metrados edificio city- estruct elm verticales.xlsx

63

Click here to load reader

Upload: armando-j-medina-palacios

Post on 08-Nov-2015

90 views

Category:

Documents


16 download

TRANSCRIPT

INFORMACION AYUDAPESO DE VARILLAS DE REFUERZO6mm1/48mm3/812mm1/25/83/411 3/80.240.250.400.560.890.991.552.243.977.91LONGITUD EN ESTRIBOSf6mm1/48mm3/812mm1/25/83/411 3/8a (m)0.070.100.130.130.13

LONGITUD DE EMPALMEf6mm1/48mm3/812mm1/25/83/411 3/8N varN LeLe(m)0.400.800.951.151.902.602132ANCLAJE DE FIERRO DE COLUMNAS A ZAPATAS43f6mm1/48mm3/812mm1/25/83/411 3/854L(m)0.150.200.250.300.4065768798109

EST

FORMATO N 12 BPRESUPUESTO DE ESTRUCTURA

ProyectoCONJUNTO RESIDENCIAL PANORAMICClientePAZ CENTENARIODpto: LIMAFechaSETIEMBRE 2012

ITEMDESCRIPCIONUND.METRADOSOT 1SOT 2PISO 1PISO 2PISO 3PISO 4PISO 5PISO 6PISO 7PISO 8PISO 9PISO 10PISO 11PISO 12PISO 13PISO 14PISO 15PISO 16PISO 17PISO 18PISO 19PISO 20TECHOUnd.MetradoMetradoMetradoMetradoMetradoMetradoMetradoMetradoMetradoMetradoMetradoMetradoMetradoMetradoMetradoMetradoMetradoMetradoMetradoMetradoMetradoMetradoMetradoMetrado

01MOVIMIENTO DE TIERRAS01.01MEJORAMIENTO DEL TERRENO01.01.01EXCAVACION MASIVA CON EQUIPO INCLUYE ELIMINACINm30.001.01.02EXCAVACIN CIMIENTOS Y ZAPATASm30.001.01.03EXCAVACIN VIGAS DE CIMENTACINm30.001.01.04RELLENO CON MATERIAL DE PRESTAMO PARA SUELO DE FUNDACINm30.001.01.05RELLENO COMPACTADO CON MATERIAL DE PRESTAMO (DESDE EL NFZ - NFP)m30.001.01.06NIVELACION Y COMPACTACION DE TERRENOm30.001.01.07ELIMINACION DE MATERIAL EXCEDENTEm30.002OBRAS CONCRETO SIMPLE0.002.01CALZADURAS0.002.01.01CONCRETO f'c=100 kg/cm2 + 30% PG (8" MAX)m31,591.031,591.0302.01.01CONCRETO f'c=100 kg/cm2 + 30% PG (8" MAX) GROUT EXPANSIVOm3360.82360.8202.01.01ENCOFRADO Y DESENCOFRADO CALZADURASm21,307.231,307.2302.01CIMIENTOS CORRIDOS0.002.01.01CONCRETO f'c=100 kg/cm2 + 30% PG (8" MAX)m30.002.02FALSA ZAPATA0.002.02.01CONCRETO CICLOPEO 1:10 + 30% PG FALSA ZAPATA fc=100 kg/cm2m321.4821.4802.02.02ENCOFRADO Y DESENCOFRADO FALSA ZAPATAm20.00.002.03FALSO PISO0.002.02.01FALSO PISO EN PATIOSm20.002.02.02SOBRELOSA DE CONCRETO E=0.15m EN DUCHASm20.003OBRAS CONCRETO ARMADO0.003.01ZAPATAS0.003.01.01CONCRETO ZAPATAS fc= 280 Kg/cm2 m364.8264.8203.01.02ENCOFRADO Y DESENCOFRADO ZAPATASm2117.32117.3203.01.03ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60kg1,534.681,534.6803.02CIMIENTOS CORRIDOS0.003.02.01CONCRETO CIMIENTOS CORRIDOS f'c=280 kg/cm2m3348.73348.7303.01.02ENCOFRADO Y DESENCOFRADO CIMIENTOS CORRIDOSm2653.91653.9103.02.02ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60m219,623.0219,623.0203.02PLATEAS DE CIMENTACION0.003.02.01CONCRETO PLATEA DE CIMENTACION f'c=280 kg/cm2m30.003.02.02ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60m20.003.03VIGAS DE CIMENTACION 0.003.03.01CONCRETO VIGA DE CIMENTACION f'c=280 kg/cm2m31.871.8703.03.02CONCRETO VIGA CIMENTACION f'c=210 kg/cm2 m30.003.03.03ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMENTACIONm215.4415.4403.03.04ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60kg285.47285.4703.04MUROS REFORZADOS0.003.04.01MUROS DE CONTENCIN0.003.04.01.01CONCRETO f'c=280 kg/cm2 m3255.10108.75146.3503.04.01.02ENCOFRADO Y DESENCOFRADO m2988.05406.33581.7203.04.01.03ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60kg12,216.265,187.147,029.1203.04.02MUROS DE CONCRETO0.003.04.02.01CONCRETO MURO f'c=280 kg/cm2 m30.003.04.02.02CONCRETO MURO f'c=210 kg/cm2 m335.1135.1103.04.02.03ENCOFRADO Y DESENCOFRADOm2374.18374.1803.04.02.04ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60kg812.28812.2803.04.03PLACAS0.003.04.03.01CONCRETO PLACA f'c=280 kg/cm2 m3933.80167.25207.66168.91129.99129.99129.9903.04.03.02CONCRETO PLACA f'c=210 kg/cm2 m32,082.27128.46128.46128.46128.46128.46128.46128.46128.46128.46128.46128.46128.46128.46128.46128.46128.4626.9403.04.03.03ENCOFRADO Y DESENCOFRADO PLACASm229,335.501,364.841,706.861,616.181,283.001,283.001,283.001,282.951,282.951,282.951,282.951,282.951,282.951,282.951,282.951,282.951,282.951,282.951,282.951,282.951,282.951,282.951,282.95271.4203.04.03.04ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60kg339,764.8924,436.1934,823.0126,964.4020,532.3420,532.3425,259.8914,260.0614,260.0617,485.4414,260.0611,597.4111,597.4113,828.5911,597.4110,863.5113,031.4010,863.5110,863.518,131.577,391.037,391.038,131.571,663.1203.05LOSAS03.05.01CONCRETO LOSA MACIZA f'c=280 kg/cm2m30.003.05.02CONCRETO LOSA MACIZA f'c=210 kg/cm2 m30.003.05.03ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS MACIZASm20.003.05.04ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60kg0.003.06VIGAS 0.003.06.01CONCRETO DE VIGA f'c=210 kg/m2m30.003.06.02ENCOFRADO Y DESENCOFRADO EN VIGASm20.003.06.03ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60kg0.003.07COLUMNAS0.003.07.01CONCRETO EN columnas f'c=280 kg/cm2m3217.728.74207.661.3103.07.02CONCRETO EN columnas f'c=210 kg/cm2m30.200.2003.07.03CONCRETO EN columnas f'c=175 kg/cm2m30.003.07.04ENCOFRADO Y DESENCOFRADO EN COLUMNASm2218.5591.19108.3115.753.3003.07.05ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60kg3,473.921,493.491,787.36193.080.003.08ALFEIZER0.003.08.01CONCRETO EN ALFEIZER f'c=175 kg/cm2m30.003.08.02ENCOFRADO Y DESENCOFRADO NORMAL EN ALFEIZERm20.003.08.03ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60kg0.003.09ESCALERAS0.003.09.01CONCRETO ESCALERA f'c=210 kg/cm2m30.003.09.02ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERASm20.003.09.03ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60kg0.004VARIOS0.004.01CURADO DE CONCRETOm20.004.02JUNTA DE TECNOPOR DE 4" (Entre edificios)m20.005PARTIDAS COMPLEMENTARIAS

COSTO DIRECTOCONCRETOM33,524.19284.75561.68205.33129.99129.99129.99128.46128.46128.46128.46128.46128.46128.46128.46128.46128.46128.46128.46128.46128.46128.46128.4627.14ENCOFRADOM230,542.101,862.362,396.892,006.111,283.001,283.001,283.001,282.951,282.951,282.951,282.951,282.951,282.951,282.951,282.951,282.951,282.951,282.951,282.951,282.951,282.951,282.951,282.95274.72ACEROKG355,455.0731,116.8243,639.4927,969.7520,532.3420,532.3425,259.8914,260.0614,260.0617,485.4414,260.0611,597.4111,597.4113,828.5911,597.4110,863.5113,031.4010,863.5110,863.518,131.577,391.037,391.038,131.571,663.12AREA TECHADACLIENTE21,510.612,029.892,029.891,063.38796.87868.66855.32868.66855.32868.66855.32868.66855.32868.66855.32868.66855.32868.66855.32868.66855.32868.66855.3274.76SRD21,860.122,019.642,029.271,019.97880.05880.08880.05880.08880.05880.08880.05880.08880.05880.08880.05880.08880.05880.08880.05880.08880.05880.08879.9470.130.160.140.280.190.160.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.361.420.921.181.891.611.481.501.481.501.481.501.481.501.481.501.481.501.481.501.481.501.481.503.6716.5215.3321.5026.3025.7723.6429.5316.4216.6720.1316.6713.3513.5615.9213.5612.5115.2412.5112.709.368.648.519.5122.250.12100.860.161.4216.52

FORMATO METRADO ESTRUCTURAS

HOJA DE SUSTENTO DE METRADOS

OBRAEDIFICIO CITYESPECIALIDADESTRUCTURASREALIZADO PORSR DESARROLLO SACCLIENTEPAZ CENTENARIOFECHA":" 28/09/2012

PARTIDADESCRIPCIONUNDVOLUMEN / AREAPARCIALTOTALENCOFRADOPARCIALm2TOTAL ACEROPARCIALkg.TOTALNLongitudAnchoAlturaLPerimetroRep @CANTTIPOabcLLtLtotal(m)(m)(m)(m)(m)PULG(m)(m)(m)(m)(m)(m)XYZ

A2020CONCRETO SIMPLE0A202002CALZADURAS Y FALSA ZAPATA0A202002CALZADURAS0A20200206CONCRETO f'c=100 kg/cm2 + 30% PG (8" MAX)M3OK1,591.030.0EJE A / EJE 0 10CALCORTE 1-1147.450.600.8524.2047.451.0549.82247.451.000.8540.3347.451.0549.82347.451.500.8560.4947.451.0549.82447.451.750.8570.5847.451.0549.82547.452.000.8580.6647.451.0549.82647.452.500.87103.2047.451.0750.77EJE A D/ EJE 0CALCORTE 1-1119.690.600.8510.0419.691.0520.67219.691.000.8516.7419.691.0520.67319.691.500.8525.1019.691.0520.67419.691.750.8529.2919.691.0520.67519.692.000.8533.4719.691.0520.67619.692.500.8742.8319.691.0721.07EJE D/ EJE 0 1CALCORTE 2-217.430.501.003.727.431.007.4327.430.750.854.747.431.057.8137.431.000.856.327.431.057.8147.431.500.859.487.431.057.8157.431.750.8511.067.431.057.8167.432.000.8512.647.431.057.8177.432.500.8716.177.431.077.95EJE D J/ EJE 1CALCORTE 1-1129.290.600.8514.9429.291.0530.76229.041.000.8524.6929.041.0530.49328.541.500.8536.3928.541.0529.97428.291.750.8542.0928.291.0529.71528.042.000.8547.6728.041.0529.45627.542.500.8759.9127.541.0729.47EJE K/ EJE 1 9CALCORTE 2-2138.880.501.0019.4438.881.0038.88238.880.750.8524.7838.881.0540.82338.881.000.8533.0538.881.0540.82438.881.500.8549.5738.881.0540.82538.881.750.8557.8338.881.0540.82638.882.000.8566.0938.881.0540.82738.882.500.8784.5638.881.0741.60EJE A J/ EJE 10CALCORTE 2-2149.740.501.0024.8749.741.0049.74249.740.750.8531.7149.741.0552.22349.741.000.8542.2849.741.0552.22449.741.500.8563.4249.741.0552.22549.741.750.8573.9849.741.0552.22649.742.000.8584.5549.741.0552.22749.742.500.87108.1849.741.0753.22

CONCRETO f'c=100 kg/cm2 + 30% PG (8" MAX) GROUT EXPANSIVOM3OK360.820.0EJE A / EJE 0 10CALCORTE 1-1147.450.600.205.69247.451.000.209.49347.451.500.2014.23447.451.750.2016.61547.452.000.2018.98647.452.500.2023.72EJE A D/ EJE 0CALCORTE 1-1119.690.600.202.36219.691.000.203.94319.691.500.205.91419.691.750.206.89519.692.000.207.88619.692.500.209.85EJE D/ EJE 0 1CALCORTE 2-227.430.750.201.1237.431.000.201.4947.431.500.202.2357.431.750.202.6067.432.000.202.9777.432.500.203.72EJE D J/ EJE 1CALCORTE 1-1129.290.600.203.52229.041.000.205.81328.541.500.208.56428.291.750.209.90528.042.000.2011.22627.542.500.2013.77EJE K/ EJE 1 9CALCORTE 2-2238.880.750.205.83338.881.000.207.78438.881.500.2011.66538.881.750.2013.61638.882.000.2015.55738.882.500.2019.44EJE A J/ EJE 10CALCORTE 2-2249.740.750.207.46349.741.000.209.95449.741.500.2014.92549.741.750.2017.41649.742.000.2019.90749.742.500.2024.87ENCOFRADO Y DESENCOFRADOM2OK1,307.23A202002FALSA ZAPATA0CONCRETO CICLOPEO 1:10 + 30% PG FALSA ZAPATA fc=100 kg/cm2M3FALTA21.480.0EJE F / EJE 5FZFalsa Zapata147.450.600.205.69247.451.000.209.49EJE H / EJE 5FZFalsa Zapata119.690.600.202.36219.691.000.203.94ENCOFRADO Y DESENCOFRADOM2OK0.0

