Page 1: Milwaukee’s Best  Brew Stand

Milwaukee’s Best Brew Stand

Ben CayaCarl Czajka

4th Update

Page 2: Milwaukee’s Best  Brew Stand

Parts

(3) 6” Cast Iron Burner-$18ea• 55,000 BTU

(1) Propane Regulator - $28ea

(3) 15gal Kettle - $220ea• 1mm walls• Best Kettle Money Can Buy

Page 3: Milwaukee’s Best  Brew Stand

Parts

(2) March Pumps - 815-PL - $150ea• 8 GPM• .04 HP• 110V

(4) 6” Pneumatic Castor - $19ea• 300lb capacity

(1)Heat Exchanger - $40• Aluminum shell• Inner Copper Spiral

Page 4: Milwaukee’s Best  Brew Stand

PartsName Quantity Price Ea Total

Steel for Frame 1 Donate -

Burners 3 $18 $54.00

Regulators 1 $26 $26.00

Pumps 2 $150 $300.00

Castors 4 $19 $76.00

Kettles 3 $175 $525.00

Thermometers 3 $26 $78.00

Valves 3 $20 $60.00

Piping 1 $40 $40.00

Heat Exchanger 1 $40 $40.00

Total: $1,058.80

Page 5: Milwaukee’s Best  Brew Stand

Frame – Shearing Material

Page 6: Milwaukee’s Best  Brew Stand

Frame – Forming Angles

Page 7: Milwaukee’s Best  Brew Stand

Frame – Sub Frame

Page 8: Milwaukee’s Best  Brew Stand

Frame - Welded

Page 9: Milwaukee’s Best  Brew Stand

Frame - Welded

Page 10: Milwaukee’s Best  Brew Stand

Gantt Chart

WBS TasksTaskLead Start End

Duration (Days)

% Complete

Working Days

Days Compl

ete

Days Remaining  

23 - Jan - 12 30 - Jan - 12 06 - Feb - 12 13 - Feb - 12 20 - Feb - 12 27 - Feb - 12 05 - Mar - 12 12 - Mar - 12 19 - Mar - 12 26 - Mar - 12 02 - Apr - 12

1 Initialize Project   1/23/12 2/15/12 3 100% 18 3 0                                                                                                                                                            

1.1 Partner Assign   1/23/12 1/24/12 2 100% 2 2 0                                                                                                                                                            

1.2 Choose Project   1/23/12 1/25/12 3 100% 3 3 0                                                                                                                                                            

2 VOC and Design Requirments   2/16/12 2/29/12 14 100% 10 14 0                                                                                                                                                            

2.1 HBT Design Pole   2/16/12 2/22/12 7 100% 5 7 0                                                                                                                                                            

2.2 Design Requirments   2/16/12 2/18/12 3 100% 2 3 0                                                                                                                                                            

2.3 Bi-Weekly Report #1   2/25/12 2/29/12 5 100% 3 5 0                                                                                                                                                            

2.4 Oral Presentation #1   2/25/12 2/29/12 5 100% 3 5 0                                                                                                                                                            

3 VOC and Design Requirments   2/16/12 2/29/12 14 100% 10 14 0                                                                                                                                                            

3.1 HBT Design Pole   2/16/12 2/22/12 7 100% 5 7 0                                                                                                                                                            

3.2 Design Requirments   2/16/12 2/18/12 3 100% 2 3 0                                                                                                                                                            

3.3 Bi-Weekly Report #2   2/25/12 2/29/12 5 100% 3 5 0                                                                                                                                                            

3.4 Oral Presentation #2   2/25/12 2/29/12 5 100% 3 5 0                                                                                                                                                            

4 Design Selection   3/01/12 3/14/12 14 77% 10 10 4                                                                                                                                                            

4.1 Select Design   3/01/12 3/04/12 4 100% 2 4 0                                                                                                                                                            

4.2 CAD Models   3/04/12 3/10/12 7 100% 5 7 0                                                                                                                                                            

4.3 FEA Analysis   3/10/12 3/14/12 5 0% 3 0 5                                                                                                                                                            

4.4 Bi-Weekly Report #3   3/12/12 3/14/12 3 100% 3 3 0                                                                                                                                                            

4.5 Oral Presentation #3   3/12/12 3/14/12 3 100% 3 3 0                                                                                                                                                            

5 Manufacturing Design   3/15/12 4/04/12 21 36% 15 7 14                                                                                                                                                            

5.1 Parts List   3/15/12 3/19/12 5 90% 3 4 1                                                                                                                                                            

5.2 Order Parts   3/19/12 3/21/12 3 30% 3 0 3                                                                                                                                                            

5.2.1 Steel for Frame   3/19/12 3/25/12 7 100% 5 7 0                                                                                                                                                            

5.2.2 Heating   3/19/12 3/25/12 7 0% 5 0 7                                                                                                                                                            

5.2.2.1 Burners   3/19/12 3/25/12 7 0% 5 0 7                                                                                                                                                            

5.2.2.2 Piping   3/19/12 3/25/12 7 0% 5 0 7                                                                                                                                                            

5.2.2.3 Pilot Lighting   3/19/12 3/25/12 7 0% 5 0 7                                                                                                                                                            

5.2.3 Pumps (2)   2/27/12 3/27/12 30 25% 22 7 23                                                                                                                                                            

5.2.4 Hoses for Pumps   3/19/12 3/25/12 7 0% 5 0 7                                                                                                                                                            

5.2.5 Valves   3/19/12 3/25/12 7 100% 5 7 0                                                                                                                                                            

5.2.6 Kettles   3/19/12 3/25/12 7 100% 5 7 0                                                                                                                                                            

5.2.7 Thermometers   3/19/12 3/25/12 7 100% 5 7 0                                                                                                                                                            

5.2.8 Heat Exhanger   3/19/12 3/25/12 7 0% 5 0 7                                                                                                                                                            

5.2.9 Castors   3/19/12 3/25/12 7 0% 5 0 7                                                                                                                                                            

5.3 Frame and Accessory Assembly   4/01/12 4/04/12 4 30% 3 1 3                                                                                                                                                            

5.4 Bi-Weekly Report #4   4/02/12 4/04/12 3 100% 3 3 0                                                                                                                                                            

5.5 Oral Presentation #4   4/02/12 4/04/12 3 100% 3 3 0