Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue Comments 1 M.Gough, F. Fortune F. Fortune E. Rollings 30/05/2105 2 F. Johnson I. Sargent E. Rollings 29/07/2015 Consultation response from Historic Scotland and SNH Environmental Management Plan - Construction Works Page 1 of 54 RHK-1A-40-HSE-002-D- EMPConstructionWorks MeyGen Tidal Energy Project Phase 1 Environmental Management Plan: Construction Works This document contains proprietary information belonging to MeyGen Ltd. and/or affiliated companies and shall be used only for the purpose for which it was supplied. It shall not be copied, reproduced, disclosed or otherwise used, nor shall such information be furnished in whole or in part to third parties, except in accordance with the terms of any agreement under which it was supplied or with the prior consent of MeyGen Ltd. and shall be returned upon request. Project Title/ Location MeyGen Tidal Energy Project, Phase 1a. Inner Sound. Date: 29/07//2015 [Redacte d] [Redact ed] [Redacte d] [Redact ed] [Redacte d] [Redacted ]

Upload: others

Post on 07-Aug-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue Comments

1 M.Gough, F. Fortune

F. Fortune

E. Rollings

30/05/2105

2 F. Johnson

I. Sargent

E. Rollings 29/07/2015 Consultation response from Historic Scotland and SNH

 

 Environmental Management Plan - Construction Works Page 1 of 54

RHK-1A-40-HSE-002-D-EMPConstructionWorks

MeyGen Tidal Energy Project Phase 1

Environmental Management Plan:

Construction Works

This document contains proprietary information belonging to MeyGen Ltd. and/or affiliated companies and shall be used only for the purpose for which it was supplied. It shall not be copied, reproduced, disclosed or otherwise used, nor shall such information be furnished in whole or in part to third parties, except in accordance with the terms of any agreement under which it was supplied or with the prior consent of MeyGen Ltd. and shall be returned upon request.

Project Title/ Location MeyGen Tidal Energy Project, Phase 1a. Inner Sound.

Date: 29/07//2015

[Redacted]

[Redacted]

[Redacted][Redacted]

[Redacted]

[Redacted]

Page 2: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

 

 Environmental Management Plan - Construction Works Page 2 of 54

RHK-1A-40-HSE-002-D-EMPConstructionWorks

Table of Contents

Executive Summary ................................................................................................................. 3 

1  Introduction ................................................................................................................... 4 

2  Scope of The Environmental Management Plan .......................................................... 5 

3  Licences and Legal Requirements ............................................................................. 10 

4  Communication, Roles and Responsibilities .............................................................. 10 

5  Marine Mammal Management .................................................................................... 20 

6  Marine Pollution Contingency Plan ............................................................................ 27 

7  Invasive Non-Native Species Management ............................................................... 36 

8  Reporting Protocol for the Discovery of Marine Archaeology ..................................... 38 

9  Waste management ................................................................................................... 42 

10  Linkages with Other Conditions .................................................................................. 43 

11  EMP Review and consultation .................................................................................... 44 

12  References ................................................................................................................. 45 

13  List of Abbreviations ................................................................................................... 46 

Appendix A: James Fisher Marine Services ISO14001 ......................................................... 48 

Appendix B: Marine Mammal Reporting Log ......................................................................... 50 

Appendix C: Waste Management Plan (FSH-1A-40-HSE-004-D-WasteManagementPlan-MeyGen.pdf) .......................................................................................................................... 52 

Appendix D: Section 36 and Marine Licence ......................................................................... 53 

Page 3: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

 

 Environmental Management Plan - Construction Works Page 3 of 54

RHK-1A-40-HSE-002-D-EMPConstructionWorks

EXECUTIVE SUMMARY

This Environmental Management Plan (EMP) has been prepared by MeyGen Ltd. to set out the proposed method for discharging the Condition 11 of the Section 36 Consent for the Development.

The document details the construction related mitigation methods proposed for the Development, how these are to be delivered in the construction procedures and good working practices for installing the Development, how this document integrates with the wider environmental management of the Development, and how communication will be maintained between the Principal Contractor, MeyGen Ltd. and the regulators.

The EMP presented within this document is to satisfy Condition 11 and enable construction of the Development to progress, subject to the EMP being implemented.

The EMP will be submitted to the to the Scottish Ministers for their written approval, in consultation with SNH and any other ecological, or such other advisors as required at the discretion of the Scottish Ministers., and will be used, where appropriate, to inform the discharge of other Conditions within the Section 36 Consent which refer to it.

An EMP for HDD Marine Works (RHK-1A-40-HSE-001-D-EnvironmentalManagementPlanHDD) has already been consulted on and approved by Scottish Ministers. This EMP is for the remaining Construction Works for Phase 1a; this includes the installation of:

4 x Turbine Subsea Cable (TSC);

4 x Turbine Support Structure (TSS); and

4 x Tidal Turbine Generator (TTG).

 

Page 4: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

Environmental Management Plan- HDD Marine Works Page 4 of 54

RHK-1A-40-HSE-002-D-EnvironmentalManagementPlanConstructionWorks

1 INTRODUCTION

The MeyGen Tidal Energy Project Phase 1 (“the Development”) received consent under Section 36 of the Electricity Act 1989 from the Scottish Ministers 9th October 2013 (“the S.36 Consent”). This Environmental Management Plan (EMP) is prepared to enable Condition 11 of the S.36 Consent (“the Condition”) to be discharged. Condition 11 states:

The Company must, no later than 3 months prior to the Commencement of the Development, submit in writing an Environmental Management Plan (“EMP”) to the Scottish Ministers for their written approval, in consultation with SNH and any other ecological, or such other advisors as required at the discretion of the Scottish Ministers. The final draft of the EMP must have been approved by the ECoW prior to its submission to the Scottish Ministers.

The EMP (and, as the case may be, amended EMP) must detail measures that must be taken by the Company, through all stages of the Development, to prevent adverse impacts including, but not limited to, marine mammals, birds, fish and habitats as outlined in Chapter 25 of the Company’s Environmental Statement. The EMP must take account of, and implement, recommendations where appropriate and reasonable from the CMS, the Operations & Maintenance Programme, the Vessel Management Plan and the Navigational Safety Plan, as well as any other recommendations within the Company’s Environmental Statement.

The EMP must be regularly reviewed by the Scottish Ministers, at timescales to be determined by the Scottish Ministers, in consultation with SNH, the ECoW and any other ecological, or such other advisors as required at the discretion of the Scottish Ministers. Following such review the Scottish Ministers may, in consultation with SNH, the ECoW and any other ecological, or such other advisors as required at the discretion of the Scottish Ministers, require the Company to amend the EMP and submit such an amended Plan to them, in writing, for their approval. The Scottish Ministers may approve an amended Plan in consultation with SNH, the ECoW and any other ecological, or such other advisors as required at the discretion of the Scottish Ministers.

The EMP must, so far as is reasonably practicable, be consistent with any relevant monitoring requirements during construction taken from the Project Environmental Monitoring Programme.

The Environmental Management Plan must be implemented in full by the Company.

This document sets out the proposed EMP that MeyGen Ltd (“MeyGen”) intends to undertake, to allow Condition 11 to be discharged.

 

Page 5: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

Environmental Management Plan- HDD Marine Works Page 5 of 54

RHK-1A-40-HSE-002-D-EnvironmentalManagementPlanConstructionWorks

2 SCOPE OF THE ENVIRONMENTAL MANAGEMENT PLAN

This EMP has been developed in accordance with the Institute of Environmental Management and Assessment (IEMA) Practitioner “Environmental Management Plans”, Best Practice Series, Volume 12, December 2008.

MeyGen commits to safeguarding the environment through the identification, avoidance and mitigation of the potential negative environmental impacts associated with the development, construction and operation of the Development.

The principle objectives of the EMP are to:

Identify avoid, minimise and control adverse environmental impacts associated with the Development; and

Define good practice as well as specific actions required to implement mitigation and monitoring requirements as identified in the ES, and the licensing and consenting process.

The Development must, at all times, be constructed and operated in accordance with the approved EMP (as updated and amended from time to time). Any updates or amendments made to the EMP by MeyGen must be submitted, in writing, by MeyGen Ltd. to the Scottish Ministers for their written approval.

The EMP must be in accordance with the Environmental Statement (ES) and Supplementary Environmental Information Statement (SEIS) as it relates to environmental management measures.

The EMP (S.36 Consent, Condition 11) includes the Marine Pollution Contingency Plan (Marine Licence, Condition 3.2.13) and Reporting Protocol for the Discovery of Marine Archaeology (S.36 Consent, Condition 16).

The EMP forms part of a suite of documents related to the consent conditions that MeyGen seek to discharge:

Construction Method Statement (CMS) (S.36 Consent, Condition 9), including Cable Installation Plan (Marine Licence 3.2.1.8) and Cable Protection Plan (Marine Licence 3.2.1.9);

Navigation Safety Plan (NSP) (S.36 Consent, Condition 17); and

Vessel Management Plan (VMP) (S.36 Consent, Condition 14).

Phase 1a of the Development is a 6MW, 4 tidal turbines initial phase to be installed and operatives under the restriction placed on the Development by Condition 2 of the S.36 Consent.

This document, as agreed with the licensing authority, covers the installation of the Phase 1a infrastructure (4 x Tidal Turbine Generators (TTG), 4 x Gravity-base Turbine Support Structures (TSS) and Turbine Subsea Cables (TSC), collectively described as “the Construction Works” (Figure 1).

Page 6: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

E

Environmen

MeyGe001-D-EScottish

T2.1

The insthen layfound CMSCo

The ins

• •

The key

tal Manage

n has prevEnvironmenh Ministers.

urbine Sub

stallation pry the TSC a

in theonstructionW

stallation wil

1 Cable La1 Multi-cat

y elements

Complete Tthe multi-ca

ment Plan-

viously prodntalManage

Fig

bsea Cable

rocess will palong to thee ConstWorks).

l use:

ying Vessetype vesse

of the TCS

TSC route aat vessel pr

HDD Marin

duced an EementPlanH

ure 1 Cons

e (TSC) Wo

pull 4 x TSseabed to

truction

l (CLV); andl.

installation

and TTG seior to opera

ne Works

EMP for theHDD), whic

struction W

rks Summ

SC from offsthe 4 x TSSMethod

d

n are:

eabed survations.

RHK-1A-4EnvironmWorks

e HDD Marh was con

Works Loca

ary

shore via thS locations.

Statemen

vey using R

Pag

40-HSE-002mentalManag

rine Works nsulted on

ation

he HDD du Full installat (MEY-

ROV / Drop-

ge 6 of 54

2-D-gementPlan

(RHK-1A-4and appro

cts to onshation details-1A-40-HSE

-down came

nConstructi

40-HSE-oved by

hore and s can be E-004-F-

era from

on

Page 7: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

E

Environmen

• • • •

• •

• • •

• •

 Figure 2

T2.2

The TSlocation1A-40-H

tal Manage

Divers fromliner and a Mobilise theThe TSC wThe CLV wThe TSC wtowards theThe TSC wAn onshoreout from theThe Multi-cWhen the TThe cable lthe TSS locTSC is settemporary dCable stabsuitable DPCable  stabidetermined DemobiliseThe proces

, below, sho

urbine Sup

SS Works inns. Full instaHSE-004-F-

ment Plan-

m a multi-capull the wine cable layi

will be mobilwill transit towill be paide HDD exit

will be connee winch wille CLV.

cat will monTSC has realaying vessecations. t down neadead man a

bility measuP vessel. lity  measureby previous 

e vessels ss will be re

ows the TS

Figure

pport Struc

cludes the allation deta-CMSConst

HDD Marin

at will removnch wire throng vessel (ised direct fsite, positio out from tpoint. ected to the then begin

itor progresached the oel will then

ar the Turbanchor. res will be

es  will  be analysis

peated for 4 

C Works Pr

2 TSC / TS

cture (TSS)

installation ails can be ftructionWor

ne Works

ve the HDDough the HCLV); from the caon and holdthe CLV, flo

e pre-installen to pull the

ss and releaonshore sitebegin to lay

bine Suppor

marshalled

overboarded

4 x TSC.

rogramme.

SS Marine W

) Works Su

of the 4 x Tfound in therks).

RHK-1A-4EnvironmWorks

D exit cap, DD liner.

able manufad station to toated and

ed winch wie TSC throu

ase the floate it will be tey the TSC a

rt Structure

d from Scra

d  from  the 

Works Prog

ummary

TSS and bae Construct

Pag

40-HSE-002mentalManag

install a bel

acturer (Hartthe north ofdirected by

ire in HDD bugh the HD

ts attached emporarily salong the de

e (TSS) and

abster Harb

DP  vessel 

gramme

llast blocks ion Method

ge 7 of 54

2-D-gementPlan

llmouth to t

rtlepool); f HDD exit py a multi-ca

bore. D bore as

to the TSCsecured. esign route

d laid down

bour, loaded

crane  into 

at their targ Statement

nConstructi

the HDD

points. at vessel

it is paid

C.

towards

n with a

d onto a

position 

get (MEY-

on

Page 8: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

E

Environmen

The ins

The key

• • • • • •

• •

• • •

Figure 2

T2.3

Two tyHammepositionhoweve

The ins

2.3.1

The key

• • • •

• •

• •

 

tal Manage

stallation wil

y elements

A DP VessThe 2 x TSThe DP vesThe DP vesThe TSS isA Remotelyof the TSS Ballast blocThe DP veswindow. Thslack tides.The DP vesThe sequenVessel is d

above sho

idal Turbin

pes of TTGerfest TTGning the TTer, some dif

stallation wil

Atlantis TTG

y elements

TTG and aPark. A DPTTG and eqThe DP vesThe DP vesThe end omanagemeThe back-pThe DP vesvessel cranA Remotelyof the TTG In installingDP Vessel

ment Plan-

l use 1 Dyn

of the TSS

el is preparS tripod wilssel transitsssel waits fos over-boardy-Operated onto the se

cks will be cssel will seqhe DP vesse. ssel then rence is repeaemobilised.

ows the TSS

ne Generato

G will be in. The inTG on the fferences ex

l use 1 DP

G installatio

of installatio

associated P Vessel is pquipment isssel transitsssel waits foof TSC is ent system; pack structussel waits fone. y-Operatedonto the TS

g the TTG ois demobilis

HDD Marin

namic Positi

installation

red with the l be loaded

s to site fromor slack tideded using thVehicle (RO

eabed. collected byquentially inel will plan a

eturns Nigg ated for all 4. 