CONCRETO ARMADO0okZAPATAS Y CIMIENTO CORRIDO0CIMENTACIN0CONCRETO f'c=280 KG/CM2 ZAPATASM364.82CONCRETO f'c=280 KG/CM2 CIMIENTO CORRIDOM3348.73CONCRETO f'c=280 KG/CM2 VIGAS CIMENTACIONM31.87EJE 0 4 /EJE ACCP-eje AC26.380.600.609.500.6025.7815.4745/8126.3826.38CCEJE 0 /EJE A DCCP-eje 0C16.500.600.605.940.6016.509.9045/8116.5016.50CCEJE 0 1 /EJE DCCP-eje DC7.030.600.602.530.606.433.8645/817.037.03CCEJE 1 /EJE D GCCP-eje 1C10.700.600.603.850.6010.706.4245/8110.7010.70CCEJE 1 /EJE GCCP-eje GC0.910.600.600.330.600.910.5545/810.910.915.7067.22416.76CCEJE 1 /EJE J KCCP-eje 1C5.280.600.601.900.605.283.1745/815.285.28CCEJE 1 9/EJE KCCP-eje KC35.150.600.6012.660.6034.5520.7345/8135.1535.15CCEJE 9 10/EJE J KCCP-eje 9 JC4.280.600.601.540.603.802.2845/814.284.28CCEJE 10/EJE A JCCP-eje 10C44.370.600.6015.970.6044.3726.6245/8144.3744.37CCEJE 9 10/EJE ACCP-eje AC5.920.600.602.130.605.323.1945/815.925.928.55103.54641.97CCEJE 4 9/EJE ACCP-eje AC14.770.701.3013.44OK1.3214.7719.4245/8114.7714.77CCEJE 4/EJE A BCCP-eje 4C1.104.351.306.234.352.6011.3245/814.354.35CCEJE 4 8/EJE BCCP-eje BC9.050.901.3010.596.051.307.8745/819.009.00CC10.261.3013.34EJE 8 9/EJE BCCP-eje BC5.840.901.306.844.721.306.1445/815.845.84CC6.971.309.07EJE 9/EJE A BCCP-eje 9C1.104.141.305.934.142.6010.7845/814.144.142.8540.96253.98CCEJE 7/EJE A BCCP-eje 7C0.604.351.303.404.352.6011.32OK35/814.354.350.04.3520.25CCEJE 8/EJE A BCCP-eje 8C0.604.351.303.404.352.6011.32OK35/814.354.350.04.3520.25CCEJE 0 1 /EJE BZPZ C-05C1.251.800.601.350.606.103.660.2095/811.151.150.01.1516.04ZP0.2065/811.701.700.01.7015.81EJE 1 2 /EJE A BZPZ C-06C1.251.500.601.130.605.503.300.2085/811.151.150.01.1514.26ZP0.2065/811.401.400.01.4013.02EJE 1 2 /EJE BZPZ C-01C1.251.800.601.350.606.103.660.2095/811.151.150.01.1516.04ZP0.2065/811.701.700.01.7015.81EJE 1 2 /EJE BZPZ C-01C1.251.800.601.350.606.103.660.2095/811.151.150.01.1516.04ZP0.2065/811.701.700.01.7015.81EJE 2 3 /EJE BZPZ C-01C1.251.800.601.350.606.103.660.2095/811.151.150.01.1516.04ZP0.2065/811.701.700.01.7015.81EJE 0 1 /EJE CZPZ C-05C1.251.800.601.350.606.103.660.2095/811.151.150.01.1516.04ZP0.2065/811.701.700.01.7015.81EJE 1 2 /EJE CZPZ C-01C1.251.800.601.350.606.103.660.2095/811.151.150.01.1516.04ZP0.2065/811.701.700.01.7015.81EJE 1 2 /EJE CZPZ C-02C1.801.800.601.940.607.204.320.2095/811.701.700.01.7023.72ZP0.2095/811.701.700.01.7023.72EJE 1 2 /EJE DZPZ C-04C1.501.250.601.130.605.503.300.2065/811.401.400.01.4013.02ZP0.2085/811.151.150.01.1514.26EJE 2 /EJE DZPZ C-01C1.801.250.601.350.606.103.660.2065/811.701.700.01.7015.81ZP0.2095/811.151.150.01.1516.04EJE 1 2 /EJE D EZPZ C-04C1.501.250.601.130.605.503.300.2065/811.401.400.01.4013.02ZP0.2085/811.151.150.01.1514.26EJE 2 /EJE D EZPZ C-01C1.801.250.601.350.606.103.660.2065/811.701.700.01.7015.81ZP0.2095/811.151.150.01.1516.04EJE 3 4 /EJE D EZPZ C-04C1.501.250.601.130.605.503.300.2065/811.401.400.01.4013.02ZP0.2085/811.151.150.01.1514.26EJE 3 4 /EJE EZPZ C-03C1.501.250.601.130.605.503.300.2065/811.401.400.01.4013.02ZP0.2085/811.151.150.01.1514.26EJE 5 /EJE D EZPZ P-08C4.331.251.005.411.0011.1611.160.2065/814.234.230.04.2339.34ZP0.20225/811.151.150.01.1539.22EJE 9 /EJE D EZPZ P-09C3.201.251.004.001.008.908.900.2065/813.103.100.03.1028.83ZP0.20165/811.151.150.01.1528.52EJE 9 /EJE F HZPZ P-12C3.201.251.004.001.008.908.900.2065/813.103.100.03.1028.83ZP0.20165/811.151.150.01.1528.52EJE 6 7 /EJE JZPZ P-18C1.204.301.005.161.0011.0011.000.2022111.131.130.01.1398.26ZP0.206114.234.230.04.23100.64EJE 1 2 /EJE GZPZ P-26C1.252.941.003.681.008.388.380.2015111.151.150.01.1568.48ZP0.206112.852.850.02.8567.89EJE 3 9 /EJE CCCCimentacion eje CC16.391.001.0016.391.0034.1734.170.20875/830.950.300.301.550.01.55209.02supCCC1.071.251.001.340.20875/830.950.300.301.550.01.55209.02infCC81117.4617.461.9019.36614.87HCCC1.770.200.350.120.353.541.2463/811.770.201.970.01.976.62HCC4111.770.201.970.01.9731.28HCC0.2575/840.161.300.073.060.03.0633.20estCC41115.690.2015.891.9017.79282.51HEJE 3 4 /EJE C DCCCimentacion eje 3C4.201.001.004.201.008.408.400.20215/830.950.300.301.550.01.5550.45supCCC1.800.200.350.130.353.601.260.20215/830.950.300.301.550.01.5550.45infCC8114.204.200.04.20133.39HCC63/811.800.202.000.02.006.72HCC4111.800.202.000.02.0031.76HCC0.2575/840.161.300.073.060.03.0633.20estCC4112.400.202.600.02.6041.29HEJE 4 7 /EJE DCCCimentacion eje DC9.051.001.009.051.0016.7016.700.20455/830.950.300.301.550.01.55108.11supCC0.20455/830.950.300.301.550.01.55108.11infCC12119.050.209.251.9011.15531.19HEJE 7 /EJE C DCCCimentacion eje 7C3.301.401.004.621.007.007.000.20175/831.350.300.301.950.01.9551.38supCC0.20175/831.350.300.301.950.01.9551.38infCC12113.300.203.500.03.50166.74HEJE 5 7 /EJE C DCCCimentacion eje C DC4.701.001.004.701.009.409.400.20245/830.950.300.301.550.01.5557.66supCC0.20245/830.950.300.301.550.01.5557.66infCC12114.700.204.900.04.90233.44HEJE 5 /EJE C DCCCimentacion eje 5C1.451.001.001.451.002.902.900.2075/830.950.300.301.550.01.5516.82supCCC1.450.200.350.100.352.901.020.2075/830.950.300.301.550.01.5516.82infCC8111.451.450.01.4546.05HCC63/811.450.201.650.01.655.54HCC4111.450.201.650.01.6526.20HCC0.2565/840.161.300.073.060.03.0628.46estEJE 7 /EJE D ECCCimentacion eje 7C7.221.001.007.221.0014.4414.440.20365/830.950.300.301.550.01.5586.49supCCC0.900.200.350.060.351.800.630.20365/830.950.300.301.550.01.5586.49infCC8117.227.220.07.22229.31HCC63/810.900.201.100.01.103.70HCC4110.900.201.100.01.1017.47HCC0.2545/840.161.300.073.060.03.0618.97estCC4116.320.206.520.06.52103.54HEJE 8 /EJE C ECCCimentacion eje 8C12.421.001.0012.421.0024.8424.840.20625/830.950.300.301.550.01.55148.96supCCC2.250.200.350.160.354.501.580.20625/830.950.300.301.550.01.55148.96infCC81112.4212.421.9014.32454.80HCC63/812.250.202.450.02.458.23HCC4112.250.202.450.02.4538.91HCC0.2595/840.161.300.073.060.03.0642.69estCC41110.170.2010.371.9012.27194.85HEJE 8 9 /EJE DCCCimentacion eje DC5.821.001.005.821.0012.6412.640.20295/830.950.300.301.550.01.5569.67supCC0.20295/830.950.300.301.550.01.5569.67infCC12115.820.206.020.06.02286.79HEJE 5 9 /EJE ECCCimentacion eje EC14.351.001.0014.351.0022.2522.250.20725/831.260.300.301.860.01.86207.58supCCC1.300.600.350.270.352.600.910.20725/831.260.300.301.860.01.86207.58infCC81114.350.200.2014.751.9016.65528.80HCC63/811.300.201.500.01.505.04HCC10111.300.201.500.01.5059.55HCC0.2555/840.161.300.073.060.03.0623.72estCC41113.050.2013.251.9015.15240.58HEJE 8 /EJE F ICCCimentacion eje 8C8.961.001.008.961.0016.9216.920.20455/830.950.300.301.550.01.55108.11supCCC4.900.200.350.340.359.803.430.20455/830.950.300.301.550.01.55108.11infCC8118.960.209.161.9011.06351.27HCC63/814.900.205.100.05.1017.14HCC4114.900.205.100.05.1080.99HCC0.25205/840.161.300.073.060.03.0694.86estCC4114.460.204.660.04.6674.00HEJE 8 9 /EJE HCCCimentacion eje HC5.851.001.005.851.0012.7012.700.20295/830.950.300.301.550.01.5569.67supCC0.20295/830.950.300.301.550.01.5569.67infCC12115.850.200.206.250.06.25297.75HEJE 3 9 /EJE ICCCimentacion eje IC18.361.001.0018.361.0033.4933.490.20925/830.950.300.301.550.01.55221.03supCC0.20925/830.950.300.301.550.01.55221.03infCC81118.360.200.2018.763.8022.56716.51HCCC2.230.200.350.160.354.461.5663/812.230.202.430.02.438.16HCC4112.230.202.430.02.4338.59HCC0.2595/840.161.300.073.060.03.0642.69estCC41116.130.2016.331.9018.23289.49HEJE 3 /EJE F ICCCimentacion eje 3C8.001.001.008.001.0017.0017.000.20405/830.950.300.301.550.01.5596.10supCCasumo corte tipicoFALTA CORTE0.20405/830.950.300.301.550.01.5596.10infCC12118.000.200.208.400.08.40400.18HEJE 3 /EJE I JCCCimentacion eje 3C6.431.001.006.431.0013.2613.260.20325/830.950.300.301.550.01.5576.88supCCasumo corte tipicoFALTA CORTE0.20325/830.950.300.301.550.01.5576.88infCC12116.430.200.206.830.06.83325.38HEJE 5 /EJE I JCCCimentacion eje 5C6.431.001.006.431.0013.8613.860.20325/830.950.300.301.550.01.5576.88supCCasumo corte tipicoFALTA CORTE0.20325/830.950.300.301.550.01.5576.88infCC12116.430.200.206.830.06.83325.38HEJE 3 5 /EJE HCCCimentacion eje HC5.641.201.006.771.0010.2810.280.20285/831.150.300.301.750.01.7575.95supCCasumo corte tipico0.20285/831.150.300.301.750.01.7575.95infCC12115.640.200.206.040.06.04287.75HEJE 4 /EJE F HCCCimentacion eje 4C4.961.001.004.961.009.929.920.20255/830.950.300.301.550.01.5560.06supCCasumo corte tipico0.20255/830.950.300.301.550.01.5560.06infCC12114.960.200.205.360.05.36255.35HEJE 5 /EJE F HCCCimentacion eje F HC3.921.001.003.921.007.837.830.20205/830.950.300.301.550.01.5548.05supCCasumo corte tipico0.20205/830.950.300.301.550.01.5548.05infCC8113.920.200.204.320.04.32137.04HCCC2.200.200.350.150.354.401.5463/812.200.202.400.02.408.06HCC4112.200.202.400.02.4038.11HCC0.2595/840.161.300.073.060.03.0642.69estCC4111.720.201.920.01.9230.41HEJE 5 7 /EJE F HZPZ P-21C3.387.161.0024.201.0018.8818.880.18411/213.380.100.103.580.03.58145.31ZP0.18411/213.380.100.103.580.03.58145.31ZP0.18381/217.160.100.107.360.07.36276.88EJE 8 9 /EJE I J CCCimentacion eje 8 9C1.201.201.001.441.002.402.400.2065/831.150.300.301.750.01.7516.28supCC0.2065/831.150.300.301.750.01.7516.28infCC8111.200.200.201.600.01.6050.82HCC63/811.200.201.400.01.404.70HCC6111.200.201.400.01.4033.35HCC0.2555/840.161.300.073.060.03.0623.72estEJE 8 9 /EJE I J CCCimentacion PlacasC18.131.0018.131.0028.9028.900.20765/831.150.300.301.750.01.75206.15supCC0.20765/831.150.300.301.750.01.75206.15infCC81115.170.200.2015.571.9017.47554.85HCC63/815.450.205.650.05.6518.98HCC6115.450.205.650.05.65134.58HCC0.25225/840.251.300.073.240.03.24110.48estCC4119.720.209.921.9011.82187.70HEJE 6 /EJE I JCCCimentacion eje 6C6.441.001.006.441.0013.8813.880.20325/830.950.300.301.550.01.5576.88supCCasumo D-D0.20325/830.950.300.301.550.01.5576.88infCC12116.440.200.206.840.06.84325.86HEJE 2 3 /EJE ICCCimentacion eje IC5.400.600.601.940.6010.806.4881/215.400.100.105.600.05.6044.35CC0.25223/840.560.560.072.380.02.3829.32estEJE 1 2 /EJE GVCVC - 1C5.940.301.302.321.3011.8815.443136.200.500.307.000.07.0083.37VC1.50(0.30)-0.453125.000.305.300.05.3063.12VC63/816.206.200.06.2020.83VC3136.200.300.306.800.06.8080.99VC0.25213/841.260.250.073.160.03.1637.16estEJE 1 2 /EJE HCCCimentacion eje HC6.951.001.006.951.0013.9013.900.20355/830.950.300.301.550.01.5584.09supCCC0.520.601.000.311.001.041.040.20355/830.950.300.301.550.01.5584.09infCC8116.950.200.207.350.07.35233.44HCC63/811.800.202.000.02.006.72HCC6111.800.202.000.02.0047.64HCC0.2575/840.151.300.073.040.03.0432.98estCC4116.200.206.400.06.40101.63HEJE 1 2 /EJE ICCCimentacion eje IC6.951.001.006.951.0013.9013.900.20355/830.950.300.301.550.01.5584.09supCCasumo D-D0.20355/830.950.300.301.550.01.5584.09infCC12116.950.200.207.350.07.35350.15HEJE 2 /EJE G HCCCimentacion eje 2C8.041.001.008.041.0017.0817.080.20405/830.950.300.301.550.01.5596.10supCCasumo D-D0.20405/830.950.300.301.550.01.5596.10infCC12118.040.200.208.440.08.44402.08HEJE 2 /EJE I JCCCimentacion eje 2C7.321.001.309.521.3014.6419.030.20375/830.950.300.301.550.01.5588.89supCCasumo corte tipico0.20375/830.950.300.301.550.01.5588.89infCC12117.320.200.207.720.07.72367.78HEJE 1 2 /EJE JCCCimentacion eje JC6.931.001.309.011.3013.8618.020.20355/830.950.300.301.550.01.5584.09supCCasumo corte tipico0.20355/830.950.300.301.550.01.5584.09infCC12116.930.200.207.330.07.33349.20HEJE 1 2 /EJE I JCCCim P-22C2.731.001.303.541.306.458.390.20145/830.950.300.301.550.01.5533.64supCCasumo corte tipico0.20145/830.950.300.301.550.01.5533.64infCC12112.730.200.203.130.03.13148.88HEJE 1 /EJE G HCCCimentacion eje 1C8.051.001.008.051.009.559.550.20405/830.950.300.301.550.01.5596.10supCCasumo corte tipico0.20405/830.950.300.301.550.01.5596.10infCC12118.050.208.250.08.25393.03HEJE 1 /EJE I JCCCimentacion eje 1C7.321.001.309.521.305.727.440.20375/830.950.300.301.550.01.5588.89supCCasumo corte tipico0.20375/830.950.300.301.550.01.5588.89infCC12117.320.207.520.07.52358.25H

ENCOFRADO Y DESENCOFRADO ZAPATASM2117.32ENCOFRADO Y DESENCOFRADO CIMIENTOS CORRIDOSM2653.91ENCOFRADO Y DESENCOFRADO VIGAS CIMENTACIONM215.44ACERO DE REFUERZO ZAPATASKG1,534.68ACERO DE REFUERZO CIMIENTOS CORRIDOSKG19,623.02ACERO DE REFUERZO VIGAS CIMENTACIONKG285.47

