930175 x 85 44,050 43,930100 x 116 44,600 44,500Shutter Patti (125mm)12 Gauge 45,170 44,94014 Gauge 45,170 44,940ERW PIPE (Gauge,OD)12, 25 40,000 40,00014,31 23,000 23,00016,41 25,000 25,00018,48 50,000 50,00020,58 30,000 30,000Square Pipe (Gauges,MM)12x18x18 42,000 42,00014x25x25 23,000 23,00016x31x31 23,000 23,00018x37x37 27,000 27,00020x48x48 30,000 30,000

FLAT PRODUCTSRs. PMT (inclusive of excise duty)

28-07-12 21-07-12Plate 5-10 mm 44,400 44,400H.R. Coil 41,100 41,100H.R. Sheets (8x12 g) 41,300 41,300C.R. Coils (16 to 20 g) 46,200 46,200C.R. Sheets (Black) 44,200 44,200G.P. Coil 47,100 47,100G.P. Sheets 49,100 49,100G.C. Sheets 50,300 50,300

28-07-12 21-07-12MUMBAI

CTD Bars (Local) (mm) 8 35,500 35,50010 35,550 35,55012 36,050 36,05016/20mm 36,050 36,050MS Angles (mmxmmxmm)25 x 32 x 40 x 3 35,700 35,75045 x 5,50 x 5 36,900 35,95065 x 6, 65 x 6 36,050 36,050M.S. Channels (mmxmm)75 x 40 35,300 35,300100 x 50 35,400 35,400125 x 65 35,600 35,600160 x 75 32,400 32,400M.S.Joists (mmxmm)150 x 75 33,400 33,300160 x 80 33,500 33,400175 x 85 33,500 33,400200 x 100 33,900 33,800

KOLKATACTD Bars (ISI-mm) 8 32,050 32,05010 31,850 31,85012 32,650 32,55016 / 20 33,650 33,55025mm 34,850 34,750CTD Bars (Local) 8 33,150 33,15010 32,850 32,85012 32,950 32,95016 / 20 33,050 32,05025mm 32,150 31,150MS Squares (mm) 8 30,450 30,35010 30,750 30,65012 31,650 31,55016 / 20 32,250 32,150M S Angles (mm x mm)25x 32x40x3 36,950 36,85045x5, 50x5 31,750 31,65060x6, 65x6mm 32,250 32,150M.S. Channels (mm x mm)75 x 40 32,200 32,200100 x 50 32,200 32,200125 x 65 32,200 32,200160x75 33,200 33,200M.S. Joists (mm x mm)150 x 75 28,700 28,700160 x 80 30,100 30,100

DELHICTD Bars (ISI-mm) 8 37,150 37,15010 37,050 37,05012 36,550 36,55016/20 36,650 36,650 25 36,750 36,650CTD Bars (Local-mm) 8 36,250 36,25010 36,150 36,15012 36,650 36,65016/20 36,250 36,25025 36,250 36,250MS Squares (mm) 8 36,250 35,15010 36,250 35,65012 35,850 35,85016/20 35,850 35,35025 35,150 35,150MS Angles (mm x mmxmm)25 x 32 x 40 x 3 37,450 37,35045x5, 50x5 37,850 37,750Channels (mmxmm)75 x 40 35,400 35,400100x 50 35,400 35,400125X65 34,200 35,200Joists (m mx mm)150 x 75 34,800 34,700

(Rs./tonne incl. excise duty)Commodity Market

28-07-12 21-07-12Old & Re-rollable Material

Old Ship Breaking (H) MG 34,300 34,300Ship Breaking (L) MG 34,200 34,000Old Ship Breaking(Tukri)MG 34,000 34,000Old Angle/Channels (H) MG 32,500 32,500

Melting ScrapMelting Scrap Jalna 27,600 27,700Melting Scrap Chennai 27,900 28,000CR Punching (LSLP) Chennai 30,000 30,100CR Punching (LSLP) Jalna 31,300 31,400

ROLLS SCRAPChill Shaft Scrap MG 30,150 30,150Chill Solid Scrap MG 29,150 29,150S.G. Scrap MG 31,650 31,650Adamile Scrap MG 31,750 31,750Solid Steel Scrap MG 27,150 27,150

STEAM COALNaga MG 12,300 12,300Katni MG 11,700 11,700Assam MG 13,000 13,000Ledo MG 15,200 15,200Brown MG 12,000 12,000

SlabDurgapur Slabs MG - -Bokaro Slabs (Heavy) MG - -

Billets & SquaresMild Steel (mm)75x75x80x80x90x 90 MG 39,200 38,900

Commodity Market28-07-12 21-07-12

100 x 100 MS MG 39,300 39,000100x100 ConcastBillets MG 39,900 39,600Induction Billet Mumbai 34,800 34,700Concast Billets Mumbai 35,300 35,200Induction Billets Kolkata 32,750 32,650Concast Billets Kolkata 32,700 32,600

Blooms251mm (HC) MG 35,550 35,250251mm (MS) MG 35,650 35,350150 x 150mm MS MG 39,450 39,150

IngotsRound quality (21x25) MG 38,700 38,100Structural (28x30) MG 38,600 38,000Low Carbon (12x16) MG 38,500 37,900Semi low carbon (16x20) 35,500 34,9005x6 girder quality (28x30) 38,300 37,600Ingots Arc Mumbai 35,500 35,400Ingots Arc Kolkata 33,400 33,300

M.S. IngotsBhiwadi 35,900 36,200Ghaziabad 37,00 37,200Kanpur 35,000 35,300Durgapur 31,200 31,600Mumbai 35,600 35,900

FORGING RATESMS/EN-8 (Rs./PMT) 53,000 53,000EN-31 57,900 57,900EN-19 58,100 58,100EN-24 73,000 73,000

ALUMINIUM

Producer Effective Date CG Ingot EC Ingot CG Wire Rod EC Wire Rod Alloy Wire Rod

National Aluminium Co. Ltd 01-08-2012 137,400� 137,650� 140,850� 142,150� 143,950Hindalco Industries Ltd 26-07-2012 141,400� 142,400� 153,500 153,500� 161,000

Note: 1. Basic Prices are in Rs./tonne, (ex-smelter) excluding excise duty.�(purity 99.0% to 99.5%) �(99.6% to 99.799) �(cond.less than 61%) �(cond.61.5% and above) �(purity 99.5% mini.) �(99.6% mini.) �(cond.61% mini.)

COPPER, ZINC & LEAD Effective DatesPrices in Rs./tonne % chg

MMR Reference : Domestic Prices Daily Rates (Rs./kg : July-Aug 2012) Average Rates (Rs./kg)

Variety Market 30 31 01 02 03 Week ended Jul Jul03/08/2012 2012 2011

AluminiumIngot Mumbai 142.00 142.00 142.00 - 142.00 142.00 139.36 132.52Wire Rod Mumbai 148.00 148.00 148.00 - 148.00 148.00 146.55 140.48Sheet Scrap Delhi 132.00 132.00 132.00 - 132.00 132.00 131.13 127.52Sheet Scrap Mumbai 133.00 114.00 133.00 - 133.00 133.00 132.45 126.48Utensil Scrap Mumbai 114.00 114.00 114.00 - 114.00 114.00 114.36 107.95Utensil Scrap Delhi 121.00 121.00 121.00 - 121.00 121.00 120.14 115.24Wire Scrap Mumbai 140.00 140.00 140.00 - 140.00 140.00 139.00 129.00Wire Scrap Delhi 135.00 135.00 135.00 - 135.00 135.00 134.14 130.62

CopperCathode Mumbai 468.00 468.00 470.00 - 468.00 468.50 470.32 475.76Pat Delhi 455.00 455.00 455.00 - 450.00 453.75 454.77 437.48Armecher Mumbai 468.00 468.00 468.00 - 464.00 467.00 468.73 450.86Wire Bar Mumbai 511.00 511.00 512.00 - 507.00 510.25 511.59 500.29Wire Bar Delhi 510.00 510.00 506.00 - 502.00 507.00 512.77 502.48Super D. Rod Delhi 501.00 501.00 500.00 - 497.00 499.75 500.82 477.48Wire Rod Mumbai 503.00 503.00 504.00 - 501.00 502.75 501.18 487.67Wire Delhi 510.00 510.00 510.00 - 501.00 507.75 511.77 453.29Sheet (Comm) Mumbai 521.00 521.00 521.00 - 522.00 521.25 517.86 458.62Sheet (ETP) Mumbai 545.00 545.00 545.00 - 546.00 545.25 536.82 495.81Utensil Scrap Mumbai 442.00 442.00 442.00 - 439.00 441.25 443.14 424.71Cable Scrap Mumbai 483.00 483.00 484.00 - 479.00 482.25 483.41 472.00Wire Scrap Mumbai 466.00 466.00 467.00 - 465.00 466.00 467.27 408.05Wire Scrap Delhi 460.00 460.00 457.00 - 455.00 458.00 459.23 452.19Turning Scrap Mumbai 431.00 431.00 431.00 - 430.00 430.75 430.14 410.40Mix. Scrap Delhi 439.00 439.00 439.00 - 435.00 438.00 438.72 412.71

BrassSh. Cutting Mumbai 324.00 324.00 325.00 - 324.00 324.25 325.86 316.90Sheet (Comm) Mumbai 472.00 472.00 472.00 - 471.00 471.75 471.23 413.14Sheet (63/37) Mumbai 442.00 442.00 436.00 - 435.00 435.75 442.18 434.19Sheet Scrap Delhi 326.00 326.00 326.00 - 326.00 326.00 326.50 317.19Utensil Scrap Mumbai 316.00 316.00 317.00 - 315.00 316.00 316.95 305.38Honey Mumbai 315.00 315.00 315.00 - 315.00 315.00 313.36 292.81Gun MetalScrap Delhi 329.00 329.00 328.00 - 327.00 328.00 328.77 316.57

LeadIngot Mumbai 122.00 122.00 122.00 - 123.00 122.00 121.09 125.05Soft Delhi 118.00 118.00 118.00 - 117.00 117.75 116.09 108.24Hard (4%) Delhi 124.00 124.00 124.00 - 123.00 123.75 122.14 112.33

ZincIngot Mumbai 134.00 134.00 133.00 - 134.00 133.00 133.86 126.33Ingot Delhi 146.00 146.00 146.00 - 146.00 146.00 148.14 133.38Dross Delhi 112.00 112.00 112.00 - 112.00 112.00 110.95 105.33

TinIngot Mumbai 1255.00 1255.00 1255.00 - 1250.00 1253.75 1284.32 1418.33Ingot Delhi 1258.00 1258.00 1255.00 - 1255.00 1256.50 1288.73 1426.48Solder (40%) Delhi 112.00 112.00 102.00 - 102.00 102.00 112.45 230.19

NickelIngot Mumbai 1058.00 1058.00 1055.00 - 1060.00 1057.75 1078.41 1217.38Ingot (4x4) Delhi 1058.00 1058.00 1055.00 - 1050.00 1055.25 1072.36 1206.81

COPPER

Hindustan Copper Ltd 01-08-2012 01-07-2012 01-06-2012 01-05-2012(excluding excise)Copper Cathodes (Full) 456,305 450,622 466,797 463,203 1.3Continuous Cast Copper Rods (8mm) 463,374 457,760 473,732 469,805 1.2*Sterlite Industries (India) Ltd 01-08-2012 01-07-2012 01-06-2012 01-05-2012(excluding excise)Copper Cathodes (Full) 460,056 456,402 450,733 467,206 0.8CC Copper Wire Rods (8mm) 464,212 460,535 454,932 471,214 0.8

ZINC

Hindustan Zinc Ltd 30-07-2012 26-07-2012 12-07-2012 09-07-2012Prime Western(Ex-Smelter:Debari/Chanderia) 118,600 117,800 119,700 120,500 0.7High Grade 120,100 119,300 121,200 122,000 0.7Special High Grade 121,100 120,300 122,200 123,000 0.7Prime Western(Ex- Bangalore) 121,400 120,600 122,500 123,300 0.7High Grade 122,900 122,100 124,000 124,800 0.7Special High Grade 123,900 123,100 125,000 125,800 0.7

Binani Zinc 03-08-2012 01-08-2012 28-07-2012 25-07-2012(including excise)High Grade (Ex:Godown: Bhiwandi) 130,500 132,500 131,000 130,000 -1.5Special High Grade 131,000 133,000 131,500 130,500 -1.5

HighGrade (Ex:Godown:Daman/Silvassa)130,500 132,500 131,000 130,000 -1.5Special High Grade 131,000 133,000 131,500 130,500 -1.5

LEAD

Hindustan Zinc Ltd 02-08-2012 30-07-2012 26-07-2012 23-07-2012Purity 99.99% 124,800 124,100 122,000 124,100 0.6(Ex-Smelter:Chanderiya)Purity 99.99%(Ex- Bangalore) 127,800 127,100 125,000 127,100 0.6

CADMIUM (Rs./kg)

09-07-2012 05-07-2012 31-05-2012 21-05-2012Hindustan Zinc Ltd (99.95%) 175 181 176 172 -3.3

Note: 1. % chg. is of the latest price with respect to the immediately preceding price. 2. The prices of HZLare excluding of excise duty, Sales Tax/ VAT and other statutory levies as applicable.

*Sterlite Industries: Copper prices are provisional for the month of August 2012

Basic prices excluding CST / VAT.ProductsADC 12 ............................................................................................................................ 137.00 ..................... 137.12 ..................... 136.15AlSi 9 Cu3 ........................................................................................................................ 138.10 ..................... 137.65 ..................... 137.10LM6 .................................................................................................................................. 138.15 ..................... 138.71 ..................... 138.15AlSi 12 Cu1 ...................................................................................................................... 140.40 140.02 139.05

Domestic Prices: Aluminium Alloys Average Rates (Rs./kg)

Week ended

03/08/2012 July’12 June’12

Page 7: Minerals and Metal Review August 2012- 1

PRIMARY MATERIAL & SEMI-FINISHED PRODUCTSMandi Gobindgarh (Open market rates of rerollables)

Minerals & Metals Review WEEKLY

AUGUST 06, 2012

Chhattisgarh Market : (Basic Price) as on 03/08/2012

Coal “F” grade 24,000Coke 20,000Iron Ore ex mines Orissa 64 grade,size 10-30 mm 7,400Lime Stone CFN eastern port, steel/cement grade $ 30Manganse Ore PMT grade 44 17,800International Market (Import Prices)

Coal grade 6300-6100 $88Coke CNF Indian Ports $340Iron Ore FOB, grade 63.5 rejection below 62.5 $ 122Lime Stone CFN eastern port, steel/cement grade $ 27

Rate Rs. Per Tonne Inclusive of Excise Duty (July-August 2012)

Weekly Average03/08/12 ----- 27/07/12

Melting ScrapRolling Mill end (Fresh) ------------------------------------------------------------------------------------ 31,200 -------------- 31,800Good Godown ----------------------------------------------------------------------------------------------- 27,400 -------------- 27,800Godwn Scrap ------------------------------------------------------------------------------------------------ 25,600 -------------- 25,800Turning ------------------------------------------------------------------------------------------------------- 24,800 -------------- 24,900Tin Tapper --------------------------------------------------------------------------------------------------- 26,000 -------------- 26,400Sponge Iron ------------------------------------------------------------------------------------------------- 28,400 -------------- 28,500Melting Scrap (Mumbai) (old) ----------------------------------------------------------------------------- 26,200 -------------- 26,100Melting Scrap (Bhavnagar) (old) -------------------------------------------------------------------------- 26,800 -------------- 26,900Melting Scrap (Kolkata) (old) ------------------------------------------------------------------------------ 30,100 -------------- 30,300Melting Scrap (Delhi) (old) -------------------------------------------------------------------------------- 29,000 -------------- 29,000Melting Scrap (CR Punching) LSLP (Mumbai) ----------------------------------------------------------- 31,100 -------------- 31,000

Pig IronFoundry Grade ----------------------------------------------------------------------------------------------- 33,900 -------------- 34,100Steel Grade -------------------------------------------------------------------------------------------------- 29,600 -------------- 29,500C.I Turning --------------------------------------------------------------------------------------------------- 26,600 -------------- 26,300Degi Scrap -------------------------------------------------------------------------------------------------- 29,700 -------------- 29,700Deg Casting ------------------------------------------------------------------------------------------------- 37,700 -------------- 37,700Ingot Moulds (New) ----------------------------------------------------------------------------------------- 37,700 -------------- 37,800

Ingot Moulds (Old) ------------------------------------------------------------------------------------------ 30,000 -------------- 30,000

7

Item Plant Quality Ex-Plant

(Base Tested Grade) prevailing base price

(Rs. Per tonne)

TMT Bar 8mm BSP IS 1786 FE / TMT 415 41,000/-

Angle 65x65x6mm BSP IS 2062 E250A SK 39,500/-

Channel 200x75mm DSP IS 2062 E250A SK 39,500/-

HSM Plates 5-10mm RSP/BSL IS 2062 E250A SK/K 39,500/-

Chequered Plates 4-10mm RSP IS 3502 (IS 2062 Base) 40,500/-

PM Plates abv 10-20mm RSP/BSP IS 2062 E250A SK/K 41,000/-

HR Sheets >2.5-3.15mm BSL IS 1079 Gr. O 39,100/-

HR Coil 2.5-3.15mm BSL IS 10748/95 Gr.II K 38,500/-

CR Coil 1-2mm BSL IS 513 Gr. O K 44,500/-

GC Sheets 0.63mm BSL IS 277 Cl.VIII 47,900/-

SAIL ex-Plant Base PriceJune 2012

VIZAG STEEL : July 2012

Products Description Grade Rs. Per Tonne

Products Vizag ....... Ludhiana ....... Chennai ....... Mumbai .... KolkataBillet 125x125 mm IS 2830 40,250 ........... 43,550 ......... 41,600 ......... 42,750 ...... 42,100Channel 200x75 IS2062 Gr.A 47,900 ........... 48,950 ......... 48,700 ......... 48,150 ...... 48,700Rebar 8mm Is 1786 Fe 500D 50,050 ........... 51,400 ......... 50,950 ......... 50,050 ...... 50,850Round 20.64 mm 55Si7 47,950 ........... 48,100 ......... 48,050 ......... 48,100 ...... 48,050Round 40 MM SAE1018 44,350 ........... 45,600 ......... 45,050 ......... 45,200 ...... 45,150Wire Rod 7 mm PC115 47,500 ........... 49,100 ......... 48,200 ......... 48,000 ...... 48,300Wire Rod 8 mm EQ 48.450 ........... 50,050 ......... 49,150 ......... 48,900 ...... 49,250

Pig Iron ...................... LSB 28,090 .................... - .................. - .................. - ............... -

The above prices are Branch Level Prices incl. ED/cess and excl. VAT/CST. etc.

JSW Ltd : Hot Rolled Sheets & Plates : Ex-Plant - Basic Prices (Rs./Kg)

Mar. 2012 Feb. 2012

HR Sheets 1.6 mm (IS 5986 Gr Fe 410) 37.25 37.75

HR Sheets 2.0 mm (IS 5986 Gr Fe 410) ............................................... 36.80 ..................... 36.80

HR Sheets 2.5 / 2.0 mm (IS 5986 Gr Fe 410) ....................................... 36.50 ..................... 36.30

HR Sheets 3.0 / 4.0 mm (IS 5986 Gr Fe 410) ....................................... 36.00 ..................... 36.00

HR Plates 5 - 10 mm (IS 2062 Gr A) .................................................... 36.00 ..................... 36.00

HR Plates 12 - 20 mm (IS 2062 Gr A) .................................................. 36.50 ..................... 36.50

HR Plates 20 - 25 mm (IS 2062 Gr A) .................................................. 37.55 ..................... 37.50

Chequered - HR Sheets & Plates 4.0 (ls 2062 Gr A) ............................. 38.00 ..................... 38.00

Chequered - HR Sheets & Plates (ls 2062 Gr B) .................................... 37.00 ..................... 37.00

Note : 1. Above prices are ex-our Vijayanagar works (karnataka) 2. Central Excise Duty including

Education Cess,Central Sales Tax. Value Added Tax, and other staturoy Ievies duties and taxes and

Freight ex-our Vijayanagar works shall be extra. 3. Above prices are based on 100% advance payment

basis.

GCS - BSL GCS - RSP

Branch 0.5 mm 0.63 mm 0.5 mm 0.63 mm

CALCUTTA / DURGAPUR 56,600 54,800 56,100 54,300BHUBANESWAR 58,200 56,500 56,700 54,900ROURKELA 57,100 55,300 55,500 53,800PATNA / HAJIPUR 57,600 55,800 57,500 55,800BOKARO / RANCHI 56,500 54,700 56,600 54,800GUWAHATI 58,400 56,600 58,100 56,300DELHI 55,400 53,700 56,500 54,800FARIDABAD 55,900 54,200 57,100 55,300GHAZIABAD 55,900 54,200 57,100 55,300JALLANDHAR 56,800 55,000 57,600 55,900LUDHIANA 56,800 55,000 57,600 55,900MANDI 56,800 55,000 57,600 55,900CHANDIGARH 56,100 54,300 57,000 55,300SRINAGAR 59,900 58,100 60,800 59,100JAMMU 57,700 55,900 59,100 57,400

KALAMBOLI/PUNE (NON OCTROI) 60,000 58,200 58,900 57,100KALAMBOLI/PUNE (OCTROI) 61,700 59,900 60,600 58,800NAGPUR(NON OCTOROI) 58,200 56,400 56,800 55,000NAGPUR(OCTOROI 1%) 58,700 57,000 57,300 55,600NAGPUR(OCTOROI 2%) 59,300 57,500 57,900 56,100

GCS - BSL GCS - RSPBranch 0.5 mm 0.63 mm 0.5 mm 0.63 mm

NAGPUR(OCTOROI3%) 59,900 58,000 58,400 56,600GOA 61,000 59,200 59,600 57,800AHMEDABAD/BARODA 60,000 58,200 58,900 57,100BHILAI 58,300 56,500 56,900 55,100JABALPUR / BHOPAL 59,800 58,000 58,600 56,800GWALIOR / INDORE 60,200 58,400 59,000 57,200JAIPUR 57,300 55,600 57,100 55,300SILVASA 59,300 57,500 57,900 56,100CHENNAI 58,600 56,800 57,400 55,600TRICHY/COIMBATORE 59,600 57,800 58,300 56,500COCHIN 60,000 58,300 58,700 57,000THIRUVANANTHPURAM 60,700 58,900 59,400 57,600HYDERABAD 58,600 56,800 56,900 55,200VIZAG 57,600 55,900 55,600 53,800VIJAYWADA 57,900 56,100 56,500 54,700PORT BLAIR 62,600 60,900 61,400 59,700BANGALORE 59,000 57,200 57,900 56,100

SAIL : GC Sheet - IS 277 CL VIII : Including Taxes : MRRP FOR JULY’12 (Rs/MT)

Branch TMT 8mm TMT 10 mm TMT 12 mm TMT 16 mmCALCUTTA / DURGAPUR 53,700 52,600 52,200 51,600SILIGURI 54,700 53,700 53,100 52,600BHUBANESWAR 54,200 53,100 52,600 52,600ROURKELA 54,200 53,100 52,600 52,600PATNA / HAJIPUR 53,700 52,600 52,100 52,100BOKARO / RANCHI 53,700 52,600 52,100 52,100GUWAHATI 54,700 53,700 53,100 53,100

DELHI 53,700 52,600 52,100 52,100FARIDABAD 53,700 52,600 52,100 52,100GHAZIABAD 53,100 52,100 51,600 51,600JALLANDHAR 53,100 52,100 51,600 51,600LUDHIANA 53,300 52,300 51,800 51,800MANDI 53,300 52,300 51,800 51,800CHANDIGARH 53,100 52,100 51,600 51,600SRINAGAR 56,200 55,200 54,700 54,500JAMMU 54,200 53,200 52,700 52,700KALAMBOLI/PUNE (NON OCTROI) 53,700 52,600 52,100 52,100KALAMBOLI/PUNE (OCTROI) 55,200 54,100 53,600 53,600

Branch TMT 8mm TMT 10 mm TMT 12 mm TMT 16 mmNAGPUR(NON OCTOROI) 55,200 54,100 53,600 53,600NAGPUR(OCTOROI 1%) 54,200 53,100 52,600 52,600NAGPUR(OCTOROI 2%) 54,700 53,600 53,100 53,100NAGPUR(OCTOROI3%) 55,200 54,100 53,600 53,600GOA 55,200 54,200 53,700 53,700AHMEDABAD/BARODA 53,700 52,600 52,100 52,100BHILAI/RAIPUR 53,700 52,700 52,100 52,900JABALPUR 56,300 55,200 54,600 54,600GWALIOR / INDORE 56,300 55,200 54,600 54,600JAIPUR/BHARATPUR 53,700 52,600 52,100 52,100SILVASA 55,800 54,700 54,100 54,100

CHENNAI 53,700 52,600 52,100 52,100TRICHY/COIMBATORE 53,700 52,600 52,100 52,100COCHIN 54,700 53,700 53,100 53,100PONDI 1(MAHE) THIVENDRAM 54,700 53,700 53,100 53,100SECUNDRABAD 53,700 52,600 52,100 52,100PORT BLAIR 58,300 57,300 56,700 57,200

BANGALORE 43,700 52,600 52,100 52,100

SAIL : TMT - EQR 500 / IS 1786 Fe 500D : Including Taxes : MRRP FOR JULY ’12 (Rs/MT)

Mumbai Market : Steel Flat Products: Basic Prices (Rs./Kg) : 03-08-2012

Carbon SteelSA 516 GR. 60 : 8 to 32mm 48SA 516 GR. 60 : 6mm 52SA 516 GR. 70 : 36 to 53 mm 54SA 516 GR. 60 : 70mm 46SA 516 Gr. 70 : 20 mm 58

Alloy Steel Chrome MolySA 387 GR 11 CL2 : 10,13,30,32mm 107SA 302 GR B : 100 mm 123SA 203 GR D : 18 mm 118

Stainless Steel SheetsSA 240 Type 304 : 5,6mm 175SA 240 Type 304 : 10,14mm 175SA 240 Type 304 : 22,28,35mm 168SA 240 Type 304L : 6mm 192SA 240 Type 304L : 8,10,12,14mm 185SA 240 Type 304L 15 to 53mm 184SA 240 Type 316 : 6 to 12mm 265SA 240 Type 316 : 28, 32mm 272

Stainless Steel SheetsSA 240 Type 316L : 10,14mm 296SA 240 Type 316L : 22,28,36mm 294SA 240 Type 321 : 6 to 12mm 246SA 240 Type 321 : 16 to 20mm 238SA SA 240 - 304 H 216SA 240 - 321 H 218SA 240 - 347 H 220SA 240 - 317 L 506SA 240 Type 321 : above 20mm 288Titanium : Grade 2 2,500Titanium : Grade 5 4,500Dulex : 500Inconel 600 : 592Inconel 625 : 750Incoloy 904 : 564Monel 400 : 700Haste Alloy : B 7,500Haste Alloy G : 21,500Haste Alloy : C 8,000

Page 8: Minerals and Metal Review August 2012- 1

International Prices

Steel Prices of Middle East (UAE)

Jul 2012

Billets - Blooms .............................................................................................................. 610-620

Reinforcing Bars ............................................................................................................. 620-630

Angles ........................................................................................................................... 620-630

Beams (JIS sizes) .......................................................................................................... 640-680

Wire Rods ...................................................................................................................... 630-640

HR Plates ....................................................................................................................... 665-675

HR Coils >=2.mm........................................................................................................ 615-635

CR Coil, 1mm ................................................................................................................ 720-730

HD Galvd. Coils, HR Base, 2mm..................................................................................... 790-830

HD Galvd. Coils, CR Base, 1mm..................................................................................... 820-840

Prepainted Galvd. Coils 0.35mm .................................................................................... 940-970

Tinplate 0.32mm.......................................................................................................... 970-1050

SS HR Coils 304 base ................................................................................................ 2700-2800

SS HR Coils 316L base .............................................................................................. 4100-4200

Source: MEsteel.com

($/tonne)

Ferro Alloys & Minor Metals - Mumbai Market (Basic Price in Kgs) as on 03/08/2012

Ferro Molybdenum ................................ 1120Ferro Silicon-Ex-plant (Bhutan) ................. 72Molybdenum Oxide ............................... 1020Ferro Boron ............................................. 260Ferro Manganese HC ................................. 62Ferro Manganese MC ................................ 95Pure Manganese ELC 99.9% ................... 172Ferro Phosphorous ................................... 32Ferro Silicon Zirconium............................ 170Ferro Titanium 30/35 % ........................... 140Ferro Titanium 70/75 % ........................... 425

Ferro Chromium Low Carbon(Cr .1%) ..... 178Ferro Chromium High Carbon .................... 80Ferro Tungsten ...................................... 2500Pure Tungsten ....................................... 2600Ferro Vanadium ....................................... 720Chromium 99.9%.................................... 770Pure Silicon ............................................. 125Cobalt Chip ........................................... 1750Magnesium ............................................. 196Manganese ............................................. 172Bismuth ................................................ 1475

Raipur Local Market Prices: Basic Rates (Rs./kgs) 03/08/2012

Variety

Ferro Silicon 70/75 ................................................................................................................ 74.00Ferro Manganese 70/75 ........................................................................................................ 54.00High Ferro Manganese (78% Mn) .......................................................................................... 58.00Electrolytic Manganese Dioxide (MnO2 : 90% min) : ........................................................... 162.00Import Low Sulp. :Cal. Petro. Coke 93/80 % Sulp. 1% .......................................................... 30.00High Carbon Ferrochome ...................................................................................................... 77.00Ferro Titanium 30/35 % ....................................................................................................... 150.00

Domestic Steel Prices

SS Sheets/Plates/Coils/Pipes/Rods/CircleMumbai Local Market :Inclusive of Excise duty / Excl. VAT.- (Rs./Kgs) as on 03-08-2012

AISI 304 AISI 316S.S.SHEET PLATE & COILS1.2mm , 1.5mm ................................................................................... 195 ......................... 2652MM ..................................................................................................... 190 ......................... 2602.5, 3m ................................................................................................ 190 ......................... 2604mm, .................................................................................................... 184 ......................... 2504.5mm .................................................................................................. 180 ......................... 2455mm, to,8mm ...................................................................................... 180 ......................... 2500.5 to 0.6mm ....................................................................................... 195 ......................... 2600.7 to 1mm .......................................................................................... 200 ......................... 270PVC 0.8,1,1.2mm ................................................................................. 225 .............................. -PVC 1.5,2,3mm .................................................................................... 210 .............................. -Design Sheets. (DECORATIVE) .............................................................. 315 .............................. -S.S.PIPE (ERW)1" NB to 4" NB ...................................................................................... 190 ......................... 265SQR. Pipe 1" to 3" ................................................................................ 196 ......................... 270S.S.FLATS1" to 4" 5 mm to 6mm Thick ................................................................ 165 ......................... 1951" to 4" 8mm to 20mm Thick ............................................................... 160 ......................... 190S.S.RODS10 mm to 20mm .................................................................................. 185 ......................... 25525mm to 80 mm .................................................................................. 180 ......................... 250S.S.CIRCLE3mm to 20 mm (UP TO 8") .................................................................. 185 ......................... 2453 mm to 20 mm (8" TO 20") ................................................................ 185 ......................... 260

Wire Rods (INCL CST & EXCISE) Rs. Per tonne.Wire Rod 5.5 mm (Chhattisgarh) ...................................................................................... 42,000

STAINLESS STEEL SCRAP : Mumbai Market (03-08-2012)

(Basic Prices)Rs. Per Kgs

Products Description Rs.Per Kgs

Stainlesss Steel - 304 ............................................................................................................ 112

Stainlesss Steel - 304 L ............................................................................................................ 120

Stainlesss Steel - 316 ............................................................................................................... 180

Stainlesss Steel - 316 L ............................................................................................................ 181

Stainlesss Steel - 410 (32% chromium) ..................................................................................... 42

Stainlesss Steel - 430 (17% chromium) ..................................................................................... 60

Stainlesss Steel - 2205 ............................................................................................................. 194

Stainlesss Steel - 2507 ............................................................................................................. 243

($/tonne)LME Steel & Minor Metal Prices

Billet Cobalt Molybdneum

Date Sett. 3m Sett. 3m Sett. 3m

27-Jul-12 .................... 385.00 .... 405.00 .... 31000.00 .... 31000.00 .. 26000.00 .... 26000.0030-Jul-12 .................... 385.00 .... 405.00 .... 30750.00 .... 30450.00 .. 26000.00 .... 26000.0031-Jul-12 .................... 385.00 .... 405.00 .... 31250.00 .... 30000.00 .. 26000.00 .... 26000.0001-Aug-12 .................. 385.00 .... 405.00 .... 31000.00 .... 30500.00 .. 26000.00 .... 26000.0002-Aug-12 .................. 361.00 .... 390.00 .... 31000.00 .... 30500.00 .. 26000.00 .... 26000.00

Average (Jul ’12) ....... 392.25 .... 412.27 .... 29131.82 .... 29079.55 .. 27890.91 .... 27890.91

Stocks (Month-end in tonnes) ... 57,070 .................... 356 ............................... 264

Minerals & Metals Review WEEKLY

AUGUST 06, 20128

Iron & Steel: Delhi Local Market Price - July-Aug. 2012(per tonne : Inclusive of Excise duty)

30 31 01 02 03Amba Saria (ISO-9002)10 .......................................................... 47,000 ...... 47,000 ..... 47,000 ...... 47,000 ...... 47,00012 .......................................................... 46,000 ...... 46,000 ..... 46,000 ...... 46,000 ...... 46,00016-25 .................................................... 46,500 ...... 46,500 ..... 46,500 ...... 46,500 ...... 46,500Amba Shakti (TMT)8 MM ..................................................... 48,300 ...... 48,300 ..... 48,300 ...... 48,300 ...... 48,300Bilets5" .......................................................... 43,000 ...... 43,000 ..... 43,500 ...... 43,000 ...... 44,000,Capital Angle (ISI)35x5 65x6 ............................................. 42,800 ...... 43,800 ..... 43,500 ...... 43,500 ...... 46,50040x5 40x6 ............................................. 42,600 ...... 43,600 ..... 43,600 ...... 43,300 ...... 46,30050x5 50x6 ............................................. 41,600 ...... 42,600 ..... 42,500 ...... 42,300 ...... 45,300Garder Joist125x70 .................................................. 42,300 ...... 43,300 ..... 43,300 ...... 43,000 ...... 46,000200x100 ................................................ 42,300 ...... 43,300 ..... 43,300 ...... 43,800 ...... 46,000IngotBhiwari ............................................................ - ...... 35,600 ..... 35,600 ................ - ...... 35,600Gaziabad ......................................................... - ............... - ............... - ................ - ................ -Gobindgarh ..................................................... - ...... 35,900 ..... 35,900 ................ - ...... 35,900Muzaffamagar ................................................. - ...... 35,800 ..... 35,800 ................ - ...... 35,800Kamdhenu (ISO-9002)10 .......................................................... 48,500 ...... 48,800 ..... 48,800 ...... 48,800 ...... 54,30012 .......................................................... 47,300 ...... 47,700 ..... 47,700 ...... 47,700 ...... 53,1008mm ...................................................... 50,900 ...... 50,600 ..... 50,600 ...... 50,600 ...... 56,100PlatePrime (Scrap) ......................................... 42,500 ...... 42,500 ..... 42,500 ...... 42,500 ...... 43,000Mill Heavy .............................................. 29,000 ...... 29,500 ..... 29,500 ...... 29,500 ...... 30,500Sheet (HR Balck)Bokaro (12) ........................................... 42,500 ...... 42,500 ..... 42,500 ...... 42,500 ...... 43,000Bokaro (14) ........................................... 42,500 ...... 42,500 ..... 42,500 ...... 42,500 ...... 43,000Bokaro (8-10 gauge) ............................. 42,500 ...... 42,500 ..... 42,500 ...... 42,500 ...... 43,000

