Microgrid project Laborelec

2007 - 2010

24/09/2010 © LABORELEC

24/09/2010 © LABORELEC 2

Mission

– Sustainable development - New generation technologies

– Distributed Generation - Impact on the grid activities

– Support to project activities for GDF-Suez, Electrabel, DNO’s, (i.e. Princess Elisabeth Antarctica project)

– Active Contribution of Laborelec to the Technology Watch

Electrical system of generation, storage and consumption

– Use of local energy sources

– Uninterruptible

– Stable voltage and frequency

Stand alone or grid connected if needed

24/09/2010 © LABORELEC 5

Grid - connected

– Advantages of distributed generation• Less transport losses

• Use of renewable sources where present

• Smoothing unpredictable generation profiles

– Immunity to Grid failures / interruptions

Off - grid

– Cover local energy needs where

grid – connection is costly or impossible

– Use of renewable sources instead of

diesel generators

24/09/2010 © LABORELEC 6

Generation– Renewable sources, CHP etc

Storage system – Batteries or other types. Load supply during low or no production

Control system (Energy flow regulator)– Load supply from generation

– Load supply from storage system if needed

– Battery charging

– Energy exchange with the grid if system is grid connected.

– Balance generation - consumption

Variable loads

24/09/2010 © LABORELEC 8

24/09/2010 © LABORELEC 10

3 types of technology:

– Multicrystalline Si (135 Wp/m² - Photovoltech – 639€/m²)

– Amorphous Si (58 Wp/m² - MSK – 189€/m²)

– Multi layer: Heterojunction with Intrinsic Thin Layer (HIT) (168 Wp/m² - Sanyo – 659€/m²)

30 kW peak (10 kWp/technology) : +/- 180 k€

State of the art SMA converters

Equivalent generation at full load: +/- 845h/year

Estimated generation/year: 25.350 kWh

24/09/2010 © LABORELEC 11

Amorphous Si

Heterojunction with Intrinsic Thin

Layer (HIT)

Multicrystalline

24/09/2010 © LABORELEC 12

What is the efficiency gain from the use of a tracking system?

Energy yield increase claimed by the manufacturer: 35-45%

Implementation– Installation of a two-axis system 5kWp

– Comparison with fix installation

(same PV & inverter technology)

Control system: – light sensors

– movement E-W, inclination0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

04:48 09:36 14:24 19:12P

AC

[W]

PAC

FIX_ 15/08 TRACK_15/08

24/09/2010 © LABORELEC 13

24/09/2010 © LABORELEC 14

6 kW 5 kW

24/09/2010 © LABORELEC 15

Model PROVEN FORTIS

Rotor downwind upwind

Max Power 6 kW 5 kW

Rated Wind Speed 12 m/s 17 m/s

Cut-in Wind Speed 2,5 m/s 2,5 m/s

Survival Wind Speed 70 m/s 60 m/s

Rotor Diameter 5,5 m 5 m

Tower Height 15 m 24 m

Grid Inverter 1 unit 6 kW 2 units 2,3 kW

24/09/2010 © LABORELEC 17

Control system

– Sunny Island 5012

– 3 single phase 4 quadrantinverters

– Master – slaves configuration

Storage system:

– 600Ah 48V C10 Lead – Acid battery bank (2V cells)

24/09/2010 © LABORELEC 19

IV-curve

0

1

2

3

4

5

6

7

8

9

0 10 20 30 40 50 60 70 80 90 100

Voltage (V)

Cu

rre

nt

(A)

HIP 210NHE1

MSK AJG 055-B (new)

MSK AJG 055-B (stable)

Photovoltech Mithras 200Wp

• The data found on the manufacturer’s data sheets are checked

• The performance of the technologies is measuredunder real operatingconditions

24/09/2010 © LABORELEC 20

Parameters

– Electrical: V [V], I [A]

– External parameters: G [W/m²], T [°C]

Comparison of theoreticaly expectedproduction underspecific operatingconditions with actualproduction 0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

0:00 4:48 9:36 14:24 19:12 0:00

Pd

c[W

]

model

measured

24/09/2010 © LABORELEC 21

• The average efficiency of the inverters is calculatedfor the different levels of AC output power

80.00

82.00

84.00

86.00

88.00

90.00

92.00

94.00

96.00

98.00

Eff

icie

ncy %

5 10 20 30 50 100

% Pac_nom

Inverter Measured Efficiency

• The results are compared with the manufacturer’s efficiency curves

24/09/2010 © LABORELEC 22

The power output of the generator Vs the recorded wind speed on site is compared to the manufacturer’scurve

Parameters recorded:

– Electrical: PAC [W]

– External: v [m/s]

24/09/2010 © LABORELEC 23

24/09/2010 © LABORELEC 24

• Reference Yield YR

• Array Yield YA

• Final Yield YF

• Performance Ratio PR

0.00

20.00

40.00

60.00

80.00

100.00

120.00

140.00

160.00

January February March April May June

[kW

h/k

Wp

/mo

nth

]

Energy Yields & Losses

YF Ls Lc

24/09/2010 © LABORELEC 25

Power Quality Results – Grid connected

– RMS – Voltage & Current

– Flicker

– Unbalance

– Voltage Harmonics

– Current Harmonics

24/09/2010 © LABORELEC 26

New decoupling protection requirements

Islanding detection strategies. Potential islanding detection problems in low voltage networks.

Experimental setup on the LBE site investigating island mode

L1

L2

L3

N

Mai

n

Gri

d

10 kW PV 10 kW PV 10 kW PV

71 mH

From 100 µF to 200 µF

From 0 kW to 21,5 kW

Adjusted to match the localproduction

24/09/2010 © LABORELEC 27

Rafaël Jahn

EPSM - MMDMGSM: 0475/693697

Email: [email protected]

Dries Lemmens

EPSM - MMDMGSM: 0477/690801

Email: Dries. [email protected]

Vasiliki Balafouti

EPSM - EPSACGSM: 0473/170386

Email: [email protected]

Sebastian Falkenberg

SPRT - INDUGSM: 0475/752576

Email: [email protected]

Sven Kerremans

EPSM - EPSACGSM: 0473/992988

Email: [email protected]

[ Five reasons for you to choose Laborelec ]

One-stop shopping for your energy related servicesMore than 40 years of experience Increased profitability of your installations Independent and confidential advice Recognized and accredited laboratory

The Technical Competence Centrein energy processes and energy use

Laborelec BelgiumRodestraat 1251630 LinkebeekBelgium

T. +32 2 382 02 11F. +32 2 382 02 41RPR/RPM Brussels 0400.902.582 BTW/TVA BE 0400 902 582

[email protected]

Laborelec The NetherlandsAmerikalaan 356199 AEMaastricht-Airport

The NetherlandsT. +31 63 88 26 022

© LABORELEC