PLACAS Y COLUMNAS02 STANO0CONCRETO f'c=280 KG/CM2 MUROS CONTENCIONM3146.35CONCRETO f'c=280 KG/CM2 PLACASM3207.66CONCRETO f'c=280 KG/CM2 COLUMNASM310.37EJE 0 1 /EJE BCC - 052S0.800.253.660.733.662.107.6943/424.150.254.400.04.4039.42VC45/824.150.204.350.04.3526.97VC0.25303/840.770.190.102.120.02.1235.62estC0.25303/840.270.220.101.180.01.1819.82estEJE 0 1 /EJE CCC - 052S0.800.253.660.733.662.107.6943/424.150.254.400.04.4039.42VC45/824.150.204.350.04.3526.97VC0.25303/840.770.190.102.120.02.1235.62estC0.25303/840.270.220.101.180.01.1819.82estEJE 1 /EJE A BCC - 062S0.500.253.660.463.661.505.4941/224.150.154.300.04.3017.03VC45/824.150.204.350.04.3526.97VC0.25303/840.470.190.101.520.01.5225.54estC0.25303/840.170.220.100.980.00.9816.46estEJE 1 /EJE BCC - 012S0.800.253.660.733.662.107.6943/424.150.254.400.04.4039.42VC45/824.150.204.350.04.3526.97VC0.25303/840.770.190.102.120.02.1235.62estC0.25303/840.270.220.101.180.01.1819.82estEJE 1 /EJE CCC - 012S0.800.253.660.733.662.107.6943/424.150.254.400.04.4039.42VC45/824.150.204.350.04.3526.97VC0.25303/840.770.190.102.120.02.1235.62estC0.25303/840.270.220.101.180.01.1819.82estEJE 1 2 /EJE DCC - 042S0.500.253.660.463.661.505.4941/224.150.154.300.04.3017.03VC45/824.150.204.350.04.3526.97VC0.25303/840.470.190.101.520.01.5225.54estC0.25303/840.170.220.100.980.00.9816.46estEJE 1 2 /EJE D ECC - 042S0.500.253.660.463.661.505.4941/224.150.154.300.04.3017.03VC45/824.150.204.350.04.3526.97VC0.25303/840.470.190.101.520.01.5225.54estC0.25303/840.170.220.100.980.00.9816.46estEJE 2 /EJE BCC - 012S0.800.253.660.733.662.107.6943/424.150.254.400.04.4039.42VC45/824.150.204.350.04.3526.97VC0.25303/840.770.190.102.120.02.1235.62estC0.25303/840.270.220.101.180.01.1819.82estEJE 2 /EJE CCC - 022S0.800.253.660.733.663.2011.7173/424.150.254.400.04.4068.99VC0.550.253.660.5085/824.150.204.350.04.3553.94VC0.25303/840.770.190.102.120.02.1235.62estC0.25303/840.220.220.101.080.01.0818.14estC0.25303/840.770.190.102.120.02.1235.62estC0.25303/840.220.220.101.080.01.0818.14estEJE 2 /EJE DCC - 012S0.800.253.660.730.103.662.107.6943/424.150.254.400.04.4039.42VC45/824.150.204.350.04.3526.97VC0.25303/840.770.190.102.120.02.1235.62estC0.25303/840.270.220.101.180.01.1819.82estEJE 2 /EJE D ECC - 012S0.800.253.660.730.103.662.107.6943/424.150.254.400.04.4039.42VC45/824.150.204.350.04.3526.97VC0.25303/840.770.190.102.120.02.1235.62estC0.25303/840.270.220.101.180.01.1819.82estEJE 2 3 /EJE BCC - 012S0.800.253.660.730.103.662.107.6943/424.150.254.400.04.4039.42VC45/824.150.204.350.04.3526.97VC0.25303/840.770.190.102.120.02.1235.62estC0.25303/840.270.220.101.180.01.1819.82estEJE 3 4 /EJE D ECC - 042S0.500.253.660.460.083.661.505.4941/224.150.154.300.04.3017.03VC45/824.150.204.350.04.3526.97VC0.25303/840.470.190.101.520.01.5225.54estC0.25303/840.170.220.100.980.00.9816.46estEJE 3 4 /EJE ECC - 032S0.600.353.660.770.113.661.906.9543/424.200.254.450.04.4539.87VC45/824.200.204.400.04.4027.28VC0.25303/840.570.290.101.920.01.9232.26estC0.25303/840.320.220.101.280.01.2821.50estEJE 3 4 /EJE CCC - 032S0.600.353.260.680.113.261.906.1943/424.200.254.450.04.4539.87VC45/824.200.204.400.04.4027.28VC0.25283/840.570.290.101.920.01.9230.11estC0.25283/840.320.220.101.280.01.2820.07estEJE 1 /EJE J KMCPLACA EJE 12S0.256.213.665.680.263.665.9621.800.25253/825.180.505.680.05.6879.52VMC0.25253/812.512.510.02.5135.14VMC0.25253/824.200.354.550.04.5563.70VMC0.25303/816.216.216.21104.26HEJE 1 10/EJE KMCPLACA EJE K2S35.100.253.6632.120.253.6635.10128.480.251403/824.200.554.750.04.75372.40VMC0.251403/812.512.510.02.51196.88VMC0.251403/824.200.354.550.04.55356.72VMC0.25303/8135.1035.1035.10589.73HEJE 9 10/EJE J KMCPLACA EJE 10 K2S4.170.253.663.810.253.664.1715.260.25173/824.200.554.750.04.7545.22VMC0.25173/812.512.510.02.5123.91VMC0.25173/824.200.354.550.04.5543.32VMC0.25303/814.174.174.1770.04HEJE 10 /EJE A KMCPLACA EJE 102S0.2545.183.6641.340.253.6644.93164.440.251813/824.200.554.750.04.75481.46VMC0.251813/812.512.510.02.51254.54VMC0.251813/824.200.354.550.04.55461.19VMC0.25303/8145.1845.1845.18759.01HEJE 9 10 /EJE AMCPLACA EJE A2S6.090.253.665.570.253.666.0922.280.25243/824.200.554.750.04.7563.84VMC0.25243/812.512.510.02.5133.75VMC0.25243/824.200.354.550.04.5561.15VMC0.25303/816.096.096.09102.28HMC303/8Le3.603.6060.48LeEJE 8 9/EJE A BPP - 22S0.255.532.763.820.132.7611.0030.360.25401/222.761.804.560.04.56180.58VP5.970.252.764.120.282.765.2814.570.25401/222.761.804.560.04.56180.58VASUMO CORTE 9-9P0.25301/235.970.206.170.06.17183.25HP0.25241/235.780.205.980.05.98142.08HP10122.761.804.560.04.56181.03VP0.13603/840.500.250.101.700.01.7057.12estP0.13603/840.250.250.101.200.01.2040.32estP0.13603/840.100.250.100.900.00.9030.24estP10122.761.804.560.04.56181.03VP0.13163/840.500.250.101.700.01.7015.23estP0.13163/840.250.250.101.200.01.2010.75estP0.13163/840.100.250.100.900.00.908.06estP10122.761.804.560.04.56181.03VP0.13163/840.500.250.101.700.01.7015.23estP0.13163/840.250.250.101.200.01.2010.75estP0.13163/840.100.250.100.900.00.908.06estEJE 7 8 /EJE AMCPLACA EJE A2S0.251.302.760.900.252.761.303.590.2553/824.200.524.720.04.7213.22VASUMO CORTE 9-9MC0.7521/211.601.600.01.603.17VMC0.2553/824.200.334.530.04.5312.68VMC0.25243/811.301.300.01.3017.47HEJE 4 7/EJE APP - 12S0.252.792.761.930.122.765.8316.090.25181/224.150.454.600.04.6081.97VP7.120.252.764.910.272.766.6318.300.25481/224.150.454.600.04.60218.59VP0.25121/2310.180.250.2510.680.8011.48136.38HP0.25121/239.680.250.2510.180.8010.98130.44HP10124.150.454.600.04.60182.62VP0.13233/840.500.250.101.700.01.7021.90estP0.13233/840.250.250.101.200.01.2015.46estP0.13233/840.100.250.100.900.00.9011.59estP10124.150.454.600.04.60182.62VP0.13233/840.500.250.101.700.01.7021.90estP0.13233/840.250.250.101.200.01.2015.46estP0.13233/840.100.250.100.900.00.9011.59estP10124.150.454.600.04.60182.62VP0.13233/840.500.250.101.700.01.7021.90estP0.13233/840.250.250.101.200.01.2015.46estP0.13233/840.100.250.100.900.00.9011.59estEJE 4 /EJE A BPPLACA EJE 42S0.255.282.763.640.132.7610.5629.150.25213/834.310.320.164.790.04.7956.35VP0.25211/211.901.900.01.9039.50VP0.25213/834.340.520.165.020.05.0259.07VP0.25243/815.405.400.05.4072.58HEJE 4 7/EJE BPP - 32S0.251.592.761.100.112.763.6810.160.25501/224.150.254.400.04.40217.80VP6.890.252.764.750.122.7614.0338.720.2561/224.150.254.400.04.4026.14VP0.25121/238.710.250.259.210.8010.01118.92HP0.25121/238.210.250.258.710.08.71103.47HP10124.150.254.400.04.40174.68VP0.13233/840.500.250.101.700.01.7021.90estP0.13233/840.250.250.101.200.01.2015.46estP0.13233/840.100.250.100.900.00.9011.59estP10124.150.254.400.04.40174.68VP0.13233/840.500.250.101.700.01.7021.90estP0.13233/840.250.250.101.200.01.2015.46estP0.13233/840.100.250.100.900.00.9011.59estP10124.150.254.400.04.40174.68VP0.13233/840.500.250.101.700.01.7021.90estP0.13233/840.250.250.101.200.01.2015.46estP0.13233/840.100.250.100.900.00.9011.59estEJE 9 /EJE A BPPLACA EJE 92S0.255.072.763.508.002.7610.1427.990.25203/834.310.320.164.790.04.7953.67VP0.25201/211.901.900.01.9037.62VP0.25203/834.340.520.165.020.05.0256.25VP0.25243/815.205.200.05.2069.89HEJE 8 9 /EJE BPP - 42S3.070.252.762.122.762.827.780.25161/224.150.254.400.04.4069.70VP2.763.329.160.25241/233.070.250.253.570.03.5784.82HP10124.150.254.400.04.40174.68VP0.25123/840.500.250.101.700.01.7011.42estP0.25123/840.250.250.101.200.01.208.06estP0.25123/840.100.250.100.900.00.906.05estP10124.150.254.400.04.40174.68VP0.25123/840.500.250.101.700.01.7011.42estP0.25123/840.250.250.101.200.01.208.06estP0.25123/840.100.250.100.900.00.906.05estEJE 7 8 /EJE BPPLACA EJE B2S0.251.302.760.902.762.607.180.2553/824.130.134.260.04.2611.93VP0.2551/211.901.900.01.909.41VP0.2553/824.150.324.470.04.4712.52VP0.25243/811.401.400.01.4018.82HEJE 8 9 /EJE BPPLACA EJE B2S0.252.652.761.832.765.3014.630.25113/824.130.134.260.04.2626.24VP0.25111/211.901.900.01.9020.69VP0.25113/824.150.324.470.04.4727.54VP0.25243/812.752.750.02.7536.96HEJE 0 4 /EJE AMCPLACA EJE A2S0.2526.383.6624.143.6626.1395.640.251063/824.200.524.720.04.72280.18VMC0.251063/812.512.510.02.51148.99VMC0.251063/824.190.334.520.04.52268.31VMC0.25303/8126.3826.3826.38443.18HEJE 0 /EJE A DMCPLACA EJE 02S0.2517.203.6615.743.6617.2062.950.25693/824.200.524.720.04.72182.38VMC0.25693/812.512.510.02.5196.99VMC0.25693/824.190.334.520.04.52174.65VMC0.25303/8117.2017.2017.20288.91HEJE 0 1 /EJE DMCPLACA EJE D2S0.257.033.666.433.666.7824.810.25283/824.200.524.720.04.7274.01VMC0.25283/812.512.510.02.5139.36VMC0.25283/824.190.334.520.04.5270.87VMC0.25303/817.037.030.07.03118.10HEJE 1 /EJE D GMCPLACA EJE 12S0.2510.353.669.473.6610.3437.860.25413/824.200.524.720.04.72108.37VMC0.25413/812.512.510.02.5157.63VMC0.25413/824.190.334.520.04.52103.78VMC0.25303/8110.3510.3510.35173.88HEJE 1 /EJE GMCPLACA EJE G2S0.251.263.661.163.661.264.610.2553/824.200.524.720.04.7213.22VMC0.2553/812.512.510.02.517.03VMC0.2553/824.190.334.520.04.5212.66VMC0.25303/811.261.260.01.2621.23HMC303/8Le2.402.4040.32LeEJE 6 7 /EJE JPP - 182S0.253.353.262.733.267.2023.470.25181/224.200.404.600.04.6081.97VP0.25281/233.340.250.253.840.03.84106.44HP10124.200.404.600.04.60182.62VP0.25143/840.500.250.101.700.01.7013.33estP0.25143/840.250.250.101.200.01.209.41estP0.25143/840.100.250.100.900.00.907.06estP10124.200.404.600.04.60182.62VP0.25143/840.500.250.101.700.01.7013.33estP0.25143/840.250.250.101.200.01.209.41estP0.25143/840.100.250.100.900.00.907.06estEJE 5 /EJE D EPP - 82S3.330.253.262.713.267.1623.340.25181/224.200.404.600.04.6081.97VP0.25281/233.330.250.253.830.03.83106.17HP10124.200.404.600.04.60182.62VP0.25143/840.500.250.101.700.01.7013.33estP0.25143/840.250.250.101.200.01.209.41estP0.25143/840.100.250.100.900.00.907.06estP10124.200.404.600.04.60182.62VP0.25143/840.500.250.101.700.01.7013.33estP0.25143/840.250.250.101.200.01.209.41estP0.25143/840.100.250.100.900.00.907.06estEJE 8 9 /EJE D EPP - 92S2.200.253.261.793.264.9015.970.25101/224.200.404.600.04.6045.54VP0.25281/232.200.250.252.700.02.7074.84HP10124.200.404.600.04.60182.62VP0.25143/840.500.250.101.700.01.7013.33estP0.25143/840.250.250.101.200.01.209.41estP0.25143/840.100.250.100.900.00.907.06estP10124.200.404.600.04.60182.62VP0.25143/840.500.250.101.700.01.7013.33estP0.25143/840.250.250.101.200.01.209.41estP0.25143/840.100.250.100.900.00.907.06estEJE 8 9 /EJE F HPP - 122S2.200.253.261.793.264.9015.970.25101/224.200.404.600.04.6045.54VP0.25281/232.200.250.252.700.02.7074.84HP10124.200.404.600.04.60182.62VP0.25143/840.500.250.101.700.01.7013.33estP0.25143/840.250.250.101.200.01.209.41estP0.25143/840.100.250.100.900.00.907.06estP10124.200.404.600.04.60182.62VP0.25143/840.500.250.101.700.01.7013.33estP0.25143/840.250.250.101.200.01.209.41estP0.25143/840.100.250.100.900.00.907.06estEJE 4 7 /EJE CPP - 52S8.250.203.666.043.6616.9061.850.25581/224.200.404.600.04.60264.13VP0.25301/238.250.200.208.650.08.65256.91HP10124.200.404.600.04.60182.62VP0.25153/840.500.200.101.600.01.6013.44estP0.25153/840.200.200.101.000.01.008.40estP0.25153/840.100.200.100.800.00.806.72estP10124.200.404.600.04.60182.62VP0.25153/840.500.200.101.600.01.6013.44estP0.25153/840.200.200.101.000.01.008.40estP0.25153/840.100.200.100.800.00.806.72estEJE 8 9 /EJE C DPP - 