International Scrap Metals FOB Price : $ / Tonne (July-Aug. 2012)

Product Name ................................ 30 ................ 31 ................. 01 ............... 02 ................ 03

U.S. clean 6063 .......................... 1905 ............ 1905 ............. 1905 ........... 1890 ............ 1875

Acsr/Ins(68%) ............................ 1295 ............ 1295 ............. 1295 ........... 1285 ............ 1275

Shredded Aluminum ................... 1710 ............ 1705 ............. 1705 ........... 1690 ............ 1675

356 Auto Wheels ........................ 1970 ............ 1970 ............. 1970 ........... 1955 ............ 1940

Aluminum Radiator ..................... 1500 ............ 1495 ............. 1495 ........... 1480 ............ 1465

#1 Bare Bright ............................ 7350 ............ 7270 ............. 7270 ........... 7180 ............ 7050

#2 Birch/Cliff .............................. 4925 ............ 6845 ............. 6845 ........... 6755 ............ 6625

Yellow BrassHoney ...................... 4820 ............ 4810 ............. 4890 ........... 4750 ............ 4680

Ocean Auto Radiator ................... 4780 ............ 4770 ............. 4750 ........... 4710 ............ 4640

304 Sabot ................................... 1500 ............ 1500 ............. 1500 ........... 1500 ............ 1490

Chalco’key products Daily Sales Price CNY / Ton (July-Aug. 2012)

Product Name ................................ 30 ................ 31 ................. 01 ............... 02 ................ 03

Aluminium Ingot (99.70) ......... 15,700 ......... 15,600 .......... 15,600 ........ 15,700 ......... 15,700

Alumina ...................................... 2900 ............ 2900 ............. 2900 ........... 2900 ............ 2900

Aluminium Hydroxide .................. 1800 ............ 1800 ............. 1800 ........... 1800 ............ 1800

Shanghai Changjiang Market Spot Price CNY / Ton (July-Aug. 2012)

Product Name ................................ 30 ................ 31 ................. 01 ............... 02 ................ 03

Copper ..................................... 55,580 ......... 55,380 .......... 55,000 ........ 55,045 ......... 54,495Aluminum ................................ 15,460 ......... 15,480 .......... 15,430 ........ 15,390 ......... 15,340Lead ........................................ 15,075 ......... 15,125 .......... 15,075 ........ 15,075 ......... 14,9750 # Zinc .................................. 15,075 ......... 15,075 .......... 15,025 ........ 14,975 ......... 14,9751 # Zinc .................................. 14,675 ......... 14,675 .......... 14,625 ........ 14,975 ......... 14,575Tin ........................................ 143,500 ....... 143,500 ........ 144,000 ...... 143,500 ....... 143,400Nickel .................................... 116,300 ....... 116,800 ........ 115,500 ...... 114,500 ....... 113,400

Page 9: Minerals and Metal Review August 2012- 1

Minerals & Metals Review WEEKLY

AUGUST 06, 2012 9

International Prices

Export Prices: China Ferro Alloys dated: 03rd August 2012

Unit Chinese European Japanese USAMain China Port European Main Port Japan Main Port

Ferro Chrome (H/C Cr>60% C<6-8% Si <3.5% P<0.05% ...... ¢/lb ...................................... 110.00-112.00 .................. 115.00-117.00 ................... 111.00-113.00 .......................... 116.00-118.00Ferro Chrome (M/C Cr>60% C<0.5% Si<1.5% P<0.03%) ..... ¢/lb ...................................... 202.00-206.00 .................. 207.00-211.00 ................... 203.00-207.00 .......................... 208.00-210.00Ferro Chrome (L/C Cr>60% C<0.01% Si<1.5%P<0.03%) ..... ¢/lb ...................................... 206.00-210.00 .................. 211.00-214.00 ................... 207.00-211.00 .......................... 212.00-216.00Ferro Chrome (L/C Cr>60% C<0.03% P<0.03%) ................... ¢/lb ...................................... 215.00-217.00 .................. 220.00-222.00 ................... 216.00-218.00 .......................... 221.00-223.00Ferro Manganese (H/C Mn>73% C<8%P<0.3S<0.04%) ........ $/mt ................................ 1560.00-1600.00 .............. 1630.00-1670.00 ............... 1575.00-1615.00 ...................... 1660.00-1700.00Ferro Manganese (M/C Mn>78%C<1.5%Si<1.5%) ................. $/mt ................................ 2100.00-2150.00 .............. 2170.00-2220.00 ............... 2115.00-2165.00 ...................... 2200.00-2250.00Ferrro Manganese (M/C Mn>78%C<2.0%) .............................. $/mt ................................ 2000.00-2050.00 .............. 2075.00-2120.00 ............... 2015.00-2065.00 ...................... 2100.00-2150.00Ferro Manganese (L/C Mn>80%C<0.5%Si<1.0%P<0.2%) ..... $/mt ................................ 2250.00-2300.00 .............. 2325.00-2370.00 ............... 2365.00-2315.00 ...................... 2350.00-2400.00Silicon Manganese (Mn>65%,Si>17%P<0.3%) ...................... $/mt ................................ 1400.00-1430.00 .............. 1475.00-1500.00 ............... 1415.00-1445.00 ................................................. -Silicon Manganese (Mn=60-70%Si=14-17%,P<0.3%) ........... $/mt ................................ 1280.00-1320.00 .............. 1350.00-1390.00 ............... 1295.00-1335.00 ................................................. -Manganese Electrolytic Flakes (Mn>99.7%) ............................. $/mt ................................ 2600.00-2650.00 .............. 2670.00-2720.00 ............... 2615.00-2665.00 ...................... 2700.00-2750.00Manganese Metal Lumps (95% min) ......................................... $/mt ................................ 2700.00-2750.00 .............. 2770.00-2820.00 ............... 2715.00-2765.00 ...................... 2800.00-2850.00Ferro Silcion - (Si>75% AL<1.5% C<0.2%) ............................ $/mt ................................ 1350.00-1380.00 .............. 1420.00-1450.00 ............... 1365.00-1395.00 ................................................. -Silicon Metals >98.5% 5-5-3 Grade .......................................... $/mt ................................ 1950.00-2000.00 .............. 2020.00-2070.00 ............... 1965.00-2015.00 ...................... 2050.00-2100.00Silicon Metals 4-4-1 Grade ........................................................ $/mt ................................ 2100.00-2150.00 .............. 2170.00-2220.00 ............... 2115.00-2165.00 ...................... 2200.00-2250.00Ferro Molybdenum Mo>60%.................................................... $/kg ......................................... 35.00-35.50 ......................................... - ......................................... - ................................................. -Molybdenum Oxide (Mo>57%) ................................................ $/lb .......................................... 12.00-12.00 ...................... 12.05-12.05 ....................... 12.00-12.02 .............................. 12.05-12.10Ferro Tungsten (W=70-80%) .................................................... $/kg ......................................... 52.00-52.10 ...................... 52.10-52.20 ....................... 52.05-52.15 ................................................. -Ferro Vanadium (V=78%-82%) ................................................. $/kg ......................................... 24.00-24.20 ......................................... - ......................................... - ................................................. -Vadanium pentoxide V2O5 (flakes) ............................................ $/lb .............................................. 5.60-5.70 .......................... 5.65-5.75 ........................... 5.65-5.70 ................................................. -

Average Bank Rates (Rs/$)

Month Buying Selling

Mar 2012 50.09 50.53

Apr 2012 53.11 51.96

May 2012 54.52 54.47

Jun 2012 56.10 56.01

Jul 2012 55.45 55.36

Exchange Rates

Currency Import Export

Australian Dollar 59.05 57.60Baharani Dinar 151.10 143.05Canadian Dollar 55.95 54.75Danish Kroner 9.30 9.05Hongkong Dollar 7.20 7.10Kenyan Shilling 67.65 63.80Kuwaiti Dinar 202.30 191.05New Zealand Dollar 45.50 70.00Japanese Yen (100) 71.80 70.00

EURO 68.80 67.25Norwegian Kroner 9.30 9.05Pound Sterling 88.05 86.25Singapore Dollar 44.95 44.00S. African Rand 7.00 6.60S. Arabian Riyal 15.20 14.40Swedish Kroner 8.30 8.05Swiss Franc 57.40 56.00UAE Dirham 15.50 14.70US Dollar 55.85 55.00

Currency Import Export

Indian Rupee v/s US $

Note: This table only gives exchange rates as announced on the first of every month. Interim revisions, if any, are not reflected in this table.

Currency Jul 2012 Jun 2012 May 2012 Apr 2012 Mar 2012 Jul 2012 Jun 2012 May 2012 Apr 2012 Mar 2012

Australian Dollar 57.40 55.55 54.95 54.30 53.25 56.05 54.15 53.70 52.05 52.00

Canadian Dollar 55.05 54.30 54.05 52.15 49.80 53.70 53.00 52.65 50.90 48.50

Hongkong Dollar 7.15 7.15 7.20 6.65 6.40 7.05 7.05 7.10 6.50 6.25

Japanese Yen (100) 70.55 70.35 70.35 62.45 61.85 68.80 68.60 67.90 60.80 60.25

Danish Kroner 9.20 9.45 9.40 9.30 8.95 8.95 9.20 9.20 9.05 8.70

Pound Sterling 87.10 86.20 86.00 82.50 78.05 85.25 84.40 84.15 80.70 76.30

Swiss Franc 57.05 58.30 58.50 57.20 55.05 55.65 57.00 57.10 55.80 53.70

U S Dollar 55.50 55.55 55.95 51.50 49.40 54.65 54.70 55.15 50.65 48.60

Singapore Dollar 44.20 43.65 42.70 41.00 39.55 43.20 42.75 41.80 40.15 38.65

Euro 68.40 69.95 70.35 69.00 66.35 66.80 68.40 68.70 67.40 64.75

Customs Notified Exchange Rates (w.e.f. 01-08-2012)

Trends in Customs Notified Exchange Rates (Rs./unit currency)

IMPORTS EXPORTS

Indicative Bank Exchange Rates (Rs./unit currency): July-Aug. 2012

Ferro Alloys

Currency 30 31 01 02 03 30 31 01 02 03

Australian Dollar 58.24 58.60 58.60 58.72 58.72 58.16 58.51 58.51 58.64 58.64

Canadian Dollar 55.30 55.63 55.48 55.71 55.71 55.18 55.52 55.38 55.61 55.62

Hongkong Dollar 7.16 7.18 7.16 7.21 7.21 7.14 7.17 7.15 7.19 7.19

New Zealand Dollar 44.88 45.09 45.09 45.36 45.36 44.87 45.04 45.04 45.30 45.30

Danish Kroner 9.15 9.19 9.19 9.22 9.22 9.14 9.18 9.18 9.20 9.20

Pound Sterling 87.10 87.33 86.82 86.86 87.01 86.98 87.20 86.69 86.75 86.88

Swiss France 56.68 56.92 56.92 57.07 57.07 56.58 56.82 56.82 56.95 56.95

U S Dollar 55.50 55.69 55.55 55.88 55.80 55.41 55.60 55.46 55.79 55.72

Singapore Dollar 44.53 44.80 44.62 44.84 44.85 44.42 44.70 44.54 44.74 44.76

Euro 68.07 68.39 68.35 68.56 68.52 67.97 68.28 68.27 68.47 68.43

IMPORTS - Buying Rates EXPORTS - Selling Rates

Ferro Chrome (Cr=49-51%) ......................................... cent/lb ............................ 100.00-105.00Ferro Chrome (Cr=60-65%) ......................................... cent/lb ............................ 105.00-110.00Ferro Chrome (C=0.05%) ............................................. cent/lb ............................ 235.00-240.00Ferro Chrome (C=0.1%) ............................................... cent/lb ............................ 220.00-222.00Ferro Chrome (C=0.15%) ............................................. cent/lb ............................ 212.50-215.00Ferro Manganese (Mn=78%) ........................................ $/lt .............................. 1220.00-1230.00Ferro Manganese (Mn>80%,C<1.5%) ......................... cent/lb ................................ 91.00-92.00Ferro Manganese (Mn>80%,C<0.5%) ......................... cent/lb ............................ 110.00-112.00Silicon Manganese ........................................................ cent/lb ................................ 58.00-60.50Ferro Silicon (Si>75%, Al<1.5%) ................................. cent/lb ................................ 87.00-89.00Silicon Metal 553 .......................................................... cent/lb ............................ 125.00-130.00Ferro Molybdenum (65-70%, Mo) ................................. $/lb ..................................... 14.50-14.75Molybdenum Oxide (Mo>51%) .................................... $/lb ..................................... 11.70-12.10Ferro Titanium (70% Ti) ................................................. $/lb ......................................... 3.35-3.40Ferro Tungsten >75% W ............................................... $/lb ..................................... 26.00-26.50Ferro Vanadium (70-80%V) ........................................... $/lb ..................................... 13.50-15.50Vanadium (V2O5) ......................................................... $/lb ......................................... 6.50-7.00

American Market Prices dated: 03-08-2012European Market Prices dated: 03-08-2012

Ferro Chrome (Cr=49-51%) ......................................... cent/lb ............................. 115.00-125.00Ferro Chrome (Cr=60-65%) ......................................... cent/lb ............................. 104.00-108.00Ferro Chrome (C=0.05%) ............................................. cent/lb ............................. 220.00-230.00Ferro Chrome (C=0.1%) ............................................... cent/lb ............................. 206.00-310.00Ferro Manganese (Mn=78%) ........................................ euro/mt ............................ 890.00-900.00Ferro Manganese (Mn>80%,C<1.5%) ......................... cent/lb ................................................... -Silicon Manganese ........................................................ euro/mt ............................ 920.00-930.00Ferro Silicon (Si>75%, Al<1.5%) ................................. euro/mt ........................ 1050.00-1100.00Silicon Metal 553 .......................................................... euro/mt .................................................. -Silicon Metal 441 .......................................................... euro/mt ........................ 1965.00-2000.00Ferro Molybdenum (65-70%, Mo) ................................. $/kg ..................................... 28.00-28.70Molybdenum Oxide (Mo>51%) .................................... $/lb ...................................... 11.70-11.90Ferro Titanium (70% Ti) ................................................. $/kg ......................................... 6.80-7.20Ferro Tungsten >75% W ............................................... $/kg ..................................... 46.40-47.00Ferro Vanadium (70-80%V) ........................................... $/kg ..................................... 23.50-24.70Vanadium (V2O5) ......................................................... $/lb .......................................... 5.50-5.80

Page 10: Minerals and Metal Review August 2012- 1

Imports: Non-Ferrous ProductsDate Product Description Port Country Quantity Value CIF Rate

(kgs.) (Rs.)Date Product Description Port Country Quantity Value CIF Rate

(kgs.) (Rs.)

Minerals & Metals Review WEEKLY

AUGUST 06, 201210

Ports Covered in this issue: KAN: Apr 2012, HYD: Apr 2012, KNA: Apr 2012, GAN: Apr 2012, DEL: Apr 2012, GUR: Apr 2012Ports Covered in recent past issues: JNP: Apr 2012, DEL: Mar 2012, GOA: Mar 2012, MUN: Mar 2012, CHN: Mar 2012, MUM: Apr 2012, VIZ: Apr 2012, COC: Apr 2012, KOL: Apr 2012, AHM: Apr 2012, PAT: Apr 2012,BAN: Apr 2012, BAR: Apr 2012, CHI: Apr 2012, DAD: Apr 2012

ORES,SLAG,ASH & CONCENTRATES,ETC.04/04/12 LEAD CONCENTRATE KNA GEORGIA 23,000 621,226 27.0111/04/12 ROASTED MOLYBDENUM CONCENTRATES HYD CHILE 11,824 19,727,978 1668.4711/04/12 ZINC ASH MIN 68% KAN CHINA 100,000 5,618,692 56.1919/04/12 LEAD CONCENTRATE KAN ETHIOPIA 27,000 877,753 32.5119/04/12 LEAD CONCENTRATE KAN UAE 40,000 1,277,072 31.9319/04/12 ZINC CONCENTRATE KAN MOROCCO 82,000 3,221,751 39.2919/04/12 ZIRCONIUM SAND (ZIRCON SAND) HYD AUSTRALIA 494,000 69,249,130 140.1820/04/12 MANGANESE ORE LUMP (MN-38.08%) GAN AUSTRALIA 3,543,000 30,432,016 8.5920/04/12 LEAD CONCENTRATE KAN UAE 177,000 5,951,578 33.6224/04/12 BRIQUETTED MOLYBDENUM ORE GUR MEXICO 24,582 43,427,321 1766.6325/04/12 LEAD CONCENTRATE KNA GHANA 26,000 1,321,252 50.8225/04/12 LEAD CONCENTRATE KAN UAE 172,000 5,780,944 33.6125/04/12 ZINC CONCENTRATE KAN UAE 44,000 1,513,238 34.3926/04/12 LEAD CONCENTRATE KAN UAE 201,000 7,689,547 38.2627/04/12 LEAD CONCENTRATE KNA GHANA 52,000 2,348,639 45.1727/04/12 LEAD CONCENTRATE KNA SRI LANKA 54,000 2,006,029 37.1527/04/12 ZINC ASH MIN 68% KAN CHINA 200,000 10,257,449 51.2930/04/12 LEAD CONCENTRATE KNA GHANA 52,000 2,354,211 45.27

COPPER & COPPER ALLOYSCopper & Copper Alloys: Scrap02/04/12 COPPER SCRAP BARLEY/BERRY KAN HUNGARY 24,000 9,819,181 409.1302/04/12 COPPER SCRAP BIRCH/CLIFF KAN UAE 66,000 27,713,318 419.9002/04/12 BRASS SCRAP HONEY KAN FRANCE 78,000 16,170,770 207.3202/04/12 BRASS SCRAP HONEY KAN GERMANY 25,000 5,154,329 206.1702/04/12 BRASS SCRAP HONEY KAN MOROCCO 20,000 4,063,510 203.1802/04/12 BRASS SCRAP HONEY KAN UAE 13,000 2,744,743 211.1302/04/12 BRASS SCRAP PALES/PALLU KAN U K 23,000 4,775,457 207.6303/04/12 COPPER SCRAP BERRY KAN UAE 19,000 8,222,499 432.7603/04/12 COPPER SCRAP BIRCH/CLIFF KAN FRANCE 25,000 10,698,039 427.9203/04/12 COPPER SCRAP BIRCH/CLIFF KAN MOROCCO 27,000 11,245,770 416.5103/04/12 COPPER SCRAP BIRCH/CLIFF KAN UAE 130,000 54,676,567 420.5904/04/12 COPPER SCRAP BERRY KAN GHANA 21,000 9,117,532 434.1704/04/12 COPPER SCRAP BERRY KAN KUWAIT 11,000 4,593,741 417.6104/04/12 COPPER WIRE SCRAP BERRY AND CANDY KAN UAE 25,000 10,803,516 432.1404/04/12 BRASS SCRAP HONEY KAN CANADA 18,000 3,881,439 215.6404/04/12 BRASS SCRAP HONEY KAN UAE 94,000 19,666,223 209.2204/04/12 BRASS SCRAP HONEY KAN MOROCCO 20,000 4,142,201 207.1104/04/12 BRASS SCRAP HONEY KAN S. ARABIA 108,000 22,702,963 210.2109/04/12 COPPER SCRAP BERRY KAN KUWAIT 11,000 4,597,687 417.9709/04/12 COPPER SCRAP BERRY KAN QATAR 20,000 8,797,474 439.8709/04/12 COPPER SCRAP BIRCH KAN KUWAIT 10,000 3,927,653 392.7709/04/12 BRASS SCRAP HONEY KAN FINLAND 25,000 5,555,512 222.2209/04/12 BRASS SCRAP HONEY KAN S. AFRICA 20,000 4,316,105 215.8109/04/12 BRASS SCRAP HONEY KAN S. ARABIA 22,000 4,595,981 208.9110/04/12 COPPER SCRAP BERRY KAN UAE 25,000 11,105,328 444.2110/04/12 COPPER SCRAP BERRY & CANDY KAN S. ARABIA 20,000 8,343,517 417.1810/04/12 COPPER SCRAP BIRCH/CLIFF KAN S. ARABIA 59,000 24,482,786 414.9610/04/12 COPPER SCRAP BIRCH/CLIFF KAN UAE 20,000 8,756,829 437.8410/04/12 BRASS SCRAP HONEY KAN BAHARAIN 20,000 4,099,293 204.9610/04/12 BRASS SCRAP HONEY KAN NETHERLANDS 25,000 5,236,881 209.4810/04/12 BRASS SCRAP HONEY KAN POLAND 20,000 4,381,566 219.0810/04/12 BRASS SCRAP HONEY KAN UAE 20,000 4,405,569 220.2810/04/12 BRASS SCRAP PALES/PALLU KAN NETHERLANDS 30,000 6,361,856 212.0611/04/12 COPPER SCRAP BIRCH/CLIFF KAN UAE 21,000 9,285,495 442.1711/04/12 COPPER SCRAP MILLBERRY KAN UAE 21,000 9,120,882 434.3311/04/12 MIX COPPER SCRAP KAN LIBERIA 22,000 9,642,388 438.2911/04/12 BRASS SCRAP HONEY KAN MOROCCO 22,000 4,646,633 211.2111/04/12 MIX BRASS SCRAP HONEY KAN UAE 19,000 4,195,655 220.8212/04/12 COPPER SCRAP BERRY KAN QATAR 19,000 8,253,452 434.3912/04/12 COPPER SCRAP BERRY KAN UAE 19,000 8,611,618 453.2412/04/12 COPPER SCRAP BIRCH/CLIFF KAN HUNGARY 95,000 40,515,187 426.4812/04/12 COPPER WIRE SCRAP BERRY & CANDY KAN UAE 25,000 10,751,501 430.0612/04/12 BRASS SCRAP HONEY KAN S. ARABIA 20,000 4,423,025 221.1512/04/12 BRASS SCRAP HONEY KAN SENEGAL 20,000 4,377,202 218.8612/04/12 BRASS SCRAP HONEY KAN U K 25,000 5,245,253 209.8112/04/12 BRASS SCRAP HONEY KAN UAE 21,000 4,568,132 217.5313/04/12 COPPER SCRAP BERRY KAN UAE 20,000 8,712,310 435.6213/04/12 COPPER SCRAP BIRCH/CLIFF KAN FRANCE 72,000 31,274,521 434.3713/04/12 COPPER SCRAP BIRCH/CLIFF KAN GERMANY 24,000 10,195,939 424.8313/04/12 COPPER SCRAP BIRCH/CLIFF KAN S. ARABIA 97,000 41,949,343 432.4713/04/12 COPPER SCRAP MILL BERRY KAN UAE 27,000 11,761,892 435.6313/04/12 BRASS SCRAP HONEY KAN BELGIUM 25,000 5,503,143 220.1313/04/12 BRASS SCRAP HONEY KAN FRANCE 51,000 11,084,839 217.3513/04/12 BRASS SCRAP HONEY KAN GERMANY 98,000 21,347,045 217.8313/04/12 BRASS SCRAP HONEY KAN HUNGARY 24,000 5,303,703 220.9913/04/12 BRASS SCRAP HONEY KAN KUWAIT 22,000 4,511,630 205.0713/04/12 BRASS SCRAP HONEY KAN S. ARABIA 40,000 8,380,475 209.5113/04/12 BRASS SCRAP HONEY KAN U K 25,000 5,455,138 218.2113/04/12 BRASS SCRAP HONEY KAN UAE 38,000 7,826,728 205.9717/04/12 COPPER SCRAP BIRCH KAN KUWAIT 11,000 4,514,055 410.3717/04/12 COPPER SCRAP BIRCH/CLIFF KAN UAE 20,000 8,548,030 427.4017/04/12 BRASS SCRAP HONEY KAN SWEDEN 24,000 5,202,019 216.7517/04/12 BRASS SCRAP HONEY KAN UAE 43,000 9,238,813 214.8617/04/12 MIX BRASS SCRAP KAN GEORGIA 26,000 5,737,615 220.6818/04/12 COPPER SCRAP BERRY KAN UAE 25,000 11,189,098 447.5618/04/12 COPPER SCRAP BERRY KAN QATAR 20,000 8,745,808 437.2918/04/12 COPPER SCRAP BIRCH/CLIFF KAN FRANCE 44,000 19,516,302 443.5518/04/12 COPPER SCRAP BIRCH/CLIFF KAN HUNGARY 95,000 41,325,491 435.0118/04/12 COPPER SCRAP BIRCH/CLIFF KAN S. ARABIA 20,000 8,690,208 434.5118/04/12 COPPER SCRAP BIRCH/CLIFF KAN UAE 103,000 45,275,480 439.5718/04/12 COPPER SCRAP CANDY KAN U K 32,000 13,420,911 419.4018/04/12 BRASS SCRAP HONEY KAN BENIN 21,000 4,726,912 225.0918/04/12 BRASS SCRAP HONEY KAN FRANCE 27,000 5,881,055 217.8218/04/12 BRASS SCRAP HONEY KAN GERMANY 99,000 21,558,039 217.7618/04/12 BRASS SCRAP HONEY KAN NETHERLANDS 27,000 5,962,706 220.8418/04/12 BRASS SCRAP HONEY KAN S. ARABIA 62,000 13,056,621 210.5918/04/12 BRASS SCRAP HONEY KAN SWITZERLAND 25,000 5,616,242 224.6518/04/12 BRASS SCRAP HONEY KAN U K 26,000 5,773,718 222.0718/04/12 BRASS SCRAP HONEY KAN UAE 15,000 3,118,138 207.8819/04/12 COPPER SCRAP BIRCH KAN KUWAIT 19,000 8,340,585 438.9819/04/12 COPPER SCRAP BIRCH/CLIFF KAN BELGIUM 24,000 10,399,857 433.3319/04/12 COPPER SCRAP BIRCH/CLIFF KAN FRANCE 28,000 12,383,710 442.2819/04/12 BRASS SCRAP HONEY KAN BELGIUM 26,000 5,719,961 220.0019/04/12 BRASS SCRAP HONEY KAN GERMANY 24,000 5,269,779 219.5719/04/12 BRASS SCRAP HONEY KAN KUWAIT 31,000 6,675,105 215.3319/04/12 BRASS SCRAP HONEY KAN UAE 24,000 5,359,153 223.3020/04/12 COPPER SCRAP BERRY KAN UAE 25,000 10,998,375 439.9420/04/12 COPPER SCRAP BIRCH/CLIFF KAN LEBANON 19,000 8,139,899 428.4220/04/12 COPPER SCRAP CLOVE KAN S. ARABIA 21,000 9,081,338 432.4420/04/12 COPPER SCRAP MILL BERRY KAN UAE 20,000 8,414,792 420.7420/04/12 MIX COPPER SCRAP BIRCH/BERRY KAN UAE 20,000 8,898,750 444.9420/04/12 BRASS SCRAP HONEY KAN GERMANY 26,000 5,689,066 218.8120/04/12 BRASS SCRAP HONEY KAN S. ARABIA 20,000 4,335,209 216.7620/04/12 BRASS SCRAP HONEY KAN UAE 20,000 4,454,375 222.7220/04/12 BRASS SCRAP NOMAD KAN MOROCCO 25,000 5,477,216 219.0920/04/12 MIXED BRASS SCRAP KAN UAE 25,000 5,455,148 218.2121/04/12 COPPER SCRAP BARLEY/BERRY KAN FRANCE 25,000 10,763,348 430.5321/04/12 COPPER SCRAP BERRY KAN LEBANON 21,000 8,696,812 414.1321/04/12 BRASS SCRAP HONEY KAN GERMANY 25,000 5,194,603 207.7821/04/12 BRASS SCRAP HONEY KAN LEBANON 22,000 4,684,456 212.9323/04/12 COPPER SCRAP BIRCH CLIFF KAN UAE 22,000 9,624,440 437.4723/04/12 BRASS SCRAP HONEY KAN CONGO 25,000 5,215,771 208.6323/04/12 BRASS SCRAP HONEY KAN GERMANY 23,000 4,991,725 217.0323/04/12 BRASS SCRAP HONEY KAN UAE 23,000 5,014,896 218.0424/04/12 COPPER SCRAP CLOVE NO.1 KAN UAE 20,000 8,685,512 434.28

Copper & Copper Alloys: Scrap24/04/12 MIXED COPPER SCRAP BIRCH & CANDY KAN JORDAN 22,000 9,151,712 415.9924/04/12 BRASS SCRAP HONEY KAN GERMANY 75,000 16,480,196 219.7424/04/12 BRASS SCRAP HONEY KAN QATAR 20,000 4,488,580 224.4324/04/12 BRASS SCRAP HONEY KAN S. ARABIA 57,000 12,505,353 219.3925/04/12 COPPER SCRAP BERRY KAN BAHARAIN 18,000 7,905,369 439.1925/04/12 COPPER SCRAP BERRY/CANDY KAN U K 20,000 8,538,640 426.9325/04/12 COPPER SCRAP BRICH CLIFF KAN UAE 137,000 57,654,731 420.8425/04/12 BRASS SCRAP HONEY KAN U K 27,000 5,993,601 221.9925/04/12 BRASS SCRAP HONEY KAN FRANCE 26,000 5,410,515 208.1025/04/12 BRASS SCRAP HONEY KAN GERMANY 24,000 5,029,493 209.5625/04/12 BRASS SCRAP HONEY KAN NETHERLANDS 25,000 5,200,127 208.0125/04/12 BRASS SCRAP HONEY KAN S. ARABIA 19,000 4,254,221 223.9125/04/12 BRASS SCRAP HONEY KAN SPAIN 27,000 5,917,733 219.1825/04/12 BRASS SCRAP HONEY KAN UAE 22,000 4,625,702 210.2625/04/12 MIX BRASS SCRAP KAN UAE 18,000 3,976,609 220.9226/04/12 COPPER SCRAP MILL BERRY KAN UAE 49,000 21,218,739 433.0426/04/12 BRASS SCRAP HONEY KAN FINLAND 26,000 5,825,886 224.0726/04/12 BRASS SCRAP HONEY KAN FRANCE 26,000 5,584,092 214.7726/04/12 BRASS SCRAP HONEY KAN SWITZERLAND 22,000 4,888,007 222.1827/04/12 COPPER SCRAP BRICH CLIFF KAN KUWAIT 42,000 18,276,677 435.1627/04/12 COPPER SCRAP BRICH CLIFF KAN UAE 60,000 25,000,698 416.6827/04/12 BRASS SCRAP HONEY KAN UAE 28,000 6,131,524 218.9827/04/12 MIX BRASS SCRAP HAIR WIRE KAN SINGAPORE 26,000 5,697,452 219.1330/04/12 COPPER SCRAP BERRY KAN LEBANON 23,000 9,895,260 430.2330/04/12 BRASS SCRAP HONEY KAN BELGIUM 25,000 5,534,592 221.3830/04/12 BRASS SCRAP HONEY KAN U K 49,000 10,634,624 217.0330/04/12 MIX BRASS SCRAP KAN PAKISTAN 24,000 5,301,777 220.91

Copper & Copper Alloys: Powders10/04/12 METAL MATRIX POWDER DEL FRANCE 50 103,490 2069.8011/04/12 V20-592 SINTERING METAL POWDER DEL GERMANY 10 34,499 3449.90

Copper & Copper Alloys: Bars,Rods,Profiles,etc.02/04/12 CC COPPER RODS WITH DIA 8MM AND MIN PURITY 99.90% HYD RUSSIA 23,590 10,203,408 432.5303/04/12 2.6MM SCR COPPER ROD GUR TAIWAN 40,000 17,523,391 438.0803/04/12 CC COPPER RODS WITH DIA 8MM AND MIN PURITY 99.90% HYD RUSSIA 23,891 10,185,805 426.3403/04/12 UNCOATED RODS OF COPPER ALLOY DEL CHINA 500 485,118 970.2404/04/12 CONTINUOUS CAST COPPER ROD 8.00MM HYD RUSSIA 26,839 11,876,730 442.5212/04/12 COPPER WIRE RODS KAN RUSSIA 926,000 408,491,713 441.1413/04/12 COPPER WIRE RODS KAN RUSSIA 534,000 238,591,679 446.8013/04/12 2.6MM SCR COPPER ROD GUR TAIWAN 20,000 9,430,278 471.5119/04/12 COPPER WIRE RODS KAN RUSSIA 181,000 77,921,699 430.5120/04/12 ROUND BAR HYD FRANCE 3,300 3,528,930 1069.3724/04/12 2.6MM SCR COPPER ROD GUR TAIWAN 40,000 18,617,854 465.4526/04/12 COPPER WIRE RODS KAN RUSSIA 263,000 112,787,364 428.8530/04/12 99.90% PURITY COPPER FLAT BARS GUR FRANCE 10,513 5,165,666 491.3630/04/12 COPPER ROD HYD CHINA 600 353,910 589.85

Copper & Copper Alloys: Wires13/04/12 TINNED COPPER WIRE HYD HONGKONG 998 1,591,310 1594.5021/04/12 COPPER ELECT GRADE STANDARD WIRE ROD 8MM HYD RUSSIA 23,665 10,895,601 460.4130/04/12 COPPER WELDING WIRE DEL CHINA 1,000 423,922 423.92

Copper & Copper Alloys: Strips,Foils,etc.07/04/12 TINNED COPPER INTERCONNECT SOLAR DEL CHINA 500 773,372 1546.7407/04/12 COPPER STRIP DEL GERMANY 542 495,481 914.1711/04/12 SOLDERING RIBBON SPOOL HYD SINGAPORE 2,362 450,129 190.5711/04/12 BERYLLIUM COPPER STRIP HYD USA 367 607,745 1655.9820/04/12 NGK'BERYLLIUM COPPER STRIP ALLOY DEL JAPAN 219 423,619 1934.3323/04/12 UNLEADED BRASS STRIP DEL SWITZERLAND 871 2,234,269 2565.1826/04/12 UNLEADED BRASS STRIP DEL JAPAN 244 304,550 1248.16

