midanpirg mid-amc steering group first meeting … 1.pdfmid-amc stg/1-wp/1 ... midanpirg mid-amc...
TRANSCRIPT
MID-AMC STG/1-WP/1 29/05/2014
International Civil Aviation Organization MIDANPIRG MID-AMC Steering Group First Meeting (MID-AMC STG/1)
(Teleconference 18 June 2014) Agenda Item 2: Follow-up on MIDANPIRG/14 Conclusions and Decisions relevant to MID-AMC
FOLLOW-UP AND MID-AMC SURVEY RESULTS
(Presented by Jordan)
SUMMARY
This paper presents follow-up on the MID-AMC Conclusion and Decision and discusses the analysis to the MID-AMC survey that has been developed to assess taking the MID-AMC GO-NO-GO decision. Action by the meeting is at paragraph 3.
REFERENCES
− MIDANPIRG/14 Report
− State Letter AN 7/5.1–14/084
1. INTRODUCTION
1.1 The MIDANPIRG/14 meeting was held in Jeddah, Saudi Arabia, from 15 to 19 December 2013. The meeting adopted one (1) Conclusions and one (1) Decisions relevant to the work of the MID-AMC Steering Group. 2. DISCUSSION 2.1 After completion of the MID-AMC development, MIDANPIRG/13 decided to launch the trial period on 12/12/2012 for one year. Since that date fifty-four (54) users from twelve (12) MID States have registered on the MID-AMC (Bahrain, Egypt, Iran, Jordan, Kuwait, Lebanon, Libya,Oman, Qatar, Saudi Arabia, Sudan, UAE). 2.2 The meeting may wish to recall that a Memorandum of Agreement (MOA) has been developed between Jordan and MID States to use the MID-AMC, however, the MOA was signed by twelve (12) States (Bahrain, Iraq, Iran, Jordan, Kuwait, Lebanon, Oman, Qatar, Saudi Arabia, Sudan, UAE and Yemen). 2.3 Furthermore, the MIDANPIRG/14 agreed to establish the MID-AMC Steering Group, and States to appoint to members to this Group:
MID-AMC STG/1-WP/1 - 2 -
DECISION 14/20: ESTABLISHMENT OF MID-AMC STEERING GROUP That, a) a MID-AMC Steering Group is established with TOR as at Appendix 4.5A to
the Report on Agenda Item 4.5; and b) States appoint a Member and Alternate for the MID-AMC Steering Group.
2.4 During MIDANPIRG/14, the meeting was appraised that not all MID-AMC functions could be tested like the Routing Management Function, therefore the meeting urged MID States to send their AFTN/AMHS/CIDIN Routing tables and complete testing the MID-AMC Functions, and agreed on Conclusion 14/21:
CONCLUSION 14/21: MID-AMC OPERATION That, a) States be urged to:
i. provide their AFTN/AMHS/CIDIN Routing tables to MID-AMC by
30 March 2014; ii. register users to MID-AMC according to the accreditation procedure defined
at Appendix 4.5B to the Report on Agenda Item 4.5; iii. complete testing of all MID-AMC Functions by 30 June 2014; and
b) the operation date of the MID-AMC be determined by the MID-AMC Steering
Group. 2.5 The meeting may wish to recall that MIDANPIRG/14 agreed to launch a survey in order to assess the MID-AMC first year of operation, and urged States to reply to the survey and agreed that the Go/No-Go Decision related to the full operation of the MID-AMC, the Survey is at Appendix A to this working paper. 2.6 As a follow-up to MIDANPIRG Decision 14/21 and Conclusion 14/22, ICAO MID Office has sent a State Letter on 14th of April, 2014. The meeting may wish to know that only six (6) States have replied to the said letter (Iran, Jordan, Lebanon, Saudi Arabia, Sudan, and UAE) and provided the filled survey, the replies at Appendix B to this working paper. 2.7 The Analysis of the Survey data is as the following:
a) 83% of States have AMHS System in place and all users have got AMHS training
but 17% have got training on AMC. And 83% of the users think they need MID-AMC training.
b) 83% of States are aware about the MID-AMC Objectives and Need while 50%
are aware about the MID-AMC project phases. c) 67% of the MID-AMC users are not aware about their responsibility and MID-
AMC operator role.