62S5.920.203.263.863.2612.2439.900.25401/224.200.404.600.04.60182.16VP2S0.207.503.264.893.2615.4050.200.25281/238.250.200.208.650.08.65239.78HP2S5.720.203.263.733.2611.8438.6010124.200.404.600.04.60182.62VP0.25143/840.500.200.101.600.01.6012.54estP0.25143/840.200.200.101.000.01.007.84estP0.25143/840.100.200.100.800.00.806.27estP10124.200.404.600.04.60182.62VP0.25143/840.500.200.101.600.01.6012.54estP0.25143/840.200.200.101.000.01.007.84estP0.25143/840.100.200.100.800.00.806.27estP0.25201/224.200.404.600.04.6091.08VP0.25281/224.200.404.600.04.60127.51VP0.25421/224.200.404.600.04.60191.27VP0.25281/237.500.200.207.900.07.90218.99HP0.25281/235.920.200.206.320.06.32175.19HP4.0040124.200.404.600.04.60730.48VP0.131083/840.500.200.101.600.01.6096.77estP0.131083/840.200.200.101.000.01.0060.48estP0.131083/840.100.200.100.800.00.8048.38estEJE 3 7 /EJE C EPP - 72S3.200.203.262.093.266.8022.170.25221/224.200.404.600.04.60100.19VP2S8.250.203.265.383.2616.1052.490.25581/224.200.404.600.04.60264.13VP2S0.650.203.260.423.261.504.890.25121/224.200.404.600.04.6054.65VP2S4.500.203.262.933.269.0029.340.2581/224.200.404.600.04.6036.43VP2S3.200.203.262.093.266.0019.560.25321/224.200.404.600.04.60145.73VP2S0.400.203.260.263.261.003.260.25281/224.200.404.600.04.60127.51VP2S0.400.203.260.263.261.003.260.25281/233.400.200.203.800.03.80105.34HP2S4.050.203.262.643.268.3027.060.25281/238.250.200.208.650.08.65239.78HP0.25281/234.900.200.205.300.05.30146.92HP0.25281/233.400.200.203.800.03.80105.34HP0.25281/234.250.200.204.650.04.65128.90HP8.0080124.200.404.600.04.601,460.96VP0.131083/840.500.200.101.600.01.6096.77estP0.131083/840.200.200.101.000.01.0060.48estP0.131083/840.100.200.100.800.00.8048.38estP0.13813/840.600.200.101.800.01.8081.65estP0.13813/840.400.200.101.400.01.4063.50estP0.13813/840.100.200.100.800.00.8036.29estP0.13273/840.650.200.101.900.01.9028.73estP0.13273/840.400.200.101.400.01.4021.17estP0.13273/840.100.200.100.800.00.8012.10estEJE 5 7 /EJE EPP - 102S5.970.603.2611.683.2612.9442.180.25401/224.200.404.600.04.60182.16VP2S0.203.023.261.973.266.2420.340.25201/224.200.404.600.04.6091.08VP0.25281/235.970.600.607.170.07.17198.75HP0.25281/233.620.200.204.020.04.02111.43HP330124.200.404.600.04.60547.86VP0.25283/840.600.500.102.400.02.4037.63estP0.25283/840.600.250.101.900.01.9029.79estP0.25283/840.100.600.101.600.01.6025.09estP0.25143/840.500.200.101.600.01.6012.54estP0.25143/840.250.200.101.100.01.108.62estP0.25143/840.100.200.100.800.00.806.27estEJE 8 9 /EJE EPP - 112S5.720.603.2611.193.2612.0439.250.25401/224.200.404.600.04.60182.16VP2S0.204.343.262.833.268.4827.640.25201/224.200.404.600.04.6091.08VP2124.200.404.600.04.6036.52VP0.25281/235.970.600.607.170.07.17198.75HP0.25281/234.340.200.204.740.04.74131.39HP330124.200.404.600.04.60547.86VP0.25283/840.600.500.102.400.02.4037.63estP0.25283/840.600.250.101.900.01.9029.79estP0.25283/840.100.600.101.600.01.6025.09estP0.25143/840.500.200.101.600.01.6012.54estP0.25143/840.250.200.101.100.01.108.62estP0.25143/840.100.200.100.800.00.806.27estEJE 8 9 /EJE HPP - 132S5.720.203.263.733.2611.6437.950.25401/224.200.404.600.04.60182.16VP2S0.204.093.262.673.268.3827.320.25281/224.200.404.600.04.60127.51VP0.25281/235.920.200.206.320.06.32175.19HP0.25281/234.090.200.204.490.04.49124.46HP330124.200.404.600.04.60547.86VP0.25423/840.500.200.101.600.01.6037.63estP0.25423/840.250.200.101.100.01.1025.87estP0.25423/840.100.200.100.800.00.8018.82estEJE 3 7 /EJE G HPP - 212S10.470.203.266.833.2652.75171.970.25941/214.260.204.460.04.46415.05VP2S7.460.203.264.860.25361/215.160.405.560.05.56198.16VP2S8.240.204.267.021.0016.6816.680.25361/215.140.255.390.05.39191.92Vhasta sotano 2P0.25281/231.450.200.201.850.01.8551.28HP0.25281/237.870.200.208.270.08.27229.24HP0.25281/236.160.200.206.560.06.56181.84HP0.25361/236.160.200.206.560.06.56233.80HP0.25281/231.700.200.202.100.02.1058.21HP0.25361/232.480.200.202.880.02.88102.64HP610114.260.204.460.04.461,062.37VP410115.150.205.350.05.35849.58VP0.25983/840.450.150.101.400.01.4076.83estP0.25983/840.200.150.100.900.00.9049.39estP0.25983/840.050.150.100.600.00.6032.93estP0.25423/840.600.150.101.700.01.7039.98estP0.25423/840.350.150.101.200.01.2028.22estP0.25543/840.050.150.100.600.00.6018.14estP0.25123/840.450.150.101.400.01.409.41estP0.25123/840.200.150.100.900.00.906.05estP0.25123/840.050.150.100.600.00.604.03estP0.2543/840.600.150.101.700.01.703.81estP0.2543/840.350.150.101.200.01.202.69estP0.2543/840.050.150.100.600.00.601.34estEJE 7 /EJE F HPPLACA EJE 72S0.155.761.501.301.5011.5217.280.35163/822.460.402.860.02.8625.63VP0.35163/822.450.302.750.02.7524.64VP0.35103/815.760.100.105.960.05.9633.38HEJE 3 4 /EJE G HPP - 222S0.252.903.262.363.266.3020.540.25161/214.260.204.460.04.4670.65VP0.25281/232.900.200.203.300.03.3091.48HHasta 2sotanoP210114.260.204.460.04.46354.12VP0.13543/840.450.200.101.500.01.5045.36estP0.13543/840.200.200.101.000.01.0030.24estP0.13543/840.050.200.100.700.00.7021.17estEJE 3 8 /EJE I JPP - 192S0.2013.163.268.583.2639.38128.380.251321/214.260.204.460.04.46582.83VP2S6.330.203.264.130.25281/2313.160.200.2013.560.8014.36398.06HHasta 2sotanoP0.25281/236.530.200.206.930.06.93192.10HP610114.260.204.460.04.461,062.37VP0.25703/840.450.150.101.400.01.4054.88estP0.25703/840.200.150.100.900.00.9035.28estP0.25703/840.050.150.100.600.00.6023.52estP0.13273/840.450.150.101.400.01.4021.17estP0.13273/840.200.150.100.900.00.9013.61estP0.13273/840.050.150.100.600.00.609.07estEJE 3 /EJE I JPP - 202S0.253.143.262.563.266.7822.100.25161/214.260.204.460.04.4670.65VP0.25281/233.140.200.203.540.03.5498.13HHasta 2sotanoPCONSULTA SOBRE PLACA210114.260.204.460.04.46354.12VPINCOMPATIBILIADA 0.13543/840.450.200.101.500.01.5045.36estPPLANTA CON DETALLE0.13543/840.200.200.101.000.01.0030.24estP0.13543/840.050.200.100.700.00.7021.17estEJE 3 /EJE G IPPLACA EJE 32S0.257.293.265.940.133.2614.5847.530.25293/824.260.204.460.04.4672.43VPINCOMPATIBILIADAD0.25291/211.901.900.01.9054.55VPCORTE0.25293/824.260.204.460.04.4672.43VP0.25283/817.297.290.07.29114.31HEJE 8 9 /EJE IPP - 142S2.950.203.261.923.267.4024.120.25181/224.260.204.460.04.4679.48VP2S0.250.553.260.450.25281/232.950.200.203.350.03.3592.86HHasta 2sotanoP210124.260.204.460.04.46354.12VP0.25143/840.450.150.101.400.01.4010.98estP0.25143/840.200.150.100.900.00.907.06estP0.25143/840.050.150.100.600.00.604.70estP0.13273/840.700.200.102.000.02.0030.24estP0.13273/840.200.350.101.300.01.3019.66estP0.13273/840.050.200.100.700.00.7010.58estEJE 8 9 /EJE I JPP - 152S2.950.203.261.923.2610.2033.250.25181/224.260.204.460.04.4679.48VP2S0.250.753.260.610.25281/232.950.200.203.350.03.3592.86HHasta 2sotanoP2S0.351.203.261.37210124.260.204.460.04.46354.12VP0.25143/840.900.200.102.400.02.4018.82estP0.25143/840.450.200.101.500.01.5011.76estP0.25143/840.050.200.100.700.00.705.49estP0.25143/841.350.300.103.500.03.5027.44estP0.25143/840.750.300.102.300.02.3018.03estP0.25143/840.050.300.100.900.00.907.06estEJE 8 9 /EJE I JPP - 172S0.580.353.260.663.269.7431.750.25261/224.260.204.460.04.46114.80VP2S0.254.143.263.370.25281/234.040.250.254.540.04.54125.85HHasta 4to pisoP210124.260.204.460.04.46354.12VP0.13273/840.450.200.101.500.01.5022.68estP0.13273/840.250.200.101.100.01.1016.63estP0.13273/840.050.200.100.700.00.7010.58estP0.13273/840.770.300.102.340.02.3435.38estP0.13273/840.400.300.101.600.01.6024.19estP0.13273/840.050.300.100.900.00.9013.61estEJE 7 /EJE JPP - 162S0.830.353.260.943.262.357.66110124.260.204.460.04.46177.06VP0.10333/840.780.300.102.360.02.3643.61estHasta 2sotanoP0.10333/840.380.300.101.560.01.5628.83estP0.10333/840.050.300.100.900.00.9016.63estEJE 2 3 /EJE I JPPLACA EJE I J2S0.206.203.354.153.3512.4041.540.30213/833.820.300.254.370.04.3751.39VP0.30213/833.820.300.254.370.04.3751.39VP0.30243/816.206.200.06.2083.33HEJE 2 /EJE I JPP - 232S9.920.202.765.482.7620.2555.890.25201/224.260.204.460.04.4688.31VP0.25481/224.260.204.460.04.46211.94VSOLO 2 SOTANOPANCHO 0.200.25241/233.510.200.203.910.03.9192.90HPSOTANO 1 ANCHO 0.250.25241/236.600.200.207.000.07.00166.32HPFalta especificar el acero310124.260.204.460.04.46531.19VPasumir lo mismo para los demas0.13693/840.450.150.101.400.01.4054.10estP0.13693/840.250.150.101.000.01.0038.64estP0.13693/840.050.150.100.600.00.6023.18estEJE 1 2 /EJE I JPP - 222S0.252.902.762.002.766.3017.390.25161/224.260.204.460.04.4670.65VP0.25241/232.900.250.253.400.03.4080.78HHasta 2sotanoP210124.260.204.460.04.46354.12VP0.13463/840.450.200.101.500.01.5038.64estP0.13463/840.200.200.101.000.01.0025.76estP0.13463/840.050.200.100.700.00.7018.03estEJE 1 2 /EJE JPPLACA EJE J2S0.257.802.765.382.7615.6043.060.25313/824.300.304.600.04.6079.86VPASUMO CORTE 16-160.25311/211.901.900.01.9058.31VP0.25313/824.300.504.800.04.8083.33VP0.25243/817.807.800.07.80104.83HEJE 2 /EJE G HPP - 252S9.920.203.266.473.2620.2566.020.25221/224.260.204.460.04.4697.14VP0.25481/224.260.204.460.04.46211.94VHasta 2sotanoP0.25281/233.510.200.203.910.03.91108.39HP0.25281/236.600.200.207.000.07.00194.04HP310124.260.204.460.04.46531.19VP0.13813/840.450.150.101.400.01.4063.50estP0.13813/840.250.150.101.000.01.0045.36estP0.13813/840.050.150.100.600.00.6027.22estEJE 1 2 /EJE GPP - 262S0.251.943.261.583.264.3814.280.2561/224.260.204.460.04.4626.49VP0.25281/231.940.250.252.440.02.4467.64HHasta 2sotanoP210124.260.204.460.04.46354.12VP0.25283/840.450.200.101.500.01.5023.52estP0.25283/840.200.200.101.000.01.0015.68estP0.25283/840.050.200.100.700.00.7010.98estEJE 2 /EJE G HPP - 272S0.256.223.265.073.265.7418.710.25441/224.260.204.460.04.46194.28VP2S2.970.203.261.943.266.6621.710.25181/224.260.204.460.04.4679.48VHasta 2sotanoP0.606.163.700.25281/233.220.200.203.620.03.62100.35HP0.25281/236.220.250.256.720.06.72186.28HP310124.260.204.460.04.46531.19VP0.13543/840.450.150.101.400.01.4042.34estP0.13543/840.250.150.101.000.01.0030.24estP0.13543/840.050.150.100.600.00.6018.14estP0.13273/840.450.200.101.500.01.5022.68estP0.13273/840.250.200.101.100.01.1016.63estP0.13273/840.050.200.100.700.00.7010.58estEJE 2 /EJE I JPP - 242S0.256.612.764.562.765.9416.390.25441/224.260.204.460.04.46194.28VP2S2.970.202.761.642.766.4417.770.25201/224.260.204.460.04.4688.31VHasta 2sotanoP0.25241/233.220.200.203.620.03.6286.01HP0.25241/236.600.250.257.100.07.10168.70HP310124.260.204.460.04.46531.19VP0.13463/840.450.200.101.500.01.5038.64estP0.13463/840.250.200.101.100.01.1028.34estP0.13463/840.050.200.100.700.00.7018.03estP0.13233/840.450.150.101.400.01.4018.03estP0.13233/840.250.150.101.000.01.0012.88estP0.13233/840.050.150.100.600.00.607.73estEJE 1 /EJE H IPPLACA EJE 12S0.251.303.661.193.661.304.760.2553/825.180.505.680.05.6815.90VP0.2553/812.512.510.02.517.03VP0.2553/824.180.354.530.04.5312.68VP0.25303/811.300.201.501.5025.20HEJE 1 2 /EJE H IPPLACA EJE 1 22S0.201.303.660.953.661.304.760.2553/825.180.505.680.05.6815.90VPFALTA ESPECIFICAR CORTEACERO ASUMIDO0.2553/812.512.510.02.517.03VP0.2553/824.180.354.530.04.5312.68VP0.25303/811.300.201.501.5025.20HEJE 1 2 /EJE IPPLACA EJE I2S0.251.303.661.193.661.304.760.2553/825.180.505.680.05.6815.90VPFALTA ESPECIFICAR CORTEACERO ASUMIDO0.2553/812.512.510.02.517.03VP0.2553/824.180.354.530.04.5312.68VP0.25303/811.300.201.501.5025.20HEJE 2 /EJE H IPPLACA EJE 22S0.201.303.660.953.661.304.760.2553/825.180.505.680.05.6815.90VPFALTA ESPECIFICAR CORTEACERO ASUMIDO0.2553/812.512.510.02.517.03VP0.2553/824.180.354.530.04.5312.68VP0.25303/811.300.201.501.5025.20H