Copper & Copper Alloys: Tubes,Pipes,Fittings,etc.04/04/12 COPPER TUBE IN LEVEL WOUND COILS HYD CHINA 7,436 3,681,007 495.0307/04/12 IGT COPPER TUBE DEL CHINA 7,916 4,677,925 590.9512/04/12 COPPER TUBE GROOVED LEVEL WOUND COIL GUR MALAYSIA 9,000 4,249,688 472.1913/04/12 COPPER TUBE GROOVED LEVEL WOUND COIL GUR MALAYSIA 9,000 4,202,711 466.9713/04/12 COPPER FITTINGS -U BENDS HYD CHINA 1,773 1,818,239 1025.5217/04/12 COPPER TUBE GROOVED LEVEL WOUND COIL GUR MALAYSIA 9,000 4,202,991 467.0018/04/12 DHP GRADE SEAMLESS PLAIN COPPER TUBES KNA MALAYSIA 37,000 18,448,296 498.6020/04/12 COPPER MOULD TUBES HYD CHINA 1,192 1,049,700 880.6223/04/12 COPPER TUBE GUR CHINA 16,075 6,889,803 428.6023/04/12 COPPER TUBE GROOVED LEVEL WOUND COIL GUR MALAYSIA 25,033 11,650,054 465.3923/04/12 DHP GRADE SEAMLESS PLAIN COPPER TUBES KNA MALAYSIA 19,000 9,197,375 484.0724/04/12 COPPER TUBE GROOVED LEVEL WOUND COIL GUR MALAYSIA 25,632 11,929,608 465.4225/04/12 COPPER TUBE GUR CHINA 5,249 2,634,808 501.9626/04/12 BRAZING MATERIAL -RINGS HYD CHINA 288 192,201 667.3627/04/12 COPPER TUBE GUR MALAYSIA 15,820 6,847,019 432.81

NICKEL & NICKEL ALLOYSNickel & Nickel Alloys: Unwrought02/04/12 UNWROUGHT & UNALLOYED PRIMARY NICKEL CATHODES KNA NORWAY 24,000 25,239,115 1051.6302/04/12 UNCUT NICKEL CATHODES SEVERO KNA RUSSIA 48,000 48,084,570 1001.7612/04/12 UNCUT NICKEL CATHODES SEVERO KNA RUSSIA 24,000 23,666,725 986.1113/04/12 PRIMARY NICKEL CATHODES H-1 UNCUT KAN RUSSIA 47,000 45,388,017 965.7017/04/12 PRIMARY NICKEL CATHODES H-1 CUT KAN RUSSIA 18,000 18,104,188 1005.7918/04/12 PRIMARY NICKEL CATHODES H-1 CUT KAN RUSSIA 6,000 6,297,199 1049.5319/04/12 PRIMARY NICKEL CATHODES H-1 CUT KAN RUSSIA 6,000 6,295,231 1049.2120/04/12 VALE INCO NICKEL PELLET HYD U K 23,600 22,374,754 948.0825/04/12 VALE INCO NICKEL PELLET HYD U K 96,400 91,395,181 948.0825/04/12 PRIMARY NICKEL CATHODES H-1 CUT KAN RUSSIA 12,000 11,018,991 918.2530/04/12 PRIMARY NICKEL CATHODES H-1 CUT KAN RUSSIA 6,000 5,506,348 917.72

ALUMINIUM & ALUMINIUM ALLOYSAluminium & Aluminium Alloys: Unwrought17/04/12 PRIMARY ALUMINIUM INGOTS-AL 99.7% KAN BAHARAIN 50,000 5,981,725 119.6323/04/12 PRIMARY ALUMINIUM INGOT FAR UAE 22,000 2,781,143 126.42

Aluminium Waste & Scrap02/04/12 ALUMINIUM SCRAP TAINT-TABOR KAN S. ARABIA 20,000 1,833,879 91.6902/04/12 ALUMINIUM SCRAP TAINT-TABOR KAN UAE 89,000 8,594,311 96.5702/04/12 ALUMINIUM SCRAP TAINT-TABOR KAN GHANA 25,000 2,104,122 84.1602/04/12 ALUMINIUM SCRAP TAINT-TABOR/TREAD KAN CYPRUS 15,000 1,354,712 90.3102/04/12 ALUMINIUM SCRAP TALDON/TALDORK KAN OMAN 39,000 3,398,356 87.1402/04/12 ALUMINIUM SCRAP TALDON/TALDORK KAN UAE 39,000 3,179,611 81.5302/04/12 ALUMINIUM SCRAP TALK KAN QATAR 16,000 3,311,914 206.9902/04/12 ALUMINIUM SCRAP TALK KAN S. ARABIA 18,000 3,595,347 199.7402/04/12 ALUMINIUM SCRAP THROB KAN LEBANON 27,000 2,714,820 100.5502/04/12 ALUMINIUM SCRAP TREAD KAN S. ARABIA 20,000 1,978,831 98.9402/04/12 ALUMINIUM SCRAP TREAD KAN UAE 16,000 1,636,780 102.3003/04/12 ALUMINIUM SCRAP TAINT-TABOR KAN S. ARABIA 22,000 2,057,304 93.5103/04/12 ALUMINIUM SCRAP TAINT-TABOR/TREAD KAN U K 20,000 1,756,071 87.8003/04/12 ALUMINIUM SCRAP TALK KAN BAHARAIN 18,000 3,587,508 199.3103/04/12 ALUMINIUM SCRAP TERSE KAN UAE 27,000 2,550,576 94.4703/04/12 ALUMINIUM SCRAP TREAD KAN KUWAIT 17,000 1,755,171 103.2503/04/12 ALUMINIUM SCRAP TREAD/TRUMP KAN UAE 16,000 1,717,381 107.3404/04/12 ALUMINIUM SCRAP TABLET KAN S. AFRICA 21,000 2,239,238 106.6304/04/12 ALUMINIUM SCRAP TABLET KAN S. ARABIA 22,000 2,235,775 101.6304/04/12 ALUMINIUM SCRAP TAINT TABOR KAN KUWAIT 10,000 895,847 89.5804/04/12 ALUMINIUM SCRAP TAINT TABOR/TERSE KAN KUWAIT 11,000 1,060,297 96.3904/04/12 ALUMINIUM SCRAP TAINT-TABOR KAN S. ARABIA 144,000 14,096,208 97.8904/04/12 ALUMINIUM SCRAP TAINT-TABOR KAN UAE 43,000 3,924,446 91.2704/04/12 ALUMINIUM SCRAP TAINT-TABOR/TREAD KAN UAE 17,000 1,639,070 96.4204/04/12 ALUMINIUM SCRAP TAINT-TAROB KAN QATAR 23,000 1,989,453 86.5004/04/12 ALUMINIUM SCRAP TALDON/TALDORK KAN KUWAIT 45,000 3,604,822 80.1104/04/12 ALUMINIUM SCRAP TALDON/TALDORK KAN SLOVENIA 33,000 2,518,589 76.3204/04/12 ALUMINIUM SCRAP TALDON/TALDORK KAN UAE 20,000 1,680,643 84.0304/04/12 ALUMINIUM SCRAP TALK KAN BAHARAIN 19,000 3,876,514 204.0304/04/12 ALUMINIUM SCRAP TALK KAN KUWAIT 26,000 5,392,061 207.3904/04/12 ALUMINIUM SCRAP TALK KAN S. ARABIA 52,000 10,717,900 206.1104/04/12 ALUMINIUM SCRAP TELIC KAN FRANCE 20,000 1,550,147 77.51

Page 11: Minerals and Metal Review August 2012- 1

Date Product Description Port Country Quantity Value CIF Rate(kgs.) (Rs.)

Date Product Description Port Country Quantity Value CIF Rate(kgs.) (Rs.)

11Minerals & Metals Review WEEKLY

AUGUST 06, 2012

Aluminium Waste & Scrap04/04/12 ALUMINIUM SCRAP TERSE KAN S. ARABIA 22,000 1,835,094 83.4104/04/12 ALUMINIUM SCRAP THROB KAN UAE 73,000 6,449,528 88.3504/04/12 ALUMINIUM SCRAP TREAD KAN BAHARAIN 19,000 1,883,047 99.1104/04/12 ALUMINIUM SCRAP TREAD KAN KUWAIT 37,000 3,640,975 98.4005/04/12 ALUMINIUM SCRAP TENSE& TRUMP KAN MOROCCO 25,000 2,283,469 91.3409/04/12 ALUMINIUM SCRAP TAINT-TABOR KAN GHANA 25,000 2,266,784 90.6709/04/12 ALUMINIUM SCRAP TAINT-TABOR KAN S. ARABIA 80,000 7,812,024 97.6509/04/12 ALUMINIUM SCRAP TAINT-TABOR KAN UAE 38,000 3,569,213 93.9309/04/12 ALUMINIUM SCRAP TALDON/TALDORK KAN UAE 21,000 1,728,578 82.3109/04/12 ALUMINIUM SCRAP TELIC KAN UAE 21,000 2,017,569 96.0709/04/12 ALUMINIUM SCRAP TERSE KAN S. ARABIA 20,000 1,699,312 84.9709/04/12 ALUMINIUM SCRAP TREAD KAN ISRAEL 25,000 2,594,575 103.7809/04/12 ALUMINIUM SCRAP TREAD KAN S. ARABIA 20,000 1,896,695 94.8309/04/12 ALUMINIUM SCRAP TREAD KAN BAHARAIN 12,000 1,309,459 109.1209/04/12 ALUMINIUM SCRAP TREAD KAN ISRAEL 28,000 3,065,203 109.4709/04/12 ALUMINIUM SCRAP TREAD KAN UAE 43,000 4,515,946 105.0210/04/12 ALUMINIUM SCRAP THROB KAN UAE 87,000 7,165,173 82.3610/04/12 ALUMINIUM SCRAP TABLET KAN MOROCCO 20,000 2,137,912 106.9010/04/12 ALUMINIUM SCRAP TAINT/TABOR KAN JORDAN 18,000 1,933,361 107.4110/04/12 ALUMINIUM SCRAP TAINT-TABOR KAN MOROCCO 51,000 4,818,867 94.4910/04/12 ALUMINIUM SCRAP TAINT-TABOR KAN S. ARABIA 83,000 8,619,724 103.8510/04/12 ALUMINIUM SCRAP TAINT-TABOR KAN UAE 35,000 3,456,266 98.7510/04/12 ALUMINIUM SCRAP TAINT-TABOR/TREAD KAN QATAR 23,000 2,239,523 97.3710/04/12 ALUMINIUM SCRAP TALDORK KAN UAE 19,000 1,639,260 86.2810/04/12 ALUMINIUM SCRAP TENSE KAN NETHERLANDS 24,000 2,198,607 91.6110/04/12 ALUMINIUM SCRAP TENSE/TAINT TABOR KAN SIERRA LEONE 21,000 1,937,785 92.2810/04/12 ALUMINIUM SCRAP TERSE/TAINT-TABOR KAN S. AFRICA 24,000 2,060,705 85.8610/04/12 ALUMINIUM SCRAP TREAD KAN KUWAIT 36,000 3,832,899 106.4710/04/12 ALUMINIUM SCRAP TREAD KAN BAHARAIN 21,000 2,103,726 100.1810/04/12 ALUMINIUM SCRAP TREAD KAN S. ARABIA 20,000 2,066,210 103.3110/04/12 ALUMINIUM SCRAP TREAD KAN UAE 38,000 3,800,957 100.0311/04/12 ALUMINIUM SCRAP TAINT-TABOR KAN S. ARABIA 43,000 4,111,495 95.6211/04/12 ALUMINIUM SCRAP TAINT-TABOR KAN UAE 36,000 3,411,169 94.7511/04/12 ALUMINIUM SCRAP TALDON/TALDORK KAN TUNISIA 26,000 1,891,122 72.7411/04/12 ALUMINIUM SCRAP TALDON/TALDORK KAN UAE 23,000 1,912,737 83.1611/04/12 ALUMINIUM SCRAP TALDON/TALDORK KAN MOROCCO 20,000 1,550,636 77.5311/04/12 ALUMINIUM SCRAP TALON KAN MOROCCO 19,000 2,272,514 119.6111/04/12 ALUMINIUM SCRAP TENSE/TAINT TABOR KAN MAURITANIA 21,000 1,903,675 90.6511/04/12 ALUMINIUM SCRAP TREAD KAN S. ARABIA 39,000 4,004,043 102.6711/04/12 ALUMINIUM SCRAP TWITCH KAN NETHERLANDS 52,000 4,379,334 84.2212/04/12 ALUMINIUM SCRAP THROB KAN UAE 47,000 4,082,324 86.8612/04/12 ALUMINIUM SCRAP TAINT TABOR/TREAD KAN GERMANY 26,000 2,627,803 101.0712/04/12 ALUMINIUM SCRAP TAINT-TABOR KAN UAE 67,000 6,502,336 97.0512/04/12 ALUMINIUM SCRAP TAINT-TABOR KAN S. ARABIA 66,000 6,731,759 102.0012/04/12 ALUMINIUM SCRAP TAINT-TABOR/TREAD KAN KUWAIT 47,000 4,730,001 100.6412/04/12 ALUMINIUM SCRAP TAINT-TABOR/TREAD KAN UAE 24,000 2,421,554 100.9012/04/12 ALUMINIUM SCRAP TALDON KAN BAHARAIN 23,000 1,875,651 81.5512/04/12 ALUMINIUM SCRAP TALDON/TALDORK KAN BAHARAIN 20,000 1,680,093 84.0012/04/12 ALUMINIUM SCRAP TALDON/TALDORK KAN GERMANY 29,000 2,210,332 76.2212/04/12 ALUMINIUM SCRAP TALK KAN BAHARAIN 20,000 4,190,910 209.5512/04/12 ALUMINIUM SCRAP TELIC KAN U K 25,000 2,026,787 81.0712/04/12 ALUMINIUM SCRAP TERSE KAN UAE 18,000 1,484,347 82.4612/04/12 ALUMINIUM SCRAP THROB KAN UAE 25,000 1,992,971 79.7212/04/12 ALUMINIUM SCRAP TREAD KAN BAHARAIN 18,000 1,875,539 104.2012/04/12 ALUMINIUM SCRAP TREAD KAN KUWAIT 32,000 3,222,629 100.7112/04/12 ALUMINIUM SCRAP TREAD KAN MOROCCO 36,000 3,423,783 95.1112/04/12 ALUMINIUM SCRAP TREAD KAN UAE 82,000 8,962,872 109.3013/04/12 ALUMINIUM SCRAP TAINT-TABOR KAN S. ARABIA 21,000 2,191,290 104.3513/04/12 ALUMINIUM SCRAP TAINT-TABOR KAN UAE 24,000 2,244,332 93.5113/04/12 ALUMINIUM SCRAP TALDON/TALDORK KAN KUWAIT 25,000 2,005,864 80.2313/04/12 ALUMINIUM SCRAP TALK KAN UAE 36,000 7,347,279 204.0913/04/12 ALUMINIUM SCRAP THROB KAN UAE 26,000 2,121,742 81.6113/04/12 ALUMINIUM SCRAP TREAD KAN S. ARABIA 20,000 2,117,890 105.8917/04/12 ALUMINIUM SCRAP THROB KAN UAE 92,000 8,000,124 86.9617/04/12 ALUMINIUM SCRAP TABLET KAN UAE 45,000 4,899,748 108.8817/04/12 ALUMINIUM SCRAP TAINT-TABOR KAN S. ARABIA 22,000 2,384,040 108.3717/04/12 ALUMINIUM SCRAP TAINT-TABOR/TREAD KAN GEORGIA 20,000 1,914,059 95.7017/04/12 ALUMINIUM SCRAP TREAD KAN UAE 21,000 2,386,365 113.6417/04/12 ALUMINIUM SCRAP TREAD KAN S. ARABIA 19,000 2,003,643 105.4518/04/12 ALUMINIUM SCRAP TABLET KAN UAE 28,000 3,152,608 112.5918/04/12 ALUMINIUM SCRAP TAINT-TABOR KAN LEBANON 21,000 1,888,687 89.9418/04/12 ALUMINIUM SCRAP TALDON KAN TUNISIA 23,000 1,731,010 75.2618/04/12 ALUMINIUM SCRAP TALDON KAN UAE 41,000 3,405,609 83.0618/04/12 ALUMINIUM SCRAP TALDON/TALDORK KAN UAE 20,000 1,713,309 85.6718/04/12 ALUMINIUM SCRAP TREAD KAN KUWAIT 34,000 3,269,129 96.1518/04/12 ALUMINIUM SCRAP TRUMP KAN UAE 35,000 3,982,841 113.8019/04/12 ALUMINIUM SCRAP TABLET KAN UAE 25,000 2,718,871 108.7519/04/12 ALUMINIUM SCRAP TAINT-TABOR KAN UAE 21,000 2,216,296 105.5419/04/12 ALUMINIUM SCRAP TALDON/TALDORK KAN OMAN 40,000 3,468,384 86.7119/04/12 ALUMINIUM SCRAP TALDON/TALDORK KAN SLOVENIA 32,000 2,511,105 78.4719/04/12 ALUMINIUM SCRAP TALK KAN S. ARABIA 38,000 7,939,960 208.9519/04/12 ALUMINIUM SCRAP TENSE KAN KUWAIT 42,000 4,112,783 97.9219/04/12 ALUMINIUM SCRAP TENSE KAN UAE 27,000 2,467,436 91.3919/04/12 ALUMINIUM SCRAP THROB KAN S. ARABIA 20,000 2,031,250 101.5619/04/12 ALUMINIUM SCRAP TREAD KAN S. ARABIA 21,000 2,327,483 110.8319/04/12 ALUMINIUM SCRAP TWITCH KAN FRANCE 22,000 2,144,522 97.4820/04/12 ALUMINIUM SCRAP TAINT TABOR/TREAD BRIQUETTED KAN NETHERLANDS 36,000 3,259,836 90.5520/04/12 ALUMINIUM SCRAP TAINT/TABOR/TREAD KAN CYPRUS 23,000 2,237,712 97.2920/04/12 ALUMINIUM SCRAP TAINT-TABOR KAN S. ARABIA 20,000 1,959,041 97.9520/04/12 ALUMINIUM SCRAP TAINT-TABOR KAN UAE 41,000 3,874,606 94.5020/04/12 ALUMINIUM SCRAP TALK KAN UAE 54,000 11,518,648 213.3120/04/12 ALUMINIUM SCRAP TENSE KAN ANGOLA 21,000 1,873,212 89.2020/04/12 ALUMINIUM SCRAP TENSE KAN S. ARABIA 25,000 2,325,435 93.0220/04/12 ALUMINIUM SCRAP TENSE KAN UAE 25,000 2,309,112 92.3620/04/12 ALUMINIUM SCRAP TENSE, TAINT TABOR & TREAD KAN ANGOLA 62,000 6,027,247 97.2120/04/12 ALUMINIUM SCRAP THROB KAN ARGENTINA 49,000 3,933,092 80.2720/04/12 ALUMINIUM SCRAP TREAD KAN S. ARABIA 59,000 5,904,423 100.0721/04/12 ALUMINIUM SCRAP TWITCH KAN NETHERLANDS 49,000 4,037,031 82.3923/04/12 ALUMINIUM SCRAP "TENSE, TAINT TABOR & TREAD KAN TANZANIA 20,000 1,935,473 96.7723/04/12 ALUMINIUM SCRAP TAINT TABOR & TREAD KAN USA 71,000 6,995,179 98.5223/04/12 ALUMINIUM SCRAP TAINT/TABOR KAN UAE 20,000 1,971,714 98.5923/04/12 ALUMINIUM SCRAP TAINT-TABOR KAN S. ARABIA 42,000 4,248,995 101.1723/04/12 ALUMINIUM SCRAP TENSE, TAINT TABOR & TREAD KAN ANGOLA 36,000 3,494,519 97.0724/04/12 ALUMINIUM SCRAP TABLET KAN KUWAIT 31,000 3,359,942 108.3924/04/12 ALUMINIUM SCRAP TABLET KAN S. AFRICA 19,000 2,069,391 108.9224/04/12 ALUMINIUM SCRAP TAINT/TABOR KAN KUWAIT 25,000 2,443,318 97.7324/04/12 ALUMINIUM SCRAP TAINT-TABOR KAN JORDAN 20,000 1,825,431 91.2724/04/12 ALUMINIUM SCRAP TAINT-TABOR KAN S. ARABIA 64,000 6,656,687 104.0124/04/12 ALUMINIUM SCRAP TAINT-TABOR/TREAD KAN GERMANY 26,000 2,485,883 95.6124/04/12 ALUMINIUM SCRAP TAINT-TABOR/TREAD KAN U K 26,000 2,453,993 94.3824/04/12 ALUMINIUM SCRAP TALDON/TALDORK KAN KUWAIT 20,000 1,609,398 80.4724/04/12 ALUMINIUM SCRAP TALDON/TALRORK KAN UAE 26,000 2,191,678 84.3024/04/12 ALUMINIUM SCRAP TASTE/TASSEL KAN PORTUGAL 43,000 4,939,600 114.8724/04/12 ALUMINIUM SCRAP TELIC KAN U K 39,000 3,214,281 82.4224/04/12 ALUMINIUM SCRAP TERSE KAN BAHARAIN 22,000 2,100,507 95.4824/04/12 ALUMINIUM SCRAP TREAD KAN KUWAIT 33,000 3,557,567 107.8124/04/12 ALUMINIUM SCRAP TREAD KAN S. ARABIA 39,000 4,119,874 105.6424/04/12 ALUMINIUM SCRAP TREAD/TASSEL KAN UAE 20,000 2,196,614 109.8324/04/12 SHREDDED ALUMINIUM SCRAP TAINT/TABOR KAN PORTUGAL 22,000 2,063,539 93.8025/04/12 ALUMINIUM SCRAP TAINT TABOR KAN KUWAIT 19,000 1,620,122 85.2725/04/12 ALUMINIUM SCRAP TAINT-TABOR/TREAD KAN PORTUGAL 21,000 1,980,283 94.3025/04/12 ALUMINIUM SCRAP TALDON/TALDORK KAN TUNISIA 24,000 1,943,237 80.9725/04/12 ALUMINIUM SCRAP TALDON/TALDORK KAN UAE 15,000 1,250,857 83.3925/04/12 ALUMINIUM SCRAP TALDORK KAN UAE 17,000 1,436,147 84.4825/04/12 ALUMINIUM SCRAP TALK KAN QATAR 16,000 3,353,095 209.5725/04/12 ALUMINIUM SCRAP TALK KAN KUWAIT 18,000 3,870,624 215.0325/04/12 ALUMINIUM SCRAP TALK KAN S. ARABIA 36,000 7,716,462 214.3525/04/12 ALUMINIUM SCRAP TALK KAN UAE 34,000 7,232,746 212.7325/04/12 ALUMINIUM SCRAP TALON KAN GEORGIA 19,000 2,043,534 107.5525/04/12 ALUMINIUM SCRAP TENSE KAN UAE 54,000 5,006,163 92.7125/04/12 ALUMINIUM SCRAP TENSE, TAINT TABOR & TREAD KAN S. ARABIA 60,000 5,625,726 93.7625/04/12 ALUMINIUM SCRAP TENSE, TAINT TABOR & TREAD KAN TANZANIA 23,000 2,197,629 95.5525/04/12 ALUMINIUM SCRAP TREAD KAN S. ARABIA 39,000 4,081,415 104.65

Aluminium Waste & Scrap25/04/12 ALUMINIUM SCRAP TREAD KAN UAE 22,000 2,493,100 113.3225/04/12 ALUMINIUM SCRAP TREAD KAN BAHARAIN 18,000 1,985,870 110.3325/04/12 ALUMINIUM SCRAP TREAD KAN KUWAIT 37,000 3,990,827 107.8626/04/12 ALUMINIUM SCRAP TAINT-TABOR KAN S. ARABIA 41,000 4,087,395 99.6926/04/12 ALUMINIUM SCRAP TALDON KAN S. ARABIA 20,000 1,755,571 87.7826/04/12 ALUMINIUM SCRAP TALDON/TALDORK KAN S. ARABIA 21,000 1,789,778 85.2326/04/12 ALUMINIUM SCRAP TALK KAN S. ARABIA 19,000 3,999,985 210.5327/04/12 ALUMINIUM SCRAP "TENSE, TAINT TABOR & TREAD KAN MOROCCO 43,000 4,104,143 95.4527/04/12 ALUMINIUM SCRAP "TENSE,TRUMP, TAINT TABOR & TREAD KAN MOROCCO 28,000 2,698,364 96.3727/04/12 ALUMINIUM SCRAP TAINT TABOR KAN S. ARABIA 21,000 2,317,296 110.3527/04/12 ALUMINIUM SCRAP TAINT-TABOR KAN KUWAIT 19,000 1,939,988 102.1027/04/12 ALUMINIUM SCRAP TAINT-TABOR KAN UAE 17,000 1,652,153 97.1927/04/12 ALUMINIUM SCRAP TALDON KAN THAILAND 16,000 1,396,373 87.2727/04/12 ALUMINIUM SCRAP TALDON/TALDORK KAN KUWAIT 71,000 6,088,494 85.7527/04/12 ALUMINIUM SCRAP TALDON/TALDORK KAN UAE 19,000 1,630,981 85.8427/04/12 ALUMINIUM SCRAP TALDON/TALDORK KAN OMAN 39,000 3,372,104 86.4627/04/12 ALUMINIUM SCRAP TALK KAN BAHARAIN 18,000 3,763,735 209.1027/04/12 ALUMINIUM SCRAP TALK KAN S. ARABIA 19,000 4,027,990 212.0027/04/12 ALUMINIUM SCRAP TALK KAN UAE 16,000 3,479,505 217.4727/04/12 ALUMINIUM SCRAP TERSE KAN GREECE 21,000 1,745,347 83.1127/04/12 ALUMINIUM SCRAP TREAD KAN S. ARABIA 18,000 1,687,248 93.7430/04/12 ALUMINIUM SCRAP TWITCH KNA U K 45,000 4,305,282 95.6730/04/12 ALUMINIUM SCRAP "TAINT TABOR & TREAD KAN GHANA 26,000 2,409,023 92.6530/04/12 ALUMINIUM SCRAP TABLET KAN KUWAIT 21,000 2,306,431 109.8330/04/12 ALUMINIUM SCRAP TAINT/TABOR KAN S. ARABIA 21,000 2,035,966 96.9530/04/12 ALUMINIUM SCRAP TAINT-TABOR/TREAD KAN S. ARABIA 21,000 2,113,100 100.6230/04/12 ALUMINIUM SCRAP TALDON/TALDORK KAN KUWAIT 44,000 3,583,209 81.4430/04/12 ALUMINIUM SCRAP TALK KAN S. ARABIA 17,000 3,684,355 216.7330/04/12 ALUMINIUM SCRAP TELIC KAN UAE 14,000 1,195,513 85.3930/04/12 ALUMINIUM SCRAP TREAD KAN KUWAIT 40,000 4,201,980 105.0530/04/12 ALUMINIUM SCRAP TREAD KAN MOROCCO 17,000 1,696,396 99.7930/04/12 ALUMINIUM SCRAP TREAD KAN UAE 93,000 9,666,920 103.95

Aluminium & Aluminium Alloys: Bars,Rods,Profiles,etc.04/04/12 ALUMINIUM HOLLOW PROFILE DEL CHINA 526 122,809 233.4804/04/12 ALUMINIUM HOLLOW PROFILE DEL KOREA 313 86,403 276.0509/04/12 ALUMINIUM BARS DEL JAPAN 100 94,442 944.4224/04/12 ALUMINIUM PROFILE DEL CHINA 522 148,489 284.4624/04/12 ALUMINIUM EXTRUDED HOLLOW PROFILE DEL KOREA 51 17,094 335.18

Aluminium & Aluminium Alloys: Wires03/04/12 ALU. WIRE A1100 DEL JAPAN 200 273,080 1365.4004/04/12 AL-TI-B WIRE DIA.3 MM DEL GERMANY 120 117,305 977.5407/04/12 ALUMINUM BRAZING WIRE DEL JAPAN 120 885,622 7380.1818/04/12 ALU. ALUMINIUM WIRE DEL JAPAN 200 268,669 1343.3524/04/12 ALUMINIUM WIRE FOR METALLIZING PURITY 99.90% DIA DEL INDONESIA 111 24,477 220.5130/04/12 ALUMINIUM BRAZING WIRE DEL JAPAN 120 885,827 7381.89

Aluminium & Aluminium Alloys: Strips,Foils,etc.03/04/12 ALUMINIUM SHEET (IN COIL) MILL FINISH DEL GERMANY 3,641 1,068,610 293.4904/04/12 ALUMINIUM SHEET (IN COIL) MILL FINISH DEL GERMANY 1,930 589,066 305.2204/04/12 ALUMINIUM STRIP IN COIL DEL CHINA 134 42,066 313.9304/04/12 ALUMINIUM FOIL HYD CHINA 6,000 816,191 136.0307/04/12 ALUMINIUM FOIL GUR KOREA 10,007 2,243,900 224.2309/04/12 ALUMINIUM SHEET (IN COIL) MILL FINISH DEL GERMANY 11,787 3,597,575 305.2209/04/12 ALUMINIUM FOIL HYD GERMANY 13,444 7,397,384 550.2410/04/12 PVDF COLOUR COATED ALUMINIUM COILS DEL CHINA 1,000 311,819 311.8211/04/12 ALUMINIUM FOIL DIG MALAYSIA 7,362 1,238,492 168.2311/04/12 ALUMINIUM FOIL DEL CHINA 1,360 582,759 428.5011/04/12 AL-FOIL SOFT TEMPER PLAIN DULL SIDE DEL GERMANY 202 284,298 1407.4213/04/12 ALUMINIUM COLOURED COILS KNA CHINA 19,870 3,084,296 155.2217/04/12 PVDF COLOUR COATED ALUMINIUM COILS DEL CHINA 1,000 232,448 232.4517/04/12 ALUMINIUM COIL GUR GERMANY 12,109 2,521,509 208.2319/04/12 ALUMINIUM COIL GUR GERMANY 3,610 771,076 213.5919/04/12 ALUMINIUM FOIL HYD GERMANY 4,301 2,237,521 520.2321/04/12 COATED ALUMINIUM COIL DEL CHINA 1,024 385,156 376.1321/04/12 ALUMINIUM COIL GUR GERMANY 5,290 1,147,946 217.0021/04/12 ALUMINIUM THIN STRIP DEL GERMANY 643 555,161 863.3921/04/12 ALUMINIUM FOIL GUR KOREA 11,649 2,571,923 220.7823/04/12 ALUMINIUM FOIL HYD CHINA 7,187 1,110,674 154.5424/04/12 CLADDING ALUMINUM FLAT SHEET GUR CHINA 4,208 854,685 203.1124/04/12 ALUMINIUM FOIL GUR CHINA 6,506 1,166,406 179.2825/04/12 45 MICRON AL-FOIL SOFT TEMPER PLAIN DULL SIDE DEL GERMANY 817 1,016,048 1243.6326/04/12 ALUMINIUM FOIL HYD GERMANY 11,209 7,370,789 657.5827/04/12 ALUMINIUM FOIL HYD CHINA 25,000 4,028,654 161.1530/04/12 PVDF COLOR COATED ALUMINIUM COIL DEL CHINA 2,115 1,121,180 530.1130/04/12 ALUMINIUM FOIL DEL ARMENIA 480 105,200 219.1730/04/12 ALUMINIUM FOIL DEL CHINA 225 51,485 228.82

Aluminium & Aluminium Alloys: Tubes,Pipes,Fittings,etc.04/04/12 ALUMINIUM TUBE DEL BRITISH VIRGIN 1,956 431,331 220.5204/04/12 ALUMINIUM CLADED TUBE FOR CAR RADIATOR GUR CHINA 1,115 412,656 370.1023/04/12 ALUMINIUM TUBE DEL GERMANY 2,741 1,229,707 448.6324/04/12 ALUMINIUM CLADED TUBE FOR CAR RADIATOR GUR CHINA 972 359,525 369.8826/04/12 ALUMINIUM CLADED TUBE FOR CAR RADIATOR GUR CHINA 13,280 4,608,351 347.01

LEAD & LEAD ALLOYSLead & Lead Alloys: Unwrought03/04/12 REMELTED LEAD INGOTS KNA BANGLADESH 24,000 2,377,414 99.0619/04/12 REMELTED LEAD INGOTS KNA BANGLADESH 48,000 4,875,538 101.5725/04/12 REMELTED LEAD INGOTS KNA S. AFRICA 25,000 2,540,119 101.6030/04/12 REMELTED LEAD INGOTS KAN S. ARABIA 147,000 15,327,781 104.27

Lead Waste & Scrap04/04/12 LEAD SCRAP RADIO KNA UAE 21,000 1,952,878 92.9909/04/12 LEAD SCRAP RADIO KNA U K 25,000 2,520,689 100.8320/04/12 LEAD SCRAP RADIO KNA GEORGIA 21,000 1,977,745 94.1820/04/12 LEAD SCRAP RADIO KNA U K 56,480 5,699,346 100.91

ZINC & ZINC ALLOYSZinc & Zinc Alloys: Unwrought21/04/12 ZINC INGOTS KAN IRAN 26,000 2,884,710 110.9523/04/12 HIGH GRADE ZINC INGOTS OF 99.95% KAN UAE 318,000 34,028,100 107.0125/04/12 HIGH GRADE ZINC INGOTS OF 99.95% KAN UAE 194,000 21,137,072 108.95

Zinc Waste & Scrap12/04/12 ZINC DIE CAST SCRAP SAVES KAN MOROCCO 22,000 1,808,825 82.2212/04/12 ZINC SCRAP SCORE KAN NETHERLANDS 22,000 1,945,970 88.4517/04/12 ZINC DIE CAST SCRAP SAVES KAN S. ARABIA 17,000 1,506,719 88.6317/04/12 ZINC SCRAP SCORE KAN DENMARK 28,000 2,328,877 83.1725/04/12 ZINC DIE CAST SCRAP SAVES KAN THAILAND 25,000 2,261,538 90.4627/04/12 ZINC DIE CAST SCRAP SAVES KAN KUWAIT 18,000 1,601,158 88.95

Zinc Dust/Powders24/04/12 ZINC DUST DEL ITALY 30 10,352 345.07

OTHER MINOR METALS04/04/12 TUNGSTEN WIRE DEL CHINA 725 2,696,466 3719.2604/04/12 MOLYBDENUM WIRE DEL CHINA 298 884,760 2968.9910/04/12 COBALT UNALLOYED UNWROUGHT DEL FRANCE 50 149,485 2989.7010/04/12 TITANIUM SPONGE TG-90 HYD RUSSIA 25,000 27,180,634 1087.2310/04/12 TITANIUM SPONGE TG-90 HYD S. ARABIA 25,000 27,180,634 1087.2311/04/12 TUNGSTEN WIRE DEL CHINA 267 1,521,346 5697.9312/04/12 MANGANESE METAL BRIQUETTES GUR CHINA 25,000 3,341,964 133.6817/04/12 TUNGSTEN WIRE DEL CHINA 151 568,201 3762.9217/04/12 COBALT BASED DEL USA 145 703,079 4848.8219/04/12 TUNGSTEN WIRE DEL CHINA 276 1,572,293 5696.7120/04/12 TUNGSTEN WIRE DEL CHINA 559 3,319,455 5938.2020/04/12 MOLYBDENUM WIRE DEL CHINA 1,061 3,365,384 3171.9021/04/12 MOLYBDENUM WIRE DEL CHINA 574 1,646,330 2868.1723/04/12 MOLYBDENUM WIRE DEL CHINA 748 2,080,312 2781.1725/04/12 TUNGSTEN WIRE DEL CHINA 527 3,004,194 5700.5625/04/12 MOLYBDENUM METAL TRAYS (MO:99.80% MIN) HYD CHINA 20,000 42,896,867 2144.8425/04/12 MANGANESE BRIQUETTES GUR CHINA 25,000 3,393,979 135.7626/04/12 MOLYBDENUM SHEET DEL CHINA 100 420,801 4208.0127/04/12 COBALT POWDER DEL FRANCE 150 442,049 2946.9930/04/12 TUNGSTEN WIRE DEL CHINA 735 2,715,589 3694.68

Page 12: Minerals and Metal Review August 2012- 1

Minerals & Metals Review WEEKLY

AUGUST 06, 201212

Ports Covered in this issue: KAN: Apr 2012, GUR: Apr 2012, DEL: Apr 2012, COC: Apr 2012, GUR: Apr 2012, KNA: Apr 2012, DAD: Apr 2012, FAR: Apr 2012, HYD: Apr 2012, KAK: Apr 2012, GAN: Apr 2012Ports Covered in recent past issues: MUN :Mar 2012,MUM :Mar 2012, CHN: Mar 2012, DEL: Mar 2012, Goa : Mar 2012, VIZ: Mar 2012, AHM: Apr 2012, JNP: Apr 2012, KOL: Apr 2012, BAN: Apr 2012

Imports: Mineral ProductsDate Product Description Port Country Quantity Value CIF Rate

(kgs.) (Rs.)Date Product Description Port Country Quantity Value CIF Rate

(kgs.) (Rs.)