S Works Pro

or (TTG) W

nstalled dunstallation m

TSS and xist, largely

Constructio

on

on for the A

componenprepared wis loaded onts to site fromor slack tideretrieved fr

ure is installeor the next

Vehicle (RSS. n the TSS tsed.

ne Works

ioning (DP)

process ar

necessary d from Nigg m port. e before mohe vessel crOV) will pro

y the DP vesnstall ballastand prepare

Energy Par4 TSS.

ogramme. 

Works Summ

uring Phasemethods aconnectingrelated to m

on Vessel.

Atlantis TTG

nts and equith the neceto the DP vm port. e before morom the se

ed onto theslack tide b

ROV) will pr

the electrica

RHK-1A-4EnvironmWorks

Constructio

re:

grillages anEnergy Par

oving onto Drane. ovide a live

ssel from St blocks to te for the ea

rk to collect

mary

e 1a, 1 x Aare largely g mechanicmethods of

G are summ

uipment areessary grillaessel.

oving onto Deabed, and

e TSS; before the T

rovide a live

al connectio

Pag

40-HSE-002mentalManag

on Vessel.

nd sea fasterk

DP station a

video feed

crabster Hathe tripod. Och subsequ

t the final 2

Atlantis TTGsimilar, w

cal and eleelectrical co

arised below

e assembleges and se

DP station ad fixed to a

TTG is over-

e video feed

on in the ba

ge 8 of 54

2-D-gementPlan

enings.

at the TSS l

of the insta

arbour. One per slauent lift in be

TSS tripods

G and 3 xwith both iectrical cononnection.

ow:

ed at Niggea-fastening

at the TSS la back-pac

-boarded us

d of the ins

ack-pack is

nConstructi

ocation.

allation

ck tide etween

s.

x Andritz nvolving

nnectors,

Energy g.

ocation. ck cable

sing the

stallation

made.

on

Page 9: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

E

Environmen

2.3.2

The key

• • • • • •

• •

• • •

Figure 3

 

E2.4

The EMEnviron

It is indevelopaccorda(Sectionimprove

tal Manage

Andritz Ham

y elements

TTG with TA DP VessTTG and eqThe DP vesThe DP vesThe TTG aTTG is instThe end of Both TSC commenceThe connecVessel is dThe operat

, below, sho

Environmen

MP is in accnmental Info

ntended thapment of spance with tn 11) durement align

ment Plan-

mmerfest T

of installatio

TSC tail andel is preparquipment isssel transitsssel waits fo

and TSC taialled on theTSC is retrand TSC ta

es. cted TSC wemobilised.ion will be r

ows the TT

Figu

ntal Manag

cordance wormation Sta

at this EMpecific marinthe Conditioing construed with ISO

HDD Marin

TG installat

on for the A

d equipmentred with the s loaded onts to site fromor slack tidel are lowere

e TSS. rieved fromail will be c

will then be l. repeated for

G Marine W

ure 3 TTG M

ement Plan

with the Envatement (SE

MP will be ne activitieson. The syuction and

O14001 prin

ne Works

tion

Atlantis TTG

t are assem necessary to the DP vm port. e before moed simultan

the seabedclamped on

laid back on

r 3 x Andritz

Works Progr

Marine Wor

n (EMP)

vironmentalEIS).

regularly s and revisioystem of red operationnciples.

RHK-1A-4EnvironmWorks

G are summ

mbled at Scrgrillages anessel.

oving onto Dneously usin

d via an ROn deck and

n the seabe

z Hammerfe

ramme.

rks Progra

l Statement

reviewed tons approvview, upda

n is to en

Pag

40-HSE-002mentalManag

arised below

rabster Harbnd sea-faste

DP station ang a tandem

V,  a dry-mate

d

est TTG. 

mme

t (ES) and

throughout ed by the S

ate, consultansure and

ge 9 of 54

2-D-gementPlan

ow:

bour. ening.

at the TSS lm lift operat

e jointing o

the Supple

the plannScottish Mination and aachieve c

nConstructi

ocation. tion. The

operation

ementary

ing and nisters in approval continual

on

Page 10: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

E

Environmen

The doc

3 LIC

The EMManage

Licence

Section 3

Marine 04577/14

Decomm

4 CO

This seduring t

R4.1

The Primplem

The Ecversion

Any updlegislatito Scott

tal Manage

cument con

Licences a

Communica

Marine Mam

Marine Pol

Invasive Sp

Reporting P

Waste Man

EMP Revie

Linkages w

References

CENCES A

MP is prodement Syste

/ Consent

36 Consent

Licence (lic4/0)

issioning Prog

OMMUNICA

ction detailsthe construc

Responsibil

rincipal Coentation of

cological Cle of the EMP

dates to theion, consentish Ministe

ment Plan-

ntains the fo

nd Legal Re

ations Role

mmals:

lution Conti

pecies Man

Protocol for

nagement;

ew and Con

with Other C

s.

AND LEGA

duced in linem (Append

cence numb

gramme

ATION, RO

s the Develction and op

lities and O

ontractor (Pthe EMP.

erk of WorkP.

e EMP by tnt conditionsrs for appro

HDD Marin

ollowing sec

equirement

s and Resp

ngency Pla

agement;

the Discov

sultation

Conditions; a

AL REQUI

ne with thedix A)

Legislat

Electricit

ber Marine (S

Energy A

OLES AND

lopment teaperation of

Ownership

PC) will h

ks (ECoW)

the PC will s and relateoval.

ne Works

ctions:

ts;

ponsibilities

ans; and

very of Marin

and

REMENTS

e Principal

tion

ty Act 1989

Scotland) Act

Act 2005

D RESPON

am roles, rethe Develop

have the u

will provid

require theed docume

RHK-1A-4EnvironmWorks

;

ne Archaeo

S

Contracto

2010

NSIBILITIE

esponsibilitiepment.

ultimate res

e quality as

e ECoW to cnts. Update

Pag

40-HSE-002mentalManag

ology

rs ISO 140

Granted

09/10/20

31/01/20

Submitte

ES

es and lines

sponsibility

ssurance a

check comped EMP will

ge 10 of 54

2-D-gementPlan

001 Enviro

013

014

ed

s of commu

for ensur

nd approva

pliance withl then be su

nConstructi

onmental

unication

ring the

al of any

h current ubmitted

on

Page 11: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

E

Environmen

O4.2

The orgcommuthe cas

The oresponsacross

Details These d

Name

Ian Sarge

Stan Groundw

Tony Blacksha

Ed Rollin

Fraser Jo

tal Manage

Organisatio

ganisationanication ase of emerge

rganisation sibilities witthe HDD M

are providedetails may

Rol

ent Pro

water Ma

aw HS

gs ECo

ohnson MaMa

ment Plan-

onal Chart

l chart for ts part of theencies.

chart prth regards tarine Work

ed in the T change an

le

oject Manager

rine Coordinat

E Advisor

oW

rine Packagenager

HDD Marin

he HDD Mae EMP will

esents theto the flow s.

Table 1 belod the CMS

Org

JamMar

tor JamMar

JamMar

Mey

e Mey

Table

ne Works

arine Worksbe conduct

e key inteof requirem

ow for contwill be upd

ganisation

mes Fisher rine Services

mes Fisher rine Services

mes Fisher rine Services

yGen Ltd

yGen Ltd

1 Contact

RHK-1A-4EnvironmWorks

s is below ited in norm

erfaces, linments and

acts relevaated when

Telephon

+441565

+441565

+441565

+44131 6

+44131 6

Details

Pag

40-HSE-002mentalManag

in Figure 4.mal working

nes of coprovision o

nt to the denecessary.

ne

658812

658824

658817

6599662

6599672

ge 11 of 54

2-D-gementPlan

. This includ procedure

ommunicatiof mitigating

elivery of th

Mobile

nConstructi

des how s and in

on and g actions

his plan.

on

[Redacted]

[Redacted]

[Redacted]

[Redacted]

[Redacted]

Page 12: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

Environmental Management Plan- HDD Marine Works Page 12 of 54

RHK-1A-40-HSE-002-D-EnvironmentalManagementPlanConstructionWorks

 

Figure 4 Key interfaces and organisation chart

Page 13: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

E

Environmen

M4.3

P4.4

4.4.1

tal Manage

MeyGen - Ec

Review and

Review / co

Review / c

where nece

Inspect th

implementa

Audit PC p

Ensure co

legislation

10).

Review env

Report com

regulatory a

Notify the li

Notify the li

Condition 3

Provide an

encountere

Provide Tra

3.2.2.1)

Notify the li

Ensuring a

Condition 1

Principal Co

Project Ma

Facilitate d

Oversee thproject.

Review andVMP and N

Monitor thoverview of

Ensure thaImplementaproject mee

Review an

ment Plan-

cological C

d approve a

omment on

comment on

essary with

he site

ation/operat

rocedures,

ompliance

and require

vironmental

mpliance a

authorities.

icensing au

icensing au

3.2.1.4)

n update

ed

ansport Au

icensing au

any protect

10)

ontractor –

nager

isseminatio

he implemen

d approve aNSP.

e environmf incidents,

at environmation of the etings.

d approve

HDD Marin

Clerk of Wo

all consent r

content of S

n Risk Ass

respect to e

/ vessel

tion of all en

inspections

with appr

ements and

l incidents /

nd inciden

thority of ve

thority of th

report sho

udit Sheets

thority of de

ed species

– James Fis

on of specifi

ntation and

all consent

mental perfinspections

mental conWorks and

Risk Asse

ne Works

orks

related docu

Site Inducti

essments a

environmen

on a

nvironmenta

s, investigat

rove conse

d address a

/ near misse

ts to the l

essel details

he commenc

ould any u

for works

eposits by M

s licenses a

sher Marine

c environm

review of e

related doc

rformance s and audits

nsiderationsd to include

essments a

RHK-1A-4EnvironmWorks

uments (S3

ons and To

and Method

ntal impacts

regular b

al mitigation

tion and rep

ent related

any shortfal

es and PC i

icensing a

s (ML Cond

cement dat

unexpected

to the licen

MHWS (ML

are in plac

e Services

ental requir

environmen

cuments, in

of the pros.

s form an environme

and Method

Pag

40-HSE-002mentalManag

36 Condition

oolbox Talks

d Statemen

s and contro

basis to

n measures

porting.

d documen

ls with the

nvestigation

uthority an

dition 3.1.3)

e and the c

d delays to

nsing autho

Condition 3

ce for the

(JFMS)

rements to t

ntal procedu

cluding, bu

oject throug

integral paental review

d Statement

ge 13 of 54

2-D-gementPlan

n 10).

s.

nts (RAMS)

ols.

ensure

s.

nts, enviro

PC (S36 C

ns

nd other ne

completion d

to construc

ority (ML C

3.2.2.2)

Developme

the project

ures throug

ut exhaustiv

gh maintai

art of Desws as part o

ts (RAMS)

nConstructi

) as and

effective

onmental

Condition

ecessary

date (ML

ction be

Condition

ent (S36

team.

hout the

ve, CMS,

ning an

sign and f regular

as and

on

Page 14: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

Environmental Management Plan- HDD Marine Works Page 14 of 54

RHK-1A-40-HSE-002-D-EnvironmentalManagementPlanConstructionWorks

where necessary with respect to environmental impacts and mitigation.

Ensure that all environmental incidents are reported to the ECoW and MeyGen in accordance detailed reporting requirements and the respective regulatory bodies (where required) as soon as possible.

Review environmental matters with the ECoW and MeyGen and respective regulatory bodies on a regular basis and as per project requirements.

Ensure that arrangements for liaison with Development respective regulatory bodies on all environmental issues is appropriate and maintained.

Implement and maintain a project communications strategy to manage project public relations and complaints.

Produce weekly and monthly reports and submit to MeyGen Package Manager and ECoW.

Ensure contractors are approved, operates a Safety Management System, confirm that they are suitably qualified in their line of work and have undertaken suitable environmental training to cover tasks to be undertaken.

4.4.2 HSE Advisor

Key roles and responsibilities of the HSE Advisor include, but are not limited to the following:

Verify compliance with relevant legislation.

Prepare, implement, review and update consent related documents (in conjunction with the Project Management Team) in accordance with consent condition, James Fisher Marine Services procedures and current legislation.

Advise the project team on environmental related decision making

Review Risk Assessments and Method Statements (RAMS) as and where necessary with respect to environmental impacts and mitigation.

Approve Toolbox Talks and Site / Vessel Inductions and ensure content promotes effective environmental management, specific works and Site / Vessel sensitivities and communicate associated lessons learnt.

Provide support to the Marine Coordinator and workforce on any environmental matters that may arise.

Audit contractors to confirm that they are suitably qualified in their line of work and have undertaken suitable environmental training to cover tasks to be undertaken.

Ensure suitable consideration is given to the period and frequency of environmental monitoring (particularly with respect to higher risk areas).

Inspect and audit the site / vessels on a regular basis to ensure effective implementation / operation of any environmental mitigation measures.

Ensure compliance with environmental requirements and address any shortfalls.

Provide inspection reports to the project management detailing any issues that must be addressed

Page 15: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

E

Environmen

4.4.3

C4.5

4.5.1

tal Manage

Undertake the root/dire

Monitor haaspects anenvironmen

Marine Coo

ResponsiblHSE during

Ensure tha

Undertake communica

Monitor and

Production stakeholde

Responsiblnotices.

