metro line traffic delays
DESCRIPTION
A City of Edmonton graphic outlining predicted traffic delays associated with the opening of the new Metro LRT Line to NAIT.TRANSCRIPT
KINGSWAY
105 STREET
106 STREET
104 STREET
Attachment 1: Duration of Traffic Impacts
105 AVENUE
106 AVENUE
107 AVENUE
111 AVENUE
PRINCESS ELIZABETH AVENUE
4 MINUTES (Traffic Signals Red)
4 MINUTES (Traffic Signals Red)
2 MINUTES (Traffic Signals Red)
2 MINUTES (Traffic Signals Red)
2 MINUTES (Traffic Signals Red)
12 to 16 minute wait time at peak hours. 3 to 4 signal cycles.
12 to 16 minute wait time at peak hours. 3 to 4 signal cycles.
2 to 4 minute wait time at peak hours. 1 to 2 signal cycles.
2 to 4 minute wait time at peak hours. 1 to 2 signal cycles.
2 to 4 minute wait time at peak hours. 1 to 2 signal cycles.