Exports: Non-Ferrous Products

Ports Covered in this issue: COC : Apr 2012, KOL: Apr 2012, BAR: Apr 2012, ANK: Apr 2012, DIG: Apr 2012, Goa : Apr 2012

Ports Covered in recent past issues: JNP: Apr 2012, BAN: Apr 2012, MUM: Apr 2012, DEL: Apr 2012, KAN: Mar 2012, CHN : Mar 2012, VIZ : Apr 2012, MUN : Apr 2012, AHM: Apr 2012

Date Product Description Port Country Quantity Value FOB Rate(kgs.) (Rs.)

Date Product Description Port Country Quantity Value FOB Rate(kgs.) (Rs.)

COPPER & COPPER ALLOYSCopper & Copper Alloys: Powders12/04/12 20% COPPER POWDER KOL SWITZERLAND 17,000 677,195 39.84

Copper & Copper Alloys: Bars,Rods,Profiles,etc.02/04/12 COPPER ROD COC BELGIUM 23,602 9,981,679 422.9202/04/12 COPPER ROD COC UAE 50,132 21,482,248 428.5102/04/12 C-1184 COPPER EXTRUDED SOLID SECTIONS COC UAE 3,931 1,825,516 464.3917/04/12 COPPER BUS BAR KOL S. ARABIA 13,305 6,219,571 467.46

Copper & Copper Alloys: Wires02/04/12 COPPER WIRE COC UAE 20,912 8,911,787 426.16

Copper & Copper Alloys: Strips,Foils,etc.02/04/12 COPPER FLATS/SHEETS/STRIPS COC UAE 1,666 752,328 451.5804/04/12 BRASS STRIPS/SHEETS C-1170 DIG PAKISTAN 2,000 602,930 301.4704/04/12 COIN BLANK BAR PERU 21,960 11,923,579 542.9704/04/12 COPPER FOILS C-1186 DIG PAKISTAN 8,000 4,123,201 515.4004/04/12 BRASS STRIPS IN COILS BAR PERU 1,980 789,628 398.8004/04/12 BRASS FOILS C-1168 DIG PAKISTAN 11,000 4,262,900 387.54

NICKEL & NICKEL ALLOYSNickel & Nickel Alloys: Unwrought11/04/12 2"X2" NICKEL CUT CATHODES KOL BANGLADESH 18,000 19,245,782 1069.21

ALUMINIUM & ALUMINIUM ALLOYSAluminium & Aluminium Alloys: Unwrought20/04/12 ALUMINIUM INGOTS KOL THAILAND 306,000 35,192,517 115.0121/04/12 ALUMINIUM INGOTS KOL KOREA 1,275,000 146,421,346 114.8423/04/12 ALUMINIUM INGOTS KOL KOREA 509,000 56,349,061 110.7125/04/12 ALUMINIUM INGOTS KOL BANGLADESH 51,000 5,809,262 113.9126/04/12 ALUMINIUM INGOTS KOL THAILAND 306,000 35,129,848 114.8026/04/12 ALUMINIUM INGOTS KOL BANGLADESH 102,000 11,655,472 114.2727/04/12 ALUMINIUM INGOTS KOL BANGLADESH 101,000 11,604,758 114.9027/04/12 ALUMINIUM INGOTS KOL KOREA 815,000 93,757,877 115.04

Aluminium & Aluminium Alloys: Bars,Rods,Profiles,etc.18/04/12 ALUMINIUM SECTION BAR TANZANIA 5,266 1,087,833 206.5818/04/12 ALUMINIUM ANGLE BAR TANZANIA 211 43,632 206.7920/04/12 ALUMINIUM WIRE ROD. KOL KENYA 42,813 5,575,158 130.2228/04/12 ALUMINIUM NOTCH BARS KOL YEMEN 12,000 1,594,462 132.87

Aluminium & Aluminium Alloys: Wires02/04/12 ALUMINIUM WIRE DIG THAILAND 8,000 1,377,341 172.1702/04/12 ALUMINIUM ALLOY WIRE GRADE.6061 KOL VENEZUELA 1,000 84,761 84.7603/04/12 ALUMINIUM WIRE BAR S. ARABIA 15,000 2,059,581 137.3112/04/12 ALUMINIUM WIRE DIG UAE 15,000 2,568,406 171.23

Aluminium & Aluminium Alloys: Strips,Foils,etc.02/04/12 ALUMINIUM STRIP (FINSTOCK) ANK BRAZIL 6,000 891,404 148.5702/04/12 ALUMINIUM FOIL SYNTHETIC RESIN ANK FRANCE 305 91,842 301.1207/04/12 ALUMINIUM PLAIN SHEET IN COIL KOL BELGIUM 20,000 2,519,112 125.9611/04/12 ROLLED ALUMINIUM SHEETS KOL SPAIN 11,000 1,375,156 125.0111/04/12 ROLLED ALUMINIUM SHEETS KOL CANADA 3,000 486,770 162.2611/04/12 ROLLED ALUMINIUM SHEETS/CIRCLE KOL GERMANY 4,000 595,170 148.7911/04/12 ROLLED ALUMINIUM SHEETS KOL GERMANY 14,000 1,830,956 130.7811/04/12 ROLLED ALUMINIUM SHEETS/STRIPS KOL ITALY 3,000 457,757 152.5911/04/12 ROLLED ALUMINIUM SHEETS KOL OMAN 4,000 463,482 115.8711/04/12 ROLLED ALUMINIUM SHEETS KOL POLAND 10,000 1,460,331 146.03

Aluminium & Aluminium Alloys: Strips,Foils,etc.11/04/12 ROLLED ALUMINIUM SHEETS KOL QATAR 15,000 2,288,628 152.5811/04/12 ALUMINIUM SHEET IN COIL FORM KOL UAE 132,000 17,924,509 135.7913/04/12 ALUMINIUM ROLLED PLATES,SHEETS,STRIPS KOL GERMANY 24,000 3,390,313 141.2613/04/12 ALUMINIUM SHEET IN COIL FORM KOL GERMANY 132,000 17,956,236 136.0313/04/12 ALUMINIUM ROLLED PLATES,SHEETS,STRIPS KOL NIGERIA 60,000 8,481,077 141.3519/04/12 ALUMINIUM SHEET IN COIL FORM KOL NIGERIA 132,000 18,100,844 137.1319/04/12 ROLLED ALUMINIUM PLATES,SHEETS,STRIPS KOL THAILAND 16,000 2,268,798 141.8019/04/12 ROLLED ALUMINIUM PLATES,SHEETS,STRIPS KOL SINGAPORE 58,000 8,584,286 148.0019/04/12 ROLLED ALUMINIUM PLATES,SHEETS,STRIPS KOL PHILIPPINES 20,000 2,839,098 141.9519/04/12 ROLLED ALUMINIUM SHEETS KOL AUSTRALIA 30,000 4,383,038 146.1019/04/12 ROLLED ALUMINIUM SHEETS KOL SINGAPORE 20,000 2,718,917 135.9520/04/12 ROLLED ALUMINIUM PLATES,SHEETS,STRIPS KOL UAE 103,000 13,927,373 135.2221/04/12 ROLLED ALUMINIUM PLATES,SHEETS,STRIPS KOL SINGAPORE 22,000 3,124,628 142.0321/04/12 ROLLED ALUMINIUM SHEETS/PLATES KOL HONGKONG 33,000 4,387,117 132.9424/04/12 ALUMINIUM SHEET IN COIL FORM KOL NIGERIA 132,000 18,084,550 137.0024/04/12 ROLLED ALUMINIUM SHEETS KOL AUSTRALIA 22,000 3,122,841 141.9524/04/12 ROLLED ALUMINIUM SHEETS KOL SINGAPORE 16,000 2,197,040 137.3225/04/12 ALUMINIUM COILS KOL NIGERIA 20,000 2,869,360 143.4725/04/12 ALUMINIUM ROLLED.PLTS.SHTS.STRPS KOL NIGERIA 22,000 3,117,166 141.6925/04/12 ROLLED ALUMINIUM COIL KOL NIGERIA 104,000 14,634,500 140.7225/04/12 ROLLED ALUMINIUM PLATES,SHEETS,STRIPS KOL SINGAPORE 23,000 3,156,880 137.2625/04/12 ROLLED ALUMINIUM SHEETS/STRIPS KOL AUSTRALIA 21,000 3,184,183 151.6325/04/12 ROLLED ALUMINIUM SHEETS/STRIPS KOL USA 15,000 2,204,136 146.9427/04/12 ALUMINIUM PLAIN SHEET IN COIL FORM KOL NIGERIA 132,000 17,964,073 136.0928/04/12 ROLLED ALUMINIUM SHEETS KOL SINGAPORE 21,000 2,715,810 129.3228/04/12 ALUMINIUM SHEET IN COIL FORM KOL NIGERIA 131,000 17,890,017 136.5728/04/12 ALUMINIUM SHEETS KOL NIGERIA 24,000 3,423,611 142.6528/04/12 ROLLED ALUMINIUM /SHEETS KOL NIGERIA 82,000 11,570,616 141.1128/04/12 ROLLED ALUMINIUM /SHEETS KOL AUSTRALIA 14,000 2,120,506 151.4628/04/12 ROLLED ALUMINIUM SHEETS/STRIPS KOL AUSTRALIA 20,000 3,026,961 151.35

Aluminium & Aluminium Alloys: Tubes,Pipes,Fittings,etc.20/04/12 ECTRUDED ALUMINIUM PRODUCTS INCL PIPES& TUBES COC U K 20,000 3,123,916 156.2025/04/12 ECTRUDED ALUMINIUM PRODUCTS INCL PIPES& TUBES COC SINGAPORE 18,000 2,664,235 148.0126/04/12 ECTRUDED ALUMINIUM PRODUCTS INCL PIPES& TUBES COC TURKEY 16,000 2,379,966 148.7528/04/12 ECTRUDED ALUMINIUM PRODUCTS INCL PIPES& TUBES COC GERMANY 17,000 2,415,962 142.1228/04/12 ECTRUDED ALUMINIUM PRODUCTS INCL PIPES& TUBES COC SINGAPORE 5,000 769,280 153.86

LEAD & LEAD ALLOYSLead & Lead Alloys: Unwrought12/04/12 LEAD INGOTS 99.97% PURITY (MINIMU) COC UAE 50,000 5,400,096 108.0012/04/12 ANTIMONIAL LEAD SB 1.7 PCT MIN COC UAE 75,000 8,250,395 110.0124/04/12 ANTIMONIAL LEAD SB 7 PCT COC INDONESIA 46,000 5,144,874 111.8524/04/12 LEAD ALLOY INGOTS COC SRI LANKA 25,000 3,370,907 134.84

ZINC & ZINC ALLOYSZinc & Zinc Alloys: Unwrought04/04/12 ZINC INGOTS DIG GERMANY 1,282,000 154,425,926 120.46

Zinc Dust/Powders02/04/12 ZINC DUST MIN. 99.5% ZINC COC UAE 43,000 5,319,595 123.71

OTHER MINOR METALS11/04/12 COBALT CATHODE BAR S. ARABIA 150 225,512 1503.4111/04/12 COBALT CATHODE BAR UAE 14,850 22,321,667 1503.1411/04/12 COBALT CATHODE BAR OMAN 500 752,871 1505.74

MINERALSSulphur (incl. Collodial Sulphur)18/04/12 BRIGHT YELLOW CRUDE SULPHUR KAN UAE 750,000 9,468,030 12.6227/04/12 BRIGHT YELLOW CRUDE SULPHUR KAN S. ARABIA 2,000,000 19,985,059 9.9930/04/12 BRIGHT YELLOW CRUDE SULPHUR KAN UAE 500,000 6,500,768 13.0013/04/12 BRIGHT YELLOW SULPHUR CRUDE KAN UAE 1,100,000 12,713,506 11.5619/04/12 CHEMICALS-SHLPHUR COC KOREA 120 19,254 160.45

Natural Graphite18/04/12 ASBURY NATURAL GRAPHITE 508 DAD ITALY 9,072 1,118,437 123.2819/04/12 NATURAL GRAPHITE DEL SRI LANKA 600 113,406 189.0127/04/12 NATURAL GRAPHITE DEL SRI LANKA 600 113,406 189.01

Nautral Sands03/04/12 SILICA SAND TYPE GUR ITALY 150,000 1,928,167 12.8510/04/12 SAND GUR BELGIUM 13,500 268,139 19.8617/04/12 SILICA SAND GUR ITALY 150,000 2,006,360 13.3819/04/12 SILICA SAND GUR ITALY 125,000 1,574,097 12.5926/04/12 SILICA SAND GUR ITALY 100,000 1,337,573 13.3826/04/12 RESIN COATED SAND GUR THAILAND 20,000 372,055 18.60

Clays like Kaolin,Bentonite,Kyanite,etc.23/04/12 UN PROCESSED KAOLIN CLAY KAK INDONESIA 7,895,000 20,977,055 2.6609/04/12 CHINA CLAY KNA NEW ZEALAND 21,000 658,125 31.3419/04/12 CHINA CLAY DAD NEW ZEALAND 21,000 653,751 31.1317/04/12 CHINA CLAY KNA U K 26,000 439,513 16.9019/04/12 CHINA CLAY KNA CHINA 49,000 747,448 15.2513/04/12 ULTRA GLOSS 90 DAD USA 20,000 314,332 15.7220/04/12 CHINA CLAY KNA NEW ZEALAND 63,000 1,974,333 31.3413/04/12 REFINED KAOLIN KAN MALAYSIA 42,000 535,234 12.7410/04/12 BENTONITE KNA CHINA 24,000 290,111 12.0910/04/12 DBK-O BALL CLAY KAN UKRAINE 540,000 3,175,973 5.8811/04/12 DBK-O BALL CLAY KAN UKRAINE 1,100,000 6,469,575 5.8812/04/12 DBK-O BALL CLAY KAN UKRAINE 350,000 2,058,501 5.8813/04/12 DBK-O BALL CLAY KAN UKRAINE 1,200,000 7,057,718 5.8817/04/12 DBK-O BALL CLAY KAN UKRAINE 250,000 1,470,358 5.8825/04/12 DBK-O BALL CLAY KAN UKRAINE 300,000 1,764,430 5.8826/04/12 DBK-O BALL CLAY KAN UKRAINE 100,000 588,143 5.8830/04/12 DBK-O BALL CLAY KAN UKRAINE 150,000 882,215 5.8809/04/12 DBK-O BALL CLAY KAN UKRAINE 100,000 588,143 5.8817/04/12 DBK-O BALL CLAY KAN UKRAINE 200,000 1,176,286 5.8818/04/12 DBK-O BALL CLAY KAN UKRAINE 450,000 2,646,644 5.8803/04/12 DBK-O BALL CLAY IN BULK KAN UKRAINE 300,000 1,764,430 5.8819/04/12 DBK-O BALL CLAY IN BULK KAN UKRAINE 100,000 588,143 5.8821/04/12 DBK-O BALL CLAY IN BULK KAN UKRAINE 600,000 3,528,859 5.8823/04/12 DBK-O BALL CLAY IN BULK KAN UKRAINE 665,000 3,911,152 5.88

Rock Phosphate12/04/12 ROCK PHOSPHATE COC MOROCCO 42,537,000 442,608,990 10.4104/04/12 EGYPTIAN ROCK PHOSPHATE 30% KAN EGYPT 13,524,000 87,910,898 6.5004/04/12 ROCK PHOSPHATE KAN EGYPT 5,624,000 36,529,228 6.5018/04/12 ROCK PHOSPHATE KAN EGYPT 2,200,000 17,391,528 7.9119/04/12 ROCK PHOSPHATE KAN EGYPT 16,200,000 116,766,705 7.2124/04/12 ROCK PHOSPHATE KAN EGYPT 1,700,000 12,890,913 7.5825/04/12 ROCK PHOSPHATE KAN EGYPT 2,000,000 14,537,152 7.27

Marble11/04/12 ROUGH MARBLE BLOCK KNA ITALY 343,000 5,772,889 16.8313/04/12 ROUGH MARBLE BLOCK KNA ITALY 507,000 8,658,874 17.0818/04/12 ROUGH MARBLE BLOCK KNA ITALY 613,000 10,180,757 16.6126/04/12 ROUGH MARBLE BLOCK KNA ITALY 374,000 6,620,270 17.7027/04/12 ROUGH MARBLE BLOCK KNA ITALY 279,000 4,959,118 17.7730/04/12 ROUGH MARBLE BLOCK KNA ITALY 440,000 7,656,693 17.40

Magnesite23/04/12 MAGNESIUM OXDE HEAVY, GRAN DAD USA 1,550 360,784 232.7618/04/12 ACTIVATED MAGNESIA DEL USA 196 64,488 329.0227/04/12 MAGNESIUM OXIDE DEL U K 26 71,433 2747.4219/04/12 STARMAG CX150 GUR JAPAN 100 18,475 184.75

Gypsum26/04/12 NORMAL GYPSUM PLASTER COC IRAN 135,000 623,208 4.6210/04/12 GYPSUM POWDER COC IRAN 96,000 325,909 3.3909/04/12 QUBI THICKENER HYD ITALY 2,000 15,054 7.5319/04/12 PLASTER OF PARIS DAD THAILAND 24,000 282,671 11.7830/04/12 PLASTER OF PARIS DAD THAILAND 24,000 289,727 12.0723/04/12 GYPSUM PLASTER GUR THAILAND 21,000 222,387 10.5903/04/12 PLASTER MOLDA KNA THAILAND 48,000 476,343 9.9230/04/12 PLASTER MOLDA KNA THAILAND 24,000 253,764 10.57

Limestone & Limestone Products29/04/12 LOW SILICA LIMESTONE GAN UAE 47,266,000 51,559,960 1.0920/04/12 CALCIUM OXIDE (QUICK LIME) GUR UAE 404,360 2,272,541 5.6220/04/12 QUICK LIME LUMPS GUR UAE 808,680 4,544,592 5.6219/04/12 WHITE CLINKER COC EGYPT 266,000 1,385,003 5.2118/04/12 WHITE PORTLAND CEMENT COC UAE 280,000 2,117,028 7.5621/04/12 WHITE PORTLAND CEMENT COC UAE 280,000 2,117,028 7.5626/04/12 WHITE PORTLAND CEMENT COC PAKISTAN 280,000 2,014,946 7.2025/04/12 ORDINARY PORT LAND CEMENT COC PAKISTAN 280,000 1,119,332 4.0025/04/12 PORTLAND CEMENT COC PAKISTAN 504,000 2,233,433 4.4326/04/12 PORTLAND CEMENT COC PAKISTAN 56,000 269,670 4.82

Asbestos10/04/12 RAW CHRYSOTILE ASBESTOES GRADE - 4Z COC BRAZIL 100,000 4,461,178 44.6110/04/12 RAW CHRYSOTILE ASBESTOES GRADE - 5K COC BRAZIL 100,000 4,190,647 41.9110/04/12 CHRSOTILE RAW ASBESTOS GRADE A5-65 COC RUSSIA 90,000 2,453,027 27.2611/04/12 CHRSOTILE RAW ASBESTOS GRADE A5-65 COC KAZAKISTAN 360,000 11,712,738 32.5411/04/12 CHRYSOTILE RAW ASBESTOES FIBRE U-100 COC RUSSIA 54,000 2,649,238 49.0611/04/12 CHRYSOTILE RAW ASBESTOS FIBRE U-85 COC RUSSIA 260,000 7,858,957 30.2324/04/12 CHRYSOTILE ASBESTOS FIBRE GRADE A4 -20 COC RUSSIA 450,000 18,912,654 42.0330/04/12 CHRYSOTILE ASBESTOS FIBRE GRADE A4 -20 COC KAZAKISTAN 225,000 9,690,395 43.0713/04/12 CHRYSOTILE RAW ASBESTOS FIBER GRADE A5-70 DAD CHINA 20,000 598,173 29.9127/04/12 RAW CHRYSOTILE ASBESTOS GRADE A5-70 FAR RUSSIA 120,000 3,432,990 28.6104/04/12 CHRYSOTILE RAW ASBESTOS OF RUSSIAN ORIGIN GRADE HYD POLAND 383,000 16,126,364 42.1119/04/12 CHRYSOTILE RAW ASBESTOS OF RUSSIAN ORIGIN GRADE HYD RUSSIA 315,000 8,388,979 26.6324/04/12 CHRYSOTILE RAW ASBESTOS OF RUSSIAN ORIGIN GRADE HYD RUSSIA 406,000 17,800,834 43.84

Steatite, Cryolite,Borates,etc.03/04/12 PHARMA TALC DEL U K 500 87,589 175.1818/04/12 TALC POWDER DEL AUSTRIA 3,000 291,222 97.0710/04/12 JM-209, TALC POWDER GUR CHINA 77,220 2,743,337 35.5319/04/12 MICROACE K-1 GUR JAPAN 105 9,338 88.9321/04/12 TALC POWDER GUR CHINA 77,220 2,743,337 35.53

Feldspar,Flourspar,etc.24/04/12 FLUORSPAR POWDER GUR CHINA 160,400 3,755,996 23.4226/04/12 FLUORSPAR POWDER GUR CHINA 108,680 2,544,898 23.4217/04/12 NEPHELINE SYENITE DEL USA 500 125,928 251.86

ENERGY MINERALSCoal & Lignite25/04/12 ANTHRACITE COAL ( SIZE(13-25MM) GAN UKRAINE 1,000,000 11,884,882 11.8804/04/12 ANTHRACITE COAL (SIZE0-13MM) GAN UKRAINE 500,000 4,678,092 9.3621/04/12 ANTHRACITE COAL (SIZE0-13MM) GAN UKRAINE 300,000 2,861,869 9.5423/04/12 COKING COAL GAN AUSTRALIA 41,181,000 596,593,171 14.4929/04/12 COKING COAL GAN AUSTRALIA 49,017,000 625,662,000 12.7620/04/12 HARD COKING COAL GAN AUSTRALIA 123,823,000 1,544,396,061 12.47

Page 13: Minerals and Metal Review August 2012- 1

13Minerals & Metals Review WEEKLY

AUGUST 06, 2012

Date Product Description Port Country Quantity Value CIF Rate(kgs.) (Rs.)

Date Product Description Port Country Quantity Value CIF Rate(kgs.) (Rs.)

Exports: Mineral Products

Ports Covered in this issue : KOL: Apr 2012 (16th to 30th), COC: Apr 2012, CHI: Apr 2012Ports Covered in recent past issues: CHN: Mar 2012, MUM: Mar 2012, KAN: Mar 2012 GOA: Mar 2012, VIZ: Mar 2012, JNP: Mar 2012 AHM: Apr 2012, BAR: Apr 2012, AMR: Apr 2012, BHU: Apr 2012

Date Product Description Port Country Quantity Value FOB Rate(kgs.) (Rs.)

Date Product Description Port Country Quantity Value FOB Rate(kgs.) (Rs.)

Coal & Lignite03/04/12 HARD COKING COAL KAN AUSTRALIA 6,445,000 107,861,403 16.7404/04/12 HARD COKING COAL KAN AUSTRALIA 6,000,000 78,873,930 13.1509/04/12 HARD COKING COAL KAN AUSTRALIA 3,000,000 33,237,585 11.0811/04/12 HARD COKING COAL KAN AUSTRALIA 3,000,000 34,017,810 11.3417/04/12 HARD COKING COAL KAN AUSTRALIA 3,000,000 39,011,250 13.0019/04/12 HARD COKING COAL KAN AUSTRALIA 3,000,000 33,159,563 11.0510/04/12 HARD COKING COAL KAN AUSTRALIA 2,000,000 26,423,620 13.2130/04/12 HARD COKING COAL KAN AUSTRALIA 6,000,000 71,733,887 11.9623/04/12 UNWASHED COKING COAL KAN AUSTRALIA 10,000,000 80,671,828 8.0712/04/12 UNWASHED COKING COAL KAN AUSTRALIA 10,000,000 80,671,828 8.0717/04/12 UNWASHED COKING COAL KAN AUSTRALIA 10,000,000 80,671,828 8.0711/04/12 STEAMING NON COKING COAL COC INDONESIA 3,000,000 10,071,720 3.3602/04/12 STEAM COAL GAN INDONESIA 54,346,000 168,114,006 3.0912/04/12 STEAM COAL GAN INDONESIA 162,870,000 790,406,927 4.8517/04/12 STEAM COAL GAN INDONESIA 51,142,000 164,929,922 3.2218/04/12 STEAM COAL GAN INDONESIA 33,032,000 89,344,293 2.7020/04/12 STEAM COAL GAN INDONESIA 17,600,000 50,849,460 2.8929/04/12 STEAM COAL GAN INDONESIA 154,376,000 753,603,078 4.8811/04/12 STEAM (NON-COKING)COAL KAK INDONESIA 53,275,000 302,128,480 5.6713/04/12 STEAM (NON-COKING)COAL KAK INDONESIA 69,956,000 401,225,870 5.7425/04/12 STEAM (NON-COKING)COAL KAK INDONESIA 55,377,000 308,365,713 5.5710/04/12 COAL KAN INDONESIA 5,000,000 18,617,234 3.7223/04/12 NON COKING COAL KAN INDONESIA 5,000,000 14,601,556 2.9209/04/12 NON COKING COAL KAN INDONESIA 5,000,000 16,614,500 3.3212/04/12 NON COKING COAL KAN INDONESIA 7,000,000 22,455,123 3.2113/04/12 NON COKING COAL KAN INDONESIA 3,000,000 8,760,934 2.9218/04/12 NON COKING COAL KAN INDONESIA 13,892,000 44,437,295 3.2019/04/12 NON COKING COAL KAN INDONESIA 1,500,000 5,047,980 3.3726/04/12 NON COKING COAL KAN INDONESIA 14,000,000 42,308,050 3.0230/04/12 NON COKING COAL KAN INDONESIA 5,000,000 16,614,500 3.3211/04/12 NON COKING COAL KAN INDONESIA 8,500,000 32,333,432 3.8017/04/12 NON COKING COAL KAN INDONESIA 7,486,000 29,145,069 3.8930/04/12 NON COKING COAL KAN INDONESIA 1,000,000 3,247,386 3.2518/04/12 STEAM (NON COKING) COAL KAN S. AFRICA 5,000,000 39,281,910 7.8609/04/12 STEAM (NON COKING) COAL KAN S. AFRICA 2,054,000 15,206,378 7.4010/04/12 STEAM (NON COKING) COAL KAN S. AFRICA 10,000,000 78,303,416 7.8320/04/12 STEAM (NON COKING) COAL KAN INDONESIA 6,000,000 17,964,300 2.9920/04/12 STEAM (NON COKING) COAL KAN S. AFRICA 5,000,000 37,016,500 7.4021/04/12 STEAM (NON COKING) COAL KAN INDONESIA 13,946,000 40,686,410 2.9204/04/12 STEAM COAL KAN S. AFRICA 5,000,000 30,168,700 6.0310/04/12 STEAM COAL KAN S. AFRICA 7,000,000 45,585,946 6.5119/04/12 STEAM COAL KAN INDONESIA 1,000,000 4,292,561 4.2925/04/12 STEAM COAL KAN S. AFRICA 5,000,000 30,168,700 6.0312/04/12 STEAM COAL (NON COKING) KAN INDONESIA 21,000,000 66,633,108 3.1724/04/12 STEAM COAL (NON COKING) KAN S. AFRICA 2,000,000 13,748,019 6.8723/04/12 STEAM NON COKING COAL KAN INDONESIA 2,000,000 7,279,633 3.6404/04/12 STEAM NON COKING COAL KAN INDONESIA 33,323,000 100,011,435 3.0024/04/12 STEAM NON COKING COAL KAN INDONESIA 1,973,000 6,162,932 3.12

CHEMICAL ELEMENTS & THEIR DERIVATIVESNon Metals like Silicon,Phosphorus,Selenium,etc.10/04/12 SILICON METAL DAD VIETNAM 24,000 2,826,786 117.7819/04/12 SILICON METAL DAD VIETNAM 20,000 2,310,276 115.5120/04/12 SILICON METAL DAD VIETNAM 24,000 2,801,837 116.7403/04/12 SILICON METAL GRADE 553 DAD CHINA 24,000 2,658,352 110.7604/04/12 SILICON METAL 553 DAD CHINA 48,000 5,423,039 112.9807/04/12 SILICON METAL 8-5-3 DAD CHINA 24,000 2,789,130 116.2107/04/12 SILICON METAL 553 DAD CHINA 48,000 5,653,573 117.7811/04/12 SILICON METAL GRADE 553 DAD CHINA 24,000 2,777,601 115.7317/04/12 SILICON METAL GRADE 553 DAD CHINA 24,000 2,771,359 115.4721/04/12 SILICON METAL 553 DAD CHINA 48,000 5,954,078 124.0427/04/12 SILICON METAL 853 DAD CHINA 24,000 2,801,837 116.7404/04/12 SILICON METAL GRADE 553 SPECS:SI-98.5 PCT MIN. FAR CHINA 48,000 5,763,206 120.0713/04/12 SILICON METAL GRADE 553 SPECS:SI-98.5 PCT MIN. FAR CHINA 48,000 5,763,206 120.0719/04/12 SILICON METAL GRADE 553 FAR CHINA 15,000 1,864,575 124.3119/04/12 SILICON METAL GRADE 3303 FAR CHINA 10,000 1,241,623 124.1625/04/12 SILICON METAL GRADE 553 SPECS:SI-98.5 PCT MIN. FAR CHINA 48,000 5,957,704 124.1227/04/12 SILICON METAL GRADE 553 FAR CHINA 20,000 2,482,377 124.12

Oxides/Hydroxides of Al,Mn,Cr,Zn25/04/12 ZINC OXIDE COC CONGO 381,000 16,454,466 43.1919/04/12 ZINC OXIDE GUR JAPAN 940 135,202 143.8324/04/12 ZINC OXIDE GUR CHINA 1,550 228,970 147.7204/04/12 CALCINED METALLURGICAL GRADE ALUMINA GAN AUSTRALIA 35,850,000 674,885,416 18.8310/04/12 PURALOX SCFA 160 DEL JAPAN 1,294 2,075,633 1604.0413/04/12 PURALOX SCFA-160 (CATALYST MANUFACTURING) GUR JAPAN 2,964 1,353,495 456.6424/04/12 PURALOX SCFA-160 (CATALYST MANUFACTURING) GUR GERMANY 7,830 3,610,168 461.0712/04/12 HYDRAL 710 ALUMINIUM TRIHYDROXIDE (ATH) HYD USA 19,051 1,189,130 62.4212/04/12 SPECIAL GRADE ALUMINA HYDRATE COC GERMANY 39,520 7,539,482 190.78

Iron Oxides/Hydroxides/earth colours02/04/12 IRON OXIDE COC CHINA 21,850 1,265,486 57.9204/04/12 IRON OXIDE COC CHINA 25,000 1,434,453 57.3811/04/12 IRON OXIDE PIGMENTS COC GERMANY 20,000 1,231,489 61.5717/04/12 IRON OXIDE PIGMENTS COC GERMANY 20,000 1,591,178 79.5619/04/12 IRON OXIDE COC CHINA 10,000 352,662 35.2725/04/12 IRON OXIDE PIGMENTS COC CHINA 36,140 2,445,948 67.6827/04/12 YELLOW IRON OXIDE COC CHINA 5,250 326,338 62.1627/04/12 BLACK IRON OXIDE COC CHINA 15,000 843,978 56.2727/04/12 RED IRON OXIDE COC CHINA 1,250 77,030 61.62

Titanium Dioxides/Oxides26/04/12 TITANIUM DIOXIDE RUTILE TI-PURE R902+ HYD TAIWAN 6,000 1,341,987 223.6626/04/12 TITANIUM DIOXIDE RUTILE TI-PURE R931 HYD USA 12,000 2,683,974 223.6609/04/12 TITANIUM DIOXIDE PRETIOX AV03F/S KNA CZECH. 20,000 3,739,878 186.9912/04/12 TI-PURE TITANIUM DIOXIDE R902 DAD USA 200,000 41,066,600 205.3313/04/12 TI-PURE TITANIUM DIOXIDE R902 DAD USA 140,000 28,907,715 206.4819/04/12 TI-PURE TITANIUM DIOXIDE R902 DAD USA 80,000 16,471,888 205.9025/04/12 TI-PURE TITANIUM DIOXIDE R902 DAD TAIWAN 200,000 41,700,880 208.50

MINERALSSulphur (incl Collodial Sulphur)02/04/12 RUBBER CHEMICALS- SULPHUR COC UAE 1,000 29,117 29.1202/04/12 SULPHUR COC UAE 100 3,165 31.65