Liaise with

Implement related doc

Coordinatinpersonnel m

Emergency

Produce dManager a

Keep Transpart of the w

Keep auditdeposited b

Contractors

Vessel Mas

Overriding navigation

Dedicated w

The person

Adhere to I

Ensure tha

ment Plan-

investigatioect cause a

azardous obnd impactsntal impacts

ordinator

le for all cong constructio

t all contrac

Toolbox Tate associat

d dissemina

of marine r list.

le for colla

port author

/ operate ecuments at t

ng, ensurinmovements

y response

aily reportsnd ECoW.

sport Audit works

t reports stbelow MHW

s

ster

authority of the vesse

watch-keep

ns present o

MO Interna

t all contrac

HDD Marin

ons into enand present

bservationss and initias and reduc

nstruction oon operatio

ctors have r

Talks to pted lessons

ate weather

safety ale

ating, comm

rities.

environmenthe site / ve

ng complians offshore.

coordinatio

s and subm

Sheets for

tating the nWS under th

and respoel and matt

per on board

on board mu

ational Regu

ctors have r

ne Works

nvironmentat the finding

s and incidate actions ce risk in a t

operations Mons.

received an

romote effs learnt.

r information

erts includin

municating

tal mitigatioessel.

nce for an

n.

mit to the P

all materia

nature ande authority

onsibility to ters related

d the vesse

ust adhere

ulations for

received an

RHK-1A-4EnvironmWorks

al incidents s, recomme

ents trendsas require

timely and e

Marine Coor

d understoo

fective env

n and forec

ng issuing

and respo

on measure

d recording

PC Project

ls listed in t

quantity oof the licen

make decto HSE.

el, or nomina

to the Vess

the Preven

d understoo

Pag

40-HSE-002mentalManag

or near mendations a

s in relationed to minieffective ma

rdination inc

od the Site /

ironmental

asts

Notice to M

nding to s

es as appro

g all vesse

Manager,

the licence

of all substce.

cisions wit

ate suitable

sel Master’s

tion of Colli

od the vess

ge 15 of 54

2-D-gementPlan

misses to deand lessons

n to enviroimise the anner.

cluding ves

/ Vessel ind

managem

Mariners to

statutory na

oved in the

el moveme

MeyGen P

to be depo

tances and

th respect

e qualified d

s instruction

isions at Se

sel induction

nConstructi

etermine learnt.

onmental potential

sel / site

duction.

ent and

o agreed

avigation

consent

ents and

Package

osited as

objects

to safe

eputy.

s.

ea.

n.

on

Page 16: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

E

Environmen

4.5.2

C4.6

EnvironTable 2

MeetingSafety, Securityand ProDaily siRisk AsStatemeToolboxenvironmitigatioSite / V

4.6.1

The PCcommuenviron

The ECan openVessel on thosadditionof the w

Minutescopies s

4.6.2

Extraor

tal Manage

All Other S

To understa

To conductthe Develoor Project M

To report asoon as po

Communica

nmental iss2.

g/briefing Health, Envy and Qualiogress Meete team brie

ssessment/Ment briefingx Talks inclumental pracon measureessel Induc

SHESQ an

C shall convnicate, dismental arra

CoW and ren invitation shall nominse contractnal meetingworks.

s of all sucsupplied to

Extraordina

rdinary mee

ment Plan-

taff

and and im

t their work opment andManager.

all environmossible.

ation

ues will be

vironment, ty (SHESQ

eting efs Method s uding ctices and es ction

Tab

d Progress

vene weeklyscuss and angements,

epresentativto attend t

nate a persotors behalfs at interva

ch meetingseach contra

ary meeting

etings would

HDD Marin

plement pro

with a viewto raise an

ental incide

e formally c

Freq

) Wee

DailyEach

Befominiper wOn fsiteany

ble 2 Comm

Meeting

y Site / Vesconsult anprocedures

ves from Methese weekon to attendf. SHESQals dictated

s shall be pactor on Sit

s

d be held in

ne Works

ocedures re

w to eliminany environm

ents to the M

communicat

quency ekly

y h job task

ore mobilisamum of oneweek first attenda/ vessel BEwork is und

munication

ssel meetingny changes and overa

eyGen and kly Site / Ved these mee

Q and Progby the requ

produced ate / Vessel,

n order to de

RHK-1A-4EnvironmWorks

elevant to th

ting/reducinmental conc

Marine Coo

ted through

ation, or a e

ance at EFORE dertaken

n and Meeti

gs with all ce in conditall environm

other interessel meetinetings with tgress Meetuirements o

nd held on the CDM C

eal with spe

Pag

40-HSE-002mentalManag

heir role as

ng the envircerns with M

ordinator an

h the arrang

AttendeeSee parag

All work pAll membeparty All site / v

All personvessel

ngs

contractors tions, work

mental perfo

ested Thirdngs. Each cthe approprings shall

of the contra

file for recCo-ordinator

ecial environ

ge 16 of 54

2-D-gementPlan

laid out.

ronmental imMarine Coo

d Vessel M

gements on

es graph below

parties ers of the w

vessel perso

ns attending

on Site / Vking practicormance.

d Parties shcontractor oriate authorbe augme

act or at key

cord purposr and ECoW

nmental iss

nConstructi

mpact of ordinator

Master as

n site in

w

working

onnel

g site /

Vessel to ces and

hall have on Site / ity to act

ented by y stages

ses, with W.

sues that

on

Page 17: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

E

Environmen

may ariorganisany ide

4.6.3

Daily sicontrac

4.6.4

These involvedand rev

4.6.5

Inductioawarenenvironunderst

4.6.6

Site / VSafety place toas newof envir

R4.7

The PC

The PC

tal Manage

se during thsed by the Hntified issue

Daily Site /

te team mectors. Any e

Risk Asses

briefings wd in the tasviewed.

Site / Vesse

ons, conducess for persmental prtanding.

Site / Vesse

Vessel noticand Enviroo highlight asletters andronmental m

Reporting

C will comm

Details of aDetails andDetails of aincidents; Any other p

Transport A

each month

Audit repor

below MHW

Marine Ma

marine ope

C will provide

ment Plan-

he DevelopHSE Advisoes.

Vessel tea

eetings will nvironment

ssment / Me

will take plask. Environm

el induction

cted beforesonnel rega

rotection a

el notice bo

ce boards wonmental issawareness d posters wmatters.

unicate the

audits and ind statistics foany pending

pertinent en

Audit Sheet

h); and

rts for the

WS (MEY-1A

mmal repo

erations)

e these in:

HDD Marin

ment such or with the

m meetings

take place al concern

ethod Statem

ce before emental requ

ns

e anyone coarding Site /arrangemen

oards

will contain sues. The of environm

will also be p

following to

nspections;or environm

g and actua

nvironmenta

ts (MEY-1A

nature and

A-70-HSE-0

rts (MEY-1

ne Works

as environmaim of ensu

s

at the Onsshall be ad

ment briefin

each constuirements a

ommences / Vessel rults. The i

relevant SitSite / Vessmental hazaposted on n

o the ECoW

mental incidl enforceme

al issues ide

A-40-HSE-0

d quantity o

005-D-Depo

A-70-TEM-

RHK-1A-4EnvironmWorks

mental inciduring a time

shore / Offsdressed at

ngs

truction tasknd mitigatio

work on thles, emergenductions

te / Vessel sel will alsoards. Othernotice board

W and contra

ents and neent action in

entified;

004-D-Trans

of all subst

ositAuditSh

-009-Marine

Pag

40-HSE-002mentalManag

dents. Theseely respons

hore site bethis meeting

k and attenon measure

he project aency respon

include a

informationo have appr communicds to comm

actors on si

ear misses; n respect of

sportAuditS

tances and

heet) (every

eMammalRe

ge 17 of 54

2-D-gementPlan

e meetingsse and reso

etween the g.

nded by alles will be in

are utilised nse procedua test to

n relating topropriate sigcations medmunicate aw

ite:

f any enviro

Sheet) (begi

d objects de

y 6 Months).

eport) (dail

nConstructi

shall be olution to

PC and

l directly nstructed

to raise ures and

confirm

o Health, gnage in dia, such wareness

onmental

nning of

eposited

.

y during

on

Page 18: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

E

Environmen

4.7.1

The Ma

The EC

T4.8

The puknowled

In ordevessel,

TraininInductio

tal Manage

Daily logs aWeekly proMonthly reenvironmenstatistics, trany of the c

External Co

arine Coord

Documentifor the DevEmergencycommunicaEmergency

CoW is resp

NotificationReporting m

o Det

o Det

o Detenv

o Any

o Any

o Tra

o Auddep

Meeting wiand Receiving, third parties

raining

urpose of dge to succ

er to ensurethe followin

ng on (which

ment Plan-

and reports ogress repoports (additntal commraining delivconsents re

ommunicati

inator is res

ng, issuing,velopment; ay Responseation and ry Response

onsible for:

n to the licenmonthly to tails of audit

ails and sta

ails of anyvironmental

y other perti

y unexpecte

nsport Audi

dit reports posited belo

th the licen

documentis

environmencessfully imp

e that the eng environm

will include

HDD Marin

when consrts tionally, conitments anvered, envir

elated docum

on

sponsible fo

, communicand e Co-operareporting p

e Plan (see

nsing authothe licensingts and inspe

atistics for e

y pending incidents;

nent enviro

ed delays to

it Sheets; a

for the naw MHWS.

sing author

ng and res

ntal trainingplement the

environmenmental traini

e environm

ne Works

struction act

nfirming thend mitigatioronmental iments)

or:

cating and r

tion Procedprotocols fothe NSP).

ority detailedg authority ections;

environment

and actual

onmental iss

o constructi

nd

ature and

rity and stat

sponding to

g is to ene environme

ntal mitigatiing Table 3

Targmental All

RHK-1A-4EnvironmWorks

tivities are t

e status of on measurnitiatives un

responding

dures are ior such an

d in the cononce works

tal incidents

l enforcem

sues identif

on should t

quantity of

tutory agen

o any enviro

nsure that ental require

on measurin will be re

get Personpersons at

Pag

40-HSE-002mentalManag

aking place

the project,es, monthlndertaken, a

to statutory

n place forevent can

sent condits have comm

s and near m

ent action

ied;

they be enc

f all substa

ncies and th

onmental co

all site peements of th

es are impequired.

ns ttending Sit

ge 18 of 54

2-D-gementPlan

e on site / ve

, implemenly and cuamendmen

y navigation

r such even be found

ion; menced wit

misses;

in respect

countered;

ances and

he local com

ommunicat

ersonnel hhe project.

plemented o

te / Vesse

nConstructi

essels;

tation of mulative

nts to the

n notices

nts. The d in the

th:

t of any

objects

mmunity;

ion from

ave the

on site /

l (Site /

on

Page 19: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

Environmental Management Plan- HDD Marine Works Page 19 of 54

RHK-1A-40-HSE-002-D-EnvironmentalManagementPlanConstructionWorks

Training Target Persons aspects such as environmental sensitivities and controls, pollution prevention, waste management and emergency preparedness and response). For Marine Mammals, this should include identification, behaviour and sensitive periods for known species and introduction to Scottish Marine Wildlife Watching Code.

Vessel personnel, contractors on Site / Vessel, and visitors).

Environmental Toolbox Talks Toolbox talks will be carried out at a minimum of one per week appropriate to the construction works being carried out on Site / Vessel at that time. All persons carrying out work on site / vessel (site / vessel personnel, contractors on site / vessel) shall attend.

Environmental Bulletins / Legislation Briefings / Best Practice Briefings

All persons carrying out work on Site / Vessel (Site / Vessel personnel, contractors on Site / Vessel) shall attend.

Job specific training e.g. IOSH Working with Environmental

Responsibilities / IOSH Managing Environmental Responsibilities.

Use of Pollution Prevention Equipment. Site Waste Management.

As identified for personnel with environmental responsibilities

Project specific information, including relevant elements of: the EMP, CMS, NSP, VMP Consent Conditions

Briefed out and available for reference to all Site / Vessel staff.

Table 3 Training

Any person working on the Site / Vessel will be competent and trained sufficiently to undertake their work in a safe and efficient manner. Each Contractor will ensure that their personnel maintain the necessary level of competence for their work & will maintain the training records on site & make them available for review and audit. Records of training will be maintained and made available for inspection.

 

Page 20: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

E

Environmen

5 M

K5.1

Chaptegrey se

In Scotwide ra

5.1.1

All speHabitatsas beinconserv

Harbougrey sedirectivedesigna

The Ha2008(b)on landprotectispeciesdetails t

A licensregulati39(1)(a2007 (a

5.1.2

The WiConsermigratoaffordedConvenspeciesexistingreckless

5.1.3

Under tof year Scottish

tal Manage

MARINE MA

Key sensitiv

r 11 of the eal and com

tland cetacenge of natio

Habitats Di

cies of cets Directive ng of consvation statu

r porpoise eal Halichoee as specieated.

abitats Reg)) implemen

d and inshoron for SAC

s listed undthe protecti

se is requirons 41(1)(a) and (b) in

amended in

Wildlife and

ildlife and Crvation of ory species d strict protntion. The s protection g protections disturbanc

Marine (Sc

the Marine r except to h Governm

ment Plan-

AMMAL M

vities and a

Environmemon seal a

eans (whaleonal and int

rective

tacean are (European

servation ins.

Phocoena perus grypuses for which

gulations 1nt the specire waters (0

Cs, designatder Annex Ion given to

red if the risa) and (b) in The Offs2009 and 2

d Countrysid

CountrysideMigratory and their h

ection as aNature Coprovided b

s for cetacece as an off

otland) Act

(Scotland) Aalleviate sent. It is a

HDD Marin

MANAGEM

associated

ental Statems the key se

es and dolpternational l

European Union (EUnterest and

phocoena as and harboh a network

994 (as ames protectio

0-12 nauticated for habiI of the HaEPS.

sk of injury in The Conhore Marin2010).

de Act and

e Act (1981Species (Thabitats. Sn endanger

onservation by the Wildlieans from infence.

2010

Act 2010 it uffering or an offence

ne Works

MENT

d legislation

ment, Marinensitivities

phins) andlegislation.

