mhi#21 号機の ep1 後の内面検査
DESCRIPTION
MHI#21 号機の EP1 後の内面検査. Optical Inspection Plan. Kirk. 1. Process log of Optical-inspection. 1/1613:05 optical inspection starts 13:30 inspect equator from cell#1 to cell#5 17:00 fin. 1/17 9:50 inspect equator from cell #5 to cell #9 17:20 fin. - PowerPoint PPT PresentationTRANSCRIPT
KirkSTF Cavity Group Meeting
@2012/2/6 1
MHI#21 号機の EP1 後の内面検査
Optical Inspection Plan
1/16 13:05 optical inspection starts 13:30 inspect equator from cell#1 to cell#5
17:00 fin.
1/17 9:50 inspect equator from cell #5 to cell #917:20 fin.
1/18 9:10 inspect equator from iris from #1-2 to #8-9 12:00 fin.
Process log of Optical-inspection
2STF Cavity Group Meeting @2012/2/6
空洞名 内面検査前の空洞の状態 検査日 測定者
MHI#21 EP1 後の検査 2012/1/16 今田 信一
3
0 360180 90 270
#1
#2
#3
#4
#5
#6
#7
#9
#8
#1-#2i
#2-#3i
#3-#4i
#4-#5i
#5-#6i
#6-#7i
#7-#8i
#8-#9i
欠陥
しみ
欠陥 ?
終端
4
MHI-021, 1-cell equator, t= 45 ~ 50 deg.
EBW end
MHI-021,1-2 iris, t= 242 ~ 260 deg.
EBW end
MHI-021 bp-top-frange, t= 156 ~ 165 deg.
EBW end
5STF Cavity Group Meeting @2012/2/6
MHI-021 , 1_eq , t= 166 deg
MHI-021 , 1-2_iris , t= 223 deg
6STF Cavity Group Meeting @2012/2/6
MHI-021 , 3-eq , t = 239 deg
Nb
Air
7STF Cavity Group Meeting @2012/2/6
MHI-021 , 5-eq , t = 87 deg
Nb
Air
8STF Cavity Group Meeting @2012/2/6
MHI-021 , 6-eq , t = 330 deg
Nb
Air
9STF Cavity Group Meeting @2012/2/6
MHI-021 , 7-eq , t = 99 deg
Nb
Air
10STF Cavity Group Meeting @2012/2/6
MHI-021 , 9-eq up , t = 46 deg
Nb
Air
11STF Cavity Group Meeting @2012/2/6
STF Cavity Group Meeting @2012/2/6
MHI-021 , 2-3_iris , t=0 deg
MHI-021 , 6-7_iris , t = 118 deg
12
STF Cavity Group Meeting @2012/2/6
MHI-021 , 7-8_iris , t= 77 deg
MHI-021 , 7-8_iris , t= 119 deg
13
MHI-021 , 8-9_iris , t= 19 deg
14STF Cavity Group Meeting @2012/2/6
MHI-021 , bp_btm_cell , t= 258 deg
Nb
Air
15STF Cavity Group Meeting @2012/2/6
欠陥の履歴( 受け入れと EP1 後の比
較 )
16STF Cavity Group Meeting @2012/2/6
STF Cavity Group Meeting @2012/2/6
MHI-021 , 3_eq , t= 239 deg
MHI-021 , 5_eq , t= 87 deg
17
MHI-021 , 6_eq , t= 330 deg
MHI-021 , 7_eq , t= 99 deg
18STF Cavity Group Meeting @2012/2/6
STF Cavity Group Meeting @2012/2/6
MHI-021 , 9_eq up , t= 46 deg
MHI-021 , 2-3_iris , t= 0 deg
19
STF Cavity Group Meeting @2012/2/6
MHI-021 , 6-7_iris , t= 118 deg
MHI-021 , 7-8_iris , t= 77 deg
20
STF Cavity Group Meeting @2012/2/6
MHI-021 , 7-8_iris , t= 77 deg
MHI-021 , 8-9_iris , t= 19 deg
21
MHI-021 , bp_btm_cell , t= 258 deg
22STF Cavity Group Meeting @2012/2/6
23STF Cavity Group Meeting @2012/2/6
アニールへMHI#21 のアニールは 1/31 より実施。MHI#22 のアニールは 2/7 より実施。