ENCOFRADO Y DESENCOFRADO MUROS CONTENCIONM2581.72ENCOFRADO Y DESENCOFRADO PLACASM21,706.86ENCOFRADO Y DESENCOFRADO COLUMNASM2108.31ACERO DE REFUERZO MUROS CONTENCIONKG7,029.12ACERO DE REFUERZO PLACASKG34,823.01ACERO DE REFUERZO COLUMNASKG1,787.36

PLACAS Y COLUMNAS01 STANO0CONCRETO f'c=280 KG/CM2 MUROS CONTENCIONM3108.75CONCRETO f'c=280 KG/CM2 PLACASM3167.25CONCRETO f'c=280 KG/CM2 COLUMNASM38.74EJE 0 1 /EJE BCC - 051S0.800.253.060.613.062.106.4343/413.163.160.03.1628.31VC45/813.163.160.03.1619.59VC0.25263/840.770.190.102.120.02.1230.87estC0.25263/840.270.220.101.180.01.1817.18estEJE 0 1 /EJE CCC - 051S0.800.253.060.613.062.106.4343/413.163.160.03.1628.31VC45/813.163.160.03.1619.59VC0.25263/840.770.190.102.120.02.1230.87estC0.25263/840.270.220.101.180.01.1817.18estEJE 1 /EJE A BCC - 061S0.500.253.060.383.061.504.5941/213.163.160.03.1612.51VC45/813.163.160.03.1619.59VC0.25263/840.470.190.101.520.01.5222.13estC0.25263/840.170.220.100.980.00.9814.27estEJE 1 /EJE BCC - 011S0.800.253.060.613.062.106.4343/423.310.303.610.03.6132.35VC45/823.310.303.610.03.6122.38VC0.25263/840.770.190.102.120.02.1230.87estC0.25263/840.270.220.101.180.01.1817.18estEJE 1 /EJE CCC - 011S0.800.253.060.613.062.106.4343/423.310.303.610.03.6132.35VC45/823.310.303.610.03.6122.38VC0.25263/840.770.190.102.120.02.1230.87estC0.25263/840.270.220.101.180.01.1817.18estEJE 1 2 /EJE DCC - 041S0.500.253.060.383.061.504.5941/223.310.303.610.03.6114.30VC45/823.310.303.610.03.6122.38VC0.25263/840.470.190.101.520.01.5222.13estC0.25263/840.170.220.100.980.00.9814.27estEJE 1 2 /EJE D ECC - 041S0.500.253.060.383.061.504.5941/223.310.303.610.03.6114.30VC45/823.310.303.610.03.6122.38VC0.25263/840.470.190.101.520.01.5222.13estC0.25263/840.170.220.100.980.00.9814.27estEJE 2 /EJE BCC - 011S0.800.253.060.613.062.106.4343/423.310.303.610.03.6132.35VC45/823.310.303.610.03.6122.38VC0.25263/840.770.190.102.120.02.1230.87estC0.25263/840.270.220.101.180.01.1817.18estEJE 2 /EJE CCC - 021S0.800.253.060.613.063.209.7973/423.310.303.610.03.6156.60VC0.550.253.060.4285/823.310.303.610.03.6144.76VC0.25263/840.770.190.102.120.02.1230.87estC0.25263/840.220.220.101.080.01.0815.72estC0.25263/840.770.190.102.120.02.1230.87estC0.25263/840.220.220.101.080.01.0815.72estEJE 2 /EJE DCC - 011S0.800.253.060.613.062.106.4343/423.310.303.610.03.6132.35VC45/823.310.303.610.03.6122.38VC0.25263/840.770.190.102.120.02.1230.87estC0.25263/840.270.220.101.180.01.1817.18estEJE 2 /EJE D ECC - 011S0.800.253.060.613.062.106.4343/423.310.303.610.03.6132.35VC45/823.310.303.610.03.6122.38VC0.25263/840.770.190.102.120.02.1230.87estC0.25263/840.270.220.101.180.01.1817.18estEJE 2 3 /EJE BCC - 011S0.800.253.060.613.062.106.4343/423.310.303.610.03.6132.35VC45/823.310.303.610.03.6122.38VC0.25263/840.770.190.102.120.02.1230.87estC0.25263/840.270.220.101.180.01.1817.18estEJE 3 4 /EJE D ECC - 041S0.500.253.060.383.061.504.5941/223.310.303.610.03.6114.30VC45/823.310.303.610.03.6122.38VC0.25263/840.470.190.101.520.01.5222.13estC0.25263/840.170.220.100.980.00.9814.27estEJE 3 4 /EJE ECC - 031S0.600.353.060.643.061.905.8143/423.310.303.610.03.6132.35VC45/823.310.303.610.03.6122.38VC0.25263/840.570.290.101.920.01.9227.96estC0.25263/840.320.220.101.280.01.2818.64estEJE 3 4 /EJE CCC - 031S0.600.353.060.643.061.905.8143/423.310.303.610.03.6132.35VC45/823.310.303.610.03.6122.38VC0.25263/840.570.290.101.920.01.9227.96estC0.25263/840.320.220.101.280.01.2818.64estEJE 1 /EJE J KMCPLACA EJE 11S0.256.212.563.972.565.9615.250.25253/822.880.203.080.03.0843.12VMC0.25253/823.770.203.970.03.9755.51VMC0.25223/816.216.210.06.2176.46HEJE 1 10/EJE KMCPLACA EJE K1S35.100.252.5622.472.5635.0589.730.251403/812.882.880.02.88225.90VMC0.251403/811.901.900.01.90148.96VMC0.251403/822.880.203.080.03.08241.47VMC0.25223/8135.1035.1035.10432.47HEJE 9 10/EJE J KMCPLACA EJE 10 K1S4.170.252.562.672.564.1710.670.25173/822.882.880.02.8827.43VMC0.25173/811.901.900.01.9018.09VMC0.25173/822.880.203.080.03.0829.32VMC0.25223/814.174.170.04.1751.36HEJE 10 /EJE A KMCPLACA EJE 101S0.2535.263.0126.533.0125.0975.520.251413/823.330.213.540.03.54279.12VMC0.251413/812.102.100.02.10165.82VMC0.251413/813.153.150.03.15248.72VMC0.25263/8135.2635.2635.26513.39HMC1S0.259.922.556.322.559.9225.300.25403/822.870.102.970.02.9766.53VMC0.359.923.470.25403/811.901.900.01.9042.56VMC0.25403/822.870.102.970.02.9766.53VMC0.25243/819.929.929.92133.32HEJE 9 10 /EJE AMCPLACA EJE A1S6.090.253.014.583.016.0918.330.25243/823.330.123.450.03.4546.37VMC0.25243/812.152.150.02.1528.90VMC0.25243/823.300.123.420.03.4245.96VMC0.25263/816.096.090.06.0988.64HMC303/8Le3.603.6060.48LeEJE 8 9/EJE A BPP - 21S0.255.533.014.163.0113.8641.720.25421/213.163.160.03.16131.39VP1S6.170.253.014.643.015.7417.280.25401/213.163.160.03.16125.14VP0.25261/236.170.250.256.670.06.67171.69HP0.25261/235.780.250.256.280.06.28161.65HP310113.163.160.03.16376.36VP0.13753/840.450.200.101.500.01.5063.00estP0.13753/840.200.200.101.000.01.0042.00estP0.13753/840.050.200.100.700.00.7029.40estEJE 7 8 /EJE AMCPLACA EJE A1S0.251.303.010.983.011.303.910.2553/813.153.150.03.158.82VMC0.2553/812.102.100.02.105.88VMC0.2553/813.153.150.03.158.82VMC0.25263/832.300.250.252.800.02.8040.77HEJE 4 7/EJE APP - 11S0.252.793.012.103.015.8317.550.25181/213.163.160.03.1656.31VP7.120.253.015.363.016.6720.080.25481/213.163.160.03.16150.16VP0.25131/237.120.250.257.620.07.6298.07HP0.25131/233.060.250.253.560.03.5645.82HP310123.163.160.03.16125.45VP0.13253/840.450.200.101.500.01.5021.00estP0.13253/840.200.200.101.000.01.0014.00estP0.13253/840.050.200.100.700.00.709.80estEJE 4 7/EJE BPP - 31S0.251.573.011.183.0117.2251.830.25501/213.163.160.03.16156.42VP6.890.253.015.180.2561/213.163.160.03.1618.77VP0.25131/236.890.250.257.390.07.3995.11HP0.25131/231.820.250.252.320.02.3229.86HP310113.163.160.03.16376.36VP0.13753/840.450.200.101.500.01.5063.00estP0.13753/840.200.200.101.000.01.0042.00estP0.13753/840.050.200.100.700.00.7029.40estEJE 8 9 /EJE BPP - 41S3.070.253.012.313.016.6319.970.25161/213.163.160.03.1650.05VP(0.25)0.250.45-0.03
Luis: Resta: concreto de viga-0.450.75-0.34
Luis: Resta: encofrado en Viga0.25261/233.070.250.253.570.03.5791.89HP210113.163.160.03.16250.90VP0.25263/840.450.200.101.500.01.5021.84estP0.25263/840.200.200.101.000.01.0014.56estP0.25263/840.050.200.100.700.00.7010.19estEJE 3 4 /EJE AMCPLACA EJE A1S0.253.823.012.873.013.8211.500.25153/823.330.153.480.03.4829.23VMC0.25153/812.152.150.02.1518.06VMC0.25153/823.330.153.480.03.4829.23VMC0.25263/813.823.820.03.8255.62HEJE 1 3 /EJE AMCPLACA EJE A1S0.2513.431.404.701.4013.4318.800.25543/831.841.050.102.990.02.9990.27VMCFALTA DATOS DE ACERO EN CORTE 7-70.25543/811.551.550.01.5546.87VMC0.25543/821.820.151.970.01.9759.57VMC0.25123/8113.4313.4313.4390.25HEJE 0 1 /EJE AMCPLACA EJE A1S0.258.883.016.683.018.8826.730.25363/813.203.200.03.2064.51VMC0.25363/812.152.150.02.1543.34VMC0.25363/813.203.200.03.2064.51VMC0.25263/818.888.880.08.88129.29HEJE 0 /EJE A DMCPLACA EJE 01S0.2517.203.0112.943.0117.2051.770.25693/823.330.203.530.03.53136.40VMC0.25693/812.102.100.02.1081.14VMC0.25693/813.153.150.03.15121.72VMC0.25263/8117.2017.2017.20250.39HEJE 0 1 /EJE DMCPLACA EJE D1S0.257.033.015.293.016.7820.410.25283/823.330.203.530.03.5355.35VMC0.25283/812.102.100.02.1032.93VMC0.25283/813.153.150.03.1549.39VMC0.25263/817.037.030.07.03102.36HEJE 1 /EJE D GMCPLACA EJE 11S0.2510.353.017.793.0110.3531.150.25413/823.340.203.540.03.5481.16VMC0.25413/812.102.100.02.1048.22VMC0.25413/813.163.160.03.1672.55VMC0.25263/8110.3510.3510.35150.70HEJE 1 /EJE GMCPLACA EJE G1S0.251.263.010.953.011.263.790.2553/823.340.203.540.03.549.90VMC0.2553/812.102.100.02.105.88VMC0.2553/813.163.160.03.168.85VMC0.25263/811.261.260.01.2618.40HMC303/8Le2.402.4040.32LeEJE 6 7 /EJE JPP - 181S0.253.353.012.523.017.2021.670.25181/213.163.160.03.1656.31VP0.25261/233.340.250.253.840.03.8498.84HHasta 2sotanoP10113.163.160.03.16125.45VP0.13253/840.450.200.101.500.01.5021.00estP0.13253/840.200.200.101.000.01.0014.00estP0.13253/840.050.200.100.700.00.709.80estP10113.163.160.03.16125.45VP0.13253/840.450.200.101.500.01.5021.00estP0.13253/840.200.200.101.000.01.0014.00estP0.13253/840.050.200.100.700.00.709.80estEJE 5 /EJE D EPP - 81S3.330.253.012.513.017.1621.550.25181/213.163.160.03.1656.31VP0.25261/233.330.250.253.830.03.8398.58Hhasta 4 pisoP10113.163.160.03.16125.45VP0.25133/840.450.200.101.500.01.5010.92estP0.25133/840.200.200.101.000.01.007.28estP0.25133/840.050.200.100.700.00.705.10estP10113.163.160.03.16125.45VP0.25133/840.450.200.101.500.01.5010.92estP0.25133/840.200.200.101.000.01.007.28estP0.25133/840.050.200.100.700.00.705.10estEJE 8 9 /EJE D EPP - 91S2.200.253.011.663.014.9014.750.25101/213.163.160.03.1631.28VP0.25261/232.200.250.252.700.02.7069.50HHasta 2sotanoP10113.163.160.03.16125.45VP0.25133/840.450.200.101.500.01.5010.92estP0.25133/840.200.200.101.000.01.007.28estP0.25133/840.050.200.100.700.00.705.10estP10113.163.160.03.16125.45VP0.25133/840.450.200.101.500.01.5010.92estP0.25133/840.200.200.101.000.01.007.28estP0.25133/840.050.200.100.700.00.705.10estEJE 8 9 /EJE F HPP - 121S2.200.253.011.663.014.9014.750.25101/213.163.160.03.1631.28VP0.25261/232.200.250.252.700.02.7069.50HHasta 2sotanoP10113.163.160.03.16125.45VP0.25133/840.450.200.101.500.01.5010.92estP0.25133/840.200.200.101.000.01.007.28estP0.25133/840.050.200.100.700.00.705.10estP10113.163.160.03.16125.45VP0.25133/840.450.200.101.500.01.5010.92estP0.25133/840.200.200.101.000.01.007.28estP0.25133/840.050.200.100.700.00.705.10estEJE 4 7 /EJE CPP - 51S8.250.203.014.973.0116.9050.870.25581/213.163.160.03.16181.45VP0.25261/238.250.200.208.650.08.65222.65Hhasta 4to