Protected U) Directived protection

and bottlenoour seal Phk of Special

mended inon requiremal miles). Pitats listed uabitats Dire

or disturbanservation oe Conserva

Nature Con

1) ratified tThe Bonn Short-beakered migrato

(Scotland)ife and Countentional d

is an offenwhere a licto harass

RHK-1A-4EnvironmWorks

n

ne Mammalduring cons

pinnipeds

Species (92/43/EEC

n is to ma

ose dolphinhoca vitulina Areas of C

Scotland ments of thePart II of theunder Annective. Part

ance to EPSof Habitats ation (Natu

nservation (

the provisioConvention

ed commonry species, ) Act 2004

untryside Acdisturbance

ce to kill, incence has seals at ha

Pag

40-HSE-002mentalManag

s, identifiesstruction wo

(seals) are

EPS) undeC) because aintain or

Tursiops tra are listed Conservatio

in 2004, 2 Habitats D

e Habitats Rex I of the HII of the Ha

S is assessand Specieral Habitats

(Scotland) A

ons of the n), which

n dolphin Dlisted unde

4 amends ct 1981 to pto encomp

njure or takebeen issue

aul-out sites

ge 20 of 54

2-D-gementPlan

s harbour pork.

e protected

er Annex IVthey are crestore fav

runcatus al as Annex

on (SACs) a

2007, 2008Directive in SRegulations Habitats Direabitats Reg

sed as ‘likeles Regulatis, &c.) Reg

Act

Conventionaims to c

Delphinus der Appendix

and improprovide extepass protect

e a seal at aed to do sos which ha

nConstructi

porpoise,

under a

V of the classified vourable

ong with II of the

are to be

8(a) and Scotland outlines

ective or gulations

y’ under ons and

gulations

n on the conserve elphis is

x 1 of the oves the ension to tion from

any time o by the ve been

on

Page 21: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

E

Environmen

identifieharbourexploita

The clo

5.1.4

Grey smoultin

Harbouand Aug

During

M5.2

The keymarine below.

Section 3

Marine L

Environm

Stateme

Commitm

s36

ML

tal Manage

ed for protecr seal are ation or rem

osest seal ha

Seal Puppi

eal breeding period for

r seal puppgust.

these perio

Mitigation a

y commitmemammals f

36 (S36),

Licence (ML),

mental

nt (ES)

ment

ment Plan-

ction underalso listed

moval from th

aul-out sites

ng and Mou

ng season r January –

ping season

ods seals ar

and manage

ents and cofrom the Me

or

Condi

The m(whichother eMinistewrittendetermIn partregarda) Hydmodelb) Colmammc) Distduringfor sead) MigSubjecresultsparty a

3.2.1.7Prior tdetailsauthormarinedisturblicensicomm

HDD Marin

r Section 11 on Annexhe wild to b

s are at Gill

ulting Period

is generalMarch for f

n is generall

re particular

ement com

onditions in eyGen cons

ition, or comm

monitoring set oh must be agreecological, or ers), must be n reports of sumined by the Aticular, the follding the monitodro dynamics /ling to validatelision / encoun

mals and fish oturbance and construction als at haul outratory salmonct to any legals must be madappointed at th

7 Monitoring oo the commen

s of the appoinrity. The MMOe mammals anbance being cng authority wencement of t

ne Works

17 of the Max V of the be subject to

ls Bay and t

ds

lly through females and

ly through J

rly sensitive

mmitments

place for msents, licenc

mitment

out in the PEMeed by the Scosuch other adimplemented

uch monitoringAdvisory Groulowing aspectsoring of the fo/ benthic survee EIA predictionter interactioof conservatiodisplacement and operation

ts; and nids l restrictions rede publicly avaheir discretion

of marine mamncement of thentment of a Ma

O must, as a mnd maintain a

caused to mariwith the MMO’the works, and

RHK-1A-4EnvironmWorks

arine (ScotlHabitats D

o managem

the island o

October ad March – M

June and Ju

e to disturba

anagementces and ES

MP or, as the cottish Minister

dvisors as requby the Compa

g to the Scottisp. s should be co

ollowing aspeceys, export caons; ns with the tidn concern; of birds, mari

n. This must a

egarding the tailable by the n.

mmals e works the licarine Mamma

minimum, mainrecord of the ine mammals.s records no ld at six month

Pag

40-HSE-002mentalManag

and) Act 20Directive, w

ment measur

of Stroma (F

and NovemMay for mal

uly followed

ance at their

t of potentiaare detaile

case may be, rs, in consultatuired at the disany. The Comsh Ministers at

onsidered andcts: able route and

al turbines for

ne mammals lso link to the

reatment of thScottish Minis

censee must al Observer (M

ntain a record action taken t The licenseeater than six mly intervals the

ge 21 of 54

2-D-gementPlan

010. Grey swhich requirres.

Figure 5).

mber followees.

by moultin

r haul-out s

al impacts oed in Table 4

an amended tion with SNHscretion of the

mpany must sut timescales to

d advice provid

d turbine locati

r diving birds,

and basking sspecies prote

he informationsters, or by su

agree in writinMMO) with the

of any sightinto avoid any e must providemonths followereafter.

nConstructi

seal and res their

ed by a

g in July

ites.

on 4,

PEMP, H and any e Scottish bmit

o be

ded

ons and

marine

sharks ection plan

, the ch other

g the licensing gs of

e the ing

on

Page 22: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

E

Environmen

Section 3

Marine L

Environm

Stateme

Commitm

ES

ES

ES

 

C5.3

Summareport, CMSCo

Marine propose

5.3.1

As detadamageinto acc2009, fonoise a

tal Manage

36 (S36),

Licence (ML),

mental

nt (ES)

ment

Constructio

aries of thewhile a

onstructionW

mammals ed works:

Noise (vess

Disturbance

Ship strike

Pollution an

Noise (vess

ailed in the e might occcount highlor harbour

are also sig

ment Plan-

or

Condi

The prSpecieon min(for ex

MeyGinjurieunderswill apScotlasignific

All vesprevenSOPEchemioperatinstallasuitabunfavo

Tab

on Works

e Constructdetailed

Works).

are conside

sel);

e (vessel pr

and collisio

nd spillage

sel)

ES the socur to eithely conservaporpoises anificantly be

HDD Marin

ition, or comm

rinciples of thees (EPS) fromnimising the risxample, reduci

en commit to s in seals andstanding of thi

pply appropriatand and SNH, cant impacts.

ssels associatntion of oil pol

EPs. All vessecal spill mop uting in similar ation, operatiole conditions tourable weath

ble 4 Marine

ion WorksConstruc

ered to be

resence and

on with duct

urce levelser cetaceanative criteriaand those pelow those

ne Works

mitment

e JNCC guidam injury and dis

sk of injury to ing the duratio

undertaking frd ducted propeis topic with rete mitigation, ashould vesse

ted with Projeclution and any

els associated up kits. Whereconditions wil

on, routine mato reduce the

her conditions.

e Mammal

and prograction Meth

potentially

d movemen

ted propelle

s for vessel s or pinnipa (being 19put forward that might

RHK-1A-4EnvironmWorks

ance on protecsturbance (JNmarine mamm

on of noise em

requent reviewellers and to reelevant regulaas deemed nels with ducted

ct operations wy vessels overwith Project o

e possible vesl be employed

aintenance andchance of an

Commitme

amme are hod Statem

sensitive to

nt);

er;

noise are eds. This 93.7dB) (e.by the US be expecte

Pag

40-HSE-002mentalManag

ction of marineCC, 2010) an

mals will be admitting activitie

ws of the literaegularly discustory and advis

ecessary in co propellers be

will comply witr 400 GT will hoperations will ssels with a prd. Vessel activd decommissiooil spill resulti

ents

provided inment (ME

o the follow

below thosis the caseg. proposeNMFS, 19

ed to cause

ge 22 of 54

2-D-gementPlan

e European Prnd of relevant gdopted as neces).

ature regardingss advances isory bodies. Monsultation withe used, to avoi

th IMO/MCA chave on board carry on boarroven track revities associatoning will occng from the in

n Section 2EY-1A-40-H

wing aspect

se at which e even wheed by Luck95). The e aversion

nConstructi

rotected guidelines cessary

g spiral n MeyGen h Marine id any

codes for d rd oil and cord for ted with ur in

nfluence of

2 of this SE-004-

ts of the

hearing en taking e et al., levels of in either

on

Page 23: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

Environmental Management Plan- HDD Marine Works Page 23 of 54

RHK-1A-40-HSE-002-D-EnvironmentalManagementPlanConstructionWorks

cetaceans or pinnipeds.

Because of the low levels of noise generated, mitigation measures (such as a Marine Mammal Mitigation Protocol), including the use of a dedicated Marine Mammal Observer or Passive Acoustic Monitoring to prevent injury to marine mammals through the establishment of an exclusion zone, are not appropriate and should not be required as part of this EMP.

However, a number of measures are proposed to both encourage best practice and minimise any limited (although small) potential for disturbance. These measures include:

The spatial separation of at least 300m of the Construction Works (HDD exit) from MLWS of the nearest known sensitive areas for seals, the designated haul out site at Gills Bay (Figure 5), and see CMS;

During the cable laying works, when working at the HDD exit site (the closest point to the designated haul out site) the multi-cat will use an anchor spread to maintain the position on site, minimises propulsion use and vessel movement on site.

The CLV will hold station at least 50m away from the HDD exit when paying out the TSC to the HDD bore.

The TSS/TTG positions are 300m from any designated haul out sites; all DP Vessel operations will take place in the vicinity of these locations.

The proposed vessel transit routes from all ports to site ensure that the vessels keep an adequate separation distance from any sensitive seal haul-out sites wherever possible, see VMP;

Training of all on site / on vessel personnel regarding the importance and sensitivity of marine mammals and their legislative protection;

Provision of advice to staff detailing the types of activity potentially disturbing, and therefore to be avoided; and

Maintenance of a daily marine mammal log (APPENDIX B) by the Principal Contractor, into which any interaction will be noted. It is important to make clear that such a log is likely to record many approaches by marine mammals to the vessels and personnel undertaking all Construction Works. Marine mammals are intelligent and naturally curious about any in water construction works, regularly approaching vessels engaged in Construction Works.

Although some of the Construction Works will be carried out during sensitive periods for seals and also during periods where there will be greater abundance of cetaceans, it is considered that there is limited potential for disturbance offence from the construction works proposed. This is primarily due to the low levels of noise generated (gravity foundations – no drilling) and the short periods required on site for the Construction Works.

For this reasons no requirement for a licence to disturb European Protected Species (in this case cetaceans) is anticipated.

5.3.2 Physical Disturbance

The presence of any vessel in the area has the potential to cause some degree of disturbance to both cetaceans and pinnipeds; however, the key receptor in terms of numbers

Page 24: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

Environmental Management Plan- HDD Marine Works Page 24 of 54

RHK-1A-40-HSE-002-D-EnvironmentalManagementPlanConstructionWorks

and proximity of sites of interest will be seals. This is considered in detail below.

The proposed Construction Works have a number of characteristics that reduce their potential to disturb all marine mammals significantly. In particular these are:

The spatial separation of at least 300m of the Construction Works (HDD exit) from MLWS of the nearest known sensitive areas for seals, the designated haul out site at Gills Bay (Figure 5), see CMS;

During the cable laying works, when working at the HDD exit site (the closest point to the designated haul out site) the multi-cat will use an anchor spread to maintain the position on site, minimises propulsion use and vessel movement on site.

The CLV will hold station at least 50m away from the HDD exit when paying out the TSC to the HDD bore.

The TSS/TTG positions are, at closest 300m from any designated haul out sites; and all DP Vessel operations will take place in the vicinity of these locations. When waiting for slack tide windows vessels will wait in areas where at least a 500m separation distance can be maintained from any sensitive seal haul-out sites.

The proposed vessel transit routes from all ports to site ensure that the vessels keep an adequate separation distance from any sensitive seal haul-out sites wherever possible, see VMP;

The short duration of the use of vessels during Construction Works. Work is anticipated to be as follows:

- TSC installation will be limited to a neap tide window, with the CLV requiring approximately 6 hours for each TSC installation (HDD pull and TSC seabed lay) running continuously through tides once the operation has commenced;

- TSS installation will be limited to a neap tide window, with each lift requiring a slack tide. Each lift will take an estimated 1-2 hours with a minimum total time of 2 days to complete a TSS installation.

- TTG installation will be limited to one neap tide per TTG installation (4 neap tides in total). The ARL TTG installation and connection will take three slack tide to install. Each AHH TTG will take one slack tide to deploy and a 12 hour period on station to make the TSC connection.

The majority of operations are limited to periods around slack water, with vessels moving off DP to sheltered areas outside of operations. These areas will ensure a minimum 500m distance from the nearest seal haul-out;

Training of all on site / on vessel personnel regarding the importance and sensitivity of marine mammals and their legislative protection;

Provision of advice to staff detailing the types of activity potentially disturbing, and therefore to be avoided; and

Maintenance of a daily marine mammal log (APPENDIX B) by the Principal Contractor, into which any interaction will be noted. It is important to make clear that such a log is likely to record many approaches by marine mammals to the vessels and personnel undertaking Construction Works. Marine mammals are intelligent and

Page 25: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

Environmental Management Plan- HDD Marine Works Page 25 of 54

RHK-1A-40-HSE-002-D-EnvironmentalManagementPlanConstructionWorks

naturally curious about any in water construction works, regularly approaching vessels engaged in marine works.

 

Figure 5 Location of Construction Works in relation to designated seal haul out sites

5.3.3 Ship strike and collision with ducted propeller

Multicat type vessels (vessel specification can be found in the VMP) do not used ducted propellers and for some activities when on site will use a fixed seabed anchor system, as described in detail in the CMS. This reduced the potential for both ship strike and propeller collision significantly, as vessel movement, and use of propeller position systems are both minimised.

DP Vessels will be used for the main activities for the TSC, TSS and TTG installation, which are likely to use ducted propeller systems to maintain position (typical vessel specification can be found in the VMP).

While both cetaceans and pinniped are potentially exposed to risk of ship strike and propeller strike, there has previously been significant concern regarding the risk of corkscrew injuries to seals, initially attributed to some ducted propeller system such as a Kort nozzle or some

Page 26: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

Environmental Management Plan- HDD Marine Works Page 26 of 54

RHK-1A-40-HSE-002-D-EnvironmentalManagementPlanConstructionWorks

types of Azimuth thrusters, commonly used by DP vessels. The proximity of the proposed Construction Works to areas of importance for seals (protected haul out sites at Gills Bay and Stroma), and the numbers of individuals present meant that this was previously a key environmental concern.