Natural Graphite30/04/12 INDIAN GRAPHITE KOL JAPAN 38,000 2,629,242 69.19

Natural Sands20/04/12 QUARTZ SANDS KOL NIGERIA 135,000 880,044 6.52

Quartz,Quarztite19/04/12 QUARTZ POWDER KOL SUDAN 135,000 822,280 6.0921/04/12 RAMMING MASS (QUARTZITE) KOL S. ARABIA 49,000 296,505 6.0523/04/12 QUARTZ POWDER KOL SUDAN 27,000 133,519 4.9526/04/12 COIL COAT (CALADUM) KOL S. ARABIA 2,000 58,247 29.1226/04/12 SILICA RAMMING MASS KOL S. ARABIA 22,000 100,287 4.5626/04/12 SILICA GRAIN MIXTURE KOL ANGOLA 250,000 1,456,188 5.82

Clays like Kaolin,Bentonite,Kyanite,etc.02/04/12 PROCESSED BENTONITE COC AUSTRALIA 28,000 77,566 2.7702/04/12 NATURAL FULLERS EARTH (ACTIVATED) COC UAE 204,000 894,752 4.3902/04/12 PROCESSED BENTONITE COC UAE 112,000 310,264 2.7702/04/12 CLAY 30/60 MESH (FULLER'S EARCH POWDER) COC UAE 18,000 161,303 8.9609/04/12 PROCESSED CHINA CLAY COC USA 15,000 344,487 22.9710/04/12 PROCESSED CHINA CLAY COC S. ARABIA 57,000 949,608 16.6610/04/12 PROCESSED CHINA CLAY COC THAILAND 24,000 362,494 15.1010/04/12 PROCESSED CHINA CLAY COC USA 24,000 362,494 15.1011/04/12 CALCINED CHINA CLAY COC AUSTRALIA 13,000 157,680 12.1311/04/12 PROCESSED CHINA CLAY COC S. ARABIA 24,000 344,767 14.3711/04/12 PROCESSED CHINA CLAY COC U K 18,000 248,632 13.8112/04/12 CALCINED CHINA CLAY COC NETHERLANDS 24,000 476,078 19.8412/04/12 CALCINED CHINA CLAY COC UAE 49,000 1,302,384 26.5813/04/12 PROCESSED CHINA CLAY COC SWITZERLAND 24,000 309,074 12.8813/04/12 CALCINED KAOLIN CLAY COC UAE 24,000 424,560 17.6917/04/12 PROCESSED CHINA CLAY COC GERMANY 72,000 936,108 13.0019/04/12 PROCESSED & CALCINED CLAY COC EGYPT 48,000 1,217,743 25.3719/04/12 KAOLIN LIGHT COC UAE 14,000 404,339 28.8820/04/12 PROCESSED CHINA CLAY COC INDONESIA 50,000 1,091,660 21.8320/04/12 KAOLIN BCK POWDER (PROCESSED CHINA C COC SRI LANKA 15,000 199,634 13.3121/04/12 PROCESSED CHINA CLAY COC KUWAIT 15,000 363,107 24.2121/04/12 PROCESSED CHINA CLAY COC MALAYSIA 17,000 367,948 21.6421/04/12 PROCESSED CHINA CLAY COC TURKEY 40,000 632,738 15.8221/04/12 CALCINED CLAY COC UAE 11,000 287,569 26.1423/04/12 PROCESSED CHINA CLAY COC GERMANY 96,000 1,240,117 12.9224/04/12 PROCESSED CHINA CLAY COC GERMANY 24,000 329,334 13.7224/04/12 CALCINED CLAY (PROCESSED COC INDONESIA 28,000 515,495 18.4125/04/12 PROCESSED CHINA CLAY COC GERMANY 24,000 324,269 13.5125/04/12 CALCINED CLAY (PROCESSED COC MAURITIUS 30,000 651,805 21.7325/04/12 PROCESSED CHINA CLAY COC OMAN 28,000 369,727 13.2026/04/12 PROCESSED CHINA CLAY COC GERMANY 24,000 304,009 12.6726/04/12 CALCINED KAOLIN CLAY COC MALAYSIA 44,000 776,343 17.6426/04/12 PROCESSED CHINA CLAY COC NETHERLANDS 24,000 342,234 14.2627/04/12 PROCESSED CHINA CLAY COC NETHERLANDS 24,000 342,234 14.2628/04/12 PROCESSED CHINA CLAY COC INDONESIA 20,000 203,400 10.1730/04/12 PROCESSED CHINA CLAY COC GERMANY 96,000 1,260,377 13.13

Limestone & Limestone Products02/04/12 HYDRATED LIME COC UAE 12,000 154,791 12.90

Mica04/04/12 MICA FLAKES 2-8 CHI AUSTRALIA 126,000 3,137,157 24.9004/04/12 MICA FLAKES CHI AUSTRALIA 126,000 3,041,680 24.1417/04/12 MICA BLOCKS KOL KOREA 20,000 637,076 31.8517/04/12 MICA MIXTURE FLAKES KOL GERMANY 91,000 1,037,059 11.4017/04/12 MICA FLAKES KOL KOREA 50,000 1,164,788 23.3017/04/12 MICA POWDER KOL BELGIUM 50,000 341,018 6.8217/04/12 MICA CHIPS KOL CHINA 54,000 660,324 12.2317/04/12 MICA SCRAP KOL CHINA 108,000 2,211,379 20.4817/04/12 CRUDE MICA KOL GERMANY 26,000 362,148 13.9317/04/12 MUSCOVITE MICA SCRAP KOL GERMANY 24,000 658,944 27.4618/04/12 MICA FLAKES KOL CHINA 40,000 667,516 16.6918/04/12 MUSCOVITE MICA FLAKES KOL FINLAND 100,000 3,268,900 32.6918/04/12 MICA FLAKES KOL JAPAN 120,000 3,322,488 27.6918/04/12 MICA POWDER KOL EGYPT 15,000 202,600 13.5118/04/12 MICA POWDER. KOL U K 25,000 242,431 9.7018/04/12 MICA SCRAP KOL BELGIUM 24,000 840,000 35.00

Mica18/04/12 MUSCOVITE MICA SCRAP KOL BELGIUM 24,000 761,400 31.7319/04/12 MICA FLAKES KOL CHINA 434,000 9,546,003 22.0019/04/12 SUPER MICA FLAKES KOL JAPAN 18,000 497,902 27.6619/04/12 RUBY SPOTTED MICA SCRAP GRADE KOL CHINA 135,000 1,242,445 9.2020/04/12 MICA POWDER 16 TO 100 MESH KOL BELGIUM 52,000 394,462 7.5920/04/12 MICA CHIPS KOL CHINA 54,000 1,367,854 25.3321/04/12 MICA BLOCKS KOL JAPAN 35,600 2,222,734 62.4421/04/12 MICA FLAKES KOL CHINA 416,000 9,997,548 24.0321/04/12 MICA KOL NETHERLANDS 16,000 104,256 6.5221/04/12 MICA FINE KOL NETHERLANDS 18,000 117,288 6.5221/04/12 MICA FLAKES KOL NETHERLANDS 18,000 117,204 6.5121/04/12 MICA SCRAP KOL AUSTRALIA 51,000 444,564 8.7221/04/12 MICA SCRAP KOL CHINA 27,000 306,433 11.3523/04/12 MICA FLAKES KOL JAPAN 20,000 520,859 26.0423/04/12 MICA FLAKES KOL NETHERLANDS 255,000 6,658,477 26.1123/04/12 MICA POWDER KOL NORWAY 90,000 1,455,840 16.1823/04/12 MUSCOVITE MICA SCRAP KOL CHINA 54,000 1,388,418 25.7124/04/12 MICA FLAKES KOL CHINA 42,000 893,010 21.2624/04/12 GREEN SPOTTED MICA KOL CHINA 108,000 1,559,615 14.4425/04/12 MICA FLAKES KOL CHINA 148,000 2,512,318 16.9825/04/12 MICA COARSE GRADE KOL S. ARABIA 112,000 1,329,060 11.8725/04/12 MICA YELLOW WHITE KOL CHINA 54,000 1,127,649 20.8825/04/12 MICA SCRAP KOL CHINA 54,000 789,634 14.6226/04/12 MICA FLAKES KOL CHINA 255,000 4,394,191 17.2326/04/12 MICA FLAKES KOL USA 86,000 2,278,929 26.5026/04/12 MICA KOL CHINA 148,000 3,004,406 20.3026/04/12 MICA KOL EL LSKANDA 21,000 169,120 8.0526/04/12 MICA FLAKES KOL GERMANY 46,000 381,349 8.2926/04/12 MICA FLAKES KOL JAPAN 63,000 1,688,257 26.8026/04/12 MICA FINE KOL S. ARABIA 112,000 436,806 3.9026/04/12 MICA KOL AUSTRALIA 54,000 679,368 12.5827/04/12 MICA BLOCKS KOL JAPAN 35,600 2,222,734 62.4427/04/12 MICA FLAKES KOL CHINA 126,000 3,137,157 24.9027/04/12 MICA POWDER KOL BELGIUM 52,000 394,462 7.5927/04/12 MICADETL. AS PER INV KOL CHINA 81,000 1,469,357 18.1427/04/12 MICA SCRAP KOL CHINA 27,000 232,433 8.6127/04/12 MICA KOL CHINA 22,000 251,882 11.4528/04/12 MICA BLOCKS KOL JAPAN 17,000 883,836 51.9928/04/12 MICA FLAKES KOL CHINA 80,000 869,103 10.8628/04/12 MICA MUSCOVITE KOL FRANCE 15,000 187,152 12.4828/04/12 MICA POWDER KOL NORWAY 102,000 2,165,562 21.2330/04/12 MICA FLAKES (GRADE A) KOL KOREA 108,000 2,844,504 26.34

Feldspar,Fluorspar,etc.12/04/12 FELDSPAR POWDER COC BAHARAIN 27,000 151,181 5.6012/04/12 FELDSPAR POWDER COC BANGLADESH 27,000 151,181 5.6012/04/12 FELDSPAR POWDER COC UAE 27,000 151,181 5.60

ENERGY MINERALSCoal & Lingite19/04/12 COAL PRODUCTS( MET COKE) KOL S. AFRICA 15,000 283,734 18.92

Petroleum Coke/Bitumen;other residues24/04/12 CALCINED PETROLEUM COKE KOL GERMANY 120,000 3,987,612 33.2327/04/12 CALCINED PETROLEUM COKE KOL GERMANY 96,000 3,220,990 33.5528/04/12 CALCINED PETROLEUM COKE KOL GERMANY 96,000 3,220,990 33.55

CHEMICAL ELEMENTS & THEIR DERIVATIVES,ETC.Oxides & Hydroxides of Al,Mn,Cr,Zn04/04/12 ZINC OXIDE (WHITE SEAL) CHI AUSTRALIA 50,000 5,771,250 115.4304/04/12 CALCINED ALUMINA COC USA 19,000 644,971 33.9527/04/12 ALUMINA AZURES F 20 COC JAPAN 7,000 1,826,240 260.8930/04/12 ALUMINA AZURES F120 COC ITALY 6,000 2,614,963 435.8330/04/12 WHITE & SEMI FRIABLE FUSED ALUMINA COC ITALY 17,000 1,058,337 62.26

Iron Oxides/Hydroxides/earth colours02/04/12 SYNTHETIC YELLOW OXIDE COC KUWAIT 300 20,513 68.3802/04/12 IRON OXIDE (RED OXIDE) COC UAE 8,000 136,264 17.03

Titanium Dioxides/Oxides12/04/12 TITANIUM DIOXIDE (RUTILE GRADE) KEMOX RC-800 COC U K 20,000 4,023,780 201.1918/04/12 TITANIUM DIOXIDE (RUTILE) COC UAE 18,000 2,940,233 163.3519/04/12 TITANIUM DIOXIDE(ANATASE) COC UAE 5,000 811,666 162.3321/04/12 TITANIUM DIOXIDE (RUTILE GRADE) COC USA 40,000 8,022,960 200.5725/04/12 TITANIUM DIOXIDE (RUTILE GRADE) COC ITALY 20,000 4,246,200 212.31

Page 14: Minerals and Metal Review August 2012- 1

Imports : Iron & Steel Products

Date Product Description Port Country Quantity Value CIF Rate(kgs.) (Rs.)

Date Product Description Port Country Quantity Value CIF Rate(kgs.) (Rs.)

Ports Covered in this issue : MUM : Apr. 2012, COC & VIZ : April 2012.

Ports Covered in recent past issues : JNPT : Apr. 2012,AHM : April 2012,CHN & DEL : Mar. 2012,MUN : Mar 2012,KAN, GOA : March 2012.

Minerals & Metals Review WEEKLY

AUGUST 06, 201214

PRIMARY MATERIALS,SPONGE IRON,PELLETS,ETC.

Ferro Alloys03/04/12 FERRO SILICON 70% : 10-100MM (90% MIN) VIZ CHINA 49,000 30,44,532 62.110/04/12 HIGH CARBON FERRO NICKEL VIZ JAPAN 1,51,000 16,43,83,466 1088.613/04/12 26 MTS FERRO PHOSPHORUS VIZ CHINA 26,000 6,28,861 24.218/04/12 NICKEL CONTENT IN FERRO NICKEL VIZ MACEDONIA 50,000 5,36,35,177 1072.730/04/12 FERRO SILICON (SI CONTENT : 75.8%) S VIZ RUSSIA 2,16,000 1,51,11,398 70.0

Ferrous Scrap & Waste02/04/12 SHREDDED STEEL SCRAP ISRI 211 COC U K 8,72,000 2,08,85,549 24.003/04/12 STAINLESS STEEL SCRAP GRADE 316 COC UAE 20,000 32,83,886 164.203/04/12 HEAVY MELTING STEEL SCRAP COC KUWAIT 2,20,000 55,58,707 25.304/04/12 STAINLESS STEEL SCRAP GRADE 304 VIZ SINGAPORE 1,43,000 1,58,37,213 110.704/04/12 NON ALLOY MELTING SCRAP COC GERMANY 49,000 12,25,470 25.004/04/12 HEAVY MELTING SCRAP VIZ S. AFRICA 44,000 8,99,484 20.407/04/12 SHREDDED STEEL SCRAP ISRI 211 COC BELGIUM 5,49,000 1,37,72,843 25.107/04/12 SHREDDED STEEL SCRAP ISRI 211 COC U K 9,01,000 2,16,74,800 24.107/04/12 SHREEDED STEEL SCRAP ISRI 211 COC USA 10,00,000 2,40,38,212 24.009/04/12 SHREDDED STEEL SCRAP ISRI 211 COC U K 9,90,000 2,50,96,431 25.310/04/12 STEEL BRIQUETTES SCRAP COC GERMANY 1,02,000 26,11,179 25.610/04/12 14X20' SHREDDED STEEL SCRAP E46 COC SPAIN 2,92,000 75,23,197 25.810/04/12 SHREDDED STEEL SCRAP COC U K 9,44,000 2,49,96,358 26.510/04/12 SHREDDED STEEL SCRAP ISRI 211 VIZ U K 3,28,000 80,07,927 24.410/04/12 SHREDDED STEEL SCRAP -ISRI 211 VIZ U K 6,61,000 1,61,35,515 24.411/04/12 STAINLESS STEEL SCRAP GRADE 304 VIZ GERMANY 5,20,000 5,92,83,659 114.011/04/12 STAINLESS STEEL SCRAP GRADE 304 VIZ INDONESIA 4,39,000 3,02,44,676 68.911/04/12 STAINLESS STEEL SCRAP GRADE 304 VIZ SINGAPORE 1,25,000 1,44,42,847 115.511/04/12 MS TURNINGS SCRAP COC BELGIUM 3,92,000 99,97,158 25.511/04/12 SHREDDED STEEL SCRAP ISRI 211 COC U K 9,06,000 2,27,22,557 25.112/04/12 STAINLESS STEEL SCRAP GRADE 304 VIZ KOREA 5,02,000 5,43,51,003 108.312/04/12 TURNING & BORING SCRAP ( BRIQUETTE) COC S. AFRICA 1,86,000 47,86,763 25.712/04/12 SHREDDED IRON STEEL SCRAP AS PER ISRI 211 COC USA 5,11,000 1,34,18,966 26.312/04/12 SHREDDED IRON SCRAP COC USA 5,11,000 1,38,73,847 27.213/04/12 SHREDDED STEEL SCRAP AS PER ISRI 211 VIZ NETHERLANDS 9,96,000 2,50,29,787 25.117/04/12 SHREDDED IRON STEEL SCRAP COC U K 4,94,000 1,29,41,102 26.218/04/12 STAINLESS STEEL SCRAP GRADE 316 TURNING VIZ U K 2,81,000 4,20,83,349 149.818/04/12 SHREDDED STEEL SCRAP ISRI 211 COC U K 6,35,000 1,60,18,311 25.218/04/12 MS TURNING & BORING SCRAP VIZ MALAYSIA 40,000 9,06,427 22.718/04/12 SHREDDED STEEL SCRAP ISRI211 VIZ U K 6,89,000 1,72,88,077 25.119/04/12 SHREDDED STEEL SCRAP COC FRANCE 3,96,000 1,00,93,614 25.519/04/12 SHREDDED STEEL SCRAP ISRI 211 COC MEXICO 5,14,000 1,27,70,470 24.819/04/12 SHREDDED STEEL SCRAP COC U K 4,89,000 1,26,71,347 25.920/04/12 STAINLESS STEEL SCRAP 304 VIZ NETHERLANDS 4,78,000 5,59,60,753 117.120/04/12 STAINLESS STEEL SCRAP GRADE 316 VIZ NETHERLANDS 4,95,000 8,04,44,673 162.520/04/12 STAINLESS STEEL SCRAP GRADE 304 VIZ U K 2,60,000 3,00,73,584 115.720/04/12 STAINLESS STEEL SCRAP 304 VIZ U K 2,34,000 2,70,52,864 115.620/04/12 STAINLESS STEEL SCRAP 304 TURNING VIZ U K 1,21,000 1,21,10,408 100.120/04/12 STAINLESS STEEL SCRAP GRADE 316 TURNING VIZ U K 2,82,000 4,33,41,216 153.720/04/12 SHREDDED STEEL SCRAP ISRI 211 COC U K 2,76,000 69,21,665 25.120/04/12 SHREDDED STEEL SCRAP COC USA 10,00,000 2,40,38,212 24.021/04/12 SHREDDED IRON STEEL SCRAP COC USA 3,38,000 89,69,633 26.523/04/12 STAINLESS STEEL SCRAP 304 GRADE SOLID VIZ KOREA 6,15,000 7,00,74,952 113.923/04/12 SHREDDED IRON STEEL SCRAP ISRI 211 COC USA 4,76,000 1,25,10,185 26.323/04/12 SHREDDED STEEL SCRAP ISRI 211 VIZ U K 2,70,000 68,26,773 25.323/04/12 SHREDDED STEEL SCRAP ISRI 211 VIZ U K 54,000 13,64,209 25.325/04/12 MILD STEEL TURNINGS SCRAP COC GERMANY 4,73,000 1,04,49,683 22.125/04/12 HEAVY MELTING IRON SCRAP COC TANZANIA 51,000 13,04,169 25.625/04/12 SHREDDED IRON STEEL SCRAP ISRI 211 COC USA 4,93,000 1,22,54,808 24.926/04/12 SHREDDED STEEL SCRAP COC FRANCE 49,000 12,37,039 25.226/04/12 SHREDDED STEEL SCRAP COC FRANCE 72,000 18,36,469 25.526/04/12 HEAVY MELTING SCRAP COC MALTA 74,000 19,40,959 26.227/04/12 STAINLESS STEEL SCRAP GRADE 304 VIZ KOREA 6,09,000 7,08,46,510 116.327/04/12 HEAVY MELTING SCRAP COC OMAN 1,00,000 25,82,563 25.827/04/12 SHREDDED STEEL SCRAP ISRI 211 COC U K 8,84,000 2,23,13,020 25.227/04/12 SHREDDED STEEL SCRAP ISRI 211 VIZ S. AFRICA 5,14,000 1,24,73,917 24.330/04/12 ALLOYED MILD STEEL SCRAP VIZ FINLAND 2,46,000 86,83,149 35.330/04/12 316 STAINLESS STEEL SCRAP TURNING VIZ U K 2,38,000 3,44,30,440 144.730/04/12 HEAVY MELTING SCRAP COC UAE 87,60,000 22,63,73,104 25.830/04/12 SHREDDED STEEL SCRAP ISRI 211 COC USA 10,00,000 2,40,38,212 24.030/04/12 SHREDDED IRON STEEL SCRAP COC USA 1,45,000 38,48,691 26.530/04/12 SHREDDED STEEL SCRAP ISRI 211 VIZ NETHERLANDS 1,91,000 45,17,186 23.730/04/12 SHREDDED STEEL SCRAP ISRI 211 VIZ USA 10,03,000 2,51,64,797 25.1

Sponge iron,pellets,granules,powder,etc.04/04/12 ANCORSTEEL 150 HP IRON POWDER MUM GERMANY 150 32,219 214.817/04/12 SS POWDER; P316L MUM USA 100 97,430 974.318/04/12 CARBONYL IRON POWDER CM MUM GERMANY 5 20,559 4111.823/04/12 HOT BRIQUETTED IRON IN BULK VIZ OMAN 2,91,50,000 64,38,30,730 22.123/04/12 HOT BRIQUETTED IRON IN BULK VIZ OMAN 1,48,50,000 32,79,89,240 22.130/04/12 CARBONYL IRON POWDER CF MUM GERMANY 5 20,559 4111.8

IRON & NON-ALLOY STEEL

Ingots or other primary forms03/04/12 INGOTS(STEEL) COC UAE 55,000 17,31,248 31.5

Semi-finished products30/04/12 M.S.BILLET 100MM X 100MM X 6 MTR COC UAE 1,66,000 54,04,124 32.6

Flat Rolled Products-Clad,Plated,Coated02/04/12 ELECTRO GALV STEEL COILS MUM BRAZIL 5,11,000 1,74,44,771 34.102/04/12 ELECTRO GALV STEEL COIL MUM BRAZIL 21,26,000 7,53,74,342 35.502/04/12 ELECTRO GALV STEEL SHEET MUM BRAZIL 11,000 3,81,995 34.703/04/12 TINPLATE SEC/DEFE CIRCLES / STRIPS MUM NETHERLANDS 1,29,000 29,04,205 22.503/04/12 HIGH STRENGTH STEEL BAR MUM SWITZERLAND 9,096 24,34,885 267.704/04/12 ETP DEFECTIVE MISPRINT MUM BELGIUM 53,000 14,54,674 27.404/04/12 ETP DEFECTIVE MISPRINT MUM BELGIUM 2,000 54,348 27.204/04/12 HOT DIPPED GALV SHEET HX220BD MUM FRANCE 965 2,15,603 223.404/04/12 SEC/DEFE LACQUERED / WHITE / MUM BELGIUM 1,000 14,617 14.604/04/12 SEC/DEFE LACQUERED / WHITE / MUM BELGIUM 26,000 5,98,000 23.007/04/12 TINFREE DEFE/SEC MISPRINT/LACQUERED MUM NETHERLANDS 1,000 13,231 13.207/04/12 TINFREE DEFE/SEC MISPRINT/LACQUERED MUM NETHERLANDS 82,000 18,85,870 23.010/04/12 NON ALLOY GALVA-ANNEALED STEEL COILS MUM KOREA 63,000 34,21,903 54.310/04/12 PRIME GALV STEEL SHEET IN COIL MUM JAPAN 19,000 13,39,370 70.510/04/12 PRIME STEEL DEFORM BARS COC UAE 1,60,000 50,16,272 31.411/04/12 ELECTROLYTIC TINPLATE MUM JAPAN 4,36,410 2,44,04,395 55.911/04/12 3 ELO ZE COIL: T 0.73MM X W 1480MM MUM BELGIUM 4,34,000 2,86,80,283 66.111/04/12 PRIME GALV STEEL SHEET IN COIL MUM JAPAN 17,000 11,16,349 65.711/04/12 M.S. LOW CARBON DEFE TINFREE/MISPRINT SHEET MUM JAPAN 1,000 11,552 11.611/04/12 M.S. LOW CARBON DEFE TINFREE/MISPRINT SHEET MUM JAPAN 1,22,000 29,05,554 23.812/04/12 TINPLATE SEC/DEFE/WASTE SHEET/COILS MUM TAIWAN 48,000 14,13,893 29.512/04/12 TINPLATE SEC/DEFE/WASTE SHEET/COILS MUM TAIWAN 1,000 19,176 19.213/04/12 NON ALLOY STEEL SHEETS IN COIL MUM JAPAN 4,14,000 2,81,92,493 68.113/04/12 TINPLATE SEC/DEFE CIRCLES / STRIPS MUM DENMARK 19,000 4,35,058 22.913/04/12 TINPLATE SEC/DEFE CIRCLES / STRIPS MUM DENMARK 57,000 12,86,696 22.617/04/12 TIN PLATE MISPRINT / PLAIN SHEETS - WASTE MUM NETHERLANDS 1,98,000 55,31,923 27.917/04/12 TINPLATE WASTE COILS MUM ITALY 1,000 25,961 26.017/04/12 TINPLATE WASTE COILS MUM ITALY 83,000 23,64,672 28.517/04/12 TINPLATE WASTE COILS MUM CANADA 2,14,000 88,38,285 41.317/04/12 PRIME ELECTRO GALV STEEL SHEET MUM KOREA 27,000 16,20,079 60.017/04/12 PRIME ELECTRO GALV STEEL SHEET MUM KOREA 8,000 4,95,540 61.917/04/12 PRIME ELECTRO GALV STEEL SHEET MUM KOREA 12,000 7,42,080 61.817/04/12 M.S. LOW CARBON TIN FREE DEFECTIVE COIL MUM BELGIUM 1,000 19,350 19.417/04/12 M.S. LOW CARBON TIN FREE DEFECTIVE COIL MUM BELGIUM 76,000 19,26,069 25.319/04/12 SEC GALV COILS MUM FRANCE 20,000 6,42,364 32.120/04/12 ALUMINIZED STEEL IN COIL MUM KOREA 76,000 36,40,309 47.9

Flat Rolled Products-Clad,Plated,Coated20/04/12 STEEL WIRE ROD IN COILS VIZ CANADA 4,66,000 1,61,34,706 34.621/04/12 TINPLATE SEC/DEFE SHEETS MUM PORTUGAL 75,000 20,44,331 27.321/04/12 TINPLATE SEC/DEFE SHEETS MUM PORTUGAL 1,000 13,720 13.721/04/12 HOT DIP GALV COIL MUM SPAIN 10,000 5,73,521 57.421/04/12 HOT DIP GALV COIL MUM SPAIN 44,000 27,87,948 63.423/04/12 REINFORCING STEEL BARS PRIME MUM UKRAINE 54,49,000 18,54,44,611 34.024/04/12 SEC/DEFE MISPRINTED SHEETS MUM ITALY 1,000 16,279 16.324/04/12 SEC/DEFE MISPRINTED SHEETS MUM ITALY 48,000 13,82,648 28.824/04/12 TINPLATE SECONDS AND DEFE IN SHEETS MUM U K 4,23,000 1,77,18,094 41.924/04/12 SEC/DEFE TIN PLATE COILS MUM S. AFRICA 26,000 7,71,988 29.724/04/12 SEC/DEFE TIN PLATE COILS MUM S. AFRICA 1,000 34,450 34.524/04/12 SEC/DEFE TIN PLATE COILS MUM S. AFRICA 1,11,000 31,03,634 28.024/04/12 M.S. LOW CARBON DEFE CR/ZINC COATED SHEETS MUM JAPAN 4,55,400 2,28,32,823 50.124/04/12 3 HOT DIP GALV COIL : T 2.00MM MUM GERMANY 1,97,000 1,03,74,312 52.724/04/12 PETFILM LAMINATED STEEL SHEET MUM KOREA 4,000 63,000 15.824/04/12 ETP SECONDARY DEFE COILS MUM FRANCE 32,000 9,32,363 29.124/04/12 HR STEEL PLATES MUM FINLAND 11,700 19,82,920 169.524/04/12 TIN FREE SEC/DEFE COILS MUM FRANCE 4,000 1,18,149 29.524/04/12 TIN FREE SEC/DEFE COILS MUM FRANCE 14,000 3,91,489 28.024/04/12 SEC/DEFE CIRCLES WIDTH LESS THAN 300MM MUM ITALY 6,000 1,47,762 24.624/04/12 PRIME HR STEEL WIRE RODS GRADE SAE 1006 MUM UKRAINE 82,83,000 29,62,86,359 35.824/04/12 ROUND BAR (RODS) ROUND BAR MUM NORWAY 999 1,37,978 138.125/04/12 TINPLATE DEFE/REJECTED SHEETS MUM BELGIUM 4,82,000 1,52,48,615 31.625/04/12 TINPLATE SEC/DEFE SHEETS MUM SPAIN 1,000 18,924 18.925/04/12 TINPLATE SEC/DEFE SHEETS MUM SPAIN 1,000 12,619 12.625/04/12 TINPLATE SEC/DEFE SHEETS MUM SPAIN 42,000 17,60,242 41.925/04/12 LOW - CARBON PREPAINTED DEFE STRIPS / COILS MUM USA 62,000 14,78,021 23.825/04/12 NON ALLOY STEEL WIRE RODS IN COILS MUM SWITZERLAND 2,00,000 94,44,285 47.226/04/12 ETP SEC WASTE DEFECTIVE MUM USA 5,95,000 1,72,65,847 29.026/04/12 TINPLATE SECONDARY DEFECTIVE MUM USA 6,29,000 1,92,90,868 30.726/04/12 TINPLATE WASTE SHEETS MUM GERMANY 5,75,000 2,14,96,321 37.426/04/12 PRIME HR NON ALLOY STEEL WIRE RODS MUM UKRAINE 1,000 30,652 30.726/04/12 PRIME HR NON ALLOY STEEL WIRE RODS MUM UKRAINE 8,21,000 3,03,11,570 36.927/04/12 TINPLATED STEEL CUTTINGS CIRCLE SEC/DEFE MUM NETHERLANDS 1,000 13,213 13.227/04/12 TINPLATED STEEL CUTTINGS CIRCLE SEC/DEFE MUM NETHERLANDS 54,000 12,60,349 23.327/04/12 STEEL WIRE ROD IN COILS VIZ CANADA 1,42,000 49,25,748 34.730/04/12 TINPLATE SEC/DEFE SHEETS MUM POLAND 25,000 7,02,425 28.130/04/12 TINPLATE SEC/DEFE SHEETS MUM POLAND 1,000 28,600 28.630/04/12 TINPLATE SEC/DEFE COILS MUM S. AFRICA 1,000 16,023 16.030/04/12 TINPLATE SEC/DEFE COILS MUM S. AFRICA 1,09,000 30,78,654 28.230/04/12 TINPLATE WASTE,DEFE COILS MUM GERMANY 4,80,000 1,34,51,177 28.030/04/12 ELECTROLYTIC COPPER COATED STEEL MUM JAPAN 3,35,241 3,21,83,645 96.0

Flat Rolled Products-Others02/04/12 PRIME HR NON ALLOY STEEL SHEETS IN COILS MUM KOREA 42,000 14,93,029 35.503/04/12 PO COIL (HR STEEL COIL) MUM KOREA 27,000 9,09,234 33.703/04/12 PO COIL (HR STEEL COILS) MUM KOREA 28,000 11,74,280 41.903/04/12 NON ALLOY CR COILS MUM CHINA 1,11,000 47,95,230 43.204/04/12 PRIME HR NON ALLOY STEEL SHEET IN COLS MUM KOREA 1,28,000 46,27,075 36.104/04/12 HR (NON ALLOY) STEEL PLATES MUM UKRAINE 12,89,000 6,69,18,716 51.904/04/12 HR ABRATION RESISTANT STEEL PLATES MUM JAPAN 20,000 14,45,922 72.304/04/12 HR ABRATION RESISTANT STEEL PLATES MUM JAPAN 1,000 73,800 73.804/04/12 CR STEEL SHEET IN COIL GRADE: JIS G3141 MUM VIETNAM 28,000 10,27,610 36.704/04/12 CR STEEL SHEET IN COIL GRADE: JIS G3141 MUM VIETNAM 14,000 5,02,165 35.904/04/12 CR STEEL COILS (CRCA) MUM VIETNAM 5,41,000 1,88,62,475 34.904/04/12 CR STEEL COILS (CRCA) MUM VIETNAM 47,08,000 16,40,03,296 34.807/04/12 PRIME CR NON ALLOY STEEL COILS MUM JAPAN 1,03,000 74,28,306 72.107/04/12 PRIME CR NON ALLOY STEEL COILS MUM JAPAN 17,000 11,93,098 70.207/04/12 PRIME CR NON ALLOY STEEL COILS MUM JAPAN 58,000 41,58,615 71.707/04/12 PRIME CR NON ALLOY STEEL COILS MUM JAPAN 23,000 16,21,192 70.507/04/12 PRIME CR NON ALLOY STEEL COILS MUM JAPAN 44,000 31,28,842 71.110/04/12 M.S. LOW CARBON DEFE CR STEEL SHEET IN COILS MUM JAPAN 6,00,000 1,34,76,925 22.511/04/12 PRIME HR PLATE. SPEC:JIS G3106 MUM KOREA 5,28,000 1,91,38,121 36.211/04/12 PRIME HR STEEL PLATE SHOT BLASTED MUM CHINA 1,90,000 79,75,170 42.011/04/12 PRIME HR STEEL PLATE SHOT MUM CHINA 26,000 12,70,892 48.912/04/12 CR COILS (SEC/DEFE):0.4000 X 0.43 MUM POLAND 20,000 5,26,390 26.312/04/12 CR STEEL STRIPS- RST443 - LC MUM GERMANY 1,447 3,78,261 261.413/04/12 PRIME HR NON ALLOY PICKLED & OILED STEEL MUM KOREA 23,000 8,39,094 36.513/04/12 PRIME CR NON ALLOY STEEL SHEETS MUM KOREA 45,000 18,79,293 41.817/04/12 PRIME HR NON ALLOY STEEL COIL MUM JAPAN 7,000 4,55,164 65.017/04/12 PRIME HR NON ALLOY STEEL COIL MUM JAPAN 20,000 13,42,255 67.117/04/12 B.Q. PLATES (160 X 2000 X 6000) MUM GERMANY 4,18,432 3,44,54,894 82.317/04/12 MS/ CR DEFE PUPS COILS MUM USA 1,93,000 45,40,175 23.517/04/12 MS/ CR DEFE PUPS COILS MUM USA 7,000 1,68,780 24.117/04/12 CR SHEET IN COIL (CRCA) MUM CHINA 14,52,000 5,52,43,120 38.017/04/12 M.S.SEC/DEFE CR COILS MUM BELGIUM 2,23,000 52,24,879 23.417/04/12 M.S.SEC/DEFE CR COILS MUM BELGIUM 1,000 1,22,747 122.718/04/12 CR STEEL COILS GRADE JISG3141 MUM CHINA 5,27,000 1,98,04,222 37.618/04/12 CR STEEL SHEET IN COIL MUM CHINA 9,94,000 3,73,24,239 37.518/04/12 CR STEEL SHEET IN COILS (CRCA) MUM CHINA 16,60,000 6,23,53,841 37.619/04/12 PRIME HR NON ALLOY STEEL COILS MUM RUSSIA 16,78,000 5,68,52,589 33.919/04/12 PLATES - CARBON STEEL PLATES MUM BELGIUM 60,151 52,95,888 88.019/04/12 M.S. SEC/DEFE CR STEEL SHEET MUM AUSTRALIA 95,000 22,67,604 23.919/04/12 SEC CR COILS MUM FRANCE 1,18,000 37,94,503 32.220/04/12 PRIME HR NON ALLOY STEEL COILS MUM RUSSIA 3,19,000 1,08,01,311 33.921/04/12 HR (NON-ALLOY) STEEL SHEET MUM TAIWAN 28,46,000 8,90,53,187 31.321/04/12 SEC HR COILS:1.50-6.00MM X 740-1600MM X C MUM TAIWAN 1,000 48,460 48.521/04/12 SEC HR COILS:1.50-6.00MM X 740-1600MM X C MUM TAIWAN 14,45,000 4,19,33,296 29.023/04/12 HR (NON ALLOY STEEL) PLATE MUM UKRAINE 1,74,000 72,04,627 41.423/04/12 HR (NON ALLOY STEEL) PLATE MUM UKRAINE 77,000 32,03,452 41.623/04/12 HR PLATES (NON ALLOY) MUM ROMANIA 6,20,388 2,94,20,037 47.423/04/12 HR STEEL PLATES MUM CHINA 5,98,770 3,28,52,263 54.923/04/12 HR PLATES (NON ALLOY) MUM ROMANIA 4,000 1,84,898 46.223/04/12 PLATES SA516 GR 70 MUM ROMANIA 1,162 60,455 52.024/04/12 HR COILS GRADE S235JR MUM IRAN 97,09,000 32,19,53,392 33.224/04/12 CR STEEL COIL MUM GERMANY 1,37,000 66,13,684 48.324/04/12 M.S. SEC/DEFE CR STEEL SHEET MUM TAIWAN 99,000 22,30,112 22.524/04/12 M.S. SEC/DEFE CR STEEL SHEET MUM TAIWAN 1,000 20,230 20.224/04/12 CRNGO SILICON ELECTRICAL STEEL COIL MUM JAPAN 1,55,000 1,04,11,569 67.225/04/12 PRIME HR PICKLED AND OILED STEEL SHEET IN COILS MUM KOREA 9,47,000 3,71,57,940 39.225/04/12 HR NON ALLOY STEEL COILS UNOILED MUM IRAN 69,65,000 22,87,85,294 32.825/04/12 HR NON ALLOY STEEL COILS UNOILED MUM IRAN 19,79,000 6,45,52,058 32.625/04/12 HR NON ALLOY STEEL COILS UNOILED MUM IRAN 37,58,000 12,36,54,143 32.925/04/12 SEC & DEFE HR/CR COILS ENDS MUM UAE 1,50,000 42,83,828 28.625/04/12 PLATES (CARBON STEEL) SA 516 MUM BELGIUM 33,000 39,65,177 120.225/04/12 PRIME HR STEEL COILS GRADE: S235JR MUM UAE 1,000 37,120 37.125/04/12 PRIME HR STEEL COILS GRADE: S235JR MUM UAE 1,56,000 48,80,250 31.326/04/12 HR CARBON STEEL PLATE SA516 MUM UAE 11,304 9,41,987 83.326/04/12 FULL HARD COIL (CR COIL) MUM KOREA 1,61,53,000 58,95,55,296 38.726/04/12 FULL HARD COIL (CR COIL) MUM KOREA 1,87,46,000 74,59,25,450 39.826/04/12 FULL HARD COIL (CR COIL) MUM KOREA 27,73,000 11,23,98,432 40.527/04/12 HR STEELPLATES (NON ALLOY) MUM CHINA 3,56,000 1,90,70,289 53.630/04/12 PRIME HR NON ALLOY SHEET AND PLATES MUM UKRAINE 5,29,000 1,69,14,010 32.030/04/12 PRIME HR NON ALLOY SHEET AND PLATES MUM UKRAINE 1,67,000 53,25,225 31.930/04/12 PRIME HR NON ALLOY SHEET AND PLATES MUM UKRAINE 12,30,000 3,92,40,458 31.930/04/12 CARBON STEEL PLATES MUM FRANCE 6,21,000 4,35,78,095 70.230/04/12 NON ALLOY GALVA-ANNEALED STEEL COILS MUM JAPAN 7,33,000 3,23,18,747 44.130/04/12 PRIME CR NON ALLOY STEEL COILS MUM KOREA 24,74,000 12,67,99,907 51.330/04/12 NON ALLOY GALVA-ANNEALED STEEL COILS MUM JAPAN 16,94,000 8,42,77,250 49.830/04/12 M.S.SEC/DEFE CR COILS MUM FRANCE 1,67,000 39,22,040 23.530/04/12 M.S.SEC/DEFE CR COILS MUM FRANCE 1,000 21,130 21.130/04/12 PRESSURE VESSEL PLATE MUM FRANCE 77,000 66,72,458 86.7

Wires,angles,shapes & sections04/04/12 G.I.WIRE BITS & CUT ROLLS COC UAE 22,000 7,90,836 35.9

Page 15: Minerals and Metal Review August 2012- 1

Date Product Description Port Country Quantity Value CIF Rate(kgs.) (Rs.)