pisoP10113.163.160.03.16125.45VP0.25133/840.450.150.101.400.01.4010.19estP0.25133/840.150.150.100.800.00.805.82estP0.25133/840.050.150.100.600.00.604.37estP10113.163.160.03.16125.45VP0.25133/840.450.150.101.400.01.4010.19estP0.25133/840.150.150.100.800.00.805.82estP0.25133/840.050.150.100.600.00.604.37estEJE 8 9 /EJE C DPP - 61S5.920.203.013.563.0112.2436.840.25401/213.163.160.03.16125.14VP1S0.207.503.014.523.0115.4046.350.25261/238.250.200.208.650.08.65222.65Hhasta 2 sotanoP1S5.720.203.013.443.0111.8435.6410113.163.160.03.16125.45VP0.25133/840.450.150.101.400.01.4010.19estP0.25133/840.150.150.100.800.00.805.82estP0.25133/840.050.150.100.600.00.604.37estP10113.163.160.03.16125.45VP0.25133/840.450.150.101.400.01.4010.19estP0.25133/840.150.150.100.800.00.805.82estP0.25133/840.050.150.100.600.00.604.37estP0.25201/213.163.160.03.1662.57VP0.25281/213.163.160.03.1687.60VP0.25421/213.163.160.03.16131.39VP0.25261/237.500.200.207.900.07.90203.35HP0.25261/235.920.200.206.320.06.32162.68HP4.0010113.163.160.03.16501.81VP0.131003/840.450.150.101.400.01.4078.40estP0.131003/840.150.150.100.800.00.8044.80estP0.131003/840.050.150.100.600.00.6033.60estEJE 3 7 /EJE C EPP - 71S3.200.203.011.933.016.8020.470.25221/213.163.160.03.1668.82VP1S8.250.203.014.973.0116.1048.460.25581/213.163.160.03.16181.45Vhasta sotano 2P1S0.650.203.010.393.011.504.520.25121/213.163.160.03.1637.54VP1S4.500.203.012.713.019.0027.090.2581/213.163.160.03.1625.03VP1S3.200.203.011.933.016.0018.060.25321/213.163.160.03.16100.11VP1S0.400.203.010.243.011.003.010.25281/213.163.160.03.1687.60VP1S0.400.203.010.243.011.003.010.25261/233.400.200.203.800.03.8097.81HP1S4.050.203.012.443.018.3024.980.25261/238.250.200.208.650.08.65222.65HP0.25261/234.900.200.205.300.05.30136.42HP0.25261/233.400.200.203.800.03.8097.81HP0.25261/234.250.200.204.650.04.65119.69HP8.0010113.163.160.03.161,003.62VP0.25393/840.450.150.101.400.01.4030.58estP0.25393/840.150.150.100.800.00.8017.47estP0.25393/840.050.150.100.600.00.6013.10estP0.13253/840.450.150.101.400.01.4019.60estP0.13253/840.150.150.100.800.00.8011.20estP0.13253/840.050.150.100.600.00.608.40estP0.25393/840.550.150.101.600.01.6034.94estP0.25393/840.350.150.101.200.01.2026.21estP0.25393/840.050.150.100.600.00.6013.10estP0.25133/840.600.150.101.700.01.7012.38estP0.25133/840.350.150.101.200.01.208.74estP0.25133/840.050.150.100.600.00.604.37estEJE 5 7 /EJE EPP - 101S5.970.603.0110.783.0112.9438.950.25401/213.163.160.03.16125.14VP1S0.203.023.011.823.016.2418.780.25201/213.163.160.03.1662.57Vhasta sotano 2P0.25261/235.970.600.607.170.07.17184.56HP0.25261/233.620.200.204.020.04.02103.47HP330113.163.160.03.16376.36VP0.25263/840.550.450.102.200.02.2032.03estP0.25263/840.550.200.101.700.01.7024.75estP0.25263/840.050.550.101.400.01.4020.38estP0.25133/840.450.150.101.400.01.4010.19estP0.25133/840.200.150.100.900.00.906.55estP0.25133/840.050.150.100.600.00.604.37estEJE 8 9 /EJE EPP - 111S5.720.603.0110.333.0112.0436.240.25401/213.163.160.03.16125.14VP1S0.204.343.012.613.018.4825.520.25201/213.163.160.03.1662.57Vhasta sotano 2P2113.163.160.03.1625.09VP0.25261/235.970.600.607.170.07.17184.56HP0.25261/234.340.200.204.740.04.74122.01HP330113.163.160.03.16376.36VP0.25263/840.550.450.102.200.02.2032.03estP0.25263/840.550.200.101.700.01.7024.75estP0.25263/840.050.550.101.400.01.4020.38estP0.25133/840.450.150.101.400.01.4010.19estP0.25133/840.200.150.100.900.00.906.55estP0.25133/840.050.150.100.600.00.604.37estEJE 8 9 /EJE HPP - 131S5.720.203.013.443.0111.6435.040.25401/213.163.160.03.16125.14VP1S0.204.093.012.463.018.3825.220.25281/213.163.160.03.1687.60Vhasta sotano 2P0.25261/235.920.200.206.320.06.32162.68HP0.25261/234.090.200.204.490.04.49115.57HP330113.163.160.03.16376.36VP0.25393/840.450.150.101.400.01.4030.58estP0.25393/840.200.150.100.900.00.9019.66estP0.25393/840.050.150.100.600.00.6013.10estEJE 3 7 /EJE G HPP - 211S10.470.203.016.303.0152.75158.780.25601/213.163.160.03.16187.70VP1S7.460.203.014.490.251041/213.163.160.03.16325.35Vhasta sotano 2P1S8.240.203.014.960.25261/231.450.200.201.850.01.8547.62HP0.25261/237.870.200.208.270.08.27212.87HP0.25261/236.160.200.206.560.06.56168.85HP0.25261/236.160.200.206.560.06.56168.85HP0.25261/231.700.200.202.100.02.1054.05HP0.25261/232.480.200.202.880.02.8874.13HP1010113.163.160.03.161,254.52VP0.25913/840.450.150.101.400.01.4071.34estP0.25913/840.200.150.100.900.00.9045.86estP0.25913/840.050.150.100.600.00.6030.58estP0.25393/840.600.150.101.700.01.7037.13estP0.25393/840.350.150.101.200.01.2026.21estP0.25393/840.050.150.100.600.00.6013.10estEJE 3 4 /EJE G HPP - 221S0.252.902.611.892.616.3016.440.25161/213.163.160.03.1650.05VP0.25221/232.900.250.253.400.03.4074.05HHasta 2sotanoP210113.163.160.03.16250.90VP0.13423/840.450.200.101.500.01.5035.28estP0.13423/840.200.200.101.000.01.0023.52estP0.13423/840.050.200.100.700.00.7016.46estEJE 3 8 /EJE I JPP - 191S0.2013.163.017.923.0139.38118.530.251321/213.163.160.03.16412.95VP1S6.330.203.013.810.25261/2313.160.200.2013.560.8014.36369.63HHasta 2sotanoP0.25261/236.530.200.206.930.06.93178.38HP610113.163.160.03.16752.71VP0.25653/840.450.150.101.400.01.4050.96estP0.25653/840.200.150.100.900.00.9032.76estP0.25653/840.050.150.100.600.00.6021.84estP0.13253/840.450.150.101.400.01.4019.60estP0.13253/840.200.150.100.900.00.9012.60estP0.13253/840.050.150.100.600.00.608.40estEJE 3 /EJE I JPP - 201S0.253.142.612.052.616.7817.700.25161/213.163.160.03.1650.05VP0.25221/232.900.250.253.400.03.4074.05HHasta 2sotanoPCONSULTA SOBRE PLACA210113.163.160.03.16250.90VP0.13423/840.450.200.101.500.01.5035.28estP0.13423/840.200.200.101.000.01.0023.52estP0.13423/840.050.200.100.700.00.7016.46estEJE 8 9 /EJE IPP - 141S2.950.202.611.542.617.4019.310.25181/213.163.160.03.1656.31VP1S0.250.552.610.360.25221/232.950.200.203.350.03.3572.96HHasta 2sotanoP210113.163.160.03.16250.90VP0.25113/840.450.150.101.400.01.408.62estP0.25113/840.200.150.100.900.00.905.54estP0.25113/840.050.150.100.600.00.603.70estP0.13213/840.700.200.102.000.02.0023.52estP0.13213/840.200.350.101.300.01.3015.29estP0.13213/840.050.200.100.700.00.708.23estEJE 8 9 /EJE I JPP - 151S2.950.203.011.783.0110.2030.700.25181/213.163.160.03.1656.31VP1S0.250.753.010.560.25261/232.950.200.203.350.03.3586.23HHasta 2sotanoP1S0.351.203.011.26210113.163.160.03.16250.90VP0.25133/840.900.200.102.400.02.4017.47estP0.25133/840.450.200.101.500.01.5010.92estP0.25133/840.050.200.100.700.00.705.10estP0.25133/841.350.300.103.500.03.5025.48estP0.25133/840.750.300.102.300.02.3016.74estP0.25133/840.050.300.100.900.00.906.55estEJE 8 9 /EJE I JPP - 171S0.580.353.010.613.019.7429.320.25261/213.163.160.03.1681.34VP1S0.254.143.013.120.25261/234.040.250.254.540.04.54116.86HHasta 4to pisoP210113.163.160.03.16250.90VP0.13253/840.450.200.101.500.01.5021.00estP0.13253/840.250.200.101.100.01.1015.40estP0.13253/840.050.200.100.700.00.709.80estP0.13253/840.770.300.102.340.02.3432.76estP0.13253/840.400.300.101.600.01.6022.40estP0.13253/840.050.300.100.900.00.9012.60estEJE 7 /EJE JPP - 161S0.830.352.610.752.612.356.13110113.163.160.03.16125.45VP0.10273/840.780.300.102.360.02.3635.68estHasta 2sotanoP0.10273/840.380.300.101.560.01.5623.59estP0.10273/840.050.300.100.900.00.9013.61estEJE 2 /EJE I JPP - 231S9.920.253.017.463.0120.2560.950.25201/213.163.160.03.1662.57VP0.25481/213.163.160.03.16150.16VSOLO 1 SOTANOP0.25261/233.510.200.203.910.03.91100.64HP0.25261/236.600.200.207.000.07.00180.18HP310113.163.160.03.16376.36VP0.13753/840.450.150.101.400.01.4058.80estP0.13753/840.250.150.101.000.01.0042.00estP0.13753/840.050.150.100.600.00.6025.20estEJE 1 2 /EJE I JPP - 221S0.252.902.611.892.616.3016.440.25161/213.163.160.03.1650.05VP0.25221/232.900.250.253.400.03.4074.05HHasta 2sotanoP210113.163.160.03.16250.90VP0.13423/840.450.200.101.500.01.5035.28estP0.13423/840.200.200.101.000.01.0023.52estP0.13423/840.050.200.100.700.00.7016.46estEJE 2 /EJE G HPP - 251S9.920.203.015.973.0120.2560.950.25221/213.163.160.03.1668.82VP0.25481/213.163.160.03.16150.16VHasta 2sotanoP0.25261/233.510.200.203.910.03.91100.64HP0.25261/236.600.200.207.000.07.00180.18HP310113.163.160.03.16376.36VP0.13753/840.450.150.101.400.01.4058.80estP0.13753/840.250.150.101.000.01.0042.00estP0.13753/840.050.150.100.600.00.6025.20estEJE 1 2 /EJE GPP - 261S0.251.942.611.272.614.3811.430.2561/213.163.160.03.1618.77VP0.25221/231.940.250.252.440.02.4453.14HHasta 2sotanoP210113.163.160.03.16250.90VP0.25223/840.450.200.101.500.01.5018.48estP0.25223/840.200.200.101.000.01.0012.32estP0.25223/840.050.200.100.700.00.708.62estEJE 2 /EJE G HPP - 271S0.256.223.014.683.015.7417.280.25441/213.163.160.03.16137.65VP1S2.970.203.011.793.016.6620.050.25181/213.163.160.03.1656.31VHasta 2sotanoP0.606.163.700.25261/233.220.200.203.620.03.6293.18HP0.25261/236.220.250.256.720.06.72172.97HP310113.163.160.03.16376.36VP0.13503/840.450.150.101.400.01.4039.20estP0.13503/840.250.150.101.000.01.0028.00estP0.13503/840.050.150.100.600.00.6016.80estP0.13253/840.450.200.101.500.01.5021.00estP0.13253/840.250.200.101.100.01.1015.40estP0.13253/840.050.200.100.700.00.709.80estEJE 2 /EJE I JPP - 241S0.256.613.014.973.015.9417.880.25441/213.163.160.03.16137.65VP1S2.970.203.011.793.016.4419.380.25201/213.163.160.03.1662.57VHasta 2sotanoP0.25261/233.220.200.203.620.03.6293.18HP0.25261/236.600.250.257.100.07.10182.75HP310113.163.160.03.16376.36VP0.13503/840.450.200.101.500.01.5042.00estP0.13503/840.250.200.101.100.01.1030.80estP0.13503/840.050.200.100.700.00.7019.60estP0.13253/840.450.150.101.400.01.4019.60estP0.13253/840.250.150.101.000.01.0014.00estP0.13253/840.050.150.100.600.00.608.40estPENCOFRADO Y DESENCOFRADO MUROS CONTENCIONM2406.33ENCOFRADO Y DESENCOFRADO PLACASM21,364.84ENCOFRADO Y DESENCOFRADO COLUMNASM291.19ACERO DE REFUERZO MUROS CONTENCIONKG5,187.14ACERO DE REFUERZO PLACASKG24,436.19ACERO DE REFUERZO COLUMNASKG1,493.49