Since the submission of the ES there has been ongoing research into the issue of spiral injuries in seals which has confirmed that the characteristic wounds can be caused by a seal being drawn through ducted propeller system such as a Kort nozzle or some types of Azimuth thrusters (Thompson et al., 2010, Bexton et al., 2012; Onoufriou & Thompson, 2014). To date the observed seal strandings appear to be restricted to juvenile grey seal and female harbour seal with seasonal differences evident between the species: grey seal newly weaned pups in the winter and common seal adults or pregnant females in the summer (Brownlow, 2013).

In experimental studies (Onoufriou & Thompson, 2014) it has been shown that using a combination of propeller and seal sizes, smaller seals were more likely to show the characteristic spiral lacerations; while larger seal models often became stuck in the ducted propeller system. The results of these trials and observed stranded seals suggested, at that time, that there were still a number of uncertainties as to the frequency of occurrence, and mechanisms for this type of injury.

However, bases on the most recent known research (Thompson et al., 2015; van Neer et al., 2015) there is now very strong evidence that predatory behaviour by grey seals, rather than ducted propeller injuries, is likely to be the main cause of spiral seal deaths. Although this evidence does not completely eliminate ship propellers, it is now considered to be unlikely that they are a key factor. The SNCBs have now provided interim advice (JNCC, 2015) on this issue, an update to the earlier (April 2012) advice, in order to clarify the agreed recommendations to regulators and industry.

This most recent advice suggests that, based on incontrovertible evidence, grey seal predation on weaned grey seal pups and young harbour seal can cause the characteristic spiral injuries that were the subject of preceding studies. The advice states that

‘it is considered very likely that the use of vessels with ducted propellers may not pose any increased risk to seals over and above normal shipping activities and therefore mitigation measures and monitoring may not be necessary in this regard, although all possible care should be taken in the vicinity of major seal breeding and haul-out sites to avoid collisions’.

This new advice provides a new perspective on the preceding Statutory Nature Conservation Agency (SNCA) Guidance (2012) on the potential risk of seal corkscrew injuries, which at that time suggested levels of risk and recommendations for mitigation.

The Development is more than 60km from the nearest grey seal Special Area of Conservation (SAC, Faray and Holm of Faray), and harbour seal SAC (Sanday). The presence of the Gills Bay and Stroma haul out sites relatively close to the development site, does suggest a need for careful management of works at the site, but no direct mitigation measures are advised (SNCA, 2012).

In the light of the new, compelling scientific evidence and the revise SNCB advice, the risk of

Page 27: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

E

Environmen

propelleinstallat

As a coSchemeConstruencouraThese m

5.3.4

The app6).

6

K6.1

This seprevent

tal Manage

er collision tion vessels

onsequencee (SCIMS) uction Workage best prmeasures in

The spatiaMLWS of thGills Bay (FDuring the the designaposition onThe CLV wout the TSCThe TSS/Toperations windows vmaintainedThe proposkeep an awherever p Training ofof marine mProvision otherefore toMaintenancContractor,such a log and personnaturally cvessels eng

Pollution an

proach to th

MARINE P

Key sensitiv

ection identit and resp

ment Plan-

impacts ass, during Co

e of the newfollowing thks. Howractice and nclude:

l separationhe nearest Figure 5), secable layingated haul o site, minim

will hold staC to the HD

TTG positionwill take pla

vessels will from any s

sed vessel adequate s

possible, seef all on site

mammals anof advice too be avoidece of a d, into whichis likely to

nnel undertacurious abogaged in Co

nd spillage

his sensitivi

POLLUTIO

vities and a

ifies the popond to su

HDD Marin

ssociated wonstruction W

w SNCB adhe SNCA (2

wever, a numinimise an

n of at leasknown sensee CMS; g works, wh

out site) themises propulation a miniDD bore. ns are 300mace in the v wait in a

sensitive seatransit routeseparation e VMP. / on vesse

nd their lego staff detad; and aily marineany interac

record maaking Constout any in onstruction

ty is detaile

ON CONTI

associated

otential sourch events

ne Works

with the usWorks is co

dvice, a ded2012) guidaumber of mny potentia

st 300m of sitive areas

hen workinge multi-cat wlsion use anmum of 50

m from anyvicinity of thareas wheral haul-out es to all Codistance f

el personneislative protiling the ty

e mammalction will beany approactruction Wo

water conWorks.

ed in the Ma

NGENCY

d legislation

rces of pollshould the

RHK-1A-4EnvironmWorks

se of ducteonsidered to

dicated Seaance is not measures al (however

the Constrs for seals,

g at the HDwill use an and vessel mm away fro

y designatedese locatione a 500m sites.

onstruction Wfrom any

l regarding tection; pes of activ

l log (APPe noted. It iches by maorks. Marinnstruction w

arine Pollut

PLAN

n

lution eveney occur.

Pag

40-HSE-002mentalManag

ed propellero be low risk

al Corkscrewconsidered

are propossmall) risk o

uction Worthe designa

D exit site (anchor spre

movement oom the HDD

d haul out sns. When w

separation

Works ensusensitive s

the importa

vity potentia

PENDIX B)is importantarine mamme mammalsworks, reg

ion Conting

ts and detaIts object

ge 27 of 54

2-D-gementPlan

rs, by DP k.

ew Injury Mod necessarysed by Meyof vessel co

rks (HDD eated haul ou

(the closestead to main

on site. D exit when

sites; all DPwaiting for sn distance

ure that theseal haul-o

ance and se

ally disturb

) by the Pt to make cmals to the s are intelligularly appr

gency Plan

ail the meaive is to m

nConstructi

or other

onitoring y for the yGen to ollisions.

xit) from ut site at

t point to ntain the

n paying

P Vessel lack tide can be

e vessels out sites

ensitivity

ing, and

Principal clear that

vessels gent and roaching

(Section

sures to minimise

on

Page 28: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

E

Environmen

environproject,The key

This wil

It will aRespon

While troutine Convenmarine Annex approve

M6.2

Section 3

Marine L

Environm

Stateme

Commitm

ES

ES

ES

ES

ES

ES

tal Manage

mental imp as well asy sensitivitie

- Water q

- Marine

- Benthic

ll also addre

ConstructioNavigationa

also set ounse Plan (E

here is no events ass

ntion for theenvironmeI of MARPOed Shipboa

Mitigation a

36 (S36),

Licence (ML),

mental

nt (E

ment

ment Plan-

pacts in res identifyinges are:

quality;

mammals;

c / intertidal

ess emerge

on Method Sal Safety Pl

ut and defiRP) being i

specific legsociated wie Preventiont by shipsOL requiresrd Oil Pollu

and manage

or

ES)

Conditi

Minimise

environm

impleme

HDD to

Vessels

preventi

Vessels

mop up

Where p

will be e

Vessel

decomm

resulting

Only rec

drilling e

HDD Marin

sponse to g potential r

and

ecology.

ency respon

Statement (an (NSP);

ne roles anitiated.

gislation or th marine

on of Pollus from opers that all shtion Emerge

ement com

on, or comm

e as far as p

ment during

enting a close

shore.

associated w

on of oil pollut

associated w

kits.

possible vesse

employed.

activities ass

missioning will

g from the influ

cognised mar

equipment.

ne Works

an oil spilrisks to the

nse, and wil

(CMS); and

and respons

published renewable tion from s

rational or ahips of 400 ency Plan (

mmitments

itment

racticable the

breakthrough

ed loop recycli

with all Projec

tion and any v

with all Project

els with a pro

sociated with

occur in suita

uence of unfav

rine standard

RHK-1A-4EnvironmWorks

l or pollutioenvironme

l cross-refe

sibilities in

guidance renergy dev

ships (MARaccidental cgross tonn

(SOPEP).

e volume of d

h of Horizont

ng system to

ct operations w

vessels over 4

operations wi

ven track reco

installation, o

able condition

vourable weat

fluids and su

Pag

40-HSE-002mentalManag

on event aent, human

rence to fol

the event

regarding avelopments

RPOL) covecauses, witnage (GT) o

rill cuttings re

al Direction

return drill cut

will comply w

400 GT will ha

ll carry onboa

ord for operat

operation, rou

s to reduce th

ther conditions

bstances will

ge 28 of 54

2-D-gementPlan

associated health and

llowing doc

of an Em

accidental as, the Interers pollutioth Regulatioor more to

eleased into t

Drill (HDD)

ttings and flui

with IMO/MCA

ave onboard S

ard oil and che

ting in similar

utine mainten

he chance of

s.

be used in th

nConstructi

with the wildlife.

uments:

mergency

and non-rnational n of the on 37 of have an

he marine

bores, by

d from the

codes for

OPEPs.

emical spill

conditions

nance and

an oil spill

he pin pile

on

Page 29: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

Environmental Management Plan- HDD Marine Works Page 29 of 54

RHK-1A-40-HSE-002-D-EnvironmentalManagementPlanConstructionWorks

Section 36 (S36),

Marine Licence (ML), or

Environmental

Statement (ES)

Commitment

Condition, or commitment

ES Consideration will be given to CIRIA guidance on the use of concrete in maritime

engineering – a good practice guide.

ES Operations will only take place during suitable weather windows.

ES A fibre optic cable will be used to monitor the level of cement, when the cement

reaches seabed level pumping of cement will cease immediately.

ES During cementing operations the cement will be separated from the open sea

conductor casing which is only removed once the cement has reached sufficient

strength to withstand current forces.

ES In the event of any unplanned discharges to sea during HDD activities the drilling

contractor would activate its emergency response plan to ensure discharges were

minimised.

ES Only recognised marine standard fluids and substances will be used in the turbine

hydraulic systems.

ES Hydraulic fluids will be mostly water based, biodegradable and be of low aquatic

toxicity.

ES Turbine sensors will detect loss of fluid pressure and leaks enabling maintenance

operatives to reduce the risk of further leaks.

S36 Condition 9 “The Company must, prior to the Commencement of the Development, submit a

CMS…Pollution prevention measures including contingency plans”

ML Condition 3.1.4 If by any reason of force majeure any substance or object is deposited other than at

the site which is described in this licence, then the licensee must notify the licensing

authority of the full details of the circumstances of the deposit within 48 hours of the

incident occurring (failing which as soon as reasonably practicable after that period of

48 hours has elapsed). Force majeure may be deemed to apply when, due to stress

of weather or any other cause, the master of a vessel, vehicle or marine structure

determines that it is necessary to deposit the substance or object other than at the

specified site because the safety of human life or, as the case may be, the vessel,

vehicle or marine structure is threatened. Under Annex II, Article 7 of the Convention

for the Protection of the Marine Environment of the North-east Atlantic, the licensing

authority is obliged to immediately report force majeure incidents to the Convention

Commission.

ML Condition 3.1.8 All chemicals utilised in the drilling operations for the works must be selected from the

List of Notified Chemicals assessed for use by the offshore oil and gas industry under

the Offshore Chemicals Regulations 2002 (this list can be viewed/downloaded at

www.cefas.co.uk). In the event that any system other that a water-based mud is

considered by the licensee for use in the drilling operation then the prior written

approval of the licensing authority must be obtained before such use. The licensee

must comply with the terms of the guidance as to the disposal of any material arising

Page 30: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

Environmental Management Plan- HDD Marine Works Page 30 of 54

RHK-1A-40-HSE-002-D-EnvironmentalManagementPlanConstructionWorks

Section 36 (S36),

Marine Licence (ML), or

Environmental

Statement (ES)

Commitment

Condition, or commitment

from that operation which will be given to the licensee by the licensing authority.

The licensee must ensure that any chemical agents placed within the void of any of

the turbine bases including biocides and corrosion inhibitors etc. are selected from

the List of Notified Chemicals. The use of any chemical not contained within this list

will require prior consent from the licensing authority.

ML Condition 3.1.9 The licensee must ensure that all reasonable, appropriate and practicable steps are

taken at all times to minimise damage to the Scottish marine area caused by the

licensed activity authorised under this licence.

The licensee must ensure that any debris or waste materials placed below the

MHWS during the construction and operation of the works are removed from the site,

as soon as is reasonably practicable, for disposal at a location above the MHWS

approved by the Scottish Environment Protection Agency.

The licensee must ensure that all substances and objects deposited during the

execution of the works are inert and do not contain toxic elements which may be

harmful to the marine environment, the living resources which it supports or human

health.

The licensee must ensure that the risk of transferring invasive non-native species to

and from the site is kept to a minimum by ensuring appropriate bio-fouling

management practices are implemented during the works.

Any drill cuttings associated with the use of water-based drilling muds situated within

the outer boundary of the works need not be removed from the seabed

ML Condition 3.2.1.3 The licensee must, no later than three months prior to the commencement of the

works, submit in writing to the licensing authority for their written approval, a Marine

Pollution Contingency Plan (MPCP).

The MPCP must make provision in respect of spills and collision incidents occurring

during the construction and operation of the works and where such spills or collisions

occur then the MPCP must be adhered to in full. The MPCP must take into account

existing plans for all operations, including offshore installations that may have an

influence on the MPCP. Practices used to refuel vessels at sea must conform to

industry standards and to relevant legislation. The MPCP must set out how any oil

leaks within the turbine nacelle are to be remedied and that such relevant repairs are

required to be undertaken without undue delay.

Commencement of the works must not occur until the licensing authority has given its

written approval to the MPCP.