MID-AMC STG/1-WP/1 - 3 -
d) 83% of the users visit the MID-AMC when they get notification mail from the MID-AMC operator, which means they visit the MID-AMC at least twice per AIRAC cycle.
e) 83% are aware about the Minimum Requirement to login to the MID-AMC. f) The MID-AMC Design and response, accreditation procedure were evaluated
"Good". g) 100% of users have not identified any wrong data in the Network Inventory and
address Management functions. h) 17 % is aware about the phases differences between the MID-AMC and the EUR
AMC. i) 100% evaluated the MID-AMC operator performance is "Good" and they have
not got any misleading information. 2.8 From the survey's result in paragraph 2.7, the following Conclusions and action can be drawn:
CONCLUSION ACTION
1- The MID-AMC Design, Response Rate, the MID-AMC Operator Performance are Good, moreover, the MID-AMC does not provide wrong or inconsistent data.
To urge the users informing the MID-AMC operator about any future Bug or wrong information.
2- Some users are not aware about the MID-AMC project phases and cycles.
Conduct a presentation about the MID-AMC objectives, Need and Project Plan in MID-AMC STG1, STG2 and CNS SG/6.
3- Some MID-AMC users are not aware about MID-AMC User types and responsibilities, all available functions.
Arrange MID-AMC training by MID-AMC
4- Use the MID-AMC more frequently also when they get notification from the MID-AMC operator.
MID-AMC operator to send additional emails to guide users about functions usage and any relevant update.
5- The MID-AMC login minimum requirements are not clear for all users.
MID-AMC operator to post on the Bulletin Board the minimum requirements and send emails to all users clarifying these requirements.
2.9 The meeting may wish to recall that MIDANPIRG/14 agreed that the GO-NOGO Decision should be taken by the first meeting of the MID-AMC STG. 2.10 Based on the survey results, it is noted that in order to have full operation it is needed to have good training on the MID-AMC in order that all MID States Com Centers avail the full advantage.
MID-AMC STG/1-WP/1 - 4 -
3. ACTION BY THE MEETING 3.1 The meeting is invited to:
a) note and discuss the Conclusions and Actions at paragraph 2.8;
b) discuss the means to arrange MID-AMC Users for the key users as soon as possible; and
c) decide on the GO-NOGO for the full operation of the MID-AMC.
---------------
Page
The a triprovthe Iinclu
PleaMIDfull
Part-
-
-
-
-
-
- -
Part
e 1 of 3
ATS Messagial basis sinvide a periodICAO MID oudes the follo
ase fill the qD AMC. Furtoperation of
t (1) : Perso Name:
Organizatio
Country:
Years of Ex
Job title:
Your role o CCC Op
Do you hav Yes If yes, Hav Yes Did you atte
Yes
t (2): MID A1- Are you
(AMC)? Yes 2- Are you Yes
3- Are you Yes
4- If you ar Yes
5- How oft
Every w
ging Managence 12/12/20dic feedback office in collaowing questi
questions prethermore it wf the MID-AM
onal data
on:
xperience in
on MID AMCperator
ve AMHS sy
ve you attend end the AMC
AMC Projecu aware abo?
u aware about
u aware about
re a CCC use
ten do you viweek
MID
ement Center12, the thirtabout the M
aboration wiionnaire.
ecisely to hewill be used bMC as was ag
the Aeronau
C: R
stem in place
ded any AMH
C training Co
ct out the obje
t the need to
t the MID A
er, are you aw
isit the MID
AMC Su
r in the Middteenth meetin
MID AMC. Bith the MID A
elp us makeby the MID-Agreed during
utical Fixed S
ead-only Use
e in your cou No
HS Training No
ourse held inNo
ectives of th
No
create a Reg No
MC Project No
ware about y No
AMC?
rvey
dle East (MIDng of MIDANefore launchAMC Team
necessary cAMC Steering fourteenth M
Services (AF
er
untry?
course?
n the ICAO M
he ATS Mes
gional AMC
phases?
your responsi
D AMC) hasNPIRG encohing the MIDis conducting
change/ impng Group forMIDANPIRG
S):
MID office in
ssaging Man
(MID AMC
ibility?