PLACAS Y COLUMNAS01 PISO0CONCRETO f'c=280 KG/CM2 PLACASM3168.91CONCRETO f'c=280 KG/CM2 COLUMNASM31.31CONCRETO f'c=280 KG/CM2 MUROS DE CONCRETOM335.11EJE 3 10 /EJE AAPlaca Perimetral1P25.250.103.358.463.3550.70169.850.251013/824.000.304.300.04.30243.21VParalelo al eje AA1P25.250.600.7010.610.7051.7036.190.25143/8125.2525.250.8026.05204.23H000.00EJE 1 3/EJE AAPlaca Perimetral1P13.400.102.403.222.4027.0064.800.25543/822.850.203.050.03.0592.23VParalelo al eje AA1P13.400.750.454.520.4528.3012.740.25103/8113.4013.400.4013.8077.28H000.00EJE 0 1 /EJE AAPlaca Perimetral1P11.000.103.353.693.3522.2074.370.25443/824.000.304.300.04.30105.95VParalelo al eje AA1P11.000.600.704.620.7023.2016.240.25143/8111.0011.000.4011.4089.38H000.00EJE 0 1 /EJE BCC - 051P0.600.253.500.533.501.705.9585/823.800.304.100.04.1050.84V80.9511.78C0.25143/840.570.190.101.720.01.7213.48est000.00C0.25143/840.200.220.101.040.01.048.15est000.00EJE 0 1 /EJE CCC - 051P0.600.253.500.533.501.705.9585/823.800.304.100.04.1050.84V80.9511.78C0.25143/840.570.190.101.720.01.7213.48est000.00C0.25143/840.200.220.101.040.01.048.15est000.00EJE 1 /EJE A BCC - 061P0.300.253.500.263.501.103.8521/223.800.304.100.04.108.12V20.81.58C45/823.800.304.100.04.1025.42V40.955.89C0.25143/840.270.190.101.120.01.128.78est000.00C0.25143/840.050.220.100.740.00.745.80est000.00EJE 0 2/EJE APPLACA EJE A1P0.2516.573.5014.503.5033.39116.870.25663/813.803.800.03.80140.45V660.414.78P0.25663/813.803.800.03.80140.45V660.414.78P0.25283/8116.5716.5716.57259.82H000.00EJE 0 /EJE A CPPLACA EJE 01P0.2512.403.5010.853.5024.8086.800.25503/813.803.800.03.80106.40V500.411.20P0.25503/813.803.800.03.80106.40V500.411.20P0.25283/8112.4012.4012.40194.43H000.00EJE 0 /EJE C DPPLACA EJE 01P0.254.802.703.242.709.6025.920.25193/812.852.850.02.8530.32V190.44.26P0.25193/812.852.850.02.8530.32V190.44.26P0.25223/814.804.804.8059.14H000.00EJE 0 1 /EJE DPPLACA EJE D1P0.259.792.706.612.7019.8353.540.25393/812.852.850.02.8562.24V390.48.74P0.25393/812.852.850.02.8562.24V390.48.74P0.25223/819.799.799.79120.61H000.00P303/8Le1.601.6026.88Le000.00EJE 1 /EJE D GPPLACA EJE 11P0.1510.102.463.732.4620.3550.060.25403/822.620.102.720.02.7260.93V400.48.96P0.25403/812.852.850.02.8563.84V400.48.96P0.25203/8110.1010.1010.10113.12H000.00EJE 8 9/EJE A BPP - 22S12.810.202.315.922.3126.0260.110.25501/212.462.460.02.46121.77V500.839.60P0.25401/212.462.460.02.4697.42V400.831.681 AL 4 PISOP0.25201/237.040.200.207.440.07.44147.31H000.00P0.25201/236.970.200.207.370.07.37145.93H000.00P310112.462.460.02.46292.99V101.975.43P0.13573/840.450.150.101.400.01.4044.69est000.00P0.13573/840.250.150.101.000.01.0031.92est000.00P0.13573/840.050.150.100.600.00.6019.15est000.00EJE 4 7/EJE APP - 12S0.209.912.314.582.3120.2246.710.25181/212.462.460.02.4643.84V180.814.26P0.25481/212.462.460.02.46116.90V480.838.021 AL 4 PISOP0.25101/237.120.200.207.520.07.5274.45H000.00P0.25101/233.010.200.203.410.03.4133.76H000.00P310112.462.460.02.46292.99V101.975.43P0.13573/840.450.150.101.400.01.4044.69est000.00P0.13573/840.200.150.100.900.00.9028.73est000.00P0.13573/840.050.150.100.600.00.6019.15est000.00EJE 4 7/EJE BPP - 32S0.204.052.311.872.3122.0851.000.2561/212.462.460.02.4614.61V60.84.75P6.690.202.313.090.25141/212.462.460.02.4634.10V140.811.09P0.25481/212.462.460.02.46116.90V480.838.021 AL 4 PISOP0.25101/236.890.200.207.290.07.2972.17H000.00P0.25101/234.050.200.204.450.04.4544.06H000.00P410112.462.460.02.46390.65V101.975.43P0.25403/840.450.150.101.400.01.4031.36est000.00P0.25403/840.200.150.100.900.00.9020.16est000.00P0.25403/840.050.150.100.600.00.6013.44est000.00EJE 8 9 /EJE BPP - 42S3.070.252.311.772.316.6315.330.25161/212.312.310.02.3136.59V160.812.67P0.25201/233.070.250.253.570.03.5770.69H000.002 sotano al 4 pisoP210112.462.460.02.46195.32V101.975.43P0.25203/840.450.200.101.500.01.5016.80est000.00P0.25203/840.200.200.101.000.01.0011.20est000.00P0.25203/840.050.200.100.700.00.707.84est000.00EJE 6 7 /EJE JPP - 182S0.253.352.311.932.317.1916.610.25181/212.462.460.02.4643.84V180.814.26P0.25201/233.340.250.253.840.03.8476.03H000.001 AL 4 PISOP10112.462.460.02.4697.66V101.975.43P0.13193/840.450.200.101.500.01.5015.96est000.00P0.13193/840.200.200.101.000.01.0010.64est000.00P0.13193/840.050.200.100.700.00.707.45est000.00P10112.462.460.02.4697.66V101.975.43P0.13193/840.450.200.101.500.01.5015.96est000.00P0.13193/840.200.200.101.000.01.0010.64est000.00P0.13193/840.050.200.100.700.00.707.45est000.00EJE 5 /EJE D EPP - 82S3.330.252.311.922.317.1616.540.25181/212.462.460.02.4643.84V180.814.26P0.25201/233.330.250.253.830.03.8375.83H000.00hasta 4 pisoP10112.462.460.02.4697.66V101.975.43P0.25103/840.450.200.101.500.01.508.40est000.00P0.25103/840.200.200.101.000.01.005.60est000.00P0.25103/840.050.200.100.700.00.703.92est000.00P10112.462.460.02.4697.66V101.975.43P0.25103/840.450.200.101.500.01.508.40est000.00P0.25103/840.200.200.101.000.01.005.60est000.00P0.25103/840.050.200.100.700.00.703.92est000.00EJE 8 9 /EJE D EPP - 92S3.330.252.311.922.317.1616.540.25181/212.462.460.02.4643.84V180.814.26P0.25201/233.330.250.253.830.03.8375.83H000.00del 1 al 4 pisoP10112.462.460.02.4697.66V101.975.43P0.25103/840.450.200.101.500.01.508.40est000.00P0.25103/840.200.200.101.000.01.005.60est000.00P0.25103/840.050.200.100.700.00.703.92est000.00P10112.462.460.02.4697.66V101.975.43P0.25103/840.450.200.101.500.01.508.40est000.00P0.25103/840.200.200.101.000.01.005.60est000.00P0.25103/840.050.200.100.700.00.703.92est000.00EJE 8 9 /EJE F HPP - 122S3.330.252.311.922.317.1616.540.25181/212.462.460.02.4643.84V180.814.26P0.25201/233.330.250.253.830.03.8375.83H000.00del 1 al 4 pisoP10112.462.460.02.4697.66V101.975.43P0.25103/840.450.200.101.500.01.508.40est000.00P0.25103/840.200.200.101.000.01.005.60est000.00P0.25103/840.050.200.100.700.00.703.92est000.00P10112.462.460.02.4697.66V101.975.43P0.25103/840.450.200.101.500.01.508.40est000.00P0.25103/840.200.200.101.000.01.005.60est000.00P0.25103/840.050.200.100.700.00.703.92est000.00EJE 4 7 /EJE CPP - 52S8.250.202.313.812.3116.9039.040.25581/212.462.460.02.46141.25V580.845.94P0.25201/238.250.200.208.650.08.65171.27H000.00hasta 4to pisoP10112.462.460.02.4697.66V101.975.43P0.25103/840.450.150.101.400.01.407.84est000.00P0.25103/840.150.150.100.800.00.804.48est000.00P0.25103/840.050.150.100.600.00.603.36est000.00P10112.462.460.02.4697.66V101.975.43P0.25103/840.450.150.101.400.01.407.84est000.00P0.25103/840.150.150.100.800.00.804.48est000.00P0.25103/840.050.150.100.600.00.603.36est000.00EJE 8 9 /EJE C DPP - 62S16.300.202.317.532.3153.56123.720.25481/212.462.460.02.46116.90V480.838.02P2S0.206.852.313.160.25381/212.462.460.02.4692.55V380.830.10del 1 al 4 pisoP0.25281/212.462.460.02.4668.19V280.822.18P0.25501/212.462.460.02.46121.77V500.839.60P0.25201/237.050.200.207.450.07.45147.51H000.00P0.25201/237.050.200.207.450.07.45147.51H000.00P0.25201/239.450.200.209.850.8010.65210.87H000.00P510112.462.460.02.4697.66V101.975.43P0.13953/840.450.150.101.400.01.4074.48est000.00P0.13953/840.270.150.101.040.01.0455.33est000.00P0.13953/840.050.150.100.600.00.6031.92est000.00EJE 3 7 /EJE C EPP - 72S3.200.202.311.482.316.8015.710.25221/212.462.460.02.4653.58V220.817.42P2S8.250.202.313.812.3116.1037.190.25581/212.462.460.02.46141.25V580.845.94del 1 al 4 pisoP2S0.650.202.310.302.311.503.470.25121/212.462.460.02.4629.22V120.89.50P2S4.500.202.312.082.319.0020.790.25101/212.462.460.02.4624.35V100.87.92P2S3.200.202.311.482.316.0013.860.25341/212.462.460.02.4682.80V340.826.93P2S0.400.202.310.182.311.002.310.25281/212.462.460.02.4668.19V280.822.18P2S0.400.202.310.182.311.002.310.25201/233.400.200.203.800.03.8075.24H000.00P2S4.050.202.311.872.318.3019.170.25201/238.250.200.208.650.08.65171.27H000.00P0.25201/234.900.200.205.300.05.30104.94H000.00P0.25201/233.400.200.203.800.03.8075.24H000.00P0.25201/234.250.200.204.650.04.6592.07H000.00P8.0010112.462.460.02.46781.30V101.975.43P0.25303/840.450.150.101.400.01.4023.52est000.00P0.25303/840.150.150.100.800.00.8013.44est000.00P0.25303/840.050.150.100.600.00.6010.08est000.00P0.13193/840.450.150.101.400.01.4014.90est000.00P0.13193/840.150.150.100.800.00.808.51est000.00P0.13193/840.050.150.100.600.00.606.38est000.00P0.25303/840.550.150.101.600.01.6026.88est000.00P0.25303/840.350.150.101.200.01.2020.16est000.00P0.25303/840.050.150.100.600.00.6010.08est000.00P0.25103/840.600.150.101.700.01.709.52est000.00P0.25103/840.350.150.101.200.01.206.72est000.00P0.25103/840.050.150.100.600.00.603.36est000.00EJE 5 7 /EJE EPP - 102S8.990.202.314.152.3118.3842.460.25201/212.462.460.02.4648.71V200.815.84P2S0.205.972.312.762.3112.3428.510.25401/212.462.460.02.4697.42V400.831.68P0.25401/212.462.460.02.4697.42V400.831.68del 1 al 4 pisoP0.25401/235.970.200.206.370.06.37252.25H000.00P0.25201/233.220.200.203.620.03.6271.68H000.00P550112.462.460.02.46488.31V501.9377.15P0.25503/840.450.150.101.400.01.4039.20est000.00P0.25503/840.200.150.100.900.00.9025.20est000.00P0.25503/840.050.150.100.600.00.6016.80est000.00EJE 8 9 /EJE EPP - 112S9.000.202.314.162.3118.4042.500.25841/212.462.460.02.46204.57V840.866.53P2S0.206.692.313.092.3113.7831.830.25201/212.462.460.02.4648.71V200.815.84del 1 al 4 pisoP2112.462.460.02.4619.53V21.915.09P0.25401/235.970.200.206.370.06.37252.25H000.00P0.25201/233.220.200.203.620.03.6271.68H000.00P0.25201/230.820.200.201.220.01.2224.16H000.00P550112.462.460.02.46488.31V501.9377.15P0.25503/840.450.150.101.400.01.4039.20est000.00P0.25503/840.200.150.100.900.00.9025.20est000.00P0.25503/840.050.150.100.600.00.6016.80est000.00EJE 8 9 /EJE HPP - 132S10.940.202.315.052.3122.4951.940.25481/212.462.460.02.46116.90V480.838.02P0.25281/212.462.460.02.4668.19V280.822.18del 1 al 4 pisoP0.25201/237.050.200.207.450.07.45147.51H000.00P0.25201/234.090.200.204.490.04.4988.90H000.00P330112.462.460.02.46292.99V301.9226.29P0.25303/840.450.150.101.400.01.4023.52est000.00P0.25303/840.200.150.100.900.00.9015.12est000.00P0.25303/840.050.150.100.600.00.6010.08est000.00EJE 3 7 /EJE G HPP - 212S12.890.202.315.962.3156.81131.240.251301/212.462.460.02.46316.60V1300.8102.96P2S7.070.202.313.270.25561/212.462.460.02.46136.38V560.844.35del 1 al 4 pisoP2S8.240.202.313.810.25201/231.700.200.202.100.02.1041.58H000.00P0.25201/236.610.200.207.010.07.01138.80H000.00P0.25201/234.980.200.205.380.05.38106.52H000.00P0.25201/236.370.200.206.770.06.77134.05H000.00P0.25201/236.160.200.206.560.06.56129.89H000.00P0.25201/232.480.200.202.880.02.8857.02H000.00P610112.462.460.02.46585.97V101.975.43P0.131143/840.450.150.101.400.01.4089.38est000.00P0.131143/840.200.150.100.900.00.9057.46est000.00P0.131143/840.050.150.100.600.00.6038.30est000.00P310112.462.460.02.46292.99V101.975.43P0.13573/840.600.150.101.700.01.7054.26est000.00P0.13573/840.350.150.101.200.01.2038.30est000.00P0.13573/840.050.150.100.600.00.6019.15est000.00EJE 3 4 /EJE G HPP - 222S0.252.892.311.672.316.2914.530.25161/212.462.460.02.4638.97V160.812.67P0.25201/232.890.250.253.390.03.3967.12H000.00del 1 al 4 pisoP210112.462.460.02.46195.32V101.975.43P0.13383/840.450.200.101.500.01.5031.92est000.00P0.13383/840.200.200.101.000.01.0021.28est000.00P0.13383/840.050.200.100.700.00.7014.90est000.00EJE 3 8 /EJE I JPP - 192S0.2014.832.316.852.3142.9399.160.251541/212.462.460.02.46375.05V1540.8121.97P2S6.330.202.312.920.25201/2314.830.200.2015.230.8016.03317.39H000.00del 1 al 4 pisoP0.25201/236.530.200.206.930.06.93137.29H000.00P410112.462.460.02.46390.65V101.975.43P0.25303/840.450.150.101.400.01.4023.52est000.00P0.25303/840.200.150.100.900.00.9015.12est000.00P0.25303/840.050.150.100.600.00.6010.08est000.00P0.13193/840.450.150.101.400.01.4014.90est000.00P0.13193/840.200.150.100.900.00.909.58est000.00P0.13193/840.050.150.100.600.00.606.38est000.00EJE 3 /EJE I JPP - 202S0.253.142.311.812.316.7815.660.25181/212.462.460.02.4643.84V180.814.26P0.25201/233.140.250.253.640.03.6472.07H000.00del 2 sotano al 4 pisoP210112.462.460.02.46195.32V101.975.43P0.25203/840.450.200.101.500.01.5016.80est000.00P0.25203/840.200.200.101.000.01.0011.20est000.00P0.25203/840.050.200.100.700.00.707.84est000.00EJE 8 9 /EJE IPP - 142S4.080.202.311.882.319.6622.310.25261/212.462.460.02.4663.32V260.820.59P2S0.250.552.310.320.25201/234.080.200.204.480.04.4888.70H000.00del 1 al 4 pisoP210112.462.460.02.46195.32V101.975.43P0.25103/840.450.150.101.400.01.407.84est000.00P0.25103/840.200.150.100.900.00.905.04est000.00P0.25103/840.050.150.100.600.00.603.36est000.00P0.13193/840.700.200.102.000.02.0021.28est000.00P0.13193/840.200.350.101.300.01.3013.83est000.00P0.13193/840.050.200.100.700.00.707.45est000.00EJE 8 9 /EJE I JPP - 152S4.080.202.311.882.3112.4628.780.25241/212.462.460.02.4658.45V240.819.01P2S0.250.752.310.430.25201/234.080.200.204.480.04.4888.70H000.00del 1 al 4 pisoP2S0.351.202.310.97310112.462.460.02.46292.99V101.975.43P0.25103/840.900.200.102.400.02.4013.44est000.00P0.25103/840.450.200.101.500.01.508.40est000.00P0.25103/840.050.200.100.700.00.703.92est000.00P0.25103/841.350.300.103.500.03.5019.60est000.00P0.25103/840.750.300.102.300.02.3012.88est000.00P0.25103/840.050.300.100.900.00.905.04est000.00P0.25103/840.450.150.101.400.01.407.84est000.00P0.25103/840.200.150.100.900.00.905.04est000.00P0.25103/840.050.150.100.600.00.603.36est000.00EJE 8 9 /EJE I JPP - 172S0.580.352.310.462.319.9422.960.25261/212.462.460.02.4663.32V260.820.59P2S0.254.142.312.390.25201/234.040.250.254.540.04.5489.89H000.00Hasta 4to pisoP210112.462.460.02.46195.32V101.975.43P0.13193/840.450.200.101.500.01.5015.96est000.00P0.13193/840.250.200.101.100.01.1011.70est000.00P0.13193/840.050.200.100.700.00.707.45est000.00P0.13193/840.770.300.102.340.02.3424.90est000.00P0.13193/840.400.300.101.600.01.6017.02est000.00P0.13193/840.050.300.100.900.00.909.58est000.00EJE 7 /EJE JPP - 162S0.332.310.772.312.555.89111112.462.460.02.46107.43V111.982.97P0.10243/840.780.220.102.200.02.2029.57est000.00del 1 al 4 pisoP0.10243/840.430.200.101.460.01.4619.62est000.00P0.10243/840.580.400.102.160.02.1629.03est000.00EJE 2 /EJE I JPP - 232S10.820.202.315.002.3122.0550.940.25281/212.462.460.02.4668.19V280.822.18P0.25481/212.462.460.02.46116.90V480.838.02del 1 al 4 pisoP0.25201/234.410.200.204.810.04.8195.24H000.00P0.25201/236.600.200.207.000.07.00138.60H000.00P310112.462.460.02.46292.99V101.975.43P0.13573/840.450.150.101.400.01.4044.69est000.00P0.13573/840.250.150.101.000.01.0031.92est000.00P0.13573/840.050.150.100.600.00.6019.15est000.00EJE 1 2 /EJE I JPP - 222S0.252.892.311.672.316.2914.530.25161/212.462.460.02.4638.97V160.812.67P0.25201/232.890.250.253.390.03.3967.12H000.00del 1 al 4 pisoP210112.462.460.02.46195.32V101.975.43P0.13383/840.450.200.101.500.01.5031.92est000.00P0.13383/840.200.200.101.000.01.0021.28est000.00P0.13383/840.050.200.100.700.00.7014.90est000.00EJE 2 /EJE G HPP - 252S6.210.202.312.872.3125.6559.250.25301/212.462.460.02.4673.06V300.823.76P6.410.202.312.960.25481/212.462.460.02.46116.90V480.838.02P0.25101/212.462.460.02.4624.35V100.87.92del 1 al 4 pisoP0.25201/236.200.200.206.600.06.60130.68H000.00P0.25201/236.600.200.207.000.07.00138.60H000.00P410112.462.460.02.46390.65V101.975.43P0.13763/840.450.150.101.400.01.4059.58est000.00P0.13763/840.250.150.101.000.01.0042.56est000.00P0.13763/840.050.150.100.600.00.6025.54est000.00EJE 1 2 /EJE GPP - 262S0.252.892.311.672.316.2914.520.25161/212.462.460.02.4638.97V160.812.67P0.25201/232.890.250.253.390.03.3967.12H000.00del 1 al 4 pisoP210112.462.460.02.46195.32V101.975.43P0.25203/840.450.200.101.500.01.5016.80est000.00P0.25203/840.200.200.101.000.01.0011.20est000.00P0.25203/840.050.200.100.700.00.707.84est000.00EJE 2 /EJE G HPP - 272S0.256.612.313.822.3118.8843.610.25441/212.462.460.02.46107.16V440.834.85P2S2.970.202.311.370.25181/212.462.460.02.4643.84V180.814.26del 1 al 4 pisoP0.25201/233.220.200.203.620.03.6271.68H000.00P0.25201/236.220.250.256.720.06.72133.06H000.00P310112.462.460.02.46292.99V101.975.43P0.13573/840.450.150.101.400.01.4044.69est000.00P0.13573/840.250.150.101.000.01.0031.92est000.00P0.13573/840.050.150.100.600.00.6019.15est000.00EJE 2 /EJE I JPP - 242S0.256.612.313.822.3119.6745.430.25441/212.462.460.02.46107.16V440.834.85P2S2.970.202.311.370.25201/212.462.460.02.4648.71V200.815.84del 1 al 4 pisoP0.25201/233.220.200.203.620.03.6271.68H000.00P0.25201/236.600.250.257.100.07.10140.58H000.00P310112.462.460.02.46292.99V101.975.43P0.13573/840.450.150.101.400.01.4044.69est000.00P0.13573/840.250.150.101.000.01.0031.92est000.00P0.13573/840.050.150.100.600.00.6019.15est000.00PLe Vert4,854.46PENCOFRADO Y DESENCOFRADO PLACASM21,616.18ENCOFRADO Y DESENCOFRADO COLUMNASM215.75ENCOFRADO Y DESENCOFRADO MUROS DE CONCRETOM2374.18ACERO DE REFUERZO PLACASKG26,964.40ACERO DE REFUERZO COLUMNASKG193.08ACERO DE REFUERZO MUROS DE CONCRETOKG812.28