ML Condition 3.2.2.1 The licensee must, on the first working day of the month, create, maintain and submit

to the licensing authority a detailed transportation audit sheet for each month during

which construction associated with the works takes place. The audit sheet must

include information on the loading facility, vessels, equipment, shipment routes,

schedules and all materials listed in the licence to be deposited (e.g. piles, pipelines,

turbine components, chemicals). Where, following the submission of an audit sheet

Page 31: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

E

Environmen

Section 3

Marine L

Environm

Stateme

Commitm

ML Cond

C6.3

Organisa

James FiMarine S

James FiMarine S

James FiMarine S

MeyGen

MeyGen

Maritime CoastguaAgency

Marine S

tal Manage

36 (S36),

Licence (ML),

mental

nt (E

ment

dition 3.2.2.2

Communica

ation N

isher Services

I

isher Services

SG

isher Services

T

Ltd E

Ltd F

and ard

-

Scotland

ment Plan-

or

ES)

Conditi

to the lic

the licen

following

If the lic

an accid

after bec

licensing

construc

soon as

In addit

under c

works, s

all subst

Such au

the first

following

Table

ation - Key

Name

Ian Sargent

Stan Groundwater

Tony Blacksha

Ed Rollings

Fraser Johnso

-

HDD Marin

on, or comm

censing autho

nsee must not

g the making o

ensee becom

dental deposit

coming aware

g authority is

ction works ar

is practicable

ion to the au

condition 3.2.2

submit audit re

tances and ob

udit reports m

such report b

g the commen

5 Pollution

contacts

Role

Project

Marine

aw HSE A

ECoW

on MarineManag

ShetlanRescueordinat

MarineDuty O

ne Works

itment

ority, any alter

tify the licensin

of the alteratio

es aware of a

, they shall co

e to advise the

of the view

re present then

e and at the lic

udit sheets re

2.2, the licen

eports to the li

bjects deposite

must be submi

eing required

ncement of the

n Preventio

t Manager

e Coordinator

Advisor

e Package ger

nd Maritime e Co-tion Centre

e Scotland Officer

RHK-1A-4EnvironmWorks

ration is made

ng authority of

on.

any materials o

ontact the licen

e licensee on t

that any acc

n the deposits

censee's expe

equired to be

nsee must, fo

censing autho

ed below MHW

itted by the lic

to be submitte

e works.

on Commit

Telephone

+44 156565

+44 156565

+44 156565

+44 131659

+44131659

+441595 69

0300 244 4

Pag

40-HSE-002mentalManag

e to the compo

f the alteration

on the audit sh

nsing authority

the appropriat

idental depos

s must be rem

nse.

submitted to

ollowing the c

ority stating the

WS under the

censee at six

ed on a date n

tments

e

58812

58824

58817

99662

99672

92976

4000

ge 31 of 54

2-D-gementPlan

onent parts of

n as soon as p

heet that are m

y as soon as p

te remedial ac

sits associated

oved by the li

the licensing

commenceme

e nature and q

authority of th

x monthly inte

no later than s

Mobile

+447584293

+447747843

+447824150

+447825414

+447787518

-

-

nConstructi

f the sheet

practicable

missing, or

practicable

ction. If the

d with the

censee as

g authority

ent of the

quantity of

he licence.

rvals, with

six months

3680

3712

0124

4402

8373

on

Page 32: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

E

Environmen

SEPA Ho

Health anExecutive

P6.4

The folcomme

6.4.1

The NSWorks. measur

6.4.2

Two typCoastgu

tal Manage

otline -

nd Safety e

-

Potential Ide

lowing genencement of

All staff wisensitivities

The contenalso be conarise.

Key operatevent of an

InventoriesconstructioIt is not ansite.

Pollution P

The designthe invento

All contractmethod sta

Constructio

SP details tThere is lim

res will be im

Issue of Nonational anRadio NaviTemporary Vessel to sTemporary

Pollution In

pes of potenuard Agenc

ment Plan-

-

-

Table

entified Ris

neral mitigaf work,

ll receive as and pollut

nt of the Mnveyed to e

tives will ben incident.

s of all chen process w

nticipated th

revention e

nated Marinory.

tors will be atements for

on Vessels O

the full navmited potenmplemented

otice to Mad local stakgation WarChart Mark

show appropstructures

ncidents

ntial pollutiocy – MCA):

HDD Marin

-

-

e 6 Pollutio

sks

tion measu

a site inducion prevent

arine Pollutensure that

e trained in

micals andwill be takenhat any mat

quipment w

ner Co-ordin

expected tor review and

Operations

vigation safential for collid:

riners (NtMkeholders; nings; kings; priate signaon site mar

on incident h

ne Works

n Preventi

ures will be

ction and totion measur

tion Continthe plan is

the use of

d materials n as part ofterials posin

will be recor

nator will b

o submit sitd approval

and collisio

fety measursion during

M) stating H

als; rked with bu

have been

RHK-1A-4EnvironmWorks

0800 80 70

Incidents ahttp://www.

on Key Co

e implemen

ool box talkres.

gency Planimplemente

spill kits an

stored on f a chemicang a major

ded in an in

be responsib

te specific rbefore work

on

res to be e these oper

DD Marine

uoys and ap

identified (a

Pag

40-HSE-002mentalManag

0 60

re reported onhse.gov.uk/rid

ntacts

ted for all

about the

n and their ed effective

nd clean up

board and l product anhealth risk

nventory.

ble for takin

isk assessmks commen

employed forations; how

Works deta

ppropriate li

as defined b

ge 32 of 54

2-D-gementPlan

-

nline at ddor/report.htm

works; prio

environme

responsibilely, should t

p procedure

being usend waste in

k are to be

ng and ma

ments incorce.

or the HDDwever, the f

tails promul

ighting;

by the Marit

nConstructi

m

or to the

ental site

lities will the need

es in the

ed in the nventory. used on

intaining

rporating

D Marine following

gated to

time and

on

Page 33: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

Environmental Management Plan- HDD Marine Works Page 33 of 54

RHK-1A-40-HSE-002-D-EnvironmentalManagementPlanConstructionWorks

Oil and chemical spills

Objects lost overboard

Oil and chemical spill

In the event of a spillage sighting originating from a vessel the following actions must be taken:

All spillage sightings must be reported to the Vessel Master immediately;

The Vessel Master must notify the Marine Rescue Coordination Centre (MRCC) identifying the location and giving an initial indication of the size of the spill (based on the 3 Tier system –see below), source of the spillage if identifiable, and other information as applicable to complete a Pollution Incident Report Form;

MRCC will direct the onsite support vessel to the location;

The onsite support vessel will confirm the spillage assessment based on the 3 Tier system and notify MRCC;

The onsite support vessel will commence clean up/containment operations as applicable;

MRCC will be responsible for completing the initial Pollution Incident Report Form which will be used to notify MCA, UKHO and other relevant authorities. Subsequent reports will be submitted on a daily basis until the spillage incident is cleared.

The responsibility for elevating and incident classification from Tier 1 to Tier 2 lies with the MRCC;

The three tier system (small, medium and major) is used to attribute a proportionate response to spill incidents.

Should a small scale spill occur (<1,000 litres) local, in house resources will be deployed in the clean-up.

For a medium sized spill (1,000-150,000 litres) external assistance and resources may be utilised.

For major spills (>150,000 litres) national level assistance and resources would be required in line with the National Contingency Plan, however, it should be noted that the scale of the works proposed for this project make a major spill unlikely.

The potential for spills is most likely to stem from construction vessels which are covered by the MARPOL Convention 1978, as is pollution stemming from the unintentional loss of objects overboard. Each vessel will have its own Ship Oil Pollution Emergency Plan (SOPEP) approved by the MCA and refuelling at sea will be minimised and performed according to industry standards (there is no refuelling anticipated as part of the Construction Works).

Objects Lost Overboard

Should an unintentional loss of objects overboard from vessels occur, the GPS position of the objects lost will be logged.

Page 34: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

E

Environmen

ObjectsHydrogbe relay

TranspoConditio

Recove

E6.5

If an emto miniproducte.g. oilservicesconditiomanageRespon

The aim

Where taken ato the sand opemploy

Upon dwould bResponincident

Upon in

tal Manage

s which conraphic Officyed to the re

ort Audit Son 3.2.2.1.

ery will take

Emergency

mergency ormise the dts, systems absorbents. Additioons, floodined to minimnse Procedu

ms of this re

Primarily to

Secondly, ta fast recov

possible, exas part of thspecific eveptions, onlyed.

discovery obe informednse Procedt is in doubt

nitiation of th

Stop work iImmediatel

- Shetlan- Marine

Assess thesafety equiEvacuate thReview incincident.

ment Plan-

stitute a poce (UKHO) elevant Ma

Sheets mus

place as so

Response

r pollution indischarge as or servicets and boonally naturg etc. that

mise pollutiure.

esponse pro

o ensure pe

to minimisevery to affec

xisting envie pre-plann

ent encounty those ac

of an incide who wouldure based t, the plan w

he ERP the

immediatelyy inform:

nd Marine RScotland (M

e environmepment.to evhe site of alcident spec

HDD Marin

ssible hazaby the ves

rine Rescue

st be main

oon as prac

e Procedure

ncident occand to mitigs for controoms, pollutral or other

could creaon to air, w

ocedure are

rsonnel saf

potential ected resour

ronmental cned actions tered and wtivities dee

ent, the alld then makeon the ser

will be imple

e following s

y.

Rescue CooMarine Scot

ental and heveryone on ll personnelific procedu

ne Works

ard to shippissel master e Coordinat

tained and

cticable.

e (ERP)

curs the empgate its effolling the ction prevenr events (eate an emewater and

e:

fety and inte

environmentrces.

conditions wset out in t

while the bremed appro

located Ree a decisionriousness oemented in

steps would

ordination Ctland Duty O

ealth and sasite

l not involveures for ap

RHK-1A-4EnvironmWorks

ing will be imand all obj

tion Centre.

d submitted

phasis will sfects. Thislean-up andntion trainine.g. “Acts ergency situ

land would

egrity of the

tal and soci

will be usedhis plan. Aroad plan sopriate to

esponsible n on whethef the incidefull.

d be taken:

entre on 01Officer) on +

afety risks a

ed in the incpropriate a

Pag

40-HSE-002mentalManag

mmediatelyjects that re.

in line wi

shift to maris will requird minimisinng, monitorof God”) s

uation that d also trigg

vessels inv

io-economic

d to compleAny responsets out a raa particula

Person (Maer to implement. If the

595 692 97+44 (0)7770

and issue ap

cident respoctions base

ge 34 of 54

2-D-gementPlan

y reported toequire reco

ith Marine

ine pollutionre the prov

ng marine pring and c

such as wimust be ef

ger the Em

volved; and

c impacts, e

ement any rese would beange of capar situation

arine Co-oment the Em

seriousnes

76; and 0 733423;

ppropriate P

onse. ed upon sp

nConstructi

o the UK overy will

Licence

n control vision of pollution, clean up nd/wave ffectively

mergency

d

ensuring

esponse e tailored pabilities

will be

rdinator) mergency ss of the

PPE and

pecific of

on

Page 35: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

E

Environmen

In6.6

6.6.1

The foll

For incion the Respon

6.6.2

tal Manage

Delegate sContain theThe respoinvolvemenDirect emeon actions Dispose ofmaterial cofacility. Carry out inhas been uDetails of thTraining aninvestigatio

ncident Spe

Fuel/oil spi

owing proc

If a spillagedeployed. All works inThe flow ofThe area sDepending initiated. If possible Any matermanagemeA report wi

idents that site, the

nsible Perso

Chemical re

Work will bThe chemipotential imThe flow ofThe spill wthe approp

ment Plan-

pecific taske spillage if onsible persnt rgency crewtaken up tof any clothiontaminated

nvestigationundertaken, he incident nd changes on to ensure

ecific Resp

lls into the P

edures are

e occurs in

n the area wf fuel/oil willurrounding on the leve

in a tidal enials used i

ent facility oll be sent to

occur outsiincident re

on, or their d

elease to w

e stopped ical will be

mpacts. f chemicals ill be contairiate organi

HDD Marin

s to site perit is safe to son will in

ws to the sco their arriva

ng or clead by fuel, o

n once the ito determinwill be recoto working

e it does no

ponses

Pentland Fi

proposed:

nto the wate

will cease imbe stemmethe inciden

el of spill (3

nvironment, n the spill nce they ar

o regulator i

de normal wesponse pldelegate.

water

mmediatelyidentified a

will be stemined, wheresations will

ne Works

rsonnel invo do so, usin

nform the

cene of the al, if applican up equipoil or chem

ncident hasne how andorded and re methods wt happen ag

rth

er environm

mmediately.ed or stoppent will be eva

tier system

absorbent clean-up w

re no longern all instanc

working holan identifie

y. and the CO

mmed. e possible, a be called im

RHK-1A-4EnvironmWorks

olved in incng appropriaMRCC org

incident, anble.

pment e.g. micals to a

s been effec why the ineported to r

will be implegain.

ment, the sa

ed at the soacuated of a

m) the appro

booms will will be dispr required. ces.

urs, when ted above

OSHH sheet

and dependmmediately

Pag

40-HSE-002mentalManag

ident respoate spill kitsganisation

nd brief the

used spill licensed w

ctively contacident occuregulators. emented in

afety boat w

ource, wherall boats.

opriate level

be used to posed of to

there is worwill be im

t and inven

ding on the y.

ge 35 of 54

2-D-gementPlan

onse. s or equipm

and reque

emergency

kits and abwaste mana

ained and curred.

light of the

will be imm

re possible.

of respons

soak up fueo a license

rk being camplemented

ntory referre

level of the

nConstructi

ent. est their

y crews

bsorbent agement

clean-up

incident

mediately

se will be

el. d waste

rried out by the

ed to for

e release

on

Page 36: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

E

Environmen

For incion the Respon

In6.7

Details be recoany thir

6.7.1

In the ecauses mitigatiooccur. MCA an

The invinvestigbreach forces interviewsupervi

All site assessm

Trainingemerge

Preventlatest Ssubject immedi

This invhappenof what

7 IN

K7.1

The pot

tal Manage

All contamdisposed oA report wi

idents that site, the

nsible Perso

ncident Rec

of the incidorded. In thrd parties af

Audits and

event of anand respo

on measureFindings of

nd the Heal

vestigation gation will p

of control moutside of ws will be sors.

control mements, daily

g in the usency proced

tative and rSEPA pollut

to reviewate effect in

vestigation n again. Fu to do and w

NVASIVE N

Key sensitiv

tential for th

ment Plan-

minated matf to a licensll be sent to

occur outsiincident re

on, or their d

cords

dent and thhe aftermathffected by th

Investigatio

n incident, aonsible partes which caf incident inth and Safe

will identifprimarily idemeasures, the contracheld with r

easures wiy plant insp

se of spill kdures. Resp

reactive contion preven

w, with anynto the plan

will be userther traininwhat their ro

NON-NAT

vities and a

he introduct

HDD Marin

terial shoused waste mo MCA and

de normal wesponse pldelegate.

