ITE 2017 Western District Annual Meeting
San Diego, CA June 21st
Mineral Avenue Corridor Assessment
![Page 2: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/2.jpg)
Biography - Aaron Heumann, PE, PTOE
• Currently City of Littleton Transportation Engineering Manager
• 24 Years Combined Experience on the Public & Private Sides
• CO/WY Section Past President
• 2018 Joint Western District & Texas District Meeting Co-Chair
![Page 3: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/3.jpg)
Presentation Outline
• Project Background
• Assessment Methodology
• Study Process
• Implementation Strategy
• Results
![Page 4: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/4.jpg)
Background
• Mineral Avenue
• Study Area
• Neighborhoods
![Page 5: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/5.jpg)
Study AreaNeighborhoods:
- Meadowbrook
- Polo Reserve-Polo Ridge Farms
- Polo Reserve-The Sanctuary
- Overlook at Platte Valley
- Pinnacle at Mountain Gate
- The Overlook Plateau
- Outlook (The Meadows at Platte Valley)
- Corridor Study Limits
- Mineral Ave Regional Trail
- City Limits
![Page 6: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/6.jpg)
Methodology
• City Pilot Project
• Resident Engagement
• Community Meetings
• Cooperative/Iterative Process
Resident Input
Potential
Solutions
Concept Design
Phasing
Plan
Cost Estimates
![Page 7: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/7.jpg)
Process
• Community Involvement
• Information Gathering
• Issues Assessment
• Preliminary Solutions
• Implementation Strategy
• Recommendations to City Council
• Implementation
![Page 8: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/8.jpg)
Community Involvement
• Project Webpage on City Website
• Neighborhood Meetings
• Development of Mission, Goals & Users
• Identification of Issues & Concerns
• Feedback on Data, Assessment,
Solutions & Implementation Strategy
![Page 9: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/9.jpg)
Info & Data
• Past Studies
• Physical Environment & Surrounding Land Uses
• Vehicular Volumes
• Pedestrian/Bicycle Activity
• Vehicle Speeds
• Vehicle Intersection Delays
• Corridor Accident History
• Police Enforcement History
• Transit & School Buses
![Page 10: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/10.jpg)
Assessment
Key Resident Perceived Issues Identified:
• Traffic Growth for Commuting & Commercial Land Use
• Increased Number & Severity of Accidents
• Speed Traffic Creating Unsafe Conditions
• Delay Accessing Adjacent Neighborhoods
➢ Review with residents to verify issues being addressed
![Page 11: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/11.jpg)
Preliminary Solutions
• Roadway Changes
• Intersection Modifications
• Side Street Improvements
• Access Revisions
• Traffic Control Considerations
➢ Review with residents to identify solutions to move forward with
![Page 12: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/12.jpg)
Implementation Strategy
• Concept Design
• Phasing Plan
• Cost Estimates
➢Review with residents to develop an agreed upon strategy
![Page 13: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/13.jpg)
Designs
• Mineral Avenue Modifications
• Platte Canyon Road Movements
• Side Street Improvements
![Page 14: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/14.jpg)
Mineral Avenue Modifications• Recommended
• Right Turn Acceleration/Deceleration Lane• Lane Width Narrowing• Center Median Widening• Speed Limit Change• Specific U-turn Locations• Deter Vehicle Queues from Blocking Intersections
• Not Recommended• Median Nose Reduction• Constructability Issues• Cost Prohibitive
![Page 15: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/15.jpg)
![Page 16: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/16.jpg)
![Page 17: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/17.jpg)
![Page 18: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/18.jpg)
![Page 19: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/19.jpg)
![Page 20: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/20.jpg)
Platte Canyon Road Movements• Recommended
