Microgrid Solutions The future of power generation
Why renewable energy?
Why Microgrid Solutions?
Microgrids are Combining Traditional & New Energy Technologies
Objective: Cleaner, Reliable & Lower operating cost
– Bring down fossil fuel consumption
– More reliable
– lowest life-cycle costs with combinations
– Low Fuel consumption
Capture the Benefits of Each:
– Reliable and fully dispatchable
– Free energy source
– Stabilization, Power conditioning: Energy Storage
– Technology solutions
– Low maintenance cost
Cost of fuel Cost of maintenance Clean Energy Availability of fuel
1
Alternative Energy
Conventional
0 3.2
Rs. 4.2
9.7 12.9 6.4 16.2 19.4
Rs. 8.9
Rs. 3 Rs. 3.6
Rs.2.1 Rs. 4.0
Rs. 18.2 Rs. 13.7
Rs.4.4 Rs. 6.5
Rs. 9.3 Rs. 3.9
Rs. 3.1 Rs. 5.1
Rs. 12.5
Rs. 14.4
(RS /KWh). Sources: Lazard LCOE Version 10.0 Cat Internal Data | All values in INR
India
Unsubsidized Levelized Cost of Energy Comparison
Solar PV - Residential
Solar PV - C & I
Solar PV - Utility Scale
Wind
Diesel Recip
Natural Gas Recip
Coal
Gas Combined Cycle
2
Global Electricity Capacity Additions
Revised 2017
Renewables: Large Market Opportunity
3
• India is endowed with over 300days of sunny days in a year • About 5,000 trillion kWh per year energy is incident over India’s land area
• Most parts receiving 4-7 kWh per Sq. m per day • As of 31 January 2018 the country's solar power had 20 GW total capacity • The solar energy available in a single year exceeds the possible energy output of all of the fossil fuel energy reserves in India
4
State wise Solar Power Generation Capacity
5
Commercially viable technologies
Mono Crystalline
– Made from a large crystal of silicon
– Most efficient panels
– Effective utilization of space
– Less Heat
– Performs better in low light conditions
Poly Crystalline
Thin film
– Shattered glass look
– Commonly used in India
– Reflective appearance
– Made from cast square ingots
– Made by deposit of thin layers, or thin film of PV material on a substrate
– Variants – CdTe – Cadmium Telluride; CIGS – Copper Indium Galium Selenide; a-Si – Amorphous Silicon
– Cheaper, but less efficient than a-Si – Crystalline Silicon.
6
Schematic Diagram
DC Energy flow AC Energy flow
Solar LT Panel
Customer Distribution Board
Customer LT Panel
AC Load
EB Power Supply
Diesel/Gas Gensets
7
Typical Wiring Diagrams With & without Diesel Generator Set
Typical wiring diagram for grid-connected solar PV system without diesel generator
8
Typical Wiring Diagrams With & Without Diesel Generator Set
Typical wiring diagram for grid-connected solar PV system with
diesel generator
9
Microgrid Solutions from Caterpillar
10
Features and Benefits
Plug and Play
Lifetime free fuel
Cost per unit current (less than 3 rupees) - payback period - 3 to 5 years
High Efficiency
Extensive Product Support
Scalability
Energy Storage
Structural and Performance Warranty
11
Integration Elements • Microgrid Master Control System • Telematics
Power Generation • Diesel / Gas Generator sets • PV Modules & Inverters
Energy Storage Systems • Batteries • Ultracapacitors • Bi-Directional Inverters
Caterpillar Microgrid Product Portfolio
12
Requirement - 1,000 square metres shade free area - Total Project cost - Rs 47 to 55 lakhs
Project Economics
Solar Power is currently popular due to the following benefits: Cost competitive with thermal power Does not depend on availability and price fluctuation of fossil fuels A source of clean power
Typical 100 kW Solar
Benefits -1.5 lakh units/year electricity generation - Break even at 3-6 years with AD - Free power till 25 years after Break even period - 150 tonnes/year carbon reduction
13
– Compelling economics
Cost of power through solar – Rs 4 /unit for a 25 year period
Cost of power through grid – Rs 6 to 10 per unit (varies)
– Sustainability
Lower organizational carbon footprint
Green Building certification for commercial buildings
What does it mean for you in India?
14
Solar + Diesel – Even better economics
Reduce diesel consumption by 50% The cost power – Rs. 4 Vs. Rs. 18 As the usage of the diesel genset increases the pay back becomes even more attractive
15
Reference Installation
16
Why Gmmco
Over 30 years of experience in alternate power generation
Trusted by over 11000 customers
Single point of contact
Offices across 100 locations
Financial stability
Technical expertise
Reliability
Product support