1221 S.E. ELLSWORTH ROAD # X-265 * VANCOUVER, WA * 98664 E-MAIL: [email protected] * MOBILE: (541) 680-2922 CHRISTOPHER WISEMAN OBJECTIVE I have over 8 years experience as supervision with 14 years in the power indust ry Working on turbines, generators and related systems . I am looking to obtain a long-term position in the power industry that will allow me to utilize and add to my current skills and experience. SUMMARY OF EXPERIENCE * I have been traveling internationally in Africa for the last two and was invo lved in the training of African nationals, engineers, craft and regional service managers for Egypt, Nigeria and South Africa. * I was subcontracted to the government power agency on the return to service of large Alstom power stations in South Africa. * Lead supervisor involved in the installation of D-11 steam turbines, 7-FA gas turbines, 6-EA gas turbines, 7-H steam/gas turbines, transformers, PDC's, storag e tanks, fire suppression systems, and other auxiliary systems. * Lead supervisor involved in the overhaul and upgrade of GE, Man, Alstom, Brown Boveri and Westinghouse steam, hydro and gas turbine-generators and prototype g as/steam turbines. * Lead supervisor the mechanical installation of two 7-H prototype G.E. gas/stea m turbine-generators and piping systems. * Competent in the use of surveying equipment, precision levels, laser and mecha nical alignments, and other precision equipment. * Site supervisor responsible for the overseeing of large and small turbine comp onents at site and for the overseeing of machine shops off site. TRAINING * G.E. supervisory training in the following * Job mobilization and demobilization * Post hire safety training; disciplinary & termination procedures * Ethical business practices * Health safety & environmental protection * Drug & alcohol policy & implementation * Experienced and certification in the use of forklifts, manlifts, overhead cran es and other construct ion equipment. One year survey training for use of transi ts, prisms and other surveying equipment. Have taken courses in the use of Rota lign Plus, basic construction mathematics and blueprint interpretation, as well as various bolt-tensioning equipment. * Have completed multiple OSHA and IMSHA training courses in full for certificat ion and have current CPR and First Aid certification and other various safety tr aining. PERSONAL I am thirty two years old and have been working on turbine-generators since I w as eighteen. I have been married for twel ve years and have two daughte rs, ages eight and four. I enjoy traveling abroad, fishing, hunting, and building high p erformance motors. WORK EXPERIENCE 08/08 to 05/10 Granite Manpower Various, Africa Millwright Foreman * I was responsible for the mechanical return to service of two Alstrom steam tu rbines, generators and boiler-feed turbines as well as maintenance on four exist ing turbines during which I rigged and set equipment, managed crews, aligned equ ipment, was responsible for contractor integration meetings as well as coordinat ing the plant cranes to assist other contractors. * I was responsible for overseeing for the upgrade of small industrial GE steam turbines including the manpower and subcontractors responsible for overseeing th

Upload: api-78299566

Post on 07-Apr-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Millwright Foreman or Craft Supervisor or General foreman or Tra

8/6/2019 Millwright Foreman or Craft Supervisor or General foreman or Tra

http://slidepdf.com/reader/full/millwright-foreman-or-craft-supervisor-or-general-foreman-or-tra 1/2

1221 S.E. ELLSWORTH ROAD # X-265 * VANCOUVER, WA * 98664

E-MAIL: [email protected] * MOBILE: (541) 680-2922

CHRISTOPHER WISEMANOBJECTIVEI have over 8 years experience as supervision with 14 years in the power industry Working on turbines, generators and related systems. I am looking to obtaina long-term position in the power industry that will allow me to utilize and addto my current skills and experience.SUMMARY OF EXPERIENCE* I have been traveling internationally in Africa for the last two and was involved in the training of African nationals, engineers, craft and regional servicemanagers for Egypt, Nigeria and South Africa.* I was subcontracted to the government power agency on the return to service oflarge Alstom power stations in South Africa.* Lead supervisor involved in the installation of D-11 steam turbines, 7-FA gasturbines, 6-EA gas turbines, 7-H steam/gas turbines, transformers, PDC's, storage tanks, fire suppression systems, and other auxiliary systems.* Lead supervisor involved in the overhaul and upgrade of GE, Man, Alstom, BrownBoveri and Westinghouse steam, hydro and gas turbine-generators and prototype gas/steam turbines.* Lead supervisor the mechanical installation of two 7-H prototype G.E. gas/steam turbine-generators and piping systems.