• Mineral Avenue Intersection• Dual NB & SB Left Turn Lanes• Traffic Signal Modifications• Channelized NB Right Turn Lane
• Mineral Drive Intersection• Full Movement Access
• Not Recommended• Meadowbrook Access to Platte Canyon Road• Not Supported by Residents• Cost Prohibitive
![Page 21: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/21.jpg)
Min
era
l A
ve
N
![Page 22: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/22.jpg)
Min
era
l A
ve
N Dual Left Turn
Lanes
![Page 23: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/23.jpg)
Min
era
l A
ve
Dual Left Turn
Lanes
N
![Page 24: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/24.jpg)
Min
era
l A
ve
N
Signal
Modifications
![Page 25: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/25.jpg)
Min
era
l A
ve
Channelization
Island
N
![Page 26: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/26.jpg)
Min
era
l A
ve
Full
Movement
N
![Page 27: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/27.jpg)
Min
era
l A
ve
Channelization
Islands
N
![Page 28: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/28.jpg)
Min
era
l A
ve
N
Dual Left Turn
Lanes
Channelization
Islands
Full
Movement
Channelization
Island
Signal
Modifications
![Page 29: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/29.jpg)
Side Street Improvements• Provisional Revisions
– Crosswalk Striping– Trail Signage– Addition of Blank Out Signs on Polo Ridge Drive Pedestrian Signal
• Ultimate Alterations– Curb Extensions– Raised Crosswalk– Additional Landscaping
![Page 30: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/30.jpg)
Mineral Avenue
Du
sk C
ou
rt
![Page 31: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/31.jpg)
Du
sk C
ou
rt
RID
E
SA
FE
CR
OS
SIN
G
SL
OW
DO
WN
RID
E
SA
FE
CR
OS
SIN
G
SL
OW
DO
WN
Mineral Avenue
PROVISIONAL
![Page 32: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/32.jpg)
Du
sk C
ou
rt Curb Extensions
RID
E
SA
FE
CR
OS
SIN
G
SL
OW
DO
WN
RID
E
SA
FE
CR
OS
SIN
G
SL
OW
DO
WN
Mineral Avenue
ULTIMATE
![Page 33: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/33.jpg)
Mineral Avenue
Du
sk C
ou
rt
RID
E
SA
FE
CR
OS
SIN
G
SL
OW
DO
WN
RID
E
SA
FE
CR
OS
SIN
G
SL
OW
DO
WN
Raised Crosswalk
ULTIMATE
![Page 34: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/34.jpg)
Mineral AvenueD
usk
Co
urt
Landscaping
RID
E
SA
FE
CR
OS
SIN
G
SL
OW
DO
WN
RID
E
SA
FE
CR
OS
SIN
G
SL
OW
DO
WN
ULTIMATE
![Page 35: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/35.jpg)
Mineral Avenue
Du
sk C
ou
rt
RID
E
SA
FE
CR
OS
SIN
G
SL
OW
DO
WN
RID
E
SA
FE
CR
OS
SIN
G
SL
OW
DO
WN
ULTIMATE
![Page 36: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/36.jpg)
Mineral Avenue
Du
sk C
ou
rt
RID
E
SA
FE
CR
OS
SIN
G
SL
OW
DO
WN
RID
E
SA
FE
CR
OS
SIN
G
SL
OW
DO
WN
ULTIMATE
![Page 37: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/37.jpg)
Mineral Avenue
Du
sk C
ou
rt
RID
E
SA
FE
CR
OS
SIN
G
SL
OW
DO
WN
RID
E
SA
FE
CR
OS
SIN
G
SL
OW
DO
WN
ULTIMATE
![Page 38: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/38.jpg)
Mineral Avenue
Du
sk C
ou
rt
RID
E
SA
FE
CR
OS
SIN
G
SL
OW
DO
WN
RID
E
SA
FE
CR
OS
SIN
G
SL
OW
DO
WN
ULTIMATE
![Page 39: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/39.jpg)
Phasing Plan
• Phase 1• Side Street Provisional Improvements –
Crosswalks, Trail Signage & Blank Out Signs• Mineral Avenue Lane Reassignments
• Phase 2• Platte Canyon Road/Mineral Avenue
Intersection
• Phase 3• Platte Canyon Road/Mineral Drive Intersection• Side Street Ultimate Improvements – Raised
Crosswalks, Curb Extensions & Landscaping
![Page 40: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/40.jpg)
Phase Project Improvements Cost
Cost Estimating
![Page 41: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/41.jpg)
Phase Project Improvements Cost
1A Side Street Provisional Improvements
• Crosswalk Striping• Trail Signage• Blank Out Signs on Polo Ridge Drive Pedestrian Signal
$11,000
1B Mineral Avenue Lane Reassignment
• Right Turn Acceleration/Deceleration Lane• Lane Width Narrowing• Center Median Widening• Speed Limit Change• Specific U-turn Locations• Deter Vehicle Queues from Blocking Intersections