e measuresh of any inche incident

on

a full investies, as welan be imple

nvestigationety Executiv

fy why thentify how thpoor managctor’s contrrelevant pla

ll be reviewection shee

kits will be ponse and c

ntrol measuntion guideliy additional under cons

ed to informng of all stafoles are res

IVE SPEC

associated

tion of non-

ne Works

ld be remomanagemenMS in all in

working holan identifie

s that havecident, Mariwill also be

tigation willl as assistemented ons will be mave as neces

e incident he spillage gement, inarol. The sant operator

wed, includets, along w

reviewed, acontainmen

ures will be ines. This l measuressultation wit

m changes tff will be undsponsibilitie

CIES MANA

d legislation

native mari

RHK-1A-4EnvironmWorks

oved off sint facility. stances.

urs, when ted above

e been takene Scotland

e included in

l be conduting in the n site to enade availabssary.

occurred aoccurred, a

adequate coource of thrs, Site sup

ding monitowith adequac

along with nt measures

thoroughly Emergenc

s deemed th the regul

to site pracdertaken tos are in rela

AGEMENT

n

ne species

Pag

40-HSE-002mentalManag

ite as soon

there is worwill be im

n to deal wd and MCAn discussion

cted by Meimplementansure that nble to MS, S

and how itand ascertaontrol meashe spill willpervisors an

oring of fuecy of spill ki

site operats will also be

examined y Responsenecessary ators.

tice to ensuensure tha

ation to poll

T

is depende

ge 36 of 54

2-D-gementPlan

n as possi

rk being camplemented

with the inciA will be briens.

eyGen, deteation of anyno further i

SEPA, SNH

t happenedain whether sures, or a l be identifnd sub con

el storage, its, and oil b

tive’s knowe reviewed

and compae Plan will

incorporat

ure that it dat they are aution preve

ent upon the

nConstructi

ible and

rried out by the

dent will efed and

ermining y further ncidents and the

d. The it was a result of ied, and

ntractor’s

COSSH booms.

ledge of .

ared with also be

ted with

does not all aware ention.

e history

on

Page 37: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

E

Environmen

and mo

There athe proj

The impthe spethe natuthe potspeciesConcerincreas

The IntSedimereducinConvencent of States Therefoencoura

The CoManage

The postructurnon-natarrival otransfer

M7.2

Section 3

Marine L

Environm

Commitm

ES

ML Cond

tal Manage

ovement of t

are two maiject, by the

Introduction

Installation

plications oecies and thural ecosystential to ins occurring rns arise aroe the risk o

ernational Cents was adg or elimina

ntion will enworld merhave sign

ore, althougaged to com

onvention ement Plan

otential for res is also stive speciesof the invasr to a numb

Mitigation a

36 (S36),

Licence (ML),

mental Statem

ment

dition 3.1.9

ment Plan-

the vessels

n potential Constructio

n of ballast

of structure

of an introduhe ability of stem dynamncrease wit

in ports iound the inf species in

Conventiondopted at thating the rister into forc

rchant shipped up wh

gh complianmply.

will requir.

the introdsignificant as from the sive carpeter of locatio

and manage

or

ment (ES)

HDD Marin

and equipm

routes for inon Works:

water and /

es, fouled w

uction of anthe specie

mics. Withinth increasinn the UK

ncrease in vnvasions.

for the Cohe Internatiosk of transpce 12 monthping tonnagich represence is not

e all ships

uction of nand there aUK and in

sea squirtons by vess

ement com

Condition, o

All vessels i

guidance (inc

on non-nativ

The licensee

species to a

bio-fouling m

ne Works

ment used.

ntroduction

/ or sedimen

with non-nat

n invasive ss to out-con the UK, kng volumesbut few re

volume of s

ontrol and Monal Maritimportation of hs after ratige. The curents 30.25legally req

s to imple

non-native are a numbnternationalt Didemnumsel moveme

mmitments

or commitme

involved in al

cluding the IM

ve marine spec

e must ensure

and from the s

management p

RHK-1A-4EnvironmWorks

of non-nat

nt, containin

tive species

pecies can mpete the nknown effecs of traffic. ecords of sshipping pre

Managemenme Organisf invasive spfication by 3rrent status% of worluired at thi

ement a B

species aer of examlly. A well

m vexillum ent,

nt

l stages of th

MO guidelines)

cies

e that the ris

site is kept to

practices are im

Pag

40-HSE-002mentalManag

ive species

ng non-nativ

s.

be catastronative speccts are so f

There arspecies reaedicted glob

nt of Ship’ssation in 20pecies arou30 States, r

s of the Cod tonnage is time UK

Ballast Wa

t epibiota ples of this reported Uin the UK a

he project will

) regarding ba

k of transferri

a minimum b

mplemented d

ge 37 of 54

2-D-gementPlan

s to the area

ve species;

ophic depencies and to far limited bre already aching pesbally which

s Ballast Wa004, with thund the worrepresentin

onvention is(as of 28vessels ar

ater and S

on the ous form of traUK exampland its sub

l adhere to a

allast water an

ring invasive n

by ensuring a

during the wor

nConstructi

a around

and

nding on interrupt but have invasive t levels. will also

ater and e aim of rld. The g 35 per

s that 40 8/07/14). re being

Sediment

utside of ansfer of e is the

bsequent

all relevant

nd transfer

non-native

ppropriate

ks.

on

Page 38: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

E

Environmen

N7.3

A risk anative s

A shortarrival o

Key info

The Noapprove

8 REAR

K8.1

PotentiaCulturaidentifiepotentiadiscove

Geophyarea wiStromamateria

Howevearchaeocultural that hav

tal Manage

Non-native

assessmentspecies.

t non-nativeon site and

ormation de

Source poequipment

Nature and

Amount of

Amount of

Conditions native spec

Details of tr

If ballast wof water ex

on-native med by the E

EPORTINGRCHAEOL

Key sensitiv

al impacts tl Heritage).

ed cultural hal, howeverered.

ysical surveith the exce. This lac

al.

er, the ideological inte material isve formed w

ment Plan-

Table

manageme

t approach

e managemeach phase

etailed in ea

rts for ves/ materials;

d purpose of

ballast wate

ballast to d

at source pcies);

reatment pu

water exchanxchanged.

managemenCoW, befor

G PROTOCLOGY

vities and a

to marine c Mitigationheritage har, for dama

ey data shoeption of sack of sedim

ntification oerest, withins possible. within the m

HDD Marin

e 7 Non-na

ent measur

will be take

ment report we of marine

ach report w

sel and ba;

f materials t

er from eac

ischarge;

ports (i.e. an

ut in place f

nge underta

nt report wre submissi

COL FOR T

associated

ultural heritn measuresave resultedage to mari

ows bedrocand waves

ment sugges

of anomalien the geopSuch mate

many gullies

ne Works

ative specie

res

en to mana

will be provequipment

will be:

allast water

transferred

ch port;

ny algal blo

for ballast w

aken, detai

will be comon to the lic

THE DISC

d legislation

tage were as to avoid od in a minone cultural

ck exposed and gravel sts low pot

es of potenphysical surerial is moss and depre

RHK-1A-4EnvironmWorks

es commitm

gement of t

vided to Ma/ materials

r uptake /

from the po

oms, dredg

water of mat

ls of where

pleted by censing aut

COVERY O

n

assessed inr reduce po

or or negligiheritage m

on the searidges to t

tential for t

ntial anthrorvey data int likely to b

essions that

Pag

40-HSE-002mentalManag

ments

the risk of i

arine Scotlainstallation

or source

ort;

ging work on

terials / equ

, how unde

the Marinehority.

OF MARINE

n Section 16otentially sigble residua

material that

abed over he SE and the surviva

opogenic orndicates th

be found witt are preval

ge 38 of 54

2-D-gementPlan

introduction

and for eacn by MeyGe

of port for

ngoing, kno

uipment;

ertaken and

e Co-ordina

E

6 of the ESgnificant imal impact. t has not y

most of the W of the Il of in situ

rigin, and at the presthin sedimelent across

nConstructi

n of non-

h vessel n.

r marine

own non-

d volume

ator and

(Marine mpacts to

There is yet been

e survey Island of

cultural

possible sence of ent traps the site.

on

Page 39: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

E

Environmen

If preseresultin

Historicimportalimit) uProtectestrategyconservPlanninbe hand

In Aprilpromotipromoti

M8.2

Section 3

Marine L

Environm

Stateme

Commitm

ES

tal Manage

ent, such mg in damag

c Scotland ant archaeounder the Med Areas (y outlined ve and enhng Policy 20dled.

2012, Hision of marining Scotland

Mitigation a

36 (S36),

Licence (ML),

mental

nt (ES)

ment

ment Plan-

material mae to, or des

carries the ological andMarine (Sc(MPA) for in National

hance Scot010 sets ou

toric Scotlane heritage d’s outstand

and manage

or

Condi

The fo

moder

HDD Marin

ay be subjestruction of,

responsibid built heritacotland) Accultural pul Planning tland’s distit policy on

and publish(2012-2015

ding marine

ement com

ition, or comm

ollowing mitig

rate and major

Avoidance

ROV surve

(ROV) in a

they can be

Detailed w

heritage, p

to impact.

specialists

conserve r

archaeolog

Intrusive a

for all sites

will be in

geophysica

of identified

Full archae

necessary

conducted

made for

recovered.

the results

ne Works

ect to direcmaterial of

ilities of Scage mattersct 2010, courposes. T

Frameworknctive natuhow archae

hed a strate5) setting o

e heritage u

mmitments

mitment

gations are pr

r impact signif

.

ey of the geo

an appropriate

e positively id

wreck survey a

plans/elevation

Wrecks sh

in marine arc

representative

gical potential

archaeological

s and wrecks w

ntrusive works

al survey resu

d remains.

eological exca

as a result of

by specialis

the examina

Provision s

together in a

RHK-1A-4EnvironmWorks

ct impact df archaeolog

cottish Miniss (to the 1omplete w

This role suk for Scotlaural and cueological re

egy for the out prioritiesunder the Ma

roposed if pra

ficance within

ophysical anom

e manner by s

entified.

and salvage.

ns will be mad

hould be reco

chaeology. A

e examples of

the strategies

assessment.

with high arch

s. Intrusive

ults and asses

avation. This

f evidence ga

ts in marine

tion and pos

hould be mad

report of publ

Pag

40-HSE-002mentalManag

uring consgical interes

sters with r2 nautical mith powers upports theand 2 (200

ultural heritaemains and

protection,s for protectarine (Scotl

acticable for

100m of the d

malies by Rem

specialists in

If the ROV

e with a full ph

orded in an a

Attempts will b

f the fabric. I

s below may b

This respon

haeological po

assessment

s the nature, e

s level of mitig

thered by othe

archaeology.

ssible conserv

de for post-ex

ication standa

ge 39 of 54

2-D-gementPlan

struction, post.

regard to nmile (nm) t to create

e long term09), which age, while discoveries

, managemting, managland) Act 20

archaeologica

development.

mote Operate

marine archa

survey revea

hotographic re

appropriate m

be made to re

If the feature

be implemente

nse will be imp

otential and w

ts would gro

extent and pre

gation may be

er levels and

. Provision s

vation of any

xcavation wor

ard.

nConstructi

otentially

ationally territorial Marine

m spatial aims to Scottish s should

ment and ging and 010.

al sites of

ed Vehicle

aeology so

als cultural

ecord prior

manner by

trieve and

is of high

ed.

plemented

here there

ound truth

eservation

e deemed

should be

should be

y artefacts

rk bringing

on

Page 40: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

E

Environmen

Section 3

Marine L

Environm

Stateme

Commitm

ES

ES

ES

ES

ES

S36 Cond

R8.3

In orderthe accmonitor

The O

tal Manage

36 (S36),

Licence (ML),

mental

nt (ES)

ment

dition 16

Reporting p

r to mitigatecidental discring.

Offshore R

ment Plan-

or

Condi

Furthe

detaile

consu

If it is

undert

made

approp

retriev

archae

Full ar

as a

specia

and po

for po

standa

Furthe

detaile

consu

Avoid

propos

The C

Repor

mainte

in con

in full b

Table

protocol

e this potencovery of m

Renewables

HDD Marin

ition, or comm

er documenta

ed examinatio

lted.

No recomm

to them be

A reporting

marine cult

Avoidance

proposed t

s not practica

taken. If the

with a full pho

priate manner

ve and conserv

eological pote

rchaeological

result of evid

alists in marin

ossible conse

ost-excavation

ard.

er documenta

ed examinatio

lted.

placing the tu

sed turbine de

Company mus

rting Protocol

enance and m

sultation with

by the Compa

e 8 Marine A

ntial impact,marine cultu

Protocol

ne Works

mitment

ary research

on of unusua

mendations ar

eing interpreted

g protocol w

tural material

. Should cu

that the site be

able to avoid

ROV survey

otographic rec

r by specialists

ve representa

ntial the strate

excavation. T

dence gathere

e archaeology

ervation of any

work bringin

ary research

on of unusua

urbines on th

eployment are

st, prior to the

for the disco

monitoring, in w

Historic Scotl

any.