* Competent in the use of surveying equipment, precision levels, laser and mechanical alignments, and other precision equipment.* Site supervisor responsible for the overseeing of large and small turbine components at site and for the overseeing of machine shops off site.TRAINING* G.E. supervisory training in the following* Job mobilization and demobilization* Post hire safety training; disciplinary & termination procedures* Ethical business practices* Health safety & environmental protection* Drug & alcohol policy & implementation* Experienced and certification in the use of forklifts, manlifts, overhead cranes and other construction equipment. One year survey training for use of transi

ts, prisms and other surveying equipment. Have taken courses in the use of Rotalign Plus, basic construction mathematics and blueprint interpretation, as wellas various bolt-tensioning equipment.* Have completed multiple OSHA and IMSHA training courses in full for certification and have current CPR and First Aid certification and other various safety training.PERSONALI am thirty two years old and have been working on turbine-generators since I was eighteen. I have been married for twelve years and have two daughters, ageseight and four. I enjoy traveling abroad, fishing, hunting, and building high performance motors.WORK EXPERIENCE08/08 to 05/10 Granite Manpower

Various, AfricaMillwright Foreman* I was responsible for the mechanical return to service of two Alstrom steam turbines, generators and boiler-feed turbines as well as maintenance on four existing turbines during which I rigged and set equipment, managed crews, aligned equipment, was responsible for contractor integration meetings as well as coordinating the plant cranes to assist other contractors.

* I was responsible for overseeing for the upgrade of small industrial GE steamturbines including the manpower and subcontractors responsible for overseeing th

Page 2: Millwright Foreman or Craft Supervisor or General foreman or Tra

8/6/2019 Millwright Foreman or Craft Supervisor or General foreman or Tra

http://slidepdf.com/reader/full/millwright-foreman-or-craft-supervisor-or-general-foreman-or-tra 2/2

e machine shop contractor for new components and refurbishment of casings and old components.* I was responsible for the overhaul and upgrade of 5-E, 9-E, and 5002-D gas turbines, SC4 steam turbine including the generators in various countries such as Equatorial Guinea, Ghana and South Africa in petro-chemical plants and power stations.01/05 to 07/08 Qualified Contractors, Inc. Hemet, CA, U.S.A.Millwright Foreman* Installation and assembly of General Electric prototype 7-H gas/steam turbine-generators and sub and balance of plant.

* Was responsible for the testing and installation of multiple, complex piping systems related with the gas/ steam turbine interface.09/03 to 05/04 W.G. Yates & Sons Construction Rincon, GA, U.S.A.Millwright General Foreman* Installation of equipment for all Balance-of-Plant sub-systems required for a1600 MW Alstom and General Electric combined-cycle power plant.09/02 to 05/03 SNC Lavalin Inc. Gila Bend,AZ, U.S.A.Millwright Foreman* Was responsible for overseeing the installation of two General Electric D-11 steam turbine-generators.10/01 to 08/02 Teton Industrial Demi

ng, NM, U.S.A.Millwright Foreman* The installation of four Frame General Electric 7-FA gas turbine-generators, Two D-11 Steam Turbines and Balance of Plant02/99 to 10/01 Fluor Global Services Jacksonville, FL, U.S.A.Millwright* Worked on the upgrade and overhaul of multiple G.E. steam and gas turbines-generators, replacing and repairing all aspects of the machines.* Overhauled and upgraded one 750MW Westinghouse steam turbine-generator, also one 250MW Westinghouse gas turbine-generator.* The installation of four General Electric Frame 7-FA gas turbine-generators.03/96 to 02/99 Qualified Contractors, Inc. Various Locations With

in U.S.AMillwright* The overhaul and upgrade of various large and small General Electric steam andgas turbine-generators and various auxiliary systems.REFERENCESDavid Post (Operations Manager Afghanistan) - Thirteen Years [email protected] +1 (678) 202-9066William Dickerson (Regional Director Africa) - Two Years [email protected] +27 (72) 879 4603Vincent Ellis (Senior Engineer) - Two Years [email protected] +27 (71) 678 0954Greg Styron (Senior Project Manager) - Two Years [email protected] +27 (71) 678 0936