PROJECT DESCRIPTION
MIA-Troy Recreation Trail
PID 100778
The City of Troy proposes to resurface three sections of the Troy Recreational Trail in Troy,
Miami County. The Troy Recreational Trail is a component of the Great Miami River
Recreational Trail.
The trail segments to be resurfaced extend from Lytle Road to Trade Square (Segment A); from
Harrison Street to the Adams Street bridge (Segment B); and from the Market Street bridge to
the Miami Shores Golf Course (Segment C). The pavement in these sections is deteriorated,
with areas of cracking and heaving that present an impediment to Trail users.
Construction is expected to begin in September 2019 and conclude in October 2019. Within
each segment, construction is expected to require up to one week. Affected segments will be
closed during construction, with signed on-street detours provided. Utility relocations are not
anticipated.
The Troy Recreational Trail is maintained by the City of Troy Board of Park Commissioners.
The underlying land is currently owned by the City of Troy Board of Park Commissioners, the
City of Troy Board of Education, the Miami Conservancy District (MCD) and one private
property owner. Portions of the Trail were not previously acquired in a manner that allows for
the necessary long-term control and public access required for a federal-aid project. As part of
the project, approximately 1.3-acre of City-owned land will be dedicated as public right-of-way.
The City will enter into a long-term agreement with MCD for the approximately 2.5 acres of
Trail on MCD-land. The portion of land occupied by CSX is in the area under the control of
MCD and will be included in the long-term agreement. The project will acquire approximately
0.25-acre of permanent right-of-way from the private property owners on which the Trail is
currently located.
The portions of Trail to be resurfaced clip Hook Park (Segment A from Sta. 14+45 to Sta.
19+65) and terminate at the Miami Shores Golf Course and associated lands (Segment C Sta. 23
to Sta. 24). Hook Park and Miami Shores Golf Course are recognized Section 4(f) Resources
owned and maintained by the Troy Board of Park Commissioners. The City will dedicate
approximately 0.25-acre of land within Hook Park and 0.2-acre of land associated with Miami
Shores Golf Course as public right-of-way. The Trail also extends along the eastern edge of
Hook Elementary School, outside of the established recreational facilities at the school; the
school board will dedicate approximately 0.2-acre of land from the Hook Elementary School
property as public right-of-way. The MCD-owned land through with the Trail extends is owned
and maintained by MCD for purposes of flood control and is not recognized as a Section 4(f)
resource.
ODOT Office of Environmental Services has determined that the dedication of right-of-way
from Hook Park and Miami Shores Golf Course, as well as the dedications/leases from other
publicly-owned properties, do not constitute a Section 4(f) use, as the Troy Recreation Trail is an
existing recreational facility. The detour of the Trail is considered to be a “temporary no use” of
the trail, due to the provision of a signed detour.
The project will not require any work within streams or wetlands. No tree removals will be
required under the project. Segment C of the project is located within the designated special
flood hazard area associated with the Great Miami River; the project will be designed to result in
no increase in the base flood elevation.
Within Segment A, minorities represent 4% of the population and individuals in poverty
represent 26% of the population. Within Segment B, minorities represent 47% of the population
and individuals in poverty represent 72% of the population. Within Segment C, minorities
represent 6% of the population and individuals in poverty represent 47% of the population.
The project will be constructed with federal (Transportation Enhancement) and local funding.
The environmental review for this project is being undertaken based on Stage 2 level plans.
Environmental clearance is scheduled for 03/09/2018. The project is expected to award in
August 2019.
s
s
s
s
ss
s
s
s
s
.
.
ss
s
0
s
s
s
s
0
ss
s
s
.
s
s
0.
.