Date Product Description Port Country Quantity Value CIF Rate(kgs.) (Rs.)

15Minerals & Metals Review WEEKLY

AUGUST 06, 2012

Wires,angles,shapes & sections04/04/12 TYRE BEAD WIRE COC THAILAND 19,000 11,10,355 58.407/04/12 ANGLES (STRACTURE OF PROFILES) MUM UKRAINE 1,71,000 68,17,321 39.907/04/12 ANGLES (STRACTURE OF PROFILES) MUM UKRAINE 9,36,000 3,55,71,680 38.010/04/12 TYRE BEAD WIRE COC THAILAND 19,000 10,65,981 56.112/04/12 GALV WIRE (2.00 MM) COC SRI LANKA 77,000 42,75,905 55.512/04/12 GALV WIRE COC SRI LANKA 5,000 2,64,904 53.012/04/12 G.I.WIRE BITS COC UAE 23,000 8,96,900 39.013/04/12 GALV IRON WIRE (0.33MM) VIZ CHINA 25,000 8,11,358 32.513/04/12 GALVANIZED IRON WIRE (0.38MM) VIZ CHINA 15,000 4,86,815 32.513/04/12 GALVANIZED IRON WIRE (0.55M) VIZ CHINA 5,000 1,62,272 32.513/04/12 GALVANIZED IRON WIRE (0.70MM) VIZ CHINA 5,000 1,62,272 32.517/04/12 ELECTRO GALV IRON WIRE BRIGHT AND SOFT - 2.0 MM COC CHINA 15,000 6,35,883 42.417/04/12 ELECTRO GALV IRON WIRE BRIGHT AND SOFT COC CHINA 10,000 4,75,937 47.617/04/12 STEEL WIRE RODS GRADE SWRCH10A MUM KOREA 88,000 38,82,533 44.117/04/12 TYRE BEAD WIRE COC THAILAND 19,000 11,10,120 58.419/04/12 TYRE BEAD WIRE COC THAILAND 19,000 10,77,426 56.720/04/12 TYRE BEAD WIRE COC THAILAND 19,000 11,10,355 58.420/04/12 TYRE BEAD WIRE COC THAILAND 19,000 11,10,355 58.423/04/12 BEAMS IN GRADE S 235JR+AR/M MUM GERMANY 31,390 20,59,113 65.625/04/12 BLACK IRON WIRE (0.90MM) VIZ CHINA 50,000 13,86,014 27.726/04/12 GLAVANIZED IRON WIRE (0.90MM) VIZ CHINA 25,000 7,10,102 28.426/04/12 GALVANIZED IRON WIRE (1.60MM) VIZ CHINA 15,000 4,26,061 28.426/04/12 GALVANIZED IRON WIRE (2.00MM) VIZ CHINA 10,000 2,84,041 28.426/04/12 ELECTRO GALV IRON WIRE 0.90MM MUM CHINA 17,200 7,06,780 41.126/04/12 ELECTRO GALV IRON WIRE 0.90MM MUM CHINA 26,250 10,78,661 41.126/04/12 BLACK ANNEALED STEEL WIRE 3.2 MM MUM CHINA 17,000 9,63,838 56.730/04/12 BLACK IRON WIRE (0.90 MM) VIZ CHINA 50,000 13,86,014 27.7

STAINLESS STEEL

SS Flat Products02/04/12 HR SS COILS GRADE 304L MUM CHINA 1,000 1,38,900 138.902/04/12 HR SS COILS GRADE 304L MUM CHINA 19,000 26,37,526 138.802/04/12 HR SS COILS, GRADE 304L MUM CHINA 39,000 53,84,370 138.104/04/12 HR SS SEC/DEFE SHEET CUTTING MUM BAHRAIN 1,000 1,13,336 113.304/04/12 HR SS SEC/DEFE SHEET CUTTING MUM BAHRAIN 22,000 24,88,765 113.104/04/12 CR SS SHEETS GRADE 304DDQ MUM ITALY 2,000 2,85,001 142.504/04/12 HR SS COIL POS410B 4.25 MMX1120 MM MUM KOREA 36,000 26,82,110 74.504/04/12 SS PLATES: 5750 x 1425 x 22.00 MM MUM BELGIUM 3,000 6,47,444 215.804/04/12 HR SS SHEETS GRADE 304DL MUM ITALY 2,000 2,17,678 108.804/04/12 CR SS COILS 304DL GRADE 304DL MUM ITALY 8,000 10,57,627 132.204/04/12 CR SS COILS GRADE 321 MUM ITALY 2,000 2,27,868 113.904/04/12 CR SS SHEETS GRADE 316LI MUM ITALY 2,000 4,30,780 215.404/04/12 CR SS SHEETS GRADE 316L/316LI/31 MUM ITALY 1,000 1,87,332 187.304/04/12 CR SS SHEETS GRADE 316L/316LI/31 MUM ITALY 16,000 29,98,044 187.404/04/12 CR SS COILS GRADE 304DL MUM ITALY 1,000 1,42,168 142.204/04/12 SS SHEET CUTTING/COILS, GRADE 304 MUM ITALY 22,939 30,48,313 132.907/04/12 SS SEC/DEFE COILS, GRADE 1.4462 MUM BELGIUM 23,000 28,59,172 124.307/04/12 HR SS PLATE MAT -SA- 240 - 316L 28 X 1000 MUM KOREA 1,000 3,25,349 325.307/04/12 HR SS SEC/DEFE PLATE MUM TAIWAN 1,000 1,04,445 104.407/04/12 HR SS SEC/DEFE PLATE MUM TAIWAN 10,000 10,55,916 105.607/04/12 PRIME CR SS IN COILS.SPEC:EN 1.4512 MUM KOREA 8,000 6,30,627 78.807/04/12 PRIME CR SS IN COILS MUM KOREA 8,000 6,30,627 78.807/04/12 CR SS SEC/DEFE COILS MUM TAIWAN 2,000 2,13,287 106.607/04/12 CR SS SEC/DEFE COILS MUM TAIWAN 9,000 10,47,893 116.411/04/12 PRIME HR AUSTENITIC STEEL PLATES MUM KOREA 73,574 1,26,40,306 171.812/04/12 SS PLATES (PLATE (SA240 TP316L) MUM U K 1,080 6,06,438 561.512/04/12 SS PLATES, GRADE 316L MUM SPAIN 12,256 22,29,415 181.912/04/12 SS SHEETS GRADE 304L MUM SPAIN 915 1,40,830 153.912/04/12 SS SHEETS GRADE 304L MUM SPAIN 1,424 2,19,171 153.912/04/12 SS SHEETS, GRADE 316L, C.R. MUM SPAIN 1,017 2,15,935 212.317/04/12 PRIME HR SS PLATES MUM BELGIUM 1,344 3,93,386 292.718/04/12 HR SS COILS, GRADE 304L MUM CHINA 1,05,000 1,45,64,293 138.718/04/12 HR SS SEC/DEFE PLATE MUM TAIWAN 32,000 42,03,802 131.418/04/12 HR SS SEC/DEFE SHEETS, GRADE 304 MUM JAPAN 14,000 16,33,525 116.718/04/12 HR SS COILS GRADE 304L MUM BELGIUM 5,050 7,14,062 141.418/04/12 HR SS COILS GRADE 304L MUM BELGIUM 5,210 7,36,686 141.418/04/12 SS COILS, GRADE 201 MUM TAIWAN 1,525 1,34,930 88.518/04/12 SS COILS, GRADE 201 MUM TAIWAN 1,05,533 1,27,39,057 120.718/04/12 SS COILS, GRADE 201 MUM TAIWAN 12,322 10,90,257 88.518/04/12 CR SS COILS GRADE 304L MUM BELGIUM 30,250 45,23,868 149.518/04/12 SS COILS, GRADE 201 MUM TAIWAN 17,148 15,17,201 88.518/04/12 CR SS SEC/DEFE COILS GRADE 316 MUM TAIWAN 33,000 40,07,537 121.419/04/12 CR SS SHEET IN COIL MUM KOREA 5,90,019 5,14,13,922 87.120/04/12 CR SS STRIPS COILS,GRADE 304 MUM BAHRAIN 1,000 39,860 39.920/04/12 CR SS STRIPS COILS,GRADE 304 MUM BAHRAIN 41,000 54,58,737 133.121/04/12 CR SS SHEET IN COIL MUM KOREA 13,000 9,76,882 75.123/04/12 STEEL PLATES, GRADE ASTM A 693-93 UNS S630 MUM FRANCE 1,000 2,71,220 271.223/04/12 STEEL PLATES GRADE ASTM A 693-93 MUM FRANCE 1,000 2,41,037 241.023/04/12 STEEL PLATES GRADE ASTM A 693-93 MUM FRANCE 1,000 1,40,711 140.723/04/12 STEEL PLATES GRADE ASTM A 693-93 MUM FRANCE 12,000 53,21,514 443.523/04/12 LC ALLOY STEEL STRIP MUM GERMANY 1,051 76,516 72.824/04/12 HR SS COILS GRADE 304L MUM CHINA 37,315 50,24,545 134.724/04/12 CR SS COILS, GRADE 304 MUM SPAIN 4,000 5,95,247 148.824/04/12 CR SS COILS, GRADE 316 MUM USA 1,000 1,44,792 144.824/04/12 CR SS COILS, GRADE 316 MUM USA 16,000 30,82,600 192.724/04/12 CR SS SHEETS,GRADE 304 MUM SPAIN 3,000 4,02,058 134.024/04/12 CR SS SHEETS, GRADE 304/304L MUM SPAIN 10,000 13,18,048 131.826/04/12 HR SS SEC/DEFE COILS GRADE 430 MUM USA 1,000 52,098 52.126/04/12 HR SS SEC/DEFE COILS GRADE 430 MUM USA 9,000 4,60,853 51.226/04/12 HR SS SEC/DEFE COILS GRADE 430 MUM USA 8,000 4,09,193 51.126/04/12 HR SS SEC/DEFE PLATE MUM USA 2,000 1,30,961 65.526/04/12 HR SS SEC/DEFE SHEETS GRADE 316 MUM BELGIUM 1,000 80,285 80.326/04/12 SS SHEETS, GRADE 304 MUM GERMANY 6,000 7,00,955 116.826/04/12 HR SS SEC/DEFE PLATE MUM USA 2,000 1,01,643 50.826/04/12 HR SS SEC/DEFE SHEETS GRADE 316 MUM BELGIUM 7,000 13,65,612 195.126/04/12 SS SHEETS, GRADE 304 MUM GERMANY 6,000 7,97,940 133.026/04/12 SS SHEETS, GRADE 304 MUM GERMANY 1,000 1,32,333 132.326/04/12 SS COILS, GRADE 316L MUM GERMANY 31,000 44,19,430 142.626/04/12 CR SS COILS GRADE 304/304L MUM GERMANY 33,000 47,98,773 145.426/04/12 CR SS SEC/DEFE COILS GRADE 316 MUM BELGIUM 1,000 2,29,400 229.426/04/12 CR SS SEC/DEFE COILS GRADE 316 MUM BELGIUM 2,000 4,27,423 213.726/04/12 CR SS SEC/DEFE COILS GRADE 304 MUM JAPAN 21,000 25,85,605 123.126/04/12 SS COILS GRADE 304L MUM GERMANY 40,000 58,85,777 147.126/04/12 CR SS COILS 304DL GRADE 304DL MUM GERMANY 1,000 1,15,661 115.726/04/12 CR SS SEC/DEFE COILS GRADE 304 MUM JAPAN 19,000 23,48,914 123.626/04/12 CR SS SEC/DEFE COILS MUM BELGIUM 9,000 17,05,104 189.526/04/12 CR SS SEC/DEFE COILS MUM AUSTRALIA 2,000 2,98,991 149.526/04/12 CR SS SEC/DEFE COILS MUM JAPAN 1,000 1,20,960 121.026/04/12 CR SS SEC/DEFE COILS MUM JAPAN 19,000 23,97,115 126.226/04/12 CR SS SEC/DEFE COILS MUM AUSTRALIA 2,000 3,05,786 152.926/04/12 CR SS SEC/DEFE COILS MUM AUSTRALIA 7,000 9,15,394 130.826/04/12 CR SS COILS GRADE 304L MUM GERMANY 9,689 20,86,500 215.326/04/12 CR SS SEC/DEFE COILS MUM AUSTRALIA 8,000 9,98,376 124.827/04/12 CR SS SEC/DEFE SHEETS MUM USA 1,000 83,334 83.327/04/12 CR SS SEC/DEFE SHEETS MUM USA 3,000 2,53,222 84.427/04/12 CR SS SEC/DEFE SHEETS MUM USA 23,000 28,82,351 125.327/04/12 CR SS SEC/DEFE SHEETS MUM USA 23,000 17,87,159 77.727/04/12 SS CR SEC/DEFE SHEET MUM JAPAN 1,000 99,730 99.727/04/12 SS CR SEC/DEFE SHEET MUM JAPAN 44,000 53,68,010 122.027/04/12 CR SS SEC/DEFE COILS MUM BRAZIL 1,000 72,359 72.427/04/12 CR SS SEC/DEFE COILS MUM BRAZIL 67,000 52,54,323 78.427/04/12 CR SS SEC/DEFE COILS MUM MEXICO 76,000 71,15,061 93.627/04/12 SS COILS GRADE 201 MUM CHINA 5,17,858 2,93,98,901 56.830/04/12 HR SS SEC/DEFE COILS /SHEET MUM USA 45,000 40,08,842 89.130/04/12 HR SS SEC/DEFE SHEETS/PLATES GR MUM JAPAN 5,000 6,11,821 122.430/04/12 HR SS SEC/DEFE SHEETS/PLATES GR MUM JAPAN 2,000 2,69,126 134.630/04/12 SS SHEETS GRADE 304L MUM GERMANY 1,000 1,66,666 166.730/04/12 SS SHEETS, GRADE 304L, HR MUM GERMANY 2,000 2,75,215 137.630/04/12 CR SS COILS GRADE 304L MUM SPAIN 17,000 24,29,936 142.930/04/12 CR SS COILS 304DL GRADE 304DL MUM CHINA 1,71,000 2,30,96,543 135.130/04/12 CR SS COILS GRADE 304/304L MUM SPAIN 27,000 40,06,260 148.4

SS Flat Products30/04/12 CR SS COILS GRADE 304/304L MUM SPAIN 13,000 19,39,574 149.230/04/12 SS CR COILS GRADE 304 MUM VIETNAM 6,000 9,56,771 159.530/04/12 SS CR COILS GRADE 304 MUM VIETNAM 1,000 76,800 76.830/04/12 SS SHEETS GRADE 304/304L MUM GERMANY 42,000 61,71,422 146.930/04/12 SS SHEETS GRADE 304L MUM GERMANY 19,000 28,64,360 150.830/04/12 SS CR SEC/DEFE SHEET MUM USA 4,000 4,35,325 108.830/04/12 SS CR SEC/DEFE SLITTED COIL MUM USA 3,000 1,43,489 47.8

Bars,rods,wires,angles,shapes,etc.21/04/12 SS ROUND BAR, GRADE 202 MUM USA 1,000 84,867 84.921/04/12 SS ROUND BAR, GRADE 202 MUM USA 18,000 14,78,028 82.121/04/12 SS RODS/TUBES DIA 60MM ROD COC SWEDEN 83 89,148 1074.126/04/12 NON MAGNETIC STEEL ROUND BAR MUM GERMANY 3,360 19,66,931 585.426/04/12 SS BARS & FLATS GRADE 304 MUM GERMANY 17,000 21,64,122 127.3

OTHER ALLOY STEELS,HOLLOW BARS & RODS ETC.

Primary,semi-products20/04/12 HR ALLOY STEEL ROUNDS GRADE MSL-8A MUM CHINA 96,44,000 37,17,33,268 38.5

Flat Rolled Products03/04/12 ALLOY CR COILS IFHS 400 SS 4011 MUM CHINA 3,57,000 1,56,22,327 43.804/04/12 PRIME HR ALLOY STEEL COIL MUM JAPAN 48,000 31,19,206 65.007/04/12 HR (ALLOY) STEEL PLATE ASME SA 387 MUM DENMARK 2,826 2,08,681 73.807/04/12 HR (ALLOY) STEEL PLATE ASME SA 387 MUM DENMARK 2,826 2,08,681 73.807/04/12 HR (ALLOY) STEEL PLATES ASME SA 387 MUM BELGIUM 50,900 37,58,618 73.809/04/12 HR WIDE STRIP IN SHEETS MUM SWEDEN 1,000 88,002 88.009/04/12 PRIMECRNGO SLITTED COIL 0.50MMX52MMXC COC TAIWAN 6,000 5,29,271 88.209/04/12 PRIMECRNGO SLITTED COIL 0.35MMX35MMXC COC TAIWAN 10,000 8,89,472 88.909/04/12 PRIMECRNGO SLITTED COIL 0.35MMX55MMXC COC TAIWAN 1,000 58,754 58.809/04/12 PRIMECRNGO SLITTED COIL 0.35MMX60MMXC COC TAIWAN 2,000 1,92,212 96.11/04/12 ALLOY STEEL PLATES MUM GERMANY 3,33,565 3,42,71,820 102.711/04/12 HOT DIP GALV COIL MUM GERMANY 1,32,000 68,71,090 52.113/04/12 HR ALLOY STEEL PLATES 25 X 2500 X 8000MM MUM GERMANY 4,000 3,66,249 91.613/04/12 HR ALLOY STEEL PLATES 25 X 2500 X 8000MM MUM GERMANY 4,000 3,66,249 91.613/04/12 SIDE ZN-NI COATED ALLOY STEEL SHEETS MUM JAPAN 9,31,000 6,36,54,639 68.420/04/12 (HR ALLOY STEEL) PLATES MUM GERMANY 19,786 18,61,497 94.120/04/12 HR ALLOY STEEL SHEETS GRADE SS400B MUM CHINA 31,67,000 10,57,81,365 33.421/04/12 HOT DIP GALVANIZED COIL MUM SPAIN 2,32,000 1,44,44,999 62.323/04/12 HR STEEL PLATES MUM BELGIUM 21,355 17,55,869 82.224/04/12 ALLOY STEEL PLATES MUM BELGIUM 2,15,450 2,40,17,234 111.525/04/12 CR NON-GRAIN ORIENTED ELECTRICAL STEEL SHEET MUM KOREA 23,91,000 10,18,96,946 42.625/04/12 HR STEEL PLATES MUM ROMANIA 4,29,000 2,52,35,976 58.826/04/12 PRIME HR STEEL PLATE (ALLOY) MUM CHINA 99,000 32,54,210 32.926/04/12 PRIME HR STEEL PLATE (ALLOY) MUM CHINA 2,96,000 95,98,157 32.426/04/12 PRIME HR STEEL PLATE (ALLOY) MUM CHINA 5,90,000 1,89,68,364 32.127/04/12 PRIME CR GRAIN ORIENTED ELECTRICAL STEEL SHEET MUM KOREA 15,99,640 19,94,73,611 124.727/04/12 ALLOY HR STEEL WIRE RODS MUM CHINA 36,08,000 12,48,79,719 34.627/04/12 PRIME HR ALLOY STEEL COILS MUM CHINA 2,93,94,900 99,64,22,773 33.927/04/12 HR STEEL PLATES MUM FRANCE 3,000 4,19,077 139.727/04/12 HR STEEL PLATES MUM FRANCE 6,000 6,98,461 116.427/04/12 HR STEEL PLATES MUM FRANCE 2,000 2,27,602 113.827/04/12 PRIME HR STEEL PLATE (ALLOY) MUM CHINA 92,34,000 30,32,02,243 32.827/04/12 CRNO DEFECTIVE STRIPS / COILS MUM USA 19,000 4,03,011 21.230/04/12 ALLOY JFE CR STEEL COIL MUM JAPAN 16,67,000 10,20,45,869 61.230/04/12 ALLOY BAKE HARDENABLE GALV MUM JAPAN 84,000 60,85,495 72.4

Bars,rods,wires,angles,shapes,etc.03/04/12 BOHLER W303 ISODISC W-NR. 1.2367 BAR MUM AUSTRIA 1,448 6,78,247 468.404/04/12 HEATING RESISTANCE WIRE FERROUS MUM CHINA 20,000 24,44,806 122.207/04/12 RESISTANCE HEATING WIRE FERROUS BASE MUM CHINA 2,714 4,28,261 157.807/04/12 RESISTANCE HEATING WIRE FERROUS BASE MUM CHINA 5,615 7,40,743 131.909/04/12 SANBAR MDH-19HS20-22-6.7-PS FL-168-1975 MUM SWEDEN 988 5,24,699 531.109/04/12 SANBAR MDH-19HS20-22-6.7-PS FL-512-2575 MUM SWEDEN 3,979 21,13,137 531.109/04/12 SANBAR MDH-19HS20-22-6.7-PS FL-930-1775 MUM SWEDEN 5,013 26,62,265 531.111/04/12 ALLOY STEEL WIRE RODS IN COILS MUM JAPAN 20,000 11,28,103 56.411/04/12 COLD DRAWN X ANNEALED STEEL ROD MUM RUSSIA 18,867 49,26,361 261.111/04/12 BRIGHT BARS 85.000RD PEELED MUM GERMANY 1,486 4,03,881 271.817/04/12 STEEL WIRE RODS GRADE SAE10B2 MUM KOREA 26,000 11,38,192 43.821/04/12 PRIME ALLOY STEEL ROUNDS DIA 200MM MUM CHINA 4,96,000 1,71,44,905 34.623/04/12 ALLOY HR STEEL WIRE ROD (DIA 8.0 MM) VIZ CHINA 7,00,000 2,67,85,907 38.323/04/12 ALLOY HR STEEL WIRE ROD VIZ CHINA 9,81,000 3,75,12,813 38.223/04/12 ALLOY HR STEEL WIRE ROD VIZ CHINA 10,04,000 3,84,11,861 38.323/04/12 ALLOY HR STEEL WIRE ROD VIZ CHINA 3,01,000 1,15,07,318 38.225/04/12 WIRE TYPE S3MOTIB DIA 4.0 MM VIZ ITALY 19,000 23,16,320 121.925/04/12 WIRE TYPE S2 DIAM 3.2 MM VIZ ITALY 10,000 5,61,861 56.225/04/12 WIRE TYPE S2 DIAM 4.0 MM VIZ ITALY 9,000 5,06,106 56.225/04/12 WELDING WIRE S3MOTIB DIA 4.0 MM VIZ ITALY 40,000 46,37,334 115.926/04/12 ALLOY HR STEEL WIRE RODS MUM CHINA 1,61,82,700 57,07,01,690 35.3

ARTICLES OF IRON & STEEL

Tubes,pipes & hollow profiles03/04/12 COLD DRAWN CARBON SEAMLESS STEEL TUBES MUM JAPAN 17,000 27,32,652 160.703/04/12 SS SEC/DEFE WELDED PIPES GRADE 304 MUM KOREA 1,000 22,250 22.303/04/12 SS SEC/DEFE WELDED PIPES GRADE 304 MUM KOREA 21,000 23,38,585 111.404/04/12 SS SEC/DEFE WELDED PIPES GRADE 304 MUM ITALY 1,000 1,12,225 112.204/04/12 SS SEC/DEFE WELDED PIPES GRADE 304 MUM ITALY 24,000 26,86,891 112.004/04/12 SEC/DEFE SS WELDED PIPE/PIPE MUM USA 1,000 1,11,100 111.104/04/12 SEC/DEFE SS WELDED PIPE/PIPE MUM USA 16,000 18,29,935 114.411/04/12 HR SEAMLESS STEEL PIPES VIZ CHINA 18,000 13,49,918 75.011/04/12 HR SEAMLESS STEEL PIPES VIZ CHINA 7,000 4,95,245 70.718/04/12 SS SEC/DEFE WELDED PIPES/PIPE FITTING MUM JAPAN 22,000 33,17,872 150.818/04/12 SS SEC/DEFE WELDED PIPES/PIPE FITTING MUM JAPAN 65,000 73,04,235 112.420/04/12 SEC/DEFE SS SEAMLESS PIPE GRADE 304 MUM CHINA 19,910 24,99,832 125.620/04/12 SS WELDED TUBE COC CHINA 5,034 5,02,260 99.820/04/12 SS WELDED TUBE COC CHINA 855 85,306 99.820/04/12 SS WELDED TUBE COC CHINA 2,089 2,08,427 99.820/04/12 SS WELDED TUBE COC CHINA 3,069 3,06,205 99.820/04/12 SS WELDED TUBE COC CHINA 1,029 1,88,499 183.220/04/12 SS WELDED TUBE COC CHINA 1,018 1,86,484 183.220/04/12 SS WELDED TUBE COC CHINA 2,094 3,83,592 183.220/04/12 SS WELDED TUBE COC CHINA 2,035 3,72,784 183.220/04/12 SS WELDED TUBE COC CHINA 2,271 4,35,873 191.920/04/12 SS WELDED TUBE COC CHINA 2,271 4,35,873 191.923/04/12 SEC/DEFE SS WELDED PIPE/PIPE MUM ITALY 19,990 33,10,622 165.624/04/12 SS SEC/DEFE SEAMLESS PIPES GRADE 304 MUM CHINA 4,92,000 4,87,19,313 99.027/04/12 SS SEC/DEFE WELDED PIPES AND TUBES MUM JAPAN 1,000 57,700 57.727/04/12 SS SEC/DEFE WELDED PIPES AND TUBES MUM JAPAN 43,000 50,17,889 116.727/04/12 SS SEC/DEFE WELDED PIPES GRADE 304 MUM ITALY 98,400 1,30,03,099 132.127/04/12 SEC/DEFE SS WELDED PIPE GRADE 304 MUM ITALY 79,990 94,77,210 118.530/04/12 HR SEAMLESS STEEL PIPES VIZ CHINA 2,000 88,882 44.430/04/12 HR SEAMLESS STEEL PIPES VIZ CHINA 2,000 1,33,242 66.630/04/12 HR SEAMLESS STEEL PIPES VIZ CHINA 52,000 28,05,639 54.030/04/12 HR SEAMLESS STEEL PIPES VIZ CHINA 18,000 9,73,520 54.130/04/12 HFS ALLOY STEEL TUBES MUM JAPAN 68,278 1,29,32,054 189.4

Electrodes Graphite09/04/12 GRAPHITE ELECTRODE REGULAR (HC) MUM CHINA 29,403 24,80,498 84.417/04/12 SEMI GRAPHITIC CATHODE CARBON SIDE SLABS VIZ POLAND 71,000 1,20,88,542 170.320/04/12 ANODE STEMS VIZ CHINA 4,03,842 5,34,17,505 132.324/04/12 SEMI GRAPHITIC CATHODE CARBON SIDE SLABS VIZ POLAND 71,000 1,20,90,386 170.3

Refractories & Bricks09/04/12 SUPPLY OF BRICKS- (MAGNESIA CARBON BRICKS) VIZ CHINA 21,14,000 9,73,10,584 46.009/04/12 REFRACTORY MATERIAL VIZ GERMANY 745 5,29,605 710.909/04/12 REFRACTORY MATERIAL VIZ GERMANY 11,855 30,21,755 254.909/04/12 GRASANIT ACA T4 AL3400U00 VIZ GERMANY 11,160 27,54,598 246.809/04/12 REFRACTORY MATERIAL VIZ GERMANY 199 1,46,163 734.524/04/12 ALUMINA BALLS- DIA.60MM VIZ CHINA 1,04,000 21,79,205 21.030/04/12 GRASANIT ACA T4 AL3400U00 VIZ GERMANY 11,160 28,71,697 257.3

Page 16: Minerals and Metal Review August 2012- 1

16Minerals & Metals Review WEEKLY

AUGUST 06, 2012

Date Product Description Port Country Quantity Value FOB Rate(kgs.) (Rs.)

Date Product Description Port Country Quantity Value FOB Rate(kgs.) (Rs.)

Exports : Iron & Steel Products

Ports Covered in this issue : CHN : Apr. 2012, MUM,COC,DIG, & COI : Apr. 2012.

Ports Covered in recent past issues : KOL & AHM : Apr. 2012,JNPT : Mar 2012, GOA : Mar 2012, MUN : Mar. 2012.

PRIMARY MATERIALS,SPONGE IRON,PELLETS,ETC.