Archaeolog

a reportingural materia

for Archa

RHK-1A-4EnvironmWorks

and archiving

al archival so

re made for an

d as natural fe

will be instigat

during develo

ultural materia

e avoided.

d the materia

reveals cultu

cord prior to im

s in marine ar

ative examples

egies below m

This level of m

ed by other l

y. Provision

y artefacts re

ng the results

and archiving

al archival so

e sandy subs

ea.

e Commence

overy of mari

writing, to the

and. The Rep

gy commit

g protocol wal during de

aeological

Pag

40-HSE-002mentalManag

g. This resp

ources that w

nomalies of low

eatures.

ted for the a

pment, mainte

al be acciden

al a detailed

ral heritage, p

mpact. Wreck

rchaeology. A

s of the fabric.

may be implem

mitigation may

evels and sh

should be ma

covered. Pro

s together in

g. This resp

ources that w

strate on the

ment of the D

ne archaeolog

Scottish Mini

porting Protoco

ments

will be impleevelopment

Discoverie

ge 40 of 54

2-D-gementPlan

ponse includ

would not rou

w potential. T

accidental dis

enance and m

ntally discove

wreck surve

plans/elevatio

ks will be reco

Attempts will b

If the feature

mented.

y be deemed

hould be cond

ade for the ex

ovision should

a report of p

ponse includ

would not rou

northeast cor

Development,

gy during co

isters for their

ol must be imp

emented to t, maintena

es (ORPA

nConstructi

es further

utinely be

This is due

scovery of

monitoring.

ered, it is

ey will be

ons will be

rded in an

e made to

e is of high

necessary

ducted by

xamination

d be made

publication

es further

utinely be

rner of the

, submit a

nstruction,

r approval,

plemented

address nce and

D) was

on

Page 41: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

E

Environmen

implemconditiolicensinThe Carchaeoprovide

The Provesselscomprisindicativmainten

MeyGeArchaeo

In accoChampnominareport Implemactions Temporinvestig

R8.4

The EC

The No

The Site

The Site

tal Manage

ented by Tons that relng authoritierown Estaological con

e awareness

otocol addres, in the intse archaeove of a ponance and m

n will impleological Dis

ordance wition (Marine

ated by the discoveriesentation Sewhich may

rary Exclusgate a site o

Reporting a

CoW is:

Ed Rollings

ominated Co

Co-ordinatiappropriate

Reporting dto other pa

CommunicaService;

Informing oposition of

Ensuring th

e Champion

Stan Groun

e Champion

ment Plan-

The Crown ate to repo

es (The Croate and suntractor apps training in

esses discoer-tidal zon

ological objeossible objemonitoring a

ement and scoveries: O

th ORPAD,e Co-ordinadeveloper

s to the ervice, the

y, for exampsion Zone (Tor anomaly.

and Respon

s (Section 4

ontact will b

ng reportse ‘first aid fo

discoveries rties (e.g. th

ating appro

other teamsthe discove

hat measure

n is:

ndwater (Ma

ns will be re

HDD Marin

Estate in 2orting protoown Estate,upported bpointed by T

the workpla

overies of ane or on lanects, sites ect or site)activities.

adhere to Offshore Re

discoverieator) on theto co-ordinaImplementaECoW wi

ple, include TEZ), the in

nsibilities

4 for contact

be responsib

s of discoor finds’ is c

to the Imphe Receiver

opriate mea

s engaged ery so that fu

es are imple

arine Coord

esponsible f

ne Works

2010 (revisocols includ, 2014). Adby an ImpThe Crown ace.

archaeologicnd (The Cror anomal) encounte

the terms oenewables P

es made bye vessel orate implemation Servill ensure tconservationstitution of

t details);

ble for:

overies fromcarried out a

plementationr of Wreck)

sures to sit

in potentiafurther impa

emented as

dinator Sect

for:

RHK-1A-4EnvironmWorks

sed 2014) aed on consdministratioplementatioEstate, and

cal interest rown Estateies (visual red during

of the ORPProjects (Th

y project str site who wentation of ice. On the implemon advice fof a watchin

m site chand that initi

n Service aas required

te staff as a

lly damaginacts may be

s appropriat

tion 4 for co

Pag

40-HSE-002mentalManag

and is intensents admi

on of the pron Service,

d an Awaren

made on the, 2014: 6)or digital sthe cours

PAD as set he Crown Es

taff will be will then rethe Protocreceipt of entation ofor finds, theg brief or m

ampions aial data is re

at the earlied;

advised by t

ng activities avoided; a

e.

ontact detail

ge 41 of 54

2-D-gementPlan

nded to satnistered by

rotocol is fu, provided ness Progra

he seabed, . Discoversignatures

se of devel

out in Prostate, 2014

reported toeport to thecol. The ECf advice frf all recome establishmmeasures to

and ensuriecorded;

est opportun

the Implem

s in the areand

ls)

nConstructi

tisfy any y marine nded by

by an amme to

onboard ries may that are lopment,

tocol for ).

o a Site e ECoW, CoW will rom the

mmended ment of a o further

ing that

nity, and

mentation

ea of the

on

Page 42: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

Environmental Management Plan- HDD Marine Works Page 42 of 54

RHK-1A-40-HSE-002-D-EnvironmentalManagementPlanConstructionWorks

Implementing a TEZ where the location of the discovery is known;

Ensuring observation of the TEZ by all staff and contractors;

Compiling Preliminary Record sheets for discoveries;

Reporting discoveries to the Nominated Contact as soon as possible and

Arranging for any archaeological finds to be carefully contained and protected.

All project staff will be responsible for:

Safeguarding finds:

Handling with care;

Leaving marine growth, rust, sediment or concretion intact; and

Undertaking appropriate first aid measures, such as immersing waterlogged finds in seawater in a clean, covered container.

Undertaking initial recording:

Recording the positon of the discovery;

Photographing finds in the condition in which they were recovered; and

Labelling finds with a unique ID number as advised by the Implementation Service.

Reporting discoveries immediately to the Site Champion (via their supervisor if appropriate).

The current provider of the Implementation Service is:

Wessex Archaeology Ltd:

Portway House. Old Sarum Park, Salisbury, Wiltshire, SP4 6EB.

[email protected]

01722 326 867

MeyGen retains ultimate responsibility for the implementation of ORPAD and will ensure that all project staff, the Site Champion and the ECoW are aware of their roles and responsibilities under the terms of the Protocol. Project staff will be made available briefed on the protocol in the site induction and tool-box talks.

On reporting features of high archaeological importance, MeyGen will agree mitigation strategies with Marine Scotland.

9 WASTE MANAGEMENT

James Fisher Marine Services Waste Management Plan can be found in Appendix C.

Page 43: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

Environmental Management Plan- HDD Marine Works Page 43 of 54

RHK-1A-40-HSE-002-D-EnvironmentalManagementPlanConstructionWorks

10 LINKAGES WITH OTHER CONDITIONS

The EMP is part of suite of consent related documents. Table 9 lists the documents and related conditions are relevant to the EMP. The Section 36 and Marine Licence can be found in Appendix D.

Con Condition summary Document Responsible for Notification

S36 9 - Construction Method Statement

S36 10 ECoW N/A

S36 11 - Environmental Management Plan

S36 12 - Project Environmental Monitoring Programme

S36 13 - Advisory Group

S36 14 - Vessel Management Plan

S36 15 - Operations and Maintenance Plan

S36 16 Reporting Protocol for the Discovery of Marine Archaeology

Environmental Management Plan

S36 17 - Navigation Safety Plan

ML 3.1.3 Notification of Vessels Construction Method Statement / Vessel Management Plan

ECoW

ML 3.2.1.3

Marine Pollution Contingency Plan

Environmental Management Plan

ML 3.2.1.4

Notification of Commencement Construction Method Statement ECoW

ML 3.2.1.5

ECoW N/A

ML

3.2.1.6

Promulgation of navigation warnings

Navigation Safety Plan

ML 3.2.1.7

Marine Mammal Observer Environmental Management Plan

ML 3.2.1.8

Cable Installation Plan Construction Method Statement

Page 44: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

Environmental Management Plan- HDD Marine Works Page 44 of 54

RHK-1A-40-HSE-002-D-EnvironmentalManagementPlanConstructionWorks

ML 3.2.1.9

Cable Protection Plan Construction Method Statement

ML 3.2.2.1

Transport Audit Sheets Construction Method Statement ECoW

ML 3.2.2.2

Notification of Deposits Construction Method Statement ECoW

Table 9 Linkages with other conditions

11 EMP REVIEW AND CONSULTATION

Under Condition 11 of the Section 36 the EMP will be reviewed and commented on by the licensing authority, SNH, and other such advisors that may be required at the discretion of the Scottish Ministers. The EMP must be approved by the licensing authority.

The EMP will be submitted to the licensing authority for distribution to the stakeholders and for approval.

Any changes the EMP deemed necessary (working methods or procedures) must be reviewed and approved by the ECoW, before it is submitted for approval to the licensing authority (Figure 6).

Version control will be conducted by the revision review block on the front page of the EMP.

Figure 6 EMP Change Process

Page 45: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

Environmental Management Plan- HDD Marine Works Page 45 of 54

RHK-1A-40-HSE-002-D-EnvironmentalManagementPlanConstructionWorks

12 REFERENCES

Bexton, S., Thompson, D., Brownlow, A., Barley, J., Milne, R. and Bidewell, C. (2012). Unusual mortality of pinnipeds in the United Kingdom associated with helical (corkscrew) injuries of anthropogenic origin. Aquatic Mammals 38:229-240.

Brownlow, A. (2013). Spiralling trauma? Describing a novel form of pinniped mortality in the United Kingdom. Presentation at the 27th Conference of the European Cetacean Society. Setubal Portugal April 2013.

Historic Scotland. 2012. Marine Heritage Strategy 2012-15

iX Survey (2009). Report of Survey for Atlantis Resources (METOC) for Site Survey JN3475. 16 October 2009. JN3475_Report/16/10/09_Rev_1.

JNCC. 2015. Interim advice on risk of seal corkscrew injuries. Staff briefing note.

Lucke, K., Siebert, U., Lepper, P. A. & Blanchet, M-A (2009). Temporary shift in masked hearing thresholds in a harbour porpoise (Phocoena phocoena) after exposure to seismic airgun stimuli. Journal of the Acoustical Society of America. 125(6), 4060-4070.

National Planning Framework for Scotland 2 (2009)

Onoufriou, J. & Thompson, D. 2014. Testing the hypothetical link between shipping and unexplained seal deaths: Final report. Marine Scotland Marine Mammal Scientific Support Research Programme MMSS/001/11, Task USD2.

Scottish Planning Policy 2010

Statutory Nature Conservation Agencies (2012). Guidance for staff advising on the potential risk of seal corkscrew injuries April 2012.

The Crown Estate (2014). Protocol for Archaeological Discoveries: Offshore Renewables Projects. Published by Wessex Archaeology, Salisbury, on behalf of The Crown Estate.

The Marine (Scotland) Act 2010

Thompson et al., 2015. Preliminary report on predation by adult grey seals on grey seal pups as a possible explanation for corkscrew injury patterns seen in the unexplained seal deaths. Sea mammal research unit report to the Scottish Government 12/01/15 0.1. Marine mammal scientific support research programme MMS/001/11. Project report USD 1&6 supplement.

Thompson, D., Bexton, S., Brownlow, A., Wood, D., Patterson, T., Pye, K., Lonergan, M and Milne, R. (2010). Report on recent seal mortalities in UK waters caused by extensive lacerations. Sea Mammal Research Unit report. Available online - http://www.smru.st-and.ac.uk/documents/366.pdf [Accessed 05/08/2013]

US NMFS (1995). Small takes of marine mammals incidental to specified activities; offshore seismic activities in southern California. Federal Register. 60(200), 53753-53760.

Van Neer et al., 2015. Grey seal (Halichoerus grypus) predation on harbour seals (Phoca vitulina) on the island of Helgoland, Germany. Journal of Sea Research, 97; 1-4.

Page 46: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

Environmental Management Plan- HDD Marine Works Page 46 of 54

RHK-1A-40-HSE-002-D-EnvironmentalManagementPlanConstructionWorks

13 LIST OF ABBREVIATIONS

Abbreviation

CDM Construction (Design and Management) Regulations 2007

CLV Cable Laying Vessel

CMS Construction Method Statement

COSHH Control of Substance Hazardous to Health

DP Dynamic Positioning

ECoW Ecological Clerk of Works

EIA Environmental Impact Assessment

EMP Environmental Management Plan

ERCoP Emergency Response Co-operation Plan

ERP Emergency Response Procedures

EPS Europena Protected Species

ES Environmental Statement

HDD Horizontal Directional Drilling

HSE Health, Safety and Environment

IOSH Institute of Occupational Safety and Health

JNCC Joint Nature Conservation Committee

NSP Navigation Safety Plan

MCA Maritime and Coastguard Agency

MHWS Mean High Water Springs

ML Marine Licence under the Marine (Sotland) Act 2010

MLWS Mean Low Water Springs

MMO Marine Mammal Observer

PC Principal Contractor – James Fisher Marine Services

PEMP Project Environmental Monitoring Programme

Page 47: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

Environmental Management Plan- HDD Marine Works Page 47 of 54

RHK-1A-40-HSE-002-D-EnvironmentalManagementPlanConstructionWorks

RAMS Risk Assessments and Method Statements

SAC Special Area of Conservation

SCIMS Seal Corkscrew Injury Monitoring Scheme

SEIS Supplementary Environmental Information Statement

SEPA Scottish Environment Protection Agency

SHESQ Safety, Health, Environment, Security and Quality

SNCA Statutory Nature Conservation Agency

SNH Scottish Natural Heritage

SPA Special Protected Area

S36 Section 36 of the Electricity Act 1989

TSC Turbine Submarine Cable

TSS Turbine Support Structure

TTG Tidal Turbine Generator

VMP Vessel Management Plan

Page 48: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

Environmental Management Plan- HDD Marine Works Page 48 of 54

RHK-1A-40-HSE-002-D-EnvironmentalManagementPlanConstructionWorks

APPENDIX A: JAMES FISHER MARINE SERVICES ISO14001

Page 49: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

Environmental Management Plan- HDD Marine Works Page 49 of 54

RHK-1A-40-HSE-002-D-EnvironmentalManagementPlanConstructionWorks

Page 50: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

Environmental Management Plan- HDD Marine Works Page 50 of 54

RHK-1A-40-HSE-002-D-EnvironmentalManagementPlanConstructionWorks

APPENDIX B: MARINE MAMMAL REPORTING LOG

Page 51: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

Environmental Management Plan- HDD Marine Works Page 51 of 54

RHK-1A-40-HSE-002-D-EnvironmentalManagementPlanConstructionWorks

Page 52: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

Environmental Management Plan- HDD Marine Works Page 52 of 54

RHK-1A-40-HSE-002-D-EnvironmentalManagementPlanConstructionWorks

APPENDIX C: WASTE MANAGEMENT PLAN (FSH-1A-40-HSE-004-D-WASTEMANAGEMENTPLAN-MEYGEN.PDF)

Page 53: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

Environmental Management Plan- HDD Marine Works Page 53 of 54

RHK-1A-40-HSE-002-D-EnvironmentalManagementPlanConstructionWorks

APPENDIX D: SECTION 36 AND MARINE LICENCE

Page 54: MeyGen Tidal Energy Project Phase 1 Environmental ...marine.gov.scot/sites/default/files/environmental... · Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue

Environmental Management Plan- HDD Marine Works Page 54 of 54

RHK-1A-40-HSE-002-D-EnvironmentalManagementPlanConstructionWorks