$35,000
Cost Estimating
![Page 42: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/42.jpg)
Phase Project Improvements Cost
1A Side Street Provisional Improvements
• Crosswalk Striping• Trail Signage• Blank Out Signs on Polo Ridge Drive Pedestrian Signal
$11,000
1B Mineral Avenue Lane Reassignment
• Right Turn Acceleration/Deceleration Lane• Lane Width Narrowing• Center Median Widening• Speed Limit Change• Specific U-turn Locations• Deter Vehicle Queues from Blocking Intersections
$35,000
2A Platte Canyon Road/Mineral Avenue Intersection
• Dual NB & SB Left Turn Lanes• Traffic Signal Modifications• Channelized NB Right Turn Lane
$92,000
Cost Estimating
![Page 43: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/43.jpg)
Phase Project Improvements Cost
1A Side Street Provisional Improvements
• Crosswalk Striping• Trail Signage• Blank Out Signs on Polo Ridge Drive Pedestrian Signal
$11,000
1B Mineral Avenue Lane Reassignment
• Right Turn Acceleration/Deceleration Lane• Lane Width Narrowing• Center Median Widening• Speed Limit Change• Specific U-turn Locations• Deter Vehicle Queues from Blocking Intersections
$35,000
2A Platte Canyon Road/Mineral Avenue Intersection
• Dual NB & SB Left Turn Lanes• Traffic Signal Modifications• Channelized NB Right Turn Lane
$92,000
3A Platte Canyon Road/Mineral Drive Intersection
• Full Movement Access $107,000
3B Side Street Ultimate Improvements
• Curb Extensions
• Raised Crosswalk
• Additional Landscaping
$246,000
Cost Estimating
![Page 44: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/44.jpg)
Phase Project Improvements Cost
1A Side Street Provisional Improvements
• Crosswalk Striping• Trail Signage• Blank Out Signs on Polo Ridge Drive Pedestrian Signal
$11,000
1B Mineral Avenue Lane Reassignment
• Right Turn Acceleration/Deceleration Lane• Lane Width Narrowing• Center Median Widening• Speed Limit Change• Specific U-turn Locations• Deter Vehicle Queues from Blocking Intersections
$35,000
2A Platte Canyon Road/Mineral Avenue Intersection
• Dual NB & SB Left Turn Lanes• Traffic Signal Modifications• Channelized NB Right Turn Lane
$92,000
3A Platte Canyon Road/Mineral Drive Intersection
• Full Movement Access $107,000
3B Side Street Ultimate Improvements
• Curb Extensions
• Raised Crosswalk
• Additional Landscaping
$246,000
Total $491,000
Cost Estimating
![Page 45: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/45.jpg)
Funding
• Public Works Operating Budget• Open Space Funds
• Capital Improvement Project Program
• State & Federal Grant Programs
![Page 46: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/46.jpg)
Project Status To Date
• Community Engaged & Pleased with Process
• City Council Approved• Phase 1 Implementation
Complete• After Data Collected• Phase 2 & 3 Still to Come
![Page 47: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/47.jpg)
• Improved Operations Due to U-turn Relocation
• Reduced Speeds Due to Lane Narrowing, RT Accel/Decel & Lower Speed Limit
• Decrease Delays Due to Two-stage Left Turn Option
• Corridor Less Intimidating to Access
Resident Perceptions
![Page 48: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/48.jpg)
• Volume Increase by <5%• Slight Growth in Traffic at
Intersections• Decrease in Corridor Traffic
Speeds by ~5 mph• Comparable Delays• Fewer Reported Accidents &
Lower Incident of Injury Accidents
After Data Indications
![Page 49: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/49.jpg)
• Corridor Functioning Safer for Bicyclists & Peds• Corridor More Accessible for Side Streets• Minimal Impact to Vehicle Operations
➢ Demonstrated Benefits of Resident Involvement & Good Communication
➢ Safety Improvements with Minimal Impacts to Operations & Congestion
➢ City Applying Process to Other Projects
Project Takeaways
![Page 50: Mineral Avenue Corridor AssessmentBiography - Aaron Heumann, PE, PTOE •Currently City of Littleton Transportation Engineering Manager •24 Years Combined Experience on the Public](https://reader034.vdocuments.mx/reader034/viewer/2022042405/5f1cb659d56fd54c88169afb/html5/thumbnails/50.jpg)
Comments or Questions