  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    1/53

    Metro Gold Line Foothill

    Extension

    Briefing

    Feb. 20, 2014

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    2/53

    Construction Authority

    Construction Authority was created by state legislation in 1998

    to plan, design and build the Metro Gold Line from Union

    Station east to Montclair (updated in 2011)

    Enabling legislation provides all necessary powers to complete

    the project

    Construction Authority is overseen by board of directors Board of directors receives feedback from all corridor cities

    through JPA and TAC

    Construction Authority works closely with Metro

    - Roles and responsibilities formalized in Master

    Cooperative Agreement- Construction Authority builds the project per Metros design

    and safety specifications

    - Both agencies play a role in project safety, planning and

    education

    2

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    3/53

    Metros Long Range

    Transportation Plan,

    projects partially

    funded by Measure R

    Construction Authority Responsibility

    Montclair

    3

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    4/53

    Planning/Construction Phases

    Pasadena to Azusa ExtensionUnderway/Funded by Measure R

    11.5 Miles, 5 Cities, 6 Stations/Construction Completion Anticipated - September 2015

    Pasadena-Azusa Azusa-Montclair Airport Ext.

    Azusa to Montclair ExtensionEnvironmentally Cleared

    12.3 Miles, 6 Stations/Estimated Funding Needed is $950 Million

    Ontario Airport Extension - Proposed

    Approximately 8 Miles/Unfunded

    Los Angeles-Pasadena

    Los Angeles to Pasadena Extension - Opened 2003

    13.7 Miles, 3 Cities, 13 Stations

    4

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    5/53

    Doug TessitorChair

    Marisol SalgueroAlternate, City of Los Angeles

    John FasanaMember

    Paul LeonMember

    Lara Larramendi

    Member, Non-Voting

    Dan Evans

    Member, Non-Voting

    Bill Bogaard

    Member, Non-Voting

    Sam Pedroza1stVice Chair

    Board of Directors

    Alan Wapner

    Member, Non-Voting

    5

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    6/53

    Joint Powers Authority and TAC

    Governance Structure includes Representation by All Corridor Cities

    - Elected OfficialsJoint Powers Authority

    - City StaffTechnical Advisory Committee

    6

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    7/53

    Community Consensus

    7

    http://negretemcleod.house.gov/file/219
  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    8/53

    Connections

    8

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    9/53

    Regional Destinations

    Santa Anita Racetrack

    LA County Fairplex

    City of Hope National Medical Center

    LA/Ontario International Airport

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    10/53

    Higher Education

    Tens of thousands of students and faculty/staff within a

    half mile radius of station areas

    10

    http://www.sluedu.us/http://www.cst.edu/about_claremont/index.phphttp://mtsierra.edu/index.php
  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    11/53

    Historic Downtowns and Hospitals

    1111 Historic Downtowns and Dozens of Hospitals/Medical Centers

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    12/53

    Pasadena to AzusaProject Update

    12

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    13/53

    Fully funded by Measure R

    Construction completion anticipated - September 2015

    Three design-build contracts:

    DB1: I-210 Bridge Contract: Skanska USA - $18.6 million - Completed

    DB2: Alignment Contract: Kiewit Parsons Joint Venture - $486 million

    DB3: Parking Facilities Contract: Webcor Builders - $48.7 million

    Pasadena-Azusa

    Pasadena to Azusa: On Time; On Budget

    13

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    14/53

    Pasadena to Azusa Major Milestones

    DB1: Gold Line Bridge Complete December 2012

    DB2: Alignment ContractOn Schedule/On Budget

    - 50% Complete

    Freight track realignment complete east of San Gabriel Ave 12/14 at-grade street crossings complete or underway

    22/24 bridge structures complete or underway Drainage65% complete Retaining walls65% complete Soundwalls35% complete

    OCS foundations55% complete Light rail track installation - began Dec 2013 DesignAll Packages are AFC

    14

    DB3/Parking: Construction underway on Arcadia, Monrovia

    and Azusa Structures

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    15/53

    Gold Line Bridge

    100% Safety Record, >95,000 work hours performed

    Majority Domestic Content:

    More than 90% of the material used to build the

    bridge is from domestic, and local sources

    15

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    16/53

    Completed Dec. 15 ,2012

    16

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    17/53

    Design Concept: Artist, Andrew Leicester

    San GabrielValleys Newest Landmark

    San GabrielValleys Newest Landmark2013 Awards:

    Best Project in Southern California, Highways/Bridges - Engineering News-Record

    Outstanding Public Civil Engineering ProjectAmer. Society of Civil Engineers

    Engineering Achievement AwardAmer. Council of Engineering Companies

    Project Achievement AwardConstruction Management Association of Amer.

    Distinguished Project AwardWestern Council of Construction Consumers17

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    18/53

    DuarteMonroviaArcadia

    Azusa-CitrusAzusa-AlamedaIrwindale

    Station Construction Status

    Under Construction Under Construction Under Construction

    Station work to begin soon in Irwindale

    Under Construction Under Construction

    18

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    19/53

    Highland

    1st &SantaClara

    BuenaVista

    Pasadena

    Alameda

    Virginia

    Mountain

    Dalton

    Magnolia

    Myrtle

    California

    SanGabriel

    Azusa

    Mayflower

    Yet to Start

    In Progress Completed

    14 At-Grade (Street-level) Crossings

    Arcadia MonroviaDuarte

    Azusa

    Irwindale

    19

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    20/53

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    21/53

    Structures Highlights

    21

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    22/53

    Shared CorridorFuture Condition

    Shared use corridor east of San Gabriel River (light rail and freight

    share right of way, but use separate tracks)

    Must keep freight line operational through construction

    Shared-Use Corridor

    (Light Rail and

    Freight)

    Light RailOnly

    22

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    23/53

    New Freight Track Installation

    Complete from San Gabriel Ave

    through Glendora city limit

    Construction ActivitiesShared Corridor

    23

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    24/53

    Operation Campus

    New 24-acre facilitylocated in Monrovia

    Provide adequate capacity for Gold Line and other regional light

    rail lines84 car capacity

    24

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    25/53

    Pre-Construction Site Conditions

    25

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    26/53

    26

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    27/53

    Construction Activities

    27

    Maintenance of Way Storage

    Structure

    Main Building

    Six Miles of Light Rail Track

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    28/53

    Major Milestones

    Light rail track installationBegan Oct 2013 (M&O)/Dec 2013(Alignment)

    Complete freight track realignmentmid 2014

    Began parking structure constructionDecember 2013

    Complete all at-grade crossingsOctober 2014

    Complete steel frame for Operations Campus main buildingApril 2014; Complete main buildingJanuary 2015

    Operations Campus ready for MetroMarch 2015

    Alignment ready for Metro (testing/pre-revenue service)

    September 2015

    28

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    29/53

    -29-

    Improving Connectivity

    w/Future Stations

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    30/53

    Intermodal Enhancements

    $9 million FTA grant to identify potential opportunities to improve connectivity

    to the future Gold Line stations; $6 million of which is going to implement

    recommendations of Bus/Ped Interface Improvements Study

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    31/53

    Bus Interface Planning

    Began initial analysis - Azusa to Montclair cities

    Future grants - work with cities and service providers to re-route existing

    lines or develop new lines to service the future stations

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    32/53

    Last Mile Analysis

    32

    Began initial analysis of walking & biking connections from future stations to

    area points of interest; future grants will be explored to continue this work &

    make recommendations for enhancements around future stations

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    33/53

    Station Art

    33

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    34/53

    Station Art

    Artist and concept were selected by the

    community, and approved by each city council

    Artwork reflects individuality of city location

    Artist helped select station colors and materials Some stations have artistic betterments