Pig Iron24/04/2012 CONTINUOUS CASTING POWDER CHN MOZAMBIQUE 44,000 13,17,913 30.028/04/2012 PIG IRON CHN THAILAND 77,000 18,92,532 24.630/04/2012 PIG IRON CHN THAILAND 26,000 6,30,844 24.330/04/2012 PIG IRON CHN THAILAND 1,02,000 25,23,376 24.7

Ferro Alloys03/04/2012 SILICO MANGANESE COC MOZAMBIQUE 1,00,000 61,67,340 61.704/04/2012 FERRO MANGANESE CHN GEORGIA 1,00,000 45,74,636 45.704/04/2012 FERRO MANGANESE CHN GEORGIA 2,00,000 1,11,89,799 55.904/04/2012 FERRO MANGANESE CHN GEORGIA 2,00,000 97,69,183 48.804/04/2012 HIGH CARBON FERRO MANGANESE CHN TAIWAN 2,00,000 1,00,67,879 50.304/04/2012 FERRO SILICO MANGANESE DIG PAKISTAN 27,000 13,23,864 49.004/04/2012 FERRO SILICON MANGANESE CHN TAIWAN 2,75,000 1,49,47,076 54.404/04/2012 SILICO MANGANESE CHN GEORGIA 2,50,000 1,21,65,350 48.704/04/2012 SILICO MANGANESE CHN GEORGIA 25,000 11,94,144 47.804/04/2012 SILICO MANGANESE CHN GEORGIA 1,25,000 59,70,723 47.811/04/2012 FERRO SILICO MANGANESE COC EGYPT 1,62,000 1,23,94,562 76.512/04/2012 75-INOCULANT(SI: 70-76%,) CHN BELGIUM 6,000 6,30,593 105.112/04/2012 FERRO SILICON CHN TANZANIA 16,000 11,75,080 73.417/04/2012 75-INOCULANT(SI: 70-76%,) CHN JAPAN 20,000 18,68,073 93.417/04/2012 75-INOCULANT(SI: 70-76%,) CHN USA 11,000 10,02,870 91.217/04/2012 75-INOCULANT(SI: 70-76%,) CHN USA 32,000 29,17,440 91.217/04/2012 75-INOCULANT(SI: 70-76%,) CHN USA 77,000 70,20,090 91.217/04/2012 FERRO SILICON MUM POLAND 10 1,180 118.017/04/2012 MAGNESIUM FERRO SILICON CHN COLOMBIA 24,000 27,53,030 114.718/04/2012 WELDING ELECTRODES-FERRO MANGENSE MUM KENYA 100 18,994 189.918/04/2012 75-INOCULANT(SI: 70-76%,) CHN SLOVENIA 12,000 10,79,709 90.018/04/2012 75-INOCULANT(SI: 70-76%,) CHN SLOVENIA 12,000 11,22,586 93.518/04/2012 FERRO SILICO MANGANESE COC NETHERLANDS 84,000 62,81,950 74.818/04/2012 FERRO MOLYBDENUM-60% CHN OMAN 200 2,30,761 1153.818/04/2012 MAGNESIUM FERRO SILICON CHN SPAIN 25,000 24,91,980 99.719/04/2012 RESEED MSI 0.2 TO 0.7 MM CHN OMAN 5,000 8,59,303 171.919/04/2012 SUPERSEED CHN OMAN 2,000 3,62,310 181.219/04/2012 SILICO MANGANESE CHN SRI LANKA 1,12,000 66,25,020 59.221/04/2012 75-INOCULANT(SI: 70-76%,) CHN FRANCE 11,000 12,73,860 115.821/04/2012 75-INOCULANT(SI: 70-76%,) CHN FRANCE 12,000 14,96,280 124.721/04/2012 MAGNESIUM FERRO SILICON CHN FRANCE 2,000 1,82,991 91.521/04/2012 MAGNESIUM FERRO SILICON CHN SLOVENIA 10,000 5,62,790 56.321/04/2012 MAGNESIUM FERRO SILICON CHN SLOVENIA 15,000 15,16,500 101.122/04/2012 75-INOCULANT(SI: 70-76%,) CHN KOREA 2,000 1,85,158 92.622/04/2012 75-INOCULANT(SI: 70-76%,) CHN KOREA 5,000 4,62,895 92.622/04/2012 75-INOCULANT(SI: 70-76%,) CHN KOREA 9,000 5,76,664 64.122/04/2012 75-INOCULANT(SI: 70-76%,) CHN KOREA 20,000 12,81,698 64.122/04/2012 FERRO SILICON CHN S. ARABIA 50,000 35,03,461 70.125/04/2012 H.C.FERRO MANGANESE CHN CHILE 50,000 32,36,535 64.725/04/2012 H.C.FERRO MANGANESE CHN MALAYSIA 27,000 17,60,594 65.225/04/2012 H.C.FERRO MANGANESE CHN PERU 25,000 16,18,268 64.725/04/2012 75-INOCULANT(SI: 70-76%,) CHN IRAN 10,000 11,36,080 113.625/04/2012 75-INOCULANT(SI: 70-76%,) CHN USA 17,000 32,01,080 188.325/04/2012 FERRO SILICO MANGANESE COC ITALY 1,04,000 91,69,676 88.225/04/2012 FERRO SILICO MANGANESE COC USA 78,000 57,13,753 73.325/04/2012 MAGNESIUM FERRO SILICON CHN SPAIN 42,000 54,62,906 130.125/04/2012 MAGNESIUM FERRO SILICON CHN SPAIN 83,000 1,07,95,744 130.126/04/2012 75-INOCULANT(SI: 70-76%,) CHN JAPAN 20,000 18,60,881 93.027/04/2012 75-INOCULANT(SI: 70-76%,) CHN OMAN 16,000 16,81,580 105.127/04/2012 MAGNESIUM FERRO SILICON CHN OMAN 1,000 1,00,287 100.327/04/2012 MAGNESIUM FERRO SILICON CHN OMAN 5,000 5,77,410 115.528/04/2012 75-INOCULANT(SI: 70-76%,) CHN INDONESIA 2,000 2,44,856 122.428/04/2012 75-INOCULANT(SI: 70-76%,) CHN INDONESIA 3,000 2,77,153 92.428/04/2012 75-INOCULANT(SI: 70-76%,) CHN INDONESIA 5,000 5,77,089 115.428/04/2012 FERRO SILICO MANGANESE COC USA 1,04,000 96,70,920 93.028/04/2012 MAGNESIUM FERRO SILICON CHN BRAZIL 10,000 10,13,000 101.328/04/2012 MAGNESIUM FERRO SILICON CHN BRAZIL 16,000 14,18,200 88.628/04/2012 MAGNESIUM FERRO SILICON CHN BRAZIL 26,000 24,69,188 95.028/04/2012 MAGNESIUM FERRO SILICON CHN INDONESIA 4,000 4,82,702 120.720/04/2012 CORNER CUTTING STEEL CHN OMAN 25,000 7,21,800 28.926/04/2012 CORNER CUTTING STEEL CHN OMAN 25,000 7,21,800 28.9

Sponge iron,pellets,granules,powder,etc.07/04/2012 SPONGE IRON PELLETS CHN S. ARABIA 1,38,000 32,42,892 23.509/04/2012 HRNON ALLOY STEEL WIDE SHEETS & PLATES MUM U K 20 3,332 166.611/04/2012 ELECTROLYTIC IRON POWDER T.R. GRADE MUM U K 14 7,190 513.620/04/2012 ELECTROLYTIC IRON POWDER 500 MESH MUM CHINA 1,350 3,07,699 227.923/04/2012 IRON POWDER-AHI 100.29 MAX MUM GERMANY 25 2,578 103.125/04/2012 SPONGE IRON PELLETS CHN SRI LANKA 1,38,000 32,36,554 23.528/04/2012 ELECTROLYTIC IRON POWDER COPPER COATED MUM GERMANY 100 24,264 242.6

IRON & NON-ALLOY STEEL

Flat Rolled Products-Clad,Plated,Coated02/04/2012 CR GALV NON-ALLOY STEEL SHEETS COC BELGIUM 3,000 1,49,332 49.802/04/2012 CR GALV NON-ALLOY STEEL SHEETS COC BELGIUM 49,000 24,13,056 49.202/04/2012 CR GALV CORR STEELSHEETS COC JAPAN 3,93,000 1,94,44,010 49.502/04/2012 CR NON ALLOY GALV STEELCORR SHEETS COC UAE 3,83,000 1,92,49,735 50.302/04/2012 CR GALV NON ALLOY STEEL GI SHEET COC UAE 8,72,000 3,54,21,702 40.602/04/2012 CR GALV PLAIN NON ALLOY STEEL GP COILS COC BELGIUM 1,17,000 49,01,242 41.902/04/2012 CR GALV PLAIN NON ALLOY STEEL GP COILS COC CHINA 13,000 5,31,228 40.902/04/2012 CR GALV PLAIN NON ALLOY STEEL GP COILS COC CHINA 13,000 5,19,549 40.002/04/2012 CR GALV PLAIN NON ALLOY STEEL GP COILS COC VIETNAM 13,000 5,18,305 39.902/04/2012 CR GALV PLAIN NON ALLOY STEEL GP COILS COC VIETNAM 49,000 20,18,867 41.202/04/2012 CR GALV PLAIN NON ALLOY STEEL GP COILS COC CHINA 13,000 5,37,766 41.402/04/2012 FLAT ROLLED PRODUCTS COC CANADA 8,000 3,10,150 38.802/04/2012 FLAT ROLLED PRODUCTS COC CANADA 85,000 35,03,657 41.202/04/2012 FLAT ROLLED PRODUCTS COC REUNION 1,18,000 46,10,439 39.102/04/2012 NON ALLOY STEELSHEETS/COILS MUM TANZANIA 25,000 14,59,400 58.402/04/2012 CR GALV NON ALLOY STEEL GI SHEET COC UAE 7,96,000 2,97,61,401 37.402/04/2012 CR PAINTED/COATED HIGH TENSILESTEEL STRAPPING COC UAE 24,971 17,06,669 68.303/04/2012 CR GALV NON ALLOY STEEL GI SHEET COC GERMANY 20,000 8,73,391 43.703/04/2012 CR GALV NON ALLOY STEEL GI SHEET COC GERMANY 41,000 17,50,912 42.704/04/2012 CR GALV NON ALLOY STEEL SHEETS MUM ZAIRE 38,000 20,12,652 53.004/04/2012 GALV PLAIN SHEETS (0.80MM) MUM ZAIRE 27,000 14,34,497 53.104/04/2012 CR GALV (PLAIN) NON ALLOY STEEL COILS CHN AUSTRALIA 9,000 3,70,915 41.204/04/2012 CR GALV (PLAIN) NON ALLOY STEEL COILS CHN AUSTRALIA 17,000 7,94,171 46.704/04/2012 CR GALV (PLAIN) NON ALLOY STEEL COILS CHN AUSTRALIA 33,000 14,91,493 45.204/04/2012 CR GALV NON ALLOY STEEL/ WIDE COILS CHN AUSTRALIA 11,000 4,54,836 41.307/04/2012 CRGALV NON-ALLOY STEEL SHEETS MUM ITALY 58,000 31,71,349 54.707/04/2012 CRGALV NON-ALLOY STEEL SHEETS MUM NIGERIA 64,000 34,90,808 54.507/04/2012 CRGALV NON-ALLOY STEEL SHEETS MUM NIGERIA 1,08,000 59,26,415 54.907/04/2012 CRGALV NON-ALLOY STEEL SHEETS MUM USA 39,000 20,59,477 52.807/04/2012 CRGALV NON-ALLOY STEEL SHEETS MUM USA 46,000 24,56,712 53.407/04/2012 CR GALV NON ALLOY STEEL/ WIDE COILS MUM GERMANY 40,000 21,01,127 52.507/04/2012 CR GALV NON ALLOY STEEL/ WIDE COILS MUM PHILIPPINES 1,48,000 77,35,693 52.307/04/2012 CRGALV NON-ALLOY STEEL SHEETS MUM USA 2,00,000 96,21,816 48.107/04/2012 NON-ALLOY STEEL WIDE COILS (PLAIN) MUM GERMANY 97,000 51,22,758 52.810/04/2012 CR GALV NON-ALLOY STEEL WIDE COILS MUM CHINA 1,50,000 82,13,232 54.810/04/2012 CR GALV NON-ALLOY STEEL WIDE COILS MUM USA 1,51,000 82,38,395 54.610/04/2012 NON-ALLOY STEEL WIDE COILS MUM CHINA 54,000 30,68,170 56.810/04/2012 NON-ALLOY STEEL WIDE COILS MUM HUNGARY 56,000 31,80,063 56.810/04/2012 NON-ALLOY STEEL WIDE COILS MUM U K 58,000 33,08,669 57.012/04/2012 CR GALV NON-ALLOY STEEL WIDE COILS MUM USA 26,000 14,22,526 54.712/04/2012 NON-ALLOY STEEL WIDE COILS MUM USA 1,52,000 87,10,690 57.313/04/2012 CR GALV NON ALLOY STEEL/ WIDE COILS MUM MALAYSIA 50,000 21,92,105 43.813/04/2012 CR GALV NON ALLOY STEEL/ WIDE COILS MUM MALAYSIA 1,19,000 53,97,997 45.413/04/2012 NON-ALLOY STEEL WIDE COILS MUM MALAYSIA 11,000 6,00,962 54.6

Flat Rolled Products-Clad,Plated,Coated13/04/2012 NON-ALLOY STEEL WIDE COILS MUM MALAYSIA 46,000 26,20,253 57.017/04/2012 NON ALLOY STEELWIDE COILS MUM DJIBOUTI 16,52,000 8,54,37,019 51.718/04/2012 CR GALV NON ALLOY STEEL SHEETS MUM DJIBOUTI 2,46,000 1,34,29,888 54.618/04/2012 CRGALV NON-ALLOY STEEL SHEETS MUM DJIBOUTI 2,36,000 1,29,07,484 54.718/04/2012 CRGALV NON-ALLOY STEEL SHEETS MUM DJIBOUTI 2,47,000 1,35,14,950 54.724/04/2012 CR GALV COLOR COATED NON ALLOY STEEL COILS MUM RUSSIA 24,29,000 12,68,67,981 52.227/04/2012 CR GALV NON-ALLOY STEEL WIDE COILS MUM DJIBOUTI 17,91,000 9,34,68,742 52.227/04/2012 STEEL COIL 3.0T*242*COIL CHN KOREA 2,090 1,02,667 49.127/04/2012 STEEL COIL 3.45T*242*COIL CHN KOREA 2,150 1,05,614 49.127/04/2012 STEEL COIL 4.0T*250*COIL CHN KOREA 2,109 1,03,600 49.130/04/2012 CRGALV NON-ALLOY STEEL SHEETS MUM BELGIUM 11,86,000 5,09,80,976 43.030/04/2012 CRGALV NON-ALLOY STEEL SHEETS MUM ITALY 17,29,000 7,80,44,981 45.130/04/2012 CRGALV NON-ALLOY STEEL SHEETS MUM KENYA 29,17,000 14,63,39,565 50.2

Flat Rolled Products-Others02/04/2012 PLATE- IS2062GRB-T10 MUM TANZANIA 23,490 17,66,684 75.202/04/2012 PLATE- IS2062GRB-T8 MUM TANZANIA 47,600 36,04,515 75.702/04/2012 PLATE- IS2062GRB-T6 MUM TANZANIA 93,340 71,99,019 77.102/04/2012 CR (FULL HARD) NON ALLOY STEEL WIDE COILS COC UAE 2,32,000 81,25,257 35.003/04/2012 HR PLATES / CARBON STEEL PLATES MATERIAL COC OMAN 68,000 39,79,236 58.504/04/2012 NON ALLOY PRIME HR STEEL PLATES CHN ITALY 52,81,000 19,50,13,092 36.910/04/2012 FLAT ROLLED PRODUCTS CHN BELGIUM 6,000 2,24,921 37.510/04/2012 FLAT ROLLED PRODUCTS CHN MALAYSIA 16,000 6,12,710 38.310/04/2012 FLAT ROLLED PRODUCTS CHN MALAYSIA 83,000 30,95,080 37.310/04/2012 FLAT ROLLED PRODUCTS CHN NETHERLANDS 1,07,000 41,45,666 38.710/04/2012 FLAT ROLLED PRODUCTS CHN POLAND 52,000 19,94,581 38.410/04/2012 FLAT ROLLED PRODUCTS CHN QATAR 99,000 38,68,367 39.110/04/2012 FLAT ROLLED PRODUCTS CHN USA 52,000 20,14,204 38.710/04/2012 NON ALLOY STEEL SHEETS 0.40 X 1219 CHN CHINA 12,000 4,81,062 40.110/04/2012 NON ALLOY STEEL SHEETS 0.40 X 1219 CHN CHINA 20,000 7,65,549 38.310/04/2012 NON ALLOY STEEL SHEETS 0.40 X 1219 CHN GERMANY 22,000 8,50,027 38.610/04/2012 NON ALLOY STEEL SHEETS 0.40 X 1219 CHN GERMANY 5,000 2,02,186 40.410/04/2012 NON ALLOY STEEL SHEETS 0.40 X 1219 CHN GREENLAND 69,000 26,99,730 39.110/04/2012 NON ALLOY STEEL SHEETS 0.40 X 1219 CHN MEXICO 15,000 5,92,326 39.510/04/2012 NON ALLOY STEEL SHEETS 0.40 X 1219 CHN THAILAND 13,000 5,13,838 39.510/04/2012 NON ALLOY STEEL SHEETS 0.40 X 1219 CHN THAILAND 5,000 2,14,510 42.910/04/2012 NON ALLOY STEEL SHEETS 0.40 X 1219 CHN USA 21,000 8,11,409 38.612/04/2012 M.S PLATE:PLATE 12 MM THICK=1500X2000X12 MUM CHINA 1,132 34,154 30.212/04/2012 M.S PLATE:PLATE 20 MM THICK=2000X2100X20 MUM CHINA 1,320 35,544 26.912/04/2012 M.S PLATE:PLATE 30 MM THICK=2000X2100X30 MUM CHINA 2,971 80,001 26.912/04/2012 PLATE 06 MM THICK=3150X1650 MUM UZBEKISTAN 1,459 1,04,835 71.912/04/2012 CR STEEL CLOSE ANNEALED GRADE:16MNCR5 CHN IRELAND 26,000 21,83,791 84.017/04/2012 SHEET METAL CHN KOREA 11,856 7,71,087 65.017/04/2012 FLAT ROLLED PRODUCTS CHN ISRAEL 2,02,000 78,62,224 38.917/04/2012 FLAT ROLLED PRODUCTS CHN YEMEN 6,62,000 2,44,20,188 36.918/04/2012 NON ALLOY STEEL CR STEEL STRIPS MUM THAILAND 44 990 22.518/04/2012 NON ALLOY STEEL CR STEEL STRIPS MUM THAILAND 56 1,261 22.519/04/2012 NON ALLOY STEEL SHEETS 0.40 X 1219 CHN SRI LANKA 24,000 9,70,518 40.419/04/2012 NON ALLOY STEEL SHEETS 0.40 X 1219 CHN SRI LANKA 27,000 10,78,282 39.920/04/2012 FLAT ROLLED PRODUCTS CHN EGYPT 2,15,000 80,06,298 37.221/04/2012 STEEL SHEETCR IF 0.80X1000X1350 CHN KOREA 19,659 10,66,610 54.323/04/2012 NON ALLOY STEEL SHEETS 0.40 X 1219 CHN UAE 3,63,000 1,41,10,004 38.924/04/2012 FLAT ROLLED PRODUCTS CHN OMAN 5,35,000 2,14,18,220 40.024/04/2012 FLAT ROLLED PRODUCTS CHN TANZANIA 21,000 8,21,203 39.124/04/2012 FLAT ROLLED PRODUCTS CHN TANZANIA 32,000 12,90,731 40.325/04/2012 HRNON ALLOY STEEL WIDE SHEETS & PLATES MUM ITALY 9,48,000 3,37,61,705 35.625/04/2012 HRNON ALLOY STEEL WIDE SHEETS & PLATES MUM ITALY 10,56,000 3,53,49,889 33.525/04/2012 NON ALLOY STEEL SHEETS 0.40 X 1219 CHN BRAZIL 75,000 31,29,821 41.725/04/2012 NON ALLOY STEEL SHEETS 0.40 X 1219 CHN COSTA RICA 99,000 39,96,741 40.425/04/2012 NON ALLOY STEEL SHEETS 0.40 X 1219 CHN COSTA RICA 56,000 22,28,067 39.826/04/2012 NON ALLOY STEEL COILS (CRCA) MUM BELGIUM 7,57,000 2,94,18,166 38.926/04/2012 NON ALLOY STEEL SHEETS 0.40 X 1219 CHN SRI LANKA 27,04,000 9,75,79,924 36.126/04/2012 NON ALLOY STEEL COILS (CRCA) MUM BELGIUM 9,50,000 3,70,36,182 39.026/04/2012 NON ALLOY STEEL COILS (CRCA) MUM BELGIUM 22,40,000 9,28,03,997 41.426/04/2012 NON ALLOY STEEL SHEETS 0.40 X 1219 CHN SRI LANKA 81,000 33,58,848 41.527/04/2012 NON ALLOY STEEL COILS (CRCA) MUM ITALY 37,000 12,28,844 33.227/04/2012 NON ALLOY STEEL COILS (CRCA) MUM ITALY 8,000 2,66,609 33.327/04/2012 NON ALLOY STEEL COILS (CRCA) MUM ITALY 29,000 10,11,693 34.927/04/2012 FLAT ROLLED PRODUCTS CHN BANGLADESH 1,77,000 69,62,148 39.327/04/2012 FLAT ROLLED PRODUCTS CHN ISRAEL 53,000 19,15,892 36.130/04/2012 NON ALLOY STEEL SHEETS 0.40 X 1219 CHN SINGAPORE 1,10,000 39,48,806 35.930/04/2012 CR NON ALLOY STEEL STRIPS MUM DJIBOUTI 6,504 6,39,080 98.3

Bars & Rods02/04/2012 CR GALV (CORR) NONALLOY STEEL SHEETS MUM TANZANIA 25,000 12,10,142 48.402/04/2012 GALV STEEL WIRE (NON ALLOY STEEL WIRE COATED) COC UAE 57,324 36,70,278 64.002/04/2012 HIGH CARBON WIRE 7MM MUM TANZANIA 11,860 8,12,857 68.503/04/2012 M.S. RODS COC OMAN 200 97,200 486.004/04/2012 FREE CUTTING NA ALLOY STEEL WIRE RODS CHN MOZAMBIQUE 4,000 1,89,182 47.304/04/2012 FREE CUTTING NA ALLOY STEEL WIRE RODS CHN MOZAMBIQUE 6,000 2,71,158 45.204/04/2012 FREE CUTTING NA ALLOY STEEL WIRE RODS CHN MOZAMBIQUE 10,000 4,74,878 47.504/04/2012 GALV STEEL WIRE (NON ALLOY STEEL WIRE COATED) DIG SUDAN 19,404 10,69,373 55.104/04/2012 WELDING ELECTRODES GM-70 (ER 70S-6) DIG SLOVENIA 54 14,823 274.505/04/2012 WELDING WIRE (ER70S-6) GM-70 CHN BULGARIA 20,000 11,83,118 59.205/04/2012 WIRE OF IRON OR NON ALLOY STEEL CHN BELGIUM 2,384 2,14,566 90.011/04/2012 NON-ALLOY STEEL CHN SINGAPORE 12,000 12,06,285 100.511/04/2012 NON-ALLOY STEEL CHN THAILAND 17,000 17,61,404 103.611/04/2012 NON-ALLOY STEEL CHN USA 18,000 18,96,754 105.418/04/2012 STEEL BAR SAE 1215 DIA 24.5X3000MM CHN THAILAND 10,000 7,07,524 70.819/04/2012 NON ALLOY STEEL WIRE COATED/PLATED MUM USA 1,22,000 57,89,672 47.524/04/2012 STEEL BAR (SAE1215 DIA 24.5X2000MM) CHN THAILAND 4,000 3,74,528 93.626/04/2012 NON ALLOY STEEL BARS COC USA 28,000 12,23,046 43.7

Wires,angles,shapes & sections18/04/2012 NON ALLOY STEEL CHANNEL BARS CHN SRI LANKA 1,41,000 61,94,248 43.9

STAINLESS STEEL

SS Flat Products02/04/2012 HR SS SHEETS4MMX1219MMX2438MM COC UAE 24,000 19,99,895 83.302/04/2012 SS FLAT CHN MALAYSIA 2,000 3,20,778 160.402/04/2012 SS FLAT CHN MALAYSIA 3,000 5,66,910 189.002/04/2012 SS FLAT CHN MALAYSIA 16,000 29,17,870 182.403/04/2012 CR SS STEEL WIDE COILS MUM USA 50,000 42,76,618 85.504/04/2012 SS GRADE 310 HR PLATE COC S. ARABIA 4,000 15,92,525 398.104/04/2012 HR SS SHNEETS4/5/6MMX1219MMX2438MM COC S. ARABIA 23,000 34,49,615 150.004/04/2012 HR SS SHNEETS4MMX1219MMX2438MM COC S. ARABIA 3,000 5,80,628 193.504/04/2012 CR SS WIDE COILS1MMX1220MMXC COC S. ARABIA 14,000 23,24,290 166.004/04/2012 CR SS WIDE COILS3MMX1220MMXC COC S. ARABIA 8,000 12,63,949 158.004/04/2012 CR SS SHEETS DIG GERMANY 5,000 8,19,402 163.911/04/2012 CR SS SHEET/HOOPS & STRIPS MUM CONGO 125 36,405 291.211/04/2012 CR SS SHEET/HOOPS & STRIPS MUM CONGO 401 1,06,631 265.911/04/2012 CR SS SHEET/HOOPS & STRIPS MUM CONGO 630 1,67,525 265.925/04/2012 SS FLAT MUM UAE 375 95,070 253.5

Bars,rods,wires,angles,shapes,etc.02/04/2012 SS WIRE RODS COC UAE 21,420 34,72,931 162.102/04/2012 SS BRIGHT BARS CHN CHINA 2,000 2,18,702 109.402/04/2012 SS BRIGHT BARS COC UAE 47,000 93,86,846 199.702/04/2012 SS ANGLE CHN MALAYSIA 45,000 64,85,566 144.102/04/2012 SS WIRE COC UAE 14,456 40,85,260 282.602/04/2012 SS WIRE CHN MALAYSIA 7,000 15,60,882 223.002/04/2012 SS WIRE CHN MALAYSIA 13,000 28,34,581 218.002/04/2012 SS WIRE CHN MALAYSIA 20,000 42,19,465 211.004/04/2012 SS WIRE RODS GRADE 1. CHN AUSTRALIA 37,000 30,88,923 83.504/04/2012 SS ROUND BRIGHT BAR MUM AUSTRALIA 5,000 21,15,316 423.1

Page 17: Minerals and Metal Review August 2012- 1

17Minerals & Metals Review WEEKLY

AUGUST 06, 2012

Date Product Description Port Country Quantity Value FOB Rate(kgs.) (Rs.)

Date Product Description Port Country Quantity Value FOB Rate(kgs.) (Rs.)

Exports : Iron & Steel Products

Name : __________________________________________________ Designation : _______________________

Company : _______________________________________________ Department : ________________________

Address : ____________________________________________________________________________________

____________________________________________________________________________________________

________________________________________________________ Pin Code : __________________________

Phone : ________________________ Fax : _____________________ Mobile : ____________________________

E-mail : __________________________________________________ Website : ___________________________

Signature : _______________________________________________ Date : ______________________________

I Wish to pay Rs ________________ by Cash Cheque Demand Draft (Add Rs. 50/- for upcountry cheques / DD)

Please make all the cheques/drafts in favour of Minerals & Metals Review.

Fill in this form and mail or fax to : MINERALS & METALS REVIEWFeltham House, 1st Floor, 10, J. N. Heredia Marg, Ballard Estate,Mumbai - 400 001. Tel. : 91-22-2266 0623 / 4710 / 6428Fax : 91-22-2266 0632 Mob. : 9769630814E-mail : [email protected] / [email protected] us at : www.mmronline.com

TERM MMR Monthly MMR Weekly

1 Year Rs.3500 / US $ 275 Rs. 5000 / US $ 300

2 Years Rs.6300 / US $ 450 Rs. 9000 / US $ 550

Minerals & Metals

Review

I WANT TO

SUBSCRIBE�����SUBSCRIPTION ORDER FORM

Bars,rods,wires,angles,shapes,etc.04/04/2012 SS BRIGHT BARS DIG PAKISTAN 9,200 7,57,062 82.304/04/2012 SS BRIGHT BARS DIG GERMANY 5,000 4,28,988 85.804/04/2012 SS BRIGHT BARS DIG GERMANY 1,000 1,38,661 138.704/04/2012 SS BRIGHT BARS DIG GERMANY 2,000 1,77,448 88.704/04/2012 SS BRIGHT BARS DIG GERMANY 15,000 14,97,024 99.804/04/2012 SS WIRE DIG SLOVENIA 20,228 32,52,175 160.804/04/2012 SS WIRE GRADE AISI302 COI USA 4,332 8,17,737 188.804/04/2012 SS WIRE GRADE AISI304 COI USA 14,747 27,83,576 188.804/04/2012 WIRE OF SS MUM AUSTRALIA 1,577 4,50,286 285.504/04/2012 WIRE OF SS MUM AUSTRALIA 6,498 12,04,397 185.304/04/2012 WIRE OF SS CHN USA 15,000 20,50,015 136.704/04/2012 WIRE OF SS CHN USA 15,000 20,91,762 139.504/04/2012 SS WIRE COI USA 8,000 16,36,857 204.604/04/2012 SS WIRE COI USA 8,000 16,90,921 211.405/04/2012 SS WIRE CHN BELGIUM 23,188 43,02,909 185.607/04/2012 WIRE DRAWING OF ALLOY STEEL OR SS MUM ITALY 239 66,998 280.307/04/2012 WIRE DRAWING OF ALLOY STEEL OR SS MUM MYANMAR 90 25,539 283.807/04/2012 WIRE DRAWING OF ALLOY STEEL OR SS MUM S. AFRICA 443 1,25,876 284.110/04/2012 WIRE DRAWING OF ALLOY STEEL OR SS MUM SPAIN 98 13,905 141.911/04/2012 PRIME SS BARS & HOLLOW BARS AISI 303/304 MUM SINGAPORE 149 17,801 119.512/04/2012 SS WIRE MUM UAE 500 1,55,749 311.518/04/2012 SS WIRE MUM UAE 125 49,384 395.118/04/2012 SS WIRE MUM UAE 360 2,63,481 731.920/04/2012 SS WIRE MUM BRAZIL 2,500 14,18,200 567.325/04/2012 SS 316 L ROD MUM PAKISTAN 335 1,86,645 557.125/04/2012 SS BRIGHT BARS MUM GERMANY 612 1,62,468 265.525/04/2012 SS BRIGHT BARS MUM GERMANY 615 1,63,264 265.525/04/2012 SS BRIGHT BARS MUM GERMANY 1,319 3,37,446 255.825/04/2012 STAINLESS STEEL ROUND BAR MUM THAILAND 38 43,698 1149.925/04/2012 STAINLESS STEEL ROUND BAR MUM THAILAND 54 62,209 1152.025/04/2012 STAINLESS STEEL ROUND BAR MUM THAILAND 116 1,33,387 1149.930/04/2012 SS WIRE MUM GERMANY 504 40,334 80.0

SS Utensils/Cultury02/04/2012 GALV STEEL STRANDED WIRE COC UAE 3,74,733 2,27,84,884 60.802/04/2012 MS THAI WOK (5PCS) DIG UAE 19,084 13,13,326 68.802/04/2012 SS HOT POT WITH NICKLE CONTENT LESS THAN 8% COC UAE 6,895 7,55,179 109.503/04/2012 UNGALV. STEEL WIRE ROPES (WIRE STEELCORE) MUM USA 16,000 11,86,931 74.203/04/2012 UNGALV. STEEL WIRE ROPES (WIRE STEELCORE) MUM USA 16,000 11,86,931 74.203/04/2012 KADAI 18" COC OMAN 3,465 5,03,960 145.403/04/2012 KADAI 20" COC MALDIVES 1,711 2,48,781 145.404/04/2012 SS DIAGONAL MESH/CLOTH 10 MESH DIG PAKISTAN 470 2,30,475 490.404/04/2012 SS DIAGONAL MESH/CLOTH 10 MESH TO 80 M DIG PAKISTAN 410 1,02,435 249.804/04/2012 KITCHEN WARE - BELAN BIG MUM AUSTRALIA 37 5,983 161.704/04/2012 KITCHEN WARE - BELAN SMALL MUM AUSTRALIA 39 5,406 138.605/04/2012 TABLE KITCHEN & OTHER HOUSE HOLD CHN BELGIUM 1,595 2,91,852 183.007/04/2012 STAINLESS STEEL ITEMS ASSORTED CHN SRI LANKA 126 29,511 234.209/04/2012 CONDENSATE FLASH TANK MUM SINGAPORE 15,000 40,43,136 269.510/04/2012 8.1.6 CABLE TRAYS & ACCESSORIES MUM CHINA 34,000 1,01,67,124 299.010/04/2012 KITCHEN ARTICLES CHN SINGAPORE 236 54,356 230.311/04/2012 GABION BOXES/NETTING ROLLS MUM SINGAPORE 50,000 2,533 0.111/04/2012 GABION BOXES/NETTING ROLLS MUM SINGAPORE 60,000 3,039 0.112/04/2012 SS WIRE 302 .020 MM MUM USA 1 1,520 1520.012/04/2012 IRON ANCHOR COC UAE 100 13,017 130.212/04/2012 S.S.KITCHENWARE (IDLI MAKER) COC CHINA 177 57,018 322.113/04/2012 8.1.6 CABLE TRAYS & ACCESSORIES MUM SUDAN 19,000 43,21,865 227.513/04/2012 8.1.6 CABLE TRAYS & ACCESSORIES MUM MALAYSIA 15,000 36,75,322 245.017/04/2012 STAINLESS STEEL WIRE MUM THAILAND 80 5,065 63.318/04/2012 STAINLESS STEEL KITCHEN ARTICLES CHN NETHERLANDS 13 4,137 318.218/04/2012 KITCHENWARE(PRESSURE COOKER) COC S. ARABIA 225 74,076 329.218/04/2012 S.S KITCHENWARE(IDLI COOKER) COC S. ARABIA 25 18,994 759.821/04/2012 SS BASIN CHN MALDIVES 102 21,255 208.421/04/2012 TABLE KITCHEN & OTHER HOUSE HOLD CHN MYANMAR 5,425 16,60,872 306.225/04/2012 8.1.17 STATION LIGHTENING SYSTEM (GALV POLES) MUM SYRIA 14,000 3,33,065 23.825/04/2012 NON STICK TAWA CHN AUSTRALIA 15 10,697 713.125/04/2012 STAINLESS STEEL KITCHEN APPLIANCES CHN AUSTRALIA 179 83,896 468.726/04/2012 8.1.6 CABLE TRAYS & ACCESSORIES MUM SYRIA 32,000 53,59,360 167.527/04/2012 SS UTENSILS MUM DENMARK 67 15,419 230.128/04/2012 SS VESSLES CHN MALAYSIA 485 67,770 139.728/04/2012 SS UTENSILS (KITCHEN UTENSILS) CHN GERMANY 137 73,302 535.1

OTHER ALLOY STEELS,HOLLOW BARS & RODS ETC.

