mice collaboration meeting may 31 st – june 3 rd 2009 ral tim hayler, andy lintern draft sequence...

8
MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern DRAFT SEQUENCE OF EVENTS STEPS 1 - 3

Post on 19-Dec-2015

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern DRAFT SEQUENCE OF EVENTS STEPS 1 - 3

MICE Collaboration meetingMay 31st – June 3rd 2009

RALTim Hayler, Andy Lintern

DRAFTSEQUENCE OF EVENTS

STEPS 1 - 3

Page 2: MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern DRAFT SEQUENCE OF EVENTS STEPS 1 - 3

Draft sequence of eventsdepending on deliveries and ISIS schedule

• Install TOF1 and KL in place for step 1• Run step 1 (Sep 2009)• Remove TOF1 and KL (move downstream)• Install spectrometer solenoid (SS1) in step 2, in beam, position. Cool down, run to full

current.• Install diffuser• Test diffuser• Perform quench test• Test diffuser• Remove diffuser• Move SS1 to parked step 2 position (This operation defines the space needed

upstream of SS, is there enough room?). Install tracker into bore and align.• Move SS1 with tracker back into beam position.• Install diffuser, V plate in front of SS1 and TOF1 into cage.• Install TOF2 and KL downstream of SS1.• Run step 2 (Q4 2009)

Page 3: MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern DRAFT SEQUENCE OF EVENTS STEPS 1 - 3

Install KL and TOF1 in place for STEP 1

Page 4: MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern DRAFT SEQUENCE OF EVENTS STEPS 1 - 3

Remove TOF1 and KLInstall SS1 in step 2 positioncool down run to full current

Page 5: MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern DRAFT SEQUENCE OF EVENTS STEPS 1 - 3

Install diffuserTest diffuser

Perform quench testTest diffuser

Remove diffuser

Page 6: MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern DRAFT SEQUENCE OF EVENTS STEPS 1 - 3

INSTALL TRACKERInstall and align the tracker into SS1 whilst in the parked, step 2, position. (This operation defines the space needed upstream of the SS, is there enough room?)

Page 7: MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern DRAFT SEQUENCE OF EVENTS STEPS 1 - 3

• Move tracker and SS1 back into the in beam position for step 2• Install diffuser• Install V plate and TOF1 cage• Install TOF2 and KL

Page 8: MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern DRAFT SEQUENCE OF EVENTS STEPS 1 - 3

STEP 3