    Artists are now members of design-build team

    bring designs to 100%, fabricate pieces,

    installation oversight

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    35/53

    Arcadia

    Michael DavisArtist

    GLASS TVM CANOPY

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    36/53

    Monrovia

    Cha Rie TangArtist

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    37/53

    Duarte

    Andrea Myklebust & Stanton Sears Artist Team

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    38/53

    Irwindale

    Robin BrailsfordArtist

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    39/53

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    40/53

    Azusa- Citrus

    Lynn GoodpastureArtist

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    41/53

    All Future Stations Have Parking

    * Gold Line parking will be integrated into multi-use structure with City and Foothill Transit

    Separate design-build contract

    Work to be completed late 2015

    Six intermodal parking facilities

    Four parking structures:

    Arcadia300 Spaces

    Monrovia350 Spaces Irwindale350 Spaces

    Azusa-Citrus200 Spaces

    Two surface parking lots:

    Duarte125 Spaces

    Azusa-Alameda200 Spaces*

    DB3: Parking Facilities Contract: Webcor Builders - $48.7 million

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    42/53

    Azusa to Montclair

    42

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    43/53

    Locally Preferred AlternativeMetro Gold Line Foothill ExtensionAzusa to Montclair

    Future Glendora Station

    Future San Dimas Station

    Future laremont Station

    Future Montclair StationFuture Pomona StationFuture La Verne Station

    Approved by Construction Authority Board of Directors

    March 201343

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    44/53

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    45/53

    Activity 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021

    Environmental

    Clearance

    Preliminary

    Design/Advanced

    Conceptual

    EngineeringFinancing &

    Procurement

    Design &

    Construction

    Measure R funding available for ACE only

    Schedule - Azusa to Montclair

    Measure R funding available for preliminary design/advanced conceptual engineering

    (ACE) only; construction funding must be secured between 2015-2016 to meet schedule

    Project currently included in unfunded portion of Long Range Transportation Plan;

    identified as top priority for new funding by Metro board in LRTP

    Measure R mandates Azusa to Montclair must be included in future tax

    45

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    46/53

    Next Steps

    In Early 2014: RFP/Procurement process to hire consultants for advanced

    conceptual engineering/NEPA work

    Contract with station artists for 18-month design process

    Re-engage SDAR Committees

    Mid-2014:

    Approve MOUsbetween each city & the Construction

    Authority

    Begin regular coordination meetings with cities

    First meetings with SDAR Committees

    46

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    47/53

    Funding Update Approved Funding Agreement with Metro includes $36

    million for advanced conceptual engineering/NEPA work Construction ROM = $950 million (currently unfunded)

    Metro discussing plans for new tax increase or extension of

    Measure R in 2016

    Azusa to Montclair must be included

    Montclair/Gold Line Agreement

    Montclair to pay up to $2.8 million for San Bernardinos

    share of the project design cost, plus SANBAGs

    oversight costs

    SANBAG Board reaffirmed commitment to building the

    Foothill Extension to Montclair, once LA County finds

    majority funding

    47

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    48/53

    Jobs/Economic Benefits

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    49/53

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    50/53

    Project Spending by Category

    73% 12%

    6%

    2%

    1%2%2%

    Construction

    Real Estate

    Architectural & EngineeringServices

    Insurance

    Legal Services

    Administrative Services

    Fees & Permits

    50

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    51/53

    Azusa to Montclair extension will create additional

    construction impacts

    Upon project completion, the fully operational Metro

    Gold Line Foothill Extension will likely lead to further

    development and economic activity for many years

    Efficient transit and appropriate zoning has served as

    a catalyst for investment and long term economic

    development around stations in other cities

    A similar pattern of densification and transit-orienteddevelopment around the Gold Line stations can be

    expected and will have an additional significant economic

    impact

    Long Term Impact

    51

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    52/53

    The 24-mile corridor can absorb significantinfill

    development potential:

    1,200 acres of opportunity sites

    Roughly equivalent to the size of

    Downtown Los Angeles

    Cities are actively pursuing

    station area development

    opportunities:

    17,000 DU 3 million SF retail

    7.5 million SF office

    Economic Impact is Significant

    52

  • 8/13/2019 Metro Gold Line Foothill Extension Construction Authority

    53/53

    www.foothillextension.org