s
0
s
s
s
s
s
s
s s
s
0
s
0
s
r
r
r
r
rr
r
r
r
r
-
-
rr
r
/
r
r
r
r
/
rr
r
r
-
r
r
/-
-
r
/
r
r
r
r
r
r
r r
r
/
r
/
r
49
721
48
571
55
48
55
571
55
571
75
75
202
41
721
36
718
48
48
41
36
185
48
718
41
75
185
66
36
75
75
202
40
571
201
202
201
41
571
55
589
201
36
55
36
589
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
49
721
48
571
55
48
55
571
55
571
75
75
202
41
721
36
718
48
48
41
36
185
48
718
41
75
185
66
36
75
75
202
40
571
201
202
201
41
571
55
589
201
36
55
36
589
MIAMI COUNTYUnincorporated Places
Mile Markers 2 mile
Airports
Interstate Routes
Proposed Interstate Routes
U S Routes
Proposed U S Routes
State Routes
Proposed State Routes
Ramps
County Roads
County Sub Division Streets
Proposed County Roads
County Roads (Right of Way only)
Township Roads
Township Sub Division Streets
Township Roads (Right of Way only)
Proposed Township Roads
Municipal Streets
Railroads
County Boundary
City Boundary
Township Boundary
1
2
3
4
0 1 2 3 4 5
Miles
Revised: April - 2015
´ 0 1,000 2,000 3,000 4,000 5,000Feet
MIA-Troy Recreation TrailPID 100778
Troy, Ohio Quadrangle
S Mark
et Str
eet
County Road 25A
Summ
it Ave
nue
North Road
Plum St
reet
E Franklin Street
E West Street
Croydon Road
DronfieldRoad
S Mulb
erry
Stree
t
N Market S
treet
Red C
edar
Drive
Indian
a Ave
nue
Staunton Road
Alley
Finsbury Lane
Linco
ln Av
enue
S Mulb
erry S
treet
Alley
S Che
rryStr
eet
Race Drive
S Ridge Avenue
Nottin
gham
Roa
d
MartinStreet
Alley
LoxleyLane
Ferguson Drive
Hoba
rtDr
ive
Morehea
dStr
eet
Adams Street
N Elm Street
N Ri
dge A
venu
e
Frank
Stree
t
CornishRoad
SurreyRoad
E Canal Street
Walnut
Stree
tMayfair
CircleN Madison Street
McKaig Road
Scott Street
McClungStreetWayne Street
W SimpsonStreet
HobartCircle
Troy Street
SussexRoad
Fleet Road
S Mon
roeStr
eet
Williams S
treet
PennsylvaniaAvenue
S Madison Street
King Richard Court
W Canal Street
ConcordStreet
W FranklinStreet
LafayetteStreetE SimpsonStreet
W MainStreet
Brown StreetW WaterStreet
PearsonCourt
Trade
Squ
are W
est
Trade
Squa
re We
st
E RaceStreetLafayetteStreet
Harrison Street
Drury Lane
ShermanStreet
RaceDrive
MerryRobinRoad
RobinHoodLane
E Water Street
Westg
ateCir
cle
RaperStreet
Jackso
nStr
eet
W Race Street
Loxley Lane
Trade Road
W WaterStreet
KirkLane
WheelerStreet
BrooksideDrive
Ceda
r Stre
et
1Str
eet
Trade
Squ
are E
ast
Shaftsbury Road
4Street
Ohio
Aven
ue
S KentLane
S Clay
Stree
t
Railroad
S Waln
ut Str
eet
S Oxfo
rdStr
eet
S Sho
rtStr
eet
S Plum
Stree
t S Che
rry St
reet
S Che
rry St
reet
S Plum
Stree
t
Ellis S
treet
Oak
Stree
tCo
unts
Stree
tN C
ounts
Stree
t
N Craw
ford
Stree
t
New
Stree
t
S Craw
ford
Stree
t
N Che
rry St
reet
N Mulb
erry S
treet
N Sho
rtStr
eet
N Oxfo
rd Str
eet
N Mon
roe St
reet
S Elm
Stre
et
PrivateDrive
Ash S
treet
Mich
igan A
venu
eVir
ginia
Aven
ueJefferson Street
Fountain Street
AtlanticStreet
WashingtonStreet
Gran
t Ave
nue
Garfie
ldAv
enue
NottinghillLane
S MayfairRoad
Mich
igan
Aven
ueW Main Street
OrchardDrive
Virgin
iaAv
enue
Sherwood Drive
Sherw
ood D
rive
OliveStreet
GlenwoodDrive
CoventRoad
Cloverleaf
ChelseaRoad
FergusonDrive
Cros
sbow
Lane
Westridge
Drive
TamplinDrive
Garfie
ldAv
enue
Summ
it Ave
nue
TamworthRoad
Herrlinger
Way
Arrow Drive
MerryRobinRoad
Hydraulic
Avenue
E Main Street
LittlejohnRoad
Lytle Road
Rutherford
Drive
CameoCircle
Berks
hire
Road
Cresent Drive
W West Street
Lake
Stre
et
Summ
itAv
enue
S Ri
dge A
venu
e
York Lane
GovernorsRoad
Foss Way
Piqua-Troy Road
S Clay
Stree
t
Private Drive
Railroad
Staunton Road
Alley
Rivers
ide D
rive
County Road 25A
Troy-S
idney
Roa
d
I 1 inch = 800 feet
Project B
Project A
Bike Path RepavingProject Overview
Project C