been runninouraged stateD AMC operag a survey w
provement onr deciding onG meeting.
n 2009?
nagement Ce
C)?
ng on es to ation
which
n the n the
enter
Page
Part
Part
e 2 of 3
Every A When I Other, p
6- Are you Yes
7- Do you Yes
t (3): MID A1- What is
Internet Other, p
2- Are you Yes
3- How do
Very go Good Accepta Bad Very ba
4- How do Very goGood AcceptaBad Very ba
5- How do Very goGood AcceptaBad Very ba
t (4): MID A1- Have yo Yes
2- Have yo Yes
3- Have yo Yes
AIRAC Cyc get notificatplease specif
u aware about
think you req
AMC Web Athe type of I
t Explorer please specif
u aware about
you evaluatood
able
ad
you rate theood
able
d
you rate theood
able
d
AMC Functiou found any
ou found any
ou found any
MID
le tion email frofy:
t the role and
quire a traini
ApplicationInternet brow Go
fy:
t the minimu
e the MID A
e registration
e performanc
ions and Pry anomalies d
y inaccurate/w
y inconsistent
AMC Su
om the MID
d responsibil No
ing in your s No
wser do you uoogle Chrom
um requireme No
AMC Design?
process on t
e (Response
ocedure during worki No
wrong data o No
t data in MID No
rvey
AMC opera
lities of the M
state?
use when logme
ent to login t
?
the MID AM
rate) of the
ng on the M
on the MID A
D AMC Repo
ator
MID AMC T
gin to the MI
to the MID A
MC?
MID AMC w
ID AMC?
AMC?
ort (s)?
Team?
ID AMC?
AMC?
web applicat
tion?
Page
Part
If yo
NoteAMC
e 3 of 3
4- If your aHave yo
Yes
5- Are you
procedu Yes
6- Are you Yes
t (5) MID A8- Do you Yes
9- Have yo Yes
10- How do Very g
Good Accepta Bad Very ba
ou have any
e: Please senC Team at m
answer is "You informed t
u aware aboutures?
u aware about
AMC Team Preceive notif
ou got any m
you rate thegood
able
ad
suggestion, p
Thank yo
nd the filled fmidamc@carc
MID
Yes" in the prthe MID AM
t the differen
t all function
Performancfication mess
misleading inf
e MID AMC
please menti
ou for filling
form to icaomc.gov.jo
AMC Su
evious three MC Team abo
No, please s
nce between
No
ns on the MID No
cesages from th No
formation fro No
team perform
ion it here:
g the form. It
rvey
questions, pout the findinspecify why?
the MID AM
D AMC?
he MID AMC
om the MID
mance
t shall be of g
nt with copy t
please answerng in questio?
MC and the E
C operator p
AMC Team?
great help
torgulam@ic
r the followions (1 or 2 or
European AM
periodically?
?
cao.int and M
ng: r 3)?
MC
MID
Page
TherunnencolaunAM
Pleathe
Part-
-
-
-
-
-
- -
Part
e 1 of 4
ATS Messning on a ouraged stnching the MC Team is c
ase fill the qMID AMC.
t (1) : Perso- Name:
Rabee El H- Organizati
Lebanese D- Country:
Lebanon - Years of Ex
18 years - Job title:
Chief of Te Your role o CCC O
- Do you hav Yes If yes, Hav Yes
- Did you att Yes
t (2): MID A1- Are yo
Center Yes 2- Are you Yes
3- Are you Yes
aging Mantrial basis
tates to prMID AMC o
conducting a
questions pr
onal data
Harakeh on: Directorate
xperience in
elecom. Moon MID AM
Operator
ve AMHS sy ve you atte
tend the AM
AMC Projecu aware a(AMC)?
u aware abo
u aware abo
MI
agement Csince 12/12
rovide a peoperation tha survey wh
recisely to h
e General of
n the Aeron
onitoringC:
ystem in pla nded any A
MC training N
t bout the o
out the nee
out the MID
D AMC Su
Center in th2/2012, theeriodic feedhe ICAO MIDhich includes
help us mak
f Civil Aviati
nautical Fixe
Read-only
ace in your cNo MHS TrainiNo
g Course helNo
objectives o
No
d to create No
D AMC ProjeNo
urvey
he Middle Ee thirteenthdback abouD office in cs the follow
ke necessary
on
ed Services
User
country?
ng course?
ld in the ICA
of the ATS
a Regional
ect phases?