PLACAS Y COLUMNAS02 PISO0CONCRETO f'c=280 KG/CM2 PLACASM3129.99EJE 8 9/EJE A BPP - 22S12.810.202.315.922.3126.0260.110.25501/212.462.460.02.46121.77VP0.25401/212.462.460.02.4697.42V1 AL 4 PISOP0.25201/237.040.200.207.440.07.44147.31HP0.25201/236.970.200.207.370.07.37145.93HP310112.462.460.02.46292.99VP0.13573/840.450.150.101.400.01.4044.69estP0.13573/840.250.150.101.000.01.0031.92estP0.13573/840.050.150.100.600.00.6019.15estEJE 4 7/EJE APP - 12S0.209.912.314.582.3120.2246.710.25181/212.462.460.02.4643.84VP0.25481/212.462.460.02.46116.90V1 AL 4 PISOP0.25101/237.120.200.207.520.07.5274.45HP0.25101/233.010.200.203.410.03.4133.76HP310112.462.460.02.46292.99VP0.13573/840.450.150.101.400.01.4044.69estP0.13573/840.200.150.100.900.00.9028.73estP0.13573/840.050.150.100.600.00.6019.15estEJE 4 7/EJE BPP - 32S0.204.052.311.872.3122.0851.000.2561/212.462.460.02.4614.61VP6.690.202.313.090.25141/212.462.460.02.4634.10VP0.25481/212.462.460.02.46116.90V1 AL 4 PISOP0.25101/236.890.200.207.290.07.2972.17HP0.25101/234.050.200.204.450.04.4544.06HP410112.462.460.02.46390.65VP0.25403/840.450.150.101.400.01.4031.36estP0.25403/840.200.150.100.900.00.9020.16estP0.25403/840.050.150.100.600.00.6013.44estEJE 8 9 /EJE BPP - 42S3.070.252.311.772.316.6315.330.25161/212.312.310.02.3136.59VP0.25201/233.070.250.253.570.03.5770.69H2 sotano al 4 pisoP210112.462.460.02.46195.32VP0.25203/840.450.200.101.500.01.5016.80estP0.25203/840.200.200.101.000.01.0011.20estP0.25203/840.050.200.100.700.00.707.84estEJE 6 7 /EJE JPP - 182S0.253.352.311.932.317.1916.610.25181/212.462.460.02.4643.84VP0.25201/233.340.250.253.840.03.8476.03H1 AL 4 PISOP10112.462.460.02.4697.66VP0.13193/840.450.200.101.500.01.5015.96estP0.13193/840.200.200.101.000.01.0010.64estP0.13193/840.050.200.100.700.00.707.45estP10112.462.460.02.4697.66VP0.13193/840.450.200.101.500.01.5015.96estP0.13193/840.200.200.101.000.01.0010.64estP0.13193/840.050.200.100.700.00.707.45estEJE 5 /EJE D EPP - 82S3.330.252.311.922.317.1616.540.25181/212.462.460.02.4643.84VP0.25201/233.330.250.253.830.03.8375.83Hhasta 4 pisoP10112.462.460.02.4697.66VP0.25103/840.450.200.101.500.01.508.40estP0.25103/840.200.200.101.000.01.005.60estP0.25103/840.050.200.100.700.00.703.92estP10112.462.460.02.4697.66VP0.25103/840.450.200.101.500.01.508.40estP0.25103/840.200.200.101.000.01.005.60estP0.25103/840.050.200.100.700.00.703.92estEJE 8 9 /EJE D EPP - 92S3.330.252.311.922.317.1616.540.25181/212.462.460.02.4643.84VP0.25201/233.330.250.253.830.03.8375.83Hdel 1 al 4 pisoP10112.462.460.02.4697.66VP0.25103/840.450.200.101.500.01.508.40estP0.25103/840.200.200.101.000.01.005.60estP0.25103/840.050.200.100.700.00.703.92estP10112.462.460.02.4697.66VP0.25103/840.450.200.101.500.01.508.40estP0.25103/840.200.200.101.000.01.005.60estP0.25103/840.050.200.100.700.00.703.92estEJE 8 9 /EJE F HPP - 122S3.330.252.311.922.317.1616.540.25181/212.462.460.02.4643.84VP0.25201/233.330.250.253.830.03.8375.83Hdel 1 al 4 pisoP10112.462.460.02.4697.66VP0.25103/840.450.200.101.500.01.508.40estP0.25103/840.200.200.101.000.01.005.60estP0.25103/840.050.200.100.700.00.703.92estP10112.462.460.02.4697.66VP0.25103/840.450.200.101.500.01.508.40estP0.25103/840.200.200.101.000.01.005.60estP0.25103/840.050.200.100.700.00.703.92estEJE 4 7 /EJE CPP - 52S8.250.202.313.812.3116.9039.040.25581/212.462.460.02.46141.25VP0.25201/238.250.200.208.650.08.65171.27Hhasta 4to pisoP10112.462.460.02.4697.66VP0.25103/840.450.150.101.400.01.407.84estP0.25103/840.150.150.100.800.00.804.48estP0.25103/840.050.150.100.600.00.603.36estP10112.462.460.02.4697.66VP0.25103/840.450.150.101.400.01.407.84estP0.25103/840.150.150.100.800.00.804.48estP0.25103/840.050.150.100.600.00.603.36estEJE 8 9 /EJE C DPP - 62S16.300.202.317.532.3153.56123.720.25481/212.462.460.02.46116.90VP2S0.206.852.313.160.25381/212.462.460.02.4692.55Vdel 1 al 4 pisoP0.25281/212.462.460.02.4668.19VP0.25501/212.462.460.02.46121.77VP0.25201/237.050.200.207.450.07.45147.51HP0.25201/237.050.200.207.450.07.45147.51HP0.25201/239.450.200.209.850.8010.65210.87HP510112.462.460.02.4697.66VP0.13953/840.450.150.101.400.01.4074.48estP0.13953/840.270.150.101.040.01.0455.33estP0.13953/840.050.150.100.600.00.6031.92estEJE 3 7 /EJE C EPP - 72S3.200.202.311.482.316.8015.710.25221/212.462.460.02.4653.58VP2S8.250.202.313.812.3116.1037.190.25581/212.462.460.02.46141.25Vdel 1 al 4 pisoP2S0.650.202.310.302.311.503.470.25121/212.462.460.02.4629.22VP2S4.500.202.312.082.319.0020.790.25101/212.462.460.02.4624.35VP2S3.200.202.311.482.316.0013.860.25341/212.462.460.02.4682.80VP2S0.400.202.310.182.311.002.310.25281/212.462.460.02.4668.19VP2S0.400.202.310.182.311.002.310.25201/233.400.200.203.800.03.8075.24HP2S4.050.202.311.872.318.3019.170.25201/238.250.200.208.650.08.65171.27HP0.25201/234.900.200.205.300.05.30104.94HP0.25201/233.400.200.203.800.03.8075.24HP0.25201/234.250.200.204.650.04.6592.07HP8.0010112.462.460.02.46781.30VP0.25303/840.450.150.101.400.01.4023.52estP0.25303/840.150.150.100.800.00.8013.44estP0.25303/840.050.150.100.600.00.6010.08estP0.13193/840.450.150.101.400.01.4014.90estP0.13193/840.150.150.100.800.00.808.51estP0.13193/840.050.150.100.600.00.606.38estP0.25303/840.550.150.101.600.01.6026.88estP0.25303/840.350.150.101.200.01.2020.16estP0.25303/840.050.150.100.600.00.6010.08estP0.25103/840.600.150.101.700.01.709.52estP0.25103/840.350.150.101.200.01.206.72estP0.25103/840.050.150.100.600.00.603.36estEJE 5 7 /EJE EPP - 102S8.990.202.314.152.3118.3842.460.25201/212.462.460.02.4648.71VP2S0.205.972.312.762.3112.3428.510.25401/212.462.460.02.4697.42VP0.25401/212.462.460.02.4697.42Vdel 1 al 4 pisoP0.25401/235.970.200.206.370.06.37252.25HP0.25201/233.220.200.203.620.03.6271.68HP550112.462.460.02.46488.31VP0.25503/840.450.150.101.400.01.4039.20estP0.25503/840.200.150.100.900.00.9025.20estP0.25503/840.050.150.100.600.00.6016.80estEJE 8 9 /EJE EPP - 112S9.000.202.314.162.3118.4042.500.25841/212.462.460.02.46204.57VP2S0.206.692.313.092.3113.7831.830.25201/212.462.460.02.4648.71Vdel 1 al 4 pisoP2112.462.460.02.4619.53VP0.25401/235.970.200.206.370.06.37252.25HP0.25201/233.220.200.203.620.03.6271.68HP0.25201/230.820.200.201.220.01.2224.16HP550112.462.460.02.46488.31VP0.25503/840.450.150.101.400.01.4039.20estP0.25503/840.200.150.100.900.00.9025.20estP0.25503/840.050.150.100.600.00.6016.80estEJE 8 9 /EJE HPP - 132S10.940.202.315.052.3122.4951.940.25481/212.462.460.02.46116.90VP0.25281/212.462.460.02.4668.19Vdel 1 al 4 pisoP0.25201/237.050.200.207.450.07.45147.51HP0.25201/234.090.200.204.490.04.4988.90HP330112.462.460.02.46292.99VP0.25303/840.450.150.101.400.01.4023.52estP0.25303/840.200.150.100.900.00.9015.12estP0.25303/840.050.150.100.600.00.6010.08estEJE 3 7 /EJE G HPP - 212S12.890.202.315.962.3156.81131.240.251301/212.462.460.02.46316.60VP2S7.070.202.313.270.25561/212.462.460.02.46136.38Vdel 1 al 4 pisoP2S8.240.202.313.810.25201/231.700.200.202.100.02.1041.58HP0.25201/236.610.200.207.010.07.01138.80HP0.25201/234.980.200.205.380.05.38106.52HP0.25201/236.370.200.206.770.06.77134.05HP0.25201/236.160.200.206.560.06.56129.89HP0.25201/232.480.200.202.880.02.8857.02HP610112.462.460.02.46585.97VP0.131143/840.450.150.101.400.01.4089.38estP0.131143/840.200.150.100.900.00.9057.46estP0.131143/840.050.150.100.600.00.6038.30estP310112.462.460.02.46292.99VP0.13573/840.600.150.101.700.01.7054.26estP0.13573/840.350.150.101.200.01.2038.30estP0.13573/840.050.150.100.600.00.6019.15estEJE 3 4 /EJE G HPP - 222S0.252.892.311.672.316.2914.530.25161/212.462.460.02.4638.97VP0.25201/232.890.250.253.390.03.3967.12Hdel 1 al 4 pisoP210112.462.460.02.46195.32VP0.13383/840.450.200.101.500.01.5031.92estP0.13383/840.200.200.101.000.01.0021.28estP0.13383/840.050.200.100.700.00.7014.90estEJE 3 8 /EJE I JPP - 192S0.2014.832.316.852.3142.9399.160.251541/212.462.460.02.46375.05VP2S6.330.202.312.920.25201/2314.830.200.2015.230.8016.03317.39Hdel 1 al 4 pisoP0.25201/236.530.200.206.930.06.93137.29HP410112.462.460.02.46390.65VP0.25303/840.450.150.101.400.01.4023.52estP0.25303/840.200.150.100.900.00.9015.12estP0.25303/840.050.150.100.600.00.6010.08estP0.13193/840.450.150.101.400.01.4014.90estP0.13193/840.200.150.100.900.00.909.58estP0.13193/840.050.150.100.600.00.606.38estEJE 3 /EJE I JPP - 202S0.253.142.311.812.316.7815.660.25181/212.462.460.02.4643.84VP0.25201/233.140.250.253.640.03.6472.07Hdel 2 sotano al 4 pisoP210112.462.460.02.46195.32VP0.25203/840.450.200.101.500.01.5016.80estP0.25203/840.200.200.101.000.01.0011.20estP0.25203/840.050.200.100.700.00.707.84estEJE 8 9 /EJE IPP - 142S4.080.202.311.882.319.6622.310.25261/212.462.460.02.4663.32VP2S0.250.552.310.320.25201/234.080.200.204.480.04.4888.70Hdel 1 al 4 pisoP210112.462.460.02.46195.32VP0.25103/840.450.150.101.400.01.407.84estP0.25103/840.200.150.100.900.00.905.04estP0.25103/840.050.150.100.600.00.603.36estP0.13193/840.700.200.102.000.02.0021.28estP0.13193/840.200.350.101.300.01.3013.83estP0.13193/840.050.200.100.700.00.707.45estEJE 8 9 /EJE I JPP - 152S4.080.202.311.882.3112.4628.780.25241/212.462.460.02.4658.45VP2S0.250.752.310.430.25201/234.080.200.204.480.04.4888.70Hdel 1 al 4 pisoP2S0.351.202.310.97310112.462.460.02.46292.99VP0.25103/840.900.200.102.400.02.4013.44estP0.25103/840.450.200.101.500.01.508.40estP0.25103/840.050.200.100.700.00.703.92estP0.25103/841.350.300.103.500.03.5019.60estP0.25103/840.750.300.102.300.02.3012.88estP0.25103/840.050.300.100.900.00.905.04estP0.25103/840.450.150.101.400.01.407.84estP0.25103/840.200.150.100.900.00.905.04estP0.25103/840.050.150.100.600.00.603.36estEJE 8 9 /EJE I JPP - 172S0.580.352.310.462.319.9422.960.25261/212.462.460.02.4663.32VP2S0.254.142.312.390.25201/234.040.250.254.540.04.5489.89HHasta 4to pisoP210112.462.460.02.46195.32VP0.13193/840.450.200.101.500.01.5015.96estP0.13193/840.250.200.101.100.01.1011.70estP0.13193/840.050.200.100.700.00.707.45estP0.13193/840.770.300.102.340.02.3424.90estP0.13193/840.400.300.101.600.01.6017.02estP0.13193/840.050.300.100.900.00.909.58estEJE 7 /EJE JPP - 162S0.332.310.772.312.555.89111112.462.460.02.46107.43VP0.10243/840.780.220.102.200.02.2029.5