Flat Rolled Products01/04/2012 CRGO SLIT COILS COC UAE 17,000 24,00,936 141.201/04/2012 CRGO SLIT COILS COC USA 51,000 77,14,240 151.304/04/2012 THERMOSTATIC BIMETAL STRIPS DIG TAIWAN 10,450 12,07,249 115.527/04/2012 KANTHAL A1-WIRE DIA 0.6MM COIL DIA-~ 0.6MM MUM GERMANY 25,000 1,810 0.1

Bars,rods,wires,angles,shapes,etc.02/04/2012 SS ALLOY STEEL DIG UAE 1,065 68,931 64.702/04/2012 SS ALLOY STEEL DIG UAE 413 23,738 57.502/04/2012 SS ALLOY STEEL DIG UAE 428 22,572 52.703/04/2012 WELDING ELECTRODE WIRE COC OMAN 60 6,329 105.504/04/2012 ALLOY STEEL WIRE ( COATED ) COI INDONESIA 5,625 4,16,693 74.104/04/2012 ALLOY STEEL WIRE ( COATED ) COI INDONESIA 2,250 1,62,123 72.105/04/2012 SS BRIGHT BARS & MILD STEEL CHN BELGIUM 3,688 5,44,459 147.605/04/2012 SS BRIGHT BARS & MILD STEEL CHN BELGIUM 8,039 9,94,203 123.705/04/2012 SS BRIGHT BARS & MILD STEEL CHN BELGIUM 8,171 10,10,528 123.710/04/2012 WIRE OF OTHER ALLOY STEEL MUM SINGAPORE 1,000 48,877 48.918/04/2012 PRIME HR ALLOY STEEL BARS CHN THAILAND 14,200 11,68,445 82.3

ARTICLES OF IRON & STEEL

Tubes,pipes & hollow profiles02/04/2012 CASTINGS PIPE FITTINGS COC UAE 16,035 18,31,564 114.203/04/2012 SS SEAMLESS TUBES AND PIPES COC GERMANY 8,000 28,62,605 357.804/04/2012 WELDED SS CONDENSER TUBES COI USA 14,856 70,71,635 476.007/04/2012 SS SEAMLESS TUBES (COLD FINISHED) MUM OMAN 1,170 7,98,865 682.807/04/2012 DY39473508AA CEW DB OD39 MUM UAE 2,612 2,03,606 78.007/04/2012 PIPE FITTINGS - VALVE MUM CHINA 172 23,154 134.610/04/2012 SEAMLESS BUTT WELDED STEEL PIPE FITTINGS CHN AUSTRALIA 6,000 3,39,277 56.510/04/2012 SEAMLESS BUTT WELDED STEEL PIPE FITTINGS CHN CANADA 1,000 6,320 6.310/04/2012 SEAMLESS BUTT WELDED STEEL PIPE FITTINGS CHN CANADA 1,000 31,215 31.210/04/2012 SEAMLESS BUTT WELDED STEEL PIPE FITTINGS CHN FRANCE 8,000 1,01,420 12.710/04/2012 SEAMLESS BUTT WELDED STEEL PIPE FITTINGS CHN GABON 1,000 19,338 19.310/04/2012 SEAMLESS BUTT WELDED STEEL PIPE FITTINGS CHN ITALY 1,000 13,841 13.810/04/2012 SEAMLESS BUTT WELDED STEEL PIPE FITTINGS CHN ITALY 2,000 1,56,869 78.410/04/2012 SEAMLESS BUTT WELDED STEEL PIPE FITTINGS CHN JAPAN 10,000 1,38,037 13.810/04/2012 SEAMLESS BUTT WELDED STEEL PIPE FITTINGS CHN KOREA 1,000 13,196 13.210/04/2012 SEAMLESS BUTT WELDED STEEL PIPE FITTINGS CHN MALAYSIA 100 1,099 11.010/04/2012 SEAMLESS BUTT WELDED STEEL PIPE FITTINGS CHN MALAYSIA 1,000 52,830 52.810/04/2012 SEAMLESS BUTT WELDED STEEL PIPE FITTINGS CHN NETHERLANDS 1,000 12,661 12.710/04/2012 SEAMLESS BUTT WELDED STEEL PIPE FITTINGS CHN NETHERLANDS 1,000 33,781 33.810/04/2012 SEAMLESS BUTT WELDED STEEL PIPE FITTINGS CHN SRI LANKA 1,000 72,122 72.110/04/2012 SEAMLESS BUTT WELDED STEEL PIPE FITTINGS CHN TANZANIA 1,000 8,433 8.410/04/2012 SEAMLESS BUTT WELDED STEEL PIPE FITTINGS CHN TANZANIA 1,000 9,585 9.610/04/2012 SEAMLESS BUTT WELDED STEEL PIPE FITTINGS CHN THAILAND 1,000 30,269 30.310/04/2012 SEAMLESS BUTT WELDED STEEL PIPE FITTINGS CHN TURKEY 1,000 5,112 5.110/04/2012 SEAMLESS BUTT WELDED STEEL PIPE FITTINGS CHN U K 2,300 80,891 35.210/04/2012 SEAMLESS BUTT WELDED STEEL PIPE FITTINGS CHN UAE 4,000 97,217 24.311/04/2012 PA 12 PIPES MUM GERMANY 50 12,000 240.012/04/2012 SEAMLESS STEEL LINE PIPES MUM DJIBOUTI 45,000 34,81,441 77.412/04/2012 SEAMLESS STEEL LINE PIPES MUM DJIBOUTI 4,000 3,66,453 91.612/04/2012 SEAMLESS STEEL LINE PIPES MUM USA 1,31,000 1,08,89,771 83.112/04/2012 SEAMLESS STEEL LINE PIPES MUM USA 15,000 12,54,428 83.613/04/2012 SS SEAMLESS TUBES MUM INDONESIA 1,000 3,21,798 321.813/04/2012 LINE PIPE - API 5L PSL 2X70M LSAW PIPE MUM S. AFRICA 1,000 86,575 86.615/04/2012 BLACK PIPES CHN JAPAN 1,000 1,04,053 104.118/04/2012 BLACK PIPES MUM DJIBOUTI 52,000 22,51,945 43.318/04/2012 BLACK PIPES MUM DJIBOUTI 52,000 22,51,945 43.319/04/2012 SS SEAMLESS & COLD DRAWN TUBES MUM GERMANY 1,000 68,218 68.219/04/2012 SS SEAMLESS & COLD DRAWN TUBES MUM GERMANY 1,000 1,35,382 135.423/04/2012 COLD DRAWN CARBON STEEL SEAMLESS ST-TUBES MUM UAE 2,000 1,91,092 95.523/04/2012 COLD DRAWN CARBON STEEL SEAMLESS ST-TUBES MUM UAE 4,000 3,85,604 96.423/04/2012 SEAMLESS BUTT WELDED STEEL PIPE FITTINGS CHN USA 51,000 67,36,653 132.127/04/2012 BLACK PIPES / TUBES CHN INDONESIA 10,000 8,94,030 89.427/04/2012 REINFORCED STEEL WIRE BRAIDED RUBBERHOSE MUM CHINA 2,078 13,14,124 632.428/04/2012 BLACK PIPES CHN INDONESIA 10,000 8,92,510 89.328/04/2012 BLACK PIPES CHN THAILAND 26,000 22,74,565 87.530/04/2012 DIECKER 730X460 14.33X3 MUM GERMANY 6,000 1,30,487 21.730/04/2012 DIECKER 730X460 14.33X3 MUM GERMANY 6,000 97,799 16.330/04/2012 BLACK PIPES CHN MALAYSIA 1,34,000 1,19,23,462 89.030/04/2012 BLACK PIPES / TUBES CHN INDONESIA 10,000 8,91,700 89.2

Electrodes Graphites12/04/2012 WAX IMPREGNATED CARBON ELECTRODES CHN HONGKONG 1,000 3,57,893 357.913/04/2012 WAX IMPREGNATED CARBON ELECTRODES CHN USA 20,000 24,99,663 125.019/04/2012 GRAPHITE ELECTRODES MUM USA 1,00,000 2,49,69,258 249.719/04/2012 UHP GRADE GRAPHITE ELECTRODES DIA 600MM MUM ITALY 20,000 44,71,491 223.619/04/2012 UHP GRADE GRAPHITE ELECTRODES DIA 600MM MUM ITALY 20,000 44,85,120 224.321/04/2012 WAX IMPREGNATED CARBON ELECTRODES CHN POLAND 16,000 19,99,730 125.021/04/2012 WAX IMPREGNATED CARBON ELECTRODES CHN POLAND 3,000 7,07,479 235.826/04/2012 WAX IMPREGNATED CARBON ELECTRODES CHN COSTA RICA 15,000 18,74,747 125.026/04/2012 WAX IMPREGNATED CARBON ELECTRODES CHN INDONESIA 1,000 3,57,893 357.930/04/2012 GRAPHITE ELECTRODES SHP 12" DIA X 72" MUM S. AFRICA 5,000 1,26,693 25.3

Refracotries & Bricks03/04/2012 CASTABLE COC OMAN 4,000 1,23,121 30.805/04/2012 MONOLITHICS/CASTABLE RESIMUR B73 V -05 V COC HUNGARY 3,000 79,712 26.605/04/2012 MONOLITHICS/CASTABLE RESIMUR B73 V -05 V COC U K 2,000 45,989 23.007/04/2012 REFRACTORY HIGH ALUMINA CASTABLE CHN USA 21,000 7,18,940 34.209/04/2012 MAGNESITE MORTAR CHN UAE 50,000 9,80,670 19.612/04/2012 NICKEL POWER PROJECTDENSE BRICK AC 85P,INSU CHN USA 3,058 6,53,366 213.719/04/2012 ALUMINA CARBON BRICKS/SHAPES CHN MALAYSIA 5,000 10,43,714 208.720/04/2012 REFRACTORY HIGH ALUMINA CASTABLE CHN QATAR 2,000 1,82,847 91.421/04/2012 FIRECLAY POWDER CHN SRI LANKA 28,000 49,637 1.823/04/2012 ALUMINA FUSED CAST REFRACTORIES ZA33 COC FRANCE 634 7,140 11.324/04/2012 ALUMINA CARBON CONTINUOUS CASTING REFR. CHN SRI LANKA 1,000 1,78,776 178.824/04/2012 ALUMINA CARBON CONTINUOUS CASTING REFR. CHN SRI LANKA 2,000 64,271 32.124/04/2012 CERAMIC ARTICLES MUM AUSTRALIA 20 20,260 1013.024/04/2012 CERAMIC ARTICLES MUM AUSTRALIA 50 37,988 759.824/04/2012 CERAMIC ARTICLES MUM AUSTRALIA 30 66,858 2228.624/04/2012 CERAMIC ARTICLES MUM AUSTRALIA 50 70,087 1401.727/04/2012 ALUMINA FUSEDCAST REFRACTORIES COC GERMANY 85,951 2,17,65,846 253.2

Articles of Iron & Steel04/04/2012 MILD STEEL MUM AUSTRALIA 1,40,000 99,43,332 71.004/04/2012 MILD STEEL MUM USA 21,000 17,42,520 83.012/04/2012 SS CASTINGS COC U K 2,116 9,29,856 439.419/04/2012 SS ROUGH CASTINGS,LS 04 1" X 2" BODY COC GERMANY 10,543 37,09,818 351.923/04/2012 SS CASTINGS COC ITALY 4,925 21,59,524 438.523/04/2012 SS CASTINGS COC ITALY 4,232 18,55,656 438.526/04/2012 SS CASTINGS COC ITALY 5,910 26,64,797 450.927/04/2012 MILD STEEL MUM USA 164 26,343 160.626/04/2012 POOJA ITEMS ( CAMATTU KATTU) CHN U K 200 9,591 48.0

Page 18: Minerals and Metal Review August 2012- 1

18Minerals & Metals Review WEEKLY

AUGUST 06, 2012

C L A S S I F I E D S

SPECIALISTS IN : CLEARANCE OF FERROUS & NON-FERROUS METAL SCRAPS AT KANDLA & MUNDRA

Clearance of containerised cargo from Port andCustom Authorities, Transportation and delivery ofcargo all over India.CHA LICENCE NO: ABUPD6492Q-CH001

PRIME FORWARDERSVISHVA HEAVY LIFTERS

Clearing,Forwarding Shipping,Fleet Owners & Transporters

PLOT NO. 9 & 10, SECTOR 2, NEAR LIONS CLUB,

GANDHIDHAM (KUTCH) 370 201, GUJARAT.TEL : (02836) 232505, 234047, FAX : 231345MOB : 098252 26447 E-MAIL : [email protected] US : www.primeforwarders.com

PPPPPARIKHARIKHARIKHARIKHARIKH M M M M METETETETETALALALALAL I I I I INDUSTRIESNDUSTRIESNDUSTRIESNDUSTRIESNDUSTRIES

Non-Ferrous Metal MerchantsImporters - Distributors - Agents

COPPER � BRASS � ALUMINIUM � LEAD � ZINC � TIN SHEETS � STRIPS � COILS � FOILS

RADIATOR FOILS ETC.

137/139, Kika Street, 2nd Floor, Gulalwadi, Mumbai - 400 004.Phones : 022-23468181 / 23468585 / 66394933

Fax : 23468888 E-mail : [email protected]

Stockist & Selling Agents of :

The Indian Smelting & Refining. Co. Ltd., (BIRLA)Mumbai - 400 078.

Manufacturers of Double Hammer Brand:BRASS - COPPER - NICKEL SILVER- PHOSPHER BRONZE

SHEETS - STRIPS - COILS - FOILS - RADIATOR FOILS etc.

ALL TYPES OF NON-FERROUS ALLOYS & S. G. IRON CASTING

SAKAR FERRO ALLOYS PVT. LTD.

WE IMPORT SCRAP & VIRGIN METALS� ALUMINIUM � TIN � ZINC � NICKEL � LEAD � BRASS

� COPPER � FERROUS METAL � STAINLESS STEEL SCRAP� NICKEL ALLOYS � NICKEL MOLY ALLOYS � STAINLESS STEEL VIRGIN

Arfin Enterprises LimitedH/10, Madhavpura Market, Shahibaug Road,

Ahmedabad - 380 004, Gujarat.Tel. : 079-256 22281 / 256 22283 / 256 22284 /

256 24681 / 256 21953 Fax : 079-25620620 / 26576941Mobile : 9898554414 E-mail : [email protected]

WE MANUFACTURE & EXPORT :� Aluminium Wire Rods � Aluminium Notch bars� Aluminium Ingots � Aluminium Shots� Aluminium Alloys � Aluminium Powder� Ferro Manganese (MC), (LC).� Ferro Titanium� Ferro Titanium � Ferro Moly

JSK Industries Private Limited(An ISO 9001-2000 company)

Manufacturers of Aluminium ProductsAAAC, ACSR, AAC, AACSR, ACSR/AW

conductors in various sizesEC/Alloy/De-Oxi Wire Rods & Wires (in all sizes)

Corporate Office :9, A.K.Naik Marg, CST (VT), Mumbai - 400 001, India

Tel: 91+22+66253700 Fax: 91+22+66550780Web: www.jskindia.in Email: [email protected]

Works :Unit- I : Survey no.369/1/1/2, Sayli, Silvassa,

U. T. of D. & N. H., India.&

Unit- II : Hiren Aluminium Ltd., 126/1, Rakholi, Silvassa,U.T. of D. & N. H., India.

Head Office Address : 401, Wellington Business Park I,4th Floor, Andheri Kurla Road, Marol, Andheri (East),

Mumbai - 400 059 INDIATel Ph : + 91-22-40260777, 91-22-40263777

Fax : + 91-22-28597772 E-mail : [email protected] / [email protected]

Website : www.macrocosmgroup.in

Macrocosm

WORLD CLASS MANUFACTURERS OFCOPPER & COPPER ALLOY, EXTRUDEDTUBES, RODS, SECTIONS & PROFILES,

WIRERODS & WIREWire Rod Factory : Plot 54/1A & 104/10B, Village Savroli,Taluka-Khalapur, District - Raigad - 410 202.Sanand Factory : Plot Nos - 77/78/81/82, Survey No : 196/1,Mahalaxmi Industrial Estate, Sanand Viramgam Highway,Sanand - 382 110 - Gujarat.

ISO 9001 : 2008

CONSIGNMENT AGENT :

HINDALCO INDUSTRIES LTD.

ATAHMEDABAD � MUMBAI � SILVASSA

Regd. Off.: 302, Majestic Shopping Centre,144, Girgaon Road, Mumbai - 400 004.

Tel. No. : 022-40557700 Fax No.: 022-40557777E-mail : [email protected] Website: www.jtgroup.in

: Dealers in :Aluminium Ingots, Wire Rods, Rolled Products & Extrusions

JUGRAJ TEJRAJ AGENCY PVT. LTD.

GURU RAJENDRA METALS PVT. LTD.

Bridging the gap of consumer and manufacturerBridging the gap of consumer and manufacturerBridging the gap of consumer and manufacturerBridging the gap of consumer and manufacturerBridging the gap of consumer and manufacturer

J. POONAMCHAND & SONSAn ISO 9001-2008 Certified Company

Imported & Stockist of :All Ferrous, Non-ferrous Metal & Ferro Alloys

Nickel, Tin, Silicon, Manganese, Magnesium,Ferro Titanium, Ferro Silicon, Ferro SiliconCalcium, Chromium Metal, Ferro Chrome

L.C./H.C., Ferro Moly, Moly Oxide,Ferro Vanadium, Bismuth, Cobalt etc.

499/501, J.S.S. Road, Shreeji Bhavan,Ground Floor, Chira Bazar, Mumbai - 400 002.

Contact No.: 64578400 to 15 Telefax No.: 2208 1672Email : [email protected]

Web : www.jpoonamchandandsons.com

SANJAY COMMERCIAL CO.FMC FORTUNA, B-1, 5th Floor, 234/3A,

A.J.C. Bose Road, Kolkata - 700 020. INDIA

Tel: +91-033-30580111 TO 115,

+91-033-30022663-66; Fax : +91-033-2287-0285

Mobile : 9830021084/85

Email : [email protected]

ANTIMONY METAL, ANTIMONY TRIOXIDE, NICKEL,SILICON, SELENIUM, BISMUTH, COBALT, TIN,

MANGANESE, ARSENIC, ZINC, CADMIUM, TITANIUM,MAGNESIUM, CHROMIUM METAL, FERRO SILICON,

FERRO SILICON CALCIUM, FERRO MOLY, FERROMANGANESE, FERRO NIOBIUM, FERRO PHOSPHORUS,

FERRO VANADIUM, L.C. FERRO CHROME,FERRO BORON, MOLY OXIDE, FLOURSPAR ETC.

IMPORTER & STOCKIST OFNON-FERROUS, MINOR METAL

& FERRO ALLOYS

Mangalam Metal Corporation(An ISO 9001 : 2008 Certified Company)

Exporters, Stockists & Suppliers Of :

Stainless Steel, Nickel, Inconel, Monel, Hastelloy,Titanium etc.

Pipe, Pipe Fittings, Flages, Fasteners, Sheets, Plates, Coils,

Wires, Rods, Capllary Tubes etc.

107, C. P. Tank Road, Near Madhav Baug,

Mumbai - 400 004, Maharashtra (India)

Tel. : + 91 22 66394189, + 6743 6951

Telefax : + 91 22 6639 4669

Email : [email protected] : www.mangalammetal.com

Contact Person : Dipesh Bhansali - 98195 89959

Call on 91 - 22 - 2266 4710 / 6428 / 0623Fax : 91- 22 - 2266 0632

To advertise in

Minerals & Metals Review

CLASSIFIED SECTION

AVAILABLEIngots, Billets & Wire Rods

Contact: Darshan Shah - Mob.09820926856Email: [email protected]

PRIMARY ALUMINIUM

Page 19: Minerals and Metal Review August 2012- 1

Minerals & Metals Review WEEKLY

AUGUST 06, 201219

MANUFACTURERS OF MANUAL METAL ARC WELDING ELECTRODES

HONAVAR ELECTRODES PRIVATE LIMITEDRegd & Head Office: 305-309, Damji Shamji Industrial Complex,

9, L.B.S. Marg, Kurla (West), Mumbai - 400 070.Tel. No. : 25020317/25021238 / 6500 8821 Fax No. : 2510 0048E-Mail : [email protected] website : www.honavarelectrodes.com

Branches and Dealers all over IndiaPROGRESS THROUGH TECHNICAL EXCELLENCE * PROGRESS THROUGH TECHNICAL EXCELLENCE * PROGRESS THROUGH TECHNICAL EXCELLENCE * PROGRESS THROUGH

PROGRESS THROUGH TECHNICAL EXCELLENCE * PROGRESS THROUGH TECHNICAL EXCELLENCE * PROGRESS THROUGH TECHNICAL EXCELLENCE * PROGRESS THROUGH

PR

OG

RE

SS

T

HR

OU

GH

T

EC

HN

ICA

L

EX

CE

LL

EN

CE

HONAVAR ELECTRODES

In a very wide range, for carbon steels, low alloy steels, stainless steels, cast iron, also formaintenance & repair welding.

Capability to meet industry’s increasingly stringent specifications established successfullythrough electrodes of exceptional quality standards, such as:-ULTIMATE-18 NC as per NACE standards for sour service;ULTIMATE-18 MET for LD Converter vessels;ULTIMATE-18 (SPL) for horton spheres, mounded bullets, high pressure boilers.

PR

OG

RE

SS

T

HR

OU

GH

T

EC

HN

ICA

L

EX

CE

LL

EN

CE

The mining major Vedanta posteda 27 per cent rise in first-quartercore earnings, as strong growthin power sales offset the impactof lower metal prices and zincvolumes. The firm said recentlythat Ebitda rose 27 per cent year-on-year to $1.34 billion in the threemonths to the end of June. Salesrose 9% to $3.7 billion.First quarter output of minedmetal in the group's zinc India unitwas 187,000 tonne, in line with theyear's mine plan, compared with188,000 tonne in the year-earlierperiod. The first-quarter output ofintegrated silver rose 70% to 2.6million ounces while integratedlead production was 79% higherat 29,000 tonne, boosted by theramp-up of the SK mine, accordingto the company. Total productionof zinc-lead metal-in-concentrateand zinc metal was in line with the

Vedanta first quarter core earnings rise 27%mine plan and earlier guidance at106,000 tonne.It sold 2,329 million units of powerin the first quarter, significantlyhigher than the 1,415 million unitsit sold in the same period a yearearlier, it said.Vedanta said production of ironore fell to 3.4 million tonne from4.4 million tonne in the year-earlierquarter, hit by a ban on mining inthe southern Indian state ofKarnataka and logisticsconstraints in Goa. Zambiancopper cathode output rose 12%year-on-year to 41,000 tonne withthe ramp-up of the Nchanga Eastconcentrator.It said plans to consolidate andsimplify the company's structurewere on track for completion in thelast quarter of 2012 after it receivedshareholders approval and the go-ahead from the Foreign

Investment Promotion Board inthe first quarter.Meanwhile, Fitch Ratings hasrevised Vedanta's outlook to'Positive' from 'Stable' whileaffirming its Long-Term ForeignCurrency Issuer Default Rating(FC IDR) at 'BB+'. The agencyhas also affirmed Vedanta'ssenior unsecured debt rating at'BB'. A list of additional ratingactions is provided at the end ofthis commentary.The outlook revision reflectsFitch's expectation that Vedantawill be able to deleverage fromFY13 onwards from its FY12 level,when adjusted net debt/EBITDARwas already below 2x on a pro-forma basis. This is due toexecution of a large part of itscapex plans, which should lead topositive free cash flow generationeven if metal prices remain soft.

The Bahrain-based Midal CablesLtd has submitted a proposal toset up an aluminium conductorand rod manufacturing unit atAngul at an investment of Rs 250-300 crore. The overseas investoris keen to set up this facility at thealuminium downstream andancillary products park at Angul tobe developed jointly by the state'snodal land acquisition agency -Industrial InfrastructureDevelopment Corporation ofOdisha (Idco) and the state-runNational Aluminium Company(Nalco). The aluminium park wasto be set up as 50:50 joint venturebetween Idco and Nalco on 204acres of land close to the aluminiummajor's smelting facility at a cost ofRs 75 crore. A special purposevehicle (SPV) called AngulAluminium Park Private Ltd(AAPPL) was formed by Idco and

Bahrain's Midal Cables to set up Al conductor unit at AngulNalco for the purpose.Midal Cables has sought 30-40acres of land within this park. Thealuminium conductor unit isexpected to cater to domestic aswell as international market. Thecompany's authorities stated thatthey expect to commission thefacility within 12-15 months ofgetting land and other approvals.Midal Cables had submitted theproposal in response to theexpression of interest (EoI) ofAAPPL. As many as 53 proposalswere received in response to EoI.Earlier, the chief investment officerof Midal Cables had visited Odishain May this year and held meetingswith top officials of Idco, IndustrialPromotion and InvestmentCorporation of Odisha Ltd (Ipicol)and Nalco in connection withthe project.Subsequently, Midal Cables

chairman came to Bhubaneswar onJune 1 and met the Odisha chiefsecretary B K Patnaik and chairmanand managing director (CMD) ofNalco B L Bagra to expedite theproposal. The company intends touse molten aluminium tomanufacture its products. Moltenaluminium requirement of MidalCables is pegged at 60,000 tonneper annum and the company wantsto enter into a 25-year metalcontract with Nalco at variablepricing mechanism."Midal Cables is one of the manyinvestors that have evincedinterest in setting up downstreamfacilities at the Angul aluminiumpark. While Nalco will be supplyingmolten aluminium as raw materialto all such units, there is no waywe are going to enter into anycontract with Midal Cables," saida top Nalco executive.

The state-run Gujarat MineralDevelopment Corporation(GMDC) reported 11.36 per centjump at Rs 170.51 crore in its netprofit for the quarter ended June.The company's profit in thecorresponding period last yearwas Rs 153.11 crore, an officialstatement said.The company's turnover in thefirst quarter rose by 5.91 per centat Rs 496.53 crore backed bygood mining practices, thestatement said.

GMDC Q1 NP up by 11.36% at Rs 170.51 crGMDC's turnover stood atRs 468.78 crore in thecorresponding period a year ago.The company has generated arevenue of Rs 400.65 crore fromits lignite mining operations andRs 19.41 crore from bauxite mining,the statement said. Focussing onthe value addition, GMDC has setup projects in collaboration withthe private sector mineral players.Gujarat Credo MineralResources Ltd is the new jointventure (JV) of GMDC that will

focus on manufacturing ofZeolite from bauxite, it said.Likewise GMDC's JV with NavinFluorine Ltd shall focus onvalue-addition to fluorspar atKadipaniFluourspar Mines, thestatement said.GMDC has set up a 5 Mw solarpower plant at Panandhro mines,on the mined out reclaimed areathere. It has commissioned 100.5Mw wind power and targets toadd another 50 Mw by October2012, the statement said.

NON FERROUS BITS

HCL IPO to happen by Sept-end: DoDThe government said it may divest stake in the copper majorHindustan Copper (HCL) by September-end and movetowards meeting the disinvestment target for 2012-13. "Thisquarter, RINL and Hindustan Copper (IPO) may come," a topofficial in the Department of Disinvestment (DoD) told.Government is already working on the initial public offer (IPO)of Rashtriya Ispat Nigam Ltd (RINL) and has launchedroadshows for it.The 10% IPO of RINL could fetch the exchequer around Rs2,500 crore. As per a note prepared by the Finance Ministry,DoD is looking at 10% stake sale in HCL. The company willalso issue fresh shares. At the current market price, thegovernment could mop up over Rs 2,000 crore through stakesale in HCL.

GCC aluminium output to touch 5 mtpa by 2013The Gulf Aluminum Council (GAC) indicated that the overallproduction capacity of aluminum smelters in the GulfCooperation Council (GCC) could come close to 5 milliontonne a year by 2013 after the construction of Saudi Arabia'sMa'aden Smelter.GAC said that the production capacity is divided amongAluminium Bahrain (ALBA) with 880,000 tonne, DubaiAluminum with 1,002 million tonne, Sohar Aluminium with370,000 tonne, Qatar Aluminium with 600,000 tonne, EmiratesAluminium with 750,000 tonne, and Saudi Arabian MiningCompany (Ma'aden) with 740,000 tonne.

Bosai group may invest $1 bn in IndonesiaChina's private mining group Bosai plans to invest $1 billionto build an alumina plant in Indonesia after the SoutheastAsian country implemented a series of policies to restrictraw material exports.The company has reached an initial agreement withIndonesian parties to build a 2 million tpy alumina plant onan island with abundant bauxite resources, its generalsecretary, Zhang Yonghua, was quoted as saying. The plantis expected to put into production in 2 years. Currently morethan 80% of bauxite supply in China relies on exports fromIndonesia.

Page 20: Minerals and Metal Review August 2012- 1

20Minerals & Metals Review WEEKLY

AUGUST 06, 2012

Regd. No. MH / MR / South-116/2012-14Registered With the Registrar of Newspaper for India under No. MAHENG/2003/09966Posted at Mumbai Patrika Channel Sorting Office, Mumbai - 400 001Published on Monday of Every Week.

Printed & published by Bina Verma on behalf of Asian Industry & Information Services Private Ltd., and printed at Dhote Offset Technokrafts Pvt. Ltd., Satyam Indl. Estate, Subhash Road, Jogeshwari (E), Mumbai - 60. INDIA and published at Feltham House, 1st Floor,10, J. N. Heredia Marg, Ballard Estate, Mumbai 400 001, INDIA. Tel. No. 022-2266 0623 / 4710 / 6428 Fax. No. 022-2266 0632 E-mail : [email protected] / [email protected]. Editor : Bina Verma

Annual Subscription : Rs. 5,000/- US$300www.mmronline.com

ASIDES & BESIDESCore sector grows 3.6% in JuneGrowth of eight core industries slipped to 3.6 per cent in Juneagainst four per cent in May, on the back of contraction innatural gas, fertilisers and steel output. This will impact overalleconomic growth, given that agriculture might also remainlacklustre due to a weak monsoon. The eight core industrieshave a combined weight of 38 per cent in the Index of IndustrialProduction (IIP). Industrial growth contracted for March andApril before growing by just 2.4 per cent in May. The Maycore data was revised downward to 3.8 per cent from 4.6 percent. In April-June, the core industries growth was just 3.6 percent down from 5.2 per cent in the same period last year.According to economists, the IIP for June will also be weak,affecting the overall gross domestic product for thefirst quarter.

Cabinet to take up land acquisition bill this weekThe land acquisition bill, aimed among other things, at providinga just and fair compensation to land owners, will be placed beforethe Cabinet next week, a top government official said."The billwill come up before Cabinet next week," said Anita Chaudhary,Secretary, Department of Land Resources in the Ministry ofRural Development.

Goa move on stamp duty to up cost for minersThe decision of the Goa cabinet to impose 15 percent royalty oniron ore miners for renewing their lease is likely to increase thecost of production for the miners, mining experts said. However,overall quantity of exports from the state may not suffer as Chineseappetite for ore is high. "The decision of the Goa cabinet to imposean additional 15 percent royalty for the next 20 years as part ofrenewing mining lease will definitely increase the cost ofproduction," Federation of Indian Mineral Industries (Fimi),Southern zone chairman Basant Poddar said.

CIL board to meet on Aug 7 to frame new FSAThe Coal India (CIL) board is scheduled to meet on August 7 tofinalise new fuel supply agreement (FSA) to be made with thepower firms."The Coal India Board will now meet on August 7 todiscuss and finalise the new FSA. The penalty issue, whichremained inconclusive in July 31 meeting will also be discussedand accordingly new FSA will be made," an official privy to theinformation told media.Meanwhile, the state-run company hasalso shifted the venue of the meeting to Delhi from earlierscheduled Kolkata.

India's mfg growth in July weakest since NovIndia's manufacturing sector witnessed a slowdown in July - theweakest growth rate since November - because of moderation inthe domestic and export orders amid sagging global economy, anHSBC survey said. The HSBC India Manufacturing PurchasingManagers' Index (PMI) - a measure of factory production - declinedto 52.9 in July, from 55 in June. Although it showed the weakestgrowth rate since November, the index has remained above the 50mark - below which it indicates contraction.

Exports down 5.5% in June; Imports fall 13.5%India's merchandise exports fell 5.5 per cent to $25 billion inJune, compared with $26.5 billion in the corresponding monthlast year, as demand in the struggling European economiescontinued to decline. Imports recorded a much sharper fall -declining 13.5 per cent to $35.4 billion, compared with $40.9billion in June 2011. This sharp fall reflected the industrialslowdown.Total exports during the quarter ended June stood at$75 billion, a 1.7 per cent fall compared with $76.50 billion in theyear-ago period.

China PMI slips to 8-month lowChina's economy continued to show signs of slowing Wednesdayafter a key measure of the nation's economic growthweakened.China's official factory purchasing managers' indexslipped to 50.1 points in July, a slight drop from 50.2 points inJune but also the lowest figure in eight months, according to theNational Bureau of Statistics.Concerned over the stagnating economy - the world's secondlargest after the United States - China's leaders have moved inrecent weeks to shore up growth w ith policy easing measuresand increasingly strident rhetoric.

IIM Symposium - Converting challenges into opportunities

1234567890123456789012345678901212345612345678901234567890123456789012123456123456789012345678901234567890121234561234567890123456789012345678901212345612345678901234567890123456789012123456123456789012345678901234567890121234561234567890123456789012345678901212345612345678901234567890123456789012123456123456789012345678901234567890121234561234567890123456789012345678901212345612345678901234567890123456789012123456

EVENTS

The Indian Institute of Metalsis celebrating NationalMetallurgists' Day (under theaegis of Government of India,Ministry of Steel) scheduledbetween 16th to 19th November2012 . On this occasion, aninternational symposium -Converting Challenges intoOpportunities-Focus: Iron andSteel and 66th annual technicalmeeting of the Indian Instituteof Metals has been organizedby IIM Jamshedpur Chapterand Tata Steel in associationwith IIM Chapters at Ranchi,Bokaro and Ghatsila. Eminentspeakers from India andabroad have been invited todeliver presentations at theinternational symposium.As a tribute to the importantrole played by metallurgists inthe country's economicdevelopment, the NationalMetallurgists' Day AwardsScheme, instituted by theMinistry of Steel & Mines,Govt of India in 1962, presentlyunder the aegis of the Ministryof Steel, Govt of India, willhonour the distinguishedMetallurgists' of India for theirinvaluable contributions on16th November.An Industry Forum of 2 hours

duration will be organized on 16th

November, in which three eminentspeakers will be invited to highlightspecific issues of sustainability'.The session will conclude with apanel discussion and summing upby the chair.A 2 hour 'Students Programme'is planned to motivate the youngstudents of Metallurgy andMaterials Science to pursue theirprofessional career inmanufacturing and otherrelated areas.50th National Metallurgists' Day

The IIM recognizes and rewardsoutstanding contributions frommetallurgists', material scientists,professionals, researchers,teachers and students in specificareas of specialization. The 2012IIM honours and awards will bepresented on 17th November.As a part of the annual event, ATMpresentations will be conducted on18th and 19th November 2012. Thescope of ATM encompassesmodelling, mineral extraction &beneficiation, manufacture offerrous, non-ferrous and othermaterials, development andcharacterization of products,

environment & othersustainability issues, corrosion,tribology & surface engineering,joining technologies, casting,powder metallurgy, non-destructive testing and emergingtechnologies. Students areencouraged to participate in largenumbers. Waiver of registrationfee, payment of sleeper classtrain fare and free accommodationwill be provided to studentmembers of IIM selected for oralpresentations in the ATM.

ATM ThemesSix parallel sessions and acommon poster session will beconducted emphasizing thefollowing themes:- Raw materials- Iron making- Steel making- Products- Non-ferrous metals- Science & technology of

materialsAbstracts of the proposed oraland poster presentations in anyof these areas are invited inprescribed format is available atthe conference website:www.iimnmdatm2012.com.Onlinesubmission of abstracts will beopen till 31st August 2012