East (MID Ah meeting ut the MIDcollaboratio
wing questio
y change/ im
(AFS):
AO MID offi
Messaging
AMC (MID
AMC) has bof MIDANP
D AMC. Beon with the onnaire.
mprovemen
ce in 2009?
g Managem
AMC)?
been PIRG efore MID
nt on
?
ment
Page
Part
e 2 of 4
4- If you a Yes
5- How oft
Every w Every A
When Other,
6- Are you Yes
t (3): MID A1- What is
Interne Other,
2- Are you Yes
3- How do
Very go Good Accept Bad Very ba
4- How doVery goGood AcceptaBad Very ba
5- How doapplicatVery goGood AcceptaBad Very ba
re a CCC us
ten do you week AIRAC CycleI get notificplease spec
u aware abo
AMC Web As the type oet Explorer please spec
u aware abo
o you evaluaood
table
ad
o you rate thood
able
ad
o you rate thtion?
ood
able
ad
MI
ser, are you
visit the M
e cation emailcify:
out the role
Applicationf Internet b G
cify:
out the min
ate the MID
he registrat
he perform
D AMC Su
aware aboNo
ID AMC?
l from the M
and responNo
browser do Google Chro
imum requNo
D AMC Desig
tion process
ance (Respo
urvey
ut your res
MID AMC op
nsibilities of
you use whome
irement to
gn?
s on the MI
onse rate) o
ponsibility?
perator
f the MID A
hen login to
login to the
D AMC?
of the MID A
?
AMC Team?
the MID AM
e MID AMC?
AMC web
MC?
?
Page
Part
Part
e 3 of 4
t (4): MID A1- Have yo Yes
2- Have yo Yes
3- Have yo Yes
4- If your a
followinHave yoor 3)?
Yes
5- Are you
AMC pr Yes
6- Are you Yes
t (5) MID A1- Do you
periodic Yes
2- Have yo Yes
3- How do Very g
Good Accept Bad Very ba
4- Do you Yes
AMC Functioou found an
ou found an
ou found an
answer is "Yng: ou informed
u aware aborocedures?
u aware abo
MC Team Preceive notcally?
ou got any m
o you rate thgood
table
ad
think you r
MI
ons and Prony anomalie
ny inaccurat
ny inconsist
Yes" in the
d the MID A
out the diffe
out all funct
Performanctification m
misleading
he MID AM
require a tra
D AMC Su
ocedure es during woNo
te/wrong daNo
ent data in No
previous th
AMC Team a
No, please
erence betw
No
tions on theNo
ce essages fro
No
informationNo
C team per
aining in yoNo
urvey
orking on th
ata on the M
MID AMC R
ree questio
about the fi
specify why
ween the M
e MID AMC?
om the MID
n from the M
rformance
ur state?
he MID AM
MID AMC?
Report (s)?
ons, please a
inding in qu
y?
MID AMC and
?
AMC opera
MID AMC T
C?
answer the
uestions (1 o
d the Europ
ator
eam?
or 2
pean
Page
If yo
Not
e 4 of 4
ou have any
te: Please se
y suggestion
Thank you
end the fille
MI
n, please m
u for filling t
d form to th
D AMC Su
ention it he
the form. It
he MID AM
urvey
ere:
t shall be of
C Team at m
f great help
midamc@ca
p
arc.gov.jo
Page
TherunnencolaunAM
Pleathe
Part-
-
-
-
-
-
- -
Part
e 1 of 4
ATS Messning on a ouraged stnching the MC Team is c
ase fill the qMID AMC.
t (1) : Perso- Name: Vrg
- Organizati
- Country: U
- Years of Ex
- Job title: A
Your role o CCC O
- Do you hav Yes If yes, Hav Yes
- Did you att Yes
t (2): MID A1- Are yo
Center Yes 2- Are you Yes
3- Are you Yes
aging Mantrial basis
tates to prMID AMC o
conducting a
questions pr
onal data ghese Koshy
on: GCAA/A
UAE
xperience in
ATCA Superv
on MID AMOperator
ve AMHS sy ve you atte
tend the AM
AMC Projecu aware a(AMC)?
u aware abo
u aware abo
MI
agement Csince 12/12
rovide a peoperation tha survey wh
recisely to h
y
ANS
n the Aeron
visor
C:
ystem in pla nded any A
MC training No
t bout the o
out the nee
out the MID
D AMC Su
Center in th2/2012, theeriodic feedhe ICAO MIDhich includes
help us mak
nautical Fixe
Read-onl
ace in your c No MHS Traini No
g Course hel
objectives o
No
d to create No
D AMC Proje No
urvey
he Middle Ee thirteenthdback abouD office in cs the follow
ke necessary
ed Services
ly User
country?
ng course?
ld in the ICA
of the ATS
a Regional
ect phases?
East (MID Ah meeting ut the MIDcollaboratio
wing questio
y change/ im
(AFS): 31
AO MID offi
Messaging
AMC (MID
AMC) has bof MIDANP
D AMC. Beon with the onnaire.
mprovemen
ce in 2009?
g Managem
AMC)?
been PIRG efore MID
nt on
?
ment
Page
Part
e 2 of 4
4- If you a Yes
5- How oft
Every w Every A
When Other,
6- Are you Yes
t (3): MID A1- What is Interne
Other,
2- Are you Yes
3- How do
Very go Good
Accept Bad Very ba
4- How doVery go
Good AcceptaBad Very ba
5- How doapplicatVery go
Good AcceptaBad Very ba
re a CCC us
ten do you week AIRAC CycleI get notificplease spec
u aware abo
AMC Web As the type oet Explorer please spec
u aware abo
o you evaluaood
table
ad
o you rate thood
able
ad
o you rate thtion?
ood
able
ad
MI
ser, are you
visit the M
e cation emailcify:
out the role
Applicationf Internet b G
cify:
out the min
ate the MID
he registrat
he perform
D AMC Su
aware aboNo
ID AMC?
l from the M
and respon No
browser do Google Chro
imum requNo
D AMC Desig
tion process
ance (Respo
urvey
ut your res
MID AMC op
nsibilities of
you use whome
irement to
gn?
s on the MI
onse rate) o
ponsibility?
perator
f the MID A
hen login to
login to the
D AMC?
of the MID A
?
AMC Team?
the MID AM
e MID AMC?
AMC web
MC?
?
Page
Part
Part
e 3 of 4
t (4): MID A1- Have yo Yes
2- Have yo Yes
3- Have yo Yes
4- If your a
followinHave yoor 3)?
Yes
5- Are you
AMC pr Yes
6- Are you Yes
t (5) MID A1- Do you
periodic Yes
2- Have yo Yes
3- How do Very g Good
Accept Bad Very ba
4- Do you Yes
AMC Functioou found an
ou found an
ou found an
answer is "Yng: ou informed
u aware aborocedures?
u aware abo
MC Team Preceive notcally?
ou got any m
o you rate thgood
table
ad
think you r
MI
ons and Prony anomalie
ny inaccurat
ny inconsist
Yes" in the
d the MID A
out the diffe
out all funct
Performanctification m
misleading
he MID AM
require a tra
D AMC Su
ocedure es during wo No
te/wrong da No
ent data in No
previous th
AMC Team a
No, please
erence betw
No
tions on the No
ce essages fro
No
information No
C team per
aining in yo No
urvey
orking on th
ata on the M
MID AMC R
ree questio
about the fi
specify why
ween the M
e MID AMC?
om the MID
n from the M
rformance
ur state?
he MID AM
MID AMC?
Report (s)?
ons, please a
inding in qu
y?
MID AMC and
?
AMC opera
MID AMC T
C?
answer the
uestions (1 o
d the Europ
ator
eam?
or 2
pean
Page
If yo
Not
e 4 of 4
ou have any
te: Please se
y suggestion
Thank you
end the fille
MI
n, please m
u for filling t
d form to th
D AMC Su
ention it he
the form. It
he MID AM
urvey
ere:
t shall be of
C Team at m
f great help
midamc@ca